Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRB100031
Design Review Board ACTION FORM TbWN OF VAi CONYJAI-Y DEVELOPMENT Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel:970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: HOVEY RESIDENCE Project Description: Participants: DECK AND HOT TUB DRB Number: DRB100031 OWNER HOVEY, NANCY M. 02/15/2010 1 WOODHOLM LN MANCHESTER MA 01944-1057 APPLICANT PEEL/LANGENWALTER ARCHITECTS 02/15/2010 P.O. BOX 1202 VAIL CO 81658 License: 0000001401 ARCHITECT PEEL/LANGENWALTER ARCHITECTS 02/15/2010 P.O. BOX 1202 VAIL CO 81658 License: 0000001401 Project Address: 1339 WESTHAVEN CR VAIL Phone: 970-476-4506 Phone: 970-476-4506 Location: Legal Description: Lot: 23 Block: Subdivision: GLEN LYON SUB. Parcel Number: 2103-124-0300-9 Comments: BOARD/STAFF ACTION Motion By: Action: STAFFAPP Second By: Vote: Date of Approval: 02/26/2010 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. Cond:202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Bill Gibson DRB Fee Paid: $20.00 Application for Design Revie F C CE ~ W Minor Exterior Alteration D / FEB X Z 2010 General Information: This application is required for all proposals involving min" anges to buildings and i - provements, such as roofing, painting, window additions, landscaping, fences, re ini Its etc. `Applicat a ail Town Code sections can be found at www.vailgov.com under Vail Information - MH IF VIM sects e- quiring design review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and/or the Plan- ning and Environmental Commission. Design review approval eocpires one year from the date of approval, unless a building permit is issued and construction commences. Fee: _ Rfor for Multi-Family/Commercial Single Family/ Duplex Single Family Duplex Multi-Family Commercial Description of the Request: pi - I^ t , . AmA 1APA WA*4i l cQ Physical Address: Parcel Number:.-103121055 42 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Property Owner: Mailing Address: Owner's Signature Primary Contact/ Owner Mailing Address: ` ifCI Phone: q-10 -10 ' +1 ~ - Fax: For Office Use Only: Cash_ CC: Visa / MC Last 4 CC # Auth # Check # ~(/3 Fee Paid: rQ0 Received From: Meeting Date: DRB No.: Planner: Project No: Zoning: Land Use: (,/-Au/y\ Location of the Proposal: Lot: Block: 1 Subdivision: UyYoy\' Wl Phone: J70 52% - `7A- N CV N N m§ r z a 5 E$o8 e ar; I m s _ g. I s luul o zt~ >g -.°45m Sego ° Z a oatlm I x>> Q O qa D.or's„~ Iaa :4Bg e F ° S N o`~5o ig~ L"~ G~2 ~L g o° Q ❑ 5O ~'O•$S ~b 8r F ~j ® U ED E °~oxy °e"Ec o UJ 5 5 5 .ooh `_Eym a LLI W Z s °E~° £'3 ~r LL U O 0 - r$ } W E oS°a ~L'r= >;zoE3 a o LJ LOL Z J of -u le O Z O Its f G boo I u° - ~iW a J H -DE ~e_LaV I W~ O ^ s ~ Q J J Q Z LLI S<<~5°°w. o UB~eao >r7Lj0O OcV ZZ-j W 3: CD ~ OJ Q 0 O M O N 00 m a codN m P if 00 O_J O n> N II O ~O 15 00'LL 3 „ 00.6b.80 N = OO ODN v M 1 n m~ zZ, N O <D 04 co 28,1 LO .W I x mss! ww N C) 0) O s. _is U \\~~ffll O I O wo d 00 1 ~ r Z ~ zW l ~ ~ w ,b 2 j I .12.1 0 Do z u~ - T f- C J W 00'0£'iz., 101.47 = 3 M-00,6b.90 S S 11 32 p7~ E W w rr c~ N 00 N to ~ O O or N II I Q ~ N 0 O ~ o ~R~S a~3^ 18 33 11.12 S W%2 44 E c 18 685 S i Fi p p, 232.00 55.46' o \ pp pp .4289AC. 23.06 a~ 20 N1 86o 5002' w r • \ k \ 138.32' i ytiq Ea sftw 2 TRACT 8 ~sw~\ ~I 0 A~ 0 138,813 Sq. Ft. 13 t 00 - 2 O O 3.1867 AC. 72 / _ o. O 3 ° O. 17,S3eSq.R. ° O 70 21,02 8 Sq. Ft. f . 4026 AC. / .48VAC e0 ►F 86 el 74 4. 15 Upr- - Selo 11 249. s6. 73 JN 8 9054' 6 14 ! 82 130 00 299' 94 75 ?Go l I at !cn 83 0 3 `19 g 76 22 77 .31 78 22,178 Sq. Ft. a gl i A' - ob 21 21,827 Sq. Ft. .SMAC. = w TRACT C 26 5011 AC m _/o F9~M2 Sq Ft. y Z 3PT63lSq. Ft 4++ a O IW .4574 AC. ck O .07 30,872 Sq. Ft. { ~0 w 00 ke411'00'W r " . N 25 _ o 2~ E 7087AC. I$ IA S~oN '~3 AO e.Sp z1 ~tP 413% :,o 4 4i34 ACSq. , j f~.,C• e p . SI7y1C. a dL: N41°00'00 - ' r'~► P1,431R. o i 8 C 60.00 ti. 88°56'4 00 q0 N 167.74 n Ft'. o' 4 N-+ 0% 19,758 S Ft 'sue N3 41°00' •D le po 91 20 t^ .4536W 111 68.90 5.00 4-5.09 90 3's 114 N 87° 17'46"E 1 0.0 ' ib 17 , 239731 Sq. Ft. S>♦ x33 E 21 63.00 2 35 AO M 7/0/3 S .54433 AC qq ~o~ 90,&X S%Ft. 101 \ ® 93 22 4 ATIMAC. 20 19 16 ..P s o .y N 10 t 9~iF N~ •;i; ~ 22,315Sq.Ft. ~ e NJ $ o .a, 15 fi23AC. 14 24507 At- \ y O dl 1! •a 13 98 $ . 32,314 84 R. mss. Opz 35,21! Sq Pt. .7410 AC. ea 96 7 A AM AG 33.610 SsFt. O 00 S* L lYi b 1 ij .7716 AC. 11 30,738S4.Ft 010 .7056 4C. [FEB TV W 01 VAIL ~c TRACT D 83'2,819 Sq. Ft. ML1185 AC, E Y: 1 w 1 LOT 22 LOT 18 WESrHAVEN CIRCLE (4 0' R. 0. W. 1=28'58'47" R=40.00 L=20.23 (40' R.O.W.) JAIL` UPDATE: PATRICK FIWETTAZ 7/16/96 PATRICK FILLIEITAZ 11/29/95 1=48'11'23" R=20.00 GREENHILL COURT L°16.82 8 a. I' a 1 1 , M` M f ~I N N, ~ N ts M, Lvd~~ 5aut~ ~*m ~6ndn t,AitE~ ~lYn elyiO f rcas -b weztiww Ci.~zfr, YeA~. *rw~n, 410 00G~, iTf" 23~ 4-IN ,1331 oeaAw ~467--r e-lif"Vaiiv, Aw mil ~Vs- 2AIA ey I gt-66 re-Kw fltqt t&+ . tG~e" lv~p 1331 we dwem p UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul- ing installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that ti~mrVV~1 eframe~pllease contact The Town of Vail. Subject Property Address: 1 ~3 I I'Vy7~'Iv~ VYM Lot Block Subdivision: Primary Contact / Owner Representative: r M. Phone: Plans Dated: 2 Authorized Signature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley ) ~ saLnuel.tpqley@WXesLqLm f 0 J XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard. isner e m HOLY CROSS ENERGY 970.947.5471(tel) 970.945.4081 (fax) Contact: Diane Golis dgolis@holycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kath . ert XCE N RGy.oom EAGLE RIVER WATER & SANITA- TION DISTRICT _ 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhaslee COMCAST CABLE 970.205.5432 (tel) 970.930.4713 (fax) Contact: Michael Johnson mi- chael 'ohnson@cable.comcast.com CDOT (Only in CDOT Right-of-way) 970.683.6284 (tei) Contact: Dan Roussin Daniel. roussin@dot.state.co. us 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. f:lcdev%formslpenTfts PlanningORB%DRB_Minor Exterior Alteration 090109 Z Id 61WV00000Sa4 -N/ LC: f L ' 1S/Z6 : V L 0 LOZ V 63L-J <f1H1) Z40066VO46 JLW3A-11 S 1S340 P40MA UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul- Ing installations. A site plan, Including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within{ that timeframe please contact The Town of Vail. Subject Property Address: ~'VV7+~ Lot Z;- Block Subdivision: Primary ct /Owner Representative: 1 ~ Phone: 7o ~ Plans Dated: • l Primerv nn n.H/rl.v..•r Annraennle4i nnefi.rs Authorized Slanature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley 1 T XCEL HIGH PRESSURE GAS rw- 970.262.4076 (tel) 970.468.1401 (fax) 1141 A-d-V '7b FaL 6SL1A•6. `T C~ Contact: Rich Sisneros ( (;/}S 4i t tc. I -n a vA-- _ . i r e co At U of & HOLY CROSS ENERGY 970.947.5471(tel) 970.945.4081 (fax) Contact: Diane Golfs dgolls@holycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (td) Contacts: Kit Bogert Kath(y XCELE E EAGLE RIVER WATER & SANITA- TION DISTRICT - 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee COMCAST CABLE 970.205.5432 (te!) 970.930.4713 (fax) Contact: Michael Johnson chaeUohnson@cable.comcast.com CDOT (Only in CDOT Right-of-way) 970.683.6284 (tei) Contact: Dan Roussin Daniel.roussln@dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3.. It is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact(Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification If the submitted plans are altered in any way after the authorized signature date. f lcdevVormslpermitsTianningM)RBV)R6 Minor Exterior Ateratlon 090108 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul- ing installations. A sibe plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that timefram a please contact The Town of Vail. Subject Property Address: / 1 YV p - Lot z~ Block Subdivision: Primary Cnntact / Owner Representative:: Phone: 7©' • -ltd / Plans Dated- .2 Primary on e1/Owner Representati rgnature Authorized Signature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley coon XCEL HIGH PRESSURE GAS ' 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisnerms richa r t HOLY CROSS ENERGY Cc~ r 970.947.5471 (tel) 970.945.4081 (fax) , Contact: Diane Golis dgolis@holycross.com f XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: KR Bogert K th N EAGLE RIVER WATER & SANITA- - TION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fh o COMCAST CABLE 970.205.5432 (tel) 970.930.4713 (fax) Contact: Michael Johnson mi- chael ' hnson@cable.comcasLcom CDOT (Only in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Daniel.roussin@dot.state.co.us 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsiti ity of the utility company and the applicant to resolve problems identified above. 4. The Primary ContxVOwner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. flCdevVonnslpermits\Plannag1DRS%DR6_Minor Exterior AEeraWri_090109 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed Improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used In conjunction with preparing your utility plan and schedul- ing installations. A site plan, Including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: Lot 2-;r Block Subdivislon: ft Primary,pyct / Owner Repr sentative; Phone: 70• Plans Dated: 2 4• L 2 Authorized Siunature Comments Date QWEST, 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros HOLY CROSS ENERGY 970.947.5471(tel) 970.945.4081 (fax) Contact: Diane Golis dgolis@holycross.com XCEL Energy 970.262.4038 (fax) EED LocAE5 970.262.4024 (tel) D 15TP_.IWTIOI`~ COG AAAIA Contacts: IGt Bogert LE I N c- ,5 EJ1 EA-r EAGLE RIVER WATER & SANITA- TION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee COMCAST CABLE 970.205.5432 (tel) 970.930.4713 (fax) Contact: Mi hnso h el J c a o n Mi- chael ohnson@cabie.comcast.com COOT (Only in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Dantel.roussin@dot.state.co.us I. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for re-approval & re-verificatlon if the submitted plans are altered in any way after the authorized signature date. f•.%odevVormsipermits\PlanninglDRB1DR6 Minor Exterior Alteratlon 090109 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul- ing installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain ~jcomments ,within that timeframme,pllease contact The Town of Vail. Subject Property Address: ! l 1 YV VW . Lot Z'7;7- Block Subdivision: Primary Contact / Owner Representative: 1 1iLI Phone: 7o° 47~ 4,50 Prima Plans Dated: 2 •1.1 D Authorized Signature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley samuel.tooley@~Lwest.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisneros celener .com HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) Contact: Diane Golis dgolis@holycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kath n. a XCELENERGY.com EAGLE RIVER WATER & SANITA- TION DISTRICT _ 970 476 7480 l t AA ~Cq ~~s . . ( ) e q. , 2 970.476.4089 (fax) V i / Contact: Fred Haslee fhaslee rwsd.or COMCAST CABLE 970.205.5432 (tel) 970.930.4713 (fax) Contact: Michael Johnson mi- chael_johnson@cable.comcast.com CDOT (Only in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Daniel. roussin@dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. f:lcdevlfonns%permasXPlanning\DRBIDRB_Minor Exterior Akeration 090109 TOWN OF VAIL, COLORADO Statement Statement Number: R100000115 Amount: $20.00 02/15/201001:14 PM Payment Method: Check Init: JLE Notation: 11023 PEEL/LANGENWALTER Permit No: DRB100031 Type: DRB-Minor Alt,SFR/DUP Parcel No: 2103-124-0300-9 Site Address: 1339 WESTHAVEN CR VAIL Location: Total Fees: $20.00 This Payment: $20.00 Total ALL Pmts: $20.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts DR 00100003112200 DESIGN REVIEW FEES 20.00 Prodigy' (Model H) Dimensions NOTE. All dimensions are approximate; measure your spa before making critical design or pathway decisions. ~I E ~ (Front view) DOOR N" 13'(33 cm) E u 14112* (36.8 cm) m MAIN DRAIN N 1 3/4"(4.4 cm) ELECTRICAL CUTOUT 33114' (84.5 cm) (Location may vary 1/2" (1.3 cm) ) 431/2" (110.5 cm) SECONDARY DRAIN 57"(144.8cm) (Bottom view) DOOR SIDE 0 10 leveling points (place shims approx. 15" in from edge). 230 VOLT OPERATION REQUIREMENTS All models require a 50 amp, single phase, 230 volt circuit breaker in the main electrical service panel. All 230 volt Hot Spring spas must be wired in accordance with applicable local and national electrical codes, all electrical work must be done by a licensed electrician. NOTE: Watkins Manufacturing Corporation REQUIRES THE USE OF A SUBPANEL TO SUPPLY POWER AND PROTECT THE SPA. On the Vistas, Grandees, Envoys, Vanguards, Sovereigns (model II) and Arias models, the subpanel containing GFCI breakers is included with the spa. On the 230 volt Sovereign (model 1), Prodigy& and Jetsetters models, the subpanel containing GFCI breakers must be purchased separately and can be purchased from your Hot Spring dealer. A licensed electrician should install a four-wire electrical service (two line voltages, one neutral, one ground) from the main electrical service panel to the subpanel, and from the sub-panel to the spa per the appropriate wiring diagram as illustrated below. The grounding conductor must be at least #10 AWG. Your electrician should mount the subpanel in the vicinity of the spa but it should not be closer than five (5) feet from the spa water edge (NEC 680-38 to 41-A-3). INSTALLATION NOTE: After the spa has been installed by the dealer's delivery crew, your electrician can connect the conduit from the subpanel to the spa's IQ 2020® Control Box and then complete the wiring connections in the control box. IMPORTANT NOTE: Three different wiring diagrams are shown: one for Grandee (model G), Vanguard Sovereign (model II) and Aria models, one for Vista, Grandee (model GG) and Envoy models and one for Sovereign, Prodigy and Jetsetter models. Always follow the wiring diagram for your specific model. NOTE: Complete step-by-step Installation and Wiring Instructions for all 230 volt Hot Spring models are included in the Owner's Manual and with each sub-panel, which can be obtained from your dealer. WARNING: Removing or bypassing the GFCI breakers in the subpanel at any time will result in an unsafe spa and will void the warranty. WIRE SPECIFICATION NOTE: Long electrical runs may require a larger gauge feed wire than stated. We recommend that a maximum voltage drop of 3% be used when calculating the larger wire size. Refer to the Wiring Diagrams to the right for the electrical requirements of the 230 volt models. When connecting the supply conduit to the bottom of the IQ2020 box, use a 3/4° liquid-tight flex conduit fitting. YJW (Model SS), Grandee d G), Envoy (Mode KK) odel AR 230 vo erman tl connecte els NING he exact physi location the termin the GFC reaker will v between nufacture nnecting a hot wire to a neutral t inal will use irrev ible damag the contr ox. 2 moo. « CM RRE ARER CEa7 ee n ?e •.c w m•~ N U m al. .~0 •vG gMUO- 20A 2 2 4° CO of b „ „ M •w K 50A N •F ° • S mat ° w fo ectri N SERVICE CTRICAL PANEL ectl tails. *SUBPANEL M" FPSi WH HGFCI nbs .m oeue BREAKERS nHM goo Er D. SO N E: The wire co ctions GFCI breakers are efer only. ays ure the neutral wire is nnect to the load neutral of 30 p break * OVIDED WI P NOTE: ALL WI R G SHOUL OPPER. Sovereign (Model 1), Prodigy@ (Model H) and Jetsetter® (Model J & JJ) 230 volt converted models 'AVAILABLE FROM DEALER.NOTE: ALL WIRING SHOULD BE COPPER. I NOTE: The wire connections to GFCI breakers are for reference only. Always ensure the I white neutral wire is connected to the load neutral of the 20 amp breaker.