Loading...
HomeMy WebLinkAboutManor Vail Unit 161NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOfff OF VAIL Y MECHANICAL PERMIT Permit #: M95 -0101 75 South Frontage Road Department of Community Development Vail, Colorado 81657 970 - 479 - 21381479 -2139 FAX 970 - 479 -2452 Job Address...: *************************** * *** * *** * * * * * * * * * * * * * * * * * * * * * ** 595 VAIL VALLEY DR Status...: ISSUED Location......: Plan Check --- > UNIT 161, MANOR VAIL Applied..: 06/27/1995 Parcel No.....: 28.00 Total Permit Fee--- - - - - -> 2101 - 081 -04 -002 Will Call ---- > Issued...: 06/29/1995 Project Number: BALANCE DUE ------------- > Expires..: 12/26/1995 APPLICANT ROD HALL COMPANY Phone: 3037773234 255 WYANDOT STREET, DENVER CO 80223 CONTRACTOR ROD HALL COMPANY Phone: 3037773234 255 WYANDOT STREET, DENVER CO 80223 OWNER NEFF ROBERT S 4466 BLAIRGOWRIE CIRCLE, KETTERING OH 45429 Description: FIREPLACE CONVERSION TO GAS Valuation: N, ro N 11 Fireplace Information: Restricted: N #Of Gas Appliances #!Of Gas Logs: 1 #tOf Wood /Pallet: **************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY *************************** * *** * *** * * * * * * * * * * * * * * * * * * * * * ** Mechanical --- > 20.00 Restuarant Plan Review - -> .00 Total Calculated Fees --- > 28.00 Plan Check --- > 5.00 DRS Fee------------ - - - - -> .00 Additional Fees --------- > .00 Investigation> .00 TOTAL FEES--------- - - - - -> 28.00 Total Permit Fee--- - - - - -> 28.00 Will Call ---- > 3.00 Payments ---------------- > 28.00 BALANCE DUE ------------- > .00 Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: 06/29/1995 LORELEI Action: APPR Item: 05400 PLANNING DEPARTMENT Dept: PLANNING Division: CONDITION OF APPROVAL DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2138 OR AT OUR OFFICE FROM 8:00 AM 5:00 PM SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER ♦ RECYCLEDPAPER TOWN OF VAIL, COLORADO Statemnt ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statemnt Number: REC -0041 Amount: 28.00 06/29/95 09:30 Payment Method: NA Notation: WAIVED FEES Init: LRD ---------------------------------------------------------------- Permit No: M95 -0101 Type: B -MECH MECHANICAL PERMIT Parcel No: 2101 - 081 -04 -002 Site Address: 595 VAIL VALLEY DR Location: UNIT 161, MANOR VAIL Total Fees: 28.00 This Payment 28.00 Total ALL Pmts: 28.00 Balance: .00 ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Account Code Description Amount * *WAIVED FEES ** ---------------------------------------------------------- WAIVED FEES 28.00 - - - - -- TOWN OF VAIL CONSTRUCTI�( PERMIT PARCEL #: PERMIT APPLI ATIO FORM DATE: r \. APPLICATION MUST BE FILLED OUT COMPLETELY Y NOT BE ACCEPTED * * * * * * * * * * * * * * * * * * * * * * * * * * ** PERMIT INFORMA * * * *t * *9 * * * * * * * * * ** [ ]- Building [ ]- Plumbing [ ]- Electrical [ echa .V ] -Other Job Name: '' .� �� � /[� Job Address: / Legal Descriptio : Lo lock__ _ Filing in g,. SUBDIVISION: Owners Name — • • Address. ph. Architect: General Description: Work Class: [ ] -New [ ]- Alteration Address: Ph. Number of Dwelling Units: Number of Accommodation Units: N mber and Type of Fireplaces: Gas Appliances Gas Logs Wood /Pellet ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** VALUATIONS ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BUILDING: $ ELECTRICAL:$ OTHER:$ PLUMBING: $ MECHANICAL: $ TOTAL: $ ,`7 * * * * * * * * * * * * * * * * * * * * * * * * * ** CONTRACTOR INFORMATION * * * * * * * * * * * * * * * * * * * * * * * * * ** Xeneral Contractor: Town of Vail Reg. NO. Address: Phone Number: Electrical Contractor: Town of Vail Reg. NO. Address: Phone Number: Plumbing Contractor: Town of Vail Reg. NO. Address: Phone Number: Mechanical Contractor: Town of Vail Reg. NO. Address: Phone Number: '7 �z * * * * * * * * * * * * * * * * * * * * * * * * ** FOR OFFICE USE * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BUILDING PERMIT FEE: BUILDING PLAN CHECK FEE: PLUMBING PERMIT FEE: PLUMBING PLAN CHECK FEE: MECHANICAL PERMIT FEE: MECHANICAL PLAN CHECK FEE: ELECTRICAL FEE: RECREATION FEE: OTHER TYPE OF FEE: CLEAN -UP DEPOSIT: DRB FEE: TOTAL PERMIT FEES: TYPE GROUP SQ.FT. VALUATION BUILDING: SIGNATURE: ZONING: SIGNATURE: Comments: CLEAN UP DEPOSIT REFUND TO: lows 75 south frontage road vail, colorado 81657 (303) 479 -2138 or 479 -2139 office of community development TO: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOWN OF VAIL FROM: TOWN OF VAIL PUBLIC WORKS /COMMUNITY DEVELOPMENT DATE: MARCH 16, 1988 SUBJECT: CONSTRUCTION PARKING & MATERIAL STORAGE In summary, Ordinance No. 6 states that it is unlawful for any person to litter, track or deposit any soil, rock, sand, debris or material, including trash dumpsters, portable toilets and workmen vehicles upon any street, sidewalk, alley or public place or any portion thereof. The right -of -way on all Town of Vail streets and roads is approximately 5 ft. off pavement. This ordinance will be strictly enforced by the Town of Vail Public Works Department. Persons found violating this ordinance will be given a 24 hour written notice to remove said material. In the event the person so notified does not comply with the notice within the 24 hour time specified, the Public Works Department will remove said material at the expense of person notified. The provisions of this ordinance shall not be applicable to construction, maintenance or repair projects of any street or alley or any utilities in the right -a -way. To review Ordinance No. 6 in full, please stop by the Town of Vail Building Department to obtain a copy. Thank you for your cooperation on this matter. Read and acknowledged by: e osition /Relationship to Project (i.e. contractor, owner) XUate lowo of uai 75 south frontage road vall, Colorado 81657 (303) 479 -2138 or 479 -2139 office of community developmeltt BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review may take as long as three weeks. All commercial (large or small) and all multi - family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take the three week period. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. X A greed to by. �Pro3ect Name L was XD Work Sheet turned into t e Community Development Department. MEMORANDUM TO: ALL CONTRACTORS FROM: TOWN OF VAIL PUBLIC WORKS DEPARTMENT DATE: MAY 9, 1994 RE: WHEN A "PUBLIC WAY PERMIT' IS REQUIRED Job Name: Date: Please answer the following questionnaire regarding the need for a "Public Way Permit ": YES NO 1) Is this a new residence? 2) Is demolition work being performed that requires the the �( use of right of way, easements or public property? 3) Is any utility work needed? 4) Is the driveway being repaved? 5) Is different access needed to site other than existing driveway? 6) Is any drainage work being done 1` affecting the right of way, easements, or public property? 7) Is a "Revocable Right Of Way Permit" \ / required? 7 � 8) A. Is t-�e right of way, easements or public property to be used for staging, parking or fencing? B. If no to 8A, is a parking, staging or fencing plan required by Community Development? If you answered yes to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development. If you have any questions please call Charlie Davis, the Town of Vail Construction Inspector, at 479 -2158. I have read and answered all the above questions. 6 /L 3 Ar Job Name Contractor's Signature Date PUBLIC WORKS PERMIT PROCESS How it relates to Building Permits: 1) Fill out our check list provided with a building permit application. If yes was answered to any of the above questions then a "Public Way" is required. You can pick up an application at either Community Development, located at 75 S. Frontage Road or Public Works, located at 1309 Vail Valley Drive. 2) Notice sign offs for utility companies. All utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to a 48 hour notice to schedule a locate. 3) A construction traffic control /staging plan must be prepared on a separate sheet of paper.An approved site plan may also be used. This plan will show locations of all traffic control devices(signs, cones, etc..) and the work zone, (area of Construction, Staging, etc..). This plan will expire on Oct. 15th. and will need to be resubmitted for approval through the winter. 4) Sketch of work being performed must be submitted indicating dimensions (length, width & depth of work). This may be drawn on the traffic control plan or a site plan for the job. 5) Submit completed application to the Public Works's office for review. If required, locates will be scheduled for the Town of Vail Electricians and Irrigation crew. The locates take place in the morning but, may require up to 48 hours to perform. 6) The Public Work's Construction Inspector will review the application and approve or disapprove the permit. You will be contacted as to the status and any that may needed. Most permits are released within 48 hours of being received, but please allow up to one week to process. 7) As soon as the permit is processed, a copy will be faxed to Community Development allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit" to do work on a project itself. NOTE: * The above process is for work in a public way only. * Public Way Permits are valid only until November 15th. * A new Public Way Permit is required each year if work is not complete. cd/pwey i1 TOWN OF VAIL 75 South Frontage Road Department of Community Development Vail, Colorado 81657 303-479-21381479-2139 FAX 303 - 479 -2452 INFORMATION NEEDED WHEN APPLYING FOR A MECHANICAL PERMIT 1. HEAT LOSS CALCULATIONS. 2. TO SCALE FLOOR PLAN OF MECHANICAL ROOM WITH EQUIPMENT DRAWN IN TO SCALE, WITH PHYSICAL DIMENSIONS AND BTU RATINGS OF ALL EQUIPMENT IN MECHANICAL ROOM. 3. SHOW SIZE AND LOCATION OF COMBUSTION AIR DUCTS, FLUES, VENT CONNECTORS AND GAS LINES. 4. NOTE WHETHER ELEVATOR EQUIPMENT WILL ALSO BE INSTALLED IN MECHANICAL ROOM. FAILURE TO PROVIDE THIS INFORMATION WILL DELAY YOUR PERMIT. lowl 75 south frontage road vall, Colorado 81657 (303) 479 -2138 (303) 479 -2139 office of community development NOTICE TO CONTRACTORS /OWNER BUILDERS Effective June 20, 1991, the Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail public Works Department will be required tc inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street on to the construction site. Such approval must be obtained prior to any request for inspection by the Town of Vail Building Department for footings or temporary electrical or any other inspection. Please call 479 -2160 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to Final Certificate of Occupancy issuance. `a:?LFS;t ?au. .:. ryty ;,,; ,'." 1, air .•vxP : �iG; -Tp'F''. _.. ro INSPECTION REQUEST TOWN OF VAIL PERMIT NUM ER OF PROJECT 479 - 2138 Va DATE -S JOB NAME ;� l CALLER f 3 READY FOR INSPECTION:/ t /MON 1 TUES WED THUR / FRI AM PM .. LOCATION: `z - Lam' V�4- BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑ FRAMING ❑ ROUGH / WATER ❑ ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ ❑ FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ '� 2C/ ❑ FINAL ❑ FINAL ❑ APPROVED ❑ DISAPPROVED ❑ REINSPECTION REQUIRED l- CORRECTIONS: nnTF 1 ^2 7 INSPECTOR ' , 4 'aM �Y • -° F.oT Psi�fT +v t 9T:.d.�. � "R ' " � .;. , � .rry" r : p €q iww'iT'8}'r 7` INSPECTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT AX IWX J� 479 -2138 DATE — rJ JOB NAME 114 14 CALLER READY FOR INSPECTIO ON TUES WED THUR FRI AM PM LOCATION: BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND • FOUNDATION / STEEL ❑ ROUGH / D.W.V. • FRAMING ❑ ROUGH / WATER ROOF & SHEER • PLYWOOD NAILING ❑ GAS PIPING • INSULATION ❑ POOL / H. TUB • SHEETROCK NAIL ❑ ❑ ❑ ❑ FINAL ❑ FINAL ELECTRICAL: MECHANICAL: • TEMP. POWER ❑ HEATING • ROUGH ❑ EXHAUST HOODS • CONDUIT ❑ SUPPLY AIR n n ❑ INAL yj it ROVED CORRECTIONS: ❑ DISAPPROVED b(FINAL ❑ REINSPECTION REQUIRED DATE _/ INSPECTOR