Loading...
HomeMy WebLinkAboutAction Plan for 03 08 2010Jason BCER: Testing fire alarm system Sunday Starting with water flow, smoke control. Monday, Jason will be testing individual devices and troubles. Monday, Brian will be testing smoke control initiation devices, manual control, over rides, etc. VFES to meet Brian Thompson at 09:00 hrs. Generator test scheduled for 6:30 PM. Dan Feeney to get verification on feedback prevention on generator. Rich to send zone maps and nomenclature from JCI and Frontier to VFES on Thurs 3/4. Gas and water valves to be marked on a clean set of floor plans. Sensitivity test on detectors to be run before and after functional test with can smoke. Elevator selection switches need to be operable. Tues. 9:00 AM to 3 PM.