0000-0.00 Cover page
0000-1.00 BAS Title Page
0000-2.00 Drawing Abbreviations.Notes.Legend
0001-1.00 BAS Drawing Index
2000-1.00 BAS Smoke Control Oneline
2000-1.01 NAE-2 Bacnet MSTP Riser
2002-2.00 NAE-2 Control Panel
3000-1.00 Garage Level Overall Smoke Control Plan
3000-10.00 Ninth Level Overall Smoke Control Plan
3000-2.00 First Level Overall Smoke Control Plan
3000-3.00 Second Level Overall Smoke Control Plan
3000-4.00 Third Level Overall Smoke Control Plan
3000-5.00 Fourth Level Overall Smoke Control Plan
3000-6.00 Fifth Level Overall Smoke Control Plan
3000-7.00 Sixth Level Overall Smoke Control Plan
3000-8.00 Seventh Level Overall Smoke Control Plan
3000-9.00 Eighth Level Overall Smoke Control Plan
9002-1.00 Elevator Pressurization
9002-2.00 Elevator Pressurization EPF-4 Control Panel
9002-2.01 Elevator Pressurization EPF-4 Point Schedule
9002-3.00 Elevator Pressurization EPF-5 Control Panel
9002-3.01 Elevator Pressurization EPF-5 Point Schedule
9002-4.00 Eleavtor Shaft Temperature Monitor Panel
9002-4.01 Elevator Shaft Temperature Point Schedule
9003-1.00 Stirwell 1 & 2 Pressurization
9003-2.00 Stairwell 1 Pressurization Control Panel
9003-2.01 Stairwell 1 Pressurization Point Schedule
9003-3.00 Stairwell 2 Pressurization Control Panel
9003-3.01Stairwell 2 Pressurization Point Schedule
9004-1.00 Stairwell 3 & 4 Pressurization
9004-2.00 Stairwell 3 Pressurization Control Panel
9004-2.01 Stairwell 3 Pressurization Point Schedule
9004-3.00 Stairwell 4 Pressurization Control Panel
9004-3.01 Stairwell 4 Pressurization Point Schedule
9005-1.00 Stairwell 5 & 6 Pressurization
9005-2.00 Stairwell 5 Pressurization Control Panel
9005-2.01 Stairwell 5 Pressurization Point Schedule
9005-3.00 Stairwell 6 Pressurization Control Panel
9005-3.01 Stairwell 6 Pressurization Point Schedule
FA Title Page
SC-00 Smoke Control Panel Layout
SC-01 Stair 1 Pressurization
SC-02 Stair 2 Pressurization
SC-03 Stair 3 Pressurization
SC-04 Stair 4 Pressurization
SC-05 Stair 5 Pressurization
SC-06 Stair 6 Pressurization
SC-07 Elevator 4 Pressurization
SC-08 Elevator 5 Pressurization
SC-10 Smoke Control System Card Wiring Details and Schedules
SC-11 Voice Command Center Fire Alarm System
SC-12 Field Device Installation and Wiring Details
SC-13 Smoke Control Sequence of Operation Matrix 1 of 4
SC-14 Smoke Control Sequence of Operation Matrix 2 of 4
SC-15 Smoke Control Sequence of Operation Matrix 3 of 4
SC-16 Smoke Control Sequence of Operation Matrix 4 of 4