Loading...
HomeMy WebLinkAboutFIRST WESTWIND UNIT 105TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S, FRONTAGEROAD VAIL, CO 81657 970479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT PETMit #: BO5.OI4I Job Address.: 548 S FRONTAGE RD WEST VAIL Status.....: ISSUED Location......: WESTWIND #105 Applied...: M/0312005' Parcel No....: 210106312005 Issued ...: Cf,ll6l2Cfr5 ProjectNo...: Prlof -o>t+ Expires...: lzll3l2ffis ogrNER MARCE, ROGER R. & VTCTORTA A05/03/200s 2120 ENCANTO DR SE PHOENIX AZ 85007 APPIJTCANT GONZATTES, DUATIE 06/03/2005 Phoner (7L9) 486-3477 PO BOX 1109 IJEADVIIJIJE cor_,oRADo 80451 I-,icense: 815-B CONTRACTOR GONZAITES, DUANE 06/03/2005 Phone: (7a9) 486-3477 PO BOX 1109 IJEJADVTIJIJE cor_,oRADo 80461 I-,icense: 815-B Desciption: BATHROOM ENLARGEMENT Occupancy: Rl Multi-Family TypeConstruction: III-A Type Occupancy: ?? Valuation: $2.800.00 Fireolace Information: Restricted: Y Add Sq Ft: 0 # of Gas AppliarEes: 0 # of Gas Logs: 0 # of rffood Peller 0 Building---- >983 . 25 Resunrant Plan Review- > FEE SUMMARY So.oo Total Calculated Fees- ) $140.35 Plan Check-> $s4.11 DRB Fee----------- > $o.oo Additional Fees----- > 90'00 Investigation- > SO.OO Recreation Fee------- > SO.OO Total Permit Fee----- > $140.36 Will Call-----> S3.oo Clean-up Deposit------ > $0,00 Paymeots---------- > $140.35 TOTAL FEES---------- > S140.35 BALANCE DUE---------> $0.00 Approvals: Item: 05L00 BUIIJDING DEPARTI{ENT o6/LO/2095 ,JRM Actions AP Item: 05400 PLANNING DEPARTMENT 06/03/2oos Js Action: AP Item: 05600 FIRE DEPART!,IENI Itemr 05500 PTBIJIC WORKS See page 2 of this Document for any conditions that nray apply to this pemtit. DECLARATIONS PAGE 2 ***,t*****{.********:**********'**'t:1.,**!t*****'t*,f *!F*,tq****'t*!**,t*******{r{!*,t***********,lc*'k*t(***:1.*,1***{.*****{.***x.* CONDITIONS OF APPROVAL Permit #: 805-0141 as of 06-16-2005 Status: ISSUED ************:*:8,k*,|.*,****'|.*t<*!t:F,**,*{.,**,F********,**:**!t!{.*{t!t.{'!**'}**:t,|t!**!****'.*****!*,t{.:t********{.****,|.'.****,******** Permit Type: ADD/ALT MF BIIILD PERMIT Applied: M10312005 Applicam GONZALES, DUANE Issued: 06ll6l2ffi5 (719) 486-3477 To Expire: l2ll3/20f6 Job Address: 548 S FRONTAGE RD WEST VAIL I-ocation: WESTWIND #105 Parcel No: 210106312005 Description: BATHROOM ENLARGEMENT Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN wALLs, CEILINGS, AND FLOORS To BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 16 (BLDG.): (SFR) SMOKE DETECTORS ARE REQLJIRED PER SECTION R313 OF THE 2OO3 IRC. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQI]IRED BEFORE ANY WORK CAN BE STARTED. I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and stale laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinancps of the Town applicabte REQUESTS FOR INSPECTION SHALL BE MADE T}VENTY.FOI'R PM. IN ADVANCE BY TELEPHONE FROM 8:00 AM - 4 *******ffa'{.{!{!l.t'*********,i*llt**********'}*t+'t!t{'*******+*+**********************'}*******+*++*** TOWNOFVAIL, COLORADO Statement l***r+++***+f*******t+*tf*+i*******+++tt++++it*+*t++++f*l't**+++****+t**+++++{'+++++*+******** Anount: S140.36 06/a6/2}0s1"1 :26 AMInit: LT Notation: Duane Gonzales / Statement Number: R050000852 Payment Method: Cash cash Pemit No: 805 -0141 Parcel No: 2101-053 - 1200-5 Site Addreaa: 548 S FRONTAGE Locat,ion: IIESTWII{D #105 Total Fees: $140.36This Payment 3 $140.35 Total AIJL PmtS: $140.35BaLalce: 50.00ff****!t****t***********lf'lt'i*+t****+****++*******a*****a****+l********'it+++**+*******+*{'*+++ ACCOUNT ITEM LIST: Account Code Current Pmts rYPE ! ADD/AI.,T MF BUII,D PERMIT RD VTEST \TAIIJ Description BP 00100003111100 PF 0 01000031123 00 wc 00100003112800 BUII.,DING PERMTT FEES PI,AI{ CHECK FEES WILL CALL INSPECTION FEE 83 .25 54.11 3.00 *tt***++*****a******ff**f********+a****+l+afll**aal*t**t***t+++**:|********:l**+'l*tltl**+******* TOWNOFVAIL, COLORADO Statement *+*:1.*++******t+f+*t*******t**********+'}'t'3+'l**'|**{'*******+f*+a+******t*+*+**********t*****t** Anount: $140.36 06/L6/20ost1 :26 AMInit: LT Notat,ion: Duane Gonzales / Statenent Nruiber: R050000852 Pa)ment Method: Cash cash $140.36 *++******ftttrlr*ttf+lt+f****+**'+**i********tfltrlttflff*******ar+*******+++*********'t't't't*t***f* ACCOI,JNT ITEM LIST: Account. Code Current Pmts Permit No: Parcel No: Site Addrese: Location: This Payment: BP 00100003111100 PF 0 0100003112 3 00 wc 00100003112800 805 - O141 2101-053-1200-5 548 S FROTTTAGE wEsTwrr{D *105 Description T]'PE: ADD/AI,T MF BUII,D PERMIT RD $IEST \/AII, Total Feea: Total AJ.,L Pmts: Balance: $140.35 $140.36 $0.00 BUII,DING PER},IIT FEES PI,AN CTIECK FEES VIIIJIJ CAIJJ INSPECTfON FEE 83 .25 54,11 3.00 2G / (tt ''ll NVTIOPYAL 75 S. Frontage Rd. Vail, Colorado 81657 requ CONTRACTOR INFORMATION oe, ( _*+.t!i r,i., r.:i IiI r ir-, i .-, i.* . " ,-- '-t "t";Ut,i i.t ;'t. '1;,i:,:1 T$\r-CCrll.FiqV. APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNS Buildinq Permit #: LICATI tngr COMPLETE VALUATIONS FOR BUILDING PERMIT BUILDING:$ PLUMBING: $ For Parcel # Contact Assessors Office at 970-328-8640 or visit ?totc(tt ilocs JobName: f/ I t-t< t, WorkClassi New() Addition( ) Remodel ffi Repair( ) Demo( ) Other( ) Does an EHU exist at this location: Yes ( ) No ( )Work Type: Interior ([ Exterior ( ) Both ( ) Type of Bldg.: Single-family ( ) Twofamily ( ) Multi-family (Y) Commercial ( ) Restaurant ( ) Other ( ) No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building: Gas Aopliances fi4 Gas Loss bO Wood/Pellet ( ) Wood Burni GasLoos( ) Wood/Pellet( ) W@ ffiFOROFFICEUSEONLYW Document2 05n0n005 ll TOWT) Department of Community Development Project Name: Project Address: r' This Checklist must be amplehd fuforc a Buildina Permit aoolication isamoH, { An pugoof application is comptete a )las DRB approval obtained (if required) Provide a copy of approval form / Condominium Association letter of approval attached if project is a Multi-Family complexe Plan Check Fee required at submittal for projecb valued over $100,000.00 (See attached Construction Fee Schedule for calculations) e- Complete site plan submitted +F Public Way Permit application included if applicable (refer b Public Works checklist) €-Staging plan induded (refer to Public Works checklist) No dumoster,oarklno or material storaoe allowed on roadwavs and shoulderc without written aporoval E- Asbestos test and results submitted if demolition is occurring "e- Architect stamp and signature (All Commercial and Multi family) e- Full flmr plans including building sections and elwations(3 sets of plans for remodel/additions, 4 sets of plans for new SFR and Duplo<, 5 seb of plans for Multi-Family and Commercial Buildings) .g-- Window and door schedule +- Full stnrctural plans, including design criteria (i.e.loads) €- Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) '+-€oils Report must be submitted prior to footing inspectlon o Fire resistive assemblies specified and penetraUons indicated -ulSmotce detectors shorn on plans y' typ", and quantity of fireplaces shown I have rcad and Applican(s Signahrre: ;the above listed subm uu..L Date of submi Document2 Received By . ('L',t{ 05n0t2005 rl NVNW BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vall Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Departrnent review or Health Deparfnent review, and a review by the Buildlng Depaftment, the estimated time for a total review may take up to six (6) weeks. All commercial (large or small) and all multi-family permib will have to follow the above mentoned maximum requirements. Residenfial and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these proJecb may take up to six (6) weeks to revien, and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the oeiraUon date, that I must stlll pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: Project Name: t)afc' 5-to /5 osnonoo6 WHEN A'PUBLtr WAY PERMIT' trS REQUIRED PI.TASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTPNS REGARDING THE NEED FOR A YUBLT WAY PERMII": No/0 o Is thb a new residence? YES Is a difrerent access needed b the siE other tran the existing driveway? YES- Does demolition urcrk being performed require thq u9e of the R'rghtof-Way, easetTEnb or pubfic prcperty? YEs_ No_(/__ Is any utility r,rrork needed? YES- NO / Are herc any imprcvernenb being done to the driveway ? YES NO (./ Is any drainage workleing done that affecE the RBhtof-Way, easemenb, or public property? YES NO I/ Is a \.evocable Right-of-Way Permif'required? YES *$r" *'n*.fiHay,lu€tnenb or public property to be used for sbsing, parking or fencins? If ansurer is NO, b a patlsrp, sbging or fencing plan required by Public Works?YES- NO L/ If you answered YES b any of hese questions, a "Public Way Permit" must be obtained' Yublic Way Permif'applications may be obbined at the Public Work's office or at Community Developrnent (a sample is attached). If you have any questons please call Leonard Sandoval in Public Worlc at479-2198. Docum€nP E . ,.^,a^r^ha ,f^"tl" /hld^. rna lr o o o tr a o No/ No/ Company Name 05/2012005 APPLICATION FORTOWNOFVAIL ,-t)PRJ #: PW #: Parcel #: AY Permit #: B Stre€t Address flf unknown call2. 479-2139\ Excavating Contractor Narne Mail Address TOV Contractor License Number - REQURED 6. Phone # Completion Date (Permit Expirarion DatQ Temp. Site Access4. Work is for (circle one) Weter Sewer Gas Electric Telephone CATV Lendscaplng Trench-width (min.4')Total SF $ Total LF Bond Amount $Permit Fee $Total Permit Fee $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC CONTROL DEVICES MUST BE ON THE JOBSITE BEFORE THE JOB IS STARTED. Rubber out-riggers are required on o(ca!"ting equipment whor working on asphalt. Asphalt surfaces undemeath the bucke and lugs shall be protected at all times. A signature below indicates a review ofthe area and utility locations and approwl. Once all utility company signatures are obtained , permittee has option of routing applicrtlon through the Public Works oflicc to obtaln thc necessery Town of Vall slgletures. Please allow up to one week to process. Xcel Energr / Public Servicc Company (I-800-922-1987) Xcel Energ High Pressure ( I -E00-922-1987) Quest (l -800-922- 1987) Comcast Cable ( I -800-922- I 987) Eagle River Water & Sanitation District (970-476-7480, ext. l 14) Holy Cross Electric Company (l-8fi!922-l Town of Vail Elecricians (970-479-2158\ Town of Vail Irrigation (970-479-2158) THERE WILL BE NO TOTAL STREET CLOSURES! A construction traflic control plan rnust be subrnitted and approved by the Public Works Departrnent pdor to issuance of the pennit. 9. All excavation must be done by hand within I 8" ofutilities - (Senate Bill l72). 10, Permittee must contact the Public Works Dcpamnent at 476-2198 24 hours prior to commencius of work. Failure to Noti! the Town will result in forfeiture of bond money. Scheduled inspections that are not r€ady may result in the Town charging the contractor a reinspection fee. I I. I certifi that I have read all chapters of Tltle E - Public Weys rnd Property, of the Vail Municipal Code and all utility Company agreancnts, signed by me and will abide by the same, and that all utilities have been notified m required E. Contracior's Signature of Agreement Print name clearly ATTACH PLAN OF WORIq INCLUDINC CONSTRUCTION TRAFFIC CONTROL PLAN Show street with names, buildings, and location of cuts. USE DASH LINES FOR CUT' Documenl2 Date ofsignature White - Public Works Yellow - Contractor 05120t2005 tl IUR1VOF MATERI'\L STORAGE AND CONSTRTrcTDN PARKNG Plece read and checkofreah of the iblrc below. (Cophs of compleb bxt are available upon rcquet) CODE 5-2.10: DEPOSIS ON PUBLT WAYS PROHIBMD a Unhwf,rl depos'lb: Subject b subsection C thereof, it is unlawful for any peron b litEr, b"ck or depc[ or cause b be litEred, tracked or depc'rEd, sand, gravel, rocks, mud, dirt, snoq ice, or any oher debris or mabrial upon any street sidewalk, alley or public place, or any portion thereof. o Notice; AbaEment The Direcbcr of Publk Work may notiff and requirc any person who violaEs or causes another b violab the prov'rsion of subsection A hereof, or who has in the Direcb/s employment a peson who viohEs or causes another b violaE tre sarne, bp remove such sand, gravel, rocks, mud, di$ snoq ke or any o$rer debris or maErial within twenty four (24) hours afur receipt of said notice by the Direcbr of Public Worlc. In the elrent the person so noUfied does not comply with the notice within the period of time herein specified, the Direcbr of Public Works, or otter auhorized agent, may cause any such sand, gravel, rocls, mud, di(, snow, ice, debris or any other mabrial b be removed from any street or alley at the expense of the notified. u Summns and Penalty: As an alEmaUve b the notice for rcmorral provided in subsection B above, any peron who violabs or causes anoUrer bc v'obb tre sarne, rnay be issued a summorr b appear before he Mun'rcipal Court of the Town for said violaUons, and upon being found guilty of a violaEon hereunder be pun'shed as provided in Section 14-1 of thb code, o Notice and Penalty: It is unlawful for any person to hil or refuse b comply wi$ he notice of the Direcbr of Public Works as provided in subsecUon B hereof, and any srrh person shall, in addiUon to paynent of the expense of removal incurred by the Direcbr of Public Work, as provided in subsectjon B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of ftb Code. (1997 Code: Ordinarrce 6 (1979). COITES 7-3ll-lAND 7-3ll-3: PARKII{G OBSTRIrcTI{G TRAFFD & IMPOUNDMENTAIJTHORZED o No penon stnll park any vehkle upon a sfeet or at any oErer place wi$in this Municipality in such a manner or under such condiuors as b inErferc with the free movement of vehicular traffic or proper sbeet or highway mainbnance. (Ord. 2(1968) S 1) a Whenener any police officer finds a vehkle atbnded or unatFnded, sbnding upon any portion of a sbeet or upon any phce within Sris Municipality in swh a manner as bc constitub a violation of any section of this Article, or left unatEnded for a perird of twenty four (24) hours or more and pmumed b be abandoned under the condiUons prescribed by Colondo Revised Sbhtbs section 424-1102, as amended, tfie officer shall require the vehicle b be removed or cause it b be remored and placed in sbrage in the nearest garclge or other place of safety designaEd or maintained by his Municipality, and the charges for bwing and sbrage of such veh'rcle shall be charged tc the owner of the vehicb in addition b a En dollar ($10) impoundment chaqe. (Od. 2(1958) 5 3: Ord. 28(1981) 5 1) I have read and will cmrply with the above code provisions: Miigned:o5t20noos Vail 2004 Vail Village and Lionshead Village Gonstruction Hours Information Handout Problem Statement The Vail Village and Lionshead Village are invaluable asseb to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summerAninter guests expect a pleasant experience while in Vail. To insure that all of the proposed constuction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implementthe Vail Village and Lionshead Village Construction Hours Handout. It would be inesponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction in the Vail and Lionshead Mllage areas. New for 2004-2006 will be the Vail Village Streetscape lmprovement Proiect. Work to Include alt utility related improvements, streetscape, drainage, snowmelt systems and landscaping. All Gonstructlon projects and/or remodels within the Vall Village Gore Area should contact Scott Bluhm Town of Vail Streetscape Coordinator at970477-3418 for further information. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Mllages: . The public's health, safety and welfare shall be honored at all times. r Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be maintained. . Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. o All construction deliveries, equipment, tools and materials entering the Vail Village and Pedestrian areas must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking, refer to approved staging plan or make other anangements for parking. . The hours of Outside Construction Activity shall be as follows: - April 15 - June 18 & September 7 - November '19,7 a.m. until 7 p.m., seven days a week. June 18 thru September 10, work must end by 4:00 p.m. on Fridays. November 13 - April 15, 2005 wo* allowed within daylight hours only. - Deliveries shall be restricted to the hours ot7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special Construction delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 19 and September 5. - No outslde construction activity shall occur on the following dates: Document2 o5nono05 WESTWIND ATVAIL 548 S. Frontage Road . Vail, Colorado 81657 {970D 476-9378 . (888) 588-9378 . Facsimile (970) 479-5598 May25,2005 Dear Town of Vail Building Department, The Westwind Condominium Association is aware of the batbroom remodel that is going to be done by Duane Gonzales in unit # 105. The unit is owned by Roger Marce. Thank you for your attention to this matter./ htSincerely, )"ll/ ,y it/ MItlJeffJacobs i y' General Marlager Westwind at Vail Vail Management Company 970-476-9378 ,&Monn$errrent, C onc4rerrql IOW BUILDINGPERMIT MANUAL BUILDING PERMIT: 805-0141 CONTRACTOR: DUANE GuNLALEZ JOB NAME: MARCE BATHROOM JOB ADDRESS. WESTWIND #TO5 IMPORTANT DOCUMENTS ENCLOSED INSPECTION PHONE # 47g-274g THIS BOOK MUST REMAIN ON JOB SITE AT ALL TIMES REeEivro DEC 14 2:c5 WESTWIND ATVAIL 548 S. Frontage Road . Vail, Colorado g1657 070) 476-9378 . (888) 588-9328 r Facsimile (gZ0) 4Zg-SSgB November 10,2005 Town of Vail Building Department To Whom It May Concern: The Westwind board of directors has approved the remodel of Westwind unit 105 masterbath. The general contractor is Duane Gonzales, Ifyou have any questions, please feel free to contact me at 476_937g. :_ lf General Manager +^Illfonrqterrrent Corrrqrerrq; lz -/9 -af To whom it may concern, Due to medical reasons I would like to ask for a continuance on my building permit 805-0141 Westwind 105 till May 30,2006. I can be reached at (970) 31 6-0825. Thank You Duane Gonzales