Loading...
HomeMy WebLinkAboutVAIL LIONSHEAD FILING 1 BLOCK 1 LOT 1 VANTAGE POINT BATHROOM REMODEL MULTIPLE UNITS LEGAL{/ TO\^AI OF VAIL DEPARTMENTOF COMMUNITY DEVELOPMENT 75 S.FI{ONTAGEROAD VAIL, CO 81657 970-479-2'1.38 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ADD/ALT MF BLIILD PERMIT Permit #: 802-0118 Job Address.: 508 E LIONSHEAD CR VAIL Status.....: ISSUED Location......: vantage point UNIT # 116 Applied...: 05/03/2002 Parcel No....: 210106311006 Issued ...: 05/07/2002 Project No...: Expires...: 71/03/2002 OWNER VANTAGE POTNT-VAII, INTERVAI., O5/O3/2O02 PhONC: ? AI,PENGI.,OW PROPERTY MGMT PO BOX 178 AVON CO 81_620 coNTRAeToR iI>F> Remodeling IJIJC 05/02/2002 Phonez 97O-547-L301 Po Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co 80424 License : 697 -B APPIJICANI iI>F> Remodeling L,LC 05/02/2OO2 Phone: 970-547-1307 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, co 80424 License:697-B Desciption: replacement of existing bathroom and counter tops Occupancy: R1 Multi-Family Type Construction: II FR Type II Fire Resistive TypeOccupancy: ?? Valuation: $3,343.89. Fireplace Information: Restricted: Y Add Sq Ft 0 # of Gas Appliances: 0 # of Gas [ogs: 0 # of Wood Pellee Building----> Plan Check--> Investigation-> Will Call--> S85 . oo Restuarant Plan Review--> $o . oo Total Calculated Fees-> Sl43 '25 Sss-2s DRB Fee------------> go.oo Additional Fees--------> $0-00 SO.OO Recreation Fee---> gO.0O Total Permit lee--> $143.25 $3 . oo Clear-up Deposit--> S0 - oO Payments----> Fl43 -25 TOTAL FEES-> S143 .25 BALANCE DUE-> $0 . 00 Approvals:I€e'm: 05L00 BUIIJDING DEPARTMENT o5/o7/2o02 JP'YI Action: AP Item: 05400 PLANNING DEPARTMENT Item: 05500 FIRE DEPARTMENT Ttem: 05500 PUBITIC WORKS Sbe pagib 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the inlormation and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towru zonin6 and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESIS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5 PM. Send Clean-up Deposit To: n/a CONTRACTORFOR HIMSELE OWNEI PAGE 2 Permit #: 802-0118 CONDITIONSOF APPROVAL as of 0'!07-2002 Status: ISSUED PermitType: ADD/ALTMFBUILDPERMIT Applied: os/03/2002 Applicant J>F>RemodelingllC Issued: 05/07/2002 970-547-7307 To Expire: 17/03/2N2 ]ob Address: 508 E LIONSHEAD CR VAIL l,ocation: vantage point UNIT # 116, Parcel No: 210106311006 Description: replacement of existing bathroom and counter tops Conditions: Cond:12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:14 (BLDG.): ALL PENETRATIONS IN WALTS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: L6 (BLDG.): SMOKE DETECTORS ARE REQTIIRED IN ALL BEDROOMSAND EVERY STORY AS PER SEC.310.6.1 OF T}IE 7997 UBC. Cond: L (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. t$tL/3,45 APPUCATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED TOWN OF VAIL BUILDING PERMIT APPLICATION Separate Permits are required for electrical, plumbing, mechanical, etc.! ll m/VNAFWN 75 S. Frontage Rd. Vail, Colorado 81657 J0)- ottCONTRACTOR INFORMATION General Contractor: dr 0ttvolEl/De LLc Town of Vail Reg. No.: 497-8 Contactand Phone #'s: CEtL A J Aflta FAlft 12,ttrbz / 7a-YK-figf ?i"'F*&-); COMPLETE VATUATIONS FOR BUILDING PERMIT (Labor & MAtEriAIs BUILDING: $ '.1347-,gq ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $rorAl: s 3.3 ^l ?, ( q For Parcel # Conta(t Assessorc Office at 970-328-864O or visit Parpel,# &tOt0O3//d0b ttwY ta (apdicition Wil[,not be'acbpted.without parc€l nrimtrdr) Job Name: ,lnilfne€ /Or,rlf JobAddress: ddg.E, Lbat(efll tEete vA/L, IA. Legal Description Loti Block:Filing:Subdivision: o*t",F,-[uJ]tY*{ifr7't?r'^;l*'^oEnaxq; Keff:A: rf'{,iff ' /v 64 r'Phone: l4g-149u Architect/Designer: p /4 Address:Phone: Ensineer: 11ft Address:Phone: Detaifed description of work: f"6:71iCe tc-,ttf Op €fijD,Oa 8flfrf Zadl/ ltAfl /7/L=, ltl/ofEft7d/o-f{/nfft F/tuc€7s, rtrfuri/lr /p&/cy<, T,cssrln aEtr Srau*4 762x Oh rt qe) WorkClass: New() Addition( ) Remodel(f) Repair( ) Demo( ) Other( ) Work Type: Interior f,f) Exterior ( ) Botr ( )Does an EHU exist at this location: Yes ( ) No ( ) Typeof Bldg.: Single-tumily( ) Two-family( ) MultFfamilV{.f,) Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: ;2{No. of Accommodation Units in this buildinS: 4)// No/Tvoe of Fireolaces Existinq: Gas Appliances (.f) Gas Loqs ( ) wood/Pellet ( ) wood Burulq ( No/TyoeofFireo|aces,,offiGasLoqs()Wood/Pe||et()WoodBurning(No.IJ|.LQWED) Fooes a rire Sprinkler system Exist: Yes (t ) No ( ) Other Fees: B Fees: 'uhlic Wav Permit Fee: F: /everyone/f orms/bld gperm **************************************FOR OFFICE USE ONLY***,t*********** Questions? Call the Building Team at 479-2325 I0tft\| Department of Commun ity Development Project Name: llfr Wn pr' /o i '- ProjectAddress: Kbf E,irc'-al t, '/, l,/Ait / This Checklist must be rcmoleted before a Buildina Permit apoh'cation is acepted. y' Rll pages of application is complete dA tr Has DRB approval obtained (if required) Provide a copy of approval form d Condominium Association letter of approval attached if project is a Multi-Family complex $+ o Complete site plan submitted tl| " Public Way Permit application included if applicable (refer to Public Works checklist) dk o Staging plan included (refer to Public Works checklist) No dumoster,parkino or material storaqe' allowed on roadwavs and shoulders without written aooroval tf, nt/4 ,O/A a Window and door schedule g Full structural plans, including desion criteria (ie.loads) o trl D Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(4 seG of plans for Multi-Family and Commercial) ,trh "p/* "P/*a 4uu Pln t Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Repoft must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans o/0 FtLi Types and quantity of fireplaces shown Op Frt / IAfnlicanfs Signature: Date of submittal: F:/everyoneforms/bldperm2 Received By: HOW DID WE RATE WITH YOU? Town of Vail Survey Community Develop ment Department Russell Forresl Director, (970)47e.2139 Check allthat applies. 1. Which Departnent(s) did you contacfl Building r,/ Environmental_ Housing_ AdminPlanning DRB PEC Was your initial contact with our staff immediatey' sbw no one available ? lf you were required to wail how long was it before you were helped? 4.Was your project reviewed on a timely basis? Yes / No lf no, why not? 0r 5. Was this yourfiBtlime to Bldg Permit / N/A fle a DRB app_ PEC app 7. Overalleffectiveness ofthe FrontService Counter. @ 4 g 2 1 8. What js the best time of day for you to use fie Front Service Counler? *frtt 9Att - 9. Any commenb you have which would allow us to beter serve you next time? Thank you for taking the time b complete this survey. We are commited b improving our service. BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Depaftment review or Health Department review, and a review by the Building Depaftment, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. f,Agreed to by:Jitlo ,5, Fntptdsttz. Project Name: YflDfA&t /otal *t ,Date: Sltloa Print name F:everyone/Forms/bldp€rm3 APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT PW*:TT-TITI Parcet#: I f I L--l 'INT-IN-ITT 1e- Brds. Permito,E n I,I I I I TOWNAFVAIL 1.Job Name Streel Address n n - - Tl (lf unknown callLJLJI I I | 429-2138 ext. o)2.Excavating Contractor Name Maillng Addr6ss TOv Contractor's License Number REOUIRED Phone #zipCity e 4. Slart Date Work is for (circle one) Other Comoletion Dat6 Water Sewer Gas Electric (Permit Expiration Dal6) Telephone CATV Landscaping Temp. Site Access Trench-width (min.4') Bond Amount $ 6. ALL MATERIAL. EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7. A Rubber out-riggers are required on Asohalt surfaces underneath the A signature below indicates a signalures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFOFE THE working on asphalt. al all times. utility locations and approvals. Once all utility company appllcation through the Public Works office to obtain the up to one week to process. Depth Total SF $ Total LF $ Permit Fee Total Permit Fee $ Public Service Company (1-800- Public Service Natural Gas Group (1-800-922-1987) U.S. West (1-800-922-1987) TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail lnigation (970-479-2158) Town ol Vail Public Works Construction Inspector (970-479-2198) 9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction traftic control plan must be approved by the Public Works Departmenl prior to issuance ol the permit. 10. All excavation must be done by hand within 18" of utilities - (Senate Bill 172), 11 . Permittee must iontact Publlc Works Department at 479-2198 24 hours prior to commencing of work. Failure to notity the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. 12. I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. Contractor's Signature of Agreement Prlnt namo clearly ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and localion of cuts. USE DASH LINES FOR CUT. Date ol Signature White - Public Works Yellow - Contractor t i!r{Y\J \ It\ \q :\\q D\a\e\it Jie3vaa' '.5 \ f, .s \J S\- T{ F =+g, \c € rr'h $qts !)vt +.-(Jt sA4 >Yce ot:\ N45tq\ t? .-l \iltY \s It- H.? j I a 1_--l ;lllt!ililio Iilttrlttrttt{-*-J (a r*-*--]t:tl!!tl i! t!t!tfItla Ilititi lilIIiIIttIt e {.... ,\t\\ Y- \vl -\ R JT \ ,\) N ) \ NrI t r.at rr) $\\$xl{tsuP) trrqx *n F)u \t) \\ oF<t,-'JJ Fo4t r'\- {^'* r-fi '-> rd "i Cd s" I J\r ."[ t t t.-. ; .u.t t7 reII6 Bfi-rl I * a Id*as tro Maka !.ife Easy.* 5906-s9 Clic* on image to retum 10 previous page STEFILING Plumbino Hom6 TN S n+LL S4rw fr {oo,Q o a/ T/4 htp:i/www.catalog.sterlingplumbing.corn/apps/big_imagejsphescom=e1sunflftimage... Llll2/2001 ,-[ r:i TOI^/N OF VAIL DEPARTMENT OF COMML]NITY DE\'ELOPMENT 75 S. FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ADD/ALT MF BLJILD PERMIT Permit #:802-0117 |ob Address.: 508 S FRONTAGE RD WEST VAIL Status.....: ISSLIED Location......: vantage point 508 E LIONSHEAD UNTT #211 Applied...: 05/03/2002 Parcel No....: 270106311007 Issued ...: 05/07/2002 Project No...: Expires...: 11,/03/2002 CoIflIRACTOR J>F> Remodeling LrLC O5/O2/2OO2 Phonet 970-547-L307 PO Box 888 Breckenridge, eo 82 Brook St. Breckenridge, Co AO424 License z 597 -B APPLTCATflT J>F> Remodeling LLC 05/02/2002 Phone. 97o-547-a3o7 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co 80424 License z 697 -B OhINER VAIflIAGE POI}CI-VATL INTERVAIJ O5/O3/2OO2 PhONE: * AIPENGLOW PROPERTY MGMT PO BOX 178 AVON CO 81620 Desciption: replacement of existing bathroom and counter tops Occupancy: R1 Multi-Family Type Construction: II FR Type II Fire Resistive Type Occupancy: ?? Valuation: $3,344.80 Fireplace Information: Restricted: Y AddSqFr 0 # of Gas Appliances: 0 # oI Gas logs: 0 # of 90.00 Total Calculated Fees-> $143.25 S0. OO Additional Fees-->$0.00 50.00 Total Permit Fee----..-> $143.25 SO.0O pavments----____> 914-}.25 TOTAL FEEg-------> $r.43 .25 BALANCE DUE-----> Wood Pelleb **** FEE SUMMARY Building--> Plan Check--> Investigation-> Will Cali---> S85. oo Restuarant Plan Review-> $ss . 2s DRB Fee-------> S0. OO Re€reation Fee-----> $3 - 00 Clean-up Deposit-> $0.00 Approvals:I€dm: 05100 BUILDING DEPARTMENI o5/o7/2oo2 JRII Action: AP Item: 05400 PLANNING DEPARTMEIflT Item: 05500 FIRE DEPARTMENT Item: 05500 PTBLIC WORKS PAGE2 **dr*****:tffitt+l**|t"****'H*1*:h*#ditiht****tir************tnt************1tS************lnt*r******* CONDITIONSOF APPROVAL Permit #: 802-0777 as of 0*07-2002 Status: ISSUED PermitType: ADD/ALTMFBUILDPERMIT Applied: 05/03/2002 Applicant ]>F>RemodelingllC Issued: 05/07/2002 970-il7-1.307 To Expire: 11,/03/2002 Job Address: 508 S FRONTAGE RD WEST VAIL Location: vantage point 508 E LIONSHEAD UNIT #211 ParcelNo: 210106311007 Description: replacement of existing bathroom and counter tops Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:14 (BLDG.): ALL PENETRATIONS IN WALTS,CEILING'AND FLOORSTO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond:16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMSAND EVERY STORY AS PERSEC.31O.6.1 OF THE 1997 UBC. Cond:1 (FIRE): FIRE DEPARTMENI APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this applicatiory filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the inJormation and plot plan, to comply with all Town ordinances and state laws, and to build this sbucture according to the towns zonin6 and subdivision codes, design review approved, Uni.form Building Code and other ordinances of the Town applicable thereto. REQUESIS FOR INSPECT1ON SHALL BE MADE TWENTY-FOI]R PM. Send Clean-up Deposit To: n,/a IN ADVANCE TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AlvI 5 OWNER OR CONTRACTOR FOR ANDOWNEF +t4b.e5 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Project #: Building Permit #: 97O..479"2149 tl NVT|OPYAIL 75 S. Frontage Rd. Separate Permits are required for electrical, plumbing, mechanical, etc.! Vail, Golorado 81657 ICONTRACTOR INFORMATION @neral @ntractor:{r Etuolgt/Ae L/.c Town of Vail Reg. No.: 69v-l Contactand Phone #'s:. CAI& * :fnntt Flt xtp ttt I: z ? lo -'/'iJ-'/J' !{*"ryff*! 6//4n^^-L,, COMPLETE VATUATIONS FOR BUILDING PERMIT (Labor & Materials BUILDING: $ 3,344,80 ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $roTAL:$ 3,344,yc1 ForParrel # Contact Assessors Office at 97O-328-8640 or visit *********tr****tr***********************FOR OFFICE USE ONLY*********** of Construction: &/ 0t 063 // 007 lob Address: 5o8.8, p aaldl/844 (i{ct{Job Name: Vnilfneg /O*uf Phone:g4q-76 iay Detailed description ol 9)utct, FAocErg uork:/gfu44EhE(Ltf HEArCtue: (Ar9;oet '/l,ead4 il4a t r,Z-t, 4 I i, a, 72/ 7' d/J, WorkClass: New( ) Addition( ) Remodel(,f) Repair( ) Demo( ) Other( ) Does an EHU exist at this location: Yes ( ) No ( )Work Type: Interior (X ) Elterior ( ) Both ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family (f,) Commercial ( ) Restaurant ( ) Other ( ) No. of Accommodation Units in this building:. ,0r1flNo. of Existing Dwelling Units in this building:f4. Does a Fire Alarm Exist: Yes (,f ) F:/everyone/formYHdgperm I0nnl Project Name: U A,0/A&-F 20, t/ Department of Community Development Questions? Call the Building Team at 479-2325 Project Address: d Plnav / This Checklist must be ompleted before a Building Permit anplication is accepted, All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a Multi-Family complex DJn o Complete site plan submitted lk , Public Way Permit application included if applicable (refer to Public Works checklist) /)t" Staging plan included (refer to Public Works checklist) No dumoster,oarkinq or material storaqe allowed on roadwavs and shoulders without written aooroval llfr. o Asbestos test and results submitted if demolition is occurring dlA a Architect stamp and signature (All Commercial and Multi fa;i[) D)4 " Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) ,fl4 o Window and door schedule tNa tb" f)na ^,|ft" d Full structural plans, including:l:gign criteria (ie.loads) Ptto Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown Y Aoolicant's Siqnature:/\ Date of submittal: F :/even/one/forms/bldperm2 Received By: HOW DIDWE RATE WIrH YOU? Town of Vail Survey Community Development Department Russell Fonest, Director, (970) 479-2139 Check allthat applies. 1. Which Deparfnent(s) did you contact? Building / Environmental_ Housing_ AdminPlanning DRB _ PEC _ 2. Wasyourinitialcontactwihoursbffimmediate i/ siow no one available ? 3. lf you were required to wait how long was it before you were helped? it /A 4. Was your project reviared on atimely basis? yes / No lf no, why not? 5. Was this your fir;t time to fle a DRB app_ PEC app Bldg Permit u/ ltUA 6. Pfease rate the performance of fie stafiperson who assisbd you:(9l321Name: i/AL (knowledge; responsivenes.s, availability) 7. Overallefiectivenessofthe FrontServiceCounter. @ 4 3 2 8. What is the best time of day for you to use fte Front Service Counter2 AfrUrZ ?*it 9. Any commenls you have which would allow us to beter serve you nexttime? Thank you for iaking the time to complete this survey, We are commited b improving our service. 0r TUMYOF BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect tuture permits that I apply for. $ Rgreed to by:JoAD 3, FAtrtp.dtcz, -I IDate: slt/oJ Print name F : everyone/forms/bldperm3 APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 - PW*:I['TTTT Parcer#:I r I n - I I n - n I - I I I Brds. Perm*o'E f I' I I I I 1.Job Name Sa€ot Address nnn-n (tfunknowncallI ll ll | | | 429-2108 ext.0)2.Excavating Contraclor Name Maillng Address TOV Contraotor's License Number REOUIRED () Phone #zipCity Start Date Work is for lcircte onel Completion Date Waler Sewer Gas Electric (Permit Expiralion Date) Telephone CATV Landscaping Temp. Site Access Other Trench-width (min.4') Bond Amount $ ALL MATERIAL, EQUIPMENT. AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asphalt surfaces underneath the A signature below indicates a signatures are obtained, permittee necessary Town ol Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utilily locations and approvals. Once all utility company application through the Public Works ofiice to obtain the up to one week to process. Depth Total SF $ Total LF $ Permit Fee Total Perrnit Fee $ Public Service Company (1-800- Public Service Natural Gas Group (1-800-922-19871 U.S. West (1 -800-922-1 987) TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Waler & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail lrrigation (970-479-2158) Town of Vail Public Works Construction lnspector (970-479-2198) 9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the Public Works Department prior to issuance of the permit. 1 0. All excavation must be done by hand within 18" of utilities - (Senate Bill 172). 1 1 . Permittee must conlact Public Works Deoartment at 479.2198 24 hours prior to commencing of work. Failure to notify lhe Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town chargirig the contractor a reinspection fee. 12. I certify that I have read all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as requirod. Contractor's Signature ol Agreement Pdnt name clearly ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASFI LINES FOR CUT. Date of Signature White - Public Works Y€llow - Contractor STATEMENT OF WORK FOR BATH REMODEL Time is of the Essence. Premises are deeded time share rurits. Maintenance period specified inthe covenants carurotbe extended. Therefore, contractor must allowtime for contingencies normally encountered in their nade. Cost to the Association, due to time over-runs will be charged to the contractor out of the final payment, up to and including the rental of comparable rmits if necessary. Scope. There will be 20 bathrooms upgraded. This will include the installation of new cabinets, cabinet hardware, counter tops, sinks and hardware, and shower doors. This will also include the proper removal of all old materials from the premises. Coordination. Contactor will coordinate with the Association Manager, Gary A, Lebo, Alpenglow Property Management, phone 970-949-1 630' Statement of Workwill become part of the contractor's proposal. Vantage PointVail Interval Owner's Association, Inc. vatr-L .--\./ | \ F)l- Do\' \.-,TNRibVA:"R ) (J F1,.. r\ t,,is\:f\1 rtii\'\lr \t { ',,tv\ J,!J g Y{\ r.\r -$ t\R.\ s/4i *q 'JS\ la) edtr?'U tSq\ D'o ,.rj ,\ \-l tx-- iq_tr"* I .+* \$ ,t It.* ; !rut7* Jlt 4 r-+-r-t{ } i,\t Reuave fdAU ce 7 y !d,;: h4 [> legtoLtCe B+fll V^-,/ ,7/, Cov 'u7L-R tnl '.'tr atl L nt eNt ct N € ((-At '/E 7-, UN{r ?tr bn-ra L r J tXP'rt*'***"*--" - - -..5 T E R L I N G.T+ .c SaL&{]:ft'ti&v/-,r' *$-.-*-**,;;;:;;*x*"" .ldeas To fr|alre Life EasY"* 5906-59 Click on irnage to relum to Fevious page $IfALllLC-EIcrnblllllelr€ J-N S -7'7Lc -S 4c,,t u4 '*A oo {c /v Tag http://www.catalog.sterlingplumbing.com'/apps/big-imagejsp?rescom=onsurner&image=... Illl2/2001 (,/[ Q' i TOWN OF VAIL DEPARTIv{ENT OF COMMUMTY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970479-2138 NOTE: THIS PERMT MUST BE POSTED ON ]OBSITE AT ALL TIMES ADD/ALTMFBLIiLDPERMIT Permit #:802-011.6 job Address.: 508 S FRONTAGE RD WEST VAIL Status.....: ISSUED Location......: vantage point UNIT # 215 Applied...: 05/03/2002 Parcel No....: 210106311011 Issued ...: 05/07 /2002 Project No...: Expires...: 11,/03/2002 COMrRACTOR J>F> Remodeling LI-,C o5/O2/2O02 Phone: 97o-547-L3O7 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co 80424 I-.,icense z 697 -B APPT-,ICAlflf .T>F> Rernodeling LrLrC O5/O2/2O02 Phone: 970-547-:-307 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co AO424 I-,icense: 597-B o?ilNER vATflIAGE POINr-VAIIJ I}ITERVAL'' 05/03/2002 phone: B AIJPENGIJOW PROPERTY MGMT PO BOX 178 AVON CO 81620 Desciption: replacement of existing bathroom and counter tops Occupancy: R1 Multi-Family Type Construction: II FR Type II Fire Resistive TypeOccupancy: ?? Valuation: $3,341.86 Fireplace Information: Restricted; Y AddSqFt 0 # of Gas Appliances: 0 # of Cas [ogs: 0 # of 90.00 Total Calculated Fees-> $143.25 g0 . 00 Additional Fees-------> S0 . 00 S0.00 Total Permit Fee------> $143.25 50.00 Payments----------t $143.25 TOTAL FEE9----------> S143,2s BALANCE DUE------> Wood Pellel Building---> Plan Check-> Investigation-> Will Call--> $85.00 Restuarant Plan Review-> ssc 2q DRB Fnn------------------> $0.00 ftscreati(nFee------> $3 . 00 clean-uP Deposit------> $0.00 Approvals:Iddm: 0sL00 BUILD]NG DEPARTMEMT o5/o7/2oo2 JRt( Action: AP Item: 05400 PLANNING DEPARTMENT Item: 05600 FIRE DEPARTMEI{:r ftem! 05500 PUBITIC WORKS il PAGE 2 ****ffi********************************************************************ri*************rr****** CONDITIONSOF APPROVAL Permit #:8102-0716 asof 05-07-2002 Status: ISSLIED PemitType: ADD/ALTMF BUILD PERMIT Applied: 05/03/2002 Applicanl ]>F> Remodeling LLC Issued: 05/07 /2002970-547-1307 To Expire: 1,1/03/2002 Job Address: 508 S FRONTAGE RD WEST VAIL Location: vantage point UNIT # 215 Parcel No: 210106311011 Description: replacement of existing bathroom and counter tops Conditions: Cond:12 (BLDG.): FIELD INSPECTIONS ARE REQTIIRED TO CHECK FOR CODE COMPLIANCE. Cond:14 (BLDG.): ALL PENETRATIONS IN WALI.S,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond:16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.310.6.1 OF THE 1997 UBC. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. ***rt***;i****{**********,r**rr**********.{* See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this applicatiorl filled out in full the information required, completed an accurate plot plan" and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this strucfure according to the towns zoninE and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. P.EQUEST S FOR INSPECTION SHALL BE MADE TWENfi-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5 PM. Serd Clean-up Deposit To: n/a F OWNER OR CONTRACTOR FOR ,n l/-l 7,a5 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Project #: Building Permit #: 97 O- 47 I -2149 (Inspecdons) tl mvnOPutn 75 S. Frontage Rd. Separate Permits are required for electrical, plumbing, mechanical, etc.! Vail, Colorado 81657 CONTRACTOR INFORMATION General Contractor: dF taftolr*,,rto /.L( Town of Vail Reg, No.:4{/4 Contact and Phone #'s: (aap 4 (Anp,ryltru*ui t t %e -Yf{' td 9{ con?f:''igny':' -- 4L -.. COMPTETE VATUA FOR BUILD PERMITING bor & Materials BUILDING: $ 3, J41,!L ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $rorAl: s 3,3til,(t For Parel # Contact Assessorc Office at 97O-328-864O or visit www. P.aiF€l.lf Jl0t 0t; 3 /l 0 /l ///n* J4 (aijilUffoiii:iiiill irot' be aCceptg without parcel number) rob Name: yA tlTn&g /Oloy Job Address: S 0 g - E, /"/ DD4' ttia4l d /'tcLEIn./A, ta.. Legal Description ll Lot:Block:Filingl Subdivision: o* jffr}flvfr {ti,","frf it{;y"'llAddnsA4/;1ff:t'";;'t?:*1/r'::''Phonet Q{f-iAJ e ArchitecflDesigner /0/ /q Address:Phone: Engine€n il/A Address:Phone: Detaifed description of work: tCfunCeUealf St,sxt, Fn tct f , fi i/)et,or flgrn e z- c 0F f 0.fhiG dArt/t'aar! trtfla-tt/tt'J1 Aua-fr:a4td' , '/nt|i41.1 ilEd S'zbutD( /n,e-f /t-rzzt*i) WorkClass: New( ) Addition( ) Remodel (f) Repair( ) Demo( ) Other( ) Work Type: Interior ({ ) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family ( ) MultFfamily (/) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: fl;No. of Accommodation Units in this buildins: 4)/V No/Tyoe of Fireplaces Existinq: Gas ADpliances (y ) Gas Loos ( ) Wood/Pellet ( ) Wood Burninq ( No/Type of Fireplaces fuooK# CasAppliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED) Does a Fire Alarm Exist: Yes (a ) No ( )Doe$ 4figipliftk4r System Exist: Yes k ) No ( ) **************************************FOR ItEVgrv r-- FFICE USE ONLY** unv {l ?. ?002 'l rkrt * * ** *** rtri rt *1t lt* * *t< 2t * tt:k I I Type of Cdnstrdctionr occupanqlGiouo:- ^^.. ^crrDate Recelveil tJv+rrer-'- I Fees: e w r Permit Fee: F:/evenroneformvbldgpefm Questions? Call the Building Team at 479-2325 Department of Community Development - Project Name: Project Address: / This Cheklist must be ompleted befote a Building Pemlit apolication is aceoM. C/ All pages of application is complete fins Has DRB approval obtained (if required) Provide a copy of approval form d Condominium Association letter of approval attached if project is a Multi-Family complex Aln" Complete site plan submitted tlt+a Public Way Permit application included if applicable (refer to Public Works checklist) l[po Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaoe- allowed on roadwavs and shoulders without written aporoval th" Asbestos test and results submitted if demolition is occurringDfro Architect stamp and signature (All Commercial and Multi family) nh" Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and' Commercial) {n" window and door schedule d Full structural plans, including design criteria (ie.loads) ph" Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) 44" Soils Report must be submitted prior to footing inspection PX" Fire resistive assemblies specified and penetrations indicated ,4A" Smoke detectors shown on plans f F" Types and quantity of fireplaces shown \Andicantt Signaturer Date of submittal: I0l,t/fr|ffi F :/everyone/forms/bldperm2 Received By: HOW DID WE RATE WITH YOU? Town of Vail Survey Gommunity Development Dqarfinent Russell Fonest Director, (970)47e.213e Check dlthat appli€s. 1. Which Departnen(s) did you contact? Building y' EnvironmenEl Housing_ AdminPlanning DRB PEC _ 2. Was your initial conbct with our stafi immediate/_ sbw _ no one available ? 3. lf you were required b wait, how long was it before you were helped? J 14 4. Was your project reviewed on a timely basis? Yes / No lf no, why not? 5, Was this your fipt lime to fle a DRB app_ PEC app BldgPermit t/ N/A il 6. Please rate the performance.of tre staf person who assisted you: @ t 3 2 | Nann: t/pt- (knowledge; responsiveness, availability) 7. Overall effectiveness of ilre Front Seruice Counter. @ + 3 z 8. What is the best time of day for you to use fre Front Service Courier? ftrrtt- ? *+t - 9. Any comments you have which would allow us to beter serve you nexttine? Thank you br taking tlre lime b complete this surt/ey. We are committed b improving our service. BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned depaftments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this depaftment to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. \Agreed to by:JOTO .J FATLEUITZ Project Name: rl t.Date: $/r/Dd F:everyone/forms/bldperm3 APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 pw*:fl I-n tr il n Parcer#:[ [ n I - I I I - n I - X I I Brds. Permit#'E f n' I I I I Job Nam6 Stregl Addr€ss n n n-[l (lrunknowncall Ll LJ Li | 479-2138 €xt,o) Excavating Contraclor Name Mailing Addr€ss TOV Coniractor's Lbense Number REOUIRED () 1. 2. o. zipClty Phone # Start DelB Work is for (circte one) Water Completion Dale Sewer Gas Electric Telephone CATV (Permil Expkation Dat6) Landscaping Temp. Site Access Other Trench-width (min.4') Bond Amount $ 6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asphalt surfaces underneath the A signature below indicates a signatures are obtrained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals, Once all utility company application through the Public Works office to obtain the up to one week to process. Depth Total SF $ Total LF $ Permit Fee Total Pennit Fee $ 8. Public Service Company (1 U.S. West (1-800-922-1987) Public Service Natural Gas Group (1-800-922-19871 TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ex| 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail lrrigation (970-479-2158) Town of Vail Public Works Construction lnspector (970-479-2198) 9. THERE WILL BE NO TOTAL STREET CLOSURES! A construclion traffic control plan must be approved by th€ Public Works Department prior to issuance of the permil. All excavation must be done by hand within 18" of utilities - (Senate Bill 172), Permittee must contac,l Public Works Deoartmenl at 479-2198 24 hours prio.r io commencino of work. Failure to notify the Town will result in forfaiture of bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. 12. I certity that I have read all chapters of Title 8 - Public Ways and Property, ol the Vail Municipal Code and all utility company agreements, signed by me, and will abide by lhe same, and that all utilities have been notified as r€quir€d. 10. 11. Contractor's Si gnature of Agreement Print name clearly ATTACH PLAN OF WOHK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Date of Signalure White - Public Works Yellow - Contractor STATEMENT OF WORK FOR BATH REMODEL Time is of the Essence. Premises are deeded time share units. Maintenance period specified in the covenants carunot be extended. Therefore. contractor must allow time for contingencies normally encountered in their trade. Cost to the Association, due to time over-runs will be charged to the contractor out of the final payment, up to and including the rental of comparable rmits if necessary. Scope. There will be 20 bathrooms upgraded. This will include the instailation of new cabinets, cabinet hardware, counter tops, sinks and hardware, and shower doors. This will also include the proper removal of all oid materials from the premises. Coordination. Contactor will coordinate with the Association Manager, Gary A, Lebo, Alpenglow Property Management, phone 97 0-949-1630. Statement of Work will become part of the contractor's proposal. Vantage Point-Vail Interval Owner's Association, Inc. ;.:i. i":l' ':-F{ L o 3 vsd 3 c Av-rrto u ,= $ /Le FLrt-ce B+rzl A'nI-E lYl Efu c t il € cA6 r N {7, V &L lg ri{ Co,: a.ry--uR Hf, srill<, F/*ucc'T vtf>b lg vn-*, /, /_tJ^y1 />rtS ,doJ CLaJ-.n/ noJ 2" & tV A) tf\ I )) qatd/ \i-pl 'r\t,* I WV a;+1d aT + an ouaad I i: ilr\ / r:qJ jr1i J,tryn 'unJ (T f,15-d+ru J/a '{|;ri$""**-"*'"-"" -" " -'STERLINC.-?+ ,r 9161r:r,.*^ r,;..1f.'. ".is*** ^-**,r**.r*o*t"* ldeas To ll4ake Life Easy.'" 5906-s9 Clid( on image io retum to pEvious page STERLING Plumbinq Holq n ETn LL S Ho,/ a4 [ooQ on/ 7JB hfip://www.catalog.sterlingplumbing.com/apps/big_imagejsp?rescorn-consruner&image=... ll/12/2001 d ,/, TO\^/NOF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ADD/ALTMFBUILDPERMIT Permit #: 802-0115 Job Address.: 508 S FRONTAGE RD WGST VAIL Status.....: ISSUED Location......: vantage point, #305 Applied...: 05/02/2002 Parcel No....: 210106310025 Issued ...: 05/07/2002 Project No...: Expires...: 11/03/2002 COMTRACTOR iI>F> Remodeling LLC 05/02/2002 phone: 91O-547-L3O1 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co 80424 IJicense : 69'7 -B APPIJICANr if>F> Remodeling I-,LC O5/O2/2O02 phone z 97O-547-L3O7 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co 80424 I-,icense z 697 -B owNER VAI\rrAGE pOIMr-VArIr rrurERVArJ o5/o2/2OO2 phone: T AIJPENGIJOW PROPERTY MGMT PO BOX 178 AVON CO 8L62A Desciption: replacement of existing bathroom and counter tops Occupancy: R1 Multi-Family Type Construction: II FR Type II Fire Resistive TypeOccupancy: ?? Valuation: $3,'1.48.74 Fireplace Information: Reskicted: y Add Sq Ft 0 # of Cas Applianccs: 0 # of Gas Logs: 0 # of g0 . 00 Total Calculated Fees--> $143 . 25 Wood Pelleh Building--> PIan Check-> lnvestigation-> Will Call--> $85.00 Restuarant PLan RevielrL-> $5s-25 DRBFee---------> S0 - 00 Recreation Fee----------> 93.00 Clean-up Deposit---------> S0. 00 Additional Fees------>$0.00 $0 - 00 Total Permit Fee------> $143 . 25 $0 - 00 l,ayments-------->' $143 . 25 TOTAL FEEg-_-_--> 5143 .25 BALANCE DUE-----_>$0.00 Approvals:f€elm: 05100 BUIITDING DEPARTMENT o5/o7/2oo2 JF-yr Action: Ap Item: 05400 PI-,ANNING DEPARTMEMT Item: 05600 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS - ;.,-;:**..-*.*.* .-tr*.#* See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this applicatiory filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the inJormation and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninp and subdivision codes, design review approved, Unilorm Building Code and other ordinances of the Town applicable thereto. REQIIESXS FOR INSPECflON SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TEIEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 ArV - 5 PM. Send Clean-up Deposit To: n/a OWNEROR CTORFOR ANDOI^TNEF ****************,t*rh|******************-**********rr*rr4**********O***".t*3-...******!r******f,*****rr*#**** CONDITIONS OF APPROVAL Permit #: 802{115 as of 05-07-2002 Status: ISSUED **"****{;*rt**ffi**gr******rhti***n*f*********tt!t*:t*rtriririii****rt**{*#**************************** PermitType: ADD/ALTMFBLIILDPERMT Applied: 05/02/2002 Applicant |>F> Remodeling LLC Issued: 05/07 /2002970-547-1307 To Expire: 17/03/2002 job Address: 508 S FRONTAGE RD WEST VAIL Location: vantage point, #305 Parcel No: 210106370025 Descripfion: replacement of existing batfuoom and counter tops Conditions: Cond: L2 @LDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: L4 (BLDG.): ALL PENETRATIONS IN WALIS,CEILINGS,AND FLOORS TO BE SEALED WTIH AN APPROVED FIRE MATERIAL. Cond:15 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.310.6.1 OF THE 1997 IuB;C. Cond:1 (FIRE): FIRE DEPARTMENT APPROVAL ISREQTIIRED BEFORE ANY WORK CAN BE STARTED. pq7 NVNWVtn 75 S. Frontage Rd. Vail, Colorado 81657 tl ;'"7 OR UNSIGNED Project #: Building Permit #: 97O-479-2t49{ri: IN Separate Permits are required for electrical, plumbing, mechanical, etc.! 4|5 CONTRACTOR INFORMATION Town of Vail Reg. No.:Contact and Phone #'s: C i,Y,/ pt :.e,,,,).' ?ra -ft-94 I I BUILDTNG: $ 3,1+8,74 rorAl: $ 3, / 4[, /4 COMPLETE VALUATIONS FOR ING PERMIT Other Fees: DRB Fees: Public Wav Permit Fee: F :/everyondformtbldgperm labor & Materials For Parcel # Contact Assessorc Office at 970-328-8640 or visit P"are$|.'# d/o/ 063 / tD 1{ fuLLd Jo.i {a#-lif#oiirUiitt.nOt'.be b'i*pted without parcel number) Job Name: Vh'tYffrfe POintf Job Address: J08 E, Llt)N /re41 C.itct E VAfu,tt, Legal Description ll Lot: ll Block: ll rlting:Subdivision: o*ETElpflt"!Jff""(o'f{ig'11od%?,n.?,offf9ffrB,Ktrf/r{* r' ll Phone: 94? -/6to ArchitecvDesig ner : /)/4 Address:Phone: Engineer: D/4 Address:Phone: Detaifeddescription of wotkt/!AfuAl4/tc-,0/ nF et/Jf//t& B,*f,fnnolt fl2/u/'r/?tAtuzt(4-//a/{ Stbzt, f&.tce-Ts,ltc-A)u-*,e oa&ier-r, {ptr,4rz ilcD ,ohtJEt AnrL f.ir ziu ) WorkClass: New() Addition( ) Remodel(X) Repair( ) Demo( ) other( ) Work Type: Interior (,t ) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family (f,) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building; /l No. of Accommodation Units in this building: /{J//f No/TvDe of Fireplaces Existinq: Gas Apoliances (,( ) Gas Loos ( ) Wood/Pellet ( ) Wood Burninq ( No/TyDe of FireDlaces prooo#lfturAoDliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED) Does a Fire Alarm Exist: Yes (f ) No ( )Does a Fire Sprinkler System Exist: Yeslf ) No ( ) **************************************FOR OFFICE USE ONLY*************** i .r'il : '. '' "t '" t"\,rf ,\ \-+'a r. Questions? Call the Building Team at 479-2325 ruh,]Vffi Department of Com munity Development flfln Window and door schedule y' futt structural plans, including design criteria (ie.loads) 4h" Structural Engineer stamp and signature on structural tl+o Soils Report must be submitted prior to footing inspec {t" Fire resistive assemblies specified and penetrations ind I W Smoke detectors shown on plans pW" Types and quantity of fireplaces shown ProjectName: t)fr'Ofn&E ft .t- .- ProiectAddress: .t'{, E, ,l'' ,l 't Crt?at, I r' This Chuklirt must be omoleted before a Buildinq Permit aoplication isacepH. d ett pages of application is complete t/4 " Has DRB approval obtained (if required) Provide a copy of approval form d Condominium Association letter of approval attached if project is a Multi-Family complex nfn o Complete site plan submitted Plt " Public Way Permit application included if applicable (refer to Public Works checklist) 4,q " Staging plan included (refer to Public Works checklist) No dumoster,oarkinq or material storaoe- allowed on roadways and shoulders without written aooroval N/A o Asbestos test and results submitted if demolition is occurring 4,q a Architect stamp and signature (All Commercial and Multi family) t/t"Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated f, Applicant's Signaturer Date of submittal: F :/everyondforms/bldp€rm2 Received By: HOW DIDWE RATE WITH YOU? Town of VailSurvey Gommunity Dwelopment Departnent Russell Forresl Dir€clor, (970)179-213s Check allthat applies. 1. Which Deparfnent(s)did you contacfl Building / Environmenhl Housing_ AdminPlanning DRB PEC Was your initial contact with our shff immediaie / dow no one available____ _? 0r lf you werelequired b wail how long was it before you were hetped? t/A Was your project reviewed on a timely basis? yes / No lf no, why nof Was this your figst time to Bldg Permit / N/A file a DRB app_ PEC app -7t. 8. Overall effectiveness of the Front Service Counter. @ * 3 Z 1 What is the best lime of day for you to use fte Front Service Counter? fifre,e 944 9. Any comments you have which would allow us to beter serve you nexttime? Thank you for taking the lime to complete this survey, We are committed h improving our seMce. BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Depaftment review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projec6 may also take three (3) weeks to review and approve. Every attempt will be made by this depaftment to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. (ngreed to by:Xt,tltt S trAtxttr)r/t- Project Name: Aftl)fAeE /otpr ;l IDate: Jll/04 F: everyone/forms/bldperm3 pw*:I ['! I f I APPLICATIoN parcer#:II[['IIn II'III FOR TOWN OF VAIL PuBLICWAYPERMIT ls- Bldg.Permitu,E I tr,I n I I - - - -T0t4\Iffit 't. Job Name Streel Address n n n-Tl (ltunknowncallI rl rl I I | 479-2138 ext.0) Excavating Conlraclor Name Maillng Adclress TOV Contractor's Licen6e Number BEOUIRED (t Phone #zipCity CATV Start Dale Work is for lcircte one) Other Complotion Date Water Sewer Gas Electric Telephone (Psrmil Expiration Date) Landscaping T€mp. Site Access Trench-width (min.4') Bond Amount $ 6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7. 8. Rubber out-riggers are required on Asohalt surlaces undemeath the A sionature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works office to obtain the up to one week to process. Depth TotalSF $ Toral LF $ Permit Fee Total Permit Fee $ Public Service Company (1 U.S. West (1 -800-922-1 987) Public Service Natural Gas Group (1-800-922-1 987) TCI Cablevision of the Flockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. '114) Holy Cross Electric Company (1-800-922-1987) Town of Vail ElEctricians (970-479-2158) Town of Vail lrrigation (970-479-2158) Town of Vail Public Works Gonstruction Inspector (970-479-2198) g. THERE WILL BE NO TOTAL STREET CLOSURESI A construction tratfic control plan must be approved by the Public Works Department prior to issuance of the permit. 'i 10, All excavation must be done by hand within 18" of utilities - (Senate Bill 172), 11 . Permitlee must contact Public Works Department at 479-21 98 24 hours orior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. Schedulod inspections which are not ready may resuh in the Town chargirig the contractor a reinspection fee. 12. I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility cornpany agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. ATTACH PLAN OF WORK, TNCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Whit€ - Public Works Yellow - Contractor STATEMENT OF WORK FOR BATII REMODEL Time is of the Essence. Premises are deeded time share units. Maintenance period specified in the covenants cannot be extended. Therefore, contractor must allow time for contingencies normally encountered in their trade. Cost to the Association, due to time' over-runs will be charged to the contractor out of the final paymenl up to and including the rental of comparable rmits if necessary. Scope. There will be 20 bathrooms upgraded. This will include tlre installation of new cabinets, cabinet hardware, counter tops, sinks and hardwareo and shower doors. This will also include the proper removal of all old matedals from the premises. Coordination. Contactor will coordinate with the Association Manager, Gary A. Lebo, Alpenglow Property Management, phone 970-949-1630, Statement of Work will become part of the contractor's proposal. Vantage Point-Vail Interval Owner's Association, Inc. It\,x {l\J\c.O :f0 rt\ \v ./\ n 6\\po h..- rV\ a-/rf rr Pt\\ rJ\ 5,) \ >--. If\ -(' +\s -t- i\Ir"q- l.-tJ ,.., .], (- l, r.l z\ lJ\\J !+t'l *ut,IL g'J r. )rt t t! llt .-J<\ <<l.\>lr't \.j q. s)- r\f\)\- \ t \s \,) oc{ t: a ) r vNL t. tL (SB3o Qstno lG "{, /{spL+ce 8+rrr kNL aeNcr/'t€ Ct%l ty'e--7-o I/ /+n/, 4, Co ct ru f'U-fQ. 7a F, Sr,v k, /.=4,tCc-7- t t UN(T 3of 4n-r4 1, J ''.l!"d..*-'-*"" "' / ''STERLING".i'i+ .q ElEnPqrt,-'d:a$ff **'**""*-""*1;**t""* * Ideas To Make Life E*rs!"" s906-59 Clk* on imagE to retum to ptevious page .sl EBUN G_Bcrn!i!s. Hgms Tlv S7-4LL Sfto-/o'4 Ao"K 5r.4,t 7,t.4 htp://www.catalog.sterlingplumbing.com/appsibig-imagejsp?rescom-consruner&image=... ll/12J200l ,L(r TOWNOFVAIL 75 S.FRONTAGEROAD VAIL, CO 81557 970479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE: THIS PERMT MUST BE TIOSTED ONIOBSITE AT ALL TIMES ADD/ALTMFBUILDPERMIT Permit #:802-011,9 Job Address.: 508 S FRONTAGE RD WEST VAIL Status.....: ISSUED Location......: vantage point UNIT #309 Applied...: 05/03/2002 ParcelNo....: 210106311013 Issued...: 05/07/2002 Project No...: Expires...: 11,/03/2002 CONTRACTOR J>F> Remodeling I-,Lc os/02/2OO2 Phone: 970-547-1-307 PO Box 888 Breckenridge, co 82 Brook St. Breckenridge, Co 80424 L,icense:. 697 -B APPI-,ICAIIIT if>F> Remodeling LLC OslO2/20O2 Phone: 970-547-1307 PO Box 888 Breckenridge, Co 82 Brook st. Breckenridge, Co 80424 I-,icense : 697 -B owNER VAI\IIAGE POrIE-VAIIJ INTERVAIJ O5/O3/2OO2 phone: ? AIJPENGIJOW PROPERTY MGMT PO BOX 178 AVON CO 81620 Desciption: replacement of exjsting bathroom and counter tops Occupancy: R1 Multi-Family Type Construction: II FR Type II Fire Resistive Type Occupanry: ?? Valuation: $3,31,4.60 Fireplace Inforrration: Restricted: Y Add Sq FL 0 # of Gas Appliances: 0 # of Gas Logs: 0 # of 90. 00 Total Calculated Fees-> $x43 .25 So. oo Additional FeeF-->$0.00 $0.00 Total Permit Fee---> $143.2s $0.00 Payments-----------1 $143.25 TOTAL FEF.q--> SL43 .2s BALANCE DUE-> wood Pellet 0********'******rfr* *** FFE SUMMARY Building--_>' Plan Check-> Investigation-> will cau-> $85.00 Restuarant Plan Review:> $55 - 2 5 DRB Fee-.-.'_----> $0.00 RecreationFee------:> $3 .00 Clean-up Deposit-------> $0.00 Approvals: IEe.m: 05100 BUIIJDING DEPARTMENr o5/o7/2oo2 ,JRju Acrion: AP Item: 05400 PLAIINING DEPARI.I"IEIi|:I Item: 05600 FIRE DEPARTMENT Item: 05500 PIIBIJIC WORKS PAGE 2 *****f,**tt**{r****fJt***tr}t*****'****rt**{iti*#tr#*rit*ri**tr****!tL************ritffiriElr*lr**{1iirt*#*'*** CONDITIONSOF APPROVAL Petrnit #: 802-0719 as of O5-07-2002 Status: ISSUED *it"********'!t*****************:Hr****************************************ir********************************* PerrdtType ADD/ALTMFBUILDPERMIT Applied: 05/03/2002 Applicant j>F>RemodelingllC Issued: 05/07/2002 97U547-1307 To Expire: 77/03/2002 fob Address: 508 S FRONTAGE RD WEST VAIL Location: vantage point UNIT #309 Parcel No: 210106311013 Description: replacement of existing bathroom and counter tops Conditions: Cond: L2 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:14 (BLDG.): ALL PENETRATIONS IN WALIS,CEILINGS,AND FLOORS TO BESEALED WITH AN APPROVED FIRE MATERIAL. Cond:16 (BLDG.): SMOKE DETECTORSAREREQUIRED IN ALL BEDROOMSAND EVERY STORY AS PER SEC.310.5.1 OF THE 7997 UBC, Cond:1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. ******rr*********i*** See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this applicatioo filled out in full the information reguired, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninp and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2136 OR AT oUR OFFICE FROM 8:00 AM - 5 PM. Send Clean-up Deposit To: n,/a ,q p13,ffi APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Building Permit #: rvtrN0pynb 75 S. Frontage Rd. Vail, Colorado 81657 tl Separate Permits are required for electrical, plumbing, mechanical, etc.! CONTRACTOR INFORMATION Town of Vail Reo. No.:Contact and Phone #'s: C€,tr t, bttn) Fntrtzutttz 97d4!-f /#t COMPLETE VALUATIONS FOR BUILDING PERMIT (labor & Materials BUILDING: $ 3,3t4,60 ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $rorAL: $ 3, -3/ 4, A ,) For Parcel # Contact Assessors Office at 97O-328-8640 or visit other Fees: D l F€es: Prr c Wev Dcrrnit Fae: F: /everyonqforms/bldgperm P.rpelff d,/ 0/ 063 // o/3 UuL,( 3 aV (app-f-ipdtiofi'will. not be a@pted Without parcel number) Job Name: Vlpfne{ /Ot,ttf Job Address: SOt !€' PL4LUHe4l i/e4.€ Filing: Pnone: g4p -rggo St'tt4d, FAA€T|y'/ E I t t t at { C 18 t,r:eft, flTHrta"t tt l/fl 0 / lrt:d, l0 /^-. 78, 9aur'ft,1a4. (ki rr*,:;. WorkOass: New() Addition( ) Remodel (f,) Repair( ) Demo( ) Other( ) Does an EHU exist at this location: Yes ( ) No L,f)Work Type: Interior (f, ) Exterior ( ) Both ( ) Type of Bldg.: Single-family ( ) Two-family ( ) MultFfamily (.{) Commercial ( ) Restaurant ( ) Other ( ) No. of Accommodation Units in this building:lNo. of Existing Dwelling Units in this building:of4i : Gas Appliances (,Y ) Gas Wood Burninq (NOT ALLOWED Does a Fire Sprinkler System Exist: Ye!_g) NoDoes a Fire Alarm Exist: Yes ({ ) No **************************************FOR OFFICE USE ONLY************** rlA Questions? Callthe Building Team at 419-Z3Zs I0l'1,'1\ Department of Community Development Project Name; ProjectAddress: (ak P, Lnps 'rfll (t/tctt" /{it / This checklist must be completed before a Building permit aootication is acepted. d All pages of application is complete tr Has DRB approval obtained (if required) Provide a copy of approval form d Condominium Association letter of approval attached if project is a Multi-Family complex il)A o Complete site plan submitted nlA a Public Way Permit application included if applicable (refer to Public Works checklist) d/ s Staginq plan included (refer to Public Works checklist) No dumpster.oarkinq or material storaoe' allowed on roadwavs and shoulders without written aooroval Ple " Asbestos test and results submitted if demolition is occurring i# a Architect stamp and signature (All Commercial and Multi famity) plA J Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and' Commercial) nlf " Window and door schedule d full structural plans, including d.esiqn criteria (ie.loads) ^lAp)l rw pM o Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) ,N* " Soils Report must be submitted prior to footing inspection o Fire resistive assemblies specified and penetrations indicated o Smoke detectors shown on plans o Types and quantity of fireplaces shown Applicant's Signature: Date of submittal: F:/everyone/forms/bldperm2 Received By: iffir'-AsdJ towfrYny HOW DID WE RATE WITH YOU? Town of Vail Survey Community Development Departnent Russell Fonest Director, (970)47e.213e Check allthat applies. 1. Which Depgrfnen(s) did you conhct? Building u/ Environmenbl_ Housing Admin Planning . DRB_PEC 2. Was your initid contacl with our staffimmediaie no one avdlable / lf you were required b wait, how long was it before you were helped? lin 4.Was your project revierryed on a timely basis? Yes / No lf no, why nof- Was fiis yourfirsttimeb fle a DRB app_ PEC app Bldg Permit t/ l,l/A Please raE the performance of the stafiperson who assisted you:(S1321Nanre:|At- (knowledge; responsiveness, availability) 7. Overall effectiveness of the Front Seruice Counter.lp 4 3 z 8. What is the best lime of day for you to use fie Front Service Cau$ten ftFrilt ? An'l 9. Any commenb you have which would allow us to better serve you nexttime? Thank you for taking the lime b complete this survey. We are commitbd b inproving our swice. 1 BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Depaftment, the estimated time for a toLal review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve, Every attempt will be made by this department to expedite this permit as soon as possible, I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. f, Aoreed to bv:{Ot+,,5 S" FAtztEaJtcz Project Name: Ir Date: {/t/Dd" llnillrt6-e lontl F: everyoneforms/bldperm3 APPLICATION FOF TOWN OF VAIL PUBLIC WAY PERMIT 19 pw*:II-lIU! Parcer#:I n n [ - I I I - [ [ - I I I Brds.Permit#,8I I-[ I n I 1.Job Nam€Street Address n n i-l -,Tl (ttunknowncellI ll ll i : | 479-2138 ext.0) Excavating Contraclor Name Mailing Address TOV Contraotor's License Numb€r BEOUIREO () Phone *zipCity Stad Date Work is for (circte one) Water Completion Date Sewer Gas Electric (P6rmit Expiration Oate) CATV Landscaping Temp. Site AccessTelephone Other 5.Trench-width (min.4') Bond Amount $ 6. ALL MATERIAL, EOUIPMENT, AND TRAFFIC JOB IS STARTED. ., 8. Rubber out-riggers are required on Asohalt surfaces undemeath the A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works office to obtain the up to one week to process. Depth Total SF $ Total LF $ Permit Fee Total Permit Fee $ Public Service Company {1 U.S. West (1 -800-922-1 987) Public Service Natural Gas Group (1-800-922-19871 v. 10. IL 12. TCI Gablevision of the Flockies (1-800-922-1987) Eagle River Waler & Sanitation District (970-476-7480, ext. 11 4) Holy Cross Electric Company (1-800-922-1 987) Town of Vail Electricians (970-479-2158) Town oi Vail lrrigation (970-479-2158) Town of Vail Public Works Construction Inspector (970-479-2198) THERE WILL BE NO TOTAL STREET CLOSURES! A construction trafiic control plan must be approved by the Public Works Department prior to issuance ol the permit. All excavation must be done by hand within 18" of utilities - (Senate Bill 172), Permittee must conlact Public Works Departmeni at 479-2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. I certity that I have read all chapters ol Title I - Public Ways and Property, ol the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. Contractor's Signature of Agreement Prinl name dearly ATTACH PLAN OF WORK, INCLUDING CONSTFUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Date ol Signature White - Public Works Yellow - Contractor II _3\J5,ttLF \\rJ. .< R ,ntDdR vl $v ,l-5\ \J f-\rY Nt\ $oS'\! t4 C':'t 'i\\b- !-- I \ { (t,*\ .\,AN Y*)\J\J F lr):9\o *'tl f$l i \..\.a ..ts{\q t. J,Q) sF4i-ID J.a( \- \- r*-}.*I\ \$ G-oo\ I 5 J iIN UU J 't'r{ v \/) p c, |Y R)l. \ Ji) U Ir\j (-X \ \ J\ {'' Sf.-. $ tuR il\../ !-\1 \ d-! i", [ -\ : ,/1 .r \J - -t.t \,,/'; \g \D*..q1 ? .it4*AlJ \.1'>\ \ti*tr\ ! s- ocl il--I :{-d €4tr. FR 'j) {-Y, "uNtT 301 9ryrtt I/ J _-,;tt:n#FP..*-_"* - - ' '.5 T E R L I N G }ru"-"-"*- #g Ideas To Make Life EasY,'' 5906-s9 Oick on image to retum 1o previous page STERLING Plumbino Horne ZNST+.U S llo ,u e>Q {oo N. A tv 1-ct I 'htp://www.catalog.sterlingplumbing.com/apps/big_imagejsp?rescom:consumer&image=... 11112/2001 (rJ f -TOW}{OF VAIL 75 S. FRONTAGEROAD VAIL, CO 81657 970-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #:B;02-01"20 ]ob Address.: 508 S FRONTAGE RD WEST VAIL Status.....: ISSUED Location......: vantage point #310 Applied...: 05/03/2002 ParcelNo....: 2'1.010631L014 Issued...: 05/07/2002 Project No...: Expires...: 11/03/2002 CONIRACTOR iI>F> Remodeling LLC O5/O2/2OO2 Phone: 97O-547-L3O7 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co 80424 I-,i-cense: 597 -B APPL,ICAIim ir>F> Remodeling I-,LC O5/O2/2oo2 Phone z 91O-547-L3O'7' PO Box 888 Breckenridge, Co 82 Brook St,. Breckenridge, Co AO424 I-,icense z 697 -B OWNER VANTAGE POIMI-VAIL IMIERVAIJ 05/03/2002 PhONE: ? AIJPENGLOW PROPERTY MGMT PO BOX 178 AVON CO 8L620 Desciption: replacement of existing bathroom and counter tops Occupancy: R1 Multi-Family Type Construction: II FR Type II Fire Resistive TypeOccupancy: ?? Valuation: $3,344.01 Fireplace Information: Restricted: y AddSqFe 0 # of Gas Appliances; 0 # of Cas Logs: 0 # of So - 00 Tota-l Calculated Fees-> $143 . 25 Wood PelleL Building--> Pl,an Check-> Investigation-> will call-> $85. 00 Restuarant Plan Review--> gss .25 DRB Fee------------> $0.00 RecreationFee-----------> 53. oo Clean-up Deposit-------> go. oo Additional Fees----->90.00 $0.00 Total Permit Fee------> $143.25 $0-00 Payments-------> 51.43.25 TOTAL FEE9---------> $143.2s BALANCE DUE---->$0.00 Approvals:ftem: 05100 BUIITDING DEPARTMENT os/o7/2oo2 JRM Acrion: AP Item: 05400 PITANNING DEPARTMENr Item: 05600 FIRE DEPARTMEtiff Item: 05500 PIIBLIC WORKS ,.ffir**l*r.***++rr+*r* See page 2 of this Document for any conditions t}at may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUE$IS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5 PIYL Smd Clean-up Deposit To: n/a OF OWNER OR CONTRACTOR PAGE 2 CONDITIONSOF APPROVAL Permit #: 802-0120 as of 05-07-2002 Status: ISSUED **t**********rH****|************************cn&******t ************************************************** Permit Type: ADD/ALT MF BUILD PERMIT Applied: 05/ 03/ 2002 Applicanh J>F>RemodelingllC Issued: 05/07/2002 970-547-1307 ToExpire: 1,1,/03/2002 |ob Address: 508 S FRONTAGE RD WEST VAIL Iocation: vantage point #310 Parcel No: 27010631101,4 Description: replacement of existing bathroom and counter tops Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FORCODE COMPLIANCE. Cond:14 (BLDG.): ALL PENETRATIONS IN WALL9CEILING'AND FLOORS TO BE SEALED VVITH AN APPROVED FIRE MATERIAL. Cond:16 (BLDG.): SMOKE DETECTORS ARE REQTIIRED IN ALL BEDROOMSAND EVERY STORY AS PERSEC.31O.6.1 OF THE 1997 luB,C. Cond:1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. I .; A tr 16 L?q In),& APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Project #: Building Permit #: 970-47€-2149 (Inq 75 S. Frontage Rd. Vail, Colorado 81657 tl Separate Permits are required for electrical, plumbing, mechanical, etc.! CONTRACTOR INFORMATION TsOJ- O I _LC General Contractor: {F tsmolElno llc Town of Vail Reg. No.: 6'f/"K Contactand Phone #'s: 6€ll+ €odd FAtArEuict f 75 '^/t('Klt 11Z;'"U*' f"/I;--; COMPLETE VALUATIO NS FOR BUILDING PERMIT (Labor & Materials BUILDING: $ 3,3 **t0t ELECTRICAL: $OTHER: $ PLUMBING; $MECHANICAL: $rorAL: S 3,3.V1/01 F :/everyon€/forms/bldgperm 328-8640 of Construction: For Parcel # Conbct Assessors Ofiice at 970-328-8640 or visit FalBel-# d I oi o63 tl 0t4 /l4t-l -l/ o (aFdicrti.On"Witl.not beractepted without parcel number) Job Name: lftoffte{ Panf Job Address: S0& E, ltadJHe-fl.t C/,ecLE l/A tz, /tt,. Legal Decription Lot:Block:Filing:Subdivision: ownersNayTella"r'i,f Fdi'fi;["IfMdff,fu Iu,fit"ll6'alu rftclcK rv /761{ 1- ')al .y' jt PJ)-)i Phone: q4g -,/Lta Architect/Desisner: //p llAddress: Phone: EnOine': il/4 Address:Phone: Djtaileddescription of work:p6/1le4rlc.fl/ 6F EtuJ2iE Eittfnttl [ADi/t?4,t]optuZfrfJ) FAtCC7,tr Uflt/ti,e l4d,:a)t'fi , T/L,S|ALL tu€ut J/toutrif jdoC.t'Os, i ot \, WorkClassr New() Addition( ) Remodel({) Repair( ) Demo( ) Other( ) Work Type: Interior (y ) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family (,f ) Commercial ( ) Restaurant ( ) fther ( ) No. of Existing Dwelling Units in this buildinq: ;f7,No. of Accommodation Units in this building: 4)/51 Nofl-ype of Fireplaces Existinq: Gas ADDliances (f ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq ( No/TypeofFirep|acesp,8d&,GasApp|iances()GasLoqs()WoodiPe||et(ffiED) Does a Fire Alarm Exist: Yes (f,) No ( )Does a Fire Sprinkler Sy tefiEllSll-Ye-sFI IS( ) *****'l*****!************************r(**FOR OFFICE USE ONLY*********-...l$At.q 3 *40*0-4 * * * * lAciSffi lur.Lrt v . er slqn-ol Questions? Call the Building Team at 479-2325 Department of Community Development Project Name: V 4p/Aa'i. (o ,/ nlA v)n tlk ProjectAddrcss: tD& i, 'topJh{At! // 'F, t',4tt r' This checklist murt be omoleted before a Buildina permit apotication is acepted. d Al pages of application is complete o Has DRB approval obtained (if required) Provide a copy of approval form d Condominium Association letter of approval attached if project is a Multi-Family complex o Complete site plan submitted o Public Way Permit application included if applicable (refer to Public Works checklist) Ph tr Staging plan included (refer to Public Works checklist) No dumpster.parkinq or materiat storaoe' allowed on roadwavs and shoulders without wiittEn aporoval - df, o Asbestos test and results submitted if demolition is occurringlF s Architect stamp and signature (All Commerciat and Multi family) Pk" Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and ' Commercial) pl[" window and door schedule Full structural plans, including *dgn criteria (ie.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown fl Applicant's Signature: Date of submittal: 4*d ^,/A"Nlfrw nfr" o/4a ,lP" F:/€:veryoneforms/bldperm2 Received By: ffi'r.-At+/.J MVNMY HOW DID WE RATE WTTH YOU? Town of Vail Survey Community Develop ment Department Russell Fonest, Direc"toG (970)479-213e Check allthat applies. 1. Which Depprtnent(s) did you contact? Building l/ Environmenhl_ Housing_ AdminPlanning DRB _ PEC Was your initial contact with our staff immediate no one available ? 4.Was your project revimred on a timely basis? Yes / No lf no, why not?- 3. lf you were required to wait, how long was it before you were heloed? i /* l V Was this your first time to file a DRB app_ PEC app Bldg Permit u/ N/A 6. fl.ease raie $e performance of fie stafiperson who assisted you:(.t4321Name: UAI (knowledge; responsiveness, availability) 7. Overall efiectiveness of the Front Service Counter. @ + 3 2 ,l L What is the best time of Counter? 9. Any comments you have which would allow us b beter serve you nexttime? Thank you fortaking the time to complete ftis survey. We are cornmitted b improving our service. for you to use the Front SeMce BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Depaftment, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this depaftment to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. \Agreed to by:Jonil S, Fhute u)irz. Date: <l,lox Project Name: Print name F:weryone/forms/bldperm3 APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 PW*:I T-T T T T Parcer#:! M-I n [-! I-I I I Brds.Permito'E f !,n [ [ I TOI|INOFVAIL 1,Job Name Stresl Addr€8s n n n-Tl (lfunknowncell LJLJu r | 479-2138 ext.0) Excavalin g Conlractor NamE Maillng Address TOV Contractor's License Number REOUIRED () ziqCity Phone # 4. Start Date Work is for (circle one) ComDletion Date Water Sewer Gas Electric (Permit Expiration Date) Telephone CATV Landscaping Temp.SiteAccess Other Trench-width (min.4') Bond Amount $ ALL MATERIAL, EOUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Bubber out-riggers are required on Asphalt surfaces underneath the A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works office to obtain the up to one week to process. Depth Total SF $ Total LF $ Permit Fee Total Permit Fee $ Public Service Company (1 U.S. West (1-800-922-1987) Public Service Natural Gas Group (1-800-922-15871 TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Elestricians (970-479-2158) Town of Vail lrrigation (970-479-2158) Town ol Vail Public Works Construction Inspector (970-479-2198) 9. THERE WILL BE NO TOTAL STREET CLOSUHESI A construction traffic control plan must be approved by the 10. 11. Public Works Department prior to issuance of the permit. All excavation must be done by hand within 18" of utilities - (Senate Bill 172). Permitte€ must contaci Publlc Works Departmenl al 479-2198 24 hours prior to commencino of work. Failure to notify the Town will result in forfeiture of bond money, Scheduled inspections which ere not ready rnay result in the Town chargirig the contractor a reinspection fee. 12. I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. Contractor's Slgnature ot Agreement Print nam6 cl€arly ATTACH PLAN OF WORK, INCLUOING CONSTBUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Date of Signature White - Public Works Yellow - Contractor ,)urT 3to 4+ru l_ f *b ts vsb t8 Ag^o ,r € q-t R-ePLn-c e B n-fl L"+n/' 77, fr^ L '"t €btcr '{ € c +'3 r rr e 77 r/ SB 3o Cc;rt ,,t7ef farA 9.r'k, F)fctCc-/ "'-'c r \h.\ rJ .t-I t\, \/- \\./l S.fY x /a J-- \-i ri >.-.F* Sr.\ }J- J\q t.\.n l\ \l j:r JJ(i r-(lY\ \${ ,\o a, iljq: -7.U rrt ^ (J\ 5<\', F'.J/ \a4 f\,r1[; .,:> ed |'t'. Ii.'' .L \i o c4 I lt.- ; , U Nrf 3rO 1n-ru /,4 ,. STERLING"-"fb, gr*rrrfli*1fi,e"1tr ****=***o*- ldeas To Make Life Easy"* s906-s9 Clid( on image to retum lo pr€vious page STE8$iqeunbils.Herne I/vST ALL 5f{o-^-'t={{Aoo.4- o 4'/' 7u http://www.catalog.sterlingplurnbing-com/apps/big_imagejsp?rescom:consumer&image=... lI/1212001 _t (, ( . TO\ALI{OF VAIL DEPARTMENTOF COMMUNITY DEVELOPMENT 75 S. FRONTAGEROAD VAIL, CO 81557 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #:802-0106 Iob Address.: 508 E LIONSHEAD CR VAIL Status.....: ISSUED Location......: vantage point #312 Applied...: 05/02/2002 Parcel No....: 210106311016 Issued ...: 05/07 /2002 Project No...: Expires...: '11 /03/2002 OSINER VANTAGE POINT-VAIL IMTERVAL O5/02/2OO2 Phone: * A]-,PENGLOW PROPERTY MGMT PO BOX 178 AVON CO 81620 License: COtflrR.ACTOR J>F> Remodelj-ng LLC 05/02/2002 Phonet 97o-547-L3o1 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co 80424 License : 697 -B APPIJICANr if>F> Remodeling I-,LC 05/02/2oo2 Phone: 970-547-1307 PO Box 888 Breckenridge, eo 82 Brook st. Breckenridge, Co AO424 Iricense z 697 -B Desciption: replacement of existing bathroom and counter tops Occupancy: Rt Multi-Family Type Construction: II FR Type II Fire Resistivc Type Occupancy: ?? Valuation: $1,404.15 Fireplace Information: Restricted: Y AddSqFt 0 # of Gas Appliances: 0 # of Gas L.ogs: 0 # of Wood PelleL Building-> Plan Check--> Investigahon-> will call-> $50 . 00 Restuarant Plan Review-> 932. s0 DRB Fee--------------> $0.00 RecreationFee-----------) $3.00 Clean-uPDcposit-----> TOTAL FEF.S-----------> 90. 00 Total CalcuLated Fees--> 90.00 AdditionalFees------> $0. oo Total Permit Fee------> 50.00 PaYments-----.-----1 $8 s . so BALANCE DUE------> s8s.50 $0.00 $0.00 Approvals:I€elm: 05100 BUIL'DING DEPARTMENT o5/o7 /2OO2 JP$I Action: AP SMOKE DETECTORS REQID Item: 05400 PLANNING DEPAR?MENT Item: 05600 FIRE DEPARTMENT IteIfr: 05500 PITBLIC WORKS See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the inJor:rnation and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROIv{ 8:00 A,V - 5 PM. Send Clean-up Deposit To: n/a SIGNA ORCONTRACTORFOR AND OI\N{EF *ffiffi!*************tits***,t,t,t***:****t *******.******:1:1*1****************************rr* CONDITIONS OF APPROVAL Per:nit#: 802-0106 asof05-07-2002 Status: ISSUED **:***it******|*nib*lh**n**!ht**r**t***********rirlirrr*******ict***************d:t************************* PermitType: ADD/ALTMFBUILDPERMIT Applied: 05/02/2002 Applicanfl J>F>RemodelingllC Issued: 05/07/2002 970-547-1307 ToExpire: 77/03/2002 .]ob Address: 508 E LIONSHEAD CR VAIL Location: vantage point #312 Parcel No: 210106311016 Description: replacement of existing bathroom and counter tops Conditions: Cond:12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:14 (BLDG.): ALL PENETRATIONS IN WALI.S,CEILINGS,AND FLOORS TO BESEALED WITHAN APPROVED FIRE MATERIAL. Cond:15 (BLDG.): SMOKE DETECTORS ARE REQTIIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.310.6.1 OF THE 1997 UBC. Cond:1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORKCANBESTARTED. (rnl' tl INCOMPLETE OR UNSIGNED Project #: Building Permit #: 970-479-2149 {Ins NVt{uvvtn 75 S. Frontage Rd. Vail, Colorado 81657 Separate Permits are required for electrical, plumbing, mechanical, etc.! CONTRACTOR INFORMATION General Contractor:Town of Vail Reg. No.:Contact and Phone #'s: C{./ L #'tt)/L'L 4fa'Yg;'''t COMPLETE VALUATIONS FOR BUILDING PERMIT (LaboT & MateTials BUIIDING: $ /.404, ti ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $TOTAL:s4ryr4,/S' For Parel # Contact Assessors Office at 970-328-864O or visit Otfier Fees: ' DRB Fees: uhlic Wav Parrrrit Fee: F:/everyone/forms/bldg perm # a/0/0b3 // o/ (aiifl idfidwilliiiot be'acceited without parcel number) rob Address: frnt ;1' ;,i'^'//{n4 c'/z''trrob Name: l/nilfi+eE /Otbf Filing: oF €t r't /t'o& d,4 /fttad*i l'f, il t TttT 1 ln d /L' lt,f 7Z $prt1 FAt)cET{ WorkClass: New( ) Addition( ) Remodel (,1') Repair( ) Demo( ) Other( ) Does an EHU exist at this location: Yes ( ) No ( )WorkType: Interior (.f,) Exterior ( ) Both ( ) Typeof Bldg.: Single-family( ) Two-family( ) Multi-family(,t) Commercial ( ) Restaurant( ) Other( ) No. of Accommodation Units in this buildingi /O/44No. of Existing Dwelling Units in this building: dzf, : Gas Apoliances (,I ) Gas Does a Fire SprinklerDoes a Fire Alarm Exist: Yes (f ) No ( ) *********************************!t** "*FOR OFFICE USE ONLY********** Questions? Call the Building Team at 479-2325ffiT0l{hl Depaftment of Community Development tr o tfr il* n)rt aift" Plko Dh" v D o o o tr t/r ol,+ tilt Dlt 4fr ProjectName: VlulAe{. /o'ttf - ProjectAddress: <dfr E, " 'rc#{o' y' rt-(tl) lt, , / This Checklirt must be omoletd beforc a Building Permit aootiation is arcoted. u/ ell pages of application is complete llfro Has DRB approval obtained (if required) Provide a copy of approval form c/ Condominium Association letter of approval attached if project is a Multi-Family complex nlA " Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No dumpster,parkinq or material storaqe allowed on roadwavs and shoulders without written aoorovat Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(4 sets of plans for MultFFamily and Commercial) Window and door schedule Full structural plans, including design criteria (ie.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown '{ Applicant's Signature: Date of submittal: F:/everyoneforms/bld perm2 Received By: Town of Vail Survey Community Development Departnent Russell Fomsl DirectoC 6'^f\st l T\ntmny HOW DID WE RATE WITH YOU? (970)479-213s Check allthat applies. 1. Which Departnent(s) did you contac8 Building -ui Environrcnhl_ Housing_ AdminPlanning DRB PEC 2. Wasyorrinilialconbctwiffr ourstiaffimmediate t/ slow no one available 3. lf you were required to wait how long was it before pu were heloed'? il lA 4. Was your project revisred on a timety basis? Yes / No lf no, why not? PEC app5. Was this yourfrsttime to fle a DRB app_ Bldg Permit V ll/A 6. Please rate the performance of tre staffpenon who assisbd you: 9 4 3 2 I Name:i,0p (knowledge; responsiveness, availability) 7. Overall efiectiveness of tre Front Service Counter. @ 4 3 2 8. What is the best time of day for you to use fre Front Service Counteft AFd ?frf'l 9. Any commenb you have which rrould allow us to bethr serve you nexttime? Thank you for taking the time to complete this survey. We are committed b improving our service. t. BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Depaftment, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned depaftments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame, I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. {Agreed to bv:(^tt0 J, E4[L/€dtcL --l tDafp: A /t./zt J Project Name: Print name F:everyondforms/bldperm3 APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 PW+:T!-ETII Parcet*:I f.TIT-NT-TTT Bldg. Permit T.fTfI Job Nam6 Street Address I ll ll l-l | (lf unknown csll L-J LJ L-i | | 479_zt3a ext. o) Excavating Contractor Name TIt #.8 T 1, Mailing Address TOV Contraclor's License Numbsr REOUIREO () ZpCity Phone # 4. Start Date Work is for (circle one) Other Completion Date Waler Sewer Gas Electric Teleohone CATV (Pernit Expiralion Dale) Landscaping Temp. Site Access Trench-width (min.4') Bond Amount $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asphalt sudaces underneath the A sionature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works otfice to obtain the up to one week to process. Depth Total SF $ Total LF $ Permit Fee Total Permil Fee $ Public Service Gompany (1 U.S. West (1 -800-922-1 987) Public Service Natural Gas Group (1-800-922-19871 TCI Cablevision of the Bockies (1-800-922-1 987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town ot Vail Electricians (970-479-2158) Town of Vail lrrigation (970-479-2158) Town of Vail Public Works Construction Inspector (970-479-2198) 9. THEBE WILL BE NO TOTAL STREET CLOSURES! A construction traflic control plan must be approved by the Public Works Department prior to issuance of the permit. ': 1 0. All excavation must be done by hand within 18" of utilities - (Senate Bill 172). 1 1 . Permittee must contact Public Works Deoartment at 479-2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money, Scheduled inspections which are not ready may result in the Town chargirig the contractor a reinspection fee. 12. I certify that I have read all chapters ot Title 8 - Public Ways and Property, ol the Vail Municipal Code and all utility company agreements, signed by me, and will abide bythe same, and that all utilities have been notified as required. Conlractor's Signatore of Agreement Prlnt name clearly ATTACH PLAN OF WOR& INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Dato of Signature White - Public Wo*s Yellow - Contractor Il-,$ i tF- r)v w T3t\* vfirI :] c tsr,\.- F{. --J \ F.L );{\s\ 'l-IF- l)i 'b \-.,/\\v ,t{<rN\d-- ._) \-/r-\f>+ tg ,1.) -' "h , \'g q:'J: u: yA s-) S'"I 1.. i =- d fl I|.\. ly !u + <] lt\ F"+(]./ \ e l' Il-il\!Il\\J Lrt (Ll\-lI l\9Jll.l|.D r <rts9 r vr r YNtT 3ra 64 7-r/ 7 '$trs4"****--* -''.STERLINC lu ,c til{gttl'r3ii:L.r- .:',F"__,* . ldeas lo futake Life Easy." 5906-s9 Cl'rd( on image to relum to pleyiotE page {^/: T-ftL L STERLING Plumbinq Home S #o ,.^t uf {oo,{ C /\t I U Zl htp:i/www.catalog.sterlingplumbing.corn/apps/bie_imagejsp?rescom=consumer&image=... ll/12/2001 '-i 3'TOWNOFVAIL DEPARTMENTOFCOMMUNITY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #:802-0122 fob Address.: 508 S FRONTAGE RD TVEST VAIL Status.....: ISSUED Location......: vantage point unit #409 Applied...: 05 / 03/ 2002 Parce1No....: 2L0L06311,021, Issued ...: 05/07 /2002 Project No...: Expires...: 71./03/2002 COIflIRACTOR iI>F> Remodeling LI-,C O5/O2/20O2 Phonez 970-547-t3O7 PO Box 888 Breckenridge, co . 82 Brook St. Breckenridge, Co 80424 License'597-B APPIJfCANT iI>F> Remodeling LLC 05/02/2OO2 Phones 970-547-L3o7 PO Box 888 Breckenri.dge, Co 82 Brook St. Breckenridge, Co A0424 Lricense : 691 -B OWNER VA}TTAGE POINT-VAII, II{TERVAI, O5/O3/2OO2 PhONC: t AIJPENGTOW PROPERTY MGMT PO BOX 178 AVON CO 81520 Desciption: replacement of existing bathroom and counter tops Occupancy: R1 Multi-Family Type Construction: II FR Type II Fire Resistive TypeOccupancy: ?? Valuation: $6,159.55 Fireplace lnformation: Restricted: y Plan Check-> Investiga tion-> will ca[-> AddSqFt 0 # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet Building-> $115 . 00 Restuarant Plan Revicw-->So . 0o Total Calculated Fees--> SL92 .'15 $0-oo574.75 DRBFc'e-----------> 90.00 RccreationFee-----------> $3 - 00 Clean-up Deposit-----> SO.0O AdditionalFees----> $0 . 00 Total Perurit Fee-------> iL92 .75 $0 . 00 Payments---------> il92 -'75 TOTAL FEEg-------> ire2 .1s BALANCE DUE----->90 - 00 Approvals:f€em: 05100 BUILDING DEPARTMENT O5/O7/2OO2 JR!4 Action: AP Item: 05400 PL,ANNING DEPARTMEMT Item: 05500 FIRE DEPARTMENT Item: 055O0 PUBLTC WORKS a;h--*r.*..-r-..*.-*.*-.* :!**r*****.r*i****{* See page 2 of this Document for any conditions tlnt may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this applicatioq filled out in full the in-formation required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the inJormation and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5 PM. Send Clean-up Deposit To: n/a CTORFOR tl*itt***********n**ti**r!****o*:|o*{irr*,.#rri}*rrirdi********J.*:.t"1"**!r********rir************** CONDITIONS OF APPROVAL Perurit#; B1024722 asof 05-07-2002 Status: ISSUED *****tf**i*r|t'tH"***tr***ti*******litii*****rt**1*ffi***********:t*d:**.t!H**il*!t**1(*rt*****r*tit********* PemdtType: ADD/ALTMFBTIILDPERMIT Applied: 05/03/2002 Applicant ]>F>RemodelingllC Issued: 05/07/2002 W0-547-1307 To Expire: 71,/03/2002 Job Address: 508 S FRONTAGE RD WEST VAIL location: vantage point unit #r()9 Parcel No: 270706311021 Description: repliacement of existing bathroom and counter tops Conditions: Cond:12 @LDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: L4 @LDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BESEALED WITH AN APPROVED FIRE MATERIAL. Cond:16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.310.5.1 OF THE 1997 UBC, Cond:1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORKCANBESTARTED. tlltrTv0P 75 S. Frontage Rd. L NOT BE ACCEPTED IF INCOMPTETE OR UNSIGNED Building Permit #: 97O-479-2149 (lnt Separate Permits are required for electrical, plumbing, mechanical, etc.! Vail, Colorado 81657 A,H C DCONTRACTOR INFORMATION a General Contractor: dF ttUalEt//dc LlC Town ofVail Reg. No.; 64 r-A Contactand Phone #'s: 1g4 4 '{at ts Fttii t tti'z / 2a- r fi-tt-f{ co"tT' 'Ttr"* )1, ;v6J2U*,+ __ COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials BUILDING: E 6,T(Q,S(ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $rorAL: s 6,1{9,({ For Parcel # Contad Assessorc Offtce at 97O-328-8640 or visit P'nrsl, A /0/ 063 // 0 A t /h/i( 4d I (appl'idblgOfiWill';not'be acce ed without pafcet number) lob Name: Vnill4e€ /Orruf JobAddress: S,t i, /-ti.,d.t'1t.44 Cftcii tn iL, ta, Legal Description Lot:Block:Filing:Subdivision: Ovwlers Name: lfr rdfA&d fo/^t/' un tL1 a€zttll D Dp Eft{ Aslt t,oddn|'tffilipflsi:fr "r'ffitrr /tlon r Phone: V4g -74j7 Arch itect/ Desig nen p/4 Address:Phone: Engineer: 1O//Address:Phone: Deteiled description of work: ti/L4c€rlc'or oF EXt.t lrDe tBT/ltro4 i/4t,t /tE.t; c2,il/€874&, 5trtt(s1 FArcEf, /t€lrctat tA6rbe-fr, ;figptL lJiu, Stlc\ttrE( lm,tSftin in7). WorkClass: New() Addition( ) Remodel(f,) Repair( ) Demo( ) Other( ) WorkType: Interiorff) Exterior( ) Both( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Singlefamily ( ) Two-family ( ) MultFfamily (f') Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: o14|No. of Accommodation Units in this building: $/ Noflype of Fireplaces Bistinq: Gas Apoliances (X) Gas Loqs ( ) Wood/Pellet ( ) Wood Burnino ( No/Type of Fireplaces proooV{ eurADDliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burnioq#€E-AIILOWED) Does a Fire Alarm Exist: Yes (rf ) No ( )Does a Fire sprinkler p6$[ff@f,,lYEp71 lno ( ) **************************************FOR OFFICE USE ONLY*******f ...ltA1.s8?ooL***J l.-AcceDtedBYr t\FV.PlfilxirgM[€r F:/everyoneformqf bldgperm ra rulryIVm Questions? Call the Building Team at 479-2325 Depaftment of Community Development ilr 4t ,h u o D Project Name: UAPf nCE /ot ru/ ProjectAddress: .<0fr E, ltotlS ''4' e t ,{, tt ) { This cheklist must be mmpleted before a Building permit apptication isaceotd. d All pages of application is complete Olk " Has DRB approval obtained (if required) Provide a copy of approval form d Condominium Association letter of approval attached if prqect is a Multi-Family complex 4n o Complete site plan submitted Oln o Public Way Permit application included if applicable (refer to Public Works checklist) p/Ao Staging plan included (refer to Public Works checklist) No dumpster,oarkino or material storaoe' allowed on roadwavs and shoulders without written aooroval ilA o Asbestos test and results submitted if demolition is occurring flfra Architect stamp and signature (All Commercial and Multi family) Nn o Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and' Commercial) tr Window and door schedule d Full structural plans, including desiqn criteria (ie.loads) Dh " Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Slfr o Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on olans Types and quantity of fireplaces shown ApplicanUs Signature: Date of submittal: F:/everyone/forms/bldperm2 Received By: . HOW DID WE RATE WrrH YOU? Town of Vail Survey Community Development Department Russelt Fonesl Director, (970147e.213e Check allthat applies. 1. Which Departrent(s) did you contact? Building y' Environmental_ Housing AdminPlanning DRB -:PEC 2. Was your initial contact wilh our stafiimme diate / dow no one available 3. lf you were required to wait, how long was it before you were helped?__1 4.Was your proj,ect revielved on a limely basis? Yes I No lf no, why not? 5. Was this yourfrsttime to fle a DRB app- PEC app Bldg Permit t/ tUA 6. fl.ease rab the performance of fte staffperson who assisted you:p1321Name:)At (knowled ge; responsiveness, availability) 7. Overall efiectiveness of he Front Service Counter.@ 4 3 2 1 8. What is the best lime of day for you to use fre Front SeMce Counter? AFtzl- Q *rt4 9. Any cornments you have which r,vould allow us to better serve you nexttime? Thank you for taking tre time b complete firis survey. We are cornmitted b improving ourseMce. l'. BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permiLs that I apply for. f,Rgreed to Project Nane: VAP(A&E Potttf L4'I t - -Date: 5lt /0J F:everyone/forms/bldperm3 Print name APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT PW+:T !'T T f, I PATCEI#:T T T N' I T N' T T' T T T te- Brds.Permit#'E n I,I I n I 't. Job Name Strgst Addr€ss nnl-n (lfunknowncall LJ LJ LJ i | 479-2109 ext.ol Excevating Contractor Nem€Mailing Addr€ss TOv Contraclor's License Numbor REOUIREO () zJp Phone # 4. Slart Dats Work is for lcircte onel Complelion Date Water Sewer Gas Electric (Permit Expiretion Oat6) Telephone CATV Landscaping Temp. Site Access Other Trench-width (min.4') Bond Amount $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asphalt surfaces undemeath the A signature below indicates a signalures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all Lttility company application through the Public Works office to obtain the up to one week to process. Depth Total SF $ Tolal LF $ Permil Fee Total Permit Fee $ Public Seryice Company (1 U.S. West (1 -800-922-1 987) Public Service Natural Gas Group (1-800-922:19871 TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Saniiation District (970{76-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town ol Vail Electricians (970-479-2158) Town of Vail Inigation (970-479-2158) Town of Vail Public Works Construction lnspector (970-479-21981 9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the Public Works Department prior to issuance ol the permit. All excavation must be done by hand within 18" of utilities - (Senate Bill 172). Permitlee must contact Public Works Deoartnent at 479.2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. 12. I certity that I have read all chapters of Title I - Public Ways and Property, ol the Vail Municipal Code and all utility company agreements, signed by me, and wlll abide by the same, and that all ulilities have been notified as required. 10. 11. Contractor's Slgnalure of Agreement Print nama cleady ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASII LINES FOR CUT. Date of Signatur€ White - Public Wo*s Yellow - Contractor STATBMENT OF WORK FOR BATH REMODEL Time is of the Essence. Premises are deeded time share units. Maintenance period specified in the covenants cannot be extended. Therefore, contractor must allow time for contingencies normally encountered in their tade. Cost to the Association, due to time ovet-runs will be charged to the contractor out of the final payment, up to and including the rental of comparable units ifnecessary. Scope. There will be 20 batbrooms upgraded. This will include the installation of new cabinets, cabinet hardware, counter tops, sinks and hmdware, and shower doors, This will also include the proper removal of all old materials from the premises. Coordination. Contactor will coordiaate with the Association Manager, Gary A, Lebo, Alpenglow Property Management, phone 970-949-1 630. Statement of Work will become part of the contractor's proposal Vantage Point-Vail Interval Owneros Association, Inc. I $Q )$--a -T-* .\ >(/1\fJ_ \,\vl Q\xDaR t) VR5 c.J 4 r.r1 N .; \t\cu \ | \. \V \{\!J l-t: /\J'{ Fur'o o ql fq *:qe ",{'r/1 \J \J) oE4-:'b J:a(\ S)\ stt \ Da -T I i t\t'= J.\v ro It'* ;f .-v " e v) \r P n cYp J'*- o Nrf- ll lr T\v{i+r\ F./i \'lrs? \1 .*\(\ lJ^ulJ-. UJJ\g(r.,4 ^t", ->VF\t '*r" l^\r3 tY \U €)Ad-tr; tfv j"'- lni f',,/i.! .; 'YlL* $..o :J. ! h- : IN U t,\h.IF\ '{< \)\ 14 \ N-\ N t"l"\ s-j \J sr\l\ irr\vS l. \\ \\ ,\r \ :r' \\\._ \\ IUi\u \-,, \ !r. {v \\lo.\q: , '<t? ru\ \ ; <'-{ lir Dt l-'- r{: t,,.v j oq :$ I.' { 14 crs .J II l\.- II\ ijs\) r* \: Q\ R)L vr:lut-- si) t\ + \\ Nr..,}\\ t.-iu\\ i\tv N l:r ,):v: f,,?r \]) U\ \s{r NR ]t-,{\{/ J r" 1.. ,"1 ;s l-C ;.L- r c) J Irt. ; ) J I.tlRLlNU Jearcn Kesults ynr tr 401 fage I 01 I Ar+-ril -/ ( A, 3r '€i;nrrNc"-r-* -'***ffii#*Ft ldeas To tltlake Lift EasJao + s906-s9 Clid( on imsge to relum to prcviotjs page STERLING Plumbino Home fN s 7-,+ LL S r+r; itt. Aoo r( o ^/ TU 6 http://www.catalog.sterlingplumbing.com/apps/big_imagejsp?rescom=onsumer&imag.e.... ll/12/2001 fuJ (/ TO'A.I\I^OF VAIL DEPARTMENT OF COMMT'NITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL. CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #:Fl02-012'1, Job Address.: 508 S FRONTAGE RD WEST VAIL Status.....: ISSUED Location......: vantage point #604 Applied...: 05/03/2002 Parcel No....: 2101,06311027 Issued ...: 05/07/2002 Project No...: Expies...: 17/03/2002 CONIRACTOR iI>F> Remodeling LLC O5/02/2OO2 Phonez 97O-547-1-3O7 PO Box 888 Breckenridg,e, Co 82 Brook St. Breckenridge, Co 80424 IJi-cense = 597 -B APPLICAIiIIr aI>F> Remodeling LLC 05/02/2002 Phone:. 97O-547-1-3o7 PO Box 888 Breckenridge, Co 82 Brook St. Breckenridge, Co 80424 License z 697 -B OWNER VAI\]'TAGE POINT-VAII, I}flTERVAIJ O5/O3/2OO2 PhONCI T AIJPENGIJOW PROPERTY MGMT PO BOX 1"78 AVON CO 81620 Desciption: replacement of existing bathroom and counter tops Occupancy: R1 Multi-Family Type Consfruction: II FR Type II Fire Resistive TypeOccupancy: ?? Valuation: $4,752.0'1. Firq>lace Informadon: Restricted: y AddSqFe 0 # of Gas Appliances; 0 # of Cas Logs: 0 # of So. o0 Total Calculated Fees-> $159 . ?5 So.0o AdditionalFees--------> $0.00 Total Permit Fee-----> $159.75 $0.00 Payments----------------> $159.7s TOTAL FEEg-------> g15e.7s BALANCE DUE-----> Wood PeIIeE *4** FEE SUMMARY Bu dhg-> Plan Check--> Investigation-> will call-> S95. 00 Restuarant Plan Review--> 961.7s DRBFee-----------------> $0 . 00 Recreation Fee----------> Sl .0o Clean-up Deposit-------> $0.00 Approvals:I€e'm: 051-00 BUILDING DEPARTMEIilT o5/07/2oo2 JRI4 Action: AP Item: 05400 PLANNING DEPARTMENT Item: 05600 FIRE DEPARTMENT Item: 05500 PUBITIC WORKS -3--":**t***sr'Fi*.r**|t{*#l*l See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the inJormation required, completed an accutate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninE and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQIJESIS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS lN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5 PM. Send Clean-up Deposit To: n/a PAGE 2 **ffitr*rt***]t****rt!l**:trt***************************s***************trt*****#****************:r*!r***** CONDITIONSOF APPROVAL Permit #: 802-01.21 as of 05-07-2002 Starus: ISSUED ***r.r**d.r***1*|hl*[*rtri&********rt*******rr***********ri******tiirr*********di****r*******slittit**#******** PerrritType: ADD/ALTMFBUILDPERMIT Applied: 05/03/2002 Applicant ]>F>RemodeIingLLC Issued: 05/07/2002 970-547-7307 ToExpire: 11/03/2002 job Address: 508 S FRONTAGE RD WEST VAIL Location: vantage point #504 Parcel No; 2101,06311027 Description: replacement of existing bathroom and counter tops Conditions: Cond:12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:14 (BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BESEALED WITH AN APPROVED FIRE MATERIAL. Cond:15 (BLDG.): SMOKE DETECTORS ARE REQTJIRED IN ALL BEDROOMS AND EVERY STORY AS PERSEC.31O.6.1 OF THE 7997WC. Cond: L (FIRE): FIRE DEPARTMENTAPPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. F stSq 1s APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Project #: tl Building Permit #= l#l 97 O: 47 9 - 2149 (Inspections) mpu0pvAL 75 S. Frontage Rd. Separate Permits are required for electrical, plumbing, mechanical, etc.! Vail, Colorado 81657 CONTRACTOR INFORMATION General Contractor: dF teltorlEt/dc- /-Lc Town of Vail Reg. No.: 6?r-B Contact and Phone #'s: 4{11- # dL/tfl) Fittrful 2 z tl la -4!s.ldl I ffi*'".Y*7;/4,1^'; /-7 COMPTETE VALUA FOR BUILDING PER.MIT (Labor & Materials BUILDING:$ */5J.At OTHER: $ rorAl: s 4, 7-(J, e i Parel F:/er/eryondforms/bldgperm of Construction: For Parel # Contad Assessors Office at 970-328-864O or visit Palsel,# number) robName: iln01rnp€ /Onf lobAddress: S0g i, xiart'si*e)44 C/tc/-ellAt\. u,. Legal Description ll Lot:Block:Filing:Subdivision: Ovwers Name' VAIyTA&E /JotatT' y 11 i") tztUAL Au) FI I a t-( 0? .^d*.;Xr.# lf,:!! jiLf . ;f " ;;:; ! /v o nt 7, ll Phone: i 4 I - tt 3 a ArchitecvDesign rr r4//A Address:Phone: Engineer: il/n Address:Phone: Detajled description of work: ftFf/4CF/tEllT S / ;oK s, FA A cE /5, llEl a2 e CAdil €T_t . 0F 5I/ d ltd t; 64 /4id dl'{ yAn} t r/€s) .f,i:s rrlu, lq€tt JtQLot-z Jtoet /itz C)L'LITEA TtFt) /ttfi ). WorkClass: New() Addition( ) Remodel(/) Repair( ) Demo( ) other( ) Work Type: Interior (2( ) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No (,t ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family (X) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building 4f S No. of Accommodation UniG in this building: p/fi No/Type of Fireplaces Existinq: Gas Aooliances (,l ) Gas Loos ( ) Wood/Pellet ( ) Wood Burningj-+1 rl"nu* "r rir"or"."r t.K"o, c", ooo"ur'.", r r nas Loqs ( ) wood/petru,fr ffiElltHliBr Atto*rot Does a Fire Alarm Exist: Yes (X ) No ( )Does a Fire Sprinklef System Exist:^ "[gq (.r ) I ruo ( ) **************************************FOR OFFICE USE ONLY****** \; MAI v--- ***************** nv-coM-@-\****** * ** ffifEltt Planner Sign-off: i Questions? Call the Building Team at 479-2325 Department of Comm unity Development d 4fr n)ft rfr thw /n ,h Project Name: V4il4ar-E louttf ProiectAddress: lirt|. L' tlllqfll CtELtZ, ttAr t Date of submittal: This Checklist must be omnleted before a Buildina Permit annrication is arcpted, All pages of application is complete tF" Has DRBapproval obtained (if required) Provide a copyof approval form d Condominium Association letter of approval attached if project is a Multi-Family complex o Complete site plan submitted o Public Way Permit application included if applicable (refer to Public Works checklist) o Staging plan included (refer to Public Works checklist) No dumpster.parkino or material storaqe allowed on roadwavs and shoulders without written aoproval tr Asbestos test and results submitted if demolition is occurnncD Architect stamp and signature (All Commercial and Multi fa;ily) n Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) o Window and door schedule 6 Full structural plans, including design criteria (ie.loads) /l*o Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) ilts Soils Report must be submitted prior to footing inspection 4*" Fire resistive assemblies specified and penetrations indicated Sl|4d Smot<e detectors shown on ptans1,o F!t.€, Dft d types and quantity of fireplaces shown o A ft cE . )-/'/ Applicant's Signature: F:/everyone/forms/bldperm2 Received By: t HOW DID I'VE RATE WITH YOU? Toum of Vail Survey Cornmunity Developmert Departnent Russeil Fonest DirectoG (970)479-213e Check allthat applies. 1. Which Departnent(s) did you conhc8 Building r/ Environmenhl_ Housing_ Admin ___-Planning DRB _ PEC _ 2. Was your initid conbct wifr our sffi inrmediatel2' dow or no one available_? 3. lf you were required b wait how long was it before you were helped? A 14 4. Was your project revierrtred on a timely basis? yes / No lf no, why not?- fle a DRB ap,p_ PEC app I 5. Was this your fipt time b Bldg Permit V t\UA 6. P{ease rate fte performance of fie stdperson who assisted you:g 4 3 2 1 Name: VkL, (knodedge; responsiveness, availability) 7. Overall efec{iveness ofthe FrontServrce Counter. @ I 3 Z 1 8. Whatis the besttime of day for you to use fie Front Service Counter? 9. Any commenb you have which would allow us to better serve you nexttime? Thank you for taking the time b complete Bris survey, We are comrnitted b improving our service. :l BUILDING PERMIT ISSUANCE TIME FRAME if this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Depaftment, the estimated time for a total review will take as long as three (3) weelG. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements, Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. --Vgreed to by: Project Name: Jot{lJ S" Fhtueutttz -I IDate: 5l il o+ Print name F:everyoneforms/bldperm3 PW*:T T'I T I T PATCEI#:I T T T T I T' tr T - T T T Brds.Pennit#,8 X f 'I I I t] ; APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 1.Job Nam6 Strset Addresg n n n-J-l (ltunknownc€ll L_J I rl i I | 479.2138 en.0) Excevating Contraclor Nam6 Maillng Addross TOV Contractor's Lioense Number REQUIRED () Phone fzipCity o. 4. Start Date Work is for lcircte one) Completion Date Water Sewer Gas Electric T€leDhone CATV (Pormit Explration Dale) Landscaping Temp. Site Access Other 5.Trench-width (min.4') Bond Amount $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED, Rubber out-riggers are required on Asohalt surfaces undemeath the A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works office to obtain the up to one week to process. Depth Total SF $ Totat LF $ Permit Fee Total Permit Fee $ o. 7. 8. Public Service Company (1 U.S. West (1 -800-922-1 987) Public Service Natural Gas Group (1-E00-922-19871 TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail lrrigation (970-479-2158) Town of Vail Public Works Construction Inspector (970-479-21981 9. THEBE WILL BE NO TOTAL STREET CLOSURESI A conslruction traffic control plan must be approved by the Public Works Department prior to issuance of the permit. 1 0. All excavation must be done by hand within 18" of utilities - (Senate Bill 1 72). 11 . Permittee must conlact Public Works Deoartment at 479-21 98 24 hours prior to commencino of work. Failure to notify the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in lhe Town charging the contractor a reinspection lee. 12. I certity that I have read all chapters of Title 8 - Public Ways and Property, ol the Vail Municipal Code and all utility company agreements, signed by me, and will abide by th€ same, and that all utilities have been notified as required. ATTACH PLAN OF WORK, INCLUDING CONSTRUCNON TRAFFIC CONTROL PLAN Show streeis with names, buildings, and location of cuts. USE DASH LINES FOR CUT. White - Public Works Y€llow - Cofltractor STATEMENT OF WORK FOR BATII REMODEL Time is of the Essence. hemises are deeded time share units. Maintenance period specified hr the covenants camot be extended. Therefore, contractor must allow time for contingencies normally encountered in their tade. Cost to the Association, due to time' over-runs will be charged to the contractor out of the final payment, up to and including the rental of oomparable ruits if necessary. Scope. There will be 20 bathrooms upgraded. This will include the installation of new cabinets, cabinet hardware, counter tops, sinks and hardware, and shower doors' This will also include the proper removal of all old materials from the premises. Coordination. Contactor will coordinate with the Association Manager, Gary A, Lebo, Alpenglow Property Management phone 970-949-1 630, Strtemeut of Work will become part of the contractor's proposal. Vantage Point-Vail Interval Owner's Association, Inc. . ti/ YIR-\ \-,\ \=?' irt, t/) c\\\t-\II DdN\Fr vi Q >it\ i F\ )a\ -4N a\/'1*:- \t) qI r\. lU (')(J\ \-,q .-At\,-- ttruI)t/-'r)ovr ,\- /\{vi+^ + Y \l /\in t-I ,l )\ r .,!\\ .-,, l t, ,J \_ oNSl\. \'.!). +"v *\ , \- {".*N + tr'l q-- Jo \\L t T l- ; t.- )v \\l't \/\ s.. (\ v N) I >. t-t-. F ) N ^-\E rcr\) I)t f" \J \\{,Y?l\ \ r)'l>\.\j .+\r*- F- U l-f':. ltrY\)q'4V- \'c\..r': , ,\J'{ -\4rJ) lr,J.2 .-> At.3, \,I )art -+\\/1 / \rJ._ q \ d f.\IN J- c.n\J :r o\g t ) g/rurr6o4 t' \l:-l ;;7 Qynr,vg \ 61,7Lt1*c€ 4ftfil ,4-t,,b AgL(Crile C,ffitze 7-, /,1-/7/ , '4, (a ,,,atr-?<Ff, nr(, t7*uct-{T En7-r{ 3 G vNtT'(oo4 b*r4 L -is. .-"*-"*** "''s r E R l- | N G" -F# L Elt4' :J"t'r^\t t- 2 4 !$t'-%**-*#J;e*- ldeas To Make Life Easy.* s906-59 Clid( on image to retum to Fevious page qTERLING Plumbinq Homo y.N I T+ LL -S t{,t ,.,t €X Loo 4 A {v Toa h@l/www.catalog.sterlingFlumbing.com/apps/big_imagejsp?rescom=consumer&image=... 11/lA2OOl ('^$