HomeMy WebLinkAboutB10-0103NOTE: TH/S PERMIT MUST BE POSTED ON JOBS/TE AT ALL T/MES
.•
�w�o�vn� �
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD/ALT MF BUILD PERMIT
Job Address: 292 E MEADOW DR VAIL
Location......: MOUNTAIN HAUS
Parcel No....: 210108228007
OWNER MOUNTAIN HAUS CONDOMINIUM AS 05/12/2010
292 E MEADOW DR
VAIL
CO 81657
APPLICANT NEDBO CONSTRUCTION 05/12/2010 Phone: 970-845-1001
P.O. BOX 3419
VAIL
CO 81658
License: 251-A
CONTRACTOR NEDBO CONSTRUCTION 05/12/2010 Phone: 970-845-1001
P.O. BOX 3419
VAIL
CO 81658
License: 251-A
Description:
COMMON ELEMENT: REMODEL TO CONSTRUCT NEW ROOM IN WOMEN'S
LOCKER ROOM FOR STEAM GENERATOR RELOCATION
Occupancy: MIXED
Type Construction:l6
Permit #:
Project #:
Valuation:
Total Sq Ft Added:
Status . . :
Applied . . :
Issued . .. :
Expires . ..:
B10-0103
PRJ10-0061
ISSUED
05/12/2010
O6/02/2010
11/29/2010
$12,500.00
0
...................>..,..,._.,,,...,..,..,..,.,.,...........,..._..............,. FEE SUMMARY ...............,,.,._.._...............,...,....,.._.._,...,..,.........,.,.,.,
Building Permit Fee------> $223.25 Will Cal Fee---------------------> $4.00 Total Calculated Fees-------------> $422.36
Plan Check--------------------> $145.11 Use Tax Fee---------------------> $50.00 Additional Fees-----------------------> $0.00
Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES--------------> $422.36
Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00
Payments-------------------------------> $422.36
Total Calculated Fees--------> $422.36 BALANCE DUE------------------------> a0.00
fi�tRMf tiYe44Ye444fi(41(tftfi4�rfMMMYekYrYr�kY`i#'M#1e#lrfffffxftttrrtL#YYrYr�Rf#fi`+4irif4�fRR4fwxw�RfLAiA'R�kA'A'Yi�kYr#f##f}f1elf�fia�ekfffYert#i(ii44rtf(�1(�l4tef4xf4frM'hi1'i1'f#�kk�4�tA�4�1(f4ff�RMtfrYrhhR#rtYl#�#Atttff4Lirffxif�Rih
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to com y with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and ¢�vision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto. /'' �
REQUESTS FOR
8:00 AM - 4:00 BI
BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
ature of ner or Contractor
/L�/����GrL-
Print Name
bid_a It_construction_perm it_041908
�
ate�
Mww�/tt#tf�#1ff�iww*w+w�wfff#f4f�fktkwwwwww�t�A��f��#�f#*#wwwrt#/fA�##f�fAfAi###fk#xxkwMwwrt#k*kw%#**#}�1xiR�wwwwwwww��lR��fff4fA�ktN;wwwwYwewk#wf#�f#��Rff�#ftffflffex��fwwwwwYk�A4tfk
APPROVALS
Permit #: 610-0103 as of 06-02-2010 Status: ISSUED
.....................................................................................................................................................................................
Item: 05100 BUILDING DEPARTMENT
06/02/2010 JRM Action: AP
Item: 05600 FIRE DEPARTMENT
05/13/2010 mvaughan Action: AP consult fire
protection professionals for relocation of any devices
that may need adjustment as a result of this project.
.....................................................................................................................................................................................
See the Conditions section of this Document for any that may apply.
bld_alt_construction_perm it_041908
.........................................................................«.,............,............,,,,...,,,.,..,,...,,...........,......................,.,.,,,.,,..........,....
CONDITIONS OF APPROVAL
Permit #: B10-0103 as of 06-02-2010 Status: ISSUED
..................�.....,.............,,.......,.,....,,.....,.,..,.,.,.........,..,..........,..,,....,..,,,,,.,.....,...,,...,,........,,..,.........................,,..,.,..,,,,,
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
bld_a It_construction_perm it_041908
*****�************************�********�****+++**************************++*****+***********
TOWN OF VAIL, COLORADO Statement
*****************�***************�**************�**********+****+*****�*********************
Statement Number: R100000603 Amount: $422.36 06/02/201003:13 PM
Payment Method: Check Init: SAB
Notation: 36791 NEDBO
-----------------------------------------------------------------------------
Permit No: B10-0103 Type: ADD/ALT MF BUILD PERMIT
Parcel No: 2101-082-2800-7
Site Address: 292 E MEADOW DR VAIL
Location: MOUNTAIN HAUS
Total Fees: $422.36
This Payment: $422.36 Total ALL Pmts: $422.36
Balance: $0.00
*****�**********************************�***************************s***********************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 223.25
PF 00100003112300 PLAN CHECK FEES 145.11
UT 11000003106000 USE TAX 4% 50.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
BUILDING PERMIT APPLICATION
Separate permits are required for electrical, plumbing, mechanical, fireplace, etc.
Project Street Address:
zqz � ��, �f.
(Number) (Street) (Suite #)
Building/Complex Name: ��v��'++n i�lwL'S �e�c�c's
Contractor Information:
Company: /v�l�x: ConS�+��'�i�n :�'�•
CompanyAddress: � �� ��N��
City: ���� State: �d Zip: ��bS�
Contact Name: �1 ��G �frs�
Contact Phone: y7�"' `�77�" GZb�
E-Mail /'t�l��� n�d�x.c: Jy
Town of VajVContractor Regislration No.: /�' ZS�
Office Use:
' Project #: P1` v� O" Ov"' �
DRB #:
Building Permit #: � I � � v'O
Detailed Scope and Location of Work:
R,.-, jc� �' a i%t K: f���rn ��� {�c.
We,n.c✓►� 1ick�r (I�.c.� -� ;�l��cr�-� �'�
��4M t�r.►ers►'� �%r,.n. -}�, c�:�ivty �'K �
�+�c rccm,
(use additional sheet if necessary)
Work Class:
New ( ) Addition ( ) Remodel ( x ) Repair ( ) Other ( )
Confractor Signatur req��d}� � �
Work Type
P�operty Info on Interior (X ) Exterior () Both ()
Parcel #: � O�-Q4fZ� Z�-Oa7
(For parcel #, contact Eagle County Assessors Office at 970-328-8640 or Type of Building:
visit www.eagleco ty. s/pa 'el Single-Family () Duplex () Multi-Family (x' )
�ir,/� o� TrRC� �n;,��s
Lot #: � Bbck# /� Subdivision: LES�c Commercial O Other O
Tenant Name: v�`�� r poes a Fire Alarm Exist? Yes (X ) No O
Owner Name: i�'���'1 rl�'S �tn �Oi'��/►�J� �SS/��. Monitored Alarm? Yes (X ) No ()
Valuations (Labor & Materials)
Building: $ � L��
Plumbing: $ ���
Electrical: $ Z�'S�
Mechanical (including Fireplace): $
Total: $ � Z.5l�Y'3
Does a Sprinkler System Exist? Yes (�( ) No (
#& Type of Existing Fireplaces: Gas Appliances ()
Gas Log () Wood/Pellet () Wood Buming ()
#& Type of Proposed Fireplaces: Gas Appliances (
Gas Log () Wood/Pellet () Wood Buming ()
Date Received:
�
i � � O �J �
MAY 1 1 2010
C:\cdev\forms\permits\buildingUesidential_building_permit_010110 I TOW�I OF VAIL
� r�
Vail Fire Department
Asbestos Testing & Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu-
lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements
at the contact info listed below.
When is asbestos testina reauired?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two-Family Dwellings: 30 square feet
All Others: 160 square feet
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State-certified and Vail-registered abate-
ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the
Town of Vail before the building permit will be issued
Project Checklist
My project falls into the category checked below:
� Will not disturb more than the threshold limits identified above.
� Tested negative, or at 1% or below (2 copies of test results included)
� Tested positive at more than 1%, requires abatement (2 copies of test results included)
Tips & Facts:
• Even recent construction projects may include asbestos-containing materials, so buildings of � age require testing.
• The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos-containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development,
75 S Frontage Rd, Vail, CO3 81657.
Town of Vail Contact:
David Rhoades, Fire Inspector
Vail Fire Department
75 S Frontage Rd
drhoades@va ilgov.com
970-477-3454
www.vailQOV.com
c: \cdev\forms\permiu\bui Iding\comm_bui Iding�ertnit_O l O l 10
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303-692-3158
asbestos@state.co. us
www. cdphe. state. co. u s
May 10 10 03:45p Elizabeth 328-5302 p.l
May 10, 2010
NEDBO CONSiRUCTION
P.O. BOX 3419
UAIL, CO 81658
SCOPE OF ELECTRICAL FOR MOUNTAIN HAUS, VAIL CO
Quiz (Bruce) Quesenberry
970-748-9780
�o. aoX z4z
Edv�rards, Colorado 8 [ 632
TO: JUNCTION STEAM SNOVVER POWER AT D�ISTING DiSCONNECT LOCATIONS.3PHASE 9 KW, 280V,#6 THHN,
44.2 AMPS
TD MOVE 2 WALL SCONCES TO NEW LOCATION.120 V. ADD (1) FUIORESCENT FIXiURE AND SWITCH 120V_
MOVE 2 RECEPTACLES.
TO MOVE STEAM SHOWER 1lOLTAGE CONTROL WIRES. 24V.
� MAR 17 '00 11�48F;M 9709Z6Z078 HOLES
�
fl
�
\
..
wo
�
,�
�a
. ..
v�
,
.<
�
�
rt
r
N
�
�
�
�
p
�
C
�
'�
.�
�
�
�
�
�
�
n
, '' ���
�ti �
�' ���
�� ''
� � . .
+, ,� M � ""\
N �
A
'� • � w a
� ����
N � O
, � r �
A
. �g �
A
. 1'� � R
� ^
�� M
n
. ��� �
w�� �
���
a o
Aq �
M
q ��t �
, .+ ii A •t
M 0 � �
. � � �
�
� �:
� p �
• � ■ Olj
� s �t
� s �
,• � a "
x� �
y
t j
. �
�
�
� �"N
. � "`�f7
S
$ �
� � ` i
� � �
v
� � H
N
N �
� � �
s�. � �,
i �
C'!
s � �
� O
� �
.�
�
�r
� �
s � �
. �
�
�
P. 2 .�..=-- ,
��%!x� �
� -
!�
. .
' MAR 1T '00 11�48RM 9709262078 HOLES
�
�
�
r
N
�
.�
�
� �
� �°
�
� ~
� n
�
� ,
.
�
a
�
, � � � .��
�ti �
� ��`�
�` :. . `j
N , f.,,��� �
A �
~ ' "� y
�
�
.+ a � F�
4 • �'
� aw g �'
. �� � a �
a
. �` � # � �
. :�� � �
��� Q � �
. '"5'a n e � y
w�� � N � �
�
�. ; � � �' �
� � a
�� � � � �
,� ` � o � /�
M� a :'� a � l J
��m � �
o�� � �
� �' °a '
q � � �
�p �
�, . r
. ���
� ��� � �
��� � _ .,�
.� �' � � �
� : �, �.+
, �' € Q
. �
P.2 ..�.�- .
����
0
� '�f
9/O1
�
HEA��Y CO
MMEI�CIAL
STEA►MBAT
H GENEKAT
OA
,
r
� �
.� �� �-- �� ��
�
OWNEK'� 1t�fANUAL
Models HC-9 Thru HC-18
;,._
PIIB. N0.400-J
TABLE OF� C0�11TEN�'S
Title
I. Plumbing Installation ................•--............................_.................................................Pagl
A. Plumbing Pre-Installation ............................................................................................1
B. Plumbing Rough-In ..........................................................................................:.........1
C. Steam Generator Plumbing Installation ......................................................................2
II. Electrical Installation ......................................................................................................2
A. Electrica! Pre-Installation ............................................................................................2
B. Electrical Rough-In ....................................................................................................2
C. Steam Generator Electrical Installation ........................................................................2
III. CP-1 Control Package Installation and Operntion ..............................................................4
A. Pre-Construction Considerntions ................................................................................4
B. CP-1 Control Package Rough-In ................................................................................5
C. CP-1 Control Package Installation ..............................................................................5
D. Steam Solenoid Valve ........................................................................................:.......6
E. Operation ..................................................................................................................6
N Auto Blowdown and Automatic ON/OFF Time Clock ........................................................8
V. Steam Generator Operation ............................................................................................8
VI. Steam Generator Maintenance ........................................................................................8
A. Manual Blowdown ....................................................................................................8
B. Periodic Inspection ...........................................................................................:........8
LIS'I' OF ILLUSTI�ATIONS
Figure Page
1. Dimensional Drawing for Heavy Commercial
Steam generator (HC-9 thru HC-18) ............................................................................1
2. Typical Steam generator Installation ................................................................................3
3. ST 200C Temperature Sensor Installation ........................................................................4
4. ST 200C Temperature Control Installation ........................................................................5
5. System Control Module Installation ..................................................................................6
6. Installed CP-1 Control Package ........................................................................................7
7. Automatic Blowdown and Automatic ON/OFF Time Clocks ..............................................9
8. "HC" Wiring Diagrnm with Options ................................................................................11
IMPORTANT: Read all instructions before installing equipment.
Steamaster Company Inc., 1998
e
�
PLUMBING INSTAL1AT10N
The Heavy Commercial Steam Generator (HC-9 thru
HC-18) comes factory assembled, carefully wired, and
tested. All work must conform to local and national
codes. All power must be OFF to the steam generator
when installing or servicing the unit.
WARNING — Elderly persons, pregnant women, or
those suffering from heart disease, high biood pressure,
diabetes, or not in good heatth must not use this device
unless directed by a physician. Also, steambathing
should be avoided while intoxicated.
1. PLUMBING INSTAUATION
A. Plumbing Pre• Installation
1) Insure that the model steam generator
unit you have purchased is sized ade-
quately [or your steamroom.
IMPORTANT: Refer to the specification
label affixed to the cabinet of : the steam-
bath generatoz (See Figure 1.)
2� Allow sufficient room {30" minimum ) for
access to the unit in the event service is
rcquired. Do not keep ftammable materials
such as gasoline. thinnen. paints. etc. in
the same ana as the steam generator.
3) The steam gcnerator must be located as
close as possible to the steamroom. !t the
steam generator is morc than ten feet from
the steamhead. tnsulate the steam pipe.
The serlal number plate should be visible.
IS Iba/P51
SAFETY VALV�
3/4 N.P.T.
9�"
IWATER—
CALUMN
STEAM OUTLET
�rj' N.P.T.
••
�
� 20"
[._�
i�� � I
��
SIGMT � �
S EMBIY � i
�� i
. �
1!"
Refer to Figure 2 for installadon drawing. �
Do not install outdoors o� an area where ;
parts may freeae or corode. Also, do not '
install near combustlble materials, i.e..
paints, thinners, chlorine. etc.
4) The steamroom must be completely sealed
on 3ll sides, top, and bottom, Floor.
walls. and ceil►ng should be completely
covered u+ith waterproof material. In the
event that the walls or ceiling are exposed
plaster. sheetrock. or plaster board. a
waterproof paint must be applied to seal
the surfaces.
B. Plumbing Rough•in
The Heavy Commercial "HC" Steam
Generator reg!cires the following connec•
Nons: 1/2" NPT piping for• urater inle�
1/2" NPT brass or 3/4" (l.D.1 coppe: tubing
tor steam outie� and 3/4" NPT safety valve
should be piped to an indirect waste line. A
3/4" minimum indirect waste line must be
installed for the drain. This should be com•
pleted beEore watls are installed.
Before conneciing the water line it is impor•
tant to make sure the line is thoroughly clean
and free of foreign matter.
l) Raugh-in a water line from hot (pre-
ferably ) or cold urater pipe : brass pipe or
L�OUID
LEVEL
PR09E
IN��CATOR-
�IGHT
woreR —
SOlEN0�0
$WITCM
STEsM —
SOLEN0�0
SW ITCM
$TORT —
SW�TCN
GRI,Y EIECTRICAL
POVYER BOX
OPERATING
PRESSURE
CONTROI.
• U •
U
U
v
PRESSURE
GAUGE
— SPEGFIC:.TION
LABEI
— W,oTER SOLEN010
VA�VE INLtT
� 4�'NPT
_T
^ DRAIN 5�„
� YALVE
, iiZ' N P T
--�
4S�" � 9" — i 4" .�
Figure 1: Dimensioncl Drawing jor Heouy Commercinl Steam
Generator (HC-9 thru HC•18)
�
k
. •�
ELECTRICAL [NSTALLATION
copper tubing is recommended. A shut-
off valve should be conv�niently placed in
the water feed tine.
2) Rough-in the steam line using 1/2" NPT
brass pipe or 3/4" [. D. copper tubing. Do
not use iron pipe, it will rust and discolor
wall of steamroom. For a steam line that is
longer than 10 feet, insulation must be
used. The steamhead location should be
approximately 12" to 18" above the
steamroom floor.
CAUTION: NO shut-off valve should be
installed on the steam line. Do not create
traps or valleys in this line which would
trap condensation and block the flow of
steam. The steam pipe should be pitched
away from the steamhead allowing con-
densation to run back into steam gener-
ator (preferably) or pitched toward the
steamhead. �
3) Rough-in a 3/4" indirect waste line to be
used for the safety valve and drain. The
indirect drain must be in accordance with
local plumbing codes.
C. Steam Generator Plumbing lnstallation
Care must be taken when installing the steam
generator. Leave proper access for servicing
(30" minimum each side ). (Re(er to Figure 2
for rypical steam generator installation.)
CAUTION : The steam generator is designed
to be used ONLY in an upright and level posi-
tion ; to do otherwise would damaoe the unit
and void the warranry.
1) I( needed mount the steam generator on a
platform to allow draining into a basin or
into previously installed indirect waste
line.
NOTE: Optional automatic blowdown
must be piped into the 3/4" indirect
waste line.
2) Connect the 3/4" NPT safety valve into
the previously installed indirect waste
iine.
3) In areas where high water pressure may
be a problem a water hammer arrestor
should be installed. Connect the water
supply to the steam generator connection
marked "water inlet". (See Figure 1.)
4) Connect the steam line from the pre•
��iously roughed-in location to the steam
solenoid valve on the generator marked
"steam outlet". (See Figure 1.)
����=!T�
, 5) In the steamroom, place the center of the
escutcheon onto the steam pipe and screw
the steamhead into place. Care must be
taken not to scratch the steamhead or
escutcheon with a wrench. Be sure the
steam slot in the steamhead is facing
down.
After the plumbing connections are complete
the elecirician may finish the wiring and test
the unit.
lI. ELECTRICAL INSTALIATION
A. Electrical Pre-Insiailation
�°� •
i
lk-
1) Properelectricalsupply: seespecification
label located above the drain valve (see
Figure 1). Determine proper size of u�ire.
voltage, amperage. and phase for the
steam generator.
2) lnline fuse/circuit breaker required: fuse
or circuit breaker sized in accordance
with specification label. Do not install a
(GFI) Ground Fault interrupter to this
equipment.
B. Electrica! Rough-In
1) Route power supply cable to the location
the steam generator will be installed before
walls are closed.
C. Steam Generator Electrical Installation
WARNING ALL POWER TO THE STEAM
GENERATOR MUST BE TURNED OFF.
1) Locate and rernove six (6) screws securing
the access cover to the gray electrical
power box. (See Figure 1.)
2) Locate appropriafe knockout found on top
of the steam generator. Mount proper
stain relief into knockout hole.
3) Stripbackthepowercable'souterinsulat•
ing jacket twelve inches and insert into
steam generator. Strip back insulation
1/2" from the incoming wires; single
phase (two power and one ground). 3
phase (three power and one ground).
4) lnsert ground wire into grounding lug
located on the lower leh side wall of the
gray electrical power box.
CAUTION: lnsure ground wire does not
come in contact with live electrical
connections.
5) Locate the fuse block, iound in the upper
part of the gray power box. Insert power
�ires into the proper power lug terminals
n top o the fuse block and secure.
S � ����
c�(i,�`
C
ELECTRICAL INSTALLATION ,
6) Replace cover and secure screws ' generator is heating.
removed in step 1.
7) lE connection5 are made properly the NOTE: Steam Generator will not operate
indicator lamp will illuminate when the without water.
NOTE: Steam Generator will not
operate without water.
' � /
/ ���
'� �
h
/
Mo�� �i
INS?ALL STEAMHEAD 18" �
ABOVE STEAMROOM FLOOR
ELFCTRICAL POWER SUPPLY.
208. 240, or 480 VOLT INCOMING
FUSED DISCONNECT/CiRCUIT BREAKER
TEMPERATURE � '
SENSOR �
i �
SINGLE T[ER , / �
SEATiNG 6' - I � �
ABOVE ELOOR I
OR s� � I
DOUBLE T1ER � POWER SUPPLY TO
SEATING 7' STEAM GENERATOR
ABOVE THE � I i
FLOOR � I
� SAVETY V.4LVE-
� I CONNECT TO
� (NDIRECT WASTE
� I OR AS REQUIRED
I j BY LOCAL CODES
,
,
,
,
:�, �
0 -., ,
i • � i
��� 1 i
1 i
1 �
EXISTING 1/2" HOT (PREFERRED}
OR COLD WATER SUPPLY
SHUT-OFF VALVE /
KEEP IN OPEN POSiT10N
DURING NORMAL OPERATION
UNIT MUST BE FASTENED �
SECURELY AND MUST BE LEVEL
� icalSteam Generato►lnstallation
Figure 2: Typ
MANUAL DRAIN VALVE
DRAIN INTO BAS1N
OR 1ND[RECT DRAIN
�
� �--
CP-1 CONTROL PACKAGE
III CP-1 CONTROL PACKAGE INSTALLATION AND
OPERATION
The CP-I Control Package is completely automatic
in operation... room temperature is thermostatical-
ly controlled by the Steamist ST 200C Solid State
Tempemture Control System in conjunction with
the generator's steam solenoid valve. No attendant
required... set it, forget it.
The "rapid response" S'I=200C Temperature
Control System is made up of three components:
Temperature Sensor Probe (Figure 3), Tempernture
Control Panel (Figure 4), and System Control
Module (Figure 5). After installation of the ST
200C is complete the steamroom temperature will
automatically be maintained within 1-1/2°F of the
desired setting.
NOTE: This control is not an ON/OFF switch, it is
used in conjunction with the Steam Solenoid Valve.
The steam generator cannot be tumed OFF with
this device.
A. Pre - Construction Considerations
1) Choose a location to mount the Temperature
Control Panel. If only a manager or limited
group will be in charge of controlling the steam-
bath temperature, a utility area may be appro-
Note: Location of sensor is as follows:
a) Single tier seating — 6 feet above floor.
b) Double tier seating — 7 feet above floor.
� ���
` ,i
'
� �' / �
' �� �~:
� ��
� (� .�
� � :. �.� _���1
Figure 3
ST-200C TEMPERATURE
SENSOR INSTALLATION
(Inside Steamroom)
priate. If steambathers iuill be permitted to
adjust the tempe�ature, choose a convenient
Iocation outside the steamroom door.
Mount the Temperature Control Panel OUT-
SIDE the steamroom. Mount the Tempernture
Sensor Probe INSIDE the steamroom.
WARMNG: All electrical power to the steam
generntor MUST be tumed OFF before pro-
ceeding with installation.
B. CP-1 Control Package Rough-in
The 3 wire cable for Temperature Control
Panel to be used during installation of the ST
200C Solid State Temperature Control System
is low voltage; 18 or 22 AWG wire recom-
mended. Every attempt should be made to
match the color wire of the Temperature
Control Potentiometer lead wires (Pl white, P2
black, and P3 red) to the 3 wire cable.
1) Install a metal two-gang switch box rotated
90° (refer to Figure 4). Install an inverted
strain relief clamp and feed the 3 wire cable
into the two -gang box. Run the 3 wire cable
from the switch box to the steam generator's
location.
S'IEPS TO INSTAIL SENSOR
1) SEPARATE TWO WIRES OF CABLE (COMING
THRU WALL FROM GENERATORS ST 200C
CIitCUTT BOARD, TERMWAL �2 AND �k4)
APPROX. 2°, STRIP AND 7WIST APPROX.
cna�TO 1/2" OF BARE 4VIRE.
STEAM GENERATOR
2) TAKE NEW SENSOR ASSEMBLY AND "t1�VIST
�MPEr:n�ruRE W(�� TO WALL CABLE AND SECURE WITH
SENSOR AND HOUSING �� NUI.S.
(SHIPPED ASSEMBLED)
. '�'i�
�
�4
0
3
DOUBLE-SIDED
TAPE
3) PEEL OFF ADHESNE BACKIIVG FROM
5���.
No. s scaews 4) CAREFULLY APPLY SILICONE SFAIANI'
1" LONG qgOUND REAR EDGE.
4
5) FEED WIRES BACK IIV'f'O WALL AND PRESS
SENSOR FlRMLY 7'O WALL (BE CAREFlJL TO
AI.IGN PLATE HOLES WITH ANCHOR HOLES).
6} INSTALL SCREWS, AND SNAP CHROME
COVER BACK IN PIACE. .
7) TEMPERATURE SENSOR ASSEMBLY MUST
FORM A 100% WATER TIGHT SEAL TO THE
WALL USING SIUCONE SUPPL.�D.
�
�
CP-1 CONTROL PACKAGE
b. Keeping the 5�8 inch hole centered,
drill two 1/4 inch holes 2 inches apart.
lnsert 2-T1o• 8 P�astic anchors into
drilled holes.
�
2� install t�e cable from the area of the _
Temperature Sensor (probe) to the steam
generator's location. The Temperature
Sensor (Probe) MUST be located inside
the steamroom. In steamrooms witr► single
tier seating the Sensor should be located 6
feet above the floor, with two tier seating
it should be 7 feet above the floor and in
e�ther case away from the steamhead and
steamroom door. The connector end of
the wire must be installed inside the
steamroom. NOTE: A 5/8 inch hole
should be provided so that the connector
can be passed through the wall for instal-
lation found later in these instructions.
Cp-1 System Control Package Installation
C. 1 ) Temperature Sensor (Probe ) (for
installation inside the steamroom)
a�,oCate the 2 wire cable described in
the Rough-in section.
�� P3 RED �
FIELD W1R�NG � g�CK
CONNECflONS pl WHITE
Fgure 4:
c. Follow F'igure 3.
2) Temperature Control Panel (for installation
outside the steamroom )
a. Attach the 3 wir� �1� P2� �d p3) from
the Temperature Control Potentiometer
to the 3 wire cable in the two-ga�8 box.
Note the colors of wire P1, P2, and p3
are attached to match the colors of the 3
wire cable to the potentiometer wire col-
ors.
b, Secure Temperature Face Plate to the
two-ga�g b°X us�ng four (4) machine
screws. (See F'igure 4.) Important: Care
m�t be taken to mount Tempernture
Face Plate properly.
�
��
�
r��
; �;
,� �i
2 � i/
CABLE TO
STEAM GENERATOR
TEMPERP►TURE CONTROL
pOTENTIOMETER
NO. 6-32 x 3/4" LONG
COUNTERSUNK HEA�
MACHINE SCREW
.,� �
4 REQUIRED
CONTROL
O I KNOB
TEMPER�►TURE
EACE PLATE
ST•200CTemperoture Control lnstallation
(Outside Steomroom)
__ �
�
�
�
�,
�
�-
��
� � � b � «�
CP-1 CONTROL PACKAGE '
3) System Contro) Module
a. Remove screws securing cover to Sys�
tem Control Module and remove
cover ( Figure 5).
b. Feed the 3 wire cable through the top
strain relief, three inches into the corr
trol module. Attach wires as shown in
the blowup (Figure 5).
c. Feed the 2 wire cable through the
lower strain relief, three inches into
the control module. Attach wires as
shown in the blowup (Figure 5).
d. Check that all connections are made
FROM TEMPERATURE
CONTROL (OUTSIDE
THE STEAMROOM) �.
FROM TEMPERATURE
SENSOR (1NSIDE THE
STEAMROOM)
� �.
I�
CONTROL CAB
NYLON
STRAIN RELIEF
SENSOR
�
� � �\�
i I \ .
i {
� I1
� �•
. �il
�e
� in accordance with Wiring Diagram.
(See Figure 7.)
e. Replace control module cover.
D. Steam Solenoid Valve
There is no instatlation required for the steam
solenoid valve, it is factory installed and
wired.
E. Operation
The temperature of the steambath is regulated
automaticaUy by the ST•200C Temperature
Control System which turns "On or Off' the
Steam Solenoid Valve located on the steam
generator allowing sieam to enter the room.
.
�
� COLOR CODED
FIELD WIR[NG
CONNECTIONS
(S PLACES)
P3 RED
S1 BLACK
P2 BLACK
S2 BIACK
P1 WHITE
ST•200C
P.C. BOARD
SOLENO[D VALVE
y /�J , I
r � �--/ "j
� GREEN PILOT LIGHT
�, � I; �` I I (UT WHEN STEAM
i� � SOLENOID IS
� � j ! ENERGIZED)
1 � _.
: � '
1
" C�.�
I�
I ��
,
� ' I
i
I 1
�
�`%/�:
� � ei
I
:•
Frgure 5: System Control Module /nstallation
6
RED PILOT LlGHT
(INCOMING POWER)
CP-1 CONTI�OL PACKAGE
To INCREASE the temperature, tum the knob on
the Tempernture Control Panel clockwise; the
HIGHER THE NUMBER, THE HIGHER THE SET-
TING (numbered 1 to 10).
To DECREASE the temperature, turn the knob
counterclockwise.
Once a desired temperature setting has been estab-
lished there should be no further need for addition-
al adjustrnents.
IMPORTANT:
NOTE: Locallon o( senwt Is a� blloati:
�) Single [kr wtlny - 6 feet above aoo�.
b) Double der xating - 71e�� abow Ilom.
TEIMPERATURE
SENSOR CABiE
No. a Pusnc
ADICHORS
p3 pED'
FlELD WIRING � guC�
CONNECT70N5
Pl WHITE
KNOB
��
l�
�
�
To check the function, two lights are provided on
fhe exterior of the System Control Module located
on the steambath generator. The "Red Light" indi-
cates there is electrical power to the Temperature
Control Module. The "Green Light" indicates the
Steam Solenoid Valve is energized.
If a malfunction should occur in either the incom-
ing electrical power supply "Red Light" or the
Steam Solenoid Valve "Green Light" then the
appropriate light will not be lit. However, the
"Green Light" will cycle "ON and OFF" to indicate
mode of the Steam Solenoid Valve.
NYLON
Fgure 6: Installed CP•1 Control Package
..
COIOR CODED
FlELD WIRING
CONNECT70N5
(S Pl�CE51
P3 RED
Sl BLACK
P2 BLACK
s2 B[ACK
Pl WHITE
SOLENOID VALVE
RED PILOT UGNT
(INCOMiNG POWER►
GREEN PILOT L1GHT
(Lfi WHEN STFAM SOLENOID
IS ENfRGIZEDI
�
J. AUTO BLOWDOWN AND AUTO ON/OFF TIlHECLOCKS
The "HC" steam generator, with an optiona! auto blow-
doum system, will automatically purge the steam boiler.
Working in conjunction, the Time Clock and electrically
motorized valve, which allows blowdoum on boilers, pre-
vents excessive mineral and scale build-up.
A. Installation
1. Auto Blowdown Drain Valve (plumbing)
Attach the main blowdown drain valve to 3/4" indirect
drain (most local codes require a blowdown tank). A
strainer must not be used with the valve. Note: the drain
line must be angled downward, allowing gravity to prop-
erly drain the machine.
2. Auto Blowdoam (electrical)
All wiring is done at the factory so that no special elec-
trical wiring is necessary.
B. Operation
First, decide the TIME OF DAY you require the boiler to
blowdoum. It is recommended to select a time while the
boiler is in use, but under low demand. For best resuits
program the Timer to blowdoum every day of use for a
period of 5 minutes.
The blowdoum will begin with the Timer "ON" com-
mand and end with the Timer "OFF" command. See
Page 9 and 10.
C. SETfIlVG AUTOMATIC ON/OFF TII� CLOCK
The Steam Generator will tum ON wlth the Timer "ON"
command and OFF with the Timer "OFF" command. See
Page 9 and 10.
iMPORTAM: The Auto Blowdoum Timer and Auto
On/Off Timer are two separate timers. If your steam
generator only has one timer, then only one of these
two options can be programmed. Check with the
installer to see which option has been purchased.
V. STEAM GENERATOR OPERA'I70N
A. Place STAR1', WATER SOLENOID, and STFAM SOLE-
NOID switches in the ON position. The Water Solenoid
Valve will open and the boiler will fill to its proper level
(one-half to two-thirds of the sight glass full) and automat-
ically shut-off.
B. When there is adequate water in the boiler the power
contactor will energize and the red power tight will illumi-
nate indicating that the boiler is heating up.
NOTE: This boiler is equipped with a Solid State Liquid
Level Control System. Water level is maintained in the boil-
er, by a ground potential signal between each stainless
steel water level probe and the boiler, and opemtes by
sensing the electrical resistance of water.
Both the water feed and low water cut-off functions are
regulated by a low voltage electrical signal that activates
the control relay(s), depending on the water level urIthin the
boiler which, in turn, energizes the water solenoid valve
and/or power contractor.
8
C. When adequate steam has been generated from the
boiler and the desired temperature reached in the steam-
room the steam solenoid valve will close: when controlled
by the ST 200C. The steamroom is now ready for use.
Note: When the steam solenoid valve closes the red pilot
light above the toggle switches will go out only after steam
pressure builds to approximately 8 to 10 PSI within the
boiler.
The boiler will maintain an 8 to 10 PSI steam pressure by
use of a pressure control which is supplied as standard
equipment. The pressure control will cycle the unit ON and
OFF automatically when the steam solenoid valve is OFF
and the room temperature control is satisfied. If the sole-
noid valve is OPEN, the pressure in the boiler will drop and
the red light urill stay ON.
D. If a ST 200C Temperature Control System (Thermostat)
is provided, set the dial to the desired TEMPERANRE
(Dial Calibration: 1 to 10 setting for comfort level). (Refer
to Section III for Operating Instructions.)
E. If an Automatic ON/OFF Time Clock is provided, set
"the timer cycle" in order to operate the steambath gener-
ator.
Vl. STEAM GENERATOR MAIN'IENANCE
A. MANUAL BLOWDOWN (Only if not equipped with
Automatic Blowdown)
The boiler should be blown doum on a daily basis to purge
the vessel of mineral deposits and possible scaling. For
effective blowdown, the STFAM, WATER, and START
switches must be placed in the OFF position. The drain
valve should be opened completely, allowing the boiler
water to exit through your drainage piping into an indirect
drain. Now, place the water solenoid switch in the ON posi-
tion allowing the system to flush through for approximate-
ly 5 minutes. Close the drain valve and allow the boiler to
fill with water until the proper level has been reached. The
genemtor is again ready for use, place the START and
STEAM switches in the ON position.
B. PERIODIC INSPECTION
CAUTION: Disconnect all power to boiler before servicing.
Service should be performed by a qualified person.
1. Check electrical connections periodically, to ensure that
they are tight.
2. Remove Liquid Level Probe periodically to check for
deposits. Check that the bottom union, which attaches
.� the water level probe assembly is clean of deposits. If
necessary, clean stainless steel probes and teflon insu-
lated tubing by removing all foreign matter. Fxtreme
care should be exercised so that porcelain insulators are
not damaged during the removal of Liquid Level Probe.
This will ensure proper conductivity and operation of
boiler.
3. Remove flange-type element to clean any scale that
might have built up on sheath of heating element(s). Be
careful when cleaning heating element, not to deform
the rods.
Digi 20 S�ries
One Circuit Electronic
24 Hour or 7 Day Time Switches
FIGURE 7. Auto Blowdown and Auto ON/OFF Timeciock
Digi 20A
(surface mounting)
Operating instructions
ppPLICATION '
Time based control of lighting, ventilating, heating, cooling or other electrical loads in commercial and in us-
trial applications. The Digi 20 time switches are programmable for 24-hour or 7-day schedules.
The Digi 20A is intended for either surface or rail mounting. The controi is completely enclosed in a plastic
housing and inciudes a terminai cover and sub-base for installafion and hard wiring.
The Digi 20E is intended for flush (panel) mounting. -
Ali units are supplied with a clear plastic dust cover.
TECHNICAL DATA
Output-1 SPDT relay with dry contacts
Switch Rating: 16A/27NAC resistive
1000NV tungsten � 240VAC; 50dW � 120�/AC
1/2 hp � 120VAC; 1 hp � 240VAC
100 hour capacitor back-up of inemory and display
Supply voltages: Separate Models - 24VAC/DC, 120VAC,
208/240VAC, all 50/60Hz (refer to product label)
Shortest switch time-1 minute
Ambient Temperature Range -20°F to 140°F ( 28°C to 60°C)
VA required: 120V & 240V models: 4VA
24V model: 2VA � 24VAC, iVA � 24VDC
Screw terminal connections (Digi 20A)
1/4' quick connects (Digi 20E)
Accuracy t 4 minutes per year
Mechanical Timer Shown
9
WIRING
1. Disconnect the power.
2. Wire input to timer, Q, to the proper volt-
age marked on the unit. Wiring to incorrect
voltage will avoid the warranty.
3. Connect wiring according to the wiring
diagram. The terminals on the Digi 20A sub-
base will accommodate 10 to 24 AWG wire.
Tsrrnlnal Connectlons
/I
0
o�p o O O
0
�
�
�
}
, �4
' Digi 20 PROGRAMIMING INSTRUCTIONS
The ciccular keypads are positioned to provide a sequential path for programming. Starting with Prog, to select a program,
ciockwise to � to select ON or OFF, then h for hour, m for minute, and finally Day to select day or days of the week. If an
in i mi in r in m i h mi im m � wili fl h wh n h � or �roaram k v ic rfa.,�o��o,�
ON or OFF is selected, the ON symbol will flash): The missing entry must be completed before programminglcan es mpee Wh le
programming, pressing the h, m, or Day key longer than 2 seconds wiU cause a rapid roll of the parameter.
• A program consists of: 1. ON or OFF command, 2. Hour and minute, and 3. Day or multiple days on which it is to occur.
• Res. is the reset key which clears the time of day and deletes all program information.
• The tt h key sets clock time up or down 1 hour for daylight savings time adjustment in the spring and fall.
• Military (24:00 hr.) or AM/PM (12:00 hr.) time may be selected by pressing and holding the h key while depressing the
31 h key.
Note: A flashing display indicates either incomplete data entry or the battery is low. Check to see if days and ON or OFF times
are entered and check the power supply to the time control.
IMPORTANT: Depress reset key before beginning to set time and program
1. Select military (24:00 hr.) or AM/PM (12:00 hr.) time mode
by depressing�alAl� holding h key while pressing t1h
key to toggle between military and AM/PM. (AM appears
in display when.' AM/PM mode.)
2. Press and hold�wn � key.
3. If setting the time when daylight savings time is in effect,
press tth key once (+1h will appear in display).
4. Set hour with h key. If AM.or PM does not appear in display,
the unit is in military time. See note above to change display.
5. Set minutes with m key.
6. Press Day key repeatedly to the day of the week. (1 is
Monday, 7 is Sunday)
7. Release B key, colon will begin flashing. If the days are
tlashing, the day of the week was not entered (see step 6).
1. Press Prog. key 4 5�1 Will appear in display. (Pressin Pro ke a ain, dis la will show the number of free pro-
AM --:- J 9 9• Y 9 P y
grams; Fr 20). Press again to return to 1st program.
2. Press r key, al ON symbol will appear. Pressing the key again will toggle to OFF c�. Select ON or OFF for the program
with the � key.
3. Press h to select hour for switching time.
4. Press m to select minute for switching time.
5. If the program is to occur every dav of the week, (24 hour time control) ignore Day key and press Prog, key to advance
to next program.
6. If 7 day time control is desired, press Day key. 1 2 3 4 5 6(Mon thru Sat) block of days appears in display. Pressing Day
key again, 1 2 3 4 5(Mon thru Fri) appears in display. Pressing Day key again, 6 7(Sat 8 Sun) appears in display. Pressing
Day key again, 1(Mon) appears in display. Repeated presses will cycle through all days of the week, and back to 1 thru 7
(Mon thru Sun). Select day or block of days desired with the Day key.
7. Press Prog, key and repeat steps 2 thru 6 to enter additional programs of ON and/or OFF times.
(Note that more than one OFF time program may be entered, enabling automatic controt of manual overrides.)
8. Press � key to enter run mode.
IMPORTAMT: Th� output ���ays ry(�� switeh ON (or OFF) �nlv at the o�oara�n�e.� �t
od, if a ahannd shpuld b� ON, it �nust b� manually tu�ned ON with tha � k�y. For xaen Po ��amminy is complat-
pletsd at 2PM and CH1 was progrsmmod to bo ON at 8AM and OFF at SPM. Attsr ressin thoproyramming is eoen.
OFF; pr�ss � to tum 1t ON. It will assunw automatio operation at th• 5PM OFF t ma. 9 � ksy, CN1 will be
1. To review a program at any time, press Prog, key. Programs will be displayed in the sequence they were entered with repeated
presses of Pro�, key.
2. To change a program, select the proyram to be changed with the Prog, key, and enter the new time of day, and/.or days of
week just as in the programming steps shown above. The old program is overwritten with the new selections. Press Prog.
to store the new program.
3. To defete an individual program, select the program as in step 1 and press the m key and then the h key until "—
appears in display. Press either Prog. or B key until '—:—• flashes. The program is deleted after a few seconds.
While in the Run mode, (� symbol is display), pressin the
ON, or switch ON if it is OFF). A hand s mbot a 9 Z` key will reverse the load status (switch load OFF if it is
y ppears in display to indicate the override is active. At the next scheduled switch-
ing time, automatic time control wilt resume, eliminating the ove� ride.
Pressing the r key a second time [�] appears in the display iridicating the load is switched permanently ON.
Pressing the � key a third time, �� appears in the display indicating the load is switched permanently OFF,
Pressing the t key a fourth time returns to automatic, p appears in the display.
If probLems occur with timer control only, contact:
GRASSLIN CONTROLS CORPORATION
31 Industrial Ave., Mahwah, New Jersey 07430 • Tel.: 2 • Fax: 201-825-8694
, n i �, _� _. .
�
B
�
�
�
�
�
�
a
W1R[NG DIAGRAM .
NOTE�
L3 TERMINAI PROvIDED ON AOJUSTABLE
j PMASE POWER CIRCUIT ONLT. TEMPERATURE
COMTROI ,
Tti�NSFORIAER PROYIOED WITM � e�ACK
ALL •60 VOLT UN1T5 WMITE
�-- -------�
i �
I STEPOOWN
INCOMING POWER SUPPIY I TRANSFORMEII �
2oe•zao-�eov � i
�-------- J
POwER � lstt �E�owl
CIRCUIT � CONTROL
fU5E5 � FUSES
T
�cK
GRO ST[LY
jINDICATOR LZ �� �aEMOID
LI L31 L2 LIGHT �
COIL
HEATIIiG ELE!ffiiT
POWER
CONT�CTOR
HEATIN6
ELEMENT
uc•i�oo-s CYwM��M�
ua 0s.�w
►N ►17
� � Sw O�1 l�Iw
�� �
��N Of�Q QDS7 �
� R D32 Q Q DS�
�i M �2 ►1 ►T W� ��
rl i� �hFn ��
� SENSOii, �
ST-200C
lO p ���LL-�
TI �
F �
O KI
O MF—_
S g
6AEEM s?���
wATER STE�� :p��No�O
SOLENOID �NOICITO■ SriiCM
SWITCH
-0j• BLUE
REO
POwER
IHDICI.TOIi
START
SW ITCH
PRES'SURE
CCNTROL BLU
�. � � �
�
I �
� �
M I
� Y I
lIIOY I
I CONiIIOI IYf[t
O�TIONIL �UTOw�1�C
ON/Of� iIYE CLOCX
� � � � �
�J
OPiIOBAI. CP-1 CONTROL PeC[AGE POR SECO2ID
Sip,AM 60UM FBOM ONE STF.Ali DNIS .
� �e� �eOY CONill01. f0� 1
�OJUST��LL SLNSOR � � �� -
T[Y�[114TYIIE 3T-200C I (
COMTIIOL
I 11 0 lO Q 10 LL-1 �K I I
� tl�[t ►] .��L
r�utt T� «': F[JSES ( AUTO I
I Mcz e�oNOO.N M
�� O I�vm �owoorn� tm� v�u� I
I s: K� I O�TIONi� �UTOM�i1C I
o� ,x., � , , . ( lLOwDOwN ►SSEM�LT
.� � � I l
I D31 OFlN SYSTEM ON I
DS2 YEL HEAT ON SLOMQDMN V�LYt ti N.C.
fTt�r � DS9 AMB WATER FILLON I wb�n IA� lLOw00WN TI�ER I� �n t I
I �a[�oio � I. D� R� �� � IA� ON wN� � ��b� O�ENi
cuc� �ri.r Ih� OFF �d� ■ �da CIOSEi
� 7iC1M so�t�e�o � L � �� �� �� � �� � �.
IMOIClfO� {t1iCM
figure 8: "HC" Wlring Diogrnms Wilh Options.
ll
SPECIFICA7'IONS
Wire .
Size
Max. Yolis/ 90°( ST� Overall
Model Produd kW Cu. Phase/ Copper Line �AT� °D�� Dimensions Shipping
No. No. Ratin Ft. Am s AWG Wse �T �B�S� � x W x H Wei hi
H(-9 b0900 9 400 140/1/36 8 SO i�2° Nrr i!z° rrnx 22-1/2" x 19" x 18" 140 bs.
60901 208/1/43 6 b0
60902 240/3/22 10 30
60903 208/3/15 8 35
60904 480/3/11 14 15
HC-12 b1200 12 S00 240/1/50 6 10 i/2„ xez i/2" xrT 22-1/2" x 19" x 28" 150 Ibs.
61201 . 208/1/58 4 80
61201 240/3/29 8 40
61103 208/3/33 8 4S
61204 480/3/15 12 20
HC-15 61 S00 15 620 240/1/63 4 80 � 1/2n Nrr i/z�� xrr 22-1/2" x 19" x 28" 150 Ibs.
b1501 206/1/12 4 90
61502 140/3/36 8 45
61503 108/3/41 6 60
61504 480/3/18 10 25
HC-18 61800 18 140 240/1/15 3 100 i/2" er�T i/2^ Ner ZY-1/2" x 19" x 28" 150 Ibs.
61801 20B/1/81 3 110
61 S02 240/3/43 ' 6 60
b1803 208/3/SO 6 10
61804 480/3/12 10 30
IJMITED WA►RRANTY
STEA�IASTER COMP.iVY. INC. hereby �a�arnnts tfiat iis Stramist gcneratori
Models HC•9. HC•12, HC•15. and HC•18 are hee (rom all detects in work-
manship and materials for ont I11 •year hom th� date o( purchau.
This �►arranty dots no� aa�end �o damag� c�used by improper or neyl�9�n�
installaiion or usr, or lor repairs a��rmpied by any person oiher ihan an
autho�ted5�e�mlu dealer. and s�all be Omiied eo tht repair or replacvment of
delec��rr p+rts by STEAMASTER or �a �uchonted dea�ers. ah�r ihe un�� has
been Eisconnec�ed �nd reiurned io STE.�!NASTER's plan� or to one ol i�s
au�horired dealer's �arehouses Said repairs shall be � ithou� cAs�pe �I � iihin
mne�y 1901 darti ol tht d�it of purchase. A(ter thr eipirauon ol nin�ey 1901 d�ys
(or �he duration ol tht I�mited �artan�y penod. there shall be a r�asonable
eMrgt (or labor mcurt�d �n tonn�thon Wi�� the r�pau or rcplacemem indica�ed
abovc.
frtight: W�thin Ihe fin� n�e�ry 190) dayt and � ith pnorcomp�ny �ppro�al,
Stt�mis� �•JI psy all freight char9e� on i�emi covered under our �arran�y
Theredt�r and uniil �he eod ol tA� �vrramy period. •nd Wuh p�ior compsny
+Dproval. �ht customer �s rtQuired to thip heigh� prepaid �a Ste�mis�'s lac�ory
and s�eamist ��ill �Mn sh�p k�ight p►epaid back �o cus�omei.
Tf+�s �s noi a�service conirsct. snd this �a�raniy does no� includr reyular
maimen�nce, clean�ng or per�odic ch�ck• ups, r�ich �rt the sol� and �aclusive
respon�iDill�y ol �he purcAaser ana are reQuired �i a condii�on ol ke�p�ng �his
limiud �•arraniy in (ull fortr �nd rHect.
This varranty shall no� becomt eNective unless the attsch�d Rrgistratron
ol 4l'srraniy is complt�ed and ret�rned io STEAMASTER r�thin f�h�en I1 SI
days ol �h� da�e ol ins�allanon.
T'hiti r�artanry i� non-�►anslerable and +h�ll tstend only �o t�e o�iginal
pu►cl+aser who shsll ha�e Eten named in �Ae R�yis�rauon ol Wuranry.
Mode1 No. Serlal No.
��.
�.
This r�artanry is void if sny of the folloWing should accur:
!. !( ihe senal number has been altered or removed
2. II the product is modified in any manncr Yrhich STf.�1MA5TE
co�dud�s. ahn inspection. aNect� the r�liabiliry of the p�oduc�.
3 Ilihe produc� hii Eeen repaued or un �ced by �nyona no� speciFical
design�ied and iuihori�ed by STE.�MASTER
i. 1! the produc� �s damaged because i� iti not oper�ied or insull�d
i
accordance +i�h tiupplied instruct�ons
1T� �olr responsib�tiry oISTFJ�MASTER under th�s �►vrranry �hall �e limiud i
the r�pair of ihe product or replacement thereoL �nclud�ng par�s. �q the wi
dise.tnon ol STE4ytA�TER COMPANY. INC T�e contumer's wli rtmtc
shall be such repau o� rtpl�cemem ac i� e:piessly pror�drd here�n. �nd und�
no c�rcumciances shall STEAMASTER bt liable lor any loss or d�m�9e, be
dirrct or conuquennal arising out o( iMx ust or lnabthry to uu thu product
THE FOREGOING IS IN LIEU OF ALL OTHER W'ARRANTIES AN
SPECIf1CA�LY E%CLUDES AND DISCUIMS EXPR�55 Ay
IMPUED WARRAYTIES OF MERC1iANTABILITY OR Of F7TvE5
FOR PARTICUUR liSE OF PURPOSE. THERE AIiE V
WARRANTIES wHICH EXTEND BEYO�D THE DESCRIPTIONO
THE FACE HEREOF. AND NEITHER STEAMASTER vOR IT
OE.�LERS ASSUMES OR AUTNORIZES ANY PERSON TO ASSUM
FOR ANY OF T'HEM ANY OTHER OBUGATION OR UABIUTY 1
CONVECTIOH 1�'ITH SAID EQUIPMENT.
No r �nan�y. Wh�th�r e.press or impli�d, is given or mide Wicf� re�prct to ��
accessory �upDl�rd by anyona o�h�� tfian STFi�MASTER.
Purchatier acknowledyes �ha� no o�h�r representationa W�re made to him
relied on by Aim With r��pecl to �he qudiry �nd h,nc�lon o( �he'anen�ot
Date of Purchase
� '�
� '� East Coast Office: 275 Veterans Blvd., Ruthertord, NJ 07070 � Tel: (201) 933-0700 • Fax (201) 933-0746
West Coast Office: 315 W. Pondera St., Suite F, Lancaster, CA 93534 • Tel: (661) 726-7046 • fax (661) 940-1617
W
N
.y-�
�
�
\
�
oadao�o� •�idn
3/�I21Q MOQd3W '3 26Z
S(�1bH NIb'1N(-l�W
��1�-01�1.
_ --- ,
�� o .
� ,u � �y � SZI�IZ131NI �NINNf/�ld 3�1(11�31IH��Iti �
� � ����
�� � g ��,,;�'�,� .�au!.�ga�.�a!dua�z�!.�� �
�.o� � ��8
� ��8
��-�1. Q Q V�$����
_ � r,, > � �����
�, � l,i.. �
� .� o ����
�
� � � .
_ _ � F..
o�
.
r
, __....__ - --=---- ---- ----- _ _ � ------
� �
�/
�
�
.�
o..
� ��..�
�
�� �; ,
�ri� � �:�
� �
� ���
� "J
�
� z
��� ���
Z � � �a m�W
a €
� < � � ' ��8.
���� ��x
� o � z �
� • � �� ���� ���
� � �� �s�� ���
� Q ° z � � <� ����� ���
� Z��
. � � �U N� �H �W'��
m � � �� � �� �N ��_
�
o � � �� � ����� ����
`� � .���aJ}!�y t� � �� a! �� �6
\ � � <a ��N �. ����� n��.
N ��- OYm� �<
� >
a � Q � �� Ci� � ����a� ��o
u� � a .s � �s a '
� �� _
�d3ruare �Olr�sr�3 �46'! sor
ltlf R6 WdBZ�Of�E "866i 'f 4��oY1 '�opsanl pay;o�d 1Mi2S86\402S86VJi
�
�
�L
�
�'
'�'i
�.° '..
�;
�''
t.�
�'
��
��
�I
___._'___ ____��_!'I
� I
�
I� I
iv J
'^�
W i
J; ��^
`t! W
�'�
�'��
U'
� .
�'
,
, �
�
_ � _,..�
- �--A�+�._ '.. .
�
_ _�_ ,�.
Ji
L�' I
'� (
3! i
��
z ,
�' �
;"' �
�
, � � i
�" i
J
� �
� � �
''J'�' FL
� � i
� ;
� ? ,
N� �� i
" � ,�—i
� a:� lJ! �
� c�
_, � i ;
��
cl!; .��: �tJ�
; � �
.�
_. :.�
�-
ti, �
n
�
�
�
, �I
4-r
� �
�,, � i�
i �;
I ; j=�
�� �o�
� �,
�
0
�
<{
��
t./!
�,F'
�
�i �
�! W - - -
��' � I
�
Q� ��
yM
4' �/
�� °
tL: Q
o �1
�: �
�' o
�
J
;3 '�'
� Z
z. �''
�4 �;
, ��; �'
�' �%
�i
_ I..._ _ _ _ �I
� � ..�
/ �
� � �r �
f � ,�
I J�
� L�I
� � ��
��� �,
�� I
�
� � �i
i' � Z;,�
i ���;
i ' �'
� ��
�, � � �
�
�
��
n�
N,
06 -11 -2010 Inspection Request Reporting Page 25
4:04 pm Vail, CO - City Of
Requested Inspect Date:
Assigned To:
Inspection Type:
Inspection Area:
Site Address:
Monda June 14, 2010
JMON&AGON
CG G
292 E MEADOW DR VAIL
MOUNTAIN HAUS
A/P /D Information
Activity: B10 -0103 Type: A -MF Sub Type: AMF Status: ISSUED
Const Type: Occupancy: Use: IB Insp Area: CG
Owner: MOUNTAIN HAUS CONDOMINIUM ASSOC
Contractor: NEDBO CONSTRUCTION Phone: 970 - 845 -1001
Description: COMMON ELEMENT: REMODEL TO CONSTRUCT NEW ROOM IN WOMEN'S LOCKER ROOM FOR
STEAM GENERATOR RELOCATION
Reauested Inspections
Item:
90 BLDG -Final
Requestor:
NEDBO CONSTRUCTION
Comments:
977 -0326
Assigned To:
JMONDRAGON
Action:
Time Exp:
Inspection History
Item:
501 PW- Access /Stagmg/Erosion
Item:
226 FIRE DEPT. NC3TIFICATION
Item:
10 BLDG - FOOTING
Item:
Item:
504 PW- Retainin Wall Layout
PW
502 -Rough riveway Grade
Item:
20 BLDG - Foundation /Steel
Item:
21 PLAWILC Foundation Plan
Item:
410 Special Inspect - progress rept
Item:
22 PLAWILC FRAMfNG
Item:
30 BLDG - Framing
Item:
50 BLDG - Insulation
Item:
60 BLDG - Sheetrock Nail
Item:
70 BLDG -Misc.
Item:
535 DIA - 30 DAY REMINDER
Item:
536 DIA - SITE /LANDSCAPING
Item:
420 Special Inspect -final rept
Item:
503 P -Final Driveway Grade
Item:
515 PW- Public Improvement
Item:
516 PW- Warranty Acceptance
Item:
90 BLDG -Final
Requested Time: 02:00 PM
Phone: 970 - 845 -1001 -or- 970 -977-
0268 Rollie cell
Entered By: JMONDRAGON K
REPT131 Run Id: 11506