This packet contains all information
related to the DRB approvals of the
Golden Peak Ski Base
RedeveJop me nt Applicatio ns.
tfiu -ta1T
Conceptual Reviews:
Final Review:
Changes to Approved Plans:
U3t96
2t7t96
2t2u96
4tr7t96
517196
s/30t96
s/3v96
7/9t96
7n6t96
7n7t96Bl+11,
q14 t1t,
lilltt,{1t,
o
esign Review Action Form
TOWN OFVAIL
Project Name: Golden Peak - Temporary Tent
Prqiect Description: Place temporary tent on site for ski season
Owncr, Address and Phone: Vail Associates.
ArchitecUContact, Address and Phone:
+H,1r3iltfilllr"ail
Resorts Development Co.' PO Box 959,
Project Street Address: 458 Veil Valley Drive
Legal Description: Tract B, Vail Village 7th and Tract F, Veil Village 5th Filing
o
D
Parcel Number:
Comments:
BuildingName: Golden Peak Ski Base
Motion by:
Seconded by:
Vote:
Conditions:
Board / Staff Action
Action: Staff Approved
Tent must be removed no later than May 31, 199E.
Town Planner: Lruren Waterton
Date: Sept.24,1997
FAEVERYONRDRB\APPROVAL\ I DRBAPPR,FRM
DRB Fee Pre-Paid:
Vail Resorts lfevelopment Company
Seatlngthe
Alplne Retont!
Vail . Ereckenridge . Keystone . Beaver Creeko . Bachelor Gulch'* . Arrowhead
September 15, 1997
Ms. Lauren Waterton
Town of Vail
75 South Frontage Road
Vail, CO 81657
Reference: Golden Peak Base Facility
File GP896.741
Subject: Golden Peak Pavilion
Dear Lauren:
Attached for your information and submittal for DRB review and approval is the Tent Option for
the Golden Peak Pavilion. We will be submitting these documents to the TOV Building
Department for a building permit later this week.
Since these documents have not been modified to reflect the as-built condition, please note
that the foundation is 80 feet instead of 100 feet, and the fabric is supported by a double pitch
steel truss system instead of single pitch as indicated on these documents, dated 9/3/96. lf
you have questions please contact me at 479.3142 or if urgent please contact Chris Walker at
479.3151.
Sincerely,
/')
I uf r ./\t/
Beii]e'l{iznik
Senior Project Manager
attachments
Cc: David Corbin - w/o
Jack Hunn - w/o
Brian McCartney - w/o
Maifing address: POBoxg59.Avon,Colorado.81620-0959.phone970.4793140'fax970.479314a
Phvsical address: 600 Lionshead Mall . Vail. Colorado .81657 g,
Vail Associates, Ino.
seatinqthe
September 16,1997
Lauren E. Waterton
Town of Vail
75 South Frontage Road
Vail, CO 81657
Dear Ms. Waterton.
Thank you for taking the time to meet with me on Monday, September 15, 1997. Upon
your suggestion, I met with Mike McGee after our discussion and explained to him the
concems with the Golden Peak Pavilion area. He seems to understand that this structure
will be used for a one-time, one-day event, only because the structure is there. Currently
there is a top cover and one end wall up on the tent. The rest of the walls will be left off
until sometime next week. Mike's major concems are occupancy with the walls in place.
Also, not having fire protection access to the facility. During the summer there are
several different routes to reach this area.
Lauren, if it would not be too much of a problem, could you draft a memo or letter stating
that it would be appropriate to use the Golden Peak Pavilion site on Saturday, September
20, 1997, or on Sunday, September 2l as a back up weather day? Would you also be
able to include a line about not affecting the 180 day occupancy for winter use?
Your help in this matter is appreciated.
Sincerely,
|W pu,14r^* nladlaA
M&Cgns'du4A
+Y,k'l/ rju+A, Cd/n-efll. O lL
+a u5s Pp) sgri!
(ve/L+ .
A-
tJ
Steph{n Lorton
PO Box 7r Vail, Colorador 81658. phone 970 476 5601
rI
Vail Resorts llevelopment Company {'n-45';5ufr2
Vail . Ereckenridge r Keystone . Beaver Creek@ . Bachelor Gulchr' . Arrowhead
August29, 1997
Ms. Lauren Waterton
Town of Vail
75 South Frontage Road
Vail, CO 81657
REF:
SUB:
Settingtlc
stotfiafu lol
Dear Lauren,
On a site inspection visit by Ethan Moore of DWI to review landscape installation and
compliance with design, we covered all outstanding issues in addition to construction
progress I was informed by Ethan that the issue of vegetation between the face of the Apres
Ski stone wall and the bike path was previously determined, with TOV acceptance, eliminating
any vegetation at this location because of continual maintenance problems and poor growth of
whatever was to be planted. Therefore, we will abut the asphalt bike path with the face of
stone, and hold off such installation at Mill Creek until such time as the head wall issue is
resolved.
Bernie Niznik
Senior Project Manager
Attach
Cc: David Corbin
Jack Hunn
Tom Mayhew - PSA
Ethan Moore - DWI
Mailing address: PO Box 959 . Avon, Colorado .81620{959 . phone 970.479 3140 ' fa\ 97O 479 3148
Physical address: 600 Lionshead Mall . Vail, Colorado . 81657
e
Golden Peak Base Facilig
File GP896.7311) Letter, Niznik to Waterton, Moore, dated 811197, same subject-GP896.719
2) Letter, Niznik to Waterton, dated 8/8/97, same subject-GP896.728
Bike Path
tt
tilfi
ll
IL
It
tl \
t-----rDeSrr/ il--\a
/z1od=
tu
v_
voIL
|J}J
F
tutuIo
olu
u
Jztu
lu
\
\
\
\
\
I
f;s
?$ili<(}
i
IL
)a
b\
qsF
$$s
\
\
\
\
\
[${;
=*iH
uFJ
$
bi>. #\"$\lV'sg_
\)t
t\
\ '.,.
t.\'\s
\
\t...
\'.
\
,\
(
t
pI
*
--
Ens'r Vrl lecu Hopru o wN ERs Ass oc;rATr oN. Ir.r c:.
Dircctc'ru
Otlicers: Presid.nt - llob (ialvin Srecretary - ( ifetfa Parl-s li'easur?r - Patlick (:mnrnr
Judith Bcrkowitz - Dcrlph Bridgswutcr - EIIic ('rrulLirs - Rt':r Lnnglcy - BiU M('rt(rr - L-'r'ruds Riddq
Post Otlice Box 238 Vail. (lolorado 8 | fi58
'l elephone: (97O) li27-Sfili{)
li27-.tfi.5 (r
'l'o: OoldcnPcaliPrcsidcnfs.r\dvisoryConrmittcc
From: .Iirrr Larrrunl, Exeoutive l)irer:krr
l)ate: .Iune ll 1997
RLl: Goldcu Pcali Pnvilion Rcviscd Dcsiel
Attached are lwo archileclurul elevaliorr views ol'lhe revised desisn lirr lhe nrorrosed
Goldcu Prxli Pavilion. 'lhc purposc of drc structr,u! is tcr acconunod'rtc iki rclatcd'acdvitics dru'-
ine thc wintcr rnondrs, 'lhis mattr:c was undcr considctatiou last sruumcr an<l wa-s a sourcc of con-
ccir regarding both design and coverranl issues. Tlre Paviliorr is sohcdulcd lirr rcview by thc
Dcsien'Rcvidv lJoard oi Julv 2. l9l)7,
irr thc sutnnrer trl'f 996, Vail Assrrciales considered several design corrccpts lirr thc prrr
poscd projcct.. 'lhcil tirxt ptoposal was tbt a pcrmancot pavilion stuciirrr:. n Vill Crtck'prop-
erly owrrer, who would lrave beerr aflbctcd by the proposed pcnnanent slruclure, lilcd an appeal
with the Town Courrcil ol'the Desisrr Rcview Roard's aprrnrvul ol'lhe paviliort. Vail Ass<:ciales
witircLcw dr.c proposol. A sccond drupos.d wns rnadc. i iornbinatiorr 6f a tcnrpolnry saucttu'c
and 1enl. Tlrt; Towrr ol'Vail guve pennissiorr lirr tlre oonslruclion ol'a oorrore[e pad and a lernpu-
rury slruclure/tent kr be alloded ltir the winler morrtlrs onlv. Iitilitv services weire incr>rnoratcl
irrto thc concrctc pad bccausc thc tqrt was to trc uscd tbi'tbod scrdcc and uscs dnt coufd not bc
corrduclcd in tlrE rnairr (iolden Peak base lodge building, as it was urrder conslructiorr. The ternp()-
rary slnrclure/tenl has becrr rernoved and lhe -soncrete p-ad with utility services rcrnairrs.
There were several covenanl issues raised with Vail Ass<rciates by Martor Vail's legal con-
sul in drc $usuncf, of 1996. Orrc issuc was & cove'lrant provision durt only scosonal stuctruts tbr
athlctic, cduc"rtionrl and cultrunl arc punrittcd on drc opcn spacc portions of thc Coldcn Pcali sitc.
As a result ol'this nnrvision- historicallv. seas()rl struolures lilr the allowed seasonll uses have
bccn rcmovcd at drc conclusion of thc"scason for which drcy wcrc irrtcndcd. As a rcsult tbis prac-
ticc, a contovcrsy cxists rLS to thc stet$ of thc propo$cd pcnDnnqrt poviliou os to whctlcr it cont-
plics with tlre seasr>n structure requirernenl. It is urrkrrown at this tirne i{'the legal issues raised by
Marrrr Vail concqrring thc covcnint issucs havc bccn rcsolvcd
It is the c()nccm cll'some propcrly ()wrlcrs that il'a ;rcnnatrerrt slruclure is allowed, it will
$ct dlc prcccd')nt tbr othct pumairort scasou.rl s[uctnrcs. ''lhc rcsult bcing drc potcntial tbr flrc
prolilbration ol'structures in tlrose areas o['llre sitc thal are intonded hy tlre c<lverranl agreemenl [o
rernairr as recrealiorral open space. I['tlre coverran[ issues are ignored hy adjacenl pnlperty owrr-
cls, who arc covcluurt holdcls, trctc oray bc rurdcsir'ablc long tcntt collqcquqnccs
The covenarrt agreenrent Dnrvides a means by which llre tenrrs <ll'thc qrvenants oan bc
arrcudcd. 'lhis proccsi was usqil tbr drc approval oldrc Childrcrfs Cclrtcr'. 'lhc prrrccss is cx-
lremely arduous. Thc arnendrncrrt pnrcess requires arr allinnalive vole by an cxlraordinary rnajor-
ily, rrrr>rrerlv ()wncrs owning 75 .o/o of'the land in the covenunt area. The c()venanl arca surroutrds
ti,i Oolhcn"pcak sitc !'om Mill Creck Circlc to Mauor Vail. Vail Associatcs is scckine a rrso-
lutiorr kr the season structlrro issues that is conrpttible with thc present larrguuge o l'tholt:vcnants
and thal avr>ids the arduousrtess ol'the urnerrdrnenl rrroscss.
It is advi
Messag€y'l.AX: (.)7o)
5
E
;
E
tl
tlzllotl
Fll
5tl
EIzll
I
t-g
\g
J
?
0
J
J.
4c
g+
^$-
\
t)
IAJn
\lt
t,
Vail Resorts llevelopment Conpany
fttl,,glhe
Saandudtoa
wbddClatt
Vail . Breckenridge r Keystone . Beaver Creek@ . Bachelor Gulcho . Arrowhead
August 8, 1997
Lauren Waterton
Town of Vail
75 South Frontiage Road
Vail. Colorado 81657
REF: Golden Peak Base Facility
File GPB96.728
1) Letter, Niznik to Waterton, Moore, dated 8/1/97, same subject, GP896.719
SUB: Bike Path, Childrens Center Parking Lot Planter
Dear Lauren.
As per our discussion this morning, the concrete section of the bike path will be asphalt with
a 2 foot grass transition to the face of Apres Ski stone wall. The exact location of the bike
path as it transitions over Mill Creek will be determined by the headwall location where the
creek enters the concrete culvert, whether at its present as-built condition or at a new
headwall location up stream.
Since the TOV is maintaining its position concerning traffic flow through the parking lot as
directed by the planters. We will leave the existing planter condition as per D\M drawings and
landscape accordingly.
Thank you for your time in coming to the site to review our project.
Senior Project Manager
attach
cc: David Corbin
Jack Hunn
Tom Mayhew - PSA
Ethan Moore - DWI
Terry UE - Weits-Cohen
Stephen Titus - Randall Blake
137 Benchmark Road . PO Box 959 . Avon,Colorado . 81620-0959 . phone 970.845 2535 . fax 970.845 2555 gt
Vail Besorts llevelopnent Conpany
tuthBth.
Slandotd for
WoddCbst
Aiplna R6ottt!
Vail . Breckenridge . Keystone . Beaver Creeko . Bachelor Gulch@ . Arrowhead
July 24, 1997
Lauren Waterton
Town of Vail
75 S. Frontage Road
Vail, Colorado 81657
Ethan Moore
Mary Dewing
Design Workshop, Inc.
953 S. Frontage Road West
Vail. CO 8'1657
REF: Golden Peak Base Facility
File GPB96.718
1) Letter Dewing to Waterton, dated 7123197 , subject Golden Peak Landscaping
SUB: Landscaprng @ Parking Garage
Dear Lauren, Ethan and Mary,
The above referenced letter and attachmenl changes the design of the planter across from
the Parking Garage entry. Aside from the goals of screening light from the garage, the trees
ranging in size from 10' to 20' cannot be planted in the locations due to significant
underground utilities already in this planter. I have aftached the proposed sketch marked up
with the underground interferences. We are placing a hold on this change pending further
review by VRDC. Since the construction sequence permits at least some time before the
landscape contractor is complete, we will review all lighting issues in this area after the TOV
street lights are placed and illuminated.
lf you have questions please feel free to contact me at 970.479.3142i ot if urgent, with
Jennifer at 970.479. 3149.
Sin99reg,(w
Bettra_Niznik
Senior Project Manager
cc: David Corbin
Jack Hunn
Tom Mayhew - PSA
Terry UE - WeiE-Cohen
137 Benchmark Road . PO Box 959 . Avon, Colorado . 81620-0959 . phone 970.845 2535 . Jax97O.U5 2555 t,
lr--\'
r0
ID2
7,
otr
$
sJ
aov^{3
:{t\
J
. .,L
Bo
d
t
il/tb ra
f- lt!\ (
Irl \ I
\9s
\9
Itt
/E
Y
$
L t EA dOHS)2tOtrtoL6
, "ta-23-s7 lz:l3P o=U" woRKsHoP vai'l s7u76 a'4o9 P-Ot
Dcriglr I'rrknhql lrc
Lrndric.r1x Ar.'lrilecltrr
l.rrrl Pllnnin6
Ilrlmn Dtli6n
'lirurirrn PlmrrinF
PROJECT MDMORANDTIM:
TO:
FROM;
DA1T:
Lauren Watcrton
Dcsign Wo*shop - Mary llwing
July 23, 1997
t,. ii,\, lt,'ut.r!', ll,,,r,l \\,'-t
rrrrr'lll:t
\;rtl. l.,J,,r;rrl,,
i;lr '.i-
'1,.1,1'h, 'rrl
,t-l | { 'tr iilllii
l.l '.rurrk'
r|;rl 1 1' :; rlFl
\1"tt
\ll,,i, t,,,.,,t,,,.
I lrttrr t
.l,r, L.,rr I l,h'
Plrrr.trtr
);rrttrr l''
-irrr I;rrrl.'
Rlt): Golden Pcak f,errdscepe
I am sending you a copy of ttrc landscape Plen for thc w€st end of the passcncgcr dntp olf
area. This pilan tras biir modificd o addniss thc scrcening o{fre qrragg 9ntry from the
Scasons ana Ramshom condminiums. Thc modificd plan rellects 7 additional $Prucc lrrts
rarging in size from lO' to 20' in hcight. Tte specif,rc sizc is indicatcd within crch fec . | , :
sym-bol on tbc plan, Thc location oftie trecs ha.r been flaggod in thc fcild amd thc
iismtladon shqrld occrrl on Slcnesday of ncxt wcck. If you world likc to mcct on thc sitc
prior lo the installation to discuss thc llan or havc any qttestions or comments rcgardint
thc plan, pleasc do not hesitatc to call.
cc: David Corbin
DESIGNV/ORKSHOP
/
/\
Y
.t
tl
I
I
I
I
tt --tl
II
It
t
t
Y
.It
{
F
$
$KJ
dET:ZT -EZ- LFCL ! EA dOHS)|UO'vt.oot t.1..zo'd
sep-zs-e6 ol ilrP o.= tryo*KsHoP-va l'l
DESIGNWORKSIIOP
Landscape Architecrure
Lnnd Plaurirrg
lJrhan Dcsign
Toufi$fi Pla.nning
935 Soudr lrront{ge Rd. West
Vail, Colorado
81657
Tele.phonc
9704768408
Fecsimik:
9m476-t409
Commonts:
Todd, this isjurt a quick not6 to c$nfirm our convcrtation on 9.2f.66 npprovirrg thv lttsht $landurds at Cotden peak
as "Vetde Gtcen" color. As we di$cuised, I hwe received a cobr sampli tom the conaacror, snd while rle sEmploAnnciri to b€ slightly d*k.r dran the exioriug fixturc$ ot thc rounrl.a-bout, dris oulur rliffenmsc is mott l8cly a rEsult
o{ gxidatign of th€ €xisting fixurcs an.t thc varialioffi that occurs wirhin differnt qrlor batches. Wc rrc procceding
with thc "vcrdc Grcen" color for ell tight etandErds on ths Goldcn Fcal projcct, 'l'hanhs!
97O;A76-A4(J9
Fecsiorilc Trrusruillrl
D!tc: seFemtr€r 23, 1996
JUU Nurubsr: l0tl6
Tu. Tudd Oppcnhcimer, TOV
bltnl: E0ran Moorc
Nunrbor uf Pagcs (irrulutlint trunsminal) 1
If you do not reccivs all Fges. please call immediatcly"
P. Ol
Sincercly.err ltbffi\,^ !Vtffit----
Lauren Wanenon, TOV
Rick Caudel, VA
Tom Mayhew, PSA
DESIGNWORKSHOP
Ap?-o4-s7 o2227P o"=i|J\ hroRKsHoP vail 97 t'r,47 6 A40S'P-Ot
DESIGNWORKSIIOP
Landscape Arch itcclurc
Lrnd I'lannirrg
Ilrbm Design
lburism Planning
Facsimile Transmittal
f)atc 414197
To l.aurcn Walterton
ljrotn Uthan Moorc
Job Nurrrber 1066
Number of Pages (including trammi[d)
')
gtl S. Frontrge Rd, W.
Suirc 102
Vail. Colorrdo t 165?
970'{?GE40t
FAX 476-8409
Commcnts
Lauren. this l'ax conocrns the upcorning initiation of lhc l,irnr.lscapc portion of thc Golden peak
Projcct. I mct with lbdd Oppenhciutcr lirst wcck rcg,urdiug rhc lirllowirrg issucs, and I havc
outlincd lhc rSrccmcnL\ we rcachcd. In addition, I anr n:qcstirrg nrtxlificatiou tcl one of tlrc
agrc€mcnl\ we discussc4 duc to unf'orsccn cost conccms which I will explain below.
I ' 'Ihe first issue rcgardul the sizu ol'threc gnruntlcovcr species. I discusscd with Todd that wc
reducc the installcd grcundcovcr pot size tionr u 6'' pot to a 4" pot on the tbllowing plants:
a. AJUR- Ajuga rcptans . 12" o.c. spacing
b. MAHR- Mahonia rcpcns -l E'' o-c. spacing
c, PAC'I'- P:rchyszurdra tcrmjnalis- g" o.c. spacing
Lauren, plcuse nolc thrrt thc plant spacinus and qu:rntity ol'grourrtlctrver will remain unchangcd"and'lbdd a8,rccd to this udjusttttcnt. I shoukl notc hcre also thut lbdd suggcstcd that wc
climinate the use of Pachysarrrha (PA(:T) duc to questionable succcss ofit-;s plant in ou alpincenvjronmcnt. Accordingly. zurd wirh 'l'o<ld's appri,uul. wc hirve change6 alt rirthc pACT toMahonia rcpens (MAl lR).
2' The second itettt that dccrns revisiting is our usc ol'sod. (lurrently we hnvc :r sod vcrsion oflhe "nlounkrin mix" sccd speciticd. Accorrling to cvery bid subnritied- it is difficutt if notimJrossible to obtain this custorn .so<J trilx. lodd requcstcd thal wc rlelctc the ..mountian mix,,sod, replacc it with a bluegrass sod. anrl incrcuse thr"l umount ol'sod wc hnvc shown on thednwings (sec attuchcd drawing). 'llrc only ar'cu of sorl we dclcrerl was an l g" strip of sqd alongall edgcs ol'pavcmcnt (this was never a Towr r'rl'vail rcquirerncnt- wc:llded to &e drawings onour own..). Regarding this is.sue. I would like to nmend i't,,1.1', rcquest 19 he as lbllows:l' we will replace thc "mouttlrtirr rnix" so<l with a blucgrass sod to match that cuncn1yin usc ut l-:,[J. Chcstcrs horrl*,. inrnrcdiatcdly crutiguorrs to the prqiecr.
2. wc w'ill lirlly sod the lrvo $no\a storagc ir.a* us sh,,*n on fi; approvcd pt'ns.3' We will also tully sod t,hc arca berwccn h,.ll, Chesrr,.rs honrc m<i the nsphalt putcsrrianwalk to the north. ('l'his area wiu not n:quired lo be sotldcd ol the approved drawings)
DESIGNWORKSHOP
Ap?-a4-e7 ('2:?7P o==T woRKsH()P vail e7v6 a4os
4. Wc will sced the atca on top olthc parking st.nrcturc to the rrtrnh ol'the asphall watk as
showu on the approvcd rlrawings.
Laurcn, pleasc lct mc reilcratc. as I ctid with'lbdd, lhsl nenc of the tbovc changcs reprcscnr any
dscrcasc in any ltmount ol'plant nriltcrill lronr whut is shout on thc ilpprovcd dr*wings. ln
addition. wc arc matching il'not slightty increasing thc amount ol stxl rcquirctl on the approve<I
drawings, and we an'switching our sod specics ro a bluegrass as lirdcl lmd suggcstcd. iiris
memo is lirr your rsuords, if I do nol here hack Inrm I wlll assune that you have notcd this
adjustmenl and did not havc uny t'unhcr questinrrs. 'l'huuk you.
bvh'^ p\'fo'---*-'--*
Ethan Moorc
I{ick Caudel. Vail Associarcs
'lbdd Oppcnhcimer,'t OV Puhlic Works
P.O?
DESIGNWORKSHOP
$fi
.,)
' ,/\
Af
$g
$tJ
s
J
;1
.rr. Il
rr. il
.rll i
I
F
9
fi
$?
$
--Jr'
^{
-!A
ti$,EN/^,.+...
L6-to--tdv
Vail Associates, Inc.
RE:
July3l,l996
Ms. Lauren Waterton
Community Development Department
Town of Vail
75 South Frontage Road West
Vail CO 81657
Golden Peak Base Facility
Site Development/Off-Site Improvements
Clarification Of Handicap Ramp Details
Dear Lauren:
It has recently come to my attention that there may be some confusion on the part of cenain members
of the Town Staffwith regard to the intended and approved detail for the required handicapped ramps
related to curb cuts at the above referenced project.
The purpose of the correspondence is to clarifo that Vail Associates, Inc. intends to install color
impregnated concrete handicap ramps in all locations, as indicated on the approved development
plans, within our project site and along Vail Valley Drive. The concrete handicap ramp detail is
consistent with drawings which are approved by the Design Review Board and the Building
Departrnent. It is our position that we are not obligated to install the required ramps with a brick paver
finish, as has been recently suggested by the Town Engineer. This matter was specifically discussed
with the Design Review Board and a well informed decision was made months ago.
Our project team is committed to completing the project site and off-site improvements in accordance
our schedule and prior to the start ofthe 199619'7 ski season. Changes, or the suggestion ofchanges to
our contractor and their subcontractors will comoromise our abilitv to successfully deliver these
improvements on schedule..
cc: David Corbin
Rick Caudel
Owne6 and Operatars ol
Ya,, Berv€r Cr€eP neiorf
and A N/heal MoLntatn''
PO Box 7 . Vail, Colorado. 81658. phone 970 476 5601 r.t
Ju'l-10-9Ct 1a : ZOI' E,caUwoRr(sHoP-val1
DESIGNWORI(SHUf
Lrndscape Architccturc
Land Planning
Urban Design
Tourism Plrnning
935 South l'rontagc Rd, wcst
Vail, Colorudo
Et657
Tclephone
970-476-t40E
Facrimila
970476-E409
Cqnocnts:
Lrurun,
Just a quick updat€ notc rcgeding your tiles on Goldpn Peak. I recently isucd a chrilication to lhe contnctor,
SbtitrBthst all sitc walls covercd in EIFS chnll match the whhe EIFS of the rrchitccture. Plcare nota thf,t rhin isnnr
il ehlnge, but mther a cluification. I drought you nighl wrnt to €ntor it into our project DRB lilc. If you hlvc any
qucstions. plc0lc don't hesihto to contacl mE, fhankr.
cc David Cwhin, VA
"rTr"-Ezlos F.or
l'ecrinilc Traurnittal
Datc: July 10, 1996
Job Number 1066
'l'oi Larcn Wsttorton, lov
From: Ethan Moore
t',fumber of Pagcs (including ransmiual) I
If you do not rocclvc all pegcs, plersc call immcdiutrly.
DEsfGl'fw'()ttt<'srrc)P
J|.rn-os-g,7 o3:44P o==|J woRKsHoP vail e7T?6 a4oe P. Ol
953 S. FrcntageRd" W.
Suitc 102
VaiL Colorado 81657
97047(,-{il;O8
rAx 4?6-t409
Comments
ttEStGilwonKsr{)P
Landecapc Architccturc
Land Planaing
Uften Dcsign
Tourism Planning
Frcsimile Tnnsmittsl
Dare 0610919?
To Lauren Wattenon
From Etlun Moorc
Job Number 1066
Numbcr of Pages (includiqg traruminal)
I
lry"q9t.itiust l qu!9k notc for your rccords of a small field adiustmcnr wc had to makc in rhcfield at Golden Pcak. The small plaza at thc intersec-tion of Mill cieek Circlc and Vail ValleyDrivc contrins two l8''tall rcat wallg which form rhe rcrr bounoary of tfrc pfara. o"" t" tliepresence oftwq tE'' buricd storm dninagc pipes, wc had to adjurt ihe ndius and columnlocations of tbewalt so that the rvail fooriqgslouH not conflia with thc uruiea pipe. The sizc of
F" pl"? hrs not changcd, pr has rny ofthe matedars. tbis * pur.ty n tn1..rt
"dlurtor*m toinsne tha.t the rmdcrground utiritics wcrc prq*rved ud rh.r rhe;;tir;fib wourd bestrucorally,sound. Ifyou datg I crn scnd you a sketch showing the aojustrne4 but otherwisc Ido not ned arU further djrcction fiom you. i' will
"ontin rc to stri've to klp you aprised of anyothcr adjustmcnts to the tandscapc or hlrdscape that may u. *""r*"ty ." L procr"o towardsurmpletion of this projcct.
on r ralated note, aE we hrvedisclsscd bricfly beforq it is higtrly likcly that adjustmcnts will haveto be made to the landccrpe plan due to urfor-sccrr conditionsl fo**L, ir"-t lo assureyouthat any adjustments will bc in laput only, and both vA anathe lanJsa;" ***o, are awarethat we will nqt reducc thc plant quantities in the went thet smatt aajuct;c'ts have to be made, lfyou hlve3nf questions. pleasc do not hcsitate to contact me. Thanls!
",.{-.\1}v{\.n
Ethan Moore I
DESIGNWORKSHOP
l{AY-13-96 l'l0N l1:52 Al,l P, 02
[4ay 13, 1996
5!5 Ea.sr vA[ vlrrEy Dwvr vmq CorcnADo 81657
970-47 6-1ffi0 Frx 970-4?(>4982
ru0-9"s0-€?45
Deeign Workshop
935 S. Frontage Road West
Vail, CO 61657
Dear Mr. Moore,
I received your memo dated May 10, today, I have this following comments.
1. This is significantly different then af;reed upon with Vail Associates and Town
of Vail.
2, No expenses to Manor Vail Lodge was the arrangement therefore no charge for
inigation movement.
3. Cuarantee on tlr€'s survivibilty of moving? | was told in a meeting with Vail
Associaler and Tawn of Vail that moving the treee would kill them-
4. Vail Associates agreed tu arftl new scretnin6 vegetation at Manor Vall Lodge In
lieu of across the street due to their space constraints.
This plan is not acceptable as is. Please call.
Sincereln
cc: Philip Eisenberg - Manor Vail Condominium Asociation
Chuck Relchert - Manor vall Condominium Association
Dave Corbin - Vail Associates
Ric Petersen - Manor Vail lodge
-Ju .f q$utg-:.ro* qt vij!-
Ric Caudell . Vail Associates
VAIL LODGE
McCleary,
Vail Associates, Inc.
TRANSMITTAL LETTER,
DESIGN AND CONSTN,UCTION
47$31t0 Telephom
O*3l4f3Fax#
PROJECT: Golden Peak Base Facil
TO: Town Of Vail
ATTN: Lauren Waterton
75 South Frontage RoaC
Vail CO 81657
WE TRANSIVIIT:
(x ) HEREWITH () UNDER SEPARATE COVER VIA
O IN ACCORDANCE WITH YOUR REQUEST-
FOR YOUR:
) APPROVAL O DISTRIBUTION TO PARTIES
) REVIEW& COMMENT O RECORD
x )USE ( )
THE FOLLOWING:
CONTRACT \O. OI.R I4O
REFERENCENO: GPB96.1
DATE: Anril 26- 19965
IF ENCLOSURES ARE NOT AS NOTED,
PLEASE INFORM US IMMEDIATELY.
IF CHECKED BELOW, PLEASE:
O ACKNOWLEDGE RECEIPT OF ENCLOSURES
O RETLTRN ENCLOSURES TO US.
0INFORMATION
Owtjt \,i ti ('t).:tdia,\.!
lrr, 3, ./! i,eii' !,.i(]fl
DRAWINGS
SPECIFICATIONS
CHANGE ORDER
O SHOP DRAWING PRINTS
O SHOP DRAWING REPRODUCTIONS
( x ) Fabric for children's center
) PRODUCT LITERATURE
) SAMPLES
a.l At '!/l !,x:i Mnt,t t,!tit:
COPIES DATE REV. NO.DESCRIPIIO:{ACTION CODE
IEA Fabric For Children's Center
lPEwrrttLrJ H24tt'u-
ACTION: A.
B.
C.
REN{ARKS:
ACTION INDICATED ON ITEM(SI TRANSIVIITTED
NO ACTION REQUIRED
FOR SIGNATURE AND RETURN TO THIS OFFICE
Pleasc call mc il'you have any questi()rs.
FOR SIGNATTIRE AND FORWARDING AS
NOTED BELOW UNDER ''REMARKS'
SEE "RET'lARKS'' BELOW
D.
\l|-t\\,r
V/
llllllxililii"|i
COPIES TO:
Master File
(WITH ENCLOSLIRE(S)()()
BY:
()
Director
& Construction
PO 8ox 7 . Vail, Colorado . 8 1658 . phone 970 476 5601
olign Review Action Filn
TOWN OF VAIL
Category Number
Project Name:
Building Name:
Project Description:
Owner. Address and Phone:
2-- -a-, ' )
Zone District "--fJ<Legal Description:
Project Street Address:
Comments:
Motion by:
Seconded by;
D Approval
fl Disapproval
\lstutrRpprou"t,/ \ -T-' Conditions: Y
Town Planner
o"", lD-lb-1tv' DRBFeePre-paid
SliltPnlilnun4un '
) jnj28t'fiar
II
I-L
:-t i,ttilfl
.!9't'.: *q., r
x.rt.d. all1 l9l
DESIGN REVTEW
I.
A.
BOARD APPIJICATION - TOI{N OF VAIIJ, COITORN)O
DATE RECEIVED:
DATE OF DRB MEETING:
**rt**t*a**
INCOMPI'WE APPIJICATIONS ItAy NOT BE SCXEDWED FOR Rt]rIEW.t**tt**tt*
PROiIECT INFOR}IATION :
DESCRIPTTON: T rarv modular of fice trailer to be installed
fr about Nov.th-an.
B.TYPE OF REVIEW:
New Construction (9200.00)Addition ($50.00)
ADDRESS:
x Minor Alteration (920.00)
Conceptual Review ($0)
c.
D.
E.
G.
LEGAL DESCRIPTTON: I,OE
-
B1OCKsubdivision rract e. vail-tirr;;t7th rili@illage
5th Filingff property is described by a meets and bounds legaldescription, please provide on a separaEe sheet and attachto this applicarion.
ZONING: Ski base 1 reereation
NAI'{E OFMailing APPLICANT: Vail Associates, fnc.
Address: P.o. Box 7 Vai1, CO 81658
Phone 479-3012
NAME OFMailing AppIrICAfiIT' S REPRESENTATIVE: Joe MacyAddress: P.o. Box 7 VaiI, Co 81658
Phone 479-1012
H.NAI'TE OF OWNER(S):
OIINER(S) SIGNATI]RE:
t'lai1i-ng Address:
Phone
APPIJTCATTONS WILL NOT BE PROCESSED WITHOW OWNER'S SrCJ\IA?URE
Condominium Approval if app1j.cab1e.
DRB FEE: DRB fees, as shown above, are to be paid at thet.ime of submittal of the DRB application. Later, whenapplying for a building penniL, please identify the accuratevaluation of the proposal. The Town of Vail will adjust thefee according t,o t.he table below, to ensure the correct. feeis paid.
FEE PAID: T CIIECK #: DATE: BY:
r.
J.
FEE SCHEDULE:
VALUATION$ o $ 1o,ooo
$ 10, 001 - $ s0, 000
$50,001 -$ 150,000
$150, 001 - g 500, 000
s500, 001- - 91, 000, 000S Over $1,000,000
DESI T REVIETI BOERD APPROVAIJ EXPIRES
APPROVAIJ I'NIJESS A BUIIJDING PERIIIT IgIS STARTBD.
FEE
$ 20.00
$ s0.00
$100 .00
$200.00
$400.00
$s00.00
ONE YE,AR A TBR FINAIJ
ISST'ED }I{D CONSTRUCTTON
Vail Associates, Inc.
owrreB and Operato$ of
vail. Eeavet Geeko Resort
and Arrowhead Mountain "
Mr. Mike Mollica
Department of Community Development
Town of Vail
75 S. Frontage Road West
VaiI, CO 81657
October 14,1995
Dear Mike,
I am writing to you to inform you that we will need to install a modular
building at Golden Peak to serye as a temporary ticket office until the
new ticket office can be completed.
The building will be 8' x20' and will serve as a ticket office. We estimate
that the trailer will have to be in place from about November 15th to
January 15th. Attached is a site plan showing where the trailer would
go, photos of the actual trailer which will be used and a floor plan of the
trailer. The trailer will be heated, lighted, alarmed with telephone, etc.
Some minor site work with ramps, etc. will have to be done to make it
accessible to pedestrians, etc. The trailer would be removed as soon as
the new ticket office is ready.
Please call with any questions.
Sincerelv,
VAIL ASSOCIATES,INC.
29
cc: Chris Ryman without attachments
attachments: site plary photos, applicatiory floor plan of trailer
PO Box 7 . Vail. Colorado .81658 . ohone 970 476 5601 r.t
<
$;o=zrU
=o
Ec
(E
opa
.E
o.o
ocoo
o
(.)
l:.
cf)r
m
CNo):fh
J
E
Lu
Q
$
cf)
O)
LONO*t-'l*Fzf
\,tr
F
D{oqNjxi
DLoo$
=,-Sst
o
xom
Tc(u
(L
li
I
V
o-,8
il5
G
ri
I
a-
TOWN OF VAIL
DF,PARTMEIiT OF CorlIt u^-tTY DE\TLOPItIENT
PnorucT
C'IECIC.S II{ DE IAYABI-E TO TOTVN OP VAIL
o^,. l0 ,J'
ACCIOU^-_TNO,
0l 00004 540 ZONINC AND N DDRESS MAPS $J.00
0 I 0000 424 t 5 U NIFORM B UI LDINGEODI-'--554.OO
0 oo00 424 l5 U NI FORM PLUM IJi NGEODI's19.00
0l 0000 42415 UNIFoRMMECIM $J7.00
0 oo00 424 t5 UN]FORM FIRD CODE s36.00
o oo00 424 t5 NATIONN L ELECTRICAL CODI:5l /.00
0 0000 424 | 5 OTIIER CODI: tsOOKS
0 0000 4 r 548 BLUE PRINTS (MYLARS)s7.00
0 oo00 42412 XEROX COPII:S s0.25
0 00Oo 42412 STUDIES
0l 0000 42412 TOVI.'EES COMPUTER PROCRNM s5.oo
0l oo00 42i71 PENALTY FEES / RE.NSPEETIONS
0 oo00 4 332 l'Ln N REvlliw RIi-ClIECK I'-l:lj [S40 l'l:R llR.]
0 0000 42332 OFI. IIOURS INSFDCTIONT'
0 oo00 41412 CONTR^CTORS LICIINSIJS FEES
0 0000 414ll S]GN APPLICNTION FEE s20.00
0 0000 4 413 ADDITIONNL SIGNAGE FI..IJ ISI.OO PER SO.FI
VTC ART PROJECT DONATION
0 oo00.4 jil )RE PAID DI:SICN RIIVIEW I]ON RD FEI:,At
0 I oo00 z2*r INV ESTICNTION FI.]I] ( I]U ILDI NC
J oo00 45 u 0 TOV PARKINC FUND
0 oo00 22027 I Ov NP-wSPn PIaR DISPI:NSI:R f UND* 0l 0000 2l I t2 TAXABLE@i4;5m* 0l 0000 410t0 TAXABLE@4.q2-(rown)
tl 0000 42371 IIUILDING lNVl:STIcn TION
ITIIIJR
PEC APPLICATION FEES
0l 0000 4 JJU I 520U.00
U u)00 4 Jt0 CONDITIONAL USE PERMIT s200.00
0 oo00 4 330 ExTE 5200.0c1
0l 0()00 4 3i0 EXTL,RIOR ALTERATION IMORF. TI]AN TOOSOJ'I 55UU.00
0000 4 i30 SPIICIALDI--VELOM s I . )00.00
(_l 0000 4 310 SPL,CIAL DEVj--LOPM llNT DISTR ICT TMAJOR n MEND s | ,0(ru.00
0 0000 4 330 SPI:CIAL DEVI:LOPMI'NT DISTR]-T IMINOR AMIND s200.00
t,0000 4 3i0 SUBDIVISION
0 ff)tn 4l130 VN RIANCI;s250.00
0 oo00 41330 ZONINC CODIi AMI:NDMENTS 52)0.O0
0 (x)u) 4 l_io RE - ZONING s200.00
oTilDR
OTIIER J
cAss r------------r,.*.,flf275M. o r-.^o. ur, lr{i,/
Tclrdhr clF (Jtrl I L-
Hiscellaneous Cash
lli-l4-?F-, 14:5r':4F-'
Fl*i*ist * ;jElTg4E
Fcct,r-.rrrt. + lli ++ :l:11
Jl:lE l'!Fr:rJ"trFlB FEE
Ftrr*unt. t'snder*d i
Itenr Paid
B 1Br:ltjrjj41f,f, 1E1$B
[:l-r.3rr$e r* t t-'| rned :
.IB. EE
Fmaun t Paid
?fi. 6E
l:1 . [1f]
THFHT4 \,GU
\t,:ut' cg=hier FlEt-tTHFt
rEcll?r b Ton oflt
a'l {?3??
DATE
I
I
I
II
Il
I
I
I
II
I
I
I
II
II
II Permit Numbers ----------- n ;
HOW PAID-Cash
-$eck
Il ll
75 South Frontage Road
Vail" Colorado 81657
970-479-2 I 3 8/479 -2 1 i 9
FAX97M79-2452
Septernber 25,1996
Jack Hunn
Vail Associates. Inc.
PO Box 7
Vail. CO 81658
RE: DRB approval of Golden Peak temporary tent
Departmen of Community Devclopment
Yvhito
Dear Jack:
This lener is intended to be an addendum to the approval ofthe temporary tent for the Golden
Peak site, After the staffapproval of this tent on September 4,1996, it came to my attention that
the proposedtent does not conform with the approved development plan' The approval is
modified as follows:
L In order to comply u'ith the development plan, it is necessary that the concrete foundation
pad not exceed -10'x80'.
2. This approval is valid for the 1996-97 ski season only. It will be necessary to retum to the
Toun of Vail in order to cither amend the development plan to allow for a larger tent or a
more permanent stucture. or to review the use of the culTent tent.
Should you bare any questions. please feel free to contact me at479'2128.
Sincerely,
il
l"["w+t -, L\LuUs,rfrD.--
Lauren Waterton
Planning Liaison Officer
cc: Jim Lamont, E\TIA
{grtnororuo
w,,ftoffP''
Vail Associates Real Dstate 0roup, Inc.
Developc't of Vail,
l€ar€r C.eeFnesort
Atowhead" and
Sa.helot Gukh village-
September 19,1996
Ms. Lauren Waterton
Community Development Department
Town of Vail
75 South Frontage Rd.
Vail, CO 81657
Golden Peak project - tent pavilion
Dear Lauren:
I received your message Tuesday regarding the size ofthe Golden Peak tent pad' My
understanding is that the current tent pavilion plan submitted by Vail Associates for the Golden
Peak ski yard consists of a concrete foundation pad of approximately 40 feet by 100 feet' in
contrast to the approved site plan which depicts a pad with dimensions of40 feet by 80 feet.
I have now spoken with Chris Ryman, Jack Hunn and Rick Caudel regarding this
deviation from the approved plan. My understanding for the proposed change is that the
original ptan of a 40' x 80' pad mirrored the dimension of the canvas tent rvhich has been used
seasonally for ski race events. This tent was primarily for organizing activities, seating, service
of food and shelter for race participants and observers. The tent size of 3,200 square feet was
adequate for groups of approximately 250 people calculating usage at 12 square feet per person
per seat. In addition to the shelter provided by the tent, during ski race events for groups of
this size, outdoor barbecue grills, service equipment and portable toilets were frequently placed
in the ski yard to serve these guests. The toilets, grills and equipment were uncovered, exposed
to the weather, and clearly visible to surrounding properties and the public.
The enlarged pad and tent depicted in the current proposal have increased the concrete
slab and the tent coverage by roughly 20 linear feet (800 s.f.) to move the toilets and food
equipment under the tent and out of view to the pubtic and surrounding properties. Mcuntain
Operations personnel feel this is an improvement for the aesthetics ofthe ski yard and our guest
services. The toilets and equipment contemplated are modular and are removable with the
tent. We ask that staff approve this change as a minor modification to the approved plan. On
the other hand, if this alteration is not acceptable to you we will continue to leave the portable
facilities exposed during race operations as in years past. Please advise me of staffs position on
this matter at your earliest convenience. Thank you for your consideration.
Very truly,
David G. Corbin, Vice President
cc: Jack Hunn, Rick Caudel, Chris Ryman
Jim Larnont
137 Benchmark Road . PO Box 959 . Avon, Colorado . 81520 . phone 970 845 2535 . fax 970 845 2555 tt
TLT If r,1
.4..i...a...a
Daf']lct.'' ol v.il,
l||{. Cr.rt'la|cfi,
ttn!,i/tr]f aN
rdr&r Orrrah VrlrrF
'\NI\\\\v/Hffiry!alattla
Scptrmbcr 19, 1996
Mr, Lrqrcn Wrterton
Cornnuntty Dcvelopmcnt DGprrtnctrt
Town of Vril
75 South Frontrge Rd,
Vell, CO 81657
rci Goldrn Pmk proJ€ct. tsna prvillon
Dcir Lrurcn:
I recelvcd your Ecrsrg! Tuerrlry rogrrdlng thc Nit€ of thc Gol.ler pcak tstrt psd. My
undcrelrndlng lr lhrt the currcnt ttni prvilio! pbu rubmiticd by Vrtl tutociiter for tbr Goldrn
Pcrk rkl yerd cosrirts of g congeb fouudgtlon ped of rpproximrtcly {0 fset by 100 hcf tu
conhnt to thc rpprovcd dte plrn which dqtcb r prd wlth dlncusioae of {0 h.t by 80 f.€t.
I havc now rpokrn wlth Chrir Rynrrn, Jrck Hunn rnd RIck Crudcl rogrrdlng thls
devirtion frrn thc rpprwcd plrn. My underrtelding lor thc proporcd changc lr thrt abe
orlglnrl plrn of e {0' r t0' pad rnlrrorcd the dinruion of thc cllvrr tont whlch hrr bccn nrcd
luronrlly for aki rrcc rvontc. Thlt tcut wri prlnrrlg for orgrnizlng ectfultlrr, rcrthg rtnric
of food ud rhcltrr for recc prrticiprnt .!d ob&rrtri. Thc tctrt rirr of !1200 rqurrc f:rt wrr
sd.qurtc for groupr of rpprorimrtrly 250 poopb crlculailng u'rgc rt 12 rquere fcrt pcr prrroo
p.r lcet In rddition to thc ch.Ihr providrd by tbe teut, durlag rkl rrce.vcntt for groupr of
thfu tizq outdoor brrbecuc grlllr, Ninicc.qulpnGlt rnd portrblc tolLh wert frrquently phcrd
in the cki yrrd to srrve tt|re guctr' The toll3t3, grltk Ind lqulpmcnt w€rc uncovcrrd, cxpoScd
to tho wother, rnd clerrly viribl: to rurroundiag prcptrthr rnd the publlc.
Thr rnlrryed pad and tcnt drplcted ln thl currcnt proponl hsve ingrearcd thc concrete
rlrb aud the tent cov€rrge by roughly 20 liller ftrt (800 r,f,) to move the totletr rnd fod
cquipuGrt undrr thc trnt rnd out of vicw to thc public rnd rurroundlng propcrties. Mountrln
Opcntlonr pertonncl feel thir il rn lmprovcmcnt for th: rotbttlcr of thc tli yrrd rnd our guert
rcwlcer' The toilcb rnd equlpmcnt co[trnplrtd rrc nodulrr rnd rrc rcmovrble n ltb thc
tent Wr rrk thrt rtrlf rpprovc lhlr ctangc rr r mlnor uodilicrtion to the rpprovcd plrn, Oo
thc othcr hrnd, ll thb oltention b not tcccptrblG to you wo wlll contlnuc t0 lesvE tho portebh
frcllltltt upomd during rrcc opcntlonr il |n yGtn pt!t. Plcre advise mc of rtrffr poclfion on
thir rnrthr rt your errliQst convcnicacr. Thrnk you lor your contiderrtio!.
Vrry truly,
VAIL ASSOCIATES REAL FSTATE GROUP, INC.n-*Y 4t
Dlvid G. Corbin, Vlcr Prerldent
cc! Jrck Hunn, Rlck Crudel, Chrlr Ryrnan
Jlm Lrmont
tl7 B.nchmrrk Rord . PO 8or 959. Avon, Colondo o lt6t0 . phonr 9?0 845 lits . frr 970 B4i 2555 $
D.t
Vail Associatefheal [state 0roup, Inc. o
FAX COVER SHEEI
Fhon€ 970 845 251s
fax t70 145 2555
Dwelopen alVail,Eaw OeeR Retotl Atqwhcad and iachalot Gulch
r.aa.
€l
t,\
.l -4UI .F
v/hlthur.,|n
b ad||rrrl
tt|l,tu|!lt|tE
r-llFj
-
FIUI
East Vil1age Homeolnrners Assoc 97 cJA21 5556 09 / LA/ 1996 11 : 34 .42 ANI P- 1
E,A'sr V n Hounowr{ERs TION,INc.
Directors
Officers: President - Bob Galvin Secretary - Gretta Parls Treasuer
Judith Berkowitz - Dolph Bridgewater - Ellie Cau&ins - Ron Langley
Patick Gramm
BilI Morton - Cornie Ridder
FROM:
DATE: 09/LA/1996
Number of Pages: 4
Message:
Post Office Box 238
Telephone: (970) 827-5680
Vail, Colorado 8 I 65 8
Message/FAX: (97 O) 827 -585 6
FAXTRANSMISSION
TO:Lauren WaterLon
Jim Lamont
Executi\re Director
Sub j ect: co]den Peak
Special Instructions:
ski Base - Temporary Tent
Pl,ease review and respond as app-ropriate
Ea.st Vill.a.Jc l{omcowncrs ^'ssoc 9'7Oe2i5956 09"LA/l-996 l1:34:42 .U$4 P-2' E,q.sr Vnrl|l HotdnowNpns AssqJarrox,INc.
OI[cers: Presrdent - tsob Galvin Secretary Gretta Parks Treasurcr Patnck Gramm
Directors - Judith Berkowitz - Dolph Bridgewater - Ellie Car:llcins - Ron Larpley - Brll Morton - Connie R:dder
To: Design Rer"iew Board
Lauren Waterton
From: Jim Lamont Executive Director
Date: Septonber 18, 1995
RE: Golden Peak Ski Base - Temporary'Tent
A review of fte proposal for tre temporary tent at the Golden Peak Ski Base indicates fiat
the 40 x 100 pad size is larger than the 40 x 80 pad in lhe app,roved development plan for the site.
It is recommended that fre size of tre Temporary Tent be reduced to conform to the ap-
proved development plan. Concarns have been raised trat tre apparent bulk and mass offre ex-
panded Temporary Tent is inappropriate for its location.
The Homeowners Association is rympadretic to dte applicanfs need to used dre Ternpo-
rary Tcnt as e structurc in rvhich to conduct on an intcrim basis, scrviccs and actiritics that will
be tansferred into dre Golden Peak Ski Base Lodge. once consfuctions is completed. However.
because of the concems over tre apparent bulk and mass of fte Temporary Turq it is requesled
that the DRB's approval for tre tent pad, as set forflr in dre approved development plaq as well
as the portable toilet modular and the enclosing tent be resticted to fie end ofdre 1996-1997 ski
season.
In fte Summer of 1997, subject to an eraluation by adjacent propertl, o!\ners as to the
aestletics and location as well as the bulk and mass of the Temporarl,Ten! a recornmendation
will be made to Vail Associates, neighborhood covenant holders and the Towr, of \rail regarding
eilher a permanent pavilion or an acceptable temporaf,y tent pavilion appropriate for the site.
Please refer to lhe attashed letter from \tail Associales' to the Homcowncts Association
regarding matters associated with the proposed Temporary Tent. Further. be advised any recom-
mendations or suggestions by the Homeowners Association regarding this matter are subject to
changes or modificatrons based upon flre intervening requirements of the covenant agreement that
apply to uses and sfructures located on dre site.
Post Office Box 238
Telephone: (970) 827.5680
Vail. Colorado 81658
Vessrrge/FAX: (970) 827-58-56
East Vil- lagc HomcoLrncrs A'ssoc
o
97 0e2i 5A 56 09 ,/ L a/ L99 6
o
11 : 34 : 42 I\I4 P.3
Vail Associates,lnc.
@"September 12, 1996
Mr. Jrm Lamont
East Village Homeowners Association Inc,
P.O. Box 238
Vail. CO 81658
Via Facirnile 82?-5856
R.E: GOT,DF,N PF,AK BASE FACILITY
VAIL, COLORADO
TEMPORARY PAVILION FACILITY
Dear Jim:
In response to the ccncerns expressed by several rnernbers ofthe neighborhood regarding
our previous proposal ro construct a year - round, permanent pavilicn facility, we have
a-"r" ,..: np-,,.v. ^lyithdrawn our application for that permanent faciiity to the Town of Yail.
Yr,; 8(J,c' :r..lr rtro,:
fat ,L'os heed l,lor)4'i h "
Enclosed, please find a set ofplans for a tenrporary winter-seasonal pavillion f'acility for
your inlbrmation and rcvierv. I did not includc a site or landscapc plan, as thc prruvious
site and landscape plans are consistent with our revised prcposal. The grading will be
lowered slightLy on the west elevation, as we are unable to berm against the tent. The
location, orienlation and floor plan are unchanged with the exception tha! the restroon
component has bcen movcd to the eart end of the facility. The facitity will support
groups and individuals participating in race evcnts at ftldcn Peak.
The facility will support groups and indMduats prrticipating iu race events al Golilen
Pcdk. Thc facitity will also support cUldrcn's racing and training prograrns which arc
typically scheduled on weekends. These poposed uses zue consistent with the uses
whicn have historically occuned in the previous tent thcility. Wc do intend to use this
facility from mid November to late December, 1996 only as an interim facility to support
the general public in the Golden Peak area until the new base facility is available for
occupancy..\
*2
\r/
ir"trJiifil.rl/al$l(ltat tiPO &rr 7r Vdll Color.dg. a16t6. plronc 970 476 t601
East l/i].:.aqc Homcowncrs ^'ssoco
97092?5A56 11:34:42 lM P-409 / L s/L996
o
Mr. Jim Lamont
Temporary Pavilion Faci.lity
Septeurber 12, 1996
Page 2
Thc facility will be disassernbled and rernoved from thc sitc cach spring during thc month
of May. The facilitl uould be reassembled each fall during the month of October
'l he colored concr€te slab would be visible during the summ€r monlhs in combination
with fie signifrcant and penftuent landscaping improvements as previously proposed.
We tnrst thet you will agree that this facility and the proposod uses are consistent with the
approval, granted by tbe Town of Vail, srd consistent with the protective covenents {rd
will bc an improvement over the facility which has historically been installed each winter
at this location
cc: Chris Ryman
David Corbin
Rick Caudel
jdhicr
jtgpjlamt.doc
fr
THIS ITEM MAY EFFECT YOUR PROPERTY
PUBLIC NOTICE
NOTICE IS HEREBY GIVEN that the Town Council of the Town of Vail will hold a public
hearing in accordance with Section 18.66.030 of the Municipal Code of the Town of Vail on
September 3, 1996, at7:30 PM in the Town of Vail Municipal Building. In consideration of:
An appeal of an approval made by the Design Review Board on August 7 , 7996, changes to an
approved set ofplans for a pavilion to be located at the Golden Peak site, located at 458 Vail
Valley Drive, Tract F, Vail Village 5th Filing and Tract B, Vail Village Tth Filing.
Appellant: Harley and Lorraine Higbie
Applicanf Vail Associates, Inc.
The application and information about the proposal is available in the Community Development Department
during regular office hours for public inspection, located at the Town of Vail Community Development
Department, 75 South Frontage Road.
v.
_t
,j,,'. __r
bJJ -4'<
/\t,.'JUu<
E
UJct
=EE
e
EEE:
=P-==8 o
*ign Review Action FOm
TOWN OF VAIL
Category Number o"t" Sept 4, t{{k,
Project Name:
Building Name:
Proiect Description:
r / .l ,'\
owner, Addres" ^n6p6on".
\l6trl tY,az. ta-UIA
1 ,,. !- -Legal Description:{#F-L- Block- Subdivision
Proiect Street Address:
zone Districr gZ-
Comments:
Motion by:
tr Approval
! Disapproval
k statfApprovat
Seconded by:
Conditions:
Town Planner
oae: 4-*-'1w DRB Fee Pre-paid
Vail Associates Real Estate 0roup, Inc.
Develope6 of vall"
8earc/ Cae€k'ferort,
Ezchelot Gulah vill age"
August 22, 1996
Ms. Lauren Waterton
Community Development Dept
Town of Vail
75 South Frontage Rd.
Vail. CO 81657
Golden Peak project - Outdoor Pavilion
Dear Lauren:
As you are aware, for quite some time Vail Associates has erected a seasonal tent at
Golden Peak for ski races and related events and a component of the new Golden Peak project
approved by the Town Council in December, 1995 was a concrete pad or foundation in the ski
yard together with a tent or a permanent pavilion to be subsequently approved by the Design
Review Board. After discussions internally and with DRB in public session, but without
separately informing the surrounding neighbors, Vail Associates submitted a design to DRB in
the spring of this year for a permanent pavilion. The plans for the pavilion were approved by
DRB, subsequently revised and enhanced by VAI, and approved again by the DRB. Mr.
Harley Higbie, Jr, and other neighbors or neighborhood representatives have objected to the
pavilion's design and Mr. Higbie has filed an appeal of the DRB approval of the pavilion as
designed. This appeal is scheduled to be hear by the Council on September 3rd, 1996'
It is not our intent to promote a design solution for this structure which is substantially
at odds with the interests or concerns of the surrounding property owners without further
coordination and dialogue with them. In tight of the obvious concern demonstrated and
articulated by these owners we ask to withdraw our plans for the above grade pavilion structure
as approved by DRB. We wish to proceed and pull a building permit for only the Council and
DRB approved concrete pad or foundation, together with the requisite site work and
underground utilities, This ski season we intend to use a tent as in the past on the new
foundation for the race events held at Golden Peak and understand that in restricting our
application to the limited approval of the foundation pad we must resubmit an application to
the DRB for such a tent. We will submit a new application for a tent design as soon as possible
and will coordinate with and copy the neighbors on the proposed tent design. We further
understand that some in the neighborhood and on planning staff find a temporary tent
unattractive and we are amenable to renewing discussions with the neighborhood and staff
concerning alternate pavilion designs at an appropriate time in the future.
Thank you for your consideration of this matter. Please advise me if anything else is
required of the applicant at this time. I presume that with our withdrawal of the pavilion plan
that Mr. Higbie's appeal is conceded and no
September 3rd.
Very truly,
Vail Associates Real Estate Group, Inc.
appearance before Council is required on
,/\,- I / -/I d llww-L,L -7 - CJ_____
David G. Corbin. Vice President
cc: Harley Higbie, Jr.
Jim Lamont, EVHOA
Chris Ryman, VAI
137 Benchmark Road . PO Box 959. Avon, Colorado. 81520 . phone 970 845 2535 . {ax 970 845 2555
,,\
\\.2
\v/
lrttftro llxn
t! CUrxrNlrtla
Y||1/lu[rar t it
T?wN 0Fvm,
APPEALS FORM
REQUIRED FOR FILING AI\ APPEAL OF A STAFF, DESIGN REVIEW BOARD OR
PLAI\NING AI\D ENVIROI\MENTAL COMMISSION ACTION
A.ACTION/DECISION BEING APPEALED:Golden Peak Ski Base - Chanqes to
approved pavilion plans
B.
C.
DATEOFACTION/DECISION: Aug. 7, L995
NAME OF BOARD OR PERSON RENDERING THE DECISION/TAKING ACTION:
D.NAMEOFAPPELLANT(S): Lorraine N. Higbie Harley G. Higbre, Jr.
MAILINGADDRESS:Suite 1-400, Denver co 80202
Denver Ph.303-861-4230
LEGALDESCRIPTIONOFAPPELLANT'SPROPERTYINVAIL: Lot 15 Vail Village Filing fl
E.STGNATUR-E(S):
Page I of2
F.Does this appeal involve a specific parcel ofland?If yes. please provide the following information:
are you an adjacent property owner? Yes _L no
If no, give a detailed explanation of how you are an "aggriwed or adversely affecrcd person." ' Aggriwed or
adversely affected penon" means any person who will suffer an adverse effect to an interest protected or
furthered by this title. The alleged advose interest may be shared in common with other members of the
community at large but shall exceed in degree the general interest in community good shared by all persons.
Provide the names and addresses (both penon's mailing address and property's physical address in Vail) ofall
owners of property which are the subject of the appeal and all adjacent property owners (including properties
separated by a right-of'way, sream, or other intervening barriers). AIso provide addressed and stamped envelopc for
each prop€rty owner on the lis.
On separate sheets of paper, specify the precise nahue of the appeal. Please cite specific. co<tr secfions hr.nng
relevance io the a<,'rion behg appealed.
FEE: $0.00
G.
H.
Page2 of2
HARLEY C. HlCBlE, lR.
1600 Broadway, Sulte l4OO
Denver, CO 80202
303/861-4230
FAX 303/83Cr,,+65
August 15, 1996
The Town of Vail
Dept. of Community Development
75 South Frontage Rd.
Vail, CO 81657
Fax: 970479-2452
Attn: Ms. Lauren E. Waterton
Dear Ms. Waterton:
Enclosed is the Appeals Form and our letter describing the nature of the
appeal concerning the construction of a pavilion on Golden Peak.
I am sending this to you by Fax and putting the original in the mail. Jim
Lamont will deliver the envelopes to you.
Thank you for your consideration.
Sincerely,
A/^0.,il4W
Hartevf . HisbHJr.
HGH:gr
Enclosures
HARLEY C. HIGBIE, JR.
16OO Broadwan Sulte l4OO
Denver, CO 80202
toIt861-4230
FAX 3O3l83G1,+65
August 15, 1996
The Town of Vail
Dept. of Community Development
75 South Frontage Rd.
Vail, GO 81657
Attn: Ms. Lauren E. Waterton
We hereby appeal the decision of the Design Review Board to approve
construction of a permanent building or a "pavilion" located near the
bottom of the race course on Golden Peak.
Our home on Mill Greek Circle will look directly at this structure, thus
negatively affecting our prime asset, a view of the Gore Range.
The Town's "Design Guidelines" call for a structure to be "compatible with
existing structures, their surroundings, and with Vail's environment." We
believe this structure to be totally inconsistent with that criteria.
lf this is classed as an "accessory structure", it is not compatible with the
main structures on the site, nor is it attached to the main building in any
way.
We believe this building to be an isolated object at odds with its
surroundings. lts appearance is unpleasing and unattractive. This area
is open space, reserved for skiing, and such a structure is out of place
and out of character at that location.
As a permanent structure, it will be subject to summertime use (and
misuse) for gatherings and parties that do not fit the residential character
of the area.
Moreover, the existence of such a foundation creates the possibility of
erecting two or three added stories in the future.
Finally, the application for construction approval seems to be insufficient
since a detailed sight plan uas not included, leaving us with many
unanswered questions about the p@ect.
Sincerely,
rG^-:,".-z &Ve'"
Lonaine N. Higbie
gr
TruS ITEM MAY EFFECT YOUR PROPERTY
PUBLIC NOTICE
NOTICE IS HEREBY GIVEN that the Town Council of the Town of Vail will hold a public
hearing in accordance with Section 18.66.030 of the Municipal Code of the Town of Vail on
September3,l996,at7:30PMintheTownofVailMunicipalBuilding. Inconsiderationof:
An appeal of an approval made by the Design Review Board on August 7 , 1996, changes to an
approved set ofplans for a pavilion to be located at the Golden Peak site, located at 458 Vail
Valley Drive, Tract F, Vail Village 5th Filing and Tract B, Vail Village 7th Filing.
Appellant: Harley and Lorraine Higbie
Applicant: Vail Associates, Inc.
The application and information about the proposal is available in the Community Development Department
during regular office hours for public inspection, located at the Town of Vail Community Development
Department, T5 South Frontage Road.
A. n*oW"
n[ffi11n(UV-., '' UN
a
--
[, p! cr-Eeglcly'allcy Wsrcr & Saniration ]
'lrlstnci
646 Forcst Road
Vail, CO 81657
/Mr. Lcc M. Bass
201 lrloin Sr. #3200
Fort Worth, TX 76102
Ski Club Vait
P.O- Box SlE
Vail,@ tt69
\?
1.
I
/ Ur. H.rtoy C. Higbic, Jr.
I6ffi Broadrmy#1400
Dcstvcr, @ E02(f,l
- Mr. Japrcs tL Ctcmoal Jr.. King Ranch
' Kingsvillg TX 7ttl6j
@
A*.zti^v ,nossJohnson
435 East 42nd Skcct
Ne',v YorI<, NY 10022
Ptnrs Del Norte Associrtion
Attn: Ginny
P.O. Box 69
Vail, CO 81658
Rams-Horn Lodge Condorniniurn
Association
Altn: Diannc Milligon
415 Vail Vallcy Drivc
vail, CO 81657
' Northwoods Condomini um r
Atn: Mrs. Brinkrnan
P.O. Box l23l' Vsil, CO il6j8
.r"
'i' Alt Scosons Condomioiurn Associ,stion' Arn: Davc
434 Gore CrcetDrivc
Vsil,(O Et6S7
r' Ms. Barbaro M. Osbornc
2014 Sea Cove Court
Houson,TX 77056
Northwind Devetopmcnt, L.L.C.
1202 Del Mar Blvd, #7
bredo, fi 7804 |
Ms. Kay H. Chcsrer
395 Mill Creck Circle
Vail, CO 81657
u Manor Vail
Attn: Sarah Ncwsam
595 E. Vail Valley Drivc
Vail, CO 81657
EAGLEo COUNTY
VILLAGE ,IST,
OF IRACT A
TOWN
CHILDR€t-tffi
,w
TRACT O a
APOLLO PARK
442
NG 5oo
;;:torfi VAILVILLA
VAIL VILLAGE 7th. FILING
tl
UNPLATTED
EAGLE COUNTY
2
*$ ig$ur l\ vt € -gE r=>:x E"EZ
xi €${5., .5; o3E nfii
_ c s$g
Ei
Ec
tgs s
3 F*33F-
=8
THIS ITEMMAY EFFECTYOUR PROPERTY
PUBLIC NOTICE
NOTICE IS HEREBY GIVEN that the Town Council of the Town of Vail will hold a public
hearing in accordance with Section 18.66.030 of the Municipal Code of the Town of Vail on
September 3,1996, at 7:30 PM in the Town of Vail Municipal Building. In consideration of:
An appeal of an approval made by the Design Review Board on August 7 , 1996,, changes to an
approved set ofplans for a pavilion to be located at the Golden Peak site, located at 458 Vail
Valley Drive, Tract F, Vail Village 5th Filing and Tract B, Vail Mllage 7th Filing.
Appellant: Harley and Lorraine Higbie
Applicant Vail Associates, Inc.
The application and information about the proposal is available in the Commturity Development Department
during regular oftice hours for public inspection, located at the Town of Vail Community Development
Department, 75 South Fronrage Road.
o a
Category Number
Projea Name: 4
r!.r-..ffii;GE11FaF"{\iryvrp';rg5{rlaaT:t].NlF7,LrEn--aFT'{
olign Review Action Ftn
TOWN OF VAIL
Building Name:,'li ^4t.
Project Description:l'; z'.
owner,Addres"ano pnone' Vnil At-aar ra[rs, \ rv .
firxl -Legal Desoiption:lir__r_ Bbck- Subdivision \ln (,\rllqe 59 zone District.\
Project Str€et Address:
Comments:
Motion by:
__aoa =-*i:---.=..-=
r+/Staff Actiofr)
-.--------,/
Vote:
Seconded by:
! Approval
n Disapproval
{$aff Approvat
Conditions:
Town Planner
o^r". <* f+ , 4 , 111V, DRB Fee e,"-paio *ZO, oO'# .
luul,i\,ul-,vH1L LUI'i*u[v llJ:iu5-4t9-1452 t'tr-t y ub
,-- tt
' rrvl rrrl 0,/17191
TYPE OF REVTEW:
Ne\,r ConsLrucElon ($200. 00)
Additlon ($50.00)
DESIGN RBVIEII BOARD AIPfTICATION ' IOWN OF VAIIT, COLORADO
DATE RECEIVED:
DATE OF DRB MEETING:*rtfatai**
INCOMPLETE APPLICATIONS I{AY NOT BE gCHEDUI'ED FOR REVIEW.
****t****tf
'yi)
o I5:UI .NO,UUs
/tino, AlLerablon ($20. 06)
]-Con""ptua1 neview ($0)
U1I
I.
n
R
ADDRESS:
IJECAL DESCRIPTION: I,OC
TtaAcT € V{-L V}tut{t-
a meeUa and bounds
on a EeparaLe shQeL
Subdivls lon
If properLy ls described by
descripuion, Pleasa Provideto thls appLlcatlon.
legal
anil atLach
PRQJECT INFOF.t'lAA[,Oll t
DESCRIPTION:
Block
ZONTNG:
NAME OFuaitlng
APPIJICAI{T. S REPRESENTATIVE:J'qct- -+{u*liJ
Address:
Phone
r.
J.
H.NAME OT OWNER(S):
OHMPR /9I ^STGNA?IURE:Mal1lng Address:
APPI'ICAFION9 WIIJ
Pho
gED
Condomlnium APProvs.icable.
FEE SCHEDULE:
VAIJUATION$ 0 $ 10,000
$ 10, 001 . $ 50, 0oo
$ s0, oo1 - $ 150, 000 -"
$150,001 - $ so0,oo0
+500,001 -. $1, 000, 0oo$ over +1, 000, 000
DESIoN REVIBW BOARD APPROVAIJ EKPIRES
APPROVAL gtII-,ESg A BUILDINO PBRI{Ir Ig
Ig STARTBD.
THOUT OPTNER I g STGNATURE
$100.00
DRB FEE: DRB feee, 6s 5 trown above, are Lo be paid ab Lha
time of eubmiural of the DRB appLlcaElon' r.,aLer, when
"bpfvinq for a bulldlng permit, please idencify Lhe accuraLe
valuation of the propoiai. The Town of vail will adjust the
fee accordlng Lo ttre- cabtu below, Lo eneure the correcL fee
is pald.
$200.00
$400 . 00
$s00.00
ONE YEAR AFTER FINAI,
ISSUED AITD CONSTRUCTION
NAI'(E OF APPLICANT:uaillng Address:
V[]
9,'ol!)\
ItrQo(\n
F
N
{rr{.
t
Fs
*
{\iRt
r
nv$rI':tlfs
3du
H6
u_{()
6(
V(f)GlI
().Jzr\)()
3$
{9
Hi-il\to
v
<;l
f)
trlLL
g --..4':l
re-tlilil|lt rl I
-l
rc_-]lilil]
tL____lrl
i:i: ll
1.: lli:lt- ;
ii
i-_'. !l
t' tliii
i:-_=
;i: , llt- ".il
'.: ,lr-- Illa:.. ]i
!- l!
; .i{
,l-f: :li'r-:- jl
E_-:Jl
t
.'j_:lilriI lL-.----!t-------""::
llt-illl,itL_iL-_-1
s
kqQo
;QS
\)1
l--Zg
bov
FZot)
0_
FF
o
-f--l
b
I
\r
c\l
iFqs
TT
ii
=dSTSsll i
=al
R)IIsl i
rF
c\|
I
N
C.l
a
I
bc\|
N
c{or
a
I
ac\
-a
Irt
c\l
a
I
.rr
c.l
O ro.
I
LIV;NC ROOMI
-l I
|.3',-a v/a"
-'ntl
-a--)l-
| | | A ^t'W,,/faIL VI-,a"/\-,DECK
fr'77,'pr-\
B16 SCREEr.v. . AuDl
BEHIND FLIFFE
*]
HAlIFOLD
FD.
$12:.zl
i P-t
)nrrn"
\t\t\l\.
"ruo
PL^,TER Li-
Ehl
r---:
iow
A rs. ll'llr. l-{*nY ---l-
--_-----l LlvlNG ROt
/7l
I
I
I-f
-r-------f\
/l-T
L.
llll
3it
I
PALNTER / (D g*lEL
lq\Fr :r-'4i
oOlgn Review Action Ftl
TOWN OF VAIL
Category Number
a
Project Name: i.
Building Name:
Proiect Description:
Owner, Address and Phone:
Architecvcontact, Address and Phone:
:Ir::1 Fl A^,:."''Legal Description:{bt " Block- Subdivision )->,'ll .-2r)^'' Zone District '-t-+a-
Prolect Street Address:'h,i ',,,''tll,.+''
Comments:
Board / Staff Action
uotionoy: /l ke i- L B.r,tlz-clr
Seconded oy:'blr' , r-+t- € ,r,l Ac t t'-
,{ncntou"l
! Disapproval
! Staff Approval
Conditions:
, |,t. r \Vote: .L - I ( f\llIw c->?c4t'4 )\\ ./
Town Planner
/-\ | '] /' ,
96,1s; i" ipt r-1 -f .'|ir)
._)
DRB Fee Prc-paid +?D oo
I uutt\UI- VH 1L LUI.i-UT-V I U
rrvl t.l l,/1?,/Dl
DESIGN RBVIE}T
B.TYPE OP REVIEW:
: iuJ-4 (y- t4>2 t"tH Y ub'yb
BOARD APPIJICATION ' TOWN OF VAIL,
DATE RECEIVAD:
DATE OF DRB MEETING:
3ilE
I.
A.
D,
^DDREss
I c458 ualL v,A|u-;Vl frAJUt--
T"4sr {LEGAL DESCRIPTION: LoL
-
rfit:
Ne\d consLructlon (4200 .ool -4inor ArtoraLlon ($20' 06)
-lddiulot
($50.00) conceptual" neview ($0)
Subdivls 1on
rf property ls descrlbed bY
descripcion, PIease ProvideLo Ehls appllcaclon.'
a meeUe and bounds
on a SepalaLe sheeE
legal
and atbach
*it*t*ii**
**rr****tfi
PRQTTECT INFOB{ATIONI
DESCRIPTIOI'l:
t.
ZONING:
NAT.{E OF
uaillng
APPL,ICAIIT:
Addre6s:
I
I
NAI,IE OF APPITICAI{T' S REPRE9ENTAT
ual1l.ng Address:
I,
.T,
I
H.NAME OF OWNER(S):
valllns Addres
APPT'ICArIONS TNIJIJ NOT BE PROCB
Condomlnium APPro lf applicable.
Phone
Phone E;6141'Ua-
WTITOVT Ory}IER' g SIONATURE
FEE
$ 20.00
$ s0.00
$100.00
$200 .00
$d00 . o0
$500.00
ONE Y&AR AFTER FINA.I,
I88UED A}ID CONSTRUCIION
DRB FEE: DRB feeB, aE shown abovs, are Lo be paid at Lhe
Lime of aubmigcal of the DRB appllcatlon' fJater' when
"bpivinq for a bulldlng permit', pleage identify Lhe accuraLe
valuation of the ptopoiai' The bown of vail' witl adjust the
fee accordlng go ihE- CaUt. below, ho ensure the correct fee
FEE SCHEDUIIE:
$
VALUATION0 -.$ 10,000
$ 10, 001 ' $ 50, ooo
$50,001 -f 150,000
$150,001 '$ soo,ooo
0s00,001 -. $1,000,000$ over fl' 000'000
DESIGN REVTBW BOARD ]iPPROVAI, EXPIRES
APPROVAIJ I'NLESS A BUfITDINO PERMIT I8
Ig S1TARTBD,
1s pald.
o
bll-ta(p
a
i-
;
-rfilrtt-{ ctF u}f I L-
lli=cel lanesu= Ca=h
,iii ,.j:'.:lrl, i-i I ii:;i; '1':l
i:;.',:* r F, i. +'i ;::lj'+''i ,j,li
!:.j,:i:,:i.-ij.-i i. ,il !::!,. +i ,tr'"]i,' L
,riii:i: itl-ri.iil r'Fli i,i.:[r 1:[[:
ijt:t,*,r-ri-! i l.,jft,i,jli! a ,:t''ii['
I t erir p.:i d Fnc'un 1' P;i d
iJ1ir'?i'ii,.i 1l: t-ia!.-l :l:1. t'..
f ',.:.'r'1': : j- ir- i'.r-'j :i '1:1
_f Htrlt-{f..; ._,rfit_l
', '-,.- i ,-.,i- i r, .-"; .lt iI'i
lFrr ;r_iallrrf
t
''''|''|'n,d.'f.ar$nt'.-.1'.
o|lgn Review Action rolr
TOWN OF VAIL
- I r,t1 ntCateoorv Number gzls L.A ttl lf, /i..
./' ":-\
PrqeclName: (.-<.kl', ' YraL '--*'t 5a:,e - ' t , tt.,, i, .. :"rttt ';'" 1 'ri't, "
Building N"t", '
Project Description: ' ..'
owner,AddressandPnone: Vr.rr/ A,l.<-cr r,,,\r-:, Atf'r'-\r"cK-tltrrn,^. .Po tr'or 1 Voii Co
/)',t - ^f/ ll^'-V,
Architecvoontact, Address and Phone:
Legal Description: Lot
-
Block-Subdivision :':' lrl, t t'@,, tt-'*, &+,t Zone District -ee-
Project Street Address: 4' ,
Comments:
Motion by: C \r.-r Z- "Rr,{fn,ur Volei 1- C)
Seconded uy: -Ierr( {\i,-t\.-t
FApprovat
! Disapproval
! StaffApproval
O ?auiltow t^,,i\\ Flrnvr, i,,Jnryl si\r.rt cotr,,nvr.- , 't t\-i,,,*.Vair.,z.r'trill to lr1rir,,.l fu
Dp-Et 4,-< (u,,>p(br/,it .
k,u, e.,'- lr )n+-c.c k-..-..-
Town Planner
oate: .\,, \ir \"1 , 1L DRB Fee Pre-paid+Zo' oc's3-'(.\ \
'a
A.o|lgn Review Action Fo*
TOWN OF VAIL
Category Numbef Date
Project Name:
Building Name:
Architecvcontact, Address and Phone:
LesatDescription:toilor-tlFBbck- suuoivision[\| €fi((-"-lf\-rnfrn L) zone District
Proiect Street Address:
Comments:
Motion by:
Seconded by:
D Approval
! Disapproval
,{staraRRrovat
Conditions:
Town Plannerl-t .,t, t,- ft tDate: , \,tAl,L{ l) r ut l*" DRB Fee Pre-paid\.\) tJ
o
From tbc rlesk 0f... Laaren Watetton
+ LArdr^yS 4 Yrk,Avg uh-14
+ (api[ttst't -()t.7V - t * v V-czaivg Nlft'& -&, ., i -
t't r1''ln . h,r,iUwq: Nst n tw\il,t Dttt"Ltu\t
uJil\ @ !y1y.JA, W*y1g, rw +rV.
ta^^- ,r^lL;n+o tu-il 1 *aa fuvUcairy5|
\atV- Wkxftd +bbwwt.W4'f teqr,*t*- wB{ wU real^u- {iwo(41
'ZA.'W \0^'t CI\^* ry* 6\ilK
AooV - u*J, 'ftr q'@+ ww4 (cnvP"a't"
1
,/tA i^Lbd , dtvo) ' qlli'l-' - )cv"..,'--
zalwhiur,". {r h^(3\lvw wll^
l,ui\ilr'rnS \^I Y\AIK
QPnurw'4'7il t* t'uru'lL
htAulps-- if .i ffi**"'w itlraw+ aDv 6w^trva-('
W+ annWtw ttt[ ?W.W-,-';,i
vut" "ravuov"
0* "(
*aw ]1 ba*-7 lo\nn+ W
wturNd utDr -"Lud+carr;*- wld fur TgYtttrtv'PVlffitrgpw'b> qPwot'
Tee('
J4t'U'
ew+-
Lowcn IYstcrtortFton tbc tluh of...
)auv.- Nowld ,P",eb( b,n*= , hatzl*' 'tD
w dQY+
Wvgid,trd, dl ilP -> *w V'ca'vw' bu-|
VJo'utd. W'^'A*-2ta*-U v&i[ / t'Di[[)
Vr tpvw{ pl Ariorr"i t)^ tPq+a }->Emd
Lardea'?*'s - , ,, ,-. a, . 1,., ^Wl(ffi'-- 4rurr4tw'M 6wWt^udq
yd eplor - B"it5 D0*-
Ulu$we U^W l-dnd"'^s*'g '(P*"^ I
Uarv' VwWu e wihh-aie{?bukr
-fd - Wlcx>k
"&r'a^* ' ?*)*'14 ' 6xwwnz'u* Lt'rvl"A4evg
. | 'l r'
Coltrn etu WtAu'g- ots'
fr\ohirr", - LVrv- zU rcpl -*i\k,e',vrartt"ve -a'.Sr,
0 ovlto"S- e.ln,Utant er*.L.r, uait' ?yy)'ai6
@
"Wiltv.r.
- 4e[g,vnn3, eoou) Utd4.tltV$Va'yWg
Vyvl-oot. €ir^^ vAtw-r ddlA<D
Pit* . ?po? @firu\4ow.vrJrclt-'AwY}r'tN|\titv:g
N\ olr\u'w ow Vole J*-o
I u til I.,t
a
UF VHI.L LUN-ULV I IJ :JU5-4 (9_ 2452 {'IHY U o'yo 15: Ul NO . UOJ P.01erivlrrl $/17lDl
DESION RBVIEW BOARI)
FRO.TACT INFORI'IATIONI'
APPITICATION ' TO?fN OF VAIIJ,
DATE RECETVEN: J T-{
DATE OF DRB MEETING: JU
*rffita*a*
r*rf,it*t*t
1996
'Uult'iliit,llty tjEPT,I.
A,DESCRIPTION:
B.TYPE OF REVIEW:
Ne\., consLruct,Ion ($200. 00)Additlon ($50.00)
/Uinor AlcoraLlon (920. OO)
]cott..ptua1- neview ($o)
c.
D.
ADDRESS:
LEGAL DESCRIPTION:LOC Block
Subdivlsion
rf properLy J.s degcrlbed bY
descripuion, pLeasE provide
Lo Ehls appllcatlon.
a meeUg and bounds
on a separaLe she?et
legaI
and at,tach
E.
F.
G.
H,
I.
J.
ZONING:
NAI'{,E OF
ual-lIng
APPLICA}ilT.:
Address:
NAME OF
ua111n9
APPLICAI{T I S
Addregs:
ENTATIVE:
DRB FEE: DRB feeg, a5 shown above, are Lo be paid at the
Eime of submiLLal of the DRB appllcaLlon. Later, when
abplying for a bulldlng permiE, please idencify the accurate
viiuition of the propolaf. The Town of vail will adjugL Lhe
fee accord.lng Eo ine Cabfe below, to ensure the correcL fee
i s palCl .
Phone
NAME OT OWNER(S):
Maillng Addr
Fhone
APPIJTCATI
Condomlnium A plicabl
FEE SCHEDUI.iE:
$150,001 - $ 50o,oo0
s500, 001 : $1, 000, 000
$ over 01' 000,000
DE8ICIN RBVIBW EOARD }PPROVAT' EXPIRES
APPROVAIJ IIt{L,Bgg A BUILDING PER}!I! I8
rg BTARIIBD,
NITHOUT Oq|NER'S SIONATURE
$100 .00
$2oo, 00
${00.00
$s00.00
ONE YEAR AFTAR FINAI.,
Is8UED Al{D CONSTRUCTION
roval lf
Golden Peak Redevelopment
Design Review Application
Conditions To Final Approval
June 10. 1996
Please accept the enclosed information relative to the outstanding elements of our
design review board approval as follows:
The amended exterior sign program for the building and the site.
The site plan, floor plan and elevations of the pavilion structure, which is
located south of the Golden Peak facility and west of the new Chair #6.
l.
2.
3. The proposed elevations of the existing race finish building, depicting m. \**,*-,1
proposed improvements which are consistent with the images of other similar/ r \'-ryr
facilities. '/
The exterior light fixture cut sheets for the condominium levels of the
building. All other exterior and site lighting has previously been approved.
The site/ landscape plan of the south side of Vail Valley Drive, east of the wb:r4 wall
Golden Peak Children's Center, which is being modified to facilitate the #v+?rowt
widening of the road as well as the expansion of the bus stop area.
4.
5.
In addition to the above referenced items, we are requesting approval of the additiona\<'f^"1* .
landscape plant materials in the vicinity of the property owned by Mrs. Johnson in ,/A?a a'rr-4
order to accommodate her request.
Please feel free to contact me ifyou have any questions or require additional
information.
Jack
b/aa,u Pt//L
Er,s
[''* .. , ,;.):
I0 :.4
12:,/:
7
||'i'
tl t/
z("
3(l
3(.
1a
%W#r'rha"kza//'*a'o%ApuZliao
- I69I erdc
Copper Verde
Swe os obow exccPt Po:r (Sn Page 791
Rust Pattna
Same as above cxtcpt I'as:
Rust Patina
S0r4e a.s qbow excelt Po:t
Antiquc Vndz, Polisbed Brsss
Cle ar
Clear Seci:d Acrylic
Clc ar
Clcar
2l
19"
cu Seeocd Acn lic
Caldu'e ll 20-1692
Caldwe Il 30- t 693
Elan 20 4I I I
Elan 30-41 13
Elan 20'4112
Elan 30-4115
Otha Fi nishes At ai ldb le :
26',
t)\o\o+
., 1".
I
I
I
@
.<:
,,,. 2',n\_./, (\
\_-/
C\t
" (r\
'-7
z
^tt
nI
I
U
Poff6 $Ed
firifi[l
| _-\
| -''-:i
+ /-----_r! -i / il
al I
I
Z
e
Jt-n
UL
tr\
rsa.'l
I ll
| . -ll
ur -al
Pl :ll
al- tl
)i -.41
->d" -
ul
,t zt:5oo-
*
ll' '
i
q,
1F
I qLvo
fs
rR
e:e
Fp3t
cr.tl
8d,F
tu\-o#
=DR Uilo intf) 21-s f<R Ud
oF
LOLtu
il=o
rfi
7. U_
FJF
fro
q5
U(I
qq
O-
H6
gg=
iiltLOO
os
0l
.ss'-(
_0
(!
o
o
a)so
.c
o
_o
so
(D
ru
oL$
.,$s0to6o-I
sq
0_
g. Cr00
.s a)35
,s$
oO2Xte)
o-9
ho-l,ut)o)b
TE.oU!NO'oCI
f,s o-
n
e,0lT
e)(-
2'
s$
U(-.E
,!,o
n
e)
_o
s$
o_
t,
ljl
rs
e)c
l-
0z
I
rl'os)(!
(ns
rzsa6
fr (t3,9o
T
a)
o
a_
0_a
J'c{o
Ts
rD(o
o
a)
o
tLqt
o_
,. e'(r)sa)oOltqts
s.oltl +,ie)6v
{
l.:
c]
I(o
J('''t
n
e)0s$
o
_o
L rpn-dol,sr"o Crss.' vEtg:60 9€i-rr-Ln....,rt-"tl,t.zo- d
Vail Associates, Inc.
July 15, 1996
Ms. Lauren Waterton
Community Development Department
Town of Vail
75 South Frontage Roacl
Vail, CO 81657
RE: GOLDEN PEAK BASE FACILITIES
RACE FINISH BUILDING
CLARIFICATION - EXTERIOR STAIN COLOR
Dear Lauren:
As requested, we are clariffing that the exterior stain color, proposed for the new siding
on the race finish building is Olympic, Semi-Transparent color #900 "Outside White on
Cedar", with the fascia to be # 905, "Cinder on Cedar". Samples are enclosed for your
ownersandoperatorsoqonvenience. It is our intention that the fascia color match the fascia on the main
yal4 8€r,,er r'eerc Re'obuilding.
ad Atowhead Mounlain'u
Please advise if you have any questions or require additional information.
David Corbin
Rick Caudel
?\p?(brA wl
D;?B "lftlate
iillr
f
\\, 7
V/
il",iiiil"ilii!
r llllrvttc|ltt
gpstcl.doc
t,
Jack D
PO Box 7 . Vail, Colorado. 81658. phone 970 476 5501
o
il
TOWN OF VAIL
Z4/4-.* ".)/-t
DEPANTAIENT OF COJTIIII L'}IITY DETELOPMENT
"^*_€__-_e-_LArrDnS,ss
tR(IrzcT
CI'ECI(S MADE IAYAXILE TO TOWN OP VAIL
^r..nrno.y'Ead
:"''^cGoI^TNo..ITuM-|:'!..-:],ri;:i..:-.:.:|,;.'Nc,;j:F:t x-.-a"coGT'|i.1',*,!]
0l 0000 41540 ZONING AND ADDRESS MNPS $5.00
0 0000 42415 UNIFORM BUILDING CODI:$54.00
0 oo00 42415 UNIFORIviP[Um sJ9.00
0 0000 424 r 5 UNIFORM MECI{ANICAL CODI]$37.00
0 oo00 424 | 5 UNIFORM FIRE CODE s36.00
(,0000 42415 NATJONAL ELECTRICAL CODI]s37.OO
0 0000 424 | 5 OTIIER CODE BOOKS
0 0000 4 t 548 BLUE PRINTS (MYLARS $ /,UU
0 oo00 42412 XLROX COPIIJS $0.25
0 oooo 42412 S I UDIb,S
0 | oo00 42412 TOVFEES COMPUTIJR PROGRN M $).0(,
0 0()00 42371 PENALTY FIIES / RE.INSPECTIONS
0 0000 41332 PLNN REV]IJW RE-CIIECK F'EE tS4O PHR IIR.
0 0000 42332 OFF I{OURS INSPECTION FIIDS
o oo00 4t412 CONTR CTORS LICIiNSI:S FI:lis
0 0000 4t413 SIGN APPLICATION FEE s20.00
0 uno 4t4t3 ADLII I IONN L SIGNAGE FEL, IS I .OO PER SO.FT.
0 (X)00 42.,140 VTC ART PROJECT DONATION
0 ooo0.4t 3i I PRE PAID DESIGN REVIEW BOARD FEE 'az
0 0000 4237r I}A/ESTIGATION FEE ( BUILDINC
3 oo00 451 t0 TOV PARKING FUND
0 oow22027 IOV NEWSPAPER DISPENSER FUND* 0t 0000 2l t2 TilTBIE@Z.5M* 0t 000041010 TAXABLE@4.q7. (IauN!t-l 0 0000 4237t BUILDINC INVESTIGATION
ITIIIJR
E
PEC APPLICATION FEES
0 oo00 41330 ADDITIONAL GRFA "250"s200.00
0 0000 41330 CONDII-IONAL USE PERMIT 5200.u0
0 oooo 41330 I]XTI]RIOR ALTERATION LESS TI-IAN 1OO SO.FT.s200.00
0 oo00 4l 330 EXTERIOR ALTERATION MORI TI|AN 100 so.FT.5500.oo
0 0000 4t330 SPF]CIALDEVELOPN,IENTDISTRICT iNIJW s I .500.00
0 0000 4l 330 SPECIAL DEVI-ILOPMl:NT DISTRICT IMAJOR AMEND s l.oo0.oo
0 0000 4 r 330 SPECIAL DEVELOPMI]NT DISTRICT IMINOR AMEND 5200.00
0 0000 41330 SUBDIVISION
i 0 0()00 4 | 330 VARIANCE s250.oo
o oo00 4l 330 ZONING CODE AMENDMENTS 5Z50.OO
0 0()00 41310 RL, - ZONING $200.00
OTI{ER
OTHER
ITOTAL.. 4a A)
cK.r [-_-J 1,1. O Ll utr"' ?' (/4--:'D'
o
a"
'4 i)a..*- " -^''"-'"'z- * * -
i.'
r{
T{fUlF{ {f,F L'|Ffrl-
lliscellseeus Ce6h
06-83-96 t2:41:53
Rstouht tendered )
Iten'paid
91S969413318SS
.
Chanp rFlurned .)
THIfHK
DRB
28,BB
firount paid
2S. AS
s. ss
Receipt *S ffi72"4
gccorrrrt I
I.IRIL ffs5OCIRTE5\PREPfi ID
vou
Vdur crshirr lElDl
o l,td
TOWNOFVAIL
.^* f,oaj4 t{r,rr.,tn
DEPARTIITF.\T OF COINTUIiITY DETELOP}IEI\T
o^n--b-t-J-Q-
?ROJECT
CEECXS MADE IAY ILE TO TOWN OF TAIL
0l 0000 41540 ZONING AND ADDRESS MAPS ST.OU
0l 000042415 UMFORM BUILDING CODE 5J4.U0
0l 000042415 UNIFORM PLI.JMBING CODE s39.00
ot 000042415 UNIFORM N,I ECHAN]CAL CODE s37.00
0l 000042415 TJNIFOP},I FIRE CODE s35.00,l qru) 42415 NAT]ONAL ELECTRICAL CODE s37.00
0t 0000 424t5 OTIIER CODE BOOKS
0l 0000 4l 548 BLUE PRINTS (MYLARS's7.00
ul urur 424l2 X.EROX COPIES s0.25
0 I oo00 42412 STUDIES
0 I 0000 424 12 TOVFEES COMPUTER PROGRA},I $5.00
u I (Xr00 4zi7l PENALTY FEES / RE-INSPECTIONS
0l 0000 41332 PLAN REVIEW RE.CHECK FEE IS4O PER HRI
0l 0000 42332 OFF HOURS INSPECTION FEES
0l 0000414r2 CONTRACTORSNE-NSESFEES
0t 0000414t3 S.IGN APPLICATION FEE s20.00
0t 0000414t3 ADDITIONAL SIGNAGE FEE ISI.OO PER SO.FT.Icw2+4e-I-YTC ART PROJECT DONATION
0000 41331=_I-FRE PAID DESIGN REVIE\V BOARDFEF 'l.oo
ot 0()00 4237t IN\iESTIGATION FEE (BUILDING)
i10000.+51t0 TOV PARKINC FUND
0l oo00 21027 TOV NEWSPAPER DISPENSER FUND* 0t 0000 2l l2 TAXABLE@,{.5m* 0t 0000 41010 TA.XABLE@{.02 (TowN)
B U IL D In*G INVES TIGA TION
OTI]ER
il P!;CA.PfLICATION FEES
0t oo00 4t.330 ADDITIONAL GRFA "250's200.00
0l 0fl)0 41330 CONDITIONAL USE PERMIT s200.t 0
0t 0000 4t330 EXTERIOR ALTERATION ILESS T}IAN IOO SO.FT.I s200.00
0l 0000 41330 ExIbRIOR ALTERATION IIvIORE TIIAN 100 SO.FT.I s500.00
0l 0000 41330 SI'LCIALDEVELOPI{ENTDISTRICT TNEWI s I,500.00
0t 0000 41330 SPECIAL DEVELOPMENT DISTRICT IMA.IOR AMEND s1.000.00
0l 0000 41330 SPECIAL DEVELOPMENT DISTRICT IMINOR AMEND s200.00
0l 0000 41330 SUBDIVISION
0l oo00 41330 VAKIANCT,s250.00
0l 0()00 4 1330 ZONING CODEAMTNDMENTS s250.00
0l 00004t330 RE-ZONING sz(ru.00
OTHER
)tHtR
ITOTAL:+'zD. DD
'l ''.or**,o, Golfu.v. PealL DV-B .
CASE I t cr't r.r.0LJ RDC. BY
oo
t- -
oCgn Revrew Acuon Folt
TOWN OF VAIL
| .--t
CalegoryNumber lZ
Project Name:
Building Name:
Date
Owner, Address and Phone:
ArchitecVcontact. Address and Phone:
Legal Description: Lot- Block- Subdivision (-r'!Li,r P<a-6 Silr Bai-e, Zone District
Project Street Address:
Motion by:
Seconded by:
D Approval
! Disapproval
fttaff AcProval
Conditions:
Town Planner
0","' *,.tK \1r,1 tn DRB Fee pre-paia *?-r>. oo*l
\J
July 3, 1996
Jack Hunn
Beth Levine
Golden Peak -
W
Condominium exterior modifications
Pierce. Segerbert & Associates
Archilects, PC.,A-1.A.
Main Office
1000 S Frontate Road W
Vail. CO 81657
fox: 970 476 4608
phone:970 476 4433
l6l7 Wazee Street
Suite C2
Denver, CO 80202
fox: 303 673 2262
phoner 103 623 1355
MEMORANDUM
Date:
To:
From:
Re:
Unit #1 : (1-) Change west window from a 6'-8" x 3'-8 3/8" with a 7'- l " head height to a
6'-8" x 2'-0"
lJnit#2: G) l. Add t'wo 2'-10" x 2'-10" skylights on the flat portion of the roof.
(East side of the roof monitor).
@ Z. Planter configuration: change the exterior planters slightly
lJnit #3: R) t Change the three french doors to four french doors on the east side ofr--"'' the living room. -) €a +zt attvr.hev-r
a, 2 Change the master bedroom french doors to french doors with a fixedr-''/' side light on each side. ) 9o vft r €-t€vc{*{t44
Unit #4: @ Xa an GG window to the west side of the master bedroom.
Unit#5:@ Move the skylight north approximately l2'-0".
Previously approved:
lJnit#2: @ f . Move main dormer 5'-0" east.
Unit #3: @t Change large east dormer to two small dormers.
f :\prj\goldp eak\docsvrunn0702.doc
lUtrr\ Uf VHrL LUI'i-ULV IU
+. -,--'rovlrrd l/ll lra
: JU5-4 (3- 24> to .u1TI):U1 I\U.UUJ To voo
VAIL,
fIH Y U
T
A
DESION RBVIEW BOARD APPIJICATION ' TOI{N OF COI,OR.LDO
DATE REcErvl'D, llElqU
DATE OF DRB MEETING. .
DESCRIPTION:
9t TYPE OF REVIEW:
Ne!, construcElon ($200' 00)
Addib.lon ($50.00)
r' Minor AI Lera Llon
Icot""ptual Review
($20.00)
($0)
****ttl***
***tt*****
1?X:r .
LEGAL DESCRIPTION: TVb I Block vJ,'tL vtLLAciL 3yADDRESS:
Subdivls lon
If property ls descrlbed.bY
aescribt.ion, Please Provideto thls aPPIlcatlon.
a moel-a and bounds
On a SeparaLe shQet
legal
and atLach
ZONING:
NAI{E OT APPIJI
Maillng AddreEs:
H
NAME OF
NAME OP OWNER(S):
Mall lng ggB:
APPTJICATT
condomlnium
APPLICANT'S REPRES ATIVE:
Ma1ffi?Address: - r
Phone
Phone
PROC WTHOUT OhTNER' 9 SIANATUn.]E
applicabI.
J.DRB FEE: DRB fees, as shown abovs' are Lo be Baid aE t} e
time of eubmiLLal'oi-tt" DRB appllcaElon' LaLer' when
"biivi^q-io. u nuliOlng permit, please identifv the accuraLe
valuarion of the ;;6;;.i. rrtt -rown or vail will adjusL the
fee accordlng to inu- cubfu below, to ensure the correcL fee
i. e pald .
FFE SCHEDULE:
VALUATION
T 0'$ 10'000
$10,oo1 '$ s0,0oo
s 50, 001 ' f 150, 000
$150,001 '$ 5oo,ooo
s500,001 -. $1,000,000$ over $1, 000, 000
$100,00
$200.00
$d00.00
$s00.00
DESIGNRBvIBt|BoARDAFFRoVAIJEXPIRESoNEY&ARAFTERFINAI,
APPROVAIJ U$IJB88 JiUiiOrNO PERMII I8 IsgUED AND CONSTRUCIION
Ig STARTED.
roval
FEE
o.a o
TOWNOFVAIL
f^$e l)A
DE'ANTME\T OF COILUUI\ITY DE\ELOP}IENT
^I,DRESS
,^n-2------z-L, 4
PROIECT
cEECtis M^DE taYllLS TO TO\t?i OF l'AtL
0l 0000 41540 ZONING AND ADDTESSIFP-5t.u0
0l 000042415 UMFORM BUILDING CODE,s54.00
0t 000042415 UNIFORM PLLMBING CODE s39.00
0t 0000 42415 UNIFORM MEC}IAMCAL CODE $37.00
0t 0000 424 t 5 UNIFORIvI FIRE CODE 536.00,l mm42.115 NAT]ONAL ELECTRICAL CODE s37.00
0l 0000 42415 OTIIER CODE BOOKS
0l 0000 4t518 BLUE PRINTS (MTLARS $7.00
J I 00u, 424 12 X-LROX COPIES ,0.25 *
0t 0000 42412 STUDIES
0l 0000 r{2412 TOVFEES COMPUTER PROGRAM s5.00
0t 0000 42371 PENALTY FEES / RE-INSPECTIONS
0l 0000 41332 PLAN REVIEWV RE.CEEEKTEE_TgAPEREE
0l m00 42_132 OFF HOURS INSPECTION FEES
0l 000041412 CONTRACTORW
0l 0000 4t413 SIGN APPLIEATIONfE-E s20.00
0t 000041413 ADDITIONALSM .f 1-.
0l fro€€F+2+VTCARTPROJM
0l 00004tjit ]PRE PAID DESIGN REVIEW BOARD FEE lnn "?a t'
-TFBO€U42:nr I},IVESTIGATION FEE (BUILDING
31 0000 451l0 TOV PARKING FUND
0t 0000 2:027 TOV NEWSPAPER DISPENSER FUND*0l 00002lIt2 TA.YAB[E@Z;5M.01 0000 41010 TAXABLE @4.oL(ToWN
B UILDIn'G INVESTIGATION
OTI{ER
PEC A-PPLICATION FEES
0l 0000 4r.3i0 II,DII'IONAL GRFA "250"s200.00
0t fr)00 4t330 CONL'I I IONAL USE PERMIT s200.00
0t 0000 41330 EXTERIOR ALTERATION LESS THAN 100 Sl .FT.s200.00
0l 0000 4t330 EXTERIOR ALTERATION IMORE TMNIOOSo.FT s500.00
0l 0000 41330 IPECIAL DEVELOP]\{ENT DISTRICT INEW s I,500.00
0l 0000 4t330 SPECIAL DEVELOPMENT DISTRICT MAJOR AMEND s1.000.000l 0000 4t33tr IPECIAL DEVELOPMENT DISTRICT TT,TINOR AMEND s200.00
0l 0000 41i30 SUBDIVISION
0l 00004t330 VARIANCE s250.00
0l 000041330 ZONING CODE AMTNDMENTS s250.00
0l 0()00 4t3_i0 KE - ZONING s200.00
OTHER
)THER E
CASE I t cx.rt M.OLI
TOLTH 0F IJF| f L
llisollarqre Crh
a7-15-96 15: 16:32
Receipr {t 20StS2
ficcount i CK lt
JMK HUiT.I . Ufl\PPD
ffmoun i terxde red
It€. paid
8ta@04133t@o
Change returned
THF|f.t](
2g.ga
houn? peid
29.Bg
a.ag
1/tlu
6354
DRB FEE5
Your crchirr .[DV
..]i.r.*\q!ii'f rr l\if{'FFJ n iN 'l:t'Y.Exl
De{n Review Action Forp
TOWN OF VAIL
Category Number oa, TfsftE
Project Name:
Building Name:
Project Description:
Owner, Address and Phone:
ArchitecilContact, hodress and Phone:
Legal Description: Lot
-
Block- Subdivision
Projec-t Slreet Address:
Zone District SF.Z
Board llsta* action7L.-.- 1
Motion by:
Seconded by:
! Approval
! Disapproval
y(statt RRRrovat
Conditions:
Town Planner
lt
- --', l-. t? tDatei /tcl lg/, DRB Fee Pre-paidla-
/JUNE IO, I"?6 GOLDEN FEAK
DRB 9UBI1ITTAL
ADDITIONAL LANDgCAPING ALONG
uJEgT PROJECT tsOUNDARY
DE9IGNUJORKgHOP
./A
/
/
/
/
/
/
NORTH O 15 30 60
NOTE, PLANTING AREA II'ILL INCLUDE 12
N$C. > GALLON PLANT IIATERIAL,
. GROIJNDCOVER
2 COT.ICOLOR FIR
I COL. BLUE gPRUCE
I CONCOLOR FIR
I COL. ELUE gPFTICE
I cor.lcoLoR FrR
2 COL.
tsLUE gPRUCE
/
It
\-)('I
\
\
I
\
\
LIFT 12
EXlgTlI.lG UTIL ITY PEDE9TAL9
olign Review Action Ft
TOWN OF VAIL
' -'-f -rsfr-T!'rTtfrrFE
Category Numbe(
Project Name:
Building Name:
Proiec{ Descripfon:
Owner, Address and
Archit€ct/Contact, Address and Phone:
Legal Description: lot
-
Block- Subdivision
Prolecl Steet Address:
Zone District
Comments:
Motion by:
Seconded by:
fl Approval
E. Disapproval
Xf Staff Approval
Town Planner
DRB Fee Pre-paid
olign Review Action Ftr
TOWN OF VAIL
Category Number \7-
Project Name:
Building Name:
Architecvoontact, Address and Phone:
Legal Descriprion: +JIOCLE Bbck x, / t/ LW zone Districr <Blf.=
Project Street Address:
Commenls:
Motion by:
n Approval
n Disapproval
,lQattRPProvat
Seconded by:
Conditions:rFr,n *
Town Planner
DRB Fee ere-paio f Zi)' oo F! '
IUU5-4 (e-2452
t.vt.tA 7lL7l9l
DESIGN REVIEW BOARI)
I"IH Y
APPIJICATION ' TOIIN OF
DATE RECEIVED:
DATE OF DRB MEETTNG:
*ratitetaa
rrL rrLrrr I ll|vl-LILVtluur!'.r,1 I5:r,rl No.UUi i'.01
I.
A.
*ii*t**tit
FROirEc[ INPORI'I.ATIONI.
DESCRIF.TION:
B.TYPE OF REVIEW:
Nehr ConstrucElon ($200.00)
Additlon ($50.00)
-' Uinox A1Lerat,ion (920. 00)
ICon""ptual neview ($0)
C. /\DDRESS:
D.I,EGAIT DESCRIPTION:I/O t Block
Subdivlslon
rf properLy ts descrlbed bY
descripuion, please provide
Lo Ehls appllcatlon.
a meeLs and bounds legal
on a separate sheet end aLLach
E.
F.
ZONING:
NA},TE OF
tlaiLlnq
APPLTCA}IT:
AddresB:
H.
NAME OF APPLICAIIT'S REPRESENTATIVE: A'WZ'
ualtlng Address:
Phone
NAME OF OWNEi?.(S):
Mal}lng Addrs
APPITICATIONg SED WTHOUT OWNERJS SIANATUfl.B
Condominium Ap applicI.
J.DRB FEE: DRB feee, aE shown abovs, are Lo be paid at Lhe
time of eubmit.ual of the DRB appllcaEton. Later, when
abplying for a bulldlng permit, pLea'e identify Lhe accurate
valuation of bhe propo;ai. The Town of vail witl- adjusb the
fee accordlng Lo ttra t,affe bel6w, to eneure the correct fee
FEE SCHEDULE:
VALUATION
$ 0'$ 10,000
$10,001 -$ 50'000
$ 50, oo1 - f 150, 000
$150,001 - $ 500,000
0s00, 001 -. $1, 000, 000
$ over fl,000,000
50.00
s100. 00
$2oo.00
$400.00
$s00 .00
DE8IGN B,EVIBW BOARD IPPROVAI' EXPIRE8
APPROVAIJ T'III.,B8g A BUITJDINO PBRMII Ig
Ig STTRtrAD
ONE YEAR AHTER FINAI/
I88UED AIID CONSTRUCIION
WIIJIJ M)T BE
is pald.
2.
aJ.
Golden Peak Base Facility
Supplement to Design Review Board Application
Vail Associates Real Estate group is requesting staff approval of the following
modifications to the Final Approved Plans for the new Golden Peak Base Facility, which
were presented conceptually to the Design Review Board several weeks ago:
We are requesting staff approval to substitute brick pavers for colored concrete at
the crosswalk between the northeast comer of the Golden Peak property and the
Manor Vail pedestrian walkway, as requested by the Town Engineer. It is our
belief that this will be a troublesome detail for the Town to maintain and,we
hereby advise that our contractor has declined to provide a warranty for this ffpe
of cross walk in this particular location.
We are requesting staff approval to install an expanded ramp in lieu of a narrow
ramp and adjacent stairs on the south side of the new facility between the plaza
and the site.
We are requesting staff approval to delete the cut stone base on the perimeter of
the building with the exception ofi
c.
The restaurant entrance, lower level, north side. We would leave the
cut stone on the sides and front of the air lock element.
The great room entrance on the south side of the building. Cut stone would
be applied to the sides and front ofthe element.
The wall surface immediately below the ticket windows on the south
elevation.
The base of each stone veneer clad column element associated with the
building perimeter.
The cut stone base would be replaced with a built out stucco detail in a color
simulating the cut stone material. The metal panel at the base of the storefront
windows has been deleted in favor of the continuous stucco band. We believe
that this will be a more successful detail, both functionally and aesthetically.
After careful consideration, we have decided to build the food service dining deck
and related planters in accordance with the approved plans. During our meeting
with the Board we discussed several alternative solutions. While we appreciate
the Boards willingness to consider altemative solutions, we will not be pursuing a
change in this element of the project.
b.
d.
.+-
Gold Peak Base FacilitY
Supplement to Design Review Board Application
Page2
5.
6.
,7
8.
9.
10.
we are requesting staff approval to construct the wheel chair ramps at each curb
cut as a pou.ed in place, color impregnated concrete ramps in lieu of a brick paver
detail. 'ihe code riquires a differintiation of materials and the concrete solution is
consistent with the recommended detail'
We are requesting staff approval to delete the cut stone or stone veneer base detail
on several site retaining walls in favor of an all stucco solution. As a result
retaining and site walls will either be all stone veneer or all stucco, each having a
cut stone cap. We believe that this will be a more successful detail'
we are requesting staff approval for the deletion of the stone cap on the low
retaining wall along the north side ofthe skier drop offarea in favor ofa cast-in
place walt with a chamfered top edge and sand blasted finish on exposed surfaces'
We are requesting staffapproval for the simplification of the decorative iron
railings as they occur on the site. We propose to minimize the omamental aspects
of these railings in order to differentiate them from the more decorative railings
on the condominium levels of the building.
We are requesting staff approval to lower the retaining wall at the condominium
entrance/courtyard. The town engineer has requested this revision in order to
improve site lines in the vicinity.
We have deleted the planting between the Chair 6 retaining wall and the
adjacent mountain aacess ramp retaining wall. This was done in response to Vail
Associates, Inc. concern about the snowmaking equipment killing the plant
material, as well as the needs of the snow-grooming equipment that will be
operating in this area. To compensate for the removal of this material, we have
added in a small planting area between the uphill side of Chair 6 and the bicycle
path.
We are requesting staff approval of the kitchen exhaust chimney details which are
clarified on the enclosed drawings.
We are requesting staff approval of the additional window, which is located on the
west elevation at the slope level of the building.
ll.
12.
Gold Peak Base Facility
Supplement to Design Review Board Application
Page 3
13. As we have recently discussed, we are requesting stalf approval to substitute back
to a metal roof in a blue color on the bus shelter. The blue color would match the
adjacent lift terminal. Our previous request to substitute a cedar shake roof failed
to anticipate a solution for the flat roof portion of the building. We now believe
that the best solution is to install the blue metal product.
Thank you for your consideration of these relatively minor modifications. Please advise
if I have overlooked any of the items that we had conceptually discussed with the Design
Review Board.
'-.:?
DESIGNWORKSHOP
Landscape Architecture
Land Plamng
Urban Design
Tourism Planning
Project Memorandum
Pro;ect Number: 1066
To: Jack Hunn. Jim Cumutte
From: K. Ethan Mmre
Date: Mav 22. 1996
Jim, below is a brief nanative description ofthe Golden Peak L-series site plans to aid you in veri$ing that the
following changes have been made to our documents, as outlined in t}te memo from Jack Hunn. If you have
any questions, please do not hesitate to contact me.
Sheet Ll- Overall site plan (the information on this plan is also contained on the site layout sheets in greater
detail, however, I am only submitting this overall sheet foryourconvenience)
l The crosswalk from the Gold Peak to Manor Vajl has been changed to a paverstone crosswalk, as
previously requested by Staffand DRB
2. On the southem side of the building the stair/ramp mountain access combination has been reduced
to a single l0'wide ramp
L
3. The planter along the back ofthe Apres' Ski dining terrace has been restored to its original design.
4. All handicapped curb cut ramps on the project have been clarified to be colored concrete on the
ramped surfaces. The adjoining pavement varies between paver stones or colored concrete.
Sheet L6-1. This sheet is for your clarification, and it points out the surface treaEnent of all site walls. In
particular, please note that the chair 6 retaining wall is entirely EIIS on its face, as are the interior walls of the
Apres Ski dining terrace. All EIFS site walls that come down to grade will have reinforced EIFS at grade to
protect the wall from damage.
Sheet L7- Wall elevations
l. Detail 3/L7 shows how the top of the condominium courtyard wall has becn lowered to
accommodate the 6'height limit, as well as provide for the 200 vehicular site distance required by Greg
Hall.
Sheet L8- Site paving details
1. Please note the notations for details 1,2,&3, regarding the colored concrete surface treatment of all
handicapped curb-cut ramps.
Sheet L9- Site wall details
l. Detail 2/L9, shows how the stone cap has been replaced with a notched and chamfered colored
concrete cap integral with the colored concrete/ rough sandblast finish wall.
2. Deta;il l0/L9, shows the full EIFS surface of the chair 6 retaining wall, with reinforced EIFS at the
base of the wall.
".:v
Sheet Ll I - Site fences and railing details
l- A note has been added to details 7 & 8 regarding the simplification of the site decorative railings.
While the detail has not been visually changed, the note points out that the "diamond" & the mid-rail
have been deleted
Sheet Ll3- Planting Plan , Zone 2
1' A small planting area of Colorado Blue Spruce and Aspens has been added just uphill of the new
chair 6. This is to compensate for the removal of the aspens along the north-south running chair 6
retaining wall.
Again, ifyou have any questions regarding the above, please contact me. Thanksl
L[lo.'"----
TGT T.I GF TJF I I-
l'li sce I l aneous Cash
rtE..-.,'u-rl't-. i 4: 'li': 'iir
i Flsr*ipt * ':r'1:. j':+
' t1c,:c,,-ri-!i * t.ii: ll iif:
JHr-:lr HUilli'.FF|EF;Iir r'r-:E F=r
Firrir:rr-in I. t *f-;ij* i+,j .: :i'-1 ' li1fi
I tenr Pa i d Htrrourn t Pa i d
B I ufififi"l1f,f !' 'Jit;jr
f,h.:rn,3e, i+ t':-r'r ira':j .: ';1 ' f {l
-rHff i-lH r.'aLl
rj,:u r c.l:;:fri ;: r HE l ll i
oGtgn Review Action Ffrh
TOWN OF VAIL
Category Number
Building Name:n
Project Description: u
Owner. Address and Phone:
!O. tLo Co /65
4
/\
1igloct< - Subdivision zone District 56 R
y' r:
-{q
Conditions:
Board/@ ,/.uotionov: D {4 vo.n,, ,<) /-*
Seconded oy, /rl {4
I Approval
! Disapproval
r,d#Ieppr*^t
Lt)r
!)n''" ""' t /u", DRBFee r,"-r,o ff ao%
x.v!'d alL1l91
I.
DESIGN RE\IIEW BOARD APPIJICATTON . TOWN OF VArrJ, COnOq#l ,, u i;r:r0
DATE RECEIVED:
oott..ol l*u. r4*EErrNG : ffi tV, DEPT
INCOMPITBTE APPITICATIONS I'IAY NOT BE SCHEDWED FOR REVIEW.**********
PROTTECT INFORIIIATION :
DESCRIpTf ON: < h,r,1A.
B. TYPE OF REVIEW:
-New
Const,ruct,ion ($200. 00)Addition (950.00)_..jMinor Alteration ($20. 00)
Conceptual Review ($0)
c.ADDRESS:
D.
E.
I,EGAIJ DESCRIPTION:
SUDCr].V].STOn
L,O !Block
If properby is described bydescription, please provideto this application.
ZONING:
a meeLs and bounds
on a separat.e sheeL
1egal
and at.tach
H.
F.
G.NA!48 OF APPIJICAITT'S
APPIIICANT:Y"il Acsrlterl.t T^,NAI{E OF
Mailing Address:
Phone
Mailinq Address:
REPRESENTATIVE:
Po llor. '7
-7-a,.- fl llt -"(r,.-
, Vail 1a
NAI{E OF OhINER(S) :V.;l A b)dctaTt>
Phone 4-7 1'tteq
I.
J.
OWNER(S) SIGNATARE:Mailing Address I
Phone
APPITICATIONS WIITIt NOT BE PROCESSED WITHOUT OWNER'S SIG'NATURE
Condominium Approval if applicable.
DRB FEE: DRB fees, as shown above, are. to be paid at the
t,ime of submittal of the DRB application. Later, whenapplying for a building penniL, please identify the accuraLevaluation of the proposal . The Town of Vail will adjusL thefee according to the table below, to ensure the correct feeis paid.
FEE SCHEDULE:
VAIJUATION$ o $ 1o,ooo
$ IVTUUI - $ )U'UUU
$ 50, 001 - $ 150, 000
$150, 001 - $ 500, 000
$500, 001 $1, 000, 000$ Over $1,000,000
DESIGN REVIEW BOARD APPROVAIJ EXPIRES
APPROVAL I'NIJESS A BUIIJDING PERMIT ISIS STARTED.
FEE
$ 20.00
$ s0.00
$100.00
$200. 00
$400.00
$s00. 00
ONE YE,AR AFTER FINAIJ
ISSUED AIiID CONSTRUCTION
t'E''r.rr5til*:r li :.rF. -, ' _-n- .iirrfr j _: --:
olign Review Action Fdt
TOWN OF VAIL
Category Number
Project Name:
Building Nam€:en
Project Description:
LegalDescripti o,#oli]ftiock \.-
Date
Co.7 -fLl-3
,qQ
6wr\
L
Subdivision zone District 1tsR
Project Street Address:
to"ro@ /-^uotionov: P&. ,"r"t ///4
seconded oyt y{tr
! Approval
l) Dty)prcval
ilAtaflApproval
Conditions:
<{at'ptQ or <{ucce sct r €-q ce F .
PwnPlanner /- / -. - Il ^ -pQ.-'r^",' -
"f7/r6 DRBFee p,"-p,id # Aote( ,/q6 DRBFee
''"-o^o # 20%
.i0l'lN.fF VRIL C0M-DEU 1303-47e-24s2 HnYO'e6
rrvlr.a l/l1lra
DESIGI REVIET BOARD TPPITICAIION ' B0||I OF V
15:01 No
'\t,
coronrDo
DATE RECEI\IED:llAY 0 ti isgb
DATE OF DR8 I{EETING:
.005 P .01e.,. di ,
sy
. DEPI
I.
A.
c.
D.
B.TYPE OF REI|IEW:
Nelt consEructton (f200.00) '' Minor AlteraElon (920.00)
-Additton
(S50.001
-Conceptual
neview (f0)
r.{]\DDRESS:
IJEGAIJ DESCBIPTION: LOE Block
Subdivlslon
rf properLy ls described by
deeCripuion, pxeage provide
to thls aDglicatlon.
a meeue and bounds
on a seParate sheet
legal
and accach
*rt*ltat*t
*iirt*at*t
PROirEcq[ INFORITAIIOII
DESCRIPTION:
F
F.
G.
H.
I.
,t.
ZONING:
NAI'{E OF
MailinE
APPLTICAI{T:+Jwr* U y'.otc a911117,
AddresF:
Phone
APPITICANI 'S REPRESENTATIVE: €LvU-'\'
Addregs:
Phone
NAIIE OF OIIINER(S) :
Mal1lng
Phone
APPLIcnTTOTIS ft'/EOtIr otrruER'g SIONI?URE
Condomlniu,m 'appItcable.
FEE SCHEDUITE i
VAIJUATIONI o'$ 1o,ooo
$10,001 -s 50,000
t50,001 -0150,000
$150,001 - $ 500,000
f500,001 : $1,000,000$ over $1,000,000
DESIOI BE\tfEt BOARD IPPROVAL EXPIRIS
TPPNOVTE IIUIASS A BUII.DIIO PERIIIT X8
Ig oITINAED
-EEE----.--+-3O.-0o)$ s0.00
$100.00
$200.00
$400.00
$s00.00
O{E YEAR AFIER FIIID
r88UED AllD CUfS'TBUCTIO!!
NAI.IE OT
*al11n9
DRB FEE: DRB feee, ag shorflr abovo, are Lo be paict at Lhe
Eime of eubmittal of the oaa appllcaElon. r'ater' when
ibpiving for e bulldlng permit, please identify_ the accuraLe
viiuici5n of the prqpoial. The rown of vail will adjust-t5e
fG-;A;dlnc to irrd gable belou, to ensure the correct fee
ie pald.
', ' l'
Golden Peak Base Facility trDH:516196
Supplement to Design Review Board Application:
We are requesting staff approval of the following modifications to the Final Approved
Plans for the new Golden Peak Base Facility:
1 . We are requesting staff approval to install the typical blue metal roof on the
Base Terminal Enclosure for Chair #6 in lieu of the dark green color as previously
proposed and approved. Rather than put blue metal on the bus shelter roof, we
would propose to install cedar shakes similar to the roof finish on the adjacent
children's center facilitv.
The reason for requesting the change from a green lift to a blue lift is to maintain
consistency in Vail and on Vail Mountain with regard to the color of the lift
enclosures.
2. We are requesting staff approval to delete the wood cladding on the overhead
doors at the loading dock and condo garage, in favor ofa coiling style metal door
which would be painted to match the adjacent stone or stucco surfaces.
The reasons for requesting this modification are as follows:
a. The wood cladding would necessitate a panel style door,
which would complicate sprinkler coverage and would
reduce vertical clearance at the loading dock door.
b. The manufacturers ofthe panel style doors have expressed concem
regarding the weight of the applied wood cladding. They are advising
against the wood cladding on panel style doors ofthis size.
c. Our building maintenance group has expressed concem regarding
the durability of the wood cladding, particularly on the loading
dock door.
After touring the Vail area to look for examples of successful applications of wood
cladding, I observed many successful examples of the coiling style overhead doors and
could find no examples of wood cladding in a non-residential application. One location
where a coiling door has recently been approved is the new Town of Vail Police
Department. There are numerous examples of coiling overhead doors in Beaver Creek
Resort as well.
Thank you for considering our request for staffapproval ofthese relatively minor
modifications. Please advise as to the status of each at your earliest convenience.
J r' I rr.o o Jc-
TOWNOFVAIL
\ , , DEP^RTIIL\T oF Corl'llllTrv DETEITO'IIIENT
*.*," { ocV- t \Lr u\A
ADDRESS ,^*_5,J_-?L
}R(}IECT
CEECIiS MADE
'^YA.BLE
TO TO\TT OF VAIL
: - ACCOI TNO. tlA}l - l-:: ::::: ia
OI (X)OO4I54O I ZONING ANDADDRESS MAPS s5.00
554.00
s39.00
s37.00
$36.00
s37.00
s7.00
s0.25
s5.00
s2u.00
ryD,O
ut v)ggJ++r lNVESTIGATION FEE ( BUILDING
3l oo0045il0 TOV PARliIrr-G FUND
0l 0000 2:027 I'OV NT,WSPAPER DISPENSER FUND* 0t 0000 2l I 12 TdABTE@lt5m* 0t 0000 4t010 TAXABLE@1.02 (TowN
BUILDING INVESTIGATION
OTI{ER
PEC A.PPLICATION FEES
0t 0000 41330 ADDITIONAL GRFA "2JO s200.00
0l 0t)0041330 CONDITIONATESETERNIIT szuu.00
0t 00004r330 ETTERIORT'TEMTION_LESS THAN IOO SO.FT.s200.00
0l fi)00 4t330 EXTER]OR ALTERATION MORE TIIAN IOO SO.FT.s500.00
0t 0000 41330 SPECIAL DEVELOPI'ENTDISTRIET TNEW s 1.500.00
0l 0000 4t330 s s 1,000.00
0l 0000.11330 SPECIALDEVELM 5200.u0
0l 0000 41330 SUBDIVISION
0l 0000 4t330 vAzuil'tcE s250.00
0l 0000 41330 zo s250.00
0l oo00 413_i0 RE - ZONING s200.00
OTHER
OTHER
lTor^Lfr?t?,Oc
"',*,**. (zoVr'^ ?corl-'- C.lr-a,.,nlo h ?Un'-
GASB l-----------J cKt t l'{.0 LJ
o J. '-. tl rr 1
j ,l r\. i {i
T(f,Whl (}F rJFlrl-
lligcellmeqrs Caeh
g5-S8-95 89284t2?
Receipt ll 199915flccount* CKS6f67
JBCfi HiJHN\PREPRID DRB FEE
fl$ount. l.cndered > 2g,AA
Iren paid houn? p.id
81BBB04l33t698 frLffi
Charqe returned > S.SS i
TFtFrh.tK 1/OrJ
ot,nn Review Action F#
TOWN OF VAIL
,-lCategoryNumber | 6 Date
Project Name:
Building Name:
(r€v^t
?
Owner, Address and Phone:
Architecvoontact, Address and Phone:
LesalDescripri"{rWf 'f^ock
-
subdivinionVq'tL V t C(ry"e- E?l Zone District
Projec-t Street Address :
Comments:
Motion by:
sefv:
NfApproval
E Disapproval
! StaffAppro/al
Gonditions:
Town Planner
,n", "1/ t I /qe DRB Fee Pre-paid o
o
tE_-*----fu*Z
9 iL€ep't"'p'") y' r'* ru *:' t
i5 ,{*u wi(cotne Lo*r{'o,n w|f St
* fepsuq ( *{: r+g i'\AA,e C,unt, r"'?t*!rtutaf.r'o { (* eq (
i'la{ert-, fu o t"( , i,.t S.'tu {,e{
* Lr* 1rc"{n*or{- l\<*t-ua* q-r.{o ( f+7,e(S//b[ef' *r,dc, * n F-{/^ 4*u,i'. {*,o.a1) * I a u {
It L* c:/c,t @
fcr{!.+rr I't** Neafl i.r'{y w'PK& q* {**gt
*., g +la ce(J,*\.**in{e ;fu.&ca*i o&t}:6
t Ftn "pd€- $;.& 64 af O a ot<+4 ),
l5i-,,r* arL r.-rr-,i+ r oli*p d{*tt*4,+ Fle {e*'c t\'
[ .4f r'-cfr4 3
( pB A C'l- ac G,+F.9*CG -{*yL (,' U;"d ceeq$+t
Pe,oJ fqt L eq- the O(,i,ry"1 aAeer
L',j;( L bu q Sr,"ftLet tUh"'L
lAo ilo t- Vq'r L c f-,q uy3 L k : f?rJ
Co r.rr'+rtL cdilcrcfu) Q!+ /*-rt,
19*
r$-
I |trt
,Pq*A*&tL"* - (btt w*{q( twcJ*'l -
bb27 P,4 &(-svA e ca,yrl2
rn
. la,,"OY9ca"P, tV .\,. \-- (-rgtl +lvrz@ ed Pol"/Q ec&€ '/-- u:
\- & r.u-r7 Q'/ n;ro -''- fr; Ly gy.a&rsh(4y +Lo( ,'€ h'r,q,
,Y *?4 he-tvf c4i,eL
- //feq ee,*l -4'Lft,ol?g cezg{a-
-i€tv p,*.r e{-/ bn n t,e f ('Q"y ,f (,/
^a.;
/ Ca/
ytl'<-i y"/f"s a.re 'lgsgc)$, ,2O r*^,'(
>,Jg
€-s
U,tY t,
,'r"-_5
rL S[". "{S i u'i * ,' ,4 * ,% KIGS
-
r,. //
^
/ /- c;)le. (i;(^{r*p, 6t |)y, et*f,iry r,,tk
U- ft , ** = {'w', ..il'o ri /* Afn.d p,.1,6*,4 {h:t LlJ4,- u.,,/,*i
w )-l (, )+ ,'- al"^k
'[^ssv
Jq,{k ,r,u ((,bii
trv"*09*- vhV ,"& ,,{ .L* L"t/w bo(,
eyst eft :*t (,369 coGrEa- Pa^k *4!^f,
,'ltlftx -' r;,'"'' tr v- iht(
-b" = - o/c,^,Q. ca/uc^o/e-
fr .y.rr/"r._il
hrl./t'/g- t,ua&a,p Lqg Wit'l
tg,t heckorcq-L
I Q*r(a-ocA A opa$e
-CR4
@r*t ct-oQ.'* a-'rgt{- AP tUnfl,
7 . [ody e= $ Tf,,A- / L,,'s
*(el
L
CeCe-fq
/ .u/ rcS
{ rrtn ffi-x-g{/:1 *C_- Lu' -/ u,,,u q r{. * 4
L*fO*. -L -o'*fr,'/ (
{)qf Ao*uo, ou fi"*Dl.+tg.
furyrl
Ir=
-Et= rlitt .9
'-J t
6? ,^ )'dl
DESIGN REVIEUOARD APPLICATION - TOWN COL,ORADO
DATE RECEIVED:
DATE OF DRB MEETING:**********
INCOMPI'EIE APPI'LCATLONS MAY NOT BE SCHEDULED FOR REVIEW.**********
"U
I.
A.DESCRIPTION:
B. TYPE OF REVIEW:
c.
11 LEGAL DESCRIPT
Subdivision
If properLy is described by
description, please provide
t,o this applicaL.ion.
a meeLs and bounds
on a separat.e sheet
legal
and aELach
F
F.
ZONING:
NAME OF
Mailing
APPI,ICANT:
Address:
NAME OF APPLICANT'S REPRESENTATIVET \nr'tr-*'{t,,'urn
Phone
H. NAME OF OWNER(S) :
OIIDIER {S l,9rGIVA?URE:
MaiLing Address:
Phone
APPLTCATIONS WILL NOT BB PROEESSED WTNHOVT OflI\'ER'S SI$NTUf,E
Condorninium Approval if applicable.
DRB FEE: DRB fees, as shown above, are Eo be paid aL the
Bime of submit.tal of the DRB applicaLion. taLer, when
applying for a building permiE, please ident.ify Lhe accuraLe
valuat,ion of f,he proposat. The Town of Vail will adjust t'he
fee aeeording to the tabLe below, t'o ensure Ehe eorreeb feois naid.
FEE PAID: $CHECK fir DAIDI BYt
T
\t.
New const.ruct,ion ($200.00) j-Minor AlEeraEion ($20.00)
Addition ($50.00)Conceptual neview ($0)
ADDRESS:
-LOLT 3 etocL
FEE SCHEDULE:
VAIJUATION
$ 0 $ 10,000
$ 10, 001 $ 50, 000
$ 50, 001 - $ 150, 000
$150, 001 - $ 5oo, 000
$500, 001 $1, 000, 000g Over $L, 000, 000
DESIGN REVIEW BOARD APPROVAL EXPIRES
APPROVAI ttNIJEgg A BUIITDING PERMIE IgIS STARTED.
FEE
$ 20.00
$ s0.00
$100.00
$200.00
$400.00
$s00.00
ONE YEAR AFBER FINAIJ
Ig 3UED AIiID C0l'lglnUeEtdl'i
G,gn Revrew Acuon FOrn
TOWN OF VAIL
Category Number 5 Date
Proiect Name:
Building Name:Gotru* fututo
Project Description:
ArchitecVOontact, Address and Phone:
f?,ncrf
Legal Description: tot_ Block zone District SFlK.
Project Strest Address:
Comments:
Motion by:6-O
,{Annrovat
n Disapproval
! StaffApproval
Conditions:
Town Planner
o^r"' dclxvr*u4 2\,4b DRB Fee pre-paid
\"
Aw*
ll
on February 21, lgg6,The Desigrr Review Board approved (by a vote of 5-0) the Golden Peak
Redwelopment project subject to the following conditions:
1. The Streetscape Lighting Plan willbe approved by staff
2. Add pavers to ttre cross-walk between Manor Vail and the Base Lodge Building'
3. The sewer line under the bridge crossing Gore Creek will be painted to make it
disappear. That color can be approved by staff
4. The handrails on the bridge wili match in color to other handrails in the Village'
such as the International Bridge.
5. Field adjustments regarding tf,e hndscaping maybe made.- These changes shall be
limited to the south iide ofthe building on top ofthe parking structure and are
related to the snowcat operations.
6. The construction details and final location of the Vail Trail must be refined and
worked out with staff.
7. The Town Engineer's (Greg Hall) letter must be addressed and all issues must be
resolved.
8. By June l, 1996, the applicant must return to the DRB for final review and
approval of the following items:
A. All exterior lighting for the building
B. The exterior signage Program.C. The Race Finish Building.
D. The Tent/?avilion design.
E. The final design for the area northeast ofthe Children's Center (retaining
walls, landscaPing, grading, etc.).
f:\cvcryare\laurcr\goldpeak\fobcottd.22 I
J
GOLDEN PEAK SKI BASE FINAL REVIEW
BYTHF DESIGN REVIEW BOARI)
FEBRUARY 21,1996
BRIDGE
The DRB directed the applicant to paint tle sewer line undemeath the bridge to 'tnake it
disappear." Staff can approve the iolor. The color of the rails will be copper green color that
matches other bridges in Vail, suoh as the Intemational Bridge and the Chapel Bridge'
MILLCREEKPLAZA
one spruce was added to hide the utility box. That spruce will be 6' to 8' tall.
LA}.IDSCAPING
There will be more native grasses south of the bike path and turf grass north of the bike path.
Jack Hqnn stated that they would like to have the flexibility to move around some of the tees in
this area to make room for a snowcat trail and for a turnaround on the trail near Mill Creek Circle.
The DRB had no problem with this.
PEDESTRIAhI BARRIER AT THE CHILDREN'S CENTER
The Design Review Board is ok with the design, as well as the end posts and the color. The color
will matcl the color of the commercial level of the Main Building, urhich is "Harford Green"'
CONDOMINIUMWALL
This was reduced in height for site distances as required by Greg Hall an(l the look of this is ok by
the DRB. Jack Hunn requested flexibility regarding the cap on the walls to replace the proposed
Sandstone cap with a pre-cast concrete with a color to match the sandstone. The DRB had no
problem with this and stated that it could be resolved with staff.
In order to save two existing tees, Vail Associates may need to request a wall height variance, b
@. The DRB concluded that this will not be approved as part of this
approval but that if a wall height variance is neede4 they will need to go to the Planning
Commission for that approval.
Diane Milligaa of th. nam*ho-, asked about the hee to the east of Chalet Road and if
this tree is going to be renroved or limbed up? The DRB concluded that the tee should
not be moved or relocated and that it should just be limbed up if possible.
Jim Lauront stated that they would like to see a pavement change; either pavers or
concrete, or a colored cross-walk connecting Ford Park to the south side of Vail Valley
Drive. This should be the priority cross-walk. The DRB concurred and agreed that this
WALLS
,r.^\
walk should be pavers. Jim Lamont also stated that the east side sidewalk between Vail
Trails to the bridge shouldbe improved with curb and gutter. The drainage should be
fixed and all improvements in thi right-of-way need to be move4 fixed and thereby
replaced if it is io be disturbed. These improveme,nts include fences and planters.
Regaraling the lighting along Vait Valley Drive, Jim Lamont asked that the lights be moved
closer to intersectionJto improve those crossings. The DRB concluded that these issues
are practical issues that can be worked out between staffand the applicant and these are
not desip issues tlat the DRB needed to discuss any firther'
BUS STOP DESIGN
The bus stop has been rdesigned since the last meeting. The roof will match the lift enclosure
roof color. The DRB stated that they are fine with the desip and colors of the building.
MAIN LODGE BUILDING
Since the last meeting ttre dormers have also changed on the main lodge building on the east
elevation. The DRB had no problem with this shange.
Bob Borne made a motlon to approve the Golden Peak Redevelopment project subject to the
following conditions:
l. The Streetscape Lighting Plan be approved by staff.
2. Add pavers to the cross-walk between Manor Vail and the Base Lodge Building.
3. The wall north of the Children's Center is not approved with this applioation'
4. The sewer line under the bridge crossing Gore Creek will be painted to make it
disappear. That colorcanbe approvedby staff.
5. The handrails on that bridge wiil matoh in oolor to other handrails in the Village'
such as the International Bridge.
6. Field adjusfinents regarding the landscaping nay be made. These changes shallbe
limited to the south side of the building on top of the parking structure and are
related to the snowcat operations.
7 . The Vail Trail and walkway adjustnents can be refined and worked out with staff.
8. Greg Hall,s letter must be addressed and all issues must be resolved.
By June l, lgg6,the following items need to be retumed to the DRB for final approval:
1. Al1 exterior lighting forthe building.
2. The exterior signage program,
3. The Race Building.
4. The Tent/Pavillion tlesip.
5. The Children's Ceirter wall.
That motion was seconded by Hans Woldrich and was approved by a vote of t'0.
f:\everyone\lnren\goldpeak\dtbootes.22 I
&wat'Wp D(e z[U\qU
a@
frrra( Pevuiot
' Stma 6w n\alo Lrc4aa\ stwo 4^nD^' tubvu)
4 lf$i= ddd-4o eae,U eowur. e& 4o wt?lqz
u+tlq ry Dndf :zll&r uru-, W{-fuMi>,
h* dtl:ktu Urlw un4/4 W Fw *rntyrzl
L5ytuir,ld A Wc) J
\>Wt ?e'td ?A,',-en l)rw -V njrptL t .t*,ayr- - *'9k
LAe erwbre_--
@a!LLt'y64 :hnrH 60crp aVu\tsv*s an .-4u,1,
.tt u,/\illL r@w -{e7 qto,,t: a* +Ta;a A {urvtr ,c(Jl^d
w WW W- fu W,ll Ltr-.qftje
T/6) fiIcrttr a* cc- --ob , w{on + e(r'drypro+
UwA,ft^;"!AtW, u/o./ , {tu* yv\a+rr{4, on,IJ. bn:dq4J
w' V?u, ( Lrn{'\ %4, U1wg,,(. 'gn'd4c)
W CV Qln,u, aMl-daw *€/t'tt *o v"iu- ^+.'1,t b*
G- ?'dd{ fl' fi (t*za.
IW k d Ev,fttu,*ur1..r [Mrrn4 -far,*,*A-
Jocu{j\,vn, tttrvuld, lib {lew'ptlt{a 4o wow ait A +re'"
UrAa wal(. - trc.d.uaA tu.g*r\r #e[4,"t &'shrwa
CY, 4 D"b
F,W fw Wh,UAt' Jo.t-*iltrtn' fu (nx\ad o{ *'}"45lvt^}-
dt c<u fi'a\V\N,L Wa+ cmc.mk- (cok'-
-t" yv\e+c,t,-)
f'Jnl/z lV^* - vwf qQ/afr,*-rut$ ,-Lv.uW b.br
61,\0,( f1y,re,
&tvv,-1,' fWd- a fdsla4L *l V*"*tl
+ldrnt' nr,t d,yttvttw, bo,L b cd'arwtt
r [.{ouo Ke. L;Vto +A} ="€+
111t ,(w^l
lwr-
il wl'tl lwt
ao
fu &.* VriqyYdx* tn frtub tua^a-fure2
'-Dflb" PW --cft,tVe wl =fuQQ
@ r,&:-
*Ftt - no'+ dor\ An r\$^) "44! cltv reuqeu fi'rnl d4',n-
Afufuru^A 04/-b* - *il:( addrtuDl^ * unth - ft,fuA*fu
]o g$4/ 2 eJ;ruea '- it $u4 t'ott tA
Wd,l- - u)/v 36^^a At"4 , b,t $)fpll
W$''t Vtufinll-
Xnilr{, Md,{,t'66o,tn, - NhaL 6"furt &.eL W
rnad 7
J C, fu", {lv ore u,*a ,,/ frLib 4,.r2- A nanJ ay U.atbe/q?ffi, U,^,Jo*tat fu**
Jrn kl^4n*: crbsutat)t'( c,orwr*ifq ffi ?0,*4t il/,L, + ' S;d-a "{ V,V, w) - ailMlt ,,L oltu/W '-etYh!tr
p^vs6 0( cololrcd w=si^l4.1y1M Siild'A' fr* y"to,r'a+t1 ,t--utssara,(L.
t, qid! $WP YtU*'t inillo {o WdQ u'h+fr^fu'r
Wb uA, l\y d,,tAtwi(, fr^nfww,rrrslo" 6 z$ul funa A
bo Wyi,re A, 6rc/,.1e C{.r1ce,, gfuafol
Uqtthn4 \r'(1l.!', Ao Uwrtz;l' Uh*^' iu ftft++r++$,a
b{F, .W;N. fu ,i,,,^cdt"l t48uu Cx^+ LtN bL WWI' t\l+ beh^rvu,.- M< 4 *ff a,,M o4U- o*( @W
isatu.
t,--qo* ttuott@K
fuq,ivq IIIA'tl-
erc( 4( u,aAZ
a
%uz+hvq d?'4'W- liaA bllrL r€A!+;r{^u{ +tiu W 4.co? <P Indj"l^. l;1t ancLosLu,v d o?tok
pVYe, CV r,u{ dt*igl 4 dDrE
O*ir Uf,"hry-h^ild^U - seg"nr* a?(. h'ova1 oqy
AW -*-qaza-t*' ry-
rhe, "bbry ) CC. UaLL, +nt+/pruir\o'G
brrvu-r cLwnp 071 -U+ e,,lz,ua**tn
Mim, %b%,rw-
+h'vulqccp |'dl'rd( eW b s+14+
w^J!' r,rorsr' "t d hc+ qv@urAd h* "pvwvl*A)d li,tw \x\dg hidry ?,fuf
uaJUA '+D u'/'afu* "&o*
"'i;?iffifl* Vox ,fuu * ttaturtn, 4dl;dtuw'b 'z+itu'/'l0
5r/-,'il. llorr=
Vife, 5- O
o
ffi E-v^**u La ruVta,rz LlAa/vW' €iclA aait aunonh o t\*,Wfr,&Y* k'b<,u & b wapd c,tt q sb{p \
t.\Q;+93!?,-rt,l? *t,r+ -drtA fgt -\ttt" *-=----t
"\:#, trW b1 r, I r ( 1b, ")b \p6=---u{ffiw pwi=, g*i"q ^Vail Vatlu4W. L\w2p ffiaLrDacya*rt Z$hffirKp$0dkJt.a tz tt ,,: 4 'r ''
(o/
63;e
b'* "F fivnat aWyDpA davw
,/ra - 6,;% A-ZSAffis"-
r1'( 6.
1"./ 2Z-l "/z"t s>o-z4p ,^-r.(n,t/ar/q^
@, f^ge.,t6"J 41"n--- &y-fnpJ-7
,/'t / tG (h'rv/o 7'^^-v{ta-',--.--e
feu Ibvt/
7
s lr^r
- 17 'tu"n/p {".147i' -L V-drrL ifu?4-t,"f/
ffi;afz k4 p*h/,h(e
/* &4.,ta'/lg,.or Hlh:# frx*ft ,76 J^/U^fr (o--Y,/ft,
-@tr; hls od :rn' 15 @;l- K"te>-
6)
19
)akb-f
,"v) Ca.,.zf5
ffi'fot fl'lla-4Y
fr,a^/* z; /tuunt -C/(
# ,,, ' 'f-/ '
YLF llrtr--,,fu 4,rrtY[io('"'l,z'/ M-tlfr\L/-YWht^4f:u.
W'frk#';f; -^,, 14ry: @ //^/td% n,oiV
-5fu&."6;< 44-- _y'{rLot//q- '
-
' Ldrc^p< r,Jhz( il t( e;/r,^t &4 # *rotf ffin eulnliidr!il/q 4*aq' @- vq"A4'Md*f'rt_1*{rd
^$frk4-""/4;.,*o'fn",r7, ,- K'frW*-'ffi :;trt"1;[#'A!W'4'4-- /7&r' lrB,- /ft>,
d:tS,l,*) q il.lb
Wfffr,/,*
'€a_sgt
i'-{ e{- t \C,n -qi@
9-+a*.
C,E {gl'l9_-lr.e-eg-
.*
l"I
'etu lc,
-
_- .ai C lvvnrt
-z'l*<3-t (e
Lt
- Lr'o-
-f
I
DESIGN REVIEW BOARD AGENDA
February 21 1996
3:00 PM.
PROJECT ORIENTATION / LT]NCH 12:30
SITE VISITS l:45
l. Ferguson - 1295 Westhaven Circle
2. Innsbruck Meadows - Lot 5, KinnickinnickRoad
3. Kinney - 5164 Main Gore Drive South
4. Thain - 483 Gore Creek Drive
5. Drisko-325 ForestRoad
6. Colorado Ski Museum - Vail Village Transportation Center
Driven Randy
' l. Golden Peak Ski Base - Final review of the proposed Golden Peak Ski Base JC
Redevelopment.
485 Vail Valley Drive/Iract F, Vail Village 5th Filing and Tract B, Vail Village 7th Filing.
Applicant Vail Associates, Inc. rqnesented by David Corbin
. MOTION: SECOND: VOTE:
2. Colmado SkiMuseurn - Wall Sip.
231 South Frontage Road /Topvn of Vail Transportation Center, 3rd Level
Applicant Margie Plath for Colorado Ski Museum
MOTION: SECOND: VOTE:
DM
3. Thain Residence - Cbanges to approved plans and discussion of previous DRB JC
condition ofapproval.
483 Gore Creek DriveAlnits 8A, 8B, Texas Tovmhomes, Vail Village 4th Filing.
Applicant John and Carmen Thain" represe,ntedby Marc Churchill
MOTION: SECOND: VOTE:
7
t
L
4. Drisko - Residential addition, utilizing the 250 Ordinance and new primary rmit. JC
325 Forest Road/Lot 18, Block 7, Vail Village lst F'iling.
Applicanf Steve Riden representing Tim Drisko
MOTION: SECOND: VOTE:
5. Kinney - Request for Final Review of a garage addition GR
. 5164 Main Gore Ihive South/Lot 13, Vail Meadows Filing #l
Applicanf Dale Smith
MOTION: SECOND: VOTE:
6. Innsbnrck Meadows - Revised Grading Plan
Innsbruck Meadows, I.ot 5, Kinnickinnick Road
Applicanf Ambros Developm.ent
MOTION: SECOND: VOTE:
7, Ferguson-LandscapePlan
1295 Westhaven Circle/Lot 48, Glen Lyon
Applicant David and Kathy Ferguson, represented by Land Designs
MOTION: SECOND: VOTE:
8. Mizrer - New singls family psidence.
5030 Main Gore Drive South/Lot l, Vail Meadoqt piling #l.
Applicant Duane Piper, representing George and Joanne Mizner
MOTION: SECOND: VOTE:
GR
RS
RS
9. A request for a worksesdon to discuss proposed amendments to numerous sections RS
of The Town of Vail Municipal Code, including but not limited to Titles 2, 16, & 18
to allow for modifications to the Sip Code and the Desip Review Guidelines.
Applicant TownofVailMOTION: SECOND: VOTE:
MEMBERS PRESENT MEMBERS ABSENT
StaffApprovals
Hovey - Changes to Approved Plans.
I 339 Westhaven Circle/I.at 23, Gle,n Lyon
Applicant Beck and Associates for Cbarles and Nancy Hovey
Lifftouse - SignProgramAmendment. JC
555 E. Lionshead Circlellot 3, Block 1, Vail Lionshead lst
Applicant Bob Lazier
King - Interior 250. LW
188 I Lionsridge Loop #25, Vail Point #25
Applicant MattKing
Sip language interpretation available upon request with 24 hour notification. Pleasr, call479-2114 voice or 479-2356 TDD for
information.
DEsrcNwot"o*
Landscqre Arohiteoture
Land Plmning
UrbmDesign
Tourism Plmning
Trensmittal O
Date: February 20, 1996
Job Number: 1066
To: JimCumutte
From: K. Ethm Moore
935 South Frontag e Rd. West
Vail, Colorado
81657
Telqrhone
970-476-8408
Faosimile
910-476-U09
Coomenls:
Jim, attached please find copies of the cutsheets for the exterior site light fixhrres at
Golden Peak. The fi.xtures are as follows:
l. Street Standaxd (TOV Specification)
2. Bollard Lisht
3. Buried t-lr""o" cannister up-light
4. Swivel mount landscape uplight (l on site, for main site entry signage)
5. Wall mounted step light.
Jim, as per our conversation, 2-20-96, the fixtures shown are examples of the fixhrre type,
and may not represent the exact fixhue manufacfirrer.
#m'tVor^--
DESIGNWORKSHOP
TfrtJ Dl,l SHOP tJts-ztso
,1it"''lt """"Oti
14:19 l'10.001 P.02 ,
c/\51 At uM[rrM wfl[Rtl
HNCCO nOOt
__- 3'o.o. pot.c, .t 25 wA ,. AtuM.
+-n-
T-
Iu'
I
Il&
s I,P ovar
- c^s€ AIUM|NUM 8^SE
/.- wtl
^ccctEoooR<J,-PCMHSIW I;].DV
.tl
ffi
2ll{l I lvlodoro ,?10 M.tlorr Vloto. CA 0$e Itla"t5$9${ tNol,l"d55'1t51
t00 rtPE t{oncoNl^t l',\MP
MTDUM lA$€ poftcct.^N tocffl
f irt.r,t
Vl.ttDl.0,frrb
36'
' I CUSlOMtnr OED/tud\,* $rclrb
JC,B! Vol l||rnrporlollon C.|(rl ar
TDV PhI SHI]P rDoe-2i50 $EP 2o5 14 : llJ I'lo .001 P ,0J
lrrtf
PCMI{SIM /J.DV
cusloMlnr otcvlixrv|{ ltoctrtc
JUo; Vol t6.$po.tollon Co|rlq
BEGA
l
ffii\tz -r I tNlEIltNt/--11 |l\EFI]N
W-
ffif,t.c
\\i-rl\l-./
\p
.B.
eIlilIt
Bollards and pillar luminarios ol
extremely rugged construclion
with die cast aluminum cao and
louvers "keyed" to posl lor precise
alignment. Clear prism glass with
screw neck. Stainless sleel socket
head screws, Wiring access door.
Bollards are secured to a heavy
cast aluminum baseplate with four
slainloss steol bolts at 90o.
Color: Black or white.
Lamp Lumen A
7561P Pillar I r3W PLC 8@ 11tVrc 5h 5V,
7561S Pillar I 35WE.I7HPS 22fi lltVn Sth
8482P Bollard 1 13W PLC 860 317z 5t/2 5Y,
8482MH Bollard 1 50W ED.17 MH 8500 3iV, Sy, SVe
84825 Bollard 1 35W E 17 HPS Z2SO 3jyz Sy,51/z
75635 Pillar 1 50W E 17 HPS 4000 19t/rc 85/o BVe
7563P Pillar 1 ,IBW PLC 1250 19t/rc B'k Bt'h
7563MH Pillar I l00W ED.17 MH B50o 19/n B%r a;h
94835 Bollard 1 50W E.17 HPS 4O0O 47V1 85/s 85/s
9483MH Bollard 1 100W ED.1Z MH 8500 47t/l 85/s 85/a
94855 Bollard 1 100W E.17 HPS 9SOO 513/rc 11|Vrc 111!ta
9485MH Bollard I 175W ED.17 MH 14000 513/rc 1l1Vrc 1113/rc
8944 Anchorage for 7561,9492 - supplied
896A Anchorage for 7563,9483 - supplied)
8974 Anchorage for 9485 - supptied
139
=-10._
101
VITTUCIII
LAMP TYPES: M€rcury Vapor, High
Pressure Sodium, Metal Halide.
and Incandescent.
HOUSING: One-piece, casl, marine grade
aluminum, wilh a baked-on black powder
coat or one-piece casl brass. Lens r€tainer
is black aluminum or brass.
FINISH: Aluminum lixtures leature a black
polyester powder coated finish. Brass
fixlures fealure a natural finish.
LENS: H€at-r€sislant, convex, lemp€red
glass l€ns. Silicone lens gasket.
SOCKET: Porcelain medium base 4KV
oulse-rated.
WIRING: Pre-wired with l2'of ST.WA cord
except High Pressure Sodium and Metal
Halide lixtures which have a 5' cord.
WIBE SEAL: Cord entry is sealed using
conneclor with a neopr€n€ grommet, cord
and sockel are sealed internally utilizing
an innovative technique which
eliminates siphoning.
BALLAST: High-power laclor, -20oF
starting. 120 volt is standard. Available in
above grade box, or composite box with a
potted, anti-siphon wiring chamber.
GBILL: Round, louvered, directional, casl
aluminum or brass. Round aluminum grill
linish is powder coated black, bronze or
gre€n. Brass finish is natural. Composite
grills are black only. Square composite
grills and walkover covers are available.
AIMING: Fixture can be tilled up lo 15
degrees from verlical inside lhe well
sleeve. Sleeve can be buried al an angle.
WELL SLEEVE: Heat and corrosion-
resislant polypropylene. Sleeve measuresf in diameter and 18' in depth.
TESTING: Each fixlure is tested with 40
pounds of air pressure before it is ceflilied
and shipped.
FASTENERS: All exposed fasten€rs ar€
slainless steel.
@
Self-Tapping
Screws 0ireclional Grill CF Ballast Housing
Bolts
Lens
Rolainor
Flxturs Support
Springs I
R-40
Mercury
Vapor
Lamp
Anti-Siphon
Chamber
Cord SEal
Fixtur€ Wiro
SPECIFICATION INFORMATION
Select appropriate choice lrom each column,
@@.
t#
Woll Sloeve
Fixture Housing
Sockot
Coupling
(by othors)
The WellLight illustratedabove is the 10i -1OO-MV-120-RFL-CF-BRZ-AG-Ofixture.
MV-Mcrcury Vapor
(100 or 175 Watl R-40 Clear
or 50 Watt R-30 Clear,
or 100 Watt PAR-38)"
HPS-High Pressure Sodium
(70 watl R-38)
MH-Motal Halido
(70 or 100 Walt R-40
or PAR-38)
RFL-Mcdium Base
Self Rellectorized
Lamps
ERZ.Bronze
GRN-Greentf
(CF available
in Black and
Eronze only.)
A-Aluminum Housin0/
Lens Ring
B-Brass Housing/ Lens Rin0
D-Square Directional
Grill-Composite (Black)
G-Round Directional
Grill-Aluminum
L-Bluo Lons
M-Ad-Medium Socket
N-Square Non-Directional
Grill-Composite (8lack)
R-Round DirsctionalGrill-Brass )
W-Waltover Cover y'
E-Small Brass
Junction Box
WFlal Lid
F-Small Aluminum
Junction Box
MFlat Lid
Aluminum
J-Box w/Flat Lid
'| ,.,.
IINC-lncandescenl
{150 Watt PAR-38 or
150 Watt R-40)
EXAMPLE OF AN ORDER GREENLEErrGHTtltG |ltc.
' Lamp nol included wilh fixture. See lamp speciflcation chart or consult laclory." An ad-medium sockel must be orderod with th€ Morcury Vapor 100 watt PAR-38 lixture.
t Local interprstations ol lhe National Elsctric Gode vary. Consult your local inspector prior to specilyilg voltaoe other lhan 120.
Tree Mount Junction Box
't7.59'
PAB38 Lamp Optics
SCB Spot R€ttocior
Full Glare Shield
.250 x ,500 Obround Hote (Zx)
SPECIFICATIONS
LAMP TYPES: Mercury Vapor,
Metal Halide, High pressure Sodium.
and Incandescent.
HOUSING: Motded from gtass fiber
r6tntorced clmposite polymsr, providing
high skength, U-V stability, and
incredible corrosion resistance.
SHIELD: Molded kom the same
compodls polymer as housing. A full
shield dosigned for optimum glare
conlrol is available. A half shietd for use
rvhere a wid€r b€am pattem is desired
is also available. Both shields are fully
sealed by 2-silicone O-rings when
installed on the lixture housino.
ENDCAP/ARM: Molded from'ihe same
composit€- polym€r as housing. Endcap
allows 358" rotalion of fixture housing ior
shield angle adiustmenl. Endcap/arni
have serrated interlocking t€sth which
provide positive adiustment lock-in.
Endcap/housing interface and Endcap
arm interfacg are fully sealed wilh
silicone O-rings.
FINISH: Available linishes are bronze
and black.
LENS: A llal clear tempered soda-lime.
or a clear convex tempered soda-lime
lens is. available- Lens is permangn y
sealed into shield.
WIRING: Faclory wired with 2OO" C
rated wire. A ground lead is provided.
LAMPHOLDER: Glazed porcelain
modium base, 4 KV pulse rated with
spring center contact. Ad-modium base
socket is porcelain conslruclion.
OPTICS: A flood distribution r€flector
with mechanically peened bright anodized
finish, or a spot distribution rellector with
a polished specular Alzak coaling are
availabl€. Optics tor R-40 and pAR 38
s€lf refleclorizod lamps ar€ also available.
BALLAST: High-pow€r tactor, minus 20
degrees Fahrenheit starting. Available in
abovs-grade Nema 3R enclosure. or
recessed composit€ housinq with an
anti-siphon wiring chamber.
AIMING: Fixture adjusts on 3 axes tor
aiming and glare control.
MOUNTING: 1/2LNPSM mounting arm
is standard with jam nut locking. The CBL
mounts easily to lhe CH recessed
composile ballast housing with hub tid, or
a tree mount iunction box.
FASTENERS: Exposed fastenors are
black oxide coated stainless steel.
reMPO6ITE
DI]LTTT
GREENLEErrGHT|l{c txG.
@r",.nor"*,*
Half Glare Shield
Spiko Junction
Box Woords€t
)
75"
AG Nsma 3R
Ballasl Enclosuro
Above Grado gallast Box
CBL OPTICS
Composito Ballast Box w/Hub Lid (CH)
Composits Bult€r WHatf Shi€td (H)
Earm Spraad: 20.8..6 Spr.|di 63.
SCB Opllcr i/Fult ShbH (z)FCB Opdc. rri/Fu{ SH.td (4
B.r,n Spr.rdi L.mp
CBL Extra-Value Features:. Five-Year Warranty Against Corrosion. Non-Conductive Construction. No Paint to Peel or Fade
@
B..m Spo.d: Lrmp
RFL Op{c. ur}btt ShLtd lH)
PAF38 Opdc. ty/Ful Shtdd (Zl
o
ARCIIlfiCN'NAL
I.AITOSGAPE
LtGtftttG
2930 Soulh Fdi.view Street
Santa Ana. CA 92704
Phone: n4668 3660
Fu:714668 1107
forurion r.tlrtrnt dh
c.rt .lumlnum and
rtrinlers rt..l
hardwarr. Concealed
tsmperrd glatt lenr
with guard. Standard
<olor black, other
qolor avallablt.
os P'3{'
I
i}itl. '
i\
l: .,I.
-
11yr1,. . .J
l-"n,r'-
19{-e!__E!E{ - vo!tag!_
sP-10 3sHP5 - 120
50HPS - 120/277
BK Black
CC Custom Color
Flnish Optionr
F Fusing
t
35MH. r20/277
s0MH.120t277
70MH - r 20
:asna'
-
u.trta. .
i
Corrooion rillrtrnt di!
crrt rlurninum and
3talnlers Steel
hardwarc. Tempercd
glars lenr. Standard
color black. other
colors avaihblc.
sp-3'fl
-j
/
Series .- Salle3t-voltage , . Finish -.Of!!gC_5P-31 35HPS - 120 BK Elack F Fusang
SOHPS - 1201277 CC Cusrom Color
70HPs - 120n77
50MH - 120/277
70MH - 12U277
--*:ooun -non77
@
@
8^n"nutnr!cu.,h..
',i'.
TOTAL P.01
GOLDEN PEAK REDEVELOPMENT
Notes from X'ebruary 7,1996 Conceptual DRB Review
The following are notes from the February 7,1996 Conceptual design review of the Golden Peak
redevelopment aPPlication:
Steetsc ape knProvements:
The Design Review Board generally felt comfortable with all steetscape improvements
proposed, ie' paver, sidewJk width, paver pattem and color' light fixtures' etc'
Gore Creek Bridge:
The Design Review Boardfelt that the bridge abutnents ry"dq! be improved fromlh3ir
existing condition. The DRB suggested u tt*. veneer. The DRB also recommended that
now would be the opportme timllo rebcate, if necessary, and disguise the existing
utilities running undemeath tle britlge. The DRB indicated that the stucco columns on the
bridge deck were not acceptable d* to high -"iot"o-ce and fhe unatfractive look that
may result as the stuoco weathers, cracks, and flakes, etc. The DRB recommended that
the columns be faced with stone. Finally, the DRB recommended tbat 4 lights be installed'
on the bridge; 2 on each side and that the fixtures should be placed on top of the two end
columns, 14fte1fhan the free standing poles.
Dave corbin, representing vail associates felt that vail Associates should not be
responsible for making u"ith"ti" improvements to the bridge abutments, nor move the
utilities, sinoe tlat is it directly related to the impact associated with the Golden Peak
RedeveloPment'
Jim Curnuttepointed out that that may be an issue for further discussion with the Town
staff , however he felt that the improvements suggested by the DRB related to the bridge
expansion itself necessitated by the new 8'wide sidewalk across the bridge and were
certainly a responsibility of Vail ,q,ssociates under the purview of the Design Review
Board. Jim then pointed out that whatever the Design Review Board requires of vail
Associales on this side of the b,ridge, the Town will be required to match on the other side
of the bridge, which it is paying 1d0%o of the cost to improve. Additionally, the Town will
pay 20Yo of the west side of the bridge improvements'
Mill Creek Circle Plaza:
The Design Review Boardfelt comfortable withthe new designof theplaza' They were
-
concemed wim aleq.,ate screening of the utility box shownon the plan' It was suggested
that berming or additional evergreens could be provided and secondly, that the tees at this
higbly visible corner ofthe properry should be as large as possible'
Landscape Plan:
The Design Review Boardfelt comfortable with vA's proposal to lower the wall in front
of the general skier drop-offparking lot to approximatity -t tlZ'-.2' in order to lessen the
grade if fte f*O*.upi"! oo til. ootin side of this wall so that the landscaping can be
staggered as much as pissible, rather than be planted in a staight line. The DRB
recommended that a curb be provided on the south side of the sidewalk to keep erosion
and dirt rtot" rro"gni"g otronto the sidewalk. The DRB discussed a concern related to
the grass on top of the parking gaxage'
Tail Associates is comfortable with providing a fescue mix north of the path and native
grasses south of the path. Dwe corbin felt this would be acceptable to Todd
Oppenheimer.
The DRBrequested adtlitional evergreens at the comer by the enbance to the pedestian
drop-off arei to screen tle parking structure entrance as much as possible from public
view. They suggested that the appticant take into account the fire hydrant that is shown in
the area as well as the proposed monument sign. The DRB discussed the pedestrian
barier which separates tne Children's Center parking lot from the bus lane and suggested
that the 4 end posts to this barrier be improved from the curent detail design The DRB
then discussed the condominium wall and suggested in order to improve site distances, the
walls start very low on the northwest and gradually get higher as it proceeded torn'ard the
building. The applicant pointed out that the gate may then need-to be lowered, in order to
tie into the shorter wall. The DRB felt comfortable with that or having the wall taper
down from the gate to tie into the short wall. The DRB requested that the color of the
gate be brought back to them for their review. It would allow for site distance necessary
tA required by the Tovm Engineer. The DRB discussed the pavement color for all
colored conorete on the properly which was pueblo brown and that was accqrtable to
tlem.
Building Detailsl
The applicantpointed out that rough sawn cdar will be used with a natural color for all
wood trim, They plan to darken the fascia from the white shown on their rendering to a
dark color to Ueef up the look of the fascia. The color of this wood was presented ant is
on file. The applicant showed the palette of colors which will be used for the roof tile.
TheDRBaskedifthisexistedanywEge\thevalleyandtheanswerwasno,TheDRB
aske4 with regard to tne windoq@lenlf they were the snap-on variety or
were true divided light windows.
Theapplicantpointedoutthattheywerenottrue<lividedlightwindows,butwerealso
not the cheaper snap-on version. Th"se mullions were adhered to the window on both
sides and upp"r toi. r.alistic tue divided liglt windows. These mullions would be
white on the condominium level and darker gfeeo oo the commercial level of the building'
Asarrpleofthestuccocolorwaspresente,dtotheDRB.Itisayellowishcolor.
The DRB felt comfortable that it was not too mustardy and has been lightened from the
previous review and felt comfortable with it'
The applicant stated that they will invite the DRB out to the site to take a look at the
color before it is applied to the building.
Tent i Pavilion
The applicant stated that they are leaning toward a more pennanent pavilion type
sfucture, but have not oompleted their disip and wish to bring that back to the Design
Review Board in a separate application'
Bus Stop Desi8ts
The applicantpointed out that they would like to make a change from the conceptual
drawing that the Design Review goard was looking at at the meeting' They discussed
lessening the amountif stone and increasing the amount of stucco. The applicant also
pointed out that the retaining walls next to the bus stop would have a stone base with
stucco above.
Jim curnutteasked the applioant to identify on a planthe material of all retaining walls on
the properlY.
Ihe DRB felt comfortable with the redesip of the bus stop as presented by the appligan!
with some suggestions on wrapping the stone around the comers and columns and asked
the applicant to refine the elevation drawings and bring it back for their final review at the
nextmeeting.
Race FinishBuilding
Ihe applicantrequested that this building be reviewed by the Desigo Review Board at a
later date, possibiy in conjunction with G tent pavilion. This was acoeptable to the
DesipReviewBoard.
Meohanical Equilment
The Design Review Board members asked whether or not any meohanical equipment or
transforrners would be visible on the site or the building'
The applicant stated that no mechanical equipment, vents' flues'.etc' would be visible on
the building, with the exception of some gas meters on the east side of the building which
would be screened with large shnrbs. Thi applicant then stated that no other site utilities
would be visible on the proierty, with the eiception of the telephone switchbox, located
at Mill Creek Circle as discussed earlis'
Sigp Program
The Design Review Boardwas generally disappointed wilh tle 9o-mnrehentiug,ttp
prog*-.*T'h, cotrrments tom tne Oesign Review Board included: the scroll idea may not
Le appropriate, too contemporary, too gi.k, tota[y off-base, too c91d, not nuts about the
dark color of the metal, too formal, too stark, the monument sips looklike tombstones'
looks like it belongs in the big city in front of an opera house'
The applicant stated that they tended to agree and reqlrested that the Comprehensive Sign
Program be removed from this application and come back at a later date, possibly with the
tent pavilion and race finish building.
Lighting
Although a site lighting plan has been provided, no details were given regardinglle site
lights, ie. bollards] *ull iigtrtr, etc. Noinformation was provided on building lighting.
The applicant stated that they have not finalized their plan with regard to building lighting
and requested that the lighting plan be brought in at a later date, possibly along with the
comprehensive sip progra4 tent pavilion and race finish building'
The Design Review Board found this acceptable.
Other Comments
The appticantpointed out that one of the condominium owrers on the east side of the
building requested to add trvo shed dormers in place of the one dormer that currently
existed.
Ihe Design Revieut Board felt comfortable with this change, even thoug! they had not
seen draings, but they were looking at the model and did understand what the request
was. The DRB zuggested that this change be reflected on the final drawings and brought
back for their final review at the next meeting'
f:\everyone\iirr\greoknot207
rys!:c
qL ned '€ed
eec e€ 9q<ft-u'4(Mga,,
*- e,; Gt[-,{^)- af ce ry,
-
p.rt Lir .-k.fi,n Jv*Ao(Y -+tfu ,^tr+ loc.D qL b gk, fi r . J,y.p s>$-j &:p{-o
acco.r-f -ile-Qrt //yd^rf+ *sa_p:@--Lfuk&Ie4 J.&,'(W
VMgp-brtge-r?i
,Lql_o-A t-= le*l1[
egLL,^ctfs€. A-S
V- 1d;;upra'(,
Li,e r' {C
ffi,
"&--real (
f*.q
ff
--@
C9 =C;
C
gsPS rl
^C:
GOLDEN PEAK REDEVELOPMENT
rtRJB 217196
Sheetscape improvements:
Overall design and detailsoK
Bridge overGore Creek
* gee ,r-o/es
Min creek pircre.plaza. .tnot( 6e yueL .:Ye(*fu"9'Jaf *o tt' Q:;;&'il{i#gE (L>,-,4,,^4t ;ft srt-e s * kqt< tatna
\jffjl$* ,,q (
Finalmaterialsamples: | , f t
roof ..-'= CoL,-b(fwa::tcp /\) - *.e AJqkfrACg 4,'^St
stucco - )/,.!{Cdrrt-Jt -glt. - e'k
stone ---.
wood t t, +- l4d{- ,t/nrk
lo,^CrC2.'^))u &e dotr'f\ -
windows
railings
concrete walks
retaining walls
parking lot material
tvlDLL ie ,,-s : #f, #*y*"k'e + e 4 oF, *
cbry/-1. t' C're., ( - g r,4.4rd
Details:
fascia
windon's
railings
Lighting Plan - cut sheets .-..-
Design of bus rtop and other pn-mountain improvments
New stairnextto Children's Center
material md retaining walls for trees
Sig[program
,d
LuA6"s* --4o)< rz€
ryfi,qf ryn*& lr' ,tlXr
1 f7*fr t44
/a. ^/,r,it t
ite v{ *< ,fr
oM J) d A.Y(YWe-@
ft**-4*,/JJ
'k,.k"(>,J'isK
:fu,t-dt-(fu,
T* fuzK+L
B/'
-rcb
* "lru
, /,t ., -Z ze -? ,.b-fu? **:?-Lz{y-E-., 1-0
@l'gl-&>
nflzUr
-!'LUe4l\-eryc4 4'
-rt4,r V"r6tsq
*1r,( Mo/-'z-o.-t<-t 2:'
"J/a.-
urV
.F2 e)"6t# c1N4^4 eaNcqf
(q I C^r^J" 0" r*'e^'lJ'* pi*M ac* €or/ &o', 147tf-r"'-Sr"^ff ,rt-tz
r.vt..A a/L1l,a
DBSTGN REVTET|APPIJICATION . TOIIN OF , COLORA.DO
DATE RECEIVED:
DATE OF DRB MEETTNG:
**alal*ttt
TNCOMPIJEITE APPLICATIONS MAY NOT BE SCITEDWED FOR RWIEW.
*******a**
PROiIECT INFORITATION :
A.DESCRIPTTON:
o
VAIIJ
o
BOARD
B.TYPE OF REVIEY\I:
X t.r const.ruct.ion (g200.00)' Addition ($50.00)
ADDRESS: 0453 VAru rrAtJ-Ef 'OzrL,lL
__:!4q.__t*Y4-t_L vt LAt4z..s! {rut*rtr' . -,ztD.r,uc.ii5-e bcRi plridN; "i;;- - yL. s 1 bckSubdivision q'tlA
a meets and bounds 1ega1
on a separate sheet and atEach
Minor A1 teration ($20.00)
JConceptual Review ($0)
If property is described bydescription, pLease provide
to this application.
F
F.
ZONING:
NAME OF
Mailing
APPLICAIiIII:
Address:
Phone
NAI{E OFMailing
APPIJICA$II 'SAddress:
AT
Phone
d H. NAI4E OF OWNER(S):a
MaiJ-ing Addr
Phone
APPITICATIONS SED J|ITEOW OWNER'S SICiliIATARE
Condorniniun Approval if applicable.
DRB FEE: DRB fees, as shown above, are to be paid at the
time of submiEEal of Ehe DRB applicaLion. rJaEer, when
applying for a building permit, please idenuify Ehe accurate
viluation of the proposal . The Town of Vail will adjust the
fee according to the table below, Eo ensure the correct fee
is paid.
FEE DITIII I (1I{TCK IIr D-A.TE: BY:
,t.
FEE SCHEDTII,E:
VAI,UATION
$ o $ 10,000
$10,001 -$ 50,000
$50,001 -$ 150,000
$150,001 - $ 500,000
$500, 001 - $1, 000, 0oo
$ Over $1,000,000
FEE
$ 20.00
$ s0.00
$100.00
$200.00
- $4oo -00=-.,
:J-I99-:99-l
DESIGN RBVIBW BOARD APPROVAIJ EXPIRES ONB YBAR AFfER FINAIJ
APPROVAIJ I]!II..ESS A BUII.'DING PERUIT IS ISSUED AIID CONSTRUCTION
IS STARTED.
--
O rJrsr oF tATERrar,s
rirAr.{E oF PRorEcr: arfl w anfr%ilfr
-' IJEGAIJ DESCRIPTION: LOT- BIJOCK
-
SUBDfVfSfON
/STREET ADDRESSI 2 0*t
The foll.owing informaEion is
Review Board before a final
required for submittal Lo Lhe Design
approval can be given:
A. BUIIJDING MATERIALTS: ,, z
b"U"F(ocKRoofz bY ^...a.L r,
CSatlw-. ,a-lSicling 9' - t
other wall MaLerials
Fascia
Soffits
windows
window Trim
Doors
Door Trim
Hand or Deck Rails
. F1ues
' Flashings
Chinneys
Trash Enclosures
Greenhouses
kitk a azzlunirzl .
Hft +cefsqkk'mTt"A
^/.aLYOh7W
s*a. e) {e r s*eQs
CcA
wic,4
TYPE OF Ct*r;;al -
utt
tfrl
ffi -zw-- ?AtNttD
OLher
B.LAIiIDSCAPING:Nane or ""rifl:::: M,f ,'ril&'sgP'D
W
Vail Associates, Inc.
TRANSMITTAL LETTER
DESIGN AND CONSTRUCTION
479-3140 Telephone
479-314E Fax #
PRO|ECT: Gold Peak Redevelopment
REtrERENCE NO:
DATE:February E, 1996
TO:Town Of Vail
ATTN Jim Curnutte
WETRANSMIT:(x)IIEREWITH ( )UNDERSEPARATECOVERVIA
O IN ACCORDANCE WITH YOUR REQIJEST
FOR YOI]R:
CONTRACT NO.
IF ENCLOSURES ARE NOT AS NOTED,
PLEASE INFORM US IMMEDIATELY.
IF CHECKED BELOW, PI,EASE:
() ACKNOWLEDGE RECEIPT OF ENCLOSURES
O RETURN ENCLOSURFf TO US.
O APPROVAL
( ) REVmW&COMMENT
O USE
THEFOLLOWING:
ODRAWINGS( )SPECTFTCATTONS
) DISTRIBUTION TO PARTIES
) RECORD
X ) Depcit for Design Review Board
) SHOP DRAWING PRINTS
) SHOP DRAWING REPRODUCTIONS
O INTORMATION
) PRODUCT LITERATT]RE
) SAMPLES
O CHANGE
REV. NO.DESCRIPTION
One Check # 06U2452 in the amount of $5fi).00 for the Tom of Vail Design Review
ACTION: A. ACTION INDICATED ON ITEM(S) TRANSMITTEI)
B. NO ACTION REQIjIRED
C. FOR SICNATI,JRE AND RETI,JRN TO TIIIS OIT'ICE
REMARKS:
ACTION CODE
FORSIGNATURE AND FORWARDING AS
NOTED BEI,()W T]I\DER'REMARKSII
SEE'REMARKSN BELOW
D.
E.
.\
\\ ,(
\v/
lllll:riilfirlr
COPIES TO:
Master File
Rick udel, Project Manager
(wrrrr ENCLoSLTRE(S)()()
BY:
()
r,rf,S,E$trJrfi,lhh,SSlgtrdo . 81658 r phone 970.476 5601
Plarm g, Design & Construq$on
PROJECT MEMORANDUM:
TO:
FROM:
DATE:
RE:
TOV Design Review
Design Workshop
January 30, 1996
Pavement Color
Concrete Paving Color:
Pueblo Brown
GOLDEN PEAK BASE FACILITY
MATERIAL SELECTION
Preliminary; ll/5/9:5
Revised: l/30/96
ROOF TILES
P g:e.Sege: i,:.]l3 & r.::c:1,'t'.:s
a :hir::lr PC.AlA
l"l,iri a)r[(!]
lO00 5 t ,-. rl.,qc Ro.L. Vvl
V,ul CO 8 :r/
lrrt t,7l-l -i7l) 1a,08
/tr.rer 9lC -ll{r l4l l
Or:.r ',rb.' !cr t.r
ll00 sc'r!n1r!rr:h St.
5'r1c ll)
Dcn'cr (,O 8ill(ll
1o.. 3l ) o.: 22r)
;,).1,r lill ,;; r l l;,
wfNDows +-C-"-{'r
clad, perhaps color
commerial levels.
TRIM
White painted wood.
White stucco trim-
Per elevation drawings.
STUCCO COLOR
Revised: l/30/96
STONE
GOLDEN PEAK BASE FACILITY
MATERIAL SELECTION
7/30/96
' .r, ,r 5,i'lcrlc ! ,l A55oc ,rlc)
Archrrecls. iia A A
f .lLn Olfir c
tCr) 5 l:roft rge Rc,rd ',^/
V l. .O B l()57
i ,:i 97;. 176 l6a3
::;rur.' 973 l16 .lt ll
(-lf.,rrJi] aurlii
| .00 5.';e rlccfJi !t
3urLe 5I i
l)cn.;er CO 8C.lL)l
t, /. J0j 6ri l16,l
rtrL r, lllj 62j lljr
METAL ROOFING
CHAIR LIFTS/
BUS SHELTER
COMMERCIAL WINDOW TRIM
@@r
Hardord Green
t
[t
at-t|-
q
-rf
f.
I
F
^ra)t
,H
H'f-t
t"-tnnnn
ffin
", t-lFi' r-{ -
:i fi-"ilru
Ilffitg
GOLDEN PEAK BASE FACILITY
TYPICAL DETAILS
r/3o/96
o,e, ae. Segerbe.i 5 \sso<iate5
A.chrie-:. ?C.. A LA
Yarn Oflke
C@ 5. Fro.::ge Road W
\:.CO81657
fox =11 a76 4ffi
ptbne :-C {76 44ll
One -;co. Center
I 2m 5: . e,\leenth St
Surte 5l5
Den,. e'. CO 80202
fox: !i! 523 2262
phone il! o23 3355
'TO,SSTUNG A
^j6.t.Ie? ?hL
r l" $-r:.. i',t$9
"t+" -' 71 F (-',. rt t *trWi
Aft1te?e aq*t
lt+''/ ltL' 4f ..
9aTa44 7FL
fiT.9. P?.'>f z
GOLDEN PEAK BASE FACILITY
TYPICAL DETAILS
r/30/96
l*4'fl 1 ,
TOP P-rI
r'.r fl I:.
7.FLTt
"'1" ,?1" fi -i. : .
> | r-+4,o\v2 di
YlWo b?Ni7'2
it).r14." g a,,.
H:DD* b.tL
l"rl"Br +.
?rc(ET'>
lA',(lvd'9fr4.
314t -_1t-
t e,!e. Set€ :)efB & Asso<rares
A-:^:€cB, rc.A.l.A
Main Offi<e
1000 S :.Dnt.gc Road \il
Varl. CO 81557
'i\.970 {76 ,1608
pr:.e 97O 476 443)
Jne Tabor Center
| ::': Seventeenth 5t.
Suitc 515
feaveir CO 80202':' l0l623 2262p-:'r l0l623 I155
---i- -
t,;.f .ltLf.s',i
^I
G
\
\
$
GOLDEN PEAK BASE FACILITY
TYPICAL DETAILS
r/30/e6
P,e(e :eieder! & Atso(ales
A(h(e(ts. PC..Al.A
flain Olli(e
--1 S frontage Road W
Va'|. CO 81657
fox:970176 4&8. ?hoae:970 476 44)3
One Tabor Center
200 Seventeenth 5t.
Sdte 5l5
Derver CO 80202
fox: 3OJ 671 2262
rhone: 103 623 1355
-'71
,(
2/ELz|AHA
\
-\+-$I
s
(-Hl?
(-fib
{!
=
Ylt?
I
:.t.
\h \tl{xt
f-o'1r 1lll-l
GOLDEN PEAK BASE FACILITY
TYPICAL DETAILS
t/30/96
P,e<e. se:e'ter3 & Alsoc,ate9
A(htlects. rc. Al.A
Maih Ollice
lOoC S Fronta8e Roac \Al
Va'|, CO 8i657
[ox: 970 476 a60,8
ti)4ne: 970 476 44tj
One Tabo. Cente.
200 Seventeeiih St
Su'!e 5l5
Denrer. CO80202
lox 30) 621 2267
::)o/re JUJ 6lJ ll))
MIScEIrANEo6. Ml - FIRESAFINOIvIATERIAL. l{2-
M!-
M4-
tvds -
M6--'}vr/-
M8-
lv{9 -
Mlo-
Mll -
Ml2-
Ml3 -
Ml4 -
Mls -
Mr6-
MJ7 -
Ml8-
Ml9 -
lv{20 -
M2l -
lv[22 -
CONTINUOUS IMBEDDED EDGE ANGLE
4' X 4' CT.IP AITIGLE - WELD AT EACH STTJD
SLIPJONTRE: to-AlO.4
2 x 6 FlSCUti BOARD WIIH 2 *6$ASCIA.BOA,RD ON 2 x 8FASCIA BOARD WITII 2 x 6 FABCIA BOARD ON l 3/4 x 14MGRO-Ia{I,iSUB FASCIAwIIt{2 x 6 TRIMBOARD _
SANDBLA,STED AND STAINED RE: 3-,c,10.2,8-lt10.2
TIJBI'ITR STEEL RAILING RE: 6.4,10.4, 8.AiO.4
CUT SA}IDSTONE CAP . PROMbD AS I}IDICATED
CONTINUOUS EDGE ANGLE
STEEL STJPPORT ANGLE
PERIMETER. FOUNDATION DRAINAGE
ISOI^ATIONJOINT
SILLSEAL
COPPERDRIPEDGE
COPPER GUTIER WITH INTEGRAL SLOPE AND HEATCABLERE: l0-A10.2
CONTINUOUSBENT PLATE
2 x 8 FASCIA BOARD ON 2 x 8 FASCTA BOARD WITH 2 x 6FASCI,ABoARD oN 1 3/4 x 14 MICRo-I.AM sua.rAsblAwrrH 2 x 6 TRIM BOAgp _ SANDBTASTED Ar.rOl:rnnreoKE:4-At0.2,7_Aro.z (.oF ?ouAH qw p \
CI.I'T SANDSTONE BASE. PROFIT^ED AS INDICATdDRE:4-A10.4
RAISED E F.S. BAND RE: t-A10.4
COPPER. COTJNTER FI.A,SHING
cusToM PRoFILE WOOD CASTNG @ RESTDENTIAL AREAS(RE: INIENOR DESTGNER)
cusToM PROFILE WOOD CASING @ CoMMERCIAL AREAS(RE: INTERIOR DESIGNER)
2x6WOOD TRIM
NOTE: ALL DETAILS ARE ArI l/2o = l'-Otr [J.O.N.
Nou-13-1995 A?347 COl.lChlJl PIELI'IHN ILHL I lNL.Jat-t zlu -J JJ
RET'ISION:
bEll.Vle
.N0u-13-1995 g7"aB CONCEPT I'IECHRNICRL' IhlC.3A3 926 ?993 P.6s
nlz
BEA'ISION:aLffiJ fu,Y'
bvz 9+<afi&
\0qI
2o
. __tr
14J
i-,r ht
'!J{ 3t-
[{trl .a.
r$
$qr$
HNo
Lr-! L1 ?-1 0Q< a2 2 atQ,t!uv L{ ..JJ COI{CEPT I'IECI.FNICAL, IT€.
o
:363 W6 -E)5 Y.tzl4
??
t,n;$
EHvr;\}d
J3
5fi
e$
NJJ
1ztr446T-+
tt
8ge{'
-r$
$f
TOTRL P.A4
X,[4a't+flil* *'&'*(.)""
lgjrll, w. Un4?UWd4F ..L
u ilo 6Pry'
elttl @ ,rlgplrt
q7f qw
at'U*l-+tbl
?ws ,v{stv
LrAi{f +{ilP
'(, 1
,a #t arrunnl
2.-g,
i
FL,F/AiAN'" AlFlpET aqFNFr- ?Y1"df't A
,A
I
I
tt\\l
\,, V''o
\
I
!
\."
NOU-16-1a95 46136 O ryt
ilEq+NIcR-' rNq'JgJ :2..o 47,r)o?
i lirtr+4rg li A{rrt l,rlt,{
Atri$':(tj. PC,,Al,A
HEn Gfilc
| 00) 9. Fr ':rr rr+l lload W
V,!i, f,( ) l{ | 6l /
$( t70 4/(r ra,00
l*'r,ri 970 479 {4tl
Oflrlitx'' a !.rqr
lr00 Ss4nlrnnh:rt.
F"i|a 513
t)rrh?r (O t0l0l
1ftr ill I 6tl l2Ai
phrr''r iUl 6rI ,l!55
,1.,n
lL ' l/'at4r'4-r.'
W ,p "t4*./^{ Lybg
A -,' -: ---,^-t ,r^' lu/Z-
/-guXt.e*t-'a:
U,u ? t* ra^4*r
o4-, 7*/-, tueqrL" d-e-L'(
C,glrY,l:t") '
1!t- ktcbuittAvnl v.t{ 1tr-k^lnc. dll'fu ol'ttt"* lz'tb;rll cr, k'lbal +onl%
Wl+11, a- Ub @^'4 q.tw '@viJe#eu
b.f"z A+,7 a;t'c W.
Nqtwuy,tlu y@( feflee.
tL r'15
z'a
aa
dnoug'3'u'u'A tlurE:54 so,'Eltnotu'@
I
TOWNOFVAIL RDCEIIT NO
DEPltITMf,NT OF COMITIUI.^ITY I,EI'ELOPIIEAT
J-rl C-
,/)
\/f( -
L/,
CIIECXS M,{DE PAYAALE TO TOWN OP VAJL'- nc - ' tt*- *- cGi!e'- - tur^t:^:
0l 00004t540 ZONING AND ADDRESS MAPS $5.00
0l 0000 42415 UMFORM BUILDINGCODE $54.00
0l oo0042415 UNIFORM PLUMBING CODE $J9.0U
0l 000042415 TINIFORM MECI{ANICA Lt!DE s37.00
0l 000042415 IJNIFORM FIRE CODE $36.00,l uxrc 42415 NA I IONAL ELECTRICAL CODE s3 7.(x)
0l 0000424t5 OTIIER CODE BOOKS
0l oo00 4l 548 BLUE PRINTS (MYLARS)s7.00
0l 0000 42412 XIROXCOPIES $0.25
0t ffiN 424t2 SI'UDIES
0l oo0042412 TOVFEESCOMPUTEW $5.(ru
0l 000042371 PENALTY FEES / RE-INSPECTIONS
0l m00 41332 PLAN REVIEW RE-CHECK FEE [S4O PER HRJ
0r 000042332 OFF HOURS INSPECTION}EES
0l 0000414t2 CONTRACTORSLICET
0t 0000414t3 PPLICATION FEE s20.00
0l 00,00 41413 ADIJITIONAL SIGNAGE FEE ISI.OO PER SO.FT.I
0t 000042440_r'TC ART PROJECT DONATION
0t m,0p-4t33:u PRE PAID DESIGN REVIEW BOART' FEF Tt'0 5tr) -0l oooF&[t7l IWESTIGATIONFEM
3l 000045110 I()V PARKING FUND
0t 0000 22027 IOV NEWSPAPER DISPENSER FUND* 0l 0000 2l I 12 TAxlEf,Eret4.5ffii 0l 0000 4t010 TAXABLE@4.O2 (TOLTN)
0l 0()00 42371 BUILDING INVESTIGATION
OTHER
PEC APPLICATION FEES
.0t uxru 41330 ADDITIONALGRFA "250"$200.000l fino 41330 CONDITIONAL USE PERNTIT s200.000l 0000 4t330 EXTERIOR ALTERATION TLESSTENI OOSOFTI $200.00
0l fix)0 41330 EXTERIoRALTEP,AW $J00.000l 0000 41330 SPECIAL D st,500.000l 0000 41330 SPECIALDEVELM sl.0w.o00l fi)00 41330 SP tiz00.u00l 0(}00 41330 SUBDIVISION
0l 0t)00 41330 VARIATIEE s250.000l 000041330 I ZONING CODE NIE s250.00ul u(}00413i0 RE.ZONING s200.00
OTHER
OTHER
r IOTAL:
COMMENTS:
x'-A
GrsE r ) .*n,Lk\-fLVkr.oL,*.V-
I !t
a.r
=9llotrl
E]IE]E
rlltr
o
z&
tl
7- n -Ib
.--\>vb
Ve+v-<-+-
U'h
6vru'r *rrn<-
VI ettc'tr-'
C-r'
?a
Ii
r ftlq(,
Ngr'd fiural mnkn'ru\ Oangba '-> to(or bar,'r,4
WAnatn+can Low{incx AIIL tk, ,r1 hW
fa.iltun rs wil'l lK- h,,uzs\r"l - at Lza fu*atl
!!
iiDW' l/lvuo h +n 4p1lnu / dorf - t/4nk//L k- w{/Y-/ll ttYa wnrtwtfrr,
;j!\o.ua'V s n\ WI'xf (ru\,r''bt r[v-b zs,uq, 'ku,wd nrttiu'al 1
lpyft,OV' UAM' nlVtw +D rno,lztu fru' Mga,bovl'vdil
ll D^vu C, y{w", * Ltrb*r,u flnan-, v,[lryaf l-aw*'
,ibtjvgorw, ,nDl fuA ,tt: tnhCur;'- flo-B(, irnaj,z,;l +6(w rr'
ry:r'.tr
"I,MW
kyw*, rav)l patd+ W,Lw Ntnl.ws *,ou,uL
',1 * J,rfterrw"& cit&/ b qz'lt' u-( dQq"*"*
ll
il
iNoltrr( rrhint,,,tr,\ rrd*, .fud - Lv(4^nAq(tn- (ap,l WkLo" Wtnlla t1brrt' zt rua[\ - i'z)'tttz,o , Z'flWw
,it YA,ow) vo,nu"tk-, - ,-u/ ?A-tt''ty'lz- t-okrr
'l
*o + a;tu, ra*tvn
.i
'l fnil'| h/r"{, krtlu /,+y,
]l nU:n t - vup\w V.uvtt'tt u rnful \uu vz;aurt''15 l'unll'r '
\ry*l LtSt+tr,r6 /arn -- (-,*kaur*
,,M q!^ Vwyw
ll
tl-> hrtq .tuy.^^Wva4 {o hn\u l_ pAut[nn -> fNM.ii \ry(d- Nl l^ewlsvn'l4!- UJxJ,I+ "t,l I Etwv',w flvLt
I
7
o
TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Design Review Board
Jim Curnutte and Lauren Waterton
January 3, 1996
Review of the Golden Peak redevelopment
On November 27, 1g95 the Planning and Environmental Commission (PEC) unanimously_(7-O)
-
recommended conditional approval-of the redevelopment of the Golden Peak Ski Base. One of
the PEC conditions of approval recommended that the stafl draft a memo to the DRB that
ou1ines the scope of th6'DRB review of this project. The Town Council, at their December 19,
1gg5 meeting, rbiterated the PEC condition to outline the role of the DRB. The PEC and Town
Council havdrequesled that the DRB focus their review of this project on the following issues:
1. Building colors; materials and details.
2. Landscaping, site details and materials'
3. The comprehensive sign program that details both on and off-site signage.
4. Design of the Mill Creek Circle plaza, with emphasis on increased landscaping'
screening of the telephone utility box, and the linal design.
5. The construclion of the Vail Trail extension.
6. The design (materials and colors) ol the seasonal tent, proposed to be located near lhe
ski race course linish area.
7. The roof material used on the mechanical coveringiarchitectural element should be the
same material as used on the remainder of the building roof area. This covering should
be mounted on posts so that it is 6"-'12" above the flat roof surface.
g. The aiste widths in the children's center parking lot will be reevaluated by the Town of
Vail staff and the applicant's representatives in an effort to provide a sidewalk of
acceptable width. The DRB shall review the landscape screening and retaining wall
design.
F leve,tonouauren\goldpeakulb. i 03
-1
/t
. vJ'rk Pag'n"
* *.':; /1,f4- 91cc(/11.*""*:s
in" A$-€ G,r,"
f J"* d.qc {@goq u)d,-t Lt5
GG:S ,u*r*tt'te ( e (L-L 1F
terder 4-.r-.W;I,{-,
€[q(/ee+
* fuetiw'@G/\eP @aar.g7t/c L
1-,tt-b L
.d
i Cr,e^g -
S q{.
aeC eaiw-*trzi,t
{rtG,l,4*Le s4c ffaae
3-/{"'o,affi76'A #qald
il"('- tatt)
* ffi.9<-(
qCL m-TLqprbq( "ult/ ,
-W;s ek u,.trY| +A,l jtdn ,@€ rt'-g
tqf@lvqt\'-;LE#*,e€
ft{g{,b U.qtds-
6&k
;u 6 -G
-hlke -Q@:EEndd
rbT@o,eq- I\PCerc{
rc{tP atff<
t
r/<_ 9lO(,
€ --brfu )peco er6uszt i:it@_
o^lf6a4 4A,a
t
TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Design Review Board
Jim Curnutte and Lauren Waterton
January 3, 1996
Review of the Golden Peak redevelopment
On November 27, 199S the Planning and Environmental Commission (PEC) unanimously^(7-0)-
recommended conditional approvat-of the redevelopment of the Golden Peak Ski Base. One of
the pEC conditions of approvalrecommended that the staff draft a memo to the DRB that
outlines the scope of th;'DRB review of this project. The Town Council, at their December 19'
1gg5 meeting, rbiterated the PEC condition lo outline the role of the DRB. The PEC and Town
Council havirequested that the DRB locus their review of this project on the following issues:
1. Building colors, materials and details.
2, Landscaping, site details and materials.
3. The comprehensive sign program that details both on and off-site signage.
4. Design of the Mill Creek Circle plaza, with emphasis on increased landscaping'
screening of the telephone utility box, and the linal design.
5. The construction of the VailTrail extension.
6. The design (materials and colors) of the seasonal tent, proposed to be located near the
ski race course finish area.
7. The roof material used on the mechanical covering/architectural element should be the
same material as used on the remainder ol the building roof area. This covering should
be mounted on posts so that it is 6"-12" above the flat roof surface'
g. The aisle widths in the Children's Center parking lot will be reevaluated by the Town of
Vail staff and the applicant's representatives in an effort to provide a sidewalk of
acceptable width. ihe DRB shall review the landscape screening and retaining wall
design.
F :bve,yoneUau.en\goldpeakv|b. 103