HomeMy WebLinkAboutB09-0030NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOWN OVIKA Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT SFR BUILD PERMIT Permit #: B09 -0030 Project #: PRJ08 -0525 Job Address: 5164 MAIN GORE DR SOUTH VAIL Location......: 5164 MAIN GORE DRIVE Parcel No....: 209918220005 OWNER KINNEY, ROL F. & VERONA D. C/O S.P. KINNEY ENG INC 143 FIRST AVE CARNEGIE PA 15106 APPLICANT BETTER HOME IMPROVERS 2695 SOUTH FRONTAGE ROAD W. VAIL CO 81657 License: 120 -B CONTRACTOR BETTER HOME IMPROVER: 2695 SOUTH FRONTAGE ROAD W. VAIL CO 81657 License: 120 -B Description: INTERIOR & EXTERIOR REMODEL 03/13/2009 Status .. : ISSUED Applied ..: 03/13/2009 Issued ...: 03/31/2009 Expires ...: 09/27/2009 V O� k 3 03/13/2009 Phone: 970 - 476 -4712 03/13/2009 Phone: 970 - 476 -4712 Occupancy: R3 Single Family Residence Type Construction:VB � V VIA �Uu-r� Valuation: $91,400.00 Total Sq Ft Added: 0 ............. ..x,xxx.......x.... <.�,..,.,.., ,..................,.x.,...... FEE SUMMARY ........,.................<....,..........,., .......................... «.... Building Permit Fee ------ > $937.75 Will Cal Fee --------------------- > $4.00 Total Calculated Fees ------------- > $3,179.29 Plan Check--------------- - - - - -> $609.54 Use Tax Fee --------------------- > $1,628.00 Additional Fees------------------ - - - - -> $0.00 Add'I Plan Check Hours -> $0.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES--------- - - - - -> $3,179.29 Investigation------------ - - - - -> $0.00 Recreation Fee------------ - - - - -> $0.00 Payments ------------------------------- > $3,179.29 Total Calculated Fees--- - - - - -> $3,179.29 BALANCE DUE ------------------------ > $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM. Signature of Owner or Contractor NAA S Print Name 3 -3t -r� Date bld_a It_construction_permit_041908 APPROVALS Permit #: B09 -0030 as of 03 -31 -2009 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 03/23/2009 JRM Action: AP Item: 05400 PLANNING DEPARTMENT 03/13/2009 bgibson Action: AP plans routed to D -5 Item: 05600 FIRE DEPARTMENT 03/18/2009 drhoades Action: DN Asbestos report does not show number and location of samples taken. Sample description shows ceiling tile only. Does not account for drywall texture or other possible asbestos containing materials. I called Pro Lab and they could not discuss the report without permission from Kerry Kuntz (who it was prepared for). Also, I don't see who did the sampling. 03/19/2009 drhoades Action: AP Complete asbestos testing report received this date. No abatement needed. See the Conditions section of this Document for any that may apply. b Id_a It_co n st ru ct i o n_pe rm it_041908 CONDITIONS OF APPROVAL Permit #: B09 -0030 as of 03 -31 -2009 Status: ISSUED Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 16 (BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R313 OF THE 2003 IRC. bld_a It nstruction_perm it_041908 Separate Permits are required for electrical, plumbing, mechanical, fi etc Project Address �I N i Y t=$ f Q t Iv L ( Project # ;= * F R3 o 6 2 51 rah MAIN �;� �e�' �� SC'�viN DRB# 0 30 q � VA►� �v ��6_S "1 _ _. ' Contractor Information Building Permit #: k�-1 — Q 0 Company: J3 I L J4OyAl6-- t/ vi 1 ROUC)Q j (4+ Company Address: 6 5 S i V► 0 , 1 - A66' RO K;07 A ME City: y A 1 State: C Zip: L l 6 S 7 Contact Name: C t4 A 4` N ' A90 t Contact Ph: 4 1 �O -1 6 `1112 Cell: 9 3 5 , 7 c o E -Mail: C I+ A M L CG ; Town of Vail Contractor Registration No: 1? O t3 Contractor Signature (required) Property Information Parcel #: 2-0 c 1 q -- -1C)00 - Legal Description: Lot # Blk # Subdivision: V A I L /v\ ► n-Do w Job Name: INN I� G / 1 0 t= L Owner Name: C Rrt 16 X I n. ti L Mailing Address: `I 3`/ r3 i 4ck 8 +90� Su% ►CIZuF; f p4 X 51 (For Parcel # Contact Eagle County assessors Office at 970 - 328 -8640 or visit www.eaglecounty.us /patie) Valuations (Labor & Material) t Building $ Plumbing $ Electrical $ Mechanical $ ' Total $ 6 - I' 1 0 0 ............. __.......................... Detailed Description of Work: CC' IWI TACH " 15 V Ida- (Use additional sheet if necessary) Architect ( Designer () Engineer Phone: U q0 - 23Z9 Fax: E -Mail: RiC_P L-) .�F c12/�i2�)+iT tISCo/►'1 Work Class: New ( ) Addition ( ) Remodel (X Repair ( ) Other ( ) Work Type: Interior ( ) Exterior () Both 06 Building Type: Single - Family (X) Two - Family ( ) Multi - Family ( ) Commercial ( ) Townhome ( ) Other ( ) # & Type of Existing Fireplaces: Gas Appliances ( ) Gas Log ( ) Wood /Pellet ( ) Wood Burning (0)2 # & Type of Proposed Fireplaces: Gas Appliances ( ) Gas Log ( ) Wood /Pellet ( ) Wood Burning 40 Does a Fire Alarm Exist: Yes (_) No ( ) Monitored Alarm: Yes (X) No( ) Does a Fire Sprinkler System Exist: Yes ( ) No O 6 Date Received E C [E)'[1 U E �' MAR 11 2009 TOWN OF VAIL 1 wi c.►• BUILDING PERMIT APPLICATION TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R090000280 Amount: $3,179.29 03/31/200903:31 PM Payment Method: Check Init: JLE Notation: 1075 K2 CARPENTRY ----------------------------------------------------------------------------- Permit No: B09 -0030 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 2099 -182- 2000 -5 Site Address: 5164 MAIN GORE DR SOUTH VAIL Location: 5164 MAIN GORE DRIVE Total Fees: $3,179.29 This Payment: $3,179.29 Total ALL Pmts: $3,179.29 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - BP 00100003111100 - -- ------------------------ BUILDING PERMIT FEES - - - - -- ------ - - - - -- 937.75 PF 00100003112300 PLAN CHECK FEES 609.54 UT 11000003106000 USE TAX 4$ 1,628.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 own Of van .E C"nu March 1, 2009 a Kinney remodel: 5164 Main Gore Dr South, Vail, CO 81657 Design review Board #: DRB080469 Legal description: Lot: 13 Block: Subdivision: VAIL MEADOWS FIL 1 Parcel: 2099- 182 - 2000 -5 Lj Description of work for TOV permit: There are three old rooms involved at the residence, all in the lower level of the main house. The old entry, sauna /hot tub room and old garage storage work area. These three rooms will be completely redone. Removal of all old walls both interior and exterior, flooring, electrical, mechanical and subfloors. Ceiling is 2x10 inch floor joicing which separates the upstairs from the downstairs, we are adding two micro Iambs to the main support beam per engineer. When the old hot tub failed it was discovered that the foundation walls of this area were 18 inch pony walls with no footers. These will be taken out and replaced with proper foundation walls and footers as needed. The old wood floor framing will be replaced with heated slab on grade throughout the remodel (no elevation changes). Exterior walls will be upgraded from 2x4 to 2x6 framing with new metal clad windows and a slider door. Old entry door may be reused (classic- antique),owners decision. Exterior siding and trim will remain as before, matching the existing home in stain color and style (vertical cedar). Existing exterior heated entry paver system will remain the same except it will expand by about 50 sq ft to tie together existing entry and new slider door (shown on plan). Remodeled area will now consist of entry, sauna, bath, closets, family room with wet bar and mechanical room. There is no increase to square footage of the home. Home will actually decrease by about 17 Sq Ft, removal of bay bump out. All old fixtures and finishes will be replaced and upgraded. All affected old electrical will be removed in the remodeled area and upgraded. Old gas boiler to be replaced with new gas boiler. Floors will be a combination of tile and carpet. Walls and ceiling will be mostly painted sheetrock. All insulation will be replaced and upgraded to meet TOV requirements and /or architects specifications. Spoke with TOV planners before going to design review last spring and was told that we could do an open pit soils test during demolition. Results will be submitted to TOV when completed before beginning of foundation work. If any changes to foundation plan are deemed necessary by soils or structural engineer then TOV planning will be notified of design changes before foundation work begins. Remodel will not impact roof or exterior decks. There are no stairs in the remodel area. There are no fire places in the remodel area and none proposed. There are two existing fireplaces in the main house area. 961 -60*�;o Kinney detached garage Kinney main house Kinney Residence, 5164 Main Gore Drive S, Vail CO, 81657 DRB Number: DRB080469, Lot: 13 Block: Subdivision: VAIL MEADOWS FIL 1, Parcel #: 2099 - 182 - 2000 -5 Materials staging plan: Small 8 yard dumpster will locate in upper parking lot next to the main house. Almost all building materials will be stored inside the detached 4 car garage and moved to the upper home on a day to day basis as they are needed. If extra space is needed we will use the upper parking lot on a temporary basis. Construction vehicles will park in the lower detached garages exterior parking spots property. There is no plan to sta ge vehicles or materials off of the Vail Fire Department Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from exposure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regulations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. ' of Vail When is asbestos testing required? " Ov o ANY building projects disturbing more than t the '� eo llding materials require asbestos testing: One- and Two - Family Dwellings: 30 square feet All Others: 160 square feet Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1 % require abatement by a State - certified and Vail- registered abatement contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: ❑ Will not disturb more than the threshold limits identified above 19 Tested negative, or at 1 % or below (2 copies of test results included) ❑ Tested positive at more than 1 %, requires abatement (2 copies of test results included) Tips & Facts: • Even recent construction projects may include asbestos - containing materials, so buildings of any age require testing. • The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos - containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: David Rhoades, Fire Inspector Vail Fire Department 75 S Frontage Rd drhoades @vailgov.com i v i 970 - 477 -3454 www.vailgov.com I! o„ State of Colorado Contact: Colorado Department of Public Health - °° and Environment Asbestos Compliance Assistance Group 303 -692 -3158 ta A a asbestos @state.co.us wwvv. cd phe. state. co. us G PRO -LAB® � - 1 'QG� The Profess Choice Environmental Testing 1675 North Commerce Parkway, Weston, Florida 33326 Tel: (954) 384 -4446 Fax: (954) 384 -4838 Toll Free: (800) 427 -0550 KERRY KUNTZ Town of Vail PO BOX 3025 VAIL, CO 81658 OF FICI: O Q * i�&.' Certificate of Bulk Asbestos Analysis Prepared for: KERRY KUNTZ Phone Number: (970) 390 -6899 Fax Number: Email Address: kerrybud @comcast.net Test Location: 5164 MAIN GORE DRIVE 5 VAIL, CO 81657 Report Number: 072408 -0470 Date Sampled: Jul 21, 2008 Date Analyzed: Jul 29, 2008 - i: Report Date: Ju129, 2008 f! John D. Shane Ph.D., QA/QC Manager Analytical results and reports generated by PRO - LAB /SSPTM, Inc. are generated for and at the request of its client(s) named on this report, and for their exclusive use. PRO - LAB /SSPTM, Inc. does not release original, copies or verbal results to any third party without prior written approval from the named client(s). This report applies only to the (� sample(s) tested. This report must not be reproduced, except in full, without written approval from PRO -LAB /SSPTM, Inc. The client(s) is solely responsible for the use and interpretation of test results and reports requested from PRO - LAB /SSPTM, Inc. This report must not be used by the client to claim product endorsement by NVLAP, NIST or any other agency of the U.S. Government. PRO - LAB /SSPTM, Inc. is not able to assess the degree of hazard resulting NvtAP Lab Code 200790 - from materials analyzed. PRO - LAB /SSPTM, Inc. reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise requested. Asbestos samples from New York are analyzed by EHS, LLC, NYS Lab ID #11714 If you have questions or comments, please contact PRO -LAB at (800) 427 -0550 rev 1.1 Page 1 of 2 PRO -LAB PREPARED FOR KERRY KUNTZ PO BOX 3025 VAIL, CO 81658 TEST LOCATION 5164 MAIN GORE DRIVE 5 VAIL, CO 81657 BULK ASBESTOS ANALYSIS 1675 North Commerce Parkway, Weston, FL 33326 (800) 427 -0550 CHAIN OF CUSTODY #: TEST ID NUMBER: SAMPLING DATE DATE RECEIVED: DATE ANALYZED: REPORT DATE: SAMPLE LOCATION: SAMPLE DESCRIPTION: SERIAL # 248758 072408 -0470 Jul 21, 2008 Jul 24, 2008 Jul 29, 2008 Jul 29, 2008 GARAGE WORK AREA FLOOR TILE SAMPLE LAYER: 1 All percentages are visually estimated by volume ASBESTOS FIBERS Chrysotile: ND Amosite: ND Crocidolite: ND Anthophyllite: ND Tremolite: ND Actinolite: ND NON - ASBESTOS FIBERS Synthetics: ND Mineral Wool: ND Fiberglass: ND Cellulose: ND Animal Hair: ND Antigorite: ND COMMENTS: HARD,COMPACT NON - FIBROUS MATERIALS Vermiculite: ND Biotite: Mica: Perlite: Aggregates Styrofoam: OTHERS Aluminum: Bitumen: Resilient Material Glue: Binders: ND ND ND 20 ND ND ND ND 1 79 Note: Limit of Quantification (LOQ) = I%. 'Trace' indicates the presence of asbestos below the LOQ and — to the limit of detection. 'ND' =None Detected. It is certifed by the signatures below that PRO - LAB /SSPTM, INC. is accredited by the National Institute of Standards and Technology for Polarized Light Microscopy (PLM) analysis under the EPA 600/M4 -82 -020 Method. Andrew Pittman, PLM Analyst JD. Shane Ph.D., QA/QC Manager NvLAP Lab Code 200790 0 All analyses are performed in accordance with the EPA/600 /R- 93/116 method. This report must not be reproduced except in full, without written approval from PRO - LAB /SSPTM, Inc. These test results apply only to the samples actually tested. Floor file is non - homogeneous and results reflect sample content. All samples will be stored for a period of thirty (30) days. The refractive index was determined by using 'Rapidly and Accurately Determining Refractive Indices of Asbestos Fibers by Using Dispersion Staining Method', by S -C. Su. The information contained in this report and any attachments is confidential information intended only for the use of the individual or entities named above. This report must not be used by the client to claim product endorsement by NVLAP, NIST or any other agency of the U.S. Government. Page 2 of 2 P, March 1, 2009 Kinney remodel: 5164 Main Gore Dr South, Vail, CO 81657 Design review Board #: DRB080469 Legal description: Lot: 13 Block: Subdivision: VAIL MEADOWS FIL 1 Parcel: 2099- 182 - 2000 -5 Description of work for TOV permit: - 7w. There are three old rooms involved at the residence, all in the lower level of the main house. The old entry, sauna /hot tub room and old garage storage work area. These three rooms will be completely redone. Removal of all old walls both interior and exterior, flooring, electrical, mechanical and subfloors. Ceiling is 2x10 inch floor joicing which separates the upstairs from the downstairs, we are adding two micro Iambs to the main support beam per engineer. When the old hot tub failed it was discovered that the foundation walls of this area were 18 inch pony walls with no footers. These will be taken out and replaced with proper foundation walls and footers as needed. The old wood floor framing will be replaced with heated slab on grade throughout the remodel (no elevation changes). Exterior walls will be upgraded from 2x4 to 2x6 framing with new metal clad windows and a slider door. Old entry door may be reused (classic- antique),owners decision. Exterior siding and trim will remain as before, matching the existing home in stain color and style (vertical cedar). Existing exterior heated entry paver system will remain the same except it will expand by about 50 sq ft to tie together existing entry and new slider door (shown on plan). Remodeled area will now consist of entry, sauna, bath, closets, family room with wet bar and mechanical room. There is no increase to square footage of the home. Home will actually decrease by about 17 Sq Ft, removal of bay bump out. All old fixtures and finishes will be replaced and upgraded. All affected old electrical will be removed in the remodeled area and upgraded. Old gas boiler to be replaced with new gas boiler. Floors will be a combination of tile and carpet. Walls and ceiling will be mostly painted sheetrock. All insulation will be replaced and upgraded to meet TOV requirements and /or architects specifications. Spoke with TOV planners before going to design review last spring and was told that we could do an open pit soils test during demolition. Results will be submitted to TOV when completed before beginning of foundation work. If any changes to foundation plan are deemed necessary by soils or structural engineer then TOV planning will be notified of design changes before foundation work begins. Remodel will not impact roof or exterior decks. There are no stairs in the remodel area. There are no fire places in the remodel area and none proposed. There are two existing fireplaces in the main house area. NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOwxoFVn� Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT SFR BUILD PERMIT Permit #: B09 -0030 Project #: PRJ08 -0525 Job Address: 5164 MAIN GORE DR SOUTH VAIL Location......: 5164 MAIN GORE DRIVE Parcel No....: 209918220005 OWNER KINNEY, ROL F. & VERONA D. 03/13/2009 C/O S.P. KINNEY ENG INC 143 FIRST AVE CARNEGIE PA 15106 APPLICANT BETTER HOME IMPROVERS 03/13/2009 Phone: 970 - 476 -4712 2695 SOUTH FRONTAGE ROAD W. VAIL CO 81657 License: 120 -B CONTRACTOR BETTER HOME IMPROVERS 03/13/2009 Phone: 970 - 476 -4712 2695 SOUTH FRONTAGE ROAD W. VAIL CO 81657 License: 120 -B Description: INTERIOR & EXTERIOR REMODEL Occupancy: R3 Single Family Residence Type Construction:VB Status .. : ISSUED Applied ..: 03/13/2009 Issued ...: 03/31/2009 Expires ...: 09/27/2009 Valuation: $89,400.00 Total Sq Ft Added: 39 ................. ..... ............................... ................+..._,.. FEE SUMMARY ........,..,....,,.....,..................,. .,.....................,,,,,,., Building Permit Fee ------ > $923.75 Will Cal Fee --------------------- > $4.00 Total Calculated Fees ------------- > $3,232.04 Plan Check--------------- - - - - -> $600.44 Use Tax Fee --------------------- > $1,588.00 Additional Fees------------------ - - - - -> $0.00 Add'I Plan Check Hours -> $110.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES--------- - - - - -> $3,232.04 Investigation------------ - - - - -> $0.00 Recreation Fee------------ - - - - -> $5.85 Payments ------------------------------- > $3,232.04 Total Calculated Fees--- - - - - -> $3,232.04 BALANCE DUE ------------------------ > $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM. Signature of Owner or Contractor C If0i n' H 690 -/ - kIw X__ Print Name i ` -23 �GS Date bld_alt_construction_perm it_041908 APPROVALS Permit #: B09 -0030 as of 05 -20 -2009 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 03/23/2009 JRM Action: AP 05/19/2009 JRM Action: AP APPROVED REVISIONS Item: 05400 PLANNING DEPARTMENT 03/13/2009 bgibson Action: AP plans routed to D -5 05/11/2009 bgibson Action: AP revisions approved - plans routed to JR Item: 05600 FIRE DEPARTMENT 03/18/2009 drhoades Action: DN Asbestos report does not show number and location of samples taken. Sample description shows ceiling tile only. Does not account for drywall texture or other possible asbestos containing materials. I called Pro Lab and they could not discuss the report without permission from Kerry Kuntz (who it was prepared for). Also, I don't see who did the sampling. 03/19/2009 drhoades Action: AP Complete asbestos testing report received this date. No abatement needed. +++++++*********+**+*++**++++*++++*+*+*+********+**++*+*++++++++*********+***++++*+++++++++*****++++*+*****+***********+++**+++++*************+**+++** + + + + * + * * * * * * * * * + + + + + + + + + + + * * * ** See the Conditions section of this Document for any that may apply. b Id_a It_co n stru ct i o n_pe rm it_041908 CONDITIONS OF APPROVAL Permit #: B09 -0030, as of 05 -20 -2009 Status: ISSUED Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 16 (BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R313 OF THE 2003 IRC. bld_a It struction_perm it_041908 Transmittal Form Revision Submittals: 1. "Field Set' of approved plans MUST accompany revisions 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. (y) Revisions Permit #(s) information applies to: Attention: ( ) Response to Correction Letter _attached copy of correction letter R U - 0030 g !lt 6 03SOw -- -J_ A, O Deferred Submittal ()Other Project Address: Contact Information Company: 6 11 1:5h 1 o E t4le ovtk/ Company Ph: Sii ` y Fax: '!2 9- l 1 Ll Contact Name: IlE�2rt`I K�rTL rlA 5 i3c�wi+�iRnr Contact Ph: j 'I `1 Cell: P i `I E -Mail: 141?A'78 ,1 00 CO&LC44 . A 6' Town of Vail Contractor Registration No: 17 o 8 ,n l X 044 1 At Vlti,V nn0r ka1 e v L Signature (required) Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building $ Plumbing $ Electrical $ Mechanical $ Fire Sprinkler /Alarm $ Total $ u Zubo— —2000 0 t cK uA-4 C= v v v r4--L cur -r Description / List of Changes: Fran i,, L ST w4 (, 0'_ /Q, 4 6'Ad y 1 ft PrAo ea dgC^alot= L Z z r; eiUT . I (1 e l C tL vl V , a Co L S VPPan i 1 J d6 re t t'►rr 6, 4 0� R h 3`1 s ('T (Use additional sheet if necessary) Date Received: MAY -12009 T01NNN OF V Il TOWN OF VAIL, COLORADO Statement Statement Number: R090000518 Amount: $52.75 05/20/200911:10 AM Payment Method: Check Init: JLE Notation: 1083 K2 CARPENTRY ----------------------------------------------------------------------------- Permit No: B09 -0030 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 2099 - 182 - 2000 -5 Site Address: 5164 MAIN GORE DR SOUTH VAIL Location: 5164 MAIN GORE DRIVE Total Fees: $3,232.04 This Payment: $52.75 Total ALL Pmts: $3,232.04 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - BP 00100003111100 - -- ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES -14.00 PF 00100003112300 PLAN CHECK FEES 100.90 RF 11100003112700 RECREATION FEES 5.85 UT 11000003106000 USE TAX 4% -40.00 KOECHLEIN CONSULTING ENGINEERS, INC. GEO TECHNICAL AND MATERIALS ENGINEERS GEOTECHNICAL REPORT PROPOSED KINNEY RESIDENCE ADDITION 5164 MAIN GORE DRIVE SOUTH VAIL, COLORADO Prepared for: Kerry Kuntz K2 Carpentry P.O. Box 3025 Vail, Colorado 81658 Job No. 09 -019 April 30, 2009 DENVER: 12364 West Alameda Prkwy., Suite 115, Lakewood, CO 80228 (303) 989 -1223 GRAND JUNCTION: 529 251/2 Rd •Suite 201 • Grand Junction, CO 81505 (970) 241 -7700 A VONISIL VER THORNE: (9 70) 949 -6009 April 30, 2009 KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 09 -019 Geotechnical and Materials Engineers TABLE OF CONTENTS SCOPE 1 EXECUTIVE SUMMARY I SITE CONDITIONS 3 PROPOSED CONSTRUCTION 3 SUBSURFACE EXPLORATION 4 SUBSURFACE CONDITIONS 5 RADON 5 MOLD 6 EXISTING FILL 6 GROUND WATER 6 EXCAVATIONS 7 FOUNDATIONS 8 SLABS -ON -GRADE 10 FOUNDATION DRAINAGE 11 LATERAL WALL LOADS 12 RETAINING WALLS 13 SURFACE DRAINAGE 14 IRRIGATION 14 COMPACTED FILL 15 LIMITATIONS 16 VICINITY MAP Fig. 1 LOCATIONS OF EXPLORATORY TEST PITS Fig. 2 LOGS OF EXPLORATORY TEST PITS Fig. 3 LEGEND OF EXPLORATORY TEST PITS Fig. 4 GRADATION TEST RESULTS Fig. 5 TYPICAL WALL DRAIN DETAIL Fig. 6 TYPICAL RETAINING WALL DRAIN DETAIL Fig. 7 April 30, 2009 KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 09 -019 Geotechnical and Materials Engineers SCOPE This report presents the results of a geotechnical subsurface exploration for the proposed addition to be constructed at 5164 Main Gore Drive South in Vail, Colorado. The approximate site location is shown on the Vicinity Map, Fig. 1. The purpose of this report is to present our evaluation of the subsurface conditions at the site and to provide geotechnical recommendations for the proposed addition. This report includes descriptions of subsurface soil and ground water conditions observed in the exploratory test pits, recommended foundation systems, allowable bearing capacity, and recommended design and construction criteria. This report was prepared from data developed during our subsurface exploration and our experience with similar projects and subsurface conditions in the area. The recommendations presented in this report are based on the addition being constructed in the location shown on the Locations of Exploratory Test Pits, Fig. 2. We should be contacted by the contractor and /or owner to review our recommendations when final plans for the structure have been completed. A summary of our findings and conclusions is presented below. EXECUTIVE SUMMARY 1. Subsurface conditions observed in the exploratory test pits were similar. The subsurface conditions consisted of 8 to 9 inches of existing fill underlain by topsoil to varying depths of 0.9 to 1.0 foot. The existing fill is characterized by dense gravel and sand with silt. Underlying the buried April 30, 2009 KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 09 -019 Geotechnical and Materials Engineers topsoil to the maximum depth explored of 2.0 feet in TP -1 and 4.8 feet in TP -2, the subsurface conditions consisted of natural dense, silty, sandy, gravel with cobbles and boulders. Refer to the SUBSURFACE CONDITIONS section of this report for additional information. 2. Buried topsoil was observed at varying depths of 0.9 to 1.0 foot in the exploratory test pits. However, greater thicknesses of topsoil could be encountered across the site. Any topsoil will need to be removed from all construction areas prior to construction. The topsoil may be used in landscaping areas. 3. During excavating, ground water was not observed in any of the exploratory test pits to a maximum depth explored of 2.0 feet in TP -1 and 4.8 feet in TP -2. Refer to the GROUND WATER section of this report for additional details. 4. We anticipate that the subsurface conditions at the foundation elevation for the proposed addition will consist of the natural sandy gravel. In our opinion, the proposed addition may be supported by a spread footing foundation bearing on the sandy gravel with a low risk of movement. Refer to the FOUNDATIONS section of this report for more details. 5. We anticipate that the subsurface conditions at the proposed floor slab elevation will consist of the existing fill. Due to the presence of existing fill and buried topsoil, we recommend that all the existing fill and topsoil be removed and if necessary replaced with approved structural fill. In our opinion, the sandy gravel or new structural fill will support slabs -on -grade with a very low risk of movement. Refer to the SLABS -ON -GRADE section of this report for more details. 6. Since cobbles and boulders were observed in the exploratory test pits, it is our opinion that heavy -duty construction equipment will be necessary to complete the required excavations. Refer to the EXCAVATIONS section of this report for more details. 7. Drainage around the addition should be designed and constructed to provide for rapid removal of surface runoff and avoid concentration of water adjacent to foundation walls. Refer to the SURFACE DRAINAGE section of this report for details. K April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers 8. The potential for radon gas is a concern in the area. Building design should include ventilation systems for below grade levels. Refer to the RADON section of this report for additional details. 9. Mold has become a concern with new construction. Refer to the MOLD section of this report for additional details. SITE CONDITIONS The proposed addition will be located at 5164 Main Gore Drive South in Vail, Colorado. The lot is accessed from Main Gore Drive South, which borders the southern edge of the site. The site is bordered on its northern, eastern, and western edges by forested land. The location of the proposed addition is bordered on the northern side by vegetated land, on the eastern and southern sides by the existing residence, and on the western side by the existing driveway. A northeast portion of the existing residence was demolished prior to our subsurface exploration, with the removal of exterior walls and the concrete slab -on- grade. However, the overhanging wood deck was left in place. Site topography varies with the existing residence constructed in a relatively flat area and the surrounding areas sloping down towards the northwest and southwest directions at approximate grades varying from 10 to 15 percent. Vegetation on the lot consists of grass and pine trees. PROPOSED CONSTRUCTION Prior to the start of our subsurface exploration, a site plan of the proposed addition 3 April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers was provided by K2 Carpentry. We anticipate that the proposed addition will consist of a single story structure with no below grade level. We anticipate that the addition will be of cast -in -place concrete and wood frame construction with slab -on -grade floors. We anticipate that excavations up to 3 feet in depth will be necessary for the proposed construction. SUBSURFACE EXPLORATION Subsurface conditions were explored at this site on April 28, 2009 by excavating two exploratory test pits (TP -1 and TP -2) with a rubber tire backhoe at the locations shown in the Locations of Exploratory Test Pits, Fig. 2. Due to the access restrictions from the presence of the overhanging wood deck, test pit TP -1 was only excavated to a depth of 2.0 feet. An engineer from our office was on site during the subsurface exploration to supervise the excavation of the exploratory test pits and to visually classify and document the subsurface soils and ground water conditions. Graphical logs of the subsurface conditions observed within the exploratory test pits are presented on the Logs of Exploratory Test Pits, Fig. 3; and on Legend of Exploratory Test Pits, Fig. 4. A soil sample obtained from exploratory test pit TP -2 was tested in our laboratory to determine its natural moisture content and gradation properties. Results of the laboratory testing is presented on the Logs of Exploratory Test Pits, Fig. 3; and on the Gradation Test Results, Fig. 5. 2 April 30, 2009 Job No. 09 -019 SUBSURFACE CONDITIONS KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnica[ and Materials Engineers Subsurface conditions observed in exploratory test pits TP -1 and TP -2 were similar. The subsurface conditions observed consisted of 8 to 9 inches of existing fill underlain by buried topsoil to varying depths of 0.9 to 1.0 foot. The existing fill is characterized by pink, very dry, dense, sand and gravel with silt. Underlying the topsoil, the subsurface conditions consisted of natural, reddish brown, moist to very moist, dense, silty, sandy, gravel with cobbles and boulders to the maximum depths explored of 2.0 feet in TP -1 and 4.8 feet in TP -2. At the time of excavation, ground water was not observed in any of the exploratory test pits. RADON In recent years, radon gas has become a concern. Radon gas is a colorless, odorless gas that is produced by the decay of minerals in soil and rock. The potential for radon gas in the subsurface strata of mountain terrain is likely. Because we do not anticipate that the proposed addition will be constructed with a below grade level, the risk of radon gas is very low. However, if plans change and a below grade level is added to the proposed addition, then we suggest that the addition be designed with ventilation for all below grade levels. April 30, 2009 KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 09 -019 Geotechnical and Materials Engineers MOLD Mold has become a concern with new construction. Mold tends to develop in dark or damp areas such as below grade areas, under floor spaces, or bathrooms. Recommendations for the prevention, remediation, and /or mitigation of mold is outside the scope of this report. We recommend that the owner contact a Professional Industrial Hygienist for recommendations for the prevention, remediation, and /or mitigation of mold. EXISTING FILL Existing fill was observed in the exploratory test pits to varying depths of 8 to 9 inches. Greater depths of existing fill could be encountered across the site. The existing fill is characterized by pink, dry, dense gravel and sand with silt. It is our opinion that the existing fill free of deleterious material is suitable for reuse as structural fill for this project. Fill should be placed as outlined in the COMPACTED FILL section of this report. GROUND WATER During excavating, ground water was not observed in any of the exploratory test pits to a maximum depth explored of 2.0 feet in TP -1 and 4.8 feet in TP -2. Based on the rol April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers conditions observed in test pits TP -1 and TP -2, we do not anticipate that ground water will adversely influence the construction of the proposed addition. However, our subsurface exploration was performed during a dry time of the year. It is possible that ground water may be encountered at shallower depths during wetter times of the year. If ground water is encountered within the excavation for the addition, we should be contacted to provide specific recommendations at that time. EXCAVATIONS We anticipate that excavations up to 3 feet in depth will be necessary for construction of the proposed addition. Because cobbles and boulders were observed in the exploratory test pits, it is our opinion that heavy -duty construction equipment will be necessary to complete the required excavation. Care needs to be exercised during construction so that the excavation slopes remain stable. It is our opinion that the existing fill and the natural sandy gravel classify as Type B soils in accordance with OSHA regulations. OSHA regulations should be followed in all excavations and cuts. Existing fill was encountered to varying depths of 8 to 9 inches. All existing fill should be removed below the proposed addition prior to the start of construction. Buried topsoil was observed underlying the existing fill to varying depths of 0.9 to 1.0 foot. Greater depths of topsoil could be encountered throughout the site. All topsoil beneath 7 April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers the proposed construction should be removed. The topsoil may be used in landscape areas. Backfill should be placed and compacted as recommended in the COMPACTED FILL section of this report. FOUNDATIONS We anticipate that the subsurface conditions at the foundation elevation for the proposed addition will consist of the natural sandy gravel. In our opinion, the proposed addition may be supported by a spread footing foundation system bearing on the sandy gravel with a, low risk of movement. We recommend that spread footings for the proposed addition be designed and constructed to meet the following criteria: Footings may be constructed on the natural sandy gravel or properly moisture conditioned and compacted new structural fill with a low risk of movement. 2. We recommend footings bearing on the sandy gravel or structural fill be designed for a maximum allowable soil bearing pressure of 2,500 psf. 3. Spread footings constructed on the natural, sandy gravel or new structural fill may experience up to 1 inch of differential movement between foundation elements. Because the soils are granular in nature, we anticipate that the majority of the differential settlement will occur during construction. 4. Construction of new foundation excavations next to existing footings may cause undercutting of the soils beneath the existing footings. The loss of support could result in settlement of the existing footings. The location of the new foundation needs to be evaluated in relation to the existing N . April 30, 2009 KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 09 -019 Geotechnical and Materials Engineers footings. Further exploration of the existing structure's foundation may be desired. 5. Excavation for foundations adjacent to existing structures should be performed with care. The excavation should be made so that existing foundations and floor slabs are not undermined. Excavations adjacent to existing structures should be excavated at a 1 to 1 slope (Horizontal to Vertical). 6. Foundation wall backfill should not be considered for support of load bearing footings. Footings should be stepped and supported by undisturbed natural soils and should not be constructed on foundation wall backfill. Foundation walls or grade beams should be designed to span across an excavation backfill zone and should not be constructed with footings within this zone. 7. Wall footings and foundation walls should be designed to span a distance of at least 10.0 feet in order to account for anomalies in the soil. 8. Footings should extend below topsoil or soft surface soils and should be supported by the natural sandy gravel or new structural fill. On this ' , we recommend that the footings be constructed at a minimum dept f 3 feet from the existing ground surface. 9. The base of the exterior footings should be established at a minimum depth below the exterior ground surface, in order to reduce the risk of frost heave. It is our understanding that Eagle County requires a depth for frost protection in the local area of 48 inches. 10. Column footings should have a minimum dimension of 24 inches square and continuous wall footings should have a minimum width of 16 inches. Footing widths may be greater to accommodate structural design loads. 11. We anticipate that cobbles and boulders will be encountered at the foundation elevation. Removal of the cobbles and boulders may result in depressions and rough bottoms in the excavation. The resulting depressions can be backfilled with compacted backfill or lean concrete. Refer to the COMPACTED FILL section of this report for backfill requirements. 4 1 0J April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers 12. Pockets or layers of loose soil may be encountered in the bottom of the completed footing excavations. These materials should be removed to expose the undisturbed natural sandy gravel. The foundations should be constructed on the sandy gravel or new structural fill. 13. A representative of our office should observe the completed foundation excavation. Variations from the conditions described in this report, which were not observed within the exploratory test pits can occur. The representative can observe the excavation to evaluate the exposed subsurface conditions. SLABS -ON -GRADE The subsurface conditions observed at the slab -on -grade elevation could consist of existing fill underlain by buried topsoil. The existing fill and topsoil are not suitable for support of slab -on -grade floors. However, it is our opinion that the natural sandy gravel will support slabs -on -grade with a very low risk of movement. We recommend that slab- on -grade floors be designed and constructed to meet the following criteria: 1. Slabs may be constructed on the natural sandy gravel or new structural fill with a very low risk of movement. 2. All existing fill and topsoil beneath slabs -on -grade should be removed prior to construction of floors. If necessary the area may be brought to grade with properly moisture treated and compacted new structural fill. 3. Slabs should be separated from exterior walls and interior bearing members. Vertical movement of the slabs should not be restricted. 4. Slab- bearing partitions should be minimized. Where such partitions are necessary, a slip joint should be constructed to allow free vertical movement of the partitions. 5. Exterior slabs should be separated from the addition. These slabs should be reinforced to function as independent units. Movement of these slabs 10 April 30, 2009 KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 09 -019 Geotechnical and Materials Engineers should not be transmitted directly to the foundations or walls of the structures. 6. Frequent control joints should be provided in all slabs to reduce problems associated with shrinkage. 7. Structural fill beneath slabs -on -grade may consist of approved on site existing fill free of deleterious material, natural sandy gravel, or imported fill. Fill should be placed and compacted as recommended in the COMPACTED FILL section of this report. Failure to properly moisture treat and compact the soils will result in excessive settlement and potential cracking of slabs -on- grade. Placement and compaction of fill beneath slabs should be observed and tested by a representative of our office. FOUNDATION DRAINAGE Surface water, especially that originating from rain or snowmelt, tends to flow through relatively permeable backfill typically found adjacent to foundations. The water that flows through the fill collects on the surface of relatively impermeable soils occurring at the foundation elevation. Both this surface water and possible ground water can cause wet or moist below grade conditions after construction. Since we do not anticipate the proposed addition will be constructed with a below grade level or crawl space, the installation of a drain along the foundation walls will not be necessary. However, if plans change and a below grade level or crawl space is added to the design, all below grade foundation walls should be constructed with a drain. The drain should consist of a 4 -inch diameter perforated pipe encased in free draining gravel and a manufactured wall drain. The gravel should have a maximum size of 1.5 inches and have a maximum of 3 percent passing the No. 200 sieve. Washed concrete aggregate 11 April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers will be satisfactory for the drainage layer. The drain should be sloped so that water flows to a sump where the water can be removed by pumping or to a positive gravity outlet. Recommended details for a typical foundation wall drain are presented in the Typical Wall Drain Detail, Fig. 6. LATERAL WALL LOADS We do not anticipate that below grade walls will be planned which require lateral earth pressures for design. However, if plans change, lateral earth pressures depend on the type of backfill and the height and type of wall. Walls, which are free to rotate sufficiently to mobilize the strength of the backfill, should be designed to resist the "active" earth pressure condition. Walls, which are restrained, should be designed to resist the "at rest" earth pressure condition. Below grade walls are typically restrained. The following table presents the lateral wall pressures that may be used for design. Earth Pressure Condition Equivalent Fluid Pressure' cf) Active 40 At -rest 60 Passive 300 Notes: 1. Equivalent fluid pressures are for a horizontal backfill condition with no hydrostatic pressures or live loads. 2. A coefficient of friction of 0.4 may be used at the base of spread footings constructed on the natural sandy gravel. Backfill placed behind or adjacent to foundation walls should be placed and 12 April 30, 2009 KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 09 -019 Geotechnical and Materials Engineers compacted as recommended in the COMPACTED FILL section of this report. Placement and compaction of the fill should be observed and tested by a representative of our office. RETAINING WALLS Based on the existing site topography, we do not anticipate that retaining walls could be constructed as part of the development of this site. However, if plans change and retaining walls are added to this site, lateral earth loads for retaining wall designs are presented in the LATERAL WALL LOADS section of this report. In order to reduce the possibility of developing hydrostatic pressures behind retaining walls, a drain should be constructed adjacent to the walls. The drain may consist of a manufactured drain system and gravel. The gravel should have a maximum size of 1.5 inches and have a maximum of 3 percent passing the No. 200 sieve. Washed concrete aggregate will be satisfactory for the drainage layer. The manufactured drain should extend from the bottom of the retaining wall to within 2 feet of subgrade elevation. The water can be drained by a perforated pipe with collection of the water at the bottom of the wall leading to a positive gravity outlet. A typical detail for a retaining wall drain is presented in the Typical Retaining Wall Drain Detail, Fig. 7. 13 April 30, 2009 Job No. 09 -019 SURFACE DRAINAGE KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers Reducing the wetting of structural soils and the potential of developing hydrostatic pressure behind below grade walls can be achieved by carefully planned and maintained surface drainage. We recommend the following precautions be observed during construction and maintained at all times after the addition is completed. 1. Wetting or drying of the open excavation should be minimized during construction. 2. All surface water should be directed away from the top and sides of the excavation during construction. 3. The ground surface surrounding the exterior of the addition should be sloped to drain away from the addition in all directions. We recommend a slope of at least 12 inches in the first 10 feet. 4. Hardscape (concrete and asphalt) should be sloped to drain away from the addition. We recommend a slope of at least 2 percent for all hardscape within 10 feet of the addition. 5. Backfill, especially around foundation walls, should be placed and compacted as recommended in the COMPACTED FILL section of this report. 6. Roof drains should discharge at least 10 feet away from foundation walls with drainage directed away from the addition. 7. Surface drainage for this site should be designed by a Professional Civil Engineer. IRRIGATION Irrigation systems installed next to foundation walls or sidewalks could cause consolidation of backfill below and adjacent to these areas. This can result in settling of 14 April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers exterior steps, patios, and /or sidewalks constructed on these soils. We recommend the following precautions be followed: 1. Do not install an irrigation system next to foundation walls. The irrigation system should be at least 10 feet away from the addition. 2. Irrigation heads should be pointed away from the structure or in a manner that does not allow the spray to come within 5 feet of the addition. 3. The landscape around the irrigation system should be sloped so that no ponding occurs at the irrigation heads. 4. Install landscaping geotextile fabrics to inhibit growth of weeds and to allow normal moisture evaporation. We do not recommend the use of a plastic membrane to inhibit the growth of weeds. 5. Control valve boxes, for automatic irrigation systems, should be located at least 10 feet away from the structure and periodically checked for leaks and flooding. COMPACTED FILL Structural fill for this project may consist of existing fill free of deleterious material, natural sandy gravel, or imported granular fill. Cobbles and boulders larger than 6 inches should be removed from the on -site soils before placement as structural fill. The imported fill may consist of non - expansive silty or clayey sands or gravels with up to 30 percent passing the No. 200 sieve and a maximum plasticity index of 10. No cobbles or boulders larger than 6 inches should be placed in fill areas. Fill areas should be stripped of all vegetation and topsoil, scarified, and then compacted. Topsoil may be used in landscape areas. Fill should be placed in thin loose lifts then moisture treated and 15 April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers compacted as shown in the following table. The recommended compaction varies for the given use of the fill. We recommend that a representative from our office observe and test the placement and compaction of each lift placed for structural fill. Fill placed beneath foundations and slabs -on -grade is considered structural. It has been our experience that without engineering quality control, inappropriate construction techniques can occur which results in unsatisfactory foundation and slab performance. LIMITATIONS Although the exploratory test pits were located to obtain a reasonably accurate determination of subsurface conditions, variations in the subsurface conditions are always possible. Any variations that exist beneath the site generally become evident during excavation for the addition. Therefore, we should be contacted by the contractor and /or 16 Recommended Compaction Percentage of the Percentage of the Use of Fill Standard Proctor Modified Proctor Maximum Dry Density Maximum Dry Density (ASTM D -698) (ASTM D -1557) Below Foundations 98 95 Below Slab -On -Grade Floors 95 90 Utility Trench Backfill 95 90 Backfill (Non- Structural) 90 90 Notes: 1. For granular soils or non - expansive clay soils the moisture content should be —2 to +2 percent of the optimum moisture content. We recommend that a representative from our office observe and test the placement and compaction of each lift placed for structural fill. Fill placed beneath foundations and slabs -on -grade is considered structural. It has been our experience that without engineering quality control, inappropriate construction techniques can occur which results in unsatisfactory foundation and slab performance. LIMITATIONS Although the exploratory test pits were located to obtain a reasonably accurate determination of subsurface conditions, variations in the subsurface conditions are always possible. Any variations that exist beneath the site generally become evident during excavation for the addition. Therefore, we should be contacted by the contractor and /or 16 April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers owner so that a representative of our office can observe the completed excavation to confirm that the soils are as indicated by the exploratory test pits and to verify our foundation and floor slab recommendations. The placement and compaction of fill, as well as installation of foundations, should also be observed and tested. The design criteria and subsurface data presented in this report are valid for 3 years provided that a representative from our office observes the site at that time and confirms that the site conditions are similar to the conditions presented in the SITE CONDITIONS section of this report and that the recommendations presented in this report are still applicable. We recommend that final plans and specifications for proposed construction be submitted to our office for study, prior to beginning construction, to determine compliance with the recommendations presented in this report and that the recommendations presented in this report are still applicable. 17 April 30, 2009 Job No. 09 -019 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers We appreciate the opportunity to provide this service. If we can be of further assistance in discussing the contents of this report or in analyses of the proposed structure from a geotechnical viewpoint, please contact our office. KOECHLEIN CONSULTING ENGINEERS, INC. Jessica E. Street, E.I. Staff Engineer Reviewed by: Senior Engineer (4 copies sent) Scott B. Myers, P.E. KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers (Generated 04129/09 From Mapquest) SITE VICINITY MAP NOT TO SCALE JOB NO. 09 -019 FIG. 1 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers SCALE: 1" - 30' LOCATIONS OF EXPLORATORY TEST PITS JOB NO. 09 -019 FIG. 2 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers TP -1 TP -2 0 0 0 23. w �aa Q WC-3 5 - 200 =12 5 10 10 15 15 � v w m w 20 20 = CL m o 25 25 30 30 35 35 40 40 LOGS OF EXPLORATORY TEST PITS JOB NO. 09 -019 FIG. 3 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers LEGEND: F7 FILL, GRAVEL and SAND, Silty, Very dry, Dense, Pink to tan. ® TOPSOIL p Q: GRAVEL, Sandy, Silty, Cobbles and boulders, Moist to very moist, Dense, Reddish brown. BULK SAMPLE. Obtained from the bucket of the backhoe. Notes: 1. Exploratory test pits were excavated on April 28, 2009 using a rubber tire backhoe. 2. No free ground water was encountered at the time of excavating in any of the exploratory test pits to the maximum depth explored of 2.0 feet in TP -1 and 4.8 feet in TP -2. 3. The Test Pit Logs are subject to the explanations, limitations, and conclusions as contained in this report. 4. Laboratory Test Results: WC - Indicates natural moisture ( %) -200 - Indicates percent passing the No. 200 sieve N LEGEND OF EXPLORATORY TEST PITS JOB NO. 09-019 FIG. 4 KOECHLEIN CONSULTING ENGINEERS 100 0 90 10 80 20 70 z 30 m A so a aom z 50 W 50 X � D 40 w w 60 z m ° 30 70 20 80 10 90 0 100 200 100 10 1 0.1 0.01 0.001 DIAMETER OF PARTICLE IN MM COBBLES GRAVEL SAND SILT CLAY Sample of GRAVEL, Sandy, Silty GRAVEL 52 % SAND 36 % Source TP -2 Sample No. Elev. /Depth 4.0 feet SILT & CLAY 12 % LIQUID LIMIT % PLASTICITY INDEX % Sample of Source GRAVEL % SAND % SILT & CLAY % LIQUID LIMIT % PLASTICITY INDEX % Sample No. Elev. /Depth GRADATION TEST RESULTS Job No. 09 -019 FIG. 5 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers CLAYEY BACKFILL 10 COMPACTED BACKFILL 11 �— BELOW GRADE WALL EDGE OF EXCAVATION (EXCAVATE AS PER OSHA REGULATIONS) MANUFACTURED WALL DRAIN WATERPROOFING OR DAMPPROOFING FILTER FABRIC GRAVEL W4 �— PLASTIC SHEETING PERFORATED PIPE f- - -I-12" MIN. NOTES: 1. DRAIN SHOULD BE AT LEAST 12 INCHES BELOW TOP OF FOOTING AT THE HIGHEST POINT AND SLOPE DOWNWARD TO A POSITIVE GRAVITY OUTLET OR TO A SUMP WHERE WATER CAN BE REMOVED BY PUMPING. 2. EXCAVATIONS ADJACENT TO FOOTINGS SHOULD BE CUT AT A 1 TO 1 (HORIZONTAL TO VERTICAL) OR FLATTER SLOPE FROM THE BOTTOM OF THE FOOTINGS. EXCAVATIONS ADJACENT TO FOOTINGS SHOULD NOT BE CUT VERTICALLY. 3. THE DRAIN SHOULD BE LAID ON A SLOPE RANGING BETWEEN 1/8 INCH AND 1/4 INCH DROP PER FOOT OF DRAIN. 4. GRAVEL SPECIFICATIONS: WASHED 1.5 INCH TO NO.4 GRAVEL WITH LESS THAN 3% PASSING THE NO. 200 SIEVE. 5. THE BELOW GRADE CONCRETE FOUNDATION WALLS SHOULD BE PROTECTED FROM MOISTURE INFILTRATION BY APPLYING A SPRAYED ON MASTIC WATERPROOFING, DAMPPROOFING, OR AN EQUIVALENT PROTECTION METHOD. TYPICAL WALL DRAIN DETAIL JOB NO. 09 -019 FIG. 6 KOECHLEIN CONSULTING ENGINEERS, INC. Geotechnical and Materials Engineers CLAYEY BACKFILL 10 -_- -_- - MANUFACTURED III -I I - mV WALL DRAIN COMPACTED BACKFILL II J,,- RETAINING WALL EDGE OF EXCAVATION (EXCAVATE AS PER OSHA REGULATIONS) WATERPROOFING OR DAMPPROOFING FILTER PERFORATED PIPE NOTES: 1. DRAIN SHOULD BE SLOPED DOWNWARD TO A POSITIVE GRAVITY OUTLET OR TO A SUMP WHERE WATER CAN BE REMOVED BY PUMPING. 2. THE DRAIN SHOULD BE LAID ON A SLOPE RANGING BETWEEN 1/8 INCH AND 1/4 INCH DROP PER FOOT OF DRAIN. 3. GRAVEL SPECIFICATIONS: WASHED 1.5 INCH TO NO.4 GRAVEL WITH LESS THAN 3% PASSING THE NO. 200 SIEVE. 4. THE BELOW GRADE CONCRETE RETAINING WALLS SHOULD BE PROTECTED FROM MOISTURE INFILTRATION BY APPLYING A SPRAYED ON MASTIC WATERPROOFING, DAMPPROOFING, OR AN EQUIVALENT PROTECTION METHOD. TYPICAL RETAINING WALL DRAIN DETAIL JOB NO. 09 -019 FIG. 7 TOWN OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2135 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ALARM PERMIT Job Address: 5164 MAIN GORE DR SOUTH VAIL Location.....: Parcel No...: 209918220005 Project No OWNER KINNEY, ROL F. & VERONA D. C/O S.P. KINNEY ENG INC 143 FIRST AVE CARNEGIE PA 15106 APPLICANT VAIL ELECTRONICS, LTD. PO BOX 3940 AVON CO 81620 License: 198 -S CONTRACTOR VAIL ELECTRONICS, LTD. PO BOX 3940 AVON CO 81620 License: 198 -S Desciption: INSTALL FIRE ALARM SYSTEM Valuation: $1,500.00 07/07/2009 Permit #: A09 -0050 $0.00 ) 0, a �'—) v F- - Status ...: ISSUED Applied..: 07/07/2009 Issued. .. 07/21/2009 Expires. .: 01/17/2010 07/07/2009 Phone: 970- 827 -9120 07/07/2009 Phone: 970 - 827 -9120 ************************************* * * * * * * * * * * * * * * * * * * * » * * * * * * * * * ** FEE SUMMARY ***************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approved as noted: 1. Heat dtectors required in mechanical rooms. 2. Add smoke detector to entry. ****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CONDITIONS OF APPROVAL Cond: 52 Monitored fire alarm system required and shall comply with NFPA 72 (2002 ed.) and VFES Standards DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Electrical --------- > $0.00 Total Calculated Fees - -> $344.25 DRB Fee --------- > $0.00 Additional Fees ---------- > $0.00 Investigation ---- > $0.00 Total Permit Fee--- - - - - -> $344.25 Will Call --------- > $0.00 Payments ------------------ > $344.25 TOTAL FEES - -> $344.25 BALANCE DUE--- - - - - -> $0.00 ****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approvals: Item: 05600 FIRE DEPARTMENT 07/21/2009 JJR Action: AP Approved plans submitted 7/07/09. Approved as noted: 1. Heat dtectors required in mechanical rooms. 2. Add smoke detector to entry. ****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CONDITIONS OF APPROVAL Cond: 52 Monitored fire alarm system required and shall comply with NFPA 72 (2002 ed.) and VFES Standards DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN AYANG"Y- ELUPHONE AT 970- 479 -2252 FROM 8:00 AM - 5 PM. SIGMA -TURF' OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER FIRE ALARM PERMIT Commercial & Residential Fire Alarm shop drawings are required at the time of application submittal and must include information listed on the 2n page of this form. Application will not be accepted without this information. Project/Street Address Project #: 0 D _ O S �� 1 Ur) 5164 Main Gore Drive /�, ............................................................................ ............................... Building Permit #: Q IJ��./ Contractor Information: — company: Vail Electronics Alarm Permit #: _ ................................... ................................ ,....... ..................; Company Address: PO Box 3940 City: r wui i Detailed Description of work: New fire alarm system State: _C Zip: 816 Contact Name: Don Anderson Contact Ph: 970 - 827 -9120 Cell: E -Mail _don@vailelectronics.net Town of Vail ntrac r Re istration No.: for single family home. Lower level being remodeled. All other existing. (use additional sheet if necessary) .............................................. ............................... $ $1.500.00 ................ ............................... X Value of Fire Alarm: Contractor Signatu a (required) (Labor &Materials) ........................... ..................................................................................................... ............................... Work Class: Property Information Parcel #: 2099 - 182 -20 -005 Legal Description: Lot #: 13 Block #: Subdivision: vale vniage rnutg i Building /Complex Name: Owner Name: Verona Kinney (For parcel #, contact Eagle County Assessors Office at 970-328 -8640 or visit New( ) Addition ( } Remodel( ) Retro -Fit (v ) Repair ( ) Other( ) Work Type: Interior (. ) Exterior ( ) Both( ) :.................................... . ...... ...................................... . ............................... Type of Building: Single- Family (v) Duplex( ) Multi - Family ( ) Commercial ( ) Restaurant( ) Other( ) www.eaglecouty.us/patie) Does a Fire Alarm Exist? Yes ( ) No Date Received: Does a Sprinkler System Exist? Yes { ) No (� ) V &A, MI T n I iH _ . WIN � �I V TOWN OF VAIL, COLORADO Statement Statement Number: R090000878 Amount: $344.25 07/21/200901:17 PM Payment Method: Check Init: JLE Notation: 3204 VAIL ALARM INC Permit No: A09 -0050 Type: ALARM PERMIT Parcel No: 2099 - 182 - 2000 -5 Site Address: 5164 MAIN GORE DR SOUTH VAIL Location: Total Fees: $344.25 This Payment: $344.25 Total ALL Pmts: $344.25 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- BP 00100003111100 FIRE ALARM PERMIT FEES 56.25 PF 00100003112300 PLAN CHECK FEES 288.00 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MWWO VY Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149 ELECTRICAL PERMIT Permit #: E09 -0037 ASFR Job Address: 5164 MAIN GORE DR SOUTH VAIL Location.....: Parcel No...: 209918220005 OWNER KINNEY, ROL F. & VERONA D. 04/28/2009 C/O S.P. KINNEY ENG INC 143 FIRST AVE CARNEGIE PA 15106 APPLICANT NATIVE ELECTRIC 04/28/2009 Phone: 970 - 328 -1293 EAGLE CO 81631 License: 143 -E CONTRACTOR NATIVE ELECTRIC EAGLE CO 81631 License: 143 -E 04/28/2009 Phone: 970-328-1293 Desciption: WIRING FOR REMODEL /ADDITION Valuation: $10,000.00 Square feet: 2500 Project #: Status...: Applied. . Issued. . . Expires. .: PRJ08 -0525 ISSUED 04/28/2009 05/21/2009 11/17/2009 FEE SUMMARY Electrical Permit Fee --------- > $109.25 Total Calculated Fees - -> $113.25 Investigation Fee--------- - - - - -> $0.00 Additional Fees ---------- > $0.00 Will Call Fee--------------- - - - - -> $4.00 Use Tax Fee ------------------- > $0.00 TOTAL PERMIT FEE --- > $113.25 Total Calculated Fees ------- > $113.25 Payments------------ - - - - -> $113.25 BALANCE DUE ---------- > $0.00 APPROVALS Item: 06000 ELECTRICAL DEPARTMENT 04/28/2009 JLE Action: AP CONDITIONS OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 A J : 4_ PM. Signature of O ner or Contractor r Date Print Name elec_prm_041908 TOWN OF VAIL, COLORADO Statement Statement Number: R090000529 Amount: $113.25 05/21/200909:53 AM Payment Method: Check Init: SAB Notation: 6736 NATIVE ELECTRIC ----------------------------------------------------------------------------- Permit No: E09 -0037 Type: ELECTRICAL PERMIT Parcel No: 2099 - 182 - 2000 -5 Site Address: 5164 MAIN GORE DR SOUTH VAIL Location: Total Fees: $113.25 This Payment: $113.25 Total ALL Pmts: $113.25 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - -- -- ------ - - - - -- EP 00100003111100 ELECTRICAL PERMIT FEES 109.25 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 FROM : FAX NO. : Apr.26 2009 0e:37AN P1 TOWN OF VAIL ELECTRICAL PERMIT APPLICATION Project Address o r I (o 4- Mai ri &oce_ 1)f Contractor Information Company: 41 Company Address: /so City: A::V g State: 4rc:- Fax: — Z Contact Name: la­t-&IA►�� Contact Ph: Cell: E-Mail! L Q Town of Vail Contract tr* egistration No- k tq3 n . .. . .. ................. ......... Project #: Building Permit #: Electrical Permit #-. Detailed Description of Work: wi Le_ Wow. (Use additional sheet if necessary) COMPLETE SO. FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & Material) 4"e Contractor Signature (required) Amount of SO Ft Property Information Parcel *: z 0 ' T!3 18 a 6 6 c ) 5- Legal Description: Lot 9 Blk # Electrical $ in, exi 0 Work Class: New ) Addition Remodel Repair ) Other ( .... .............. ......... . .. ...... .. ..... ...... .......... . Subdivision: Building Type: Job Name: k4kI& Single-Famllyj,..� Two-Family Multi-Family qn Commercial Townhome Other Owner Name: tL V:7. Iti `l ... .......... . .... . ..... Date Received: Mailing Address: M*11' Gbh v/.*'I L_ (For Parcel # Contact Eagle County assessors Office at 970-328-8640 or visit www,easiecounty.us/patie) ... ...... .. Architect ) Designer ) Engineer Name Phone: Fax: E-Mail: APR 2 2009 EN A �113'� FROM : FAX NO. : Apr.26 2009 08:38RM P2 O ViA�L& Amendment to the 2002 N.E.C. Town of Vail Ordinance 4. Series of 2005 o Overhead services are not allowed in the Town of Vail. ❑ Underground services shall be in conduit (PVC) from the utility transformer to the electric meter, main disconnect switch, and to the first electrical distribution circuit breaker panel. o The main disconnect switch shall be readily accessible, and located next to the meter on the exterior wall of the structure. All underground conduits are required to be inspected before back - filling the trench. ❑ In multi- family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common walls and spaces are exempt, ❑ NM Cable (Romex) can be used only in single and multi - family dwellings. Type NM cannot be used in any building mixed with Type A,B.E,F,H,I,M &S occupancies. ❑ Aluminum conductors smaller than size #8 are not permitted. TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES Li All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). o If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30° above grade, you must also obtain a building permit. ❑ If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and verify that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. ❑ If this is a remodel in a multi - family building with a homeowners association, a letter of permission from the association is required. ❑ If this permit is for a commercial space, two (2) sets of stamped drawings are required. Electrical one - line and panel schedules are required if load is added or distribution is altered. I have read and u derstand the above. z /.Z., le��, _ �V-zg - D 9 Signat re Date Signed If you have any questions regarding the above information or have additional questions, please contact the Town of Vail Electrical Inspector at 970 - 479 -2147. The inspector can be reached on Monday thru Friday mornings between the hours of 8am and 9am. You may also leave a voice mail and the inspector will call you back. NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT IOWOTFVE Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970 - 479 -2139 f. 970.479.2452 inspections. 970.479.2149 MECHANICAL PERMIT ASFR Job Address: 5164 MAIN GORE DR SOUTH VAIL Location.....: Parcel No...: 209918220005 OWNER KINNEY, ROL F. & VERONA D. 06/02/2009 C/O S.P. KINNEY ENG INC 143 FIRST AVE CARNEGIE PA 15106 APPLICANT AST & MCFERRIN PLUMBING & HE 06/02/2009 Phone: 970 - 926 -5862 PO BOX 1303 EDWARDS COLORADO 81632 License: 320 -M CONTRACTOR AST & MCFERRIN PLUMBING & HE 06/02/2009 Phone: 970 - 926 -5862 PO BOX 1303 EDWARDS COLORADO 81632 License: 320 -M Desciption: INSTALL NEW BOILER FOR RADIANT HEAT AND SNOW MELT FOR ADDITION, TIE INTO EXISTING BASEBOARD Valuation: $13,000.00 Status ...: ISSUED Applied ..: 06/02/2009 Issued. .: 06/0912009 Expires . .: 12/06/2009 ...... �......* �.<.......*.*.*.....**.....*....*.*. ....,� * * *.........�x * "' * * * * * * ** * FEE SUMMARY .*..***...*.*.**....,.*......**....**. �, �.........., �, �, �.*. � .,�,....,.. *.......��.......... Mechanical Permit Fee --- > $260.00 Will Call ------------ > $4.00 Total Calculated Fees --- > $329.00 Plan Check ------------------- > $65.00 Use Tax Fee ------ > $0.00 Additional Fees------ - - - - -> $0.00 Investigation------------ - - - - -> $0.00 TOTAL PERMIT FEE --- > $329.00 Total Calculated Fees - -> $329.00 Payments------------ - - - - -> $329.00 BALANCE DUE --------- > $0.00 APPROVALS Item: 05100 BUILDING DEPARTMENT 06/08/2009 JRM Action: AP CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC.. Cond: 31 (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6. ALL TIMES Permit #: M09 -0076 Project #: PRJ08 -0525 mechcan ical_permit_041908 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIO SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0( AM - 4 PM. Signature of Owner r Contractor Date mechcan ical_permit_041908 TOWN OF VAIL, COLORADO Statement Statement Number: R090000641 Amount: $329.00 06/09/200910:53 AM Payment Method: Check Init: LC Notation: #12255/AST & MCFERRIN PLUMBING AND HEATING Permit No: M09 -0076 Type: MECHANICAL PERMIT Parcel No: 2099 - 182 - 2000 -5 Site Address: 5164 MAIN GORE DR SOUTH VAIL Location: Total Fees: $329.00 This Payment: $329.00 Total ALL Pmts: $329.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- MP 00100003111100 MECHANICAL PERMIT FEES 260.00 PF 00100003112300 PLAN CHECK FEES 65.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 Boiler/Furnace Applications MUST include: Mechanical Room Layout/Plan with Dimensions Combustion Air Duct Size and Location Flue or Vent Size ; Piping Plan (if applicable) ge' Heat Loss Calculations* r✓ Equipment Cut Sheets for Boiler /Furnace *Not required for same size (BTU) boiler replacement with no system changes, or snow melt Fireplace Applications MUST include: ❑ Equipment Cut Sheets for Fireplaces /Log Sets (Manufacturer's info showing make, model & approval listing) Project Street Address: Office Use- !!21 A&I'd 4✓�r /��_ Project #: Q (Number) (Street) (Suite #) �I Building Permit #: G V Building /Complex Name: M Mechanical Permit #: - Cc Contractor Information: Lot #: Block # Subdivision: Wo 1 Company 1 i 11, Detailed Description of Work: /,����jef� j Company Address- 00442 /Z City � 74 Stater v zip: "�_ Contact Name: ��A°``��� T�T�� I a —� W—. / g�/�� g/l S� -'?5��J2 �C nal'��� �dA�'(� (, Contact Phone: t (use ad tonal sheet if n cessary) E -Mail � 1 � - iC' �1)" ,r2�(.�s Gas Piping Included 1 Town of Vail Contra r Registration No.: ,/�' M Gas Piping by Others ❑ Wood to Gas Fireplace Conversion Boiler Location: Co tr for ignature (required) (requi qui Interior ()C) Exterior ( ) Other ( ) I Property Information Parcel #: ON hm ) Number of Existing Fireplaces: (For parcel #, contact agle County Assessors Office at 970 - 328 -8640 or Gas Appliances Gas Logs Wood /Pellet visit www.eaglecounty.us /patie) --- �,•M, Number of Proposed Fireplaces: Tenant Name: (Commercial Properties) Gas Appliances Gas Logs Wood /Pellet Owner Name:� rly 4,0 a ,/ Type of Building: Single- Family ?c) Duplex( ) Multi - Family ( ) Commercial( ) Complete Valuation for Mechanical Permit: Restaurant( )Other ( ) ? Mechanical $: !............_......._ . _----- ._..__...- - ....._......._. _. _. Date Received: E Q LS V CP J JUN o 2 2009 `O 0 - May -09 \ / A 11 • MECHANICAL PERMIT t w r La ki 2 0 Z ow IL OQ o z m I tic K1 s �I Q ti xu NZ O tt1 o tu Q LL; - + -- w lJ J V. t d Ott ..g � — . z m Q� O tL Vl = 00 IE C Fu- uW[E - JUN- 0 2 2009 TOWN OF VAIL Radiant Works 2002.08 Zone List 05 -31 -2009 Project Information Contact Information Project Name: KINNEY RESIDENCE Designed By: BRENT HETTTINGER Project Number: Project Quote: Company Name: GEORGE T SANDERS COMPANY Designed For: AST & MECFERIN P &H Phone Number: 970 - 468 -8254 0210 EWARDS VILLAGE BLVB #A025 D EEWARDS,CO 81632 Phone Number: 970 - 926 -5682 JUN 0 2 2009 Fax Number: Notes: TOWN OF VAIL Zone 1 (Slab Application) Room Specifications Room Name Primary Primary Banded Banded Heating Required Radiant Fluid [ Spacing Area Spacing Area Intensity Heat Capacity in [ [in] [ Btu /h ft [Btu/h] [Btu /h] FAMILY ROOM 12 213 - -- -- 17.3 3,692 6,508 Zone Specifications Supply Delta T GPM Head Radiant Product Tube No. of Fluid [ [ ° FJ [ft] Panel Type Length [ft] Circuits Load Btu /h 150 20 0.4 2.6 4,055 1/2" Onix 250 1 Pump Specs & Radiant Panel Load are calculated on the smaller of Required Heat or Radiant Capacity (+ back and edge losses) Zone 2 (Slab Application) Ro Specifications Room Name Primary Primary Banded Banded Heating Required Radiant Spacing Area Spacing Area Intensity Heat Capacity [in] [i [ft [ Btu /h ft [Btu /h] [Btu /h] ENTRY,BATH,SAU 12 170 - -- - -- 24.7 4,200 5,369 NA Zone Specifications Supply Delta T GPM Head Radiant Product Tube No. of Fluid [°F] [ °F] [ft] Panel Type Length [ft] Circuits Load [Btu /h] _ 150 20 0.6 3.0 5,016 1/2" Onix 200 1 Pump Specs & Radiant Panel Load are calculated on the smaller of Required Heat or Radiant Capacity (+ back and edge losses) Thermostat should be located in the room in which the radiant capacity is closest to the required heat. KINNEY RESIDENCICuoright(c) Watts Radiant Page 1 Radiant Works 2002.08 Zone List 05 -31 -2009 Project Totals Radiant System Pumping Specs: 1.0 GPM at 3.0 feet of head. (excluding Supply & Return piping.) Radiant System Boiler Load: 9071 Btu /h (excluding Supply & Return piping losses and Aux. Heat, if required) 450' of 1/2" Onix * Report not valid unless Assumption Report has been verified. KINNEY RESIDENCEnoright(c) Watts Radiant Page 2 Radiant Works 2002.08 Heat Loss Report 05 -31 -2009 Project Information Contact Information Project Name: KINNEY RESIDENCE Designed By: BRENT HETTTINGER Project Number: Project Quote: Company Name: GEORGE T SANDERS COMPANY Designed For: AST & MECFERIN P &H Phone Number: 970 - 468 -8254 0210 EWARDS VILLAGE BLVB Fax Number: 970 - 468 -8258 #A025 EEWARDS,CO 81632 Phone Number: 970 - 926 -5682 Fax Number: Notes: Zone 1 (Slab Application) Calculated Heat Loss for FAMILY ROOM �D- 70 F Indoor Description Units R -Value Heat Loss Btu /h Infil. Loss [Btu/hl Total Loss Btu /h Exposed Walls 50 ft 19 234 1 235 Windows 54.4 ft 1.61 2632 6 2638 Manual Infiltration 0.3 ACH 2 939 819 819 Totals 170 ft 30 2866 826 3692 Zone 2 (Slab Application) Calculated Heat Loss for ENTRY,BATH,SAUNA (a- 68 F Indoor Description Units R -Value Heat Loss [Btu /h] Infil. Loss [Btu /h] Total Loss [Btu /h] Exposed Walls 168 ft 19 768 2 770 Windows 16 ft 1.61 757 2 759 Doors 24 ft 2 939 8 947 Exposed Ceiling Area 170 ft 30 495 0 495 Exhaust Fans 1 9 9 Manual Infiltration 0.6 ACH 1220 1220 Totals 2959 1241 4200 Project Totals Total Heat Loss: 7892 Btu /h Total Back & Edge Loss: 1179 Btu /h Outside Air Temp : -20 F " Report not valid unless Assumption Report has been verified. KINNEY RESIDENCLeoright(c) Watts Radiant Page 1 aaaa aaaaa a N - c r ,�77J,TJ�i W� �7,b77xJ�J �f � z O C �3 [=i CrJ t=7 tli [ t Cr1 CrJ C�'1 t�J ^�o C � a a a a a a a a a a y d r r 'b r C � 00 J Q� V1 A W N ►+ ° � O � � O 5 w z > y ro d b Ci7 "� yCyC�Ck��X�y�OpOrrn � x�� C v1 y C z > > ° o > > d ° w o z r� v,r�zo,k� c o�y�'� a x z � 0 cn O C .r a y rA un N O N A N O O1 O N rA a 0 o n -3 u z cf o z z d b ul Qn N ° o W 0 0 � cn c O `� °A r. d C7 A c o � r W tj 0 O O tA �a �rob��y�r cdC W� odd'0 ZaY Qoayy.dar"a I j r r O 5 w "� x�� vz`i'UO�HR�"dp zc�o� x z r� a cn O a O N O N A N O O1 O N a 0 o z cf o W 0 0 � cn O A c o � O O s o � a 0 o o 0 0 0 0 0 0 o c o o c Cl v� O J 0 0 � a 0 N O 0 O O O p O 0 0 0 0 0 � a Vi O pr O � N O ►+ N 00 a N O r y O � z z �z n b O Cr1 C" y n r n C y 0 CrJ F"3 a) CD A W r z o a o z� tQ N) r o y r -� M O 00 O 0o w w Cs9 J O Cd r� y Go O y a `r7 O o C � � � v O x n O � � n o w � � N C y NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOWAO VA O' Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970 - 479 -2139 f. 970.479.2452 inspections. 970.479.2149 MECHANICAL PERMIT Permit #: M09 -0103 ASFR Project #: PRJ08 -0525 Job Address: 5164 MAIN GORE DR SOUTH VAIL Location.....: Parcel No...: 209918220005 OWNER KINNEY, ROL F. & VERONA D C/O S.P. KINNEY ENG INC 143 FIRST AVE CARNEGIE PA 15106 APPLICANT SKYLINE MECHANICAL P.O. BOX 1258 GYPSUM CO 81637 License: 121 -M CONTRACTOR SKYLINE MECHANICAL P.O. BOX 1258 GYPSUM CO 81637 License: 121 -M 07/08/2009 07/08/2009 Phone: 970-524-6809 07/08/2009 Phone: 970 - 524 -6809 Desciption: INSTALL EXHAUST FAN AND SUPPLY AIR TO MECHANICAL ROOM, CLOTHES DRYER VENTING Valuation: $1,000.00 Status ...: ISSUED Applied..: 07/08/2009 Issued. .. 07/09/2009 Expires. .: 01/05/2010 SUMMARY# ii* ii* i** ii**********# ii********#***###****#####***i# * # *** # * * # # # # * * # * * * # * # * * #i # # * * i Mechanical Permit Fee --- > $20.00 Will Call ------------ > $4.00 Total Calculated Fees --- > $29.00 Plan Check ------------------- > $5.00 Use Tax Fee ------ > $0.00 Additional Fees------ - - - - -> $0.00 Investigation------------ - - - - -> $0.00 TOTAL PERMIT FEE --- > $29.00 Total Calculated Fees - -> $29.00 Payments------------ - - - - -> $29.00 BALANCE DUE --------- > $0.00 APPROVALS Item: 05100 BUILDING DEPARTMENT 07/08/2009 JLE Action: AP CONDITION OF APPROVAL Cond:12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPE TIO SH BE MADE TW TY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0( AM - 4 PM. Signature 71 Date mechcan ical_permit_041908 Jul 08 2009 7:59nM HP LRSERJET FAX om Layout drawn to scale to inc lude: P.1 Mechanical Room Dimensions Combustion Air Duct Size and Location Flue, Vent and Gas Line Size and Location _ Heat Loss Calculations Equipment Cut f Spec Sheets Project Address Proved Building Permit #: ri(J"I -00 Contractor Information "t � A a� Q ®5 t Mechanical Permit #: I Company : �C!! p y '� p� �,A 0 � 7 �, Detailed Description of Work' (j r ,� (.Y aC Com an Address: © City: Cs-) Su At Slate Zip 14 , t� / jt. e /l &9_ a F A-y Y-0 Contact Name: ` L� / S /.ci re IX /c r C> Contact Ph' J �- b X09 Cell 7 U T2 1, ' / L E -Mail: J / s Sky tkle (KPC /M f_" r n Use i• if add onal sheet necessary) T o wn of Vail Contractor Reglstrati No: f�{'1 Complete Va luation for Mechanical Permit: " ' ! I l [°��c (�Let A a _ _ Mechanical $ l o o O, �-- - P Contractor Signature (required) Property Information Work Class: Parcel #: Qom New () Addition ( ) Remodel ) Repair ( ) Other ( j Legal Description: Lot # Blk # Q X73 Boiler Location: V Subdivision: i ZA lC_ t/t e--,4 ,/ c, Interior ( ) Exterior { ) Other ( ) No /Type Existing Fireplaces: Job Name: _ / (o 5! r7/t. /-t/ Gas Appliances( ) Gas Logs ( ) Wood/Pellet ( ) Owner Name: (mot /�( /�� , c [te ar 4 K ye 2o .t , Jq NofType Proposed Fireplaces: Mailing Address:/! F/AS`'f,,'-' 4V Gas Appliances( ) Gas Logs ( ) WoodlPellet ( ) I (For Parcel #Contact Eagle County assessors Office a 970 328 - 8840 cr visit www.eaglecounty.us /patie) 0 /s/.0 Building Type: ..__ . . _ Architect Desig () g () F�gineer ( ) Single- Family ( Two - Family ( ) Multi-Family( ) Commercial( ) Townhome ( ) Other( ) Name: Phone. Date Received: Fax: E -Mail: 42-q, 0 l_V' E H a I TOWN OF VAIL I VVVN Ur VAIL Mtc HANICAL PERMIT APPLICATION The following Items MUST be attached to this permit application TOWN OF VAIL, COLORADO Statement Statement Number: R090000817 Amount: $29.00 07/09/200901:19 PM Payment Method: Check Init: JLE Notation: 15510 SKYLINE MECH Permit No: M09 -0103 Type: MECHANICAL PERMIT Parcel No: 2099 - 182 - 2000 -5 Site Address: 5164 MAIN GORE DR SOUTH VAIL Location: Total Fees: $29.00 This Payment: $29.00 Total ALL Pmts: $29.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- MP 00100003111100 MECHANICAL PERMIT FEES 20.00 PF 00100003112300 PLAN CHECK FEES 5.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MAOVE Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149 PLUMBING PERMIT Permit #: P09 -0048 ASFR Project #: PRJ08 -0525 Job Address: 5164 MAIN GORE DR SOUTH VAIL Status ...: ISSUED Location.....: Applied ..: 06/02/2009 Parcel No...: 209918220005 Issued . .: 06/09/2009 Expires . .: 12/06/2009 OWNER KINNEY, ROL F. & VERONA D. 06/02/2009 C/O S.P. KINNEY ENG INC 143 FIRST AVE CARNEGIE PA 15106 APPLICANT AST & MCFERRIN PLUMBING & HE 06/02/2009 Phone: 970 - 926 -5862 P.O. BOX 1303 EDWARDS CO 81632 License: 202 -P CONTRACTOR AST & MCFERRIN PLUMBING & HE 06/02/2009 Phone: 970 - 926 -5862 P.O. BOX 1303 EDWARDS CO 81632 License: 202 -P Desciption: PLUMBING FOR REMODEL AND ADDITION INCLUDING GAS PIPING FOR NEW BOILER Valuation: $5,000.00 ...... ............................ .................x............. FEE SUMMARY ........>............,...,............ ........�...........,, :........ Plumbing Permit Fee --- > $75.00 Will Call ------------------ > $4.00 Total Calculated Fees --- > $97.75 Plan Check ---------------- > $18.75 Use Tax Fee ------------ > $0.00 Additional Fees ------------ > $0.00 Investigation--------- - - - - -> $0.00 TOTAL PERMIT FEES - -> $97.75 Total Calculated Fees - -> $97.75 Payments ------------------- > $97.75 BALANCE DUE------ - - - - -> $0.00 APPROVALS Item: 05100 BUILDING DEPARTMENT 06/02/2009 JLE Action: AP CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 1X1�tV�_��N7.6? hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0( AM - 4 PM. Signature of Owner or Contractor Print Name Date plmbpermt1_041908 TOWN OF VAIL, COLORADO Statement Statement Number: R090000642 Amount: $97.75 06/09/200910:54 AM Payment Method: Check Init: LC Notation: #12255/AST & MCFERRIN PLUMBING AND HEATING ----------------------------------------------------------------------------- Permit No: P09 -0048 Type: PLUMBING PERMIT Parcel No: 2099 - 182 - 2000 -5 Site Address: 5164 MAIN GORE DR SOUTH VAIL Location: Total Fees: $97.75 This Payment: $97.75 Total ALL Pmts: $97.75 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- PF 00100003112300 PLAN CHECK FEES 18.75 PP 00100003111100 PLUMBING PERMIT FEES 75.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 V n PLUMBING PERMIT Project Street Address: ;?4 1 6 e= - - - I /_ OF 17a^� � (Number) (Street) (Suite #) Building /Complex Name: Contractor Information: Company: - / " , , � f7 !l // �� ✓/ `e Company Address: (j 9y yr� U City: &M&4& State Zip: Contact Name: �/w l ,t- Contact Phone: A21 !?a L _��X E -Mail � rY / � { � / I J L�J�,� Town of Vail Contractor Registration No.: ? ' Z , �i' F X Co tr cto Signature (required) Property Information d, Parcel #: ZD9'9 /92 (For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or visit www.eaglecounty.us /patie) Tenant Name: Owner Name: V Ali ✓I /h -' Complete Valuation for Plumbing Plumbing $: I vs Office Use: 17 Project #: Building Permit #: r Plumbing Permit #: �f 1 `t S --� �__ -- -- rr Lot #: L! Block # Subdivision: uQ,l I 7'` iled Description of Work: i (use additional sheet if necessary) Work Class: New ( ) Addition ( ) Remodel �tj Repair ( ) Other ( ) Type of Building: Single - Family J 0 Duplex( ) Multi - Family ( ) Commercial ( ) Restaurant( ) Other( ) Date Received: JUN n 2 2009 TOWN OF VAIL 29- May -09 11 -23 -2009 Inspection Request Reporting Wage 7 4:50 pm Vail, CO - Cit-V Of AIP /D Informal Act "vity: Const Type: Owner: Contractor: Description: Requested Inspect Date: Tuesday, November 24, 2009 Inspection Area: JRM Slte Address: 5164 MAIN GORE DR SOUTH VAIL 5164 MAIN GORE DRIVE ion 609 -0030 Type: A -BUILD Occupancy: KINNEY, ROL F, & VERONA D, BETTER HOME IMPROVERS INTERIOR & EXTERIOR REMODEL r,tion s 534 PLAN -FINAL C/O BETTER HOME IMPROVERS 390 -6899 BGIBSON Time Exp: Requested Inspe Item: Requester: Comments: Assigned To: Action: Item: 90 BLDG-Final Requester: BETTER HOME IMPROVERS Comments: 390 -6899 Assigned To: C t I Action: 2 [ �lr Time Exp: Inspection HistorY Item: 10 BLDG - FOOTING ** Approved — 06/02/09 Inspector: . JRM Comment: 08/03/09 Inspector: JRM Comment: Item: 20 BLDG Foundation /Steel ** Approved ** 06 /05/09 Inspector: MH Comment: Obtain an approved ILC Item: 30 BLDG - Framing ** Approved *" 07128/09 Inspector. JRM Comment: FRAMING APPROVED Item: 50 BLDG - Insulation **A proved ** 08103/09 Inspector: JRM Comment: Item: 60 BLDG- Sheetrock Nail "* Approved ** 08/06/09 Inspector: JRM Comment: Item: 70 BLDG -Misc. Item; 533 PLAN -TEMP, C/O Item: 535 DIA - 30 DAY REMINDER Item: 536 DIA - SITE= /LANDSCAPING Item: 534 PLAN -FINAL C/O Item: 90 BLDG -Final REPT131 Sub Type; OSFR Use: B Phone: 970- 476 -4712 Requested Time: Phone: Entered By: Requested Time: Phone: Entered By: Status: ISSUE Insp Area: JRM 08:00 AM 970 - 476 -4712 -or- 3 6- 5994 JM ONDRA 00 K 10:00 AM 970- 476 -4712 -or- 376 - 5994 JMONDRAGON K Action: AP APPROVED Action: AP APPROVED Action: APCR APRROVED /CORRECTION REOD Action: AP APPROVED Action: AP APPROVED Action: AP APPROVED Run Id: 10670 I 10 -07 -2009 Inspection Request Re orting Page 25 4:21 pm Vail_ CO - City Of Requested Inspect Date: Thursday, October 08, 2009 Inspection Area: JRM Site Address: 5164 MAIN GORE DR SOUTH VAIL A /P /D Information Activity: M09 -0103 Type: B -MECH Sub Type: ASFR Status: ISSUED Const Type: Occupancy: Use: Insp Area: JRM Owner: KINNEY, ROL F. & VERONA D. Contractor: SKYLINE MECHANICAL Phone: 970 - 524 -6809 Description: INSTALL EXHAUST FAN AND SUPPLY AIR TO MECHANICAL ROOM, CLOTHES DRYER VENTING Requested Inspections Item: 390 MECH -Final Requested Time: 11:00 AM Requestor: SKYLINE MECHANICAL Phone: 970 - 524 -6809 Comments: we 524 -6809 Assigned To: CAR Entered By: JMONDRAGON K Action: ' j 6 � `— Time Ex p 3 AvN Inspection Histo Item: 200 MECH -Rough ** Approved ** 07/24/09 Inspector: shahn Action: AP APPROVED Comment: Item: 330 MECH - Supply Air Item: 340 MECH -Misc. Item: 390 MECH -Final REPT131 Run Id: 10438 10 -07 -2009 Inspection Request Reporting Page 28 4:21 pm Vail, CO - City Of Requested Inspect Date: Thursday, October 08, 2009 Inspection Area: JRM Site Address: 5164 MAIN GORE DR SOUTH VAIL A /P /D Information Activity: P09 -0048 Type: B -PLMB Sub Type: ASFR Status: ISSUED Const Type: Occupancy: Use: Insp Area: JRM Owner: KINNEY, ROL F. & VERONA D. Contractor: AST & MCFERRIN PLUMBING & HEATING Phone: 970 - 926 -5862 Description: PLUMBING FOR REMODEL AND ADDITION INCLUDING GAS PIPING FOR NEW BOILER Requested Insnectionls Item: 290 PLMB -Final Requested Time: 11:00 AM Requestor: I NS C T & MCFERRIN PLUMBING & HEATING, Phone: 970 - 926 -5862 Comments: we 904 -5402 Assigned To: JM NDRAGON Entered By: JMONDRAGON K Action: Time Exp: ial; Inspection Histo Item: 210 PLMB - Underground ** Approved ** 06/19/09 Inspector: JRM Action: AP APPROVED Comment: FLOW and 10 FT HEAD Item: 220 PLMB -Rou h /D.W.V. ** Approved ** 07/22/09 Inspector: JRM Action: AP APPROVED Comment: Item: 230 PLMB- Rough/Water ** Approved ** 07/22/09 Inspector: JRM Action: AP APPROVED Comment: Item: 240 PLMB -Gas Piping ** Approved ** 07/22/09 Inspector: JRM Action: AP APPROVED Comment: Item: 250 PLMB -Pool /Hot Tub Item: 260 PLMB -Misc. Item: 290 PLMB -Final REPT131 Run Id: 10438 M09 -0076 : Entries for Item:39O - MECH -Final 08:34 01/23/2013 Action Comments By Date Unique_ Key CR 1) PAINT PVC BOILER VENT ON ROOF 09 10/08/2009 A000128 403 AP BW 11/24/2009 A000132 043 Total Rows: 2 Page 1