HomeMy WebLinkAbout2024-06-18 Agenda and Supporting Documentation Town Council Afternoon Meeting1.Call to Order
2.Presentation/Discussion
2.1 US Forest Service Update 30 min.
Listen to presentation.
Presenter(s): Leanne Veldhuis, District Ranger US Forest
Service
Background: Implementation update as well as an update on
the Booth Creek Fuels Reduction Project, Camp Hale
Monument Management planning, and the Front Country
Ranger Program.
2.2 Alternative Design of Lot 10, 281 Meadow Drive
Discussion
30 min.
Listen to presentation and provide feedback.
Presenter(s): Todd Oppenheimer, Capital Projects Manager,
and Matt Gennett, Director of Community Development
Background: The purpose of this agenda item is to discuss the
alternative design concepts and the future development of the
Lot 10 Pocket Park, located at 281 West Meadow Drive.
2.3 Replacement Ice Alternatives Update 20 min.
Listen to presentation and provide feedback.
Presenter(s): Russell Forrest, Town Manager
Background: The purpose of this discussion is to confirm that
the Town would like to contribute funding to a replacement ice
sheet and to proved feedback on a preferred option for
location and creating an alternative sheet of ice.
VAIL TOWN COUNCIL MEETING
Afternoon Session Agenda
The Grand View, 395 S. Frontage Road W. Vail, CO 81657
and virtually by Zoom: https://vail.zoom.us/webinar/register/WN_mdXQQ2XCSpWBlmKZMAgcKA
2:30 PM, June 18, 2024
Notes:
Times of items are approximate, subject to change, and cannot be relied upon to determine what time
Council will consider an item.
2023 Front Country End of Season Report
2023 Front Country End of Season Report_TOV.pdf
Lot 10 Alternatives TC Memo 6-18-24
Town Council Lot 10 Alternatives 6.18.24
Dobson Replacement Ice Memo 2024-06-18
Alternative Ice Sheets in the Valley 2024-06-18
Ice Bubble Alternatives 2024-06-18
1
3.DRB/PEC (5 min.)
3.1 DRB/PEC Update
4.Information Update
4.1 Vail Bighorn Initiative Update
5.Matters from Mayor, Council, Town Manager and Committee Reports (20 min.)
5.1 Town Manager Report
5.2 Council Matters and Status Update
6.Executive Session (90 min.)
Executive Session pursuant to:
1.C.R.S. §24-6-402(4)(a) - to consider the purchase, acquisition, lease, transfer or sale of any
real, personal or other property interest, C.R.S. §24-6-402(4)(b) to hold a conference with the
Town Attorney, to receive legal advice on specific legal questions, and §24-6-402(4)(e) to
determine positions relative to matters that may be subject to negotiations, develop a strategy
for negotiations and instruct negotiators and on the topics of: 1. Potential real property
acquisitions by the Town; 2. The redevelopment of the East side of the Timber Ridge
Apartments; and 3. The development of the West Middle Creek housing project.
7.Recess 5:45pm (estimate)
DRB Results 6-05-24
PEC Results 6-10-24
Memo to Town Council - Update Vail Bighorn Initiative .pdf
TM Update 2024-06-18
2024-06-18 Matters
Meeting agendas and materials can be accessed prior to meeting day on the Town of Vail website
www.vailgov.com. All town council meetings will be streamed live by High Five Access Media and
available for public viewing as the meeting is happening. The meeting videos are also posted to High
Five Access Media website the week following meeting day, www.highfivemedia.org.
Please call 970-479-2136 for additional information. Sign language interpretation is available upon
request with 48 hour notification dial 711.
2
AGENDA ITEM NO. 2.1
Item Cover Page
DATE:June 18, 2024
TIME:30 min.
SUBMITTED BY:Kristen Bertuglia, Environmental Sustainability
ITEM TYPE:Presentation/Discussion
AGENDA SECTION:Presentation/Discussion
SUBJECT:US Forest Service Update
SUGGESTED ACTION:Listen to presentation.
PRESENTER(S):Leanne Veldhuis, District Ranger US Forest Service
VAIL TOWN COUNCIL AGENDA ITEM REPORT
ATTACHMENTS:
2023 Front Country End of Season Report
2023 Front Country End of Season Report_TOV.pdf
3
2023 FRONT COUNTRY
RANGER PROGRAM
Eagle-Holy Cross Ranger District
White River National Forest
4
2023 CREW
Forest Service
Employees
•Mae Watson
•Nadia Albaiz
•Jerry Olp
•Mike Cancelliere
Partner Employees
•Ember Penas (RMYC)
•Lucy Blair (RMYC)
•Hunter Davis (RMYC)
•Lauren Murray (RMYC)
•Ashton Mowrey (Walking
Mountains)5
FIRE PREVENTION AND EDUCATION
2
7
3
1
1
2
4
1
0 1 2 3 4 5 6 7 8
Homestake
Red Sandstone
Muddy Pass
Tigiwon
Coffee Pot
Deep Lake
Yeoman
Fulford
Unattended/Abandoned Campfires
6
Opportunity for New Fire Restriction Signage
Permanent, modern, user friendly and bi-lingual
Hinged
7
DISPERSED SITE MANAGEMENT
•262 dispersed sites
visited
•1,971 public contacts
•208 educational
contacts and
warnings
•121 fire rings
dismantled
No Camping within 100’ of water
Coffee Pot Road Dispersed Site
8
DISPERSED PATROLS BY AREA
0
2
4
6
8
10
12 87 total dispersed
patrols
9
DISPERSED CONTACTS BY ZONE North of Vail
East Vail Trails
Red Sandstone/Muddy Pass
Berry to June Creek
Piney Designated Dispersed Sites
Highway 24
Camp Hale
Tigiwon Road
Minturn Trailheads
Two Elk Shooting Range
No Name
Klettergarden
Homestake
Shrine Pass/Lime Creek
Down Valley
Edwards THs
Coffee Pot
Hardscrabble
Gypsum Creek
Hat Creek Nolan/Fulford/Yeoman
1,971 total contacts
22% Down Valley
61% North of
Vail
17% Highway 24
10
TRASH REMOVAL BY ZONE
North of Vail
East Vail Trails
Red Sandstone/Muddy Pass
Berry to June Creek
Piney Designated Dispersed Sites
Highway 24
Camp Hale
Tigiwon Road
Minturn Trailheads
Two Elk Shooting Range
No Name
Klettergarden
Homestake
Shrine Pass/Lime Creek
Down Valley
Edwards THs
Coffee Pot
Hardscrabble
Gypsum Creek
Hat Creek Nolan/Fulford/Yeoman
26% Downvalley
907.5 lbs
52% North of Vail
1795.5 lbs
22% Highway 24
772 lbs
11
DISPERSED AREA TRASH REMOVAL
•3,475 lbs of trash removed
•8 incidents of abandoned
property
12
HUMAN WASTE
•103 incidents of
human waste mitigated
•20 toilets removed
•42 dog poop bags
re moved
13
MUDDY PASS
•38% of garbage from dispersed areas
•26% of incidents of human waste from dispersed areas
•40% of toilets removed from dispersed areas
•Continuing issues with residential users
14
CAMP HALE NATIONAL
MONUMENT
15
DISPERSED MANAGEMENT TO COME IN 2024
Piney Designated Dispersed Campsites
•National Forest Foundation Ski
Conservation Fund Grant
•Replace 1 mile of failing split rail
fence and replace with boulders
•New signage
Replace vandalized or failing
signage
16
Inventorying climbing areas
DISPERSED MANAGEMENT TO COME IN 2024
Dispersed site too close to water along FSR 414 Powerline Rd
Close and rehabilitate dispersed sites too close to
water 17
•5,921 lbs of trash
removed
•CXTs cleaned 346
times
•219 fire rings cleaned
•171 bear boxes
cleaned
•42 incidences of dog
waste
•12 incidences of
human waste
DEVELOPED SITE MANAGEMENT
18
DEVELOPED SITE CONTACTS
•90 developed patrol
days
•1,305 contacts
•98 educational
contacts and warnings
0 50 100 150 200 250 300 350 400 450
Deep
Lake
Fulford
Holy
Cross
Loop
Two Elk
Target
Range
Yeoman
19
CAMPGROUND INFRASTRUCTURE REPLACEMENT
•Yeoman Park, Fulford Cave, and Deep Lake CGs and Deep Lake Day Use Area
•66 picnic tables
•12 fire rings
20
21
TIGIWON COMMUNITY HOUSE
•Replaced failing parking
area fence with boulders
•Installed new site sign
•Graveled vault toilet
pathway
22
DEVELOPED WORK FOR 2024
•Designate dispersed campsites in the Homestake drainage
•Two Elk TH Fence Replacement
•Replace Vault Toilet Seats
•Maintenance on Piney Guard Station windows and furniture
Several dispersed campsite along
FSR 703, Homestake, are heavily
compacted with no riparian
vegetation to support a healthy
watershed.
Bear Claw Marks
23
ROCKY
MOUNTAIN
YOUTH CORPS
•Hosted 5 weeks of
RMYC
•Ages- 14 – 28
•1,760 hours of youth
involvement in public
lands
24
Front
Country
Ranger
Program
Colorado
Springs
Utilities
$25,000
National
Forest
Foundation
$22,500
Forest Service
$55,000
Great
American
Outdoors Act
$150,000
Eagle County
$120,000
SUPPORTING PARTNERS
25
THANK YOU FOR
YOUR CONTINUED
PARTNERSHIP!
26
2023 FRONT COUNTRY
RANGER PROGRAM
Eagle-Holy Cross Ranger District
White River National Forest
27
2023 CREW
Forest Service
Employees
•Mae Watson
•Nadia Albaiz
•Jerry Olp
•Mike Cancelliere
Partner Employees
•Ember Penas (RMYC)
•Lucy Blair (RMYC)
•Hunter Davis (RMYC)
•Lauren Murray (RMYC)
•Ashton Mowrey (Walking
Mountains)28
FIRE PREVENTION AND EDUCATION
2
7
3
1
1
2
4
1
0 1 2 3 4 5 6 7 8
Homestake
Red Sandstone
Muddy Pass
Tigiwon
Coffee Pot
Deep Lake
Yeoman
Fulford
Unattended/Abandoned Campfires
29
DISPERSED SITE MANAGEMENT
•262 dispersed sites
visited
•1,971 public contacts
•208 educational
contacts and
warnings
•121 fire rings
dismantled
No Camping within 100’ of water
Coffee Pot Road Dispersed Site
30
DISPERSED PATROLS BY AREA
0
2
4
6
8
10
12 87 total dispersed
patrols
31
DISPERSED CONTACTS BY ZONE North of Vail
East Vail Trails
Red Sandstone/Muddy Pass
Berry to June Creek
Piney Designated Dispersed Sites
Highway 24
Camp Hale
Tigiwon Road
Minturn Trailheads
Two Elk Shooting Range
No Name
Klettergarden
Homestake
Shrine Pass/Lime Creek
Down Valley
Edwards THs
Coffee Pot
Hardscrabble
Gypsum Creek
Hat Creek Nolan/Fulford/Yeoman
1,971 total contacts
22% Down Valley
61% North of
Vail
17% Highway 24
32
TRASH REMOVAL BY ZONE
North of Vail
East Vail Trails
Red Sandstone/Muddy Pass
Berry to June Creek
Piney Designated Dispersed Sites
Highway 24
Camp Hale
Tigiwon Road
Minturn Trailheads
Two Elk Shooting Range
No Name
Klettergarden
Homestake
Shrine Pass/Lime Creek
Down Valley
Edwards THs
Coffee Pot
Hardscrabble
Gypsum Creek
Hat Creek Nolan/Fulford/Yeoman
26% Downvalley
907.5 lbs
52% North of Vail
1795.5 lbs
22% Highway 24
772 lbs
33
DISPERSED AREA TRASH REMOVAL
•3,475 lbs of trash removed
•8 incidents of abandoned
property
34
HUMAN WASTE
•103 incidents of
human waste mitigated
•20 toilets removed
•42 dog poop bags
removed
35
MUDDY PASS
•38% of garbage from dispersed areas
•26% of incidents of human waste from dispersed areas
•40% of toilets removed from dispersed areas
•Continuing issues with residential users
36
CAMP HALE NATIONAL
MONUMENT
37
DISPERSED MANAGEMENT TO COME IN 2024
Piney Designated Dispersed Campsites
•National Forest Foundation Ski
Conservation Fund Grant
•Replace 1 mile of failing split rail
fence and replace with boulders
•New signage
Replace vandalized or failing
signage
38
Inventorying climbing areas
DISPERSED MANAGEMENT TO COME IN 2024
Dispersed site too close to water along FSR 414 Powerline Rd
Close and rehabilitate dispersed sites too close to
water 39
•5,921 lbs of trash
removed
•CXTs cleaned 346
times
•219 fire rings cleaned
•171 bear boxes
cleaned
•42 incidences of dog
waste
•12 incidences of
human waste
DEVELOPED SITE MANAGEMENT
40
TIGIWON COMMUNITY HOUSE
•Replaced failing parking
area fence with boulders
•Installed new site sign
•Graveled vault toilet
pathway
41
DEVELOPED WORK FOR 2024
•Designate dispersed campsites in the Homestake drainage
•Two Elk TH Fence Replacement
•Replace Vault Toilet Seats
•Maintenance on Piney Guard Station windows and furniture
Several dispersed campsite along
FSR 703, Homestake, are heavily
compacted with no riparian
vegetation to support a healthy
watershed.
Bear Claw Marks
42
ROCKY
MOUNTAIN
YOUTH CORPS
•Hosted 5 weeks of
RMYC
•Ages- 14 – 28
•1,760 hours of youth
involvement in public
lands
43
Front
Country
Ranger
Program
Colorado
Springs
Utilities
$25,000
National
Forest
Foundation
$22,500
Forest Service
$55,000
Great
American
Outdoors Act
$150,000
Eagle County
$120,000
SUPPORTING PARTNERS
44
THANK YOU FOR
YOUR CONTINUED
PARTNERSHIP!
45
AGENDA ITEM NO. 2.2
Item Cover Page
DATE:June 18, 2024
TIME:30 min.
SUBMITTED BY:Steph Johnson, Community Development
ITEM TYPE:Presentation/Discussion
AGENDA SECTION:Presentation/Discussion
SUBJECT:Alternative Design of Lot 10, 281 Meadow Drive Discussion
SUGGESTED ACTION:Listen to presentation and provide feedback.
PRESENTER(S):Todd Oppenheimer, Capital Projects Manager, and Matt Gennett,
Director of Community Development
VAIL TOWN COUNCIL AGENDA ITEM REPORT
ATTACHMENTS:
Lot 10 Alternatives TC Memo 6-18-24
Town Council Lot 10 Alternatives 6.18.24
46
To: Vail Town Council
From: Department of Public Works
Date: June 18, 2024
Subject: Alternative Concepts for Lot 10, 281 West Meadow Drive
I. SUMMARY
The purpose of this agenda item is to discuss the alternative design concepts for the
future development of the Lot 10 Pocket Park, 281 West Meadow Drive. Staff will
present 2 alternative design concepts for the Town Council consideration. The selected
concept will inform the final design of the Evergreen Lodge Redevelopment allowing that
project to move forward to review by the Design Review Board (DRB). Lot 10 is in the
GU Zone District and will require a Planning and Environmental Commission (PEC)
Conditional Use Permit as well as DRB approval. The park, however, will likely not be
developed for another 3 to 5 years pending completion of the Evergreen Redevelopment,
renovations to the Dobson Arena, and availability of funding.
The primary consideration in the selection of an alternative design is the degree of
influence the completed Evergreen may have on the park versus the independence the
park design may have from the Evergreen.
II. BACKGROUND
Lot 10 is a Town-owned parcel located on West Meadow Drive between Vail Health and
Dobson Arena. It is a small parcel at less than 0.5 acres in size and is currently
developed as a parking lot utilized by the Vail Library staff and patrons requiring
accessible parking. The parcel is included within the Civic Area Master Plan study area.
The master plan recommendations include the following items.
• Involving the community and neighboring property owners in the design of the
park.
• Coordinating with the Evergreen Lodge redevelopment and,
• Identifying alternate accessible parking for the Library and Library staff.
The Lot 10 parcel is bisected by the West Meadow Drive bus route. The current planning
and design include the northern portion of the parcel. The southern parcel includes a
green space and the start of the detached portion of the Gore Valley Trail in this area.
The Transportation Master Plan, in process, may suggest modifications to the trail
alignment at a later date. Renovations to the Dobson Arena may include modifications to
the bus lanes/plaza area but are not expected to affect West Meadow Drive adjacent to
47
Town of Vail Page 2
Lot 10. A limited number of signed parking spaces for the Library staff will be designated
at the east end of the Lionshead Parking Structure. There is space near the entrance to
the Library for 2 accessible parking spaces.
III. PUBLIC INPUT
As recommended in the Civic Area Master Plan, staff reached out to the community
through an Engage Vail webpage and a letter to all property owners along West Meadow
Drive and East Lionshead Circle. Representatives from Vail Health, Dobson Arena and
the Evergreen were also consulted regarding possible features of the park design. The
Engage Vail webpage was left open to receive comments for approximately 2 months. It
is evident that the Lot 10 project is currently not a concern to many people. The Engage
Vail webpage and the personal letter only generated a total of 5 responses.
Following is a summary of the comments received. The written comments are attached
to this memorandum.
• Gore Valley Trail connection to W Meadow Dr. is dangerous.
• Include public art, seating, and landscaping.
• Highlight proximity to the hospital and Dobson.
• A healing Garden or “Hall of Fame” would be special.
• Gathering space between Vail Village and Lionshead.
• Size of the Evergreen is inappropriate.
• Honor the Steinbergs.
• Include food trucks and a screen for “movie night”.
• Keep the healing garden public.
These comments were taken into consideration when developing the alternatives. Final
design that will occur closer to development of the park may generate additional public
interest.
IV. EVERGREEN LODGE REDEVELOPMENT
The Evergreen Lodge occupies the property to the north of Lot 10. The redevelopment of
the Evergreen Lodge will be one of the most significant redevelopment projects to occur
in several years. Currently, the lodge has limited exposure from West Meadow Drive and
is primarily oriented to the South Frontage Road. The planned redevelopment will
increase the presence of the building on West Meadow Drive as well as the South
Frontage Road where the vehicular access occurs. The Evergreen Lodge holds a
pedestrian access easement across Lot 10 to West Meadow Drive.
Redevelopment Plans include a public pedestrian corridor between the South Frontage
Road and West Meadow Drive. The corridor consists of a 6 foot (minimum) heated
concrete walkway and stairways which follows a circuitous and canyon-like route
between the Lodge and Vail Health passing through the Lodge’s landscape plaza before
arriving at the south property line approximately 20 feet above Lot 10 and West Meadow
48
Town of Vail Page 3
Drive. Navigating the 20-foot elevation difference is an important consideration for the
Evergreen and the design of Lot 10.
The public pedestrian corridor provides some level of public benefit as a means of access
between West Meadow Dive, the Library and Dobson Arena and the South Frontage
Road near the Municipal Building and main entrance to Vail Health. The
owner/developer of the Evergreen Lodge has indicated that the public will be allowed
access through the lobby area and the landscape plaza amenity area. The level of public
benefit this may provide will depend on how the lobby area and landscape plaza are
activated to be attractive to those who are in the vicinity. This activation and the level of
financial participation by the owner/developer will also influence the design of Lot 10.
The 2 alternative concepts to be presented will illustrate possible solutions to create
access for the 20-foot elevation difference.
V. VAIL HEALTH AND THE HEALING GARDEN
Hospitals and rehabilitation centers have come to realize the health and wellness benefits
of healing gardens for their patients and staff. The proximity of Lot 10 to the Vail Health
facility makes it feasible to dedicate a portion of the property to this beneficial use.
Currently, outdoor space where patients, staff, and the public can interact with the
soothing effects of nature is limited within the facility. Vail Health is supportive of the idea
of a healing garden but has not committed funding or included the costs in a capital
campaign at this time.
The 2 alternative concepts share the same conceptual design for a healing garden on the
east side of the property. This is the location where an accessible access route to the
nearby hospital entrance can be created. Every healing garden is different depending on
the site and the type of facility it serves. Healing gardens have several features that are
typically included in the design. These features include the following items.
• Gateway signifying entrance into a special space.
• Perimeter wall or enclosure to focus attention inward and block outside
distractions.
• Colorful and textured landscape.
• Private seating out of the flow of traffic.
• Water feature for soothing sounds and background noise.
A continued dialog with Vail Health will be necessary to continue to develop the concept
of a healing garden and the mechanism to fund it.
VI. ALTERNATE CONCEPTS FOR THE DESIGN OF LOT 10
The following 2 alternative concepts for the design of Lot 10 were selected out of several
possible concepts as the most feasible and constructible options. Both concepts share
some similar features based on suggestions included in the public comment and
discussions with the staff from the 3 primary adjacent properties, Vail Health, Dobson
49
Town of Vail Page 4
Arena, and Evergreen Lodge. These features can be easily mixed and matched between
the alternatives. Regardless of what alternative is selected as the preferred alternative
concept for the design of Lot 10 it will require considerable advanced design and
engineering before proceeding to the development of construction documents.
The bus lane on West Meadow Drive, sidewalk and alignment of the Gore Valley Trail
remains unchanged on both alternatives. The design concept for the Healing Garden, as
previously mentioned, is the same in both alternatives. Improvements to the Middle
Creek stream tract will be separate project from Lot 10.
PRELIMINARY DESIGN ALTERNATE 1
Preliminary Design Alternate 1 provides access to a ground level entrance to the
Evergreen Lodge and external stairway connecting to the Landscape Plaza and
pedestrian route to the South Frontage Road. The stairway depicted utilizes the stairway
in the current approval for the Evergreen Lodge however, at the request of the developer,
it has been moved south to be within the limits of Lot 10. It is important to note that
Alternate 1 and the stairway configuration function equally well on either side of the
property line. There is a benefit to the developer by placing the stairway on Town of Vail
property.
50
Town of Vail Page 5
In addition to the previously discussed Healing Garden, Alternate 1 includes an out-of-
the-way seating area with a landscape feature in the center; a more social seating area
with tables and chairs and a projection screen for “movie night”; and an area of turf grass
for additional lounging and play area.
PRELIMINARY DESIGN ALTERNATIVE 2
Preliminary Design Alternative 2 provides similar pedestrian access to the grade level
entrance to the Evergreen. The stairway to the Landscape Plaza is handled much
differently in this alternative. This alternative depicts a self-supported stairway structure
connecting the Landscape Plaza more directly with West Meadow Drive. The concept,
still benefiting the developer, uses the stairway as more of a feature of the park rather
than hidden in the architecture of the building. The plaza area, with tables and chairs
which are not depicted, can pass beneath the stair structure once it gains sufficient height
above the park. Dedicating the space for the stair structure in the park would suggest
that the lodge and Landscape plaza include sufficient public interest to draw people to
make the climb. The landscaped seating area in this concept includes a shade structure
over the benches.
VII. NEXT STEPS
The next steps for the Lot 10 development project will include discussions with the
developer of the Evergreen Lodge and Vail Health regarding possible financial
partnerships to fund the project. These discussions will inform the selection of a
51
Town of Vail Page 6
preferred concept for the design which can then be presented to the Design Review
Board, DRB, as a work session item to garner feedback. The feedback received may
allow the Evergreen Lodge to proceed through final entitlement review and approval. As
previously mentioned, final design, entitlement and construction of Lot 10 is not
anticipated for 3 to 5 years.
VIII. ACTION REQUESTED BY COUNCIL
Staff requests the Council review and provide comments on the 2 Alternatives and direct
staff to engage in negotiations with the developer of the Evergreen Lodge and Vail Health
regarding possible financial partnerships.
Attachments:
1. Power Point Presentation
52
PRESENTATION BY
TODD
OPPENHEIMER
ALTERNATIVE
CONCEPTS FOR
LOT 10, 281
MEADOW DRIVE
DESIGN
53
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com 54
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com
SITE PHOTOS – EXISTING PARKING LOT
55
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com
SITE PHOTO – GORE VALLEY TRAIL
56
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com
CIVIC AREA MASTER PLAN
57
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com
SUMMARY OF PUBLIC COMMENT
USES AND FEATURES?
•Realign Gore Valley Trail Bike Path
•Rest stop for walkers from Vail Village to Lionshead, Drinking Fountain
•Gathering place for youth hockey players
•Keep it simple and uncluttered
•A picnic table or tow
•Bright flower beds
•Evergreen trees to hide the building
•Bench to honor Tom and Flo Steinberg
•Food/Ice Cream/Sno-cone truck
•Loveseat swings
•Movie projection surface
•Benches
58
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com
SUMMARY OF PUBLIC COMMENT
ELEMENTS TO EXCLUDE?
•Public art
•Playground or kid structures (would detract from the respite of the Healing Garden)
•Access to the Evergreen
•Artwork, statues or fountains
•Picnic Tables
PARK NAME?
•Dr. Tom and Flo Steinberg
•Local’s Park
•Meadow Park
59
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com
EVERGREEN LODGE:
CURRENT PLAN WITH
PEC APPROVAL
ELEVATION
PLAN VIEW
60
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com 61
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com 62
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com
ALT 2 STAIRWAY:
CONCEPT DETAIL
63
LOT 10, 281 MEADOW DRIVE, ALTERNATIVES
Town of Vail | Lot 10 Alternatives| vailgov.com
HEALING GARDEN: TYPICAL COMPONENTS
64
Thank you
65
AGENDA ITEM NO. 2.3
Item Cover Page
DATE:June 18, 2024
TIME:20 min.
SUBMITTED BY:Stephanie Bibbens, Town Manager
ITEM TYPE:Presentation/Discussion
AGENDA SECTION:Presentation/Discussion
SUBJECT:Replacement Ice Alternatives Update
SUGGESTED ACTION:Listen to presentation and provide feedback.
PRESENTER(S):Russell Forrest, Town Manager
VAIL TOWN COUNCIL AGENDA ITEM REPORT
ATTACHMENTS:
Dobson Replacement Ice Memo 2024-06-18
Alternative Ice Sheets in the Valley 2024-06-18
Ice Bubble Alternatives 2024-06-18
66
1
TO: Vail Town Council
FROM: Russell Forrest, Town Manager
DATE: June 18, 2024
SUBJECT: Third Sheet of Ice
I. Introduction and Purpose
On June 4, 2024 the Vail Town Council gave direction to move forward with the recommended
redevelopment plan for the Dobson Ice Rink. Staff will provide regular updates and identify
decision milestones over the next year leading up to a construction start in the spring of 2025.
Based on the direction received on June 4th and the current project schedule for Dobson, the
facility would not be available for the 2025/2026 hockey and ice season. Tentatively, town staff
has discussed, with the Town Council, budgeting $1,000,000 for an alternative ice sheet in the
season(s) that ice programs would be unavailable at Dobson during its construction. The
purpose of this discussion is to 1) confirm that the Town would like to contribute funding to a
replacement ice sheet and 2) provide feedback on a preferred option for locating and creating
an alternative sheet of ice. It should be noted that further refinement in terms of design, capital
costs, operational costs, property owner approval, and entitlements need to be developed.
Another key consideration is whether the Town Council is interested in either contributing to
1) A one-year rental system for ice during the 25/26 winter season, or
2) A permanent third ice sheet that would create an ongoing opportunity to relocate ice
programs at Dobson when the facility is needed for events.
It should be noted that the $1,000,000 number has been a number the Town has carried in the
Dobson budget and does not correlate to a specific cost for an ice replacement solution. Also,
no commitments have been made regarding this number other than it being a budget place
holder within the Dobson project budget. It has been assumed that this would be leveraged with
other funds to create a third temporary or permanent sheet of ice in the valley.
II. BACKGROUND ON OPTIONS
Type of Structure
For the permanent options (A, B, & E) being considered a sprung structure is proposed. They can
be sized based on the need of the user. They can also be purchased or leased over a short-term
period of 12 to 36 months. Staff would propose utilizing more inexpensive shade structures
supported by a pole and cable system for options C. and D. If the ice facility was permanent a
67
2
concrete foundation with ice refrigeration would be installed and then a sprung structure placed
over the ice for sun protection. In the summer months the concrete surface could be used for
other recreational uses. With a rental facility, a temporary ice mat is laid down with a refrigeration
system that can be rolled up and returned at the end of a season. In any scenario site work is
required to make the site flat. This will destroy turf if a park site is used for this use.
Rental Options
Temporary ice rink systems can be rented and installed and taken down by a third party. A rental
system could be in Vail open space/park or potentially in the EagleVail park. With this type of a
system, a pole structure would be installed with cables that would support shade netting over the
ice. An ice/refrigeration mat would be placed under the netting. A one-year rental would only
provide a solution of displaced hockey and ice programs during the 25/26 season and would not
provide a solution moving forward when Dobson is completed and used for special events. Staff
would note that the rental scenario is over $1,000,000.
Also in this scenario, the Town is assuming the Vail Recreation District would operate the rental
ice facility and pay for that operation in the 25/26 season.
Specific options for rental systems are described below:
Option C: Option C would cost $1,850,000 for a shade structure and a rental ice system in a
Town of Vail park or open space such as the Vail Golf Course Driving Range. If a more enclosed
sprung structures is needed the cost would increase to $2.600,000 for a one-year rental. The
challenge with these locations is that for one season (25/26 season) the temporary facility would
need to be installed in late September/October to be operational by November. This would
impact users (golf and or soccer users at Donovan). Also, to make the site ready for a temporary
ice facility, it would need to be flattened with sand that would require both grading and
replacement of the grass in these locations. It would require approvals by both the Planning &
Environmental Commission and the Design Review Board. A consideration is that if the desired
location was the golf course, there would be competition for parking between ice users and Nordic
users. Also, this alternative would require restoring the impacted turf which could cost
approximately $700,000. The Town could also consider artificial turf which would have a similar
price but an ongoing savings in water.
Option D: Option D would include the same type of temporary rental structure that would be
installed in September/October of 2025 and removed in the spring of 2026 in the Eagle Vail Park.
This option would require approvals from the EagleVail Metro District and Eagle County. This
temporary facility would utilize bathrooms at EagleVail Pavilion. We may save on restoration in
this location in that the site is currently disturbed, but it would need to be revegetated.
For a rental system to be available for use in the 25/26 winter season an order would need to
occur by June 1, 2025.
68
3
Permanent/Seasonal Ice
Two options (A and B) would provide permanent seasonal ice. In this scenario the Town would
contribute up to $1,000,000 for a permanent sheet. The assumption for both options is that these
are sprung structures that are ordered and installed relatively quickly over a concrete foundation,
utilities, and ice system. The following is a description of the of each permanent seasonal Ice
option.
Option A: Eagle County has been planning to create a new indoor event venue/facility at the
Eagle County Fairgrounds. Per their capital planning, this was a project they are looking at
building in four to five years. The County has been in conversation with both Mountain Recreation
and Vail Recreation Districts about locating a permanent seasonal ice facility at the fairgrounds. In
option A the County would run and operate the event facility in the non-winter months. The VRD
would operate the facility in the 25/26 season and then the Mountain Recreation District would
continue to operate thereafter in the winter. Capital funding would come from the County ($3.5 -
$4 million), Mountain Recreation District ($1 million), and Town of Vail ($1 million) if this were the
preferred option. The total capital cost is estimated to be approximately $10 million to $11.2
million. The gap in funding currently is estimated to be $4-$5.2 million. The County is looking at
raising funds for sponsorship of the facility and it is recommended that a fund-raising campaign
occur with the ice. The advantage of option A is that the capital cost and operational cost is
spread between multiple entities. Staff would suggest that a contract would be necessary between
the County, Recreation Districts, and the Town to ensure that there is available ice time when
there are events at Dobson, ensure Mountain Recreation will operate two sheets of ice over time,
and to simply ensure adequate ice time for youth and adult ice programs. It is contemplated that
there would be bathrooms and potentially locker rooms in the sprung structure in option A. The
most significant concern with Option A is verifying this facility could be open for the 25/26 season.
The County is currently verifying a construction schedule and confirming costs.
Option B: This option contemplates the same type of sprung structure over an ice system to be in EagleVail
in the same location as option D. Cost for the structure again would be approximately $10-$11.2 million.
However, the only firm source of funding for this location is the Town’s $1 million leaving a gap of $9-$10
million. The EagleVail Metro District may have an interest in operating it on an ongoing basis after
the 25/26 season. This structure would require approvals from the EagleVail Metro District Board
and design review approval. It would also require approvals from Eagle County. A contract
would also be recommended between the Town and EagleVail Metro District to ensure adequate
ice time is made available. The price mentioned for Option B is the same as Option A. It could be
less if bathrooms and locker room space was eliminated.
Option E is acknowledged in that an ice sheet in a sprung structure has been proposed by a
developer at the east end of Chamber Street on an unincorporated parcel on the east side of
Eagle. Unless new information comes forward it does not appear this option could be available
for the 25/26 season.
69
4
III. ACTION REQUESTED
Staff is requesting general direction on which option to further develop. Strategically creating a
permanent seasonal ice sheet (Options A and B) has ongoing value to Vail in providing greater
flexibility to shift ice programs to a third sheet of ice in the Valley when Dobson is needed for an
event. Both the staffs of the Vail Recreation District and Mount Recreation District would recommend
option A in that it has several entities that are willing to fund the capital cost and the operational cost
can be split between summer and winter uses. As mentioned above, it would need to be verified
that this option could be delivered in time for a 25/26 season and the financial gap would need to be
filled. The County is willing to advance a design for this facility if the Town and other ice
stakeholders indicate this is a preferred option. If a permanent option could not be secured by June
1, 2025 the Town could pursue a rental solution for the 25/26 season.
Attachment A: Summary of Options and Costs
Attachment B: Site Plan of Options for rental ice options (For option A there is significant space at
the Fair Ground)
70
71
I 0 100 20050Feet This map was created by the Town of Vail GIS Team. Use of this map should be for general purposes only.The Town of Vail does not warrant the accuracy of the information contained herein.(where shown, parcel line w ork is approximate)
Last Modified: June 13, 2024
T e m p o r a r y I c e S u r f a c e L o c a t i o nTemporary I c e S u r f a c e L o c a t i o n
T O V G o l f C o u r s e (D r i v i n g R a n g e ) C o n c e p tTOV G o l f C o u r s e (D r i v i n g R a n g e ) C o n c e p t Subject Property
I c e R i n k D i m e n s i o n s : 2 0 0 ' x 8 5 '
R e d b o x a s s h o w n : 2 5 0 ' x 1 1 0 '
72
I 0 100 20050Feet This map was created by the Town of Vail GIS Team. Use of this map should be for general purposes only.The Town of Vail does not warrant the accuracy of the information contained herein.(where shown, parcel line w ork is approximate)
Last Modified: June 13, 2024
T e m p o r a r y I c e S u r f a c e L o c a t i o nTemporary I c e S u r f a c e L o c a t i o n
D o n o v a n P a r k C o n c e p tDonovan P a r k C o n c e p t Subject Property
Ice Rink Dimensions: 200' x 85'
Red box as shown: 250' x 110'
73
I 0 100 20050Feet This map was created by the Town of Vail GIS Team. Use of this map should be for general purposes only.The Town of Vail does not warrant the accuracy of the information contained herein.(where shown, parcel line w ork is approximate)
Last Modified: June 13, 2024
T e m p o r a r y I c e S u r f a c e L o c a t i o nTemporary I c e S u r f a c e L o c a t i o n
E a g l e -V a i l C o n c e p tEagle-V a i l C o n c e p t Subject Property
Ice Rink Dimensions: 200' x 85'
Red box as shown: 250' x 110'
Eagle-VailPavilion
Homestake PeakSchool Property
b
74
AGENDA ITEM NO. 3.1
Item Cover Page
DATE:June 18, 2024
SUBMITTED BY:Jamie Leaman-Miller, Community Development
ITEM TYPE:DRB/PEC Update
AGENDA SECTION:DRB/PEC (5 min.)
SUBJECT:DRB/PEC Update
SUGGESTED ACTION:
VAIL TOWN COUNCIL AGENDA ITEM REPORT
ATTACHMENTS:
DRB Results 6-05-24
PEC Results 6-10-24
75
Present:Kit Austin
Mary Egan
Roland Kjesbo
Rys Olsen
Absent: Herbert Roth
1. Virtual Meeting Link
Register to attend Design Review Board Meetings. Once registered, you will receive a
confirmation email containing information about joining this webinar.
2. Call to Order
3. Main Agenda
Final review of an exterior alteration (paint/windows/doors/exterior updates)
Address/ Legal Description: 2960 Manns Ranch Road B/Lot 8, Block 1, Vail Village Filing 13
Planner: Heather Knight
Applicant Name: Todd Mekles / Malinda Appel and Penny Brabb Turilli, represented by RMT Architects
3.1 DRB24-0157 - Mekles / Turilli Duplex Remodel
Final review of a change to approved plans (paint scheme)
Address/ Legal Description: 68 East Meadow Drive/Lot O, Block 5D, Vail Village Filing 1
Planner: Jamie Leaman-Miller
Applicant Name: Village Inn Plaza, represented by Pierce Austin Architects
3.2 DRB24-0008.002 - Village Inn Plaza
(Austin recused)
Final review of an addition (parking/garage/elevator)
Address/ Legal Description: 1759 Sierra Trail, Lot 19, Vail Village West Filing 1
3.3 DRB24-0138 - Selak Holdings
Design Review Board Minutes
Wednesday, June 5, 2024
2:00 PM
Vail Town Council Chambers
DRB24-0157_architectural.pdf
Rys Olsen made a motion to Approve with the findings it meets 14-10-4 & 14-10-5; Mary Egan seconded
the motion Passed (4 - 0).
DRB24-0008.002 Paint Colors.pdf
DRB24-0008.002 Plans.pdf
DRB24-0008.002 Photos.pdf
Roland J Kjesbo made a motion to Approve with the findings it meets 14-10-5
; Mary Egan seconded the motion Passed (3 - 0).
1
Design Review Board Meeting Minutes of June 5, 2024 76
Planner: Greg Roy
Applicant Name: Selak Holdings, represented by TAB Associates
Final review of new construction (multi-family/mixed use)
Address/ Legal Description: 199 North Frontage Road West/Tract A, Middle Creek Subdivision
Planner: Greg Roy
Applicant Name: West Middle Creek, represented by Shears Adkins Rockmore Architects
3.4 DRB24-0156 - West Middle Creek
(Austin recused)
4.Staff Approvals
Final review of a change to approved plans (extension of approval/deck repair)
Address/ Legal Description: 2875 Manns Ranch Road/Lot 1, Block 1, Vail Village Filing 13
4.1 DRB20-0177.001 - Booth Creek Townhouses
Planner: Jonathan Spence
Applicant Name: Booth Creek Townhouses, represented by ECE Design Build
Final review of a changed to approved plans (extension)
Address/ Legal Description: 1460 Ridge Lane B/Ridge at Vail Subdivision
4.2 DRB23-0083.001 - Teel Mountain Properties
Planner: Greg Roy
Applicant Name: Teel Mountain Properties, represented by Gies Architects
Final review of a change to approved plans (dumpster)
4.3 DRB23-0289.001 - GP-R2 LLC
Address/ Legal Description: 458 Vail Valley Drive R2/Golden Peak Ski Base And Recreation District
Parcel
DRB24-0138 Plans.pdf
Rys Olsen made a motion to Table to the June 19th DRB meeting; Roland J Kjesbo seconded the
motion Passed (4 - 0).
DRB24-0156 Plans Part 1.pdf
DRB24-0156 Plans Part 2.pdf
DRB24-0156 Plans Part 3.pdf
DRB24-0156 Plan Part 4.pdf
DRB24-0156 Plans Part 5.pdf
DRB24-0156 Plans Part 6.pdf
DRB24-0156 Plans Part 7.pdf
Xcel Will Serve Letter.pdf
Fire Truck Turning Exhibit.pdf
Vail WMC - 2-YR FP Setback Encroachment Exhibit.pdf
West Middle Creek TIS.pdf
WMC Title Commitment 5.22.24.pdf
Holy Cross Will Serve.pdf
Roof Material Exhibit.pdf
DRB24-0156 Geohazard Assessment.pdf
Rys Olsen made a motion to Table to the June 19th DRB meeting; Roland J Kjesbo seconded the
motion Passed (3 - 0).
2
Design Review Board Meeting Minutes of June 5, 2024 77
Planner: Jamie Leaman-Miller
Applicant Name: GP-R2, represented by MacAllister Construction
Final review of a change to approved plans (hot tub)
Address/ Legal Description: 555 East Lionshead Circle/Lot 3, Block 1, Vail Lionshead Filing 1
4.4 DRB23-0368.001 - Lift House Condos
Planner: Heather Knight
Applicant Name: Lift House Condos, represented by Pierce Austin Architects
Final review of a change to approved plans (windows)
Address/ Legal Description: 286 Bridge Street/Lot A & B, Block 5A, Vail Village Filing 1
4.5 DRB23-0441.002 - 286 Bridge St Inc
Planner: Jonathan Spence
Applicant Name: 286 Bridge Street, represented by S3 Architectural Group
4.6 DRB24-0064 - Geroca S.C.
Final review of an exterior alteration (sliders/condenser/screen)
Address/ Legal Description: 68 East Meadow Drive 101/Lot O, Block 5D, Vail Village Filing 1
Planner: Jamie Leaman-Miller
Applicant Name: Geroca, represented by Studio Spinnato
Final Review of an addition (balcony/bath/closet)
Address/ Legal Description: 1975 West Gore Creek Drive 27/Lot 29 - 42, Vail Village West Filing 2
4.7 DRB24-0108 - Peterson Residence
Planner: Greg Roy
Applicant Name: Jessica Peterson
Final review of an exterior alteration (venting)
Address/ Legal Description: 300 East Lionshead Circle 203/Lot 4, Block 1, Vail Lionshead Filing 2
4.8 DRB24-0114 - Gramm Residence
Planner: Heather Knight
Applicant Name: Melise Gramm, represented by Service Now
Final review of an addition (deck enclosure)
4.9 DRB24-0133 - Wild Residence
Address/ Legal Description: 1030 Lions Ridge Loop 301/Lot B1 & B2, Block B, Lion's Ridge Subdivision
Filing 1
Planner: Jamie Leaman-Miller
Applicant Name: Richard Wild, represented by Pierce Austin Architects
Final review of a tree removal
Address/ Legal Description: 1205 Vail Valley Drive/Vail Golf Course - Lightning Shelter
4.10 DRB24-0152 - Town of Vail
Planner: Heather Knight
Applicant Name: Vail Golf Course, represented by Old Growth Tree Service
3
Design Review Board Meeting Minutes of June 5, 2024 78
Final review of an exterior alteration (windows/sliders)
Address/ Legal Description: 1234 Westhaven Drive A81/Cascade Village - Liftside Condominiums
4.11 DRB24-0155 - Wengert-Neff Residence
Planner: Jamie Leaman-Miller
Applicant Name: Donna Wengert Neff, represented by SRE
Final review of an exterior alteration (chimney)
Address/ Legal Description: 2475 Garmisch Drive/Lot 5 & 6, Block H, Vail Das Schone Filing 2
4.12 DRB24-0160 - Sunlight North Condominiums
Planner: Jamie Leaman-Miller
Applicant Name: Sunlight North Condominiums, represented by Cheryl Lindstrom
Final review of an exterior alteration (windows)
4.13 DRB24-0163 - Donaldson Residence
Address/ Legal Description: 2863 Timber Creek Drive 3A/Lot 8, Block 4, Vail Intermountain Development
Subdivision Intermountain Swim and Tennis Club Condominiums
Planner: Heather Knight
Applicant Name: David Donaldson, represented by Lifetime Windows and Siding
Final review of an exterior alteration (windows)
Address/ Legal Description: 3255 Katsos Ranch Road/Lot 9, Block 1, Vail Village Filing 12
4.14 DRB24-0167 - Navas Residence
Planner: Heather Knight
Applicant Name: Jorge Navas, represented by Renewal by Andersen
Final review of an exterior alteration (boilers)
Address/ Legal Description: 4504 Meadow Drive/Timber Falls Condominiums
4.15 DRB24-0168 - Timber Falls Condos
Planner: Heather Knight
Applicant Name: Timber Falls Condos, represented by R & H Mechanical
Final review of an exterior alteration (windows/sliding door)
Address/ Legal Description: 4650 Vail Racquet Club Drive 11/Vail Racquet Club Condominiums
4.16 DRB24-0171 - Noble Residence
Planner: Heather Knight
Applicant Name: Bruce & Patricia Noble, represented by BZ Construction
Final review of an exterior alteration (windows/doors)
Address/ Legal Description: 1592 Golf Terrace Q57/Area A, Sunburst at Vail
4.17 DRB24-0178 - Whistlervail LLC
Planner: Jonathan Spence
Applicant Name: Whistlervail, represented by Renewal by Andersen
Final review of an exterior alteration (deck)
Address/ Legal Description: 193 Gore Creek Drive B/Tract A, Block 5B, Vail Village Filing 1
4.18 DRB24-0184 - Sweet Basil
Planner: Jonathan Spence
4
Design Review Board Meeting Minutes of June 5, 2024 79
Applicant Name: Sweet Basil, represented by Plath Roofing
5.Staff Denials
6.Adjournment
Roland J Kjesbo made a motion to Adjourn ; Mary Egan seconded the motion Passed (3 - 0).
5
Design Review Board Meeting Minutes of June 5, 2024 80
Present:David Tucker
William Jensen
Robert Lipnick
John Rediker
Scott McBride
Brad Hagedorn
Robyn Smith
1. Virtual Link
Register to attend the Planning and Environmental Commission meeting. Once registered,
you will receive a confirmation email containing information about joining this webinar.
2. Call to Order
3. Main Agenda
Planner: Jonathan Spence
Applicant Name: PHH Design Development
3.1
A request for a recommendation to the Vail Town Council for a major amendment to
Special Development District No. 4 (Cascade Village), pursuant to Section 12-9(A), Special
Development Districts, Vail Town Code, to allow for the development of a mixed use
project on the property known as the Cornerstone site, located at 1276 Westhaven Drive/
Cornerstone Parcel, Liftside/Cornerstone Subdivision and setting forth details in regard
thereto. (PEC24-0016)
Time Stamp 0.00.28
Planner Spence gives an introduction. He gives a history of the Cornerstone Property. He walks through
the history of the previous approvals. He talks about the public benefit for the 2024 proposal. He talks
about proposed uses on the site.
Planning and Environmental Commission Minutes
Monday, June 10, 2024
1:00 PM
Vail Town Council Chambers
PEC24-0016 Staff Memo June 10, 2024.pdf
Attachment_A._Vicinity_Map.pdf
Attachment B. Narrative-Project Description.pdf
Attachment C. Amendment Materials.pdf
Attachment D. Part 1.pdf
Attachment D. Part 2.pdf
Attachment D. Part 3.pdf
Attachment D. Part 4.pdf
Attachment D. Part 5.pdf
Attachment E. Massing Model.pdf
Attachment F. March 11, 2024 PEC minutes (Worksession).pdf
1
Planning and Environmental Commission Meeting Minutes of June 10, 2024 81
Rediker and Spence discuss the previous approvals, which did not move forward. Rediker asks about
the improvements to the frontage road.
Town Engineer Tom Kassmel walks through the Right-of-way work in this area. Kassmel walks through
the traffic flow in the area.
Lipnick asks about the turn from the Frontage Road in that area. Jensen asks about traffic backups in
that area.
Smith asks how far away are we from them having to add the turn lane back in? Kassmel says that’s a
good question that should be studied further. Smith asks about the new development on Greenhill Court.
Kassmel confirms that doesn’t connect with Westhaven via the road.
Smith asks about the tennis courts in the area. Kassmel says if that site redeveloped it might get new
access off the frontage road. It currently does not access from Westhaven. Smith asks about level of
service, Kassmel says its likely wouldn’t change that level.
Lipnick says part of the project is being a third portal for Vail Mountain, it could potentially bring a lot
more skiers. Also a lot of events happen at the Grand Hyatt, would favor shortened right turn instead of
doing away with it.
Rediker asks about the parking information. Spence says there is a slight surplus in the Arias garage that
could accommodate the increased commercial parking. Rediker asks how that works since it is a private
garage. Spence says the excess capacity is total spaces minus current uses. There is data from 2016
showing the 38 space surplus. The current uses are largely the hotel, some for the CMC building, and
the Cascade Residences. Rediker asks how the current garage works for public parking. Spence says
that is best answered by the property owner.
Lipnick asks how Cornerstone fits the land use. Spence says it includes resort style multifamily, the
proposed uses are consistent.
Hagedorn asks about commercial linkage; are the dorm style EHUs allowed?
Spence says it’s allowed with approval from PEC and Council.
Smith says this SDD seems like somewhat of a regulatory nightmare, it’s not consistent with other areas.
Does the Town or anyone else have an appetite for changing how this area is regulated?
Rediker wants to stay on this project, that can be further addressed at commissioner comment.
Spence says the SDD is set, we’re doing our best to understand the development standards as time go
by. Agrees that it is messy but breaking it apart could create a new set of challenges.
Alonso Ruiz de Velasco and Brendan Byrne with Davis Partnership Architects give a presentation for the
applicants. Velasco says he knows Cascade has important potential, which is not fully harnessed today.
They want to revitalize this area and create another hub. There are 30 residential units, a couple retail, it
enhances the accessibility and connections in the area. Activation is an important goal, they’re trying to
be compatible with surrounding properties.
Gabby Voeller with SE Group gives a presentation on the parking requirements.
Rediker asks if Vail Resorts is planning on expanding the ticket office in this location? Is there a
contemplated ski patrol office there?
Voeller says we’re not changing the function of the ticketing office, just slightly larger square footage for
expanded restrooms. Velasco says there is potentially space in the area for ski patrol but it is not
currently planned. Voeller talks about the current parking uses on site.
2
Planning and Environmental Commission Meeting Minutes of June 10, 2024 82
Lipnick asks where increased skier parking would go? Voeller says they can come via transit, she didn’t
see anywhere in code where it’s the developer’s responsibility to account for that.
Rediker asks about the parking management plan for the dormitory. Voeller discusses how the proposed
parking was arrived at.
Jensen says he doesn’t see this as a portal, it is more a self-contained community. We have to be
honest and say this is a fairly exclusive community for property owners, maybe don’t market it as a portal
to the mountain.
Joseph Lear with the applicant team talks about the commercial uses in the building, these square
footages derived the parking requirements. Voeller says the final numbers are still being finalized.
Rediker asks if there is a front office on the upper floors. Lear says just a residence lounge.
Rediker asks if this will be managed as a hotel, as many others in Town. Velasco says the current intent
is residential units for sale.
Rediker would like a better understanding of how the building is operated. Spence says Inclusionary
Zoning is based on square footage only, doesn’t contemplate how the property is managed.
Smith asks if there is a distinction for limited service lodges in commercial linkage. Spence says he will
check on that.
Smith says we’re allowing the parking requirement for private development to be satisfied by a third
party. Is there a pitfall involved in that? We don’t have to solve for all the what ifs, but what responsibility
does the Town have in that case?
Velasco says there are two questions: does it comply with the code and who manages that parking?
Right now we’re trying to make sure that we’re compliant with the code; there are existing spaces which
could fulfill those needs.
Smith asks about who owns the current parking in the garage. Rediker asks about potential parking
agreements, Velasco says there will be a written agreement in place.
Smith asks if there will be a rundown next meeting as to how the Town feels about the parking
arrangement? Spence confirms.
Voeller runs through proposed GRFA amendments to the SDD.
Smith asks if SDD ordinances considered 250 additions over the years? Spence says likely not, they are
allowed separate from the GRFA total – but are charged inclusionary zoning.
Voeller talks about the Commercial Linkage numbers. Smith and Voeller discuss rounding the numbers.
Spence says one employee would be satisfied by fee-in-lieu, per the applicant’s table.
Smith asks about the fee-in-lieu, Spence says it could be possible to house them on site, it’s an option of
the Town Council.
Lear gives a presentation on the architecture and site planning for the building. There is a loading dock
on the west side of the CMC building, which could service the Cornerstone building. PEC discusses the
circulation of the deliveries in the area. Velasco says they don’t yet know who will own or operate the
coffee shop.
Lear talks about the paseo area. He walks through the access and dropoff area at the front of the
building. He walks through the various floor levels and elevations. He talks about the landscaping
3
Planning and Environmental Commission Meeting Minutes of June 10, 2024 83
features south of the building.
Tucker says the distance from the loading to the commercial spaces is a long way for the drop-offs. The
service will not come down the paseo.
Rediker asks about the access sidewalk on the west, is that on cornerstone property? Lear says it is split
with the property to the west. The building setback is 8’ to the property line in that area. Rediker asks
how tall the hotel is south of Cornerstone. Velasco says it is 5 stories in that area.
Rediker asks about access to the on-site EHU units. He asks about the south property line. Lear says
the building is 30 ft from the hotel, 15 feet to the property line on the southwest part of the lot.
Lear walks through the floor plan of the on site EHUs. He says the pathways in that area will be heated.
Rediker asks about the owner’s lounge. Lear says there is one at the drop-off level, and one at the paseo
level that will have resident amenities.
Hagedorn says that space is prominent on the façade, talks about uses on basement or garden level. Is
that the right use for that area?
Lear says they’re trying to put the active resident spaces in that area, so it’s activated.
Rediker asks about the plans for the dorm style EHUs. Velasco walks through the floor plans for the
dormitories. Rediker and applicants discuss access to dormitories and restrooms.
Smith asks staff how these compare to others? Spence says there is one other example in the Four
Seasons, with individual access to the outside.
Hagedorn asks about enforceability of an offsite EHU like this. Spence says the deed restrictions can be
required prior to completion of the main buildings.
Smith asks about the occupancy requirements for this type of EHU. Spence says it could be a violation
of the deed-restriction if it was not occupied, it’s an interesting question because of the challenges with
occupancy.
Lipnick has concerns with the proposed access and light. Velasco says they’re adapting an existing
space for a better use. Lipnick doesn’t think year-round workers and families would tolerate that, maybe
J-1 visas for three months.
Smith asks if there is already a building permit? Spence confirms there was a building permit but with a
condition that the acceptance of the units for Cornerstone mitigation was to be determined by the PEC
and the Town Council.
Rediker asks about the sun-shade analysis. Lear walks through the greatest impacts, the dropoff area is
snowmelted because of this.
Rediker asks about the 2008 approval, where was the building envelope? Spence says the footprint was
similar, the height was 71 feet from the lowest level.
Smith asks about other properties within the ownership.
Hagedorn asks about the vestibule in the paseo level. Lear says they are small day lockers. Velasco
talks about the ownership situation for the parking.
Lipnick asks if they thought about workforce housing for the tennis court area? Velasco says they have
thought about it.
4
Planning and Environmental Commission Meeting Minutes of June 10, 2024 84
Stan Beard lives in the neighborhood. He asks about the orientation of the dropoff level and the paseo.
His concern is the outdoor entertainment areas, has concerns with noise as they face Gore Creek and
Glen Lyon. He doesn’t believe past approvals should have anything to do with this one today. It should
not exceed the height of the tallest existing building, what would support that? He believes the parking
should be in house only, and let’s be clear this is not a hotel in disguise. He doesn’t believe we should
make exceptions, doesn’t want to push the height limit even higher, our neighborhood doesn’t justify it.
Rory Keller is the managing partner of Keller and Mendoza in the CMC building, which has 11
professional employees. Their HOA recently approved the dormitory. He was not too excited to have
dormitory housing but understood the need, it’s what a good business neighbor should do.. One month
later, they received an increase in parking prices, which are untenable for a business. If we are unable to
get a reasonable parking option, we are likely to have to move to another location outside of Vail. They
have also reserved two units in Timber Ridge. They request that Town look at what possible solutions
may be available to a business. They are in favor of the proposal, but they are here to advocate that long
term parking solutions be addressed as the development district is being amended. The question is
whether they would commit to a percentage being allocated for long-term reasonable parking rates.
Kim Seter, with Seter & Vander Wall, is representing Cascade Village Metro District (CVMD). They fear
this proposal will have some serious impacts on the operations of Cascade Village. There are
agreements in place with the Town, Vail Resorts, and easements in the area owned by CVMD. The
easement agreements limit the owner’s ability to construct improvements with the prior consent of CVMD
and the plans will interfere with the use of the easement. The CVMD board is opposed to this application
and believes the application is inconsistent with the criteria and inappropriate for the site, scale, height. If
the previous approvals have expired, there is nothing in the bank. Since those amendments were
approved, things have changed a great deal. This will block the view that many residents currently have
to the mountains across I-70. The plan does not satisfy the requirement for compatibility. There will likely
not be room for a larger lift with the new construction and decreased setback. The proximity of skiers in
the area creates an additional hazard. The use of the skier plaza for grooming vehicles will put heavy
equipment near increased skier traffic. The design features are not responsive to the overall aesthetic of
the community. The lift space and paseo create concerns, there is additional need for snow removal. The
vehicle and pedestrian access hasn’t been addressed. During winter months, Westhaven will be shaded,
creating dangerous conditions for pedestrian and traffic circulation. There are many questions
concerning the workability of the plan. How will the lift be workable during construction? How will Vail
Resorts access during construction? These dictate that the project should not be approved at this time.
Janie Lipnick says this will obliterate the views in the neighborhood, casting a shadow as well. Past
approvals shouldn’t have a bearing on this. She is not opposed to development, but smart, sensitive
development is possible. This is an odd site, worried about what it does to the skier plaza. Doesn’t think
the infrastructure is there to create another portal or village. Where will day skiers go?
Scott Wagner lives in the neighborhood. He shares some of the concerns already voiced.. The 2008
approval expired in 2017, doesn’t see why that should be relevant. Access from the frontage road is a
challenge, especially with increased traffic count. This is a pie in the sky as another access point, the
master plan is something Vail Resorts will have to work with the Forest Service on, there is also not room
for an improved lift. Approval is needed from CVMD for work in the easement. The turnabout raises
some concerns, re-doing that whole circle makes it a bigger safety hazard. The ticket office has
management questions. The EHU units are already being built.
Thad King is president of Liftside Condos. The owners of Liftside recently were made aware of this
meeting. The notices weren’t mailed to the address that the county would have, instead it was sent to the
Liftside building itself. They have concerns about setbacks, height, sun-shade, they will reserve final
comments until they’ve had a chance to poll all of the owners.
Rediker says the public can also put questions in writing for future meeting as this item will be continued.
5
Planning and Environmental Commission Meeting Minutes of June 10, 2024 85
Lorenza Chico is at the Liftside building. She is not opposed to new buildings and is happy to see
activation. But they do not want to see this increased height, increased setbacks, and more parking.
Liftside is the only neighbor which isn’t owned by this ownership. They are impacted by the height and
setbacks. Cascade is great community with respect for natural environment.
Bob Rosen lives in the neighborhood and is on the board for the CVMD. How can someone submit a
proposal on land that they don’t control? CVMD has control of the easement, Cornerstone has not
contacted them, how can they move forward with that?
No further public comment. Rediker asks for commissioner comment.
Tucker has concerns with the easement issues as well as sun-shading and restaurants so far from the
serviceable loading dock. Would like to see an elevation plan for the basement.
Smith says there is an obligation to get to yes as effectively and efficiently as possible but there are
concerns. Per Staff questions, the housing component of the application is insufficient, quantitively, and
qualitatively. You do have a desperate need for dorms to support the hotel, if you’re building that anyway
building housing is great period. She encourages applicant to explore other opportunities for Housing
and public-private partnerships. If the proposal is activation as a public benefit, it would be inconsistent to
accept a private ski club as an activating use. This would go better if you acknowledge this is an all-
inclusive private community with public benefit. The development standards are dependent on public
benefit, which is currently insufficient. She struggles to understand established requirements, wants to
seek legal advice on how to proceed with that. She understand there is a time requirement with the 2008
deal that expired. If we’re evaluating previous approvals, we also have to evaluate previous public
benefits. She doesn’t understand parking required for commercial uses. You should work with your
neighbors on resolving easement issues. Let’s make it happen but fix it.
Lipnick says the building height went from 71’ to 97’ – when they got approval in 2008 a requirement
from Council was to lower the height from 91’ to 71’. Worries about density and massing. Easements
were not in the packet and have been brought to bear today, encourage you to meet with your neighbors
and CVMD. The increase in GRFA, height, bulk, mass are not appropriate for this site. The dormitory
style EHUs in the basement are not effective mitigation for inclusionary and commercial linkage. This
does not accommodate for year-round employees and families. You should re-examine the tennis courts
as a beneficial place for workforce housing. Does not think the public benefits outweigh the adverse
effects of the deviations that are being requested. The space is inadequate for ski-base activity today, if
you increase the number it will exacerbate the problems. There is a place for Cornerstone, would like to
see it but you must work with your neighbors to figure it out in a more efficient way.
Jensen says the massing and shadowing is unacceptable. Encourage you to talk about ski operations, it
will need to be replaced at some point in the next ten years. Has concerns with height, the EHU’s feels
like you’re warehousing your J1’s, could be convinced on parking. Never seen the PEC grant four
exceptions. Complements you for looking at it, but you have to go back to drawing board and listen to
neighbors and the community. The size of the east building looks better, the west not as much. Take the
feedback respectively and rethink how you want to build it out.
Hagedorn thanks the applicants for the presentation. Being an engaged neighbor is importantly. How
does PEC approach this with the easement conflict? Parking issues raise this concern about how does a
third party factor in? Has concerns about activations and the large frontage dedicated to owner’s lounge-
which is not the most active use. Agrees there is a lot of time spent on comparison to previous
applications, but those rights are no longer vested. Would like to see how this varies from base level
SDD that is currently in place. How can off-site units satisfying EHU requirements?. There is a lot of ask
here, only two other buildings in Town that approach these height, don’t see a change in the give from
last time. There is a path forward here, need to see how we get there.
McBride shares concerns on height, parking, traffic, easement issues, and EHU proposal.Agrees this is a
6
Planning and Environmental Commission Meeting Minutes of June 10, 2024 86
lot of ask without a lot of give. This proposal is an attempt to maximize this property, would like to see
anything that can be done to compromise, does not want to impinge on property rights but we need to
make sure the public interest is met.
Rediker thanks applicant for the presentation today. He is concerned about dorm-style EHUs, and how
the EHUs interplay with parking. Building height is a concern, the 2008 approval is not necessarily a
benchmark, it can be taken under consideration but we are not bound to it. 91’ height is significant, 71’ is
substantial, the owner’s lounge on the paseo level takes up a lot of space that is supposed to be active
for other uses. The purpose is not to activate for the public, it is a private owner’s club. He is concerned
about the lack of parking and increased density.. Both Town and applicant need to rethink turn lanes
from the Frontage Road. He would like to understand how this development would impact Vail Resort’s
current and future operations. The easement issues need to be straightened out before anything is
approved, would like to hear from the Town Attorney before an approval. He doesn’t know that it can
meet criteria No. 9 if easement rights are violated by proposed plan.
Smith says this application seems to pivot on public benefit. We need to have a clear understanding of
the public benefits that are being proposed.
Spence confirms part of that analysis will be in the memo.
Planner: Heather Knight
Applicant Name: Town of Vail, represented by Tom Kassmel
3.2
A request for recommendation to the Vail Town Council, pursuant to Section 12-3-7,
Amendment, Vail Town Code, for the adoption of the Vail Mobility and Transportation
Master Plan. (PEC24-0013)
Time Stamp 3:23:14
Knight gives an introduction.
Kassmel gives an introduction. There are still some minor revisions to be made, the PEC can give final
approval with conditions today or continue to the following meeting. Kassmel walks through the redline
changes.
PEC and Kassmel discuss timeframe for the application.
Rediker talks about the the public engagement section. He is hesitant about conclusions on public
support given the limited engagement.
Kassmel says we got great participation for this type of document. But he understands the point.
Robert N Lipnick made a motion to Continue to the meeting on July 8th, 2024; Robyn Smith seconded
the motion Passed (7 - 0).
PEC24-0013 Staff Memo.pdf
Attachment A. PEC Memo 6-10-24.pdf
Attachment B. Go Vail 2045 06042024.pdf
Attachment C. Vail Project Recommendations Table_060424.pdf
Attachment D. PEC MP Comments5-13-24.pdf
Attachment E. Public Comment - EngageVail Summary.pdf
7
Planning and Environmental Commission Meeting Minutes of June 10, 2024 87
6.Adjournment
Rediker says the distinction of who responded can be mentioned in the plan, it needs that qualifier.
Smith asks about approvals the plan in light of the Westhaven conversation.Kassmel says the master
plan doesn’t grant specific approvals, it identifies areas to be looked at.
Jensen says this is a plan, there will be deviations over the years. Knight adds it’s a guideline, not a
specific plan for each project.
Rediker asks for public comment. There is none.
Brad Hagedorn made a motion to Continue to the meeting on June 24th, 2024; William A Jensen
seconded the motion Passed (7 - 0).
4. Approval of Minutes
4.1 PEC Results 5-13-24
PEC Results 5-13-24.pdf
(Jensen & Rediker abstain, absent from last meeting)
Robert N Lipnick made a motion to approve ; Robyn Smith seconded the motion (5 - 0).
5. Information Update
5.1 June 24th Meeting - Virtual Only
Knight confirms the next meeting on June 24th will be virtual only.
Smith asks about site visits.
Rediker says he discussed this with the Town and they can be done within certain parameters, like not
discussing the application. They might be appropriate in some cases, how do we determine that?
Spence says in the past they were chosen when staff felt it was appropriate. There are challenges of
communication and would need protocols. Staff could discuss which projects might warrant a visit.
PEC and staff discusses the appropriate protocols for site visits. Rediker asks staff to look into it, Knight
confirms.
Hagedorn thanks staff for timestamps on minutes.
William A Jensen made a motion to Adjourn ; Robyn Smith seconded the motion Passed (7 - 0).
8
Planning and Environmental Commission Meeting Minutes of June 10, 2024 88
AGENDA ITEM NO. 4.1
Item Cover Page
DATE:June 18, 2024
SUBMITTED BY:Kristen Bertuglia, Environmental Sustainability
ITEM TYPE:Information Update
AGENDA SECTION:Information Update
SUBJECT:Vail Bighorn Initiative Update
SUGGESTED ACTION:
VAIL TOWN COUNCIL AGENDA ITEM REPORT
ATTACHMENTS:
Memo to Town Council - Update Vail Bighorn Initiative .pdf
89
To: Town Council
From: Department of Environmental Sustainability
Date: June 18, 2024
Subject: Vail Bighorn Initiative Update
I. Purpose
The purpose of this memorandum is to provide the Vail Town Council an update on the effort
and funds raised by the Vail Bighorn Initiative, an independent citizens group dedicated to
protecting the Gore Range bighorn herd.
II. Background
Vail Bighorn Initiative
Mission
Our mission is to work alongside wildlife conservation organizations to present science-based
information specific to the Gore Range S2 Bighorn Sheep Herd in an effort to educate and
inform the public, build awareness of the current threat to their habitat, and raise funds
necessary to bridge the gap between the valuation of the Booth Heights parcel, and the
current funds available for the land purchase.
VBI Work to date
Over the past several years the Vail Bighorn Initiative has worked to raise awareness and
funds to support the purchase of the Booth Heights parcel, through grassroots citizen efforts
as well as a formalized campaign with Milhoan Creative and Social Impact Advisors serving
as campaign managers, funded entirely by private contributions. The campaign managers
were able to facilitate a partnership with the Wild Sheep Foundation, a nearly 50-year old
international organization dedicated to enhancing wild sheep populations, promoting scientific
wildlife management, educating the public and the conservation benefits of hunting. The WSF
and the Town of Vail entered into an agreement where the WSF agreed to serve as the fiscal
agent for the funds raised and continues to do so today. To date, the campaign has raised
920K with nearly 700 donors with pledges and cash in hand. Note that some donors have
expressed their desire to wait until the title of the Booth Heights parcel is transferred to the
town to complete their gift agreement. The managers also launched a full-scale media
campaign including Facebook, Instagram, a partnership with Howl for Wildlife, and a Vail Daily
week-long blitz. While passive fundraising continues today, the VBI is not actively spending
campaign funds to raise additional revenue until the status of the court appeals and the path
90
Town of Vail Page 2
forward is determined. When the title of the parcel has been transferred, a compelling case for
a conservation easement can be made and fundraising will continue.
Additional Funds
The VBI has also received a donation of a Gore Range bighorn sheep mount which will be
hosted at the Eagle County Airport. Naming recognition opportunities have been provided to
donors and will be additional source of ongoing funding to support the herd.
Staff has also received approval from the Eagle County Open Space Advisory Committee to
contribute up to $5 million toward the purchase of the Booth Heights parcel. The Board of
County Commissioners has decided to wait until the court appeals process is complete to vote
on the approval of these funds.
The Rocky Mountain Bighorn Society has been an excellent partner in support of the Gore
Range herd, providing $25K in funding toward the purchase of the parcel, in-kind support on
the Home for the Wild documentary, and herd and vegetation management projects.
91
AGENDA ITEM NO. 5.1
Item Cover Page
DATE:June 18, 2024
SUBMITTED BY:Stephanie Bibbens, Town Manager
ITEM TYPE:Town Manager Report
AGENDA SECTION:Matters from Mayor, Council, Town Manager and Committee Reports
(20 min.)
SUBJECT:Town Manager Report
SUGGESTED ACTION:
VAIL TOWN COUNCIL AGENDA ITEM REPORT
ATTACHMENTS:
TM Update 2024-06-18
92
Town Managers Update
June 18, 2024
1. Strategic Goals & Actions
The Town Council adopted the 2024 Strategic Plan on May 7
th, 2024. Staff made very good progress
last week in developing an action plan to achieve the strategic results. Those actions will come back
to Council for your review and approval. We will also track progress on achieving results in both the
Town Mangers update and on our website.
2. Dewatering Permits and the State of Colorado Department of Public Health and Environment
For many large development projects that involve excavation in the water table a State of Colorado
dewatering permit is required which has historically been used to prevent silt from entering a water
body (Gore Creek in Vail) from a construction project. The State’s process on these types of permits
and specifically a permit the Town had for the Residences at Main Vail changed dramatically. They
are now asking/requiring the Town to continue to monitor and sample water quality for metals on a
weekly basis after the project is completed. No detectable metals are being found in water now
coming of the stormwater system for the Residences of Main Vail. The cost of annual monitoring
could be $60 - $90k per year. Staff is communicating with the State Water Quality Division on why
this is being required. We are also hearing from other municipalities and sanitation districts about
increasingly onerous requirements being placed on projects needing some form of permit. We
simply wanted to make Council that this is an issue staff is attempting to address with the State of
Colorado.
3. Upcoming Council Topics
Staff will be bringing an update on ideas for improving the Vail Promenade in July.
Staff is currently reviewing our polices, programs, and rent policies for Town owned housing
for our employees and will be bring that topic to Council in July.
4. Other
There may be other topics the Town Manager needs to share with the Town Council.
93
AGENDA ITEM NO. 5.2
Item Cover Page
DATE:June 18, 2024
SUBMITTED BY:Stephanie Bibbens, Town Manager
ITEM TYPE:Town Manager Report
AGENDA SECTION:Matters from Mayor, Council, Town Manager and Committee Reports
(20 min.)
SUBJECT:Council Matters and Status Update
SUGGESTED ACTION:
VAIL TOWN COUNCIL AGENDA ITEM REPORT
ATTACHMENTS:
2024-06-18 Matters
94
COUNCIL MATTERS
Status Report
Report for June 18,2024
Town Council asked staff for an update on Booth Heights fundraising. Staff
has prepared a memo for today’s Council meeting which is included in the
“Information Update” section of the agenda.
Big thank you to the Vail PD, the Ford Amphitheater staff and Donovan
Pavilion Management for their expert handling of 2 proms and 3 graduation
ceremonies this month!
Big thanks for the tour of Public Works facility! It’s definitely “where the magic
happens”
Social Media Listening
https://share.sproutsocial.com/view/77b0e09b-f203-47ff-b0e0-9bf20337ffa5
The GoPro Mountain Games showed up in a big way on social as always! What an
incredible weekend and while there was some chatter around overflow parking, that
didn't dampen the overwhelmingly positive response. The (mostly) incredible weather
didn't hurt either:
Here were the top posts across Town of Vail's social media channels including Fire and
Police, interestingly Hiker Shuttle was the top post by Impressions:
95
ICYMI -a look at the Town of Vail Greenhouse as we prepare for summer with Hannah
Sorensen: https://www.facebook.com/watch/?v=1007057411040633
In the News______________________________________________________
May 30
Artist in Residence
https://www.denverpost.com/2024/05/30/danielle-seewalker-artist-palestine-vail-symposium/
96
May 31
Dismount Zone
https://www.realvail.com/vail-village-dismount-zone-returns-for-summer/a19224/
Bus It to Hike It
https://www.realvail.com/hikers-encouraged-to-bus-it-to-hike-it-with-the-hiker-express-to-booth-
creek/a19227/
Artist in Residence - editorial
https://www.vaildaily.com/opinion/wissot-a-callous-disregard-for-life-but-not-genocide/
June 1
Mill Creek Mud Slide
https://www.vaildaily.com/news/small-landslide-on-vail-mountain-muddies-creeks-in-town/
June 3
Bus Roadeo
https://www.vaildaily.com/news/eagle-county-bus-drivers-compete-fiercely-and-for-fun-to-see-
whose-skills-are-the-best-at-bus-roadeo/
June 4
Timber Ridge Pre-Sales
https://www.realvail.com/home-pre-sales-now-available-at-the-new-timber-ridge-village-
neighborhood/a19252/
Art in Public Places
https://www.vaildaily.com/news/vail-public-art-controversy/
Geothermal
https://www.realvail.com/big-pivots-analysis-growing-interest-in-geothermal-includes-vail-eagle-
county/a19245/
June 5
Dobson Remodel
https://www.vaildaily.com/news/vail-dobson-ice-arena-remodel/
Fourth of July
https://www.vaildaily.com/news/vail-police-to-crack-down-on-unaccompanied-minors-young-
adults-during-fourth-of-july-celebrations/
https://www.realvail.com/vail-to-implement-fourth-of-july-celebration-safety-measures/a19272/
June 6
Frontage Road Parking
https://www.vaildaily.com/news/vail-eliminates-some-overflow-frontage-road-parking-during-
summer/
97
Geothermal
https://www.vaildaily.com/news/polis-honors-gubernatorial-tradition-while-celebrating-a-clean-
energy-future-during-eagle-county-visit/
June 9
Short Term Rentals
https://www.vaildaily.com/news/does-vail-need-more-short-term-rental-regulations/
Artist in Residence - letter
https://www.summitdaily.com/opinion/letter-to-the-editor-summit-county-must-distance-itself-
from-vails-artistic-censorships/
June 11
West Middle Creek
https://www.vaildaily.com/news/vails-west-middle-creek-is-on-track-to-bring-268-deed-
restricted-units-by-2027/
June 12
Summer in Vail - editorial
https://www.vaildaily.com/opinion/howard-summer-is-heating-up-in-the-vail-valley/
Upcoming Dates
July 4 4th of July Town of Vail Parade!
July 9 Community Picnic: Bighorn Park
August 13 Community Picnic: Donovan
September 10 Vail Social
98