Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
B18-0313 Approved Documents
B18-0313 Approved Plans
B18-0313 Permit Card
B18-0313.001 Approved Documents
B18-0313.001 Permit Card
B18-0313.001 REV1 Transmittal
B18-0313.002 Approved Plans
B18-0313.002 Permit Card
B18-0313.002 REV2 Transmittal
Cert: CO 3792 Lupine Drive
Cert: TCO 3792 Lupine Drive
DIA: B18-0313 & B18-0314
DIA: Refund
Inspection: Blower Door Test - Pass 12.30.2019
Inspection: Final Building - Conditional 12.31.2019
Inspection: Final Building - Conditional 6.25.2020
Inspection: Final Building - Pass 6.26.2020
Inspection: Final Mechanical - Pass 12.13.2019
Inspection: Final Planning - Conditional 12.30.2019
Inspection: Final Planning - Pass 6.25.2020
Inspection: Final Plumbing - Pass 12.13.2019
Inspection: Footing - Fail 10.3.2008
Inspection: Footing - Pass 10.3.2018
Inspection: Major Framing - Pass 3.18.2019
Inspection: Rough Mechanical - Pass 2.4.2019
Inspection: Rough Mechanical - Pass 4.12.2019
Inspection: Stem Wall - Conditional 10.18.2018
Inspection: Stem Wall - Pass 10.19.2018
Observation of Excavation
Snow Load Revision.pdf
Special Inspection: ILC 11.15.2018
Special Inspection: Elevator - Pass 1.3.2020
Special Inspection: Elevator Cert
Special Inspection: ILC 4.15.2019
Special Inspection: Steel Connections
Structural Analysis: Entry Stairs Footing