HomeMy WebLinkAboutVAIL HEIGHTS FILING 1 LOT 16 VAIL HEIGHTS COMMON RETAINING WALLTOI\AIOF VAIL DEPARTMENT OF COMMT]NITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES
ADD/ALT MF BLIILD PERMIT Permit #: 801-0187
Job Address.: 2059 CHAMONIX LN VAIL Status.....: ISSUED
Location......: Applied...: 06/29/2001.
Parcel No....: 270311403012 Issued ...: 11./07/2001.
ProjectNo...: pr€-ro1- 0-206 Expires...: 05/06/2002
owNER MCCARTTTY, COLLEEN A. 06/29/2OOt Phone:
PO BOX 1416
VAIL CO
81658
License:
APPLICANT GREAT DIVIDE CONSTRUCTION 06/29|2OOL PhONC:
P O BOX 1292
GYPST]M, CO
8153 7
License:124-A
CONTR,ACTOR GRE,AT DIVIDE CONSTR.UCTION 06/29/2OOL PhONC:
P O BOX 1292
GYPSI'M, CO
8]-637
License z L24-A
Desciption:
Replace retaining walls
Occupancy:
Type Construction:
TypeOccupancy: ??
Valuation: $75,000.00
Firepl,ace Information: Restricted: Y
AddSqFf 0
# of Gas Appliances: 0 # ofGas L.ogs: 0 # of
So.oo Total Pemrit Fee-> $558.8?
50.00 Pavments-> $558.8?
Wood Pellel
Building---> $515.00 RestuarantPl,anReview-->S0. O0 Total Calculated Fees-> $1, 117 . 75
Plan Creck-> 9399.?5 DRB Fee---> glOO.OO Additional Fees---*> ($55S.88)
Investigation->
will call->
$0.00 RecreationFee--->
S3 . 00 Clean-up Deposit->
TOTAL FEFS;---> 51 , 11? . ? s BALANCE DUE->
Approvals:ft-em: 05100 BUII-,DING DEPARTMENI
07/03/2O0L CDAVTS Action: AP SEE COI[DrTroNs
Item: 05400 PLANNING DEPARTMENT
o7/ro/2oo! AK Action: AP
Item: 05500 FIRE DEPARTMENT
Item: 05500 PUBL,IC WORKS
s0. 00
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in fuIl the inforrration required completed an
accurate plot plan, and state that dl the inJormation as required is correct I agree to comply with the information and
plot plan, to comply with all Town ordinances and state larc and to build this structure according to the towns zoning
and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable
thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5
PM.
Send Clean-up Deposit To: NA
SIGNATURE OF OWNERORCONTRACTOR FOR HIMSELF ANDOWNET
PAGE 2
Permit #: 801-0187
CONDITIONSOF APPROVAL
as of 01-03-2002 Status: ISSLIED
PermitType: ADD/ALTMFBLIILDPERMIT Applied: 05/29/2007
Applicant GREATDIVIDECONSTRUCTION Issued: 77/07/2001.
ToExpire: 05/06/2002
Job Address: 2059 CHAMONIX LN VAIL
Location:
Parcel No: 21031]403012
Description:
Replace retaining walls
Conditions:
Cond:12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: CON00O1898
PER CHAPTER 17OF THE l99TLINIFORMBTIILDING CODE. THE
STRUCTTIRALENGINEER OF RECORD IS REQUIRED TO
INSPECT,APPROVE AND PROVIDE ASTAMPED REPORT TO THE TOWNOF
VAIL FOR THE INSTALLATION,CONSTRUCTION AND BACKFILL OF THE
NEW RETAIMNG WALL BEING INSTALLED
l*Yfr'"'vQftfrl' /,'<==-tl"td
OR
Building Permit #:
97 O- 47 9 -2t49 (Inspections)
mvNu|utn
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRA
General Contractor:
6reT 2>,r{r (*r7fro Town of Vail Reo. No.:Contact and Phone #'s:
n6 ?arz "oi)'rrr l
coM PLETE VALUATIONS FOR BUILDING PERMTT (LaboT & MateTia|s
BUILDING: $ELECTRICAL: $oTHER: $ )fary,
PLUMBING: $MECHANICAL: $TOTAL: $
$
For Parcet
Fees:
# Conbd Assssors Office at 970-328-864O or visit
rob Name:
ua; / r/LaetrTt /k.t ,("7.,>;,. tta y'obAddress: Torq pr{oont,.- ln
Lesar Description ll iott 16 ll erc*, ll r(a, / ll subdivision:
PY\w#nZ^ adn .,4ss o Mdresshor, /ahuot ;- r(o Phonet.4r b aq7
Architex,afigSigogr / lf AddressFl2?IuD.u
"<
, ll
Phone:
Enoineer: fJaffaaon Er.Address: tlla fc-oc t*u+. G.T,Phone:gq"-4pO
Detailed description of worl{/
sdi/ aq)/ To rierre ,r.-//. r,b/-nreT-. n.* &e.
WorkClass: New() Addition( ) Remodel( ) Repair$Q Demo( ) Other( )
Work Type: Interior ( ) Exterior (2Q Both ( )Dois an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single-family ( ) Two-family ( ) Mutu-family (r{ Commercial ( ) Resburant ( ) Other ( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: 72
NoffypeofFireplacesExistinq: GasAopliances( ) GasLoqs( ) Wood/Pellet( ) WoodBuming(
Nofl'ype of Fireplaces Proposed: Gas Aooliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Buminq (NOT ALLOWED)
Does a Fire Alarm Exist: yes ( ) No ( )Does a Fire Sprinkler System Exist: Yes ( ) No ( )
******rr*******************************FOR OFFICE USE n.EES.F.[VFP..
--JU\ 2 8faffiot",
********************
\t
Type of Construction:Bv:D
I Planner:n-odT:occupanqt €roup:
,ate Rece lTiov:DoM.DEv.
F:/everyone/fu nn6/bldgperm
rffsl
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5-2.10: DEPOSITS ON PUBLIC WAYS PROHIBTTED
u Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, di4 snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any por.tion thereof.
o Notice; Abatement: The Director of Public Works may notifo and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
o Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section l.-4-1 of this code.
D .Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection I hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODEST-3A-1 AND 7-3A-3: PARKTNG OBSTRUCTINGTRAFFIC&IMPOUNDMENTAUTHORIZED
a No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) g 1)
o Whenever any police offrcer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 424-1102, as
amended, the.officer shall require the vehicle to be removed or cluse it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Posirion or Relationship to Project: ,l
Date Signed: CG ,?7.0 t
F Jcv eryonc/fo rmvb ldpermT
DRAINAGE AND CULVERT INSPE TIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
u The Town of Vail
ensure that new
Building Department has developed the following procedures to
construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Depaftment will be required to inspect and approve
drainage adjacent to Town of Vail roads or.streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary elecbical or any other
inspection. Please call Leonard Sandoval at479-2198 to request an inspection from
the Public Works Depaftment. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Department will be approving all final drainage
and culvert installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Certificate of Occuoancv issuance.
Agreed to by:
Project Name:
Date Signed:
Signature
a6- 2?.6/
F:/everyonqformVbldpam6
APPLICATION
FOF TOWN OF VAIL
PUBLIC WAY PERMIT 19
pw*:lr rIL-,--]r
Parcer#:i ['I I - I i,-: [ - I II.rrrr t;ilII
Job Name Streel Address -l Tl |r- _ --] (lt unknown catt| | l-l L---.i' , ' lz9-2t ge ext. o)
Excavating Contraclor Nama Mailing Address TOV Contractor's Licensa Number REQUIFED
()
zbCity Phono f
Start Date Completion Date
Sewer Gas Electric
. (Permil Expiration Date)
Telephone CATV Landscaping Temp. Site Access4. Work is fonlcircle onel Water
Other
5. Trench-width
(min.4')
Depth
Total SF $
Total LF $
Bond Amount $
Public Service Company (1
U.S. West (1-800-922-1987)
Permit Fee Total Permit Fee $
6. ALL MATERIAL, EQUIPMENT, AND TBAFFIC C
JOB IS STARTED.
7.Rubber out-riggers are required on
Asphalt surfaces undemeath the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
ST BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utilily locations and approvals. Once all utility company
application hrough the Public Works oflice to obtain the
up to one week to process.
Public Service Natural Gas Group (1-800-322-1987)
| \r.
11.
9.
12.
TCI Cablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation Dislrict (970-476-7480, ext. 114)
Holy Cross Electric Company (1-800-922-1987)
Town oi Vail Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970-479-2198)
THERE WILL BE NO TOTAL STREET CLOSURESI A conslruction traffic control plan must be approved by the
Pub|icWorksDepartmentpriortoissuanceotthepermit.
All excavation must be done by hand within 18" of utilities - (Senate Bil 1721.
Permitte€ must contact Publlc Wo*s Deoartment at 479'2198 24 hours prior to commencino of work. Failure to notify
lhe Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town
chargiig the contractor a reinspection fee.
I certity that I have read all chapters oi Trtle I - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
Conlractor's Slgnature ol Agreement Pdnl name cleady
ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION THAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Date of Signature
White - Publlc Works
Yellow - Contractor
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeK5.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time ftame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Asreed toay: -fV*., /ckl*-
Project Name:
Date:
Signature
h,/
F:s/eryone/forms/bldperm3
Lz'. //
MWNOF
How it relates to Building Permits:
If yes was ansu/ered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
D A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locaUons of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November 1st and will need to be resubmitted for consideraUon for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
> Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
be scheduled for the Town of Vail electricians and irrigation crew. The locates lake place in
the morning, but may require up to 48 hours to perform.
the permit. You will be contacted as to the status and any requiremenG that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
"Building Permif'to be released. Please do not confuse the "Public Way Permif with a
"Building Permit".
i NOTE: The above process is for work in a pubtic way ONLY. public Way
Permits are valid only until November 15th. A new Public Way Permit is rcquired
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
Signature
F:/everyone/forms/bldperm5
Date Signed
WHEN A'PUBLIC WAY PERMIT IS REQUIRED
PLEASE READ AND CHECK OFF EACH OFTHE
"PUBUC WAY PERMIT":
o Is this a new residence? YES
Is any utility work needed? YES
Is the driveway being repaved?
FOLLOWING QUESTIONS REGARDING THE NEED FOR A
No--lr_
3 Does demolition work being performed require the use of the Right-of-Way, easements or
public property?YES NO_.k-
No_x_
o
Is the Right-of-Way,. easements or public property to be used for staging, parking or fencing?YES NO X
I
If answer is NO, is a parking, staging or fencing plan required by Public Works?YES_ NO tr
If you answered YES to any of these questionsr a "Public Way Permif'must be obtained.
"Public Way Permit" applications may be obtained at the Public Workt office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2198.
i HAVE READ AND ANSWERED ALL THE ABOVE OUESTIONS.
Contractor Sionature Company Name
Job or Project Name:
Date Signed:
No{
Is a different access needed to the site other than the existing driveway? YES- NO ,f
Is any drainage work being done that affects the Right-of-Way, easements, or public propefty?
YES- NO T
Is a "Revocable Right-of-Way Permit" required? YES No--d-
F:/everyone/fonns/bldperm4
?fa,'y u/4 /,/
F l,i,lll
g
.o.a
o
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:
This Checklist must be completed before a Buildino Permit aoplication is
acceoted.
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a MulU-Family complex
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Work checklist)
Staging plan included (refer to Public Works checklist) No dumpster,parkino or materiat storaqe
allowed on roadwavs and shoulders without written aoproval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commerciat and Multi family)
Full floor plans including building sections and elevations(4 sets of plans for Muiti-Family and
Commercial)
Window and door schedule
Full structural plans, including design criteria (ie.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
Applicanfs Signature:
Date of submittal:
tr
-l
tr
a
f
D
tr
a
a
o
o
o
F:/everyoneforms/bldperm2
Received By:
fYJ.'^-\f+$/. J
NntEvnY
HOW DID WE RATE WTTH YOU?
Town of Vail Survey
Community Development Department Russell Fomst, Director,
(970)47e-213s
Check allthd applies.
2. Was yourinitialcontactwitlr oursbffimrnediate V slwt 0r
no one available
lf you were required b wait, how long was it before you were
helped?..__.-_.....-
4.Was your projiect reviewed on a timely basis
lf no, why not?
5, Was hs yourfirsttimeb file a DRB ep_ PEC app
Bldg Permit_ N/A
1. Which Deparfnent(s) did you contact?
Euilding X Environmenhl _ Housing_ AdminPlanning' DRB _ PEC _
6. flpase rab fte performance of tre sffipenon who assisbd you:
F,, 13 21 Name:V
(knowledgei responsiveness, availability)
7. Overallefiectiveness offp FrontService Counter. 6f 4 3 2 1
8. What is tre best time of day for you to use fie Front Service
Counter?
9. Any commenb you have which would allow us b better serve you
nexttime?
Thank you for taking the fime b complete this survey. We are
commited b improving our serrrice.
From:
To:
Ilate:
Subject:
Georye Ruther
Cherlie Davis
61281011:31PM
Building Permit Fee
Pleese waive 50% of the buildlng permlt fee forthe retaining wall repair end reconstrucfion at V€ilHelghts. ll ls my understandirglhat a 50% reduction wouE sew the ownors spproximatety sss0.oo
Thanks
George Ruther, AlCp
Chief of Planning
Town of Vai!
75 South Frontege Roed
Vall, Colorado E1657
gruther@ci.vail.co.us
970-479-2145 (ofitce)
376-2675 (celD
97M79-2152(tax)
Gary Goodell; Russ Fonest
OFFf;
Ju n e I 3 ,
SUM MA
Town of Vall
20 0 I
RY TABLE of Soil Nail Stability
ffiF 00Py- o*il,Pflf^tT
GRAN D JUNCTION CO
(970)245-6200 Fax 997
Em a il burtharlm@ ea.t
II
76
20
et
EER
VE
8150l -
0 245-6
th I ink ,n 'Bpt -OR+
Calculations using SN AILZ 3'09b
W all
Height
sv I
Ft
V ertical
Ft
Horiz
Ft
Ft N ail
Letrgth
Number
oflevels
Factor of
Safety
D ata F ile
N ame
7 z 5 l0 2 7.46 CHE I
9 7 J 5 l0 z I .6 6 CHE 7
t2 5 5 20 2 1.69 CHE 5
l7 4 ))30 4 l.7z CHB 3
2l 5 5 30 4 I .5 3 CHE 6
z6 2 4 5 JJ 6 1.5 8 CHE 2
Soil nail tendons shau be R32 M AI rods as pfovid€d by Dyw idag systems Internstional'
Rods are to be hot dip galvanized for corrosion prolection'ft
Post grouting ports on self-drilling MAI rods pre-
p"r"d fot drilling in soils. Drill the rods in to design
iocation while slowly pumping grout tbrough the rod
to support the hole and fill it.
After the grout stiffens wash out the stiffened grout
in the central hole to prepare for post grout injection'
Repeat after each injection if more than one are
required. Allow 4 hours between multiple grout
injlctions to allow a strong seal to develop. D0 NOT
shess soil nails more than 10% of design load or 5
kips to seat the soil-bond. Place job-fabricated
washer plates on soil nails and snug up hex nuts to
hold in place.
Sffiffiffi fr:ilffifr;ilfifftt 32; p6i" oitt bits showing flame-cut, p_ost-srout holes made in
one side of the rod with a cutting torclr, These holes are bumed 6-inches from the bottom, and on
l2-inch centers for 4 feet.
ll
CATION WILL NOf,GACCEPTED IF
ROUTED TO:
DATE ROUTED:
Contact and Phone #'s:ln$ fa)zTown ofVail Reg. No.:General Contractor:
6raT 2',(*rT,W
OR
Building Permit #:
97 G 47 9-2149 (Ingections)
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRA
COMPLETE VALUATIONS FOR BUILDING PERMTT (LAhT & DIATET|AIS
BUILDING: $ELECTRICAL: $OfiER:$ >faP,
PLUMBING: $MECHANICAL: $TOTAL: $
Forhrcel # Conhct Aswso rs Offrce a t 9 70- 3 2 8' I H O-QLIEE
parces# a/oa t/Ll ov ooLl
(applhatibn,wlllnot be
rob Name: h; I lhclG /h.t ,#7.,>* tu y'obAddress: 2orq P/onarr,, ln
Lesal Description Itot /6 ]uoa:Wr Subdivision:
P#rny?rflrs lLd^ ls o Addrescizr^, /ahr"n ;, /a .phone:17r7 6 OW
*chitsMg[7.affu- .cn r .
Address:Phone:
Ensineer: HdFtai"" 4,Address: t2l6 fpro. t*u+- 6,T'PhonetgelS-S2OO
Detailed description of worl{/
sai/ ac)'/ 7o s{our, ,rn//, rtrcr"n ".,--Qa- *
WorkClass: New( ) Addition( ) Remodel( ) Repair(Xl Demo( ) Other( )
Work Type: Interlor ( ) Exterior Q( Both ( )ffis an Enu o<ist at this location: Yes ( ) No ()_
Typ."f BtdS., Single-tumity( ) Two-iamilyt I Uuni-famifypf Commercial ( ) Restaurant( ) Other( )
No. of Exlstlng Dwelllng Units in this building:
Nofrvpe of Fireolaces Existino: Gas Aooliances (' ) Gas Loqs ( ) WoodiPellet ( 'l Wood Burninq ( )
^,rlrrrlr, ALLOWLuINo/Tvne of Firenlaces Pronosed: Gas Aooliances ( ) Gas Loqs ( ) wood/Pellet ( ) wood Buminq (NoT
'
Does a Fire Alarm Exist: Yes ( ) No (
*******************t"**************** **FoR *tt* ;ilaflEf )ElvEtl******rt**,l1* * tl*** * ******* **it * :r * ** Il\'
-
Type ofConstruction: I
Z OIEWE Bv:D
_o:fr:
ccuDancY Group:
DatE TO It r:rtit l_tEv
F:/$/eryone/f orms/bld9 perm
"w
EXAMPLE OF AITERNATE POST GROUTING PROCEDURE
If you must use a low pressure pump' like a Moyno 3L6, 225 psi 3-stage progressive cavity
pump, use this Procedure.
1.0 install first-stage grout or primary glout in the hole by filling it with a tremie pipe or through
PVC-Pipe grout valve assemblY.
l.l0 through and inside ofcasing
1.20 or through post-grout valve assembly
2.0 Clean out l/2-inch PVC Post Grout pipe with 3/8-inch plastic flush-water line inside post
grout line in case of cement leakage into the post-grout valve assembly line
3.0 Wait for cement grout sample in cup to become firm to touch. Indent slightly with finger pres-
sure. Post grout line in case
4.0 Rupture primary grout with about 5 gallons of water pumped into post-grout valve assembly
pipe with grout po-p. This should be done as soon as grout sample in cup is firm to touch, in 3 to
i t o*r. post grout channels for grout channels are developed by this procedure'
5.0 Post grouting injection is initiated after the primary first stage grout has firmly set for 8-hours
p*p p.oro.e glout through post grout pipe until a) pump pressure reaches the maximum pres-
sure of 225 psi or b) 8-sacks of grout mixture are pumped and target pressure above primary
press're reading is not reached and grout flows easily into soil easily, then stop pumping grout,
wash out line, pump 5-gallons of water as in step 1 .0 allow to set ovemight and repeat post-grout
valve assembly as in 5.0 until maximum pump pressure is developed. Post grouting is then com-
plete.
Vy'ash out --clean PVC post-grout valve assembly tube with hydrant water'
Rupture and break grout-pump water with grout pump to rupture first stage grout and make chan-
nels for post-gout valve assembly injection through grout valve rubber sleeves' Post grouting
injection pumiing cement grout through grout valves into the soil up to maximum pump pressure
oi:OO pri. Oo not pump more than 8-sacks if no pressure increase develops-
I
't
ir.
l1
olc
o
tu
.5
ENtrt!
o
.so-
),, -ol-!Pq)CI'+
E
r-(JOoOg
\-/ co
!,-=oL)2\;.>
_l
I
.X;
b>E,'
= ca
-,8 9FcJrj-8
1E..i:Ei it3+l#
&'
t-
ELecs
]{"4
G"$
G..it&l!C'
E
oc
=P
Or-z_o
Lro
2\_6,^,rrfi<>5:
E=:?R
=*ESjFz lq)7-=R 5gRe--
|--.r
E-
rc)
CI
CI
U)6(\
O(o
C95tCI
CI-c(I (ncnCr-Ot*Oao
-to-cO
_*_l
+Etrf
I
I!r;*o
;---6..-=l -rn
it
I
Y_'--l o
I
|\
I
rF:
lk-,
I
.. rO
tlqJ-
trol'=.s
C)-ooo_
=a
O._
Oa
g
_lrf \F!Oc
/ao!
t- -\-I- -{-,CIcr
J-) Cg'c)o-|-t-J:r*-z O
OLcl-'o€
rF:
I
f.*"
U)
Ef'-='F a)
E
Sortsc->c# o-o o.!;rl o-:t
=>xa.u+)c\-ooEo-o
_c
O
!q)
cn-oEP*N
sc-
Or-Z.O
LO
;11rlrZ=to-
829?Re?9s+ftil6&'-Jz- |o7-=R 5
=Ko--Fs- -
E.
rO
()
(l)(n
o
I
(o
N
O(o
#rc
fl)#-Orq)(l)-c
6ir U)c?-! cr-Ot-Oa
q)
-to-gO
a
Ef'-3
'=(l)
)-
=fort<-:c# 9-n\ rE
--? Xq- o(JY >.-; E-,( \.r., .--PcLOoEo-o
_c
O
!q)
or-oEE
I+Ettri
I
*o
^---6.--=l
-A
i'+
I
Y
E t-J LJ
I
r\
.. LrO
t-
tlUJ-
I
t=-
IF€
Qr
Oa
tro)'=.s
O
-ooo_
=a
g
I+bE/-oo,_ l_\- -{-,OcD
J-) c
ba)ohJ.:\-/ o
oc!L'a€
l:
F
t
r\
rF,=,
+ftl
sG-
Oeco
"F:g'
F E€8$
=,Hg€*EEffi*
EP-(,
iox
+
I
I
o-
.(,co
" s:H.
=
e€sF
H,H$€*jiF:*
-(.,
o
OR
Building Permit #:
97 0-479-2149 (Inspecff ons)
T0WNilFVttn
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRA.
@neral Contractor:(*rT Cnntact and Phone #'s:/n6 ad)L
Town of Vail Reg, No,:
COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials
BUILDING: $ELECTRICAL: $oTtfER: $ )faA,
PLUMBING: $MECHANI€AL: $TOTAL: $
ForParel # Conhd Assessors Offrce at 97O-328-8640 or visit| ,/oa t/Ll o 7 oo
(applicafion,wll$not, be accepirid*riiithout farrcel nunber)
/eT.,>;*t'ta
WorkClass: New() Addition( ) Remodel( ) Repair$( Demo( ) Other( )
Dobs an EHU exist at this location: Yes ( ) No ( )Work Type: Interior ( ) Exterior ffi Both ( )
Typeof Bltlg.: Single-family( ) Two-famiV( ) Multi-familV(r{ Commerciat ( ) Restaurant( ) Other( )
No, of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
DoefiEre5ffik|er Sy-tem Exi$ Yes ( ) No ( )Does a Fire Alarm Exist: Yes ( ) No
P * * **** * ********* *** **** * 'r*************FoR oFFIcE uSE
Other Fees:
Fees:
c Wav Permit Fee:
F:/everyone/fi omE/bldgpem
**********:t*******
T
EXAMPLE OF ALTERNATE POST GROUTING PROCEDURE
If you must use a low pressure pump, like a Moyno 3L6, 225 psi 3-stage progressive cavity
pump, use this procedure.
1.0 install fust-stage grout or primary grout in the hole by filling it with a tremie pipe or through
PVC-Pipe grout valve assembly.
l.l0 through and inside ofcasing
1.20 or through post-grout valve assembly
2.0 Clean out l/2-inch PVC Post Grout pipe with 3/8-inch plastic flush-water line inside post
grout line in case of cement leakage into the post-grout valve assembly line
3.0 Wait for cement grout sample in cup to become firm to touch. Indent slightly with finger pres-
sure. Post grout line in case
4.0 Rupture primary grout with about 5 gallons of water pumped into post-grout valve assembly
pipe with grout pump. This should be done as soon as grout sample in cup is firm to touch, in 3 to
4 hours. Post grout charurels for grout channels are developed by this procedure.
5.0 Post grouting injection is initiated after the primary first stage grout has firmly set for 8-hours
pump pressure grout through post grout pipe until a) pump presslue reaches the maximum pres-
swe of 225 psi or b) 8-sacks of grout mixture are pumped and target pressure above primary
pressure reading is not reached and grout flows easily into soil easily, then stop pumping grout,
wash out line, pump S-gallons of water as in step 1.0 allow to set overnight and repeat post-grout
valve assembly as in 5.0 until maximum pump pressure is developed. Post grouting is then com-
plete.
Wash out --clean PVC post-grout valve assembly tube with hydrant water.
Rupture and break grout--pump water with grout pump to rupture first stage grout and make chan-
nels for post-grout valve assembly injection through grout valve rubber sleeves. Post grouting
injection pumping cement gout though grout valves into the soil up to maximum pump pressure
or 300 psi. Do not pump more than 8-sacks if no pressure increase develops
oFiiHf'ilbPv
-.,h"/l-( -o -
rcfttA .1r;l'y
i, ii
. \!,,!
"-l i,!'|:lit
HAR
June 13,2001
SUM MARY TABLE of Soil Nail Stability Calculations using SN AILZ 3.09b
Soil nail tendons shall be R32 MAI rods as provided by Dywidag Systems International.
Rods are to b€ hot dip galvanized for corrosion protection.Ft
Post grouting ports on self-drilling MAI rods pre-
pared for drilling in soils. Drill ttre rods in to design
location while slowly pumping grout through the rod
to support the hole and fill it.
After the grout stiffens wash out the stiffened grout
in the cental hole to prepare for post grout injection.
Repeat after each injection if more than one are
required. Allow 4 hours between multiple grout
injections to allow a strong seal to develop. D0 NOT
stress soil nails more than l0% of design load or 5
kips to seat the soil-bond. Place job-fabricated
washer plates on soil nails and snug up hex nuts to
hold in place.
Self-drilling rods with shop-built 314" plate dirt bits showing flame-cut, post-grout holes made in
one side ofthe rod with a cutting torch These holes are bumed 6-inches from the bottom, and on
l2-inch centers for 4 feet.
8
IN
763
202
et
ER
E
l50l -
245-6
link.n
R
(e
T]
c
W all
Height
sv I
Ft
V e rtical
Ft
Horiz
Ft
FtNail
L en gth
Number
oflevels
Factor of
Safety
D ata F ile
N amc
7 1 4 j l0 2 2.46 CHE I
9 .|5 t0 .,1.66 CHB 7
t2 a 5 5 z0 .'1.69 CHE 5
t7 4 ))30 4 t.72 CHE 3
2l 1 5 5 30 4 l .5 3 CHE 6
26 2 4 )35 6 1.58 CHB 2
:;'.atiiN
t% '!iE
rilcw{
\
'1.
il
l
I
(D
E,
=c'-oo
.s
ctltr
UJ
{,c
CL
). 'ol-ll+)go'+
E
\- (,OeOF
\-, co
E:o()2\;.>
t-
.I;
b>E,
= ce
.E 9FOh8
3(,
+tcg
L
I
I
o
=
Ea>i-tg
F#s
-,-10, ,.nt' Ia1t\
,4
f .ja t
)lli I
:t, d.
Os-z_oto
r n l-.il r-Z=*o-
E5:?R
H*ERJFz. I q)
7-=R 5
=Ke'-t
I()
O(o
O
c)a
#s_c95-tuo-c('|mcc.ot-Oa
c)
o-cO
=.-- |
6c{
5 ct''=.s
O:c'oo_
=a
O-
Oa
a
Ef'-=
'=(l)
F
=$ortc:
=f, Y--9 fis-- oLJ Y \.-l-=>xa.Y+)c\-ooEo-o
_c
O
bE
/ao-o
l- -tJogl
J-r c
tD o)
ol-rj:\-/ o
.l)c
Pl-'or €
!o
Ct't-O.EP
sntr
It:*or--#-:l -;.i+
Y:-trg
I
if
rl:
IF
I
rd=
C\
ot,
I
l.r
=c-
O._z.o
trO
1n lr lrZ=*o-
trTS8Fz- z- 1..
?xESj
-=2. I ar
2-=R 5+Ko--
|- /,u
IO
CI
O
U)(o
C!
O(o
#rcat\ #;0)to
O-Cor(ncnC.ot-oao
o-cU
a
Ef'-B
'=(l)
:
f o't E c.:
c-P y-
1t,t tg _.! 6*€
\--l --
x (n.9
cl-OoE0-o
-CO
iar
cn-o.EP
I
+Eltrt
I
*o
I---#-:l -t
lt
i
Y_'---fl tr
=
\J
I
f"\
..lf)
tlqr-
,
tF.
O-
Oa
io)
=.-O
oo_
=a
g
I+bE/-oor- -I-\_ _rt_J(l)o)
;5o
L_t .:\-/ o
ocpr-'crr€
F
F
,
N
+N
sG_
(,Fco
.FiHn
=
E€8F
;H$.*H
E;e;*
OFco
.F:H.
s EIa$
;H$'f;fr
E s[54'EfE'EPtg,
I
a,x
+
I
I
E'-
E
E
o
o
q
o
u
o
o
E
E
ee
From: George RutherTo: Charlie DavisDde: 6l2ElO11:31PMSubjectr Building Pennit Fee
Please weive 50% of the building permit fee for the reteining wall repair and reconstrudion at Vail
Heights. lt is my understanding that a 50% reduciion would save the owners approximately $550.00
Thanks
George Ruther, AICP
Chief of Planning
Town of Vail
75 South Frontage Road
Vail, Colorado 81657
gruther@ci.vail.co.us
970-479-2145 (office)
376-2675 (celD
970-479-2452 (tax)
CC: Gary Goodell; Russ Fonest
*ll l.*ttl 'l*t** t**{r* **t'ff +**'}t |
'lr
* *'t* ***tt:tl **** *t t*f *rl* +*rt* t * f,**{r* | t* ** * *'l'+'l * * 't ** ***** *'l'f * *tttti l*
TOWNOFVAIL, COLORADO Stat€metrt
Statement Number: R000001118 Anrount: $558.87 07/24/2OOL0'I:32 All
Payment Method: Check Init: DF
Notation: CHECK # 3434 'ltAIIJ HEIGHTS
Permit. No: 801-0187 Type: ADD/AIJT UF BUILD PERJiIIT
Parcel No: 210311403 012
Site Addreea: 2059 CIIAIi,IONIX L,N ITAIL
Location:
Total FeeB: S558.87
This Payment: 9558.87 Total ALL Prnte: $558.87
Balance: 90.00
*{r't'l**'}{r* *'}'t{r* +**** **'}** *** * * * *!r*** * *'**** * *'r*** * ***** * '} *'}** * ** +** t**** *'}*** ***'t'l t'l ** *** t **'}+
ACCOTJNT ITEM LIST:
Account Code Descri pti on Current ftfts
BP OO1OOOO31111OO BUILDING PERMIT FEES 558.87