HomeMy WebLinkAboutB10-0050co -vvso
Continued:
Comment:
Comment:interior walls and ceiling.07/26/10 Inspector: mdennev Action: PA PARTIAL APPROVAL
Comment:exterior walls - complete fireplace.
08/13/10 Inspector: nsc Action: AP APPROVED
Comment:fireplace drywall ok
Item: 70 BLDG -Misc.
06/16/10 Inspector: CG Action: NO NOTIFIED
Comment:CONTRACTOR HAS DISTURBED UNIT BELOW FOR PLUMBING. 1) METAL FRAMING TO BEREPLACEDWHEREDAMAGED.
2 BATH FAN TO BE RE- CONNECTED WHERE REMOVED.
3 PIPING TO BE FIRESTOPED AT FLOOR
4 HOLES IN CONCRETE TO BE FIRESTOPPED
06/17/10 Inspector: CG Action: PI PARTIAL INSPECTION
Comment:UNIT 102 CEILING REPAIR AND BATH FAN REPAIR
1) FIRESTOP ALL PIPE PENETRATIONS IN CONCRETE FLOOR ABOVE
07/28/10 Inspector: sgremmer Action: DN DENIED
Comment: 1 need info on flex duct in 3 wall exsisiting vent
Item: 90 BLDG -Final 2 b -vent from unit below commmunicates with unit 202 need to have fire seperation
12/07/10 Inspector: JRM Action: DN DENIED
Comment: A AND P PERMITS NEED FINAL INSPECTIONS
Item: 537 PLAN -FINAL C/O
Item: 538 FIRE -FINAL C/O
Item: 540 BLDG -Final C/O
REPT131 Run Id: 12316