HomeMy WebLinkAboutB09-0011 Community Development Department
75 South Frontage Road
, ' Vail, Colorado USA 81657
{ �
' �� � � �
CERTIFICATE OF OCCUPANCY
This certificate is issued pursuant to the requirements of Title 10, Section 10-1-2, ADOPTED CODES of the Vail Town
Code certifying that, at the time of issuance, this structure was found to be substantially in compliance with the various
ordinances of the town regulating building construction or use for the following:
Name and description of project Ice Skatin�Shop Solaris
Address of project: 143 E Meadow Drive Vail Colorado
Owner name and address• Solaris Pro�erty Owner LLC 2211 N Frontage Rd Suite A,Vail,Colorado 81657
IBC Edition: 2003 IBC Occupancy Group(s): M Type(s) of Construction: IB
Permit Number(s) B09-0011 Occupant Load: Sprinkler System Y/N Type: Y 13
t �'� _ 12/01/2010
`Martin aeberle,Building Official Date
11-18-2010 Inspection Request Re orting Page 3
5:00 pm Va�I,S.:� O�
Requested Inspect Date: Friday, November 19,2010
Inspection Area: JRM
Site Address: 143 E MEADOW DR VAIL
ICE SKATING SHOP,SOLARIS
A/P/D Information
Activity: 609-0011 Type: A-COMM Sub Type: ACOM Status: ISSUED
Const Type: Occ�u�pa� ncy: Use: IB Insp Area: JRM
Owner: SOLARIS PROPERTY OWNER LLC
Contractor: WEITZ COMPANY, INC. (THE) Phone: 303-860-6600
Description: TENANT IMPROVEMENT: RETAIL& RENTAL ICE SKATING
Requested Inspection(s)
Item: 90 BLDG-Final Requested Time: 02:30 PM
Requestor: WEITZ COMPANY INC THE Phone: 970-688-1877
Comments: SOLARIS SKATE SHOf�W/C 30 MINUTES PRIOR
Assigned To: JMONDRAGON Entered By: SBELLM K
Action: Time Exp:
Item: 90 BLDG-Final Requested Time: 03:30 PM
Requestor: WEITZ COMPANY INC THE Phone: 970-688-1877
Comments: SOLARIS SKATE SHO�'W/C 30 MINUTES PRIOR
Assigned To: JMONDRAGON Entered By: SBELLM K
Action: Time Exp:
(���,D Q��rJ l ��
�L-PNr�� r.� � � �� �
� � �
�� �� , �
Inspection Historv
Item: 30 BLDG-Framing "*Approved"
09/22/10 Inspector: mdenney Action: AP APPROVED
Comment: skate shop.
Item: 50 BLDG-Insulation *"Approved'"
07/28/10 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 60 B�DG-Sheetrock Nail ""Approved"*
09/28/10 Inspector: JRM Action: AP APPROVED
Comment:
Item: 70 BLDG-Misc.
Item: 90 BLDG-Final
Item: 537 PLAN-FINAL C/O
REPT131 Run Id: 12195
NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
, .
.
�w�ro�vn�, �
Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD/ALT COMM BUILD PERMT Permit #: B09-0011
Project #:
Job Address: 143 E MEADOW DR VAIL Status. . : ISSUED
Location......: ICE SKATING SHOP, SOLARIS Applied . . : 02/02/2009
Parcel No....: 210108201007 Issued. .. : 07/09/2010
Expires. ..: 01/05/2011
OWNER SOLARIS PROPERTY OWNER LLC
2211 N FRONTATGE RD STE A
VAIL
CO 81657
APPLICANT WEITZ COMPANY, INC. (THE) 02/02/2009 Phone:303-860-6600
4725 S. MONACO STREET,STE 100
DENVER
CO 80237
License: 131-A
CONTRACTOR WEITZ COMPANY, INC. (THE) 02/02/2009 Phone:303-860-6600
4725 S. MONACO STREET,STE 100
DENVER
CO 80237
License: 131-A
Description:
TENANT IMPROVEMENT:RETAIL&RENTAL ICE SKATING
Occupancy: M Valuation: $53,920.00
Type Construction:l6 Total Sq Ft Added: 0
•f4fRkf'f441r4�t1fftfVffflfff4Ty'W'k'M'4R���tARR*4f#1r#l4R4kk#}#1f1R1tt1rYntiRiRfffffRYiktrIYtRY FEE SUMMARY ••••••*••«..,,..........,..<...............................,....++..+.._..........
Building Permit Fee-----> $671.75 Will Cal Fee--------------------> $4.00 Total Calculated Fees-------------> $1,990.79
Plan Check----------------> $436.64 Use Tax Fee------------------> $878.40 Additional Fees----------------------> ($878.40)
Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES------------> a1,112.39
Investigation--------------> $0.00 Recreation Fee-------------> $0.00
Payments--------------------------> a1,112.39
Total Calculated Fees--------> $1,990.79 BALANCE DUE--------- ----> 50.00
fAff'f#fftilfl'YfYY'ViF4trf.4rtff#k�t#1r�ff�#�#/�f4*�#4#4Rltr4R#4f4fVtrtffitAiRfiRiRiRrt�lY}'RRYfYYTHfrtfrtYeY4fft#4R*flffef'f'kRRfR4ff'f'fft'frfR�YiRY`YitRiFY'S�A"kYeL4lfffRffd#R4frR1RRRRtr4trVf1V V fZlr4rtiRiRfYtYitiff'kfAYfrt#f
DECLARATIONS
I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the information
as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure
according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM-4:00 PM.
�_O� ��aaQ,wl--fvr �lar� Provo� D�n��LI.G ?l9/�a
Signature of O�er or Contractor Date
�f7MM1 (7ctA
-� Print Name
bld_a It_construction_perm it_041908
#tiR!lRff**►fttYYrRk\xtRlrff��flfMlt//k4}�kt4!l�fMlxlN�xflfYYYflfwwlwkx4tNk*N��Rfkkk�#/#�#fRlfxxt�RffR�ffflfY4ww�w}*kkRRA��w�}iR�ifR�Ywyt�XyYfYMkwMwww�Yf/*#R*��kk*fr4�R4k##i#1A��i1lRffR
APPROVALS
Permit#: B09-00�11 as of 07-09-2010 Status: ISSUED
.
♦r:��ixr:rreww,rwrx��wi.r�.it�x:eiiixxxrww�rwx���+.:�x��::::r�n.x:xx:xiixxixrxxxwiwr�eewr�wxw�rit�3rrx+�+:::�xr.xxxxwixxxwwixwx�rrt�t�rrt+.�,�++:�xx�arr�wxxww:w:xiiixx,re:ww»�,rwxw+,t+vwwvrr,vt++
Item: 05100 BUILDING DEPARTMENT
02/10/2009 cg Action: DN
F:\cdev\CHRIS\PERMIT.COMMENTS\B09-0010\609-0010.DOC
05/14/2010 cg Action: CR second plan review
comments sent
07/07/2010 cg Action: AP APPROVED REVISED
PLANS ADDRESSING CORRECTIONS
Item: 05400 PLANNING DEPARTMENT
02/13/2009 Warren Action: AP
04/30/2010 Warren Action: AP Revised set
approved.
Item: 05600 FIRE DEPARTMENT
02/09/2009 McGee Action: CR Corrections
required
1. FPFA0000 Flex heads are not approved.
2. Manual pull stations in retail and assembly areas may
be under"employee control".
3. Smoke detector beneath skate sharpener may be changed
to a thermal detector.
4. A 6.12 Door swing impedes wheel chair access.
05/19/2010 McGee Action: CR Corrections
required
1. FPFA0000 Flex heads are not approved.
2. Manual pull stations in retail and assembly areas may
be under"employee control".
3. Smoke detector beneath skate sharpener may be changed
to a thermal detector."
Sheet FAFP0.00 does not show sprinkler or fire detection
in storage and mechanical rooms.
07/08/2010 McGee Action: AP Fire alarm changes
are to be reflected on fire alarm shop drawings.
11'RfR1'#44*4#ffk41r1'tR�Y#MrR}1Mit#dfr44tl#f4Rit###fitRf'l1r1e1'1nt1fA##1�YrYrlr4�kfR***YtiM#frtrtR�kMf�4�kfYrYfYeYeYrkflftYfY.'kY�YeR'Yf t�FYefM1'MM*y4fi�YYr#Mt#M#M#tWA'4#tk444fek�44Yr*kk44w'fte4#*�k4�ki�tltYtYey'YeY`f�k�iiY�YYiY�RSy'yy'ff
See the Conditions section of this Document for any that may apply.
bld alt_construction�ermit_041908
•�te�.rw�rx�N�:x���+thwww���w�e�wrrx�w��iie�,e��xaxx:www�twxw���xix��w��i�:w,�xi�:t��xRxawwxrww�rw��wxxrnr+�w4+.�.xxrrrxw��wx++w��,rv.,r��+�xwwxw�v.�ii:►rxrw�,rr�r�tr.�s.i���r��:�n..:s.xxo-r��
, CONDITIONS OF APPROVAL
Permit#: 809-0011 as of 07-09-2010 Status: ISSUED
11�R1rt1tYY�*f►HllttYfrtf'!U}tt4Yr*f41r�fRttt4tfRt�tt�ltKtrrt4rtRfil4Yt}ilYtW'kYrlrRf�feRHMt t4fr#1rRitfRt�f f iR►y"RA1}}firleiRlek�Rf�4f'�f�f�'kMrt*�f 4f RRty44kMrRllrk4iRkf'kMf4Rlrf#fRf1f'Rf1r1r1r1rtHftl+Yt4frWk4flfl�y}RW*YMf�klff f
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
bld alt_construction�ermit 041908
*****�*****�*****************************:****r*�********�***�r*****��*+********************
TOWN OF VAIL, COLORADO Statement
*�*********�s*�******************�*****+*************�+*********�*********�*�*************�r
Statement Number: R100000830 Amount: $1, 112.39 07/09/201001:23 PM
Payment Method: Check Init: JLE
Notation: 4881 SOLARIS
PROP OWN
-----------------------------------------------------------------------------
Permit No: B09-0011 Type: ADD/ALT COMM BUILD PERMT
Parcel No: 2101-082-0100-7
2101-082-0200-1
Site Address: 143 E MEADOW DR VAIL
Location: ICE SKATING SHOP, SOLARIS
Total Fees: $1, 112.39
This Payment: $1,112.39 Total ALL Pmts: $1, 112.39
Balance: $0.00
*********+*�*******************�**************�****s***************+******************�*****
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 671.75
PF 00100003112300 PLAN CHECK FEES 436.64
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
,�`t`-�K'� S`'`� �� v �''�"�'i ��. s a �3 %" t _ �-.:d f� � � a ��. � :c �3 �_ '��« :.� 'c.q ��
'�' *+�F� "r�'x �_ 3' �� . . .��� a { ��. : � : ., � �- � ����
��''�' s�w�6z � � z 9 �- ,�� ti� : ��s � � -a 1 � - :� . � �- �
�,j"�.- 2ta�^ �S .����"`�"�, -. i �� F; r sT � .,s Y�� ti� �' �� c� � � �, �
c� �p�n�������� � � r '�r ��`� r ��� z a ��� ��� � � ���� a"i�� ��` �°�`;
�'-. '�3 `�a �'�' "�''� �P�, �'�3�' d ,� x. �a � r y �:' �� .' �' .. , �"}k� � .�q. �,..���,.- yg .
�,�z�����£�����`�`��� � ,� � , Departmen#of'Commurirty De�ret�opmera �
� � €` ��%
�.� : ��� �'��,,"°�� � °���, .� , '� ���`z��� '7�5 South Frar�tage,��''; .
���� ���� . ��".«' `���,� ` T�, ,; �� ��� ��: F Vail����otac�
, � „ � ;�� a�„-
a':�X ,�M � y`� � o��.� � "�.'f�'S._t w�'_ � "`��''�� � ... s�,���`�^ fr�'� ',_��,
--�ya„ ��,� � �'+.�
LL��� �`� �,� � '�` „,�r.��.. � �� .,1 C�,�' � "y,a
��� `. .A a! �� �. i^
��� �= . .�� �.-�T . . �� � �_ � e� '9 � ., �,
� �` z��°
TRANSMITTAL FORM
Revision Submittals:
1. "Field Set°of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved&the permit is re-issued.
3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum),and are due upon issuance.
�Permit#(s)information applies to: Attention: ( ) Revisions �
(VrResponse to Correction Letter �
� �q" OCl� �j�CaC�1G S�Lpp rZ. ✓attached copy of correction letter �
( ) Deferred Submittal j
� ( )Other =
i
�Project Street Address: �
� ��� �A� MLadD1N �P�V� 113 Description/List of Changes: ;
� ��(Number) (Street) (Suite#) Ska+�. S�Lo� T.=. �"P�/i5�� t'AW
i Building/Complex Name: SD��II"jS �tYt� GOYVIIMP�At' I�PrSC+CbIS�. 1.�5 _ ?
�
Contact Information:
� j
�Company: Solarj5 ProvQt"�1 �wYY2t' . LLC. ;
�Company Address: � 0 - SUi
� }
�Ciry: VlIS� State: GO Zip: ,
�Contact Name:� f�m j
Contact Phone: 9Z0� y79—7138 �
3
�
�E-Mail '(�'OWt.�aA Lp SD�dUriSVa��.GE�N9 �
i i
,
�
�
1
Revised ADDITIONAL Valuations(Labor 8�Materials) �
(DO NOT include original valuation) �
� �
'Building: $ (use additional sheet if necessary) �
i
Plumbing: $ �
�Date Received:
j Electrical: $
i
�Mechanical: $ D � � � O �/ �
�Total: $
JJN 2 2 2n�0
(�-22�IO
TOWN OF VAIL
O1-Jan-10
June 22, 2010
Mr. Martin Haeberle
Chief Building Official
Town of Vail �
75 South Frontage Road
Vail, CO 81657
RE: Skate Shop Tenant Improvement (TI) Revised Plans and Comment Response
Submittal for Solaris—(Building Permit B09-0011) Project Address: Suite 113, 141 E.
Meadow Drive, Vail, CO 81657
Dear Mr. Haeberle,
We are pleased to transmit with this letter TOV Plan Review Comment Responses for the
Skate Shop Tenant Improvement. The Skate Shop is located on the east side of the retail
area on Level 1.
Included with this letter are:
1. One Transmittal.
2. Four TOV Comment Response Letters dated 6-22-10.
3. Four VFES Comment Response Letters dated 6-22-10.
4. Four full-size stamped and signed Skate Shop TI Revised Plans with cover date of
7 June 2010.
Please communicate all TOV Plan Review comments to Jim Buckner of Davis
Partnership Architects at jim.buckner(a�davispartnership.com. Please call Tom Ogg of
Solaris at 970-479-7138 with any questions.
Sincerely,
To�w�
Tom Ogg
Project Manager
Solaris Development
attachments
2211 North Frontage Rd � Suite A � Vail, Colorado 81657 � Phone 970.479.7566 � Fax 970.479.6666 � solarisvail.com
.
�
!
�f�(�Y� `
Depaitment of Community Deve%pment
Building Safety and Inspection Services
75 South Frontage Road
�ail, Co%rado 81657
970-479-2138
FAX 970-479-2452
www.vailgov.com
BUILDING SAFETY AND INSPECTION SERVICES PLAN REVIEW COMMENTS:
TO: Contractor/Applicant
Solaris Properly Owner
Tom Ogg
FAX/Email #: tom.ogg@solarisvail.com
NUMBER OF PAGES: 2
FROM: Chris Gunion, Building Plans Examiner
DATE: 5/14/2010
BUILDING PERMIT #: B09-0011
OWNERS NAME: Solaris Property Owner LLC
SITE ADDRESS: 143 E Meadow Drive
OCCUPANCY GROUP: mixed
TYPE OF CONSTRUCTION: mixed
NUMBER OF STORIES: n/a
BUILDING AREA: n/a
The documents submitted for this project have been reviewed for compliance with the 2003
International Building Code, 2003 International Residential Code, 2003 International Mechanical
Code, 2003 International Fuel Gas Code, 2003 International Plumbing Code, 2003 International
Energy Conservation Code and 2008 National Electrical Code as modified and adopted by the Town of
Vail.
The fo/%wing comments wi//need to be addressed p�ior to issuanc1e of a bui/ding permit;
For processing:
• Please submit four complete sets of revised construction documents containing the requested
information with all plan revision items clouded or otherwise identified. Partial plan sets or
loose plan sheets are not accepted.
• Please respond in writing to each comment with a response letter stamped and signed by the
architect and/or engineer. Indicate which plan sheet, detail, specification, or calculation shows
the requested information. Please resubmit complete plan revisions, response letter and
a Town of Vail transmittal form to the Town of Vail Community Development Office.
• Please be sure to include on the resubmittal the architect's stamp and or engineer's stam�
sianature, registration number and date on all sheets of the plans.
.
Solaris Design Team 6-22-10 Responses provided below in Green Text.
Mechanical Comments:
4 Provide fire dampers at all ducts passing through the fire barrier walls from adjacent occupancy
space.
Revise p/ans to provide Fr�e damper at the 10"duct shown passing through the 2 hour
fire ba�rier wa//at the adjacent Bo/space,
Revise p/ans to coondinate f/oor p/ans with the revised architectu�a/p/ans
Please see revised Sheet M2.11 and M2.12 for added fire damper in 10"duct.
Electrical Comments:
6 Include a panel schedule, one-line diagram and load calculations for the proposed electrical work on
the tenant space.
Revise p/ans to cv�nrdinate tloor p/ans with the revised arrhitectu�a/p/ans
Please see revised Enlarged Plan 2 on Sheet E4.05L for revisions to coordinate with
architectural plans. Backgrounds on M2.12, E4.05P, and P2.12 were also updated.
Please refer to the cover sheet for information on resubmitting plans. In order to avoid delays in issuance of
a permit,please check all requested information is included with the resubmitted plans. Please submit
revised plans as a complete set. Partial plan resubmittals will not be reviewed.
F:\cdev\CH RIS\PERMIT.COM MENTS\B09-0010\B09-0010.DOC
.
, .
Responses to VFES Comments emailed 5/19/10:
Solaris Design Team 6-22-10 Responses provided below in Green Text.
From: Mike McGee [mailto:MMcGee@vailgov.com]
Sent: Wednesday, May 19, 2010 9:37 AM
To: Chris Gunion
Cc: michael@sumanarchitects.com; David Rhoades; ]R Mondragon; 7ames Overcash; Mike
McGee; Mark Miller; Mike Vaughan
Subject: B09-0011 Solaris Skate Shop
The Corrections Required by the Fire Dept. on 02/29/09 have not been addressed.
Corrections required
1. FPFA0000 Flex heads are not approved.
Sheet FPFA .00 has been revised to show Schedule 40 Pipe in the Typical Arm Detail.
Flex heads will not be used.
2. Manual pull stations in retail and assembly areas may be under "employee
control".
We did not relocate this manual pull station, however if VFES prefers it moved to
behind the counter we can discuss and agree on location prior to Shop Drawings being
completed.
3. Smoke detector beneath skate sharpener may be changed to a thermal detector."
On Sheet FPFA .00, the Fire Alarm Plan has been revised to show a heat detector in
Skate Sharpening Room 118.
4. Sheet FAFP0.00 does not show sprinkler or fire detection in storage and mechanical
rooms.
On Sheet FPFA .00, the Fire Protection Plan has been revised to add four sprinkler
heads in Storage Room 118-A. Mechanical 146 is a rated shaft with no access.
Mike McGee
_ . , . , . . . _. . �_ .,. ; ;. . .
. , . � , � ', � � ;
y r r= �. �,,� _ ,,�,�t �,.;�.���� � De{�artment,of Communrty�Development-
Crv �, i � � :� �w� � �,�� � ' "� .75 South Frantage Roa'
,� ;, ., x.: ; � ��� . , X`a ` - • . .1%ailx;C�lora_c�. � -,
..,+. '�� % ,:..�,' . . , 'e ' ' �. ' �� . . y .. . ,� 4 � i y,.n_
.. .,. ,i . �,,:::` : �� 9,�Q;
f }' y� ;
x � � � � y : ` F'ti .
' �' w.' �+.5' �''� � � �'!t� ��,k a
ti
�,.�3 t,.n, � , !�'��,1,',;Y�.�.. .. . � . F �f . � ,n 4� .;�4.
. '�n¢ y,,+�� , , " ���.� * �.
D �[�e er�. �, �
� , '° - :..+. r ��J^p1.!�M },i+'�. �i'' 'Y
. ...-y`_� . ,. ��` c: �
TRAN!SMIT�AL FORM
Revision Submittals: ;
1. "Field SeY'of appro�:ed plans M ST�accoirpany',revisions.
2. No further inspections will be perfor�ed until ths revisions are approved&the permit is re-issued.
3. Fees for reviewing revisions are$59.00 per hour(2 hour minimum), and are due upon issuance.
,. .. __..__. _.__._ ._�_. ._..__._..._ __... .._.._ ._.__._. _.. .___ _.__..__.._._..._.__.._.._.___�. _...__ . _ . __ _. . .
, _ .. _.
� Permit#(s)information applies to: Attention: O Revisions '
`; (vYResponse to Correction Letter
�Oq - 001 � $ a e- SI��?A_5u_��n. 113 �attached copy correc �on letter
! { ) Deferred Submittal
--y—_-- .-- ( )Other
.__,.....,�..._._._ ...._.._.._,_.__._.,_._.,._....�... .._.. .. � ,.... . _
�Project Street Address: '� �
._L'�.L__ �as� Mea�ow q-���1� ��3_� �� �escription/List of Changes:
�(Number) (Street) (Suite#) S),�.�i�_ `��ta�u `f'S Gvwiv►na yti 1<<Gr���t_:� �
BuildinglComplex Name: '`JO�ariS ,'_,_(,��,���, �xrt_� IZ,�1,-.:-_� l.�r-��..����-a-, _
a -
, ,:
i ,
�Contact Information:�_...._.,..........�.,.._...........�.._„_.._...........,,..,.._...m,.._... �; __ -----
!.Company: ShcariS ProPdr'�+l [�w o� LLG ------- ---
E
;Company Address: 2211 IJvr� Fi�rvf-a�e. Ko,-�.cl� 5u�-ke.�.__��----------- --_-_�-_
i ; �
�
'City: Va51 State: GO Zip: BI(o57 �_ ----- - - - �
;Contact Name:_ 'Tv►�n �"J� __ F.__-..____ _._
i s
'Contact Phone: '��0- 479�7138 •� 91v-3y3-Q�$�_ - -
!F_-Mail Tvm o�� Solaris��a�l Gvrv� ___ ---__..� _ .
� .
�
�Revised ADDITIONAL Valuations (Labor&Materials) V �
�(DO NOT include original valuation) _�_..._._.._ ______._ '
�
Suilding: $ �(��se additional sheet if necessary) u�~' ^ � ^ '
�
;Plumbing: �
� �,��Datr_ Received:
i Electrical: $ ��
i Mechanical: $ ^ � �i � M C�
�Total: _ D
! ` APR 29 2010
�I�l�--to ' TOWN OF VAlL
O1-Jan-10
0� •UV � 1
Apri129, 2010
Mr. Martin Haeberle
Chief Building Official
Town of Vail � �
75 South Frontage Road
Vail, CO 81657
RE: Skate Shop Tenant Improvement (TI) Revised Plans and Comment Response
Submittal for Solaris—(Building Permit B09-0011) Project Address: Suite 113, 141 E.
Meadow Drive, Vail, CO 81657
Dear Mr. Haeberle,
We are pleased to transmit with this letter TOV Plan Review Comment Responses for the
Skate Shop Tenant Improvement. The Skate Shop is located on the east side of the retail
area on Level 1.
Included with this letter are:
1. One Transmittal.
2. Four TOV Comment Response Letters dated 4-29-10.
3. Four full-size stamped and signed Skate Shop TI Revised Plans with cover date of
22 March 2010.
Please communicate all TOV Plan Review comments to Jim Buckner of Davis
Partnership Architects at jim.buckner�a�,davispartnership.com. Please call Tom Ogg of
Solaris at 970-479-7138 with any questions.
Sincerely,
r��
Tom Ogg
Project Manager
Solaris Development
attachments D � � � � M �
APR 2 9 ��I�O
; ;
T`O�il� �� '��;�r�,....., ...
2211 North Frontage Rd � Suite A � Vail, Colorado 81657 � Phone 970.479.7566 � Fax 970.479.6666 � solarisvail.com
*
i
L
�������� i
Department of Community Deve%pment
Building Safety and Inspection Services
75 South Fiontage Road
�ail, Co%rado 81657
970-479-2138
fAX 970-479-2452
www,vailgov.com
BUILDING SAFETY AND INSPECTION SERVICES PLAN REVIEW COMMENTS:
TO: Contractor/Applicant Architect
Weitr Company Davis Partnership
Chris Keran proj#
FAX/Email #: chris.keran@weitr.com jim.buckner@davispartnership.com
NUMBER OF PAGES: 2
FROM: Chris Gunion, Building Plans Examiner
DATE: 2/10/2009
BUILDING PERMIT #: B09-0011
OWNERS NAME: Solaris Property Owner LLC
SITE ADDRESS: 143 E Meadow Drive
OCCUPANCY GROUP: mixed
TYPE OF CONSTRUCTION: mixed
NUMBER OF STORIES: n/a
BUILDING AREA: n/a
The documents submitted for this project have been reviewed for compliance with the 2003
International Building Code, 2003 International Residential Code, 2003 International Mechanical
Code, 2003 International Fuel Gas Code, 2003 International Plumbing Code, 2003 International
Energy Conservation Code and 2008 National Electrical Code as modified and adopted by the Town of
Vail.
The fo/%wing comments wi//need to be addressed p�ior to issuanc�e of a bui/ding permit;
For processing.•
• Please submit four complete sets of revised construction documents containina the requested
information with all �lan revision items clouded or otherwise identified. Partial plan sets or
loose plan sheets are not accepted.
• Please respond in writing to each comment with a response letter stamped and signed by the
architect and/or engineer. Indicate which plan sheet, detail, specification, or calculation shows
the requested information. Please resubmit complete plan revisions, response letter and
a Town of Vail transmittal form to the Town of Vail Community Development Office.
• Please be sure to include on the resubmittal the architect's stamp and or engineer's stamp,
si4nature, reQistration number and date on all sheets of the plans.
Solaris Design Team 4-29-10 responses are shown in Green text below each TOV comment.
Architectural Comments:
1 Include building code summary information on the plans. Occupancy type, occupant load, type of
construction, and adopted codes per TOV.
Please see revised Sheet R2.12.
2 Revise plans to provide a minimum 21"clearance from the front of the water closet in toilet room
114.
Please see Enlarged Plan 1 on revised Sheet A6.12. Clearance is now 22 �/2".
Mechanical Comments:
3 Provide outside air calculations showing compliance with IMC table 403.3.
Please see attached Retail Ventilation Summary Spreadsheet. In addition, the F+K design
required an OA Louver of 0.70 square feet (sf) NFA for Retail 113 — Skate Shop. We have
provided a louver with 0.75 sf NFA above on Level 3 near Grids T and 22.5, as shown on
Detail 6 on A4.30.
4 Provide fire dampers at all ducts passing through the fire barrier walls from adjacent occupancy
space.
Please see revised Sheet M2.11 and M2.12.
5 Provide fire dampers at the 8x6 exhaust duct through the floor/ceiling assembly.
Please see revised Sheet M2.12 for added Fire Damper at ceiling in 8 x 6 duct.
Electrical Comments:
6 Include a panel schedule, one-line diagram and load calculations for the proposed electrical work on
the tenant space.
Please see revised Sheets E0.14, E0.17, E0.31 for Panels Schedules. See revised Sheet
E5.02 for the One-Line Diagram. See Sheets E0.14 and E0.17 for Lo�d� Galculations.
Please refer to the cover sheet for information on resubmitting plans. In order to avoid delays in issuance of
a permit,please check all requested information is included with the resubmitted plans. Please submit
revised plans as a complete set. Partial plan resubmittals will not be reviewed.
F:\cdev\CH RIS\PERM IT.COM M ENTS\609-0010\B09-0010.DOC
.,
Solaris-Vail,CO
S06.12030.00
TOV UPDATE-12/19/08
Retail Ventilation
LMM/PLT
8/11I2009
RETAIL VENTILATION ALLOWANCES
Octupied Avail.
Area Code Storage'Area Total Code Code Req'd OA Louver Code Req'd Toilet Exh. Kitehen
Req'd Vent. Code Req'd Req'd Total Provided OA Louver provided Toilet Exh. Provided s Exh.TOtal
ROOm Number Room Name Gross Area Net Area' Occupanty (cfm) Vent.(cfm) Vent.(cfm) Vent.(cfm) NFA°(sq.H.) NFA(sq.k.) (cfm) (cfm) (cfm)
FIRST FLOOR
West 102 Retail� 1,030 824 n/a 247 31 278 280 0.6 0.6 75 150 0
103 Retail� 785 628 n/a 188 24 212 220 0.4 L2 75 150 0
104 Retail� 1,440 1,152 n/a 346 43 389 390 Ducted Ducted 75 150 0
106 Retail� 2,090 1,672 n/a 502 63 564 560 Ducted Ducted 75 150 0
107 Retail� 1,455 1,164 n/a 349 44 393 400 Ducted Ducted 75 150 0
108 Retail� 1,540 L232 n/a 370 46 416 420 Ducted Ducted 75 150 0
Totel 6 800 5,440- 2 002 230 2 252 2 270 375 750 0
East 109 Retail' 895 716 n/a 215 27 242 245 0.5 0.5 75 150 0
110 Retail` 1,220 976 nla 293 37 329 330 0.6 0.6 75 150 0
111 Retail� 1,620 1,296 nla 389 49 437 440 0.9 0.9 75 150 0
112 Retail� 1,630 1,304 n/a 391 49 440 440 0.9 0.9 75 150 0
113 Retail' 1,640 1,312 n/a 394 49 443 450 Duded Ducted 75 150 0
115 Skate Rental 640 512 n/a 154 19 173 175 Duded Ducted 0 240 0
1148owling S ons Bar Part of De(erred Submittal Area and Separate Permit Package 425 -
Bowiin
Total 7 645 5,604 7,681 210 1,891 1,905 �75 7,415 0
SEC�QND FLOOR
West 202 Retail� 1,820 1.456 n/a 437 55 491 500 Ducted Duded 75 � 150 0
203 Retail� 1.430 1.144 n/a 343 43 386 390 Ducled Ducted 75 150 0
204 Retail� 3.800 3,040 n/a 912 114 1,026 1.030 Ducted Ducted 75 150 0
205 Retail� 1,360 1,088 n/a 326 41 367 370 Ducted Ducted 75 150 0
206 Retail� 1,210 968 n/a 290 36 327 330 Ducted Ducted 75 150 0
207 Restaurent PaK o/De/erred Submittal Area and Se arete Permit Packa e
Theater Theater PaR o/De/ened Submittal Area end Se erate Permit Pecke e 900
?otBl 9 620 7 696 2 308 289 2 S97 2 620 375 7 850 0
East 208 Retail` 1,610 1288 n/a 386 48 435 440 Ducted Ducted 75 150 0
209 Retail'` 1.640 1,312 n/a 394 49 443 45� Ducted Ducted 75 150 0
210 Retail- 2,230 1784 n/a 535 67 602 610 Ducted Ducted 75 150 0 �
211 Retail° 2,290 1,832 n/a 550 69 618 620 Ducted Ducted 75 150 0 .
Total 7,770 6,216 1,865 233 2,09d 2,120 300 600 0 ��
East Total 15,415 71,620 3 546 443 3 989 4,025 - - 675 �2 015 0 II
WastTOtal 16,420 13,136 4,310 539 4,849 4,890 750 2,400 0
'Retail Net Area is assumed to be 80%of the Gross Area.
�Retail Area Ventilation Rate is 0.30 c/MfIZ per IBC 2003.
'Storege Area Ventilation Rate is 0.15 cfm/fl�per IBC 2003.
°OA Louver Size based on air velocity of 500 fpm(nett free area).
5 Available toilet exhuast at noted cfm and 0.25 in.wg.(75 cfm per WC or Ur)