PROCEDURE:
Upon completion oi work,inspection and tests shall be made by the contractor s representative and witnessed by an owner's representative.All
defects shall be corrected and system left in service before contractors personnel finally leave the job.
A certificate shall be filled ou�and signed by both representatives.Copies shall be prepared for approving authorities,owner's and contractor.
It is understood the owner s representatives signature in no way prejudices any claim against the contractor for faulty material,poor workmanship,
or failure to comply with approving authority's requirements or local ordinances.
PROPERTY NAME DATE
SOLARIS PROJECT 3/17/2010
PROPERTY ADDRESS
141 EAST MEADOW DRIVE VAIL, CO
ACCEPTED BY APPROVING AUTHORITV(S)NAMES
VAIL FIRE DEPT
ADDRESS
PLANS
INSTALLATION CONFORMS TO ACCEPTED PLANS Q YES ❑ NO
EQUIPMENT USED IS APPROVED(IF NO,STATE DEVIATIONS BELOW) Q YES ❑ NO
HAS PERSON IN CHARGE OF FIRE E�UIPMENT BEEN INSTRUCTED AS TO LOCATION OF CONTROL Q YES ❑ NO
VALVES AND THE CARE AND MAINTENANCE OF THIS NEW
IF NO,EXPLAIN:
INSTRUCT�ONS
HAVE GOPIES OF APPROPRIATE INSTRUCTIONS AND CARE AND MAINTENANGE GHARTS BEEN Q YES ❑ NO
LEFT ON PREMISES?
IF NO,EXPLAIN:
LOCATION OF SUPPLIES BUILDINGS
srsTeM Fire Standpipe Flow Test
MAKE MODEL YEAR OF ORIFICE SIZE QUANTITY TEMPERATURE RATING
MANUFACTURE
0
SPRINKLERS °
0
0
0
PIPECONFORMSTO N.F.P.A.#13 STANDARD Q YES ❑ NO
PIPE AND FITTINGS FITTINGS CONFORM TO N.F.P.A.#13 STANDARD Q YES ❑ NO
IF N0,EXPLAIN:
ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST PIPE
ALARM VAIVE OR TYPE MAKE MODEL MIN. SEC.
FLOW INDICATOR ALARM VALVE VIKING F-1
DRY VALVE Q.O.D.
MAKE MODEL SERIAL NUMBER MAKE MODEL SERIAL NUMBER
Time Watar
TIME TO TRIP THRU AIR TRIP POINT AIR Alerm Operated
TEST PIPE WATER PRESSURE pRESSURE PRESSURE Reached Test properly
DRY PIPE outiet
OPERATING TEST MIN. SEC. PSI PSI PSI MIN. SEC. MIN. SEC.
WITHOUT
Q.O.D
WITH
Q.O.D.
IF NO,EXPLAIN:
OPERATION ❑ PNEUMATIC ❑ ELECTRIC ❑ HYDRAULIC
PIPING SUPERVISED ❑ YES ❑ NO DETECTING MEDIA SUPERVISED? � YES ❑ NO
DOES THE VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL? ❑ YES ❑ NO
IS THERE AN ACCESSIBLE FACILITV IN EACH CIRCUIT FOR TESTING? ❑ YES ❑ NO
DELUGE& IF NO.EXPLAIN:
PREACTION VALVES
Does each circuit operete supervision Does each circuit operate valve Maximum tima to oparete
MAKE MODEL loss elerm� releases� release
YES NO YES NO MIN. SEC.
HYDROSTATIC:Hydroslatic lests shall be made at not less than 200 psi(13.6 bars)for two hours or 50 psi(3.4 bars)above slatic pressure in
excess of 150 psi(10.3 bars)for two hours.Differenlial dry-pipe valve clappers shall be left open during lesl lo prevent damage.All
TEST DESCRIPTION aboveground piping leakage shall be stopped.
PNEUMATIC:Eslablish 40 psi(2.7 bars)air pressure and measure drop which shall no�exceed t-t/2 psi(0.1 bars)in 24 hours.Tes(pressure
tanks at normal water level and air pressure and measure air pressure drop which shall nof exceed 1-1/2 psi(0.1 bars)in 24 hours.
ALL PIPING PNEUMATICALLY TESTED AT 200 PSI FOR '1 Hrs. IF NO,STATE REASON
DRY PIPING PNEUMATICALLY TESTED? ❑ YES ❑ NO
� EQUIPMENT OPERATES PROPERLY? � YES ❑ NO
READING OF GAGE LOCATED NEAR WATER SUPPLY TEST PIPE: RESIDUAL PRESSURE WITH VALVE IN TEST PIPE:
TESTS
DRAIN TEST PSI OPEN WIDE PSI
Underground mains and lead-in connections to system risers shall be flushed before connection mede to sprinkler piping.
VERIFIED BY COPY OF THE FORM NUMBER 858? ❑ YES ❑ NO OTHER EXPLAIN
FLUSHED BY INSTALLER OF UNDERGROUND
SPRINKLER PIPING? ❑ YES ❑ NO
NUMBER USED LOCATIONS NUMBER REMOVED
BLANK
TESTING GASKETS
NONE
WELDED PIPING? Q YES ❑ NO
IF YES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH
THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3? �YES ❑ NO
WELDING DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN COMPLIANCE
WITH THE REOUIREMENTS OF AT LEAST AWS D10.9.LEVEL AR37 �YES ❑ NO
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY
. CONTROI PR(7CFnI1RF TO INSI IRF THAT AI I nISCR ARF RFTRIFVFfI THAT OPFNINGS IN PIPINC;
ARE SMOOTH.THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED.AND THAT INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED7
Q YES ❑ NO
NAMEPLATE PROVIDED? Q YES ❑ NO
HYDRAULIC DATA IF No,EXPLAIN:
NAMEPLATE
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
REMARKS
NAME OF INSTALLING CONTRACTOR
Frontier Fire Protection, Inc.
TESTS WITNESSED BY
SIGNATURES FOR PROPERTY OWNER(Signed) TITLE DATE
.F.sR-tt�YSTALRFeG NTRAC R( gned) TITLE , ` DATE
G�T ,� E'
�...,.w � . ����'"��/�. /y � '-�,,J • '✓C.=� � '���
ADDITIONAL EXPLANATION AND NOTES: ,�/�y� / y
���r `�l��� /✓v!�"�/i3 �`6 .-'� ����� �L�C� , t� ��/�`C��U
/' ���� / �