HomeMy WebLinkAboutB08-0017 Plans:
the Board Room Remodel for I
174 East Gore Creek Drive
Vail, Colorado 81657
ARCHITECTURE
INTERIOR DESIGN
GRAPHIC DESIGN
General Notes
Architectural Abbreviations
Reference Symbols
P Team
Building Data
Pr Data
[ndex to Drawings &
Room Information Symbol
Project Architect / Interior Designer
V1=V
A licable Codes
pp
Construction Documents
19
Clean and provide maintenance on completed
AFF .......Above
Finished Floor
MATL ......
Material
Occupancy.
@TLANTI i
1 CONTRACT DOCUMENTS construction as frequently as necessary through
ACOUS ... .Accoustical MO ........ Masonry Opening
NAME �--- -- Room Name
A -3
Contract Documents for this project are comprised of
the Drawings, the Specifications, and the Project Manual.
construction. Adjust and lubricate operable
components to assure new and existing
ADD _.
ADJ
... Addenda Addendum
MTL • ......
MAX
Metal
� ( Room Number
97 Ma Street, Un W1
Building:
Cover .....Notes / Index / Project Information
Sq. Foot Area of Space:
equipment will operate to manufacturer's requirements
2 All work under this contract shall be in strict accordance
at substantial completion.
.......Adjacent .......Maximum
AGGR .....Aggregate MECH......Mechanical
Edwards CC} 81532
' 03 International Building Cade
g
A -10 .......Floor Plan and Reflected Ceilin Plan
Section Elevation Symbol.
/
with applicable codes, local ordinances, and public
havi to assure that
haven the work. 20 S
ALT....... ,Alternate MC ........ Mechanical Contractor
B oard Room:
358
with local amendments
A
A -1 Path of Exit ccess Plan
3
a j urisdiction over
agencies
9
All materials stared on site shall be properly
construction operations
P P
no part of the construction, completed or in progress,
is subject to harmful, dangerous, damaging
ALUM .....Aluminum
APPD .....A
PP roved
MED....- ..Medic(ine)
MIN .. ...Minimum
{al}
A Drawing Number
Contacts: Ter Carp enter, AIA
Terry p ,
Jeff Methene Y
Pre- Convention Roam:
259
1
stacked and protected to prevent damage and
exposure during construction.
APPROX.. Approximate
MISC
Miscellaneous
Mechanical:
deterioration. Failure to protect materials may be
v
......
;hens Widmer
cause for re
rejection of the work,
i
21
Contractor shall replace, without cost to the Owner,
P
ARCH .....
ASAP
Architect(ural)
Soon As Possible
NOM ......
NIC
Nominal
Not in. Contract
A� 0 Sheet Number
Occupant Load:
► 03 International Mechanical '
4
The Contractor shall confine construction operations
by documents.
defective work or materials appearing within one
1 y e a r after completion of the ro ect.
[ j Y p
....
BBR .......Baseboard
..As
Radiation
.......
NA ... , ....
Not A
PP
Phon 70 .925.2194
Board Room: 15 per SF
Cade
Detail S
Sy mbol
Y
5
on site to areas permitted these
PRECEDENCE:
22
Contractor shall coordinate samples and materials
with Architect in order that Architect /Interior
BM , ... •
BRG......
... Beam
.Bearin g
NTS .......
OC ........OnCenter
Not To Scale
!� Detail Number
Fax: 970.925.2159
(with local amen dments)
A Generally, specifications take precedence over the
Designer may review samples in a manner so as
BFF........
Below Finished Floor
OPG .......
Opening
Sheet Number
drawings and large scale details or plans shall govern
not to impede the progress of the work.
BET
Between
OPP .......Opposite
Owner / T e nant
Plumbing:
over small scale drawings. In the event the
g
Contractor discovers discrepancies, or the intent
23
Contractor shall prepare a construction schedule
five days the
BLK .. , ....
BSMT
Block
Basement
ORN .. - - ...
OPH
Ornimental
Hand
03 International Plumbing
Keyed Note Symbol
Vail Resorts Development Co.
Total Occupancy Load:
of the plans or specifications is not clear, the
Contractor shall notify the Architect before proceeding
within [5] after established start of
construction. This schedule is to be coordinated
with Architect /Interior Designer to anticipate
......
BTU .......
British Thermal Units)
.......Opposite
OD . , .. • , . ,
Outside Diameter
F -- ---•-- Note Identificat
137 B enc h mar k Road
encmar
25
Code
with the work.
lead /delivery times of items provided by Architect
BD .........
Board
PTN .......
Partition
PO BOX 959
(with local amendments)
Finish Material Symbol
Construction Type:
B All dimensions take precedence over scale to be installed by Contractor.
drawings.
BS ... , .... Both Sides d .......... Penny ( Nails, Ect.)
BO ........Bottom of PERF ...... Perforated
Avon, CO 81520 -0959
of
C All dimensions are to face of stud unless otherwise
24
Contractor to provide the Architect will all
submittals and shop drawings and samples in
Contract Documents.
BLDG......
CAB .. , .
Building
, , , Cabinet
PLAST .....
PLAS ......
Plaster
Plastic
w-t Finish Identification
Contact: Bryan Austin
> I I I A
Fire:
'03
Hated.
accordance with the
International Fire Code
Room Wall Elevation Symbol
cL. c .....
...... enter Line PL . . Piste
Phone: 970,477.3737
D Ceiling height dimensions are from finish floor to
face of finish ceiling surface unless noted otherwise.
25
Contractor shall provide inspections, tests and other
quality control services specified here and elsewhere
in the Contract Documents and required b authorities
q Y
CLG .......
CER ......
Ceiling
,Ceramic
PLEX ......
PLMB ......
Plexiglass
Plumbing
� -- °--•--•°- Elevation Number
�
Accessibility (ADA):
6
The Contractor shall ac quire and a for all permits
q p ay P
having jurisdiction over the work. The costs for
CLR .......Clear
PLY........
Plywood
�} A10 Sheet Number
inspections and approvals connected with the
work as part of the cast of construction.
these services are to be included in the final
CLO , ......
Closet
PROJ . , ....
Project
03 I B U ild i rig
APPROVED
construction sum.
CLD .......
Clothes Dryer
PROP......
Property
Code &ANSI A117.1
� Community Development Department
7
The drawings and specifications shall serve as a guide
to the of this The Contractor shall
26
sequence of activities to accommodate
Coordinate the se q
CLW....
, • . Clothes Washer
QT. , .......
Quarry Tile
�
I
t. `. .. Building Safety and In pe tion Services
Door Number Symbol
scope project,
provide all necessary lobar, materials, and equipment
required for a complete project.
required services with a minimum of delay. Coordinate
activities to avoid removing and replacing construction
to accommodate inspections and tests.
COL . , .....
CONC .....
Column
Concrete
QTY........
R .
Quantity
Radius
100 Door Number
Electric:
f� crnatlonal L u €ldln Code/lnternatloncl r-,oai „lcl
CJ .........Construction
Joint
RD ........Roof
Drain
05 National Electric Code
t c, crm t. The issuance or rantin of a r 'I
granting py„r
8
The Contractor shall do all cutting, fitting and
27
Contractor is responsible for scheduling inspections,
GONT . ,
, , .Continuous
RM ........Room
not � d to be permit for, or an approval of, any v ;,: � of
Window Number S m bol
Y
patching such that all parts fit together properly, tests and similar activities m a timely fashion
Cutting and patching shall not endanger any other
COORD ... Coordinate RS ... .... Rough Sawn
any {413 of this code or of an y other ordinance of .
jurr sd ".� Presuming to give authority to violate or c^nccl the
work. All patching, repairing, and replacement
so as not to impede the progress of the work.
GTR ....
- , .Counter
RCB .......Resilient
Cave Base
provss code or other ordinances of the jurisdiction shall not be
of surfaces or materials damaged during cutting
28
All work shall be done by workers skilled.in their
C/S , ... ,
.. • Counter Sink
RW . , ......
Retaining Wall
Window Number
valid ' nco of a permit based on construction documents and
other c i not prevent the building official from
and p atching shall be r to match surrounding
P 9 p
respective trade, All work shall be done in strict
CF.........
Cubic Feet
REF .......
Refer
requiring the
Correctio c c sors in the construction documents and other data. The
Revision Symbol
/\,
- R evision Number
surfaces free from visible differentiation. accordance with manufacturer's directions
where applicable. Workmanship that does not comply
9 The Contractor shall provide all necessary blocking, with the obvious intent of these documents shall
backing and framing for all store fixtures, all equipment
DID • .. • _ .... Dam roofin REFR ... , , Refri erator
P g f
DEPT • - . , ..Department REiNF...... Rein
DTL REBAR Reinforcing Bar (s)
g ()
buildin c" vjhcro k ' 1 13 als orized to prevent occupancy or use of a
structu in iolation this code or of any other ordinances of
this jurisdiction.
shelving, electrical devices and equipment, mechanical
be replaced at the Contractor's expense. All materials
....
DIA,
• ..Detail
Diameter
- . , .
RESIL
Resilient
PLANS EXAMINER: °'
DATI_
Equipment Number Symb
shall be of the best of the their respective kinds
devices and equipment, recessed items and other
....... .....
items as required, wheather indicated exactly on drawings
or not.
29
specified, new and free of defects.
Brands or names of manufacturers specified herein
DIM .......
DW ........
Dimension
Dishwasher
REQD.. , ...
R ..........Riser
Required
1� E q uip ment — � p ment Number
10
Provide access panels as required by governing codes
reflect a measure of quality or a standard. If the
Contractor desires to use any other brand or
DN , . , • ...
DR....
, Down
Drain
RO ........
SAN
Rough Opening
Sanitary
Wall Type /Construction Sym bol
to all concealed spaces, equipment, and devices.
Verify required, location, and size with Architect
� t YP q
P rior to installation.
manufacturer, he shall request approval from the
Architect justifying the equal substitution and shall
submit that information to the Architect for review in
• ,
DWG , .....
EA.........
. , ,
Drawing
g
Each .
.... , ..
SECT .. , ...Section
SEW. , .....
Sewer
Wall Type Cali Out
E �----- -- Refer to Details A, B,C, D, E, &
g
11
Provide smoke detectors in accordance with
such a time frame so as not to impact the project
EW ........
Each Way
SHT ... , ...
Sheet
F Sheet A30
.
current applicable codes.
schedule.
ELECT.....
EG.
Electrical
Contractor
SVF .......
SHLV
Sheet Vinyl Flooring
Shely {es }(ing)
°
t<
North Arrow Symbol
12
The General Contractor and all Contractors bidding on
30
Contractor shall provide complete systems to ensure
• - • • •
• • •Electrical
, .. , , .
this project shall visit the job site to familiarize them-
selves with the actual site conditions prior to building.
proper function so as to comply with the intent of
these documents whether all components or parts are
specified or not
EL ......
ENGR .....
EQ ........Equal
, , .Elevation
Engineer
SIM , , ......Similar
SL ..... , ...
STC .......Sound-
Sliding
Transmission Class
N< ---•— Direction of Project
North
`�� �
13
Field verify all conditions and dimensions with
construction documents prior to commencing
31
FINAL ACCEPTANCE:
EXG ....
, .. Existing
SPEC ......
cation
Specification
."�.M1
construction or fabrication. If any departure from the
Before requesting final acceptance certification,
EJ .........
EXP........
Expansion Joint
Exposed
SQ ........
SF
Square
Square Feet
,
design intent of the contract documents is r
complete and provide the following:
.........
the General Contractor shall notify the Architect
Owner before into the
A Submit warranties, workmanship bonds,
EXT .......
Exterior
SS ........
Stainless Steel
"
and entering a contract with
specific
FO
Face Of
STD
Standard
Owner. Failure to provide Architect and Owner with
maintenance agreements, final certifications,
.....
FIN
, . ,
. , , , , , ,
STL
the aforementioned notification shall result in the
and similar documents.
.. , ..
, . ,Finish
. , .....Steel
specific Contractor being held responsible for all
work required to meet the design intent of the
B Maintain a clean set of blue line prints of
FP .........
FPL • - - •
Fireproof
... Fireplace
STRUCT...
SUB .......Subs#itive
Structural
construction documents shop drawings and
, p g
t documents with no additional construction
contrac
specifications. Mark these documents with
FIXT.......
Fixture
SUPPL ....
Supplement
costs incurred by the Owner.
locations of "as- built" assemblies.
FLR .......
Floor
S4S .......
Surfaced Four Sides
14
The Contractor shall not commence with the work
until actual condi #ions are verified to be as se# forth
until
G Change over permanent locks and transmit
FD.........
FT
Floor Drain
Foot Feet
SUSP ... , ..
TEL
Suspended)
one
Telephone
Are �
e P I a U n
keys to Owner and Facility Manager. Advise
.........
.......
1
in the drawings. The Contractor, by starting the work,
will be deemed to have accepted the existing conditions.
Owner and Architect of key / security change.
FTG .......
Footing
TV .........Television
it will then be the Contractor's responsibility to make
D Complete start-up and testing of systems.
FDN ......
FURN
Foundation
Furnish
TEMP, .....
THK
Tempered
the necessary corrections, repairs and adjustments
......
.......Thick
,
to make the project complete without additional
32
FINAL CLEANING:
GAL . , .....
Gallon
TLT ... , , .. •
Toilet
Golden Peak'
15
compensation. P
The installer of each major component shall
In addition to periodic clean up, the contractor
at the completion ro'ectshallthorou hl
P project thoroughly
clean all areas of the work. Wash all windows
GA , . , ..
GALV.,,,,-
, , ,Gauge
Galvinized
T &G .......Tongue
T &B .- , -. -To
&Groove
P And Bottom
� �
P roj ect Lo catio n - � ♦
_ r
'"'
P roject
Lo catio n -� -��
l�l
inspect both substrate and conditions under which
work is to be performed. Do not proceed until
P P
unsatisfactory conditions have been corrected
frames and mirrors. Clean all finished floors
wash all fixtures and tiled surfaces, remove
any spills or spatters from finished surfaces.
GC ... , ..
GL,.. -...-
GR ........
, . General Contractor
.Glass, Glazed
Grade
TO ........
T..- ..- .- ...Tread
TYPTypical
........
Top Of
The Lodge at Vail
174 East Gore Creek Drive
l -
s k ° "� �
•„ Itaidi YistaBab
.j:� •�., r�r} UP cfraldllt
Main Level
Board Room 118.1 .
in a satisfactory
ry manner.
Touch up and otherwise repair and restore marred,
GYP .......Gypsum
UG .........
Underground
Vai I Colorado 81557
r chaidift I #1
^• "'`
,
16
Contractor to schedule construction o erations in the
P
exposed finishes.
GWB
Wallboard
UNGL
f
•
'�. 1
Vail
Village
"�►�"
sequence required to obtain the best results where
......Gypsum
.....Unglazed
1�`
•-� .�
installation the Work depends
HDW ...
, .. Hardware
UNFIN ... , .
Unfinished
t . st#rwti �... 1 `~-•- �•�..�.�.,,�„
.. " _J
of one park of on
installation of other components before or after its own
installation. Make to items
HD.........
HVAC......
Head
Heating, Venting & Air Conditioning
9 g
U.N.O. , . • ..
U.O.N......
Unless Noted Otherwise
Unless Otherwise Noted
„� ru; �
- t v rod. °-.
`r
w %*
provisions accommodate
.� ,.
+
a
scheduled for later installation.
HORIZ.....
Horizontal
UBC .......
Uniform Building Code
,--lw, sc•
,:,. !nw p
• _"
17
Coordinate installation of different components to
assure maximum accessibility for required
HP .........Horse
HWH.......
Power
Hot Water Heater
VIF.........Verify
VERT ... , , .
in Field
Vertical
,
., Av
ti �•.,.. . �`~" .
, `
maintenance, service and repair.
HT.........
Height
VCT..
Vinyl Composition Tile
`` ~s'� s
18
Clean and protect construction in progress and.
INCL ......Include(d)(ing)
, , . , ..
V ..........Volt
*�ara �-•. W
�"
adjoining materials in place during handing and
INFO ......
Information
WH . , ......
Water Heater
an 11011 rn�
erk �
installation. Apply protective covering to existing
INSP .......
Inspector, inspection
WC ........
Water Closet
materials and assemblies when being aved and
9
ID, .........
Inside Diameter
WP ........
Waterproof
where required to assure protection from damage or
deterioration prior to substantial completion.
[NSUL .....
lNT ........interior
Insulation
WT .. - ... , .Weight
WWF ... , ..Welded
Wire Fabric
70
Tom of Vag
.
JT..........
JCT ........
KWH.......
LAB........
Joint
Junction
Kilowatt Hour
Laboratory
WDW ......
W / .........
W/O .......
WD .... , ...
Window
With
Without
Wood
otrices
watt
4
LM
LAM .......
Laminate
WKG.......
Working
-'
LAV .......
LT
Lavatory
Light
.........
N
! V
MFR, ...... Manufacturer
%op CD �T 0)
GENERAL NOTES: 0)(0
1. MAINTAIN ALL EXISTING FIRE C C I, ) N -
C\J
SEPARATIONS AT WALLS AND (6(6
.5 C*14
CEILING; PATCH ALL PENETRATION5 N m m
IN FIRE RATED ASSEMBLIES WITH 0 66
.-.; F_
O
UL LISTED FIRE 5TOF SYSTEMS. U)
a U)
PROVIDE OWNER AND ARCHITECT 12
W/CUT5HEET5 OF EXACT UL A55EM[3LIE5 m
3: 0
USED AND MAINTAIN COFIE5 ON 51TE -0
[30 ARP ROOM FOR REVIEW WITH BUILDING 0) W
INSPECTOR,
WALL FRAMING LEGEND:
I lwm� EXISTING WALLS TO REMAIN
NEW WALL,5- RE: P/A-1O`
FOR WALL TYFE5
. . . . . . . KEYED NOTES:
17 Fl NEW SCONCES LOCATED 0
t 21 66" AFF TO CENTER OF J13OX
F EXISTING RECESSED CAN
TO REMAIN
EXISTING RECESSED CAN
TO 13E REMOVED
15
F EXISTING RECESSED CAN
lit TO FE REMOVE[) AND RELOCATED
F5fl RELOCATE KECE55ED CAN
FIXTURE TO CENTER OF TILE
22 EXISTING REGISTER TO REMAIN
7] REMOVE AND RELOCATE EX15TING
REGISTER IN PRE- CONVENTION 118
LAY-IN CEILING TO MATCH
EX15TING
F171a FKE-CONVENTION F59] MATCH EXISTING COVE DETAIL
AND LIGHTING
1_0 REMOVE EXISTING ACCE55
PANEL
FT] EXISTING SMOKE ALARM 0
1_2� EXISTING SPRINKLER HEAD, RELOCATE
HEADS AS REQUIRED TO 5AT15FY U)
mmm CURRENT ADOPTED CODES C
1 EXISTING SPEAKER
14 REMOVE NON-LOAD FEARING
Floor flan WALL X
Scale: 114 "=1'-0" 1A10 1 REMOVE STONE FLOOR, PREPARE UJ a)
FLOOR TO RECEIVE PAC) AND CARPET i >
16 15T. 3 X 6l-43 DOOR TO
REMAIN - FIELD VERIFY THAT
20 MIN FIRE-RATING 15 MET
0
EXTEND EXISTING WALL - PATCH
AND REPAIR AS NECESSARY. cj� > C Lo
)
I lal 1130ARE) KOOM GENERAL CONTRACTOR TO VERIFY 4-1 (0
AND MAINTAIN EXISTING FIRE T'
RATING AS REQUIRED. ( o CC)
1 8 ADD NEW MILLWORK TO MATCH a) (D 0
EXISTING AS REQUIRED b) Uj c)
0 - 0
F191 VAIL RESORTS I.T. TO CONFIRM 0
m LOCATION OF PROJECTION
SCREEN AND REQUIRED SOFFIT _J
PROVIDE FLOOR OUTLET FOR
DATA AND ELECTRIC PER VAIL
RESORTS LT, REQUIREMENTS,
EXACT LOCATION BELOW THE Project No. 07.104.vri
CONFERENCE TA13LE T[31) FY
2 r GM OR VAIL RESORTS.
t
6 PROVIDE RECE55ED ELECTRICAL Date: Issue:
--4 4 OUTLET AND RECE55EI) GABLE E
) f t .
09128/07 PERMIT SET
4 OUTLET FOR FLAT SCREEN TV
__ = =
----------- MOUNT 03/17/08 ASI #01
CONSTRUCT WALL - ----------- RELOCATE WALL PER DIMENSIONS,
CEILING JOINT A55EMbLY MAINTAIN EX15TING MILLWORK THIS
CONCRETE STEEL TO SPECIFICATIONS SET 2 51DE
DECK A55EMI3LY FORTH BY UL LISTED - ---------- ------------ ---- - ---- ---- ---- --- ----- -----
A55EM5LY #HW-5-0001 - ---------- ----- ------ ---- ----- ----- ---- 25 EXISTING FR. 3'-6" X 6-6' VOOK5
25 GA STEEL 12 TO REMAIN
CHANNEL 7 7 i i F2_41 EXISTING COVE DETAIL AND
5 i LIGHTING TO BE REMOVED
275 PER IBC 716,5.4 SMOKE / FIRE
5 DAMPERS WILL DE REQUIRED IF
THE RELOCATION OF WALLS
AFFECT THE DUCTWORK IN PLACE
rrv-r
26 DROP CEILING 15 A NON-RATED A55EMI3LY,
"a GC TO CONFIRM AND MAINTAIN 1 HOUR RATING
AT CEILING / FLOOR A55EMbLY ABOVE -
SEE DETAIL D / A-10
3 50' 25 GA _TJ
"C" STUD 0
24'O.C.
5/8 GYP 131)
FINISHES TO
MATCH EXIST.
ADJACENT WALLS CONSTRUCT WALL TO
SPECIFICATIONS AS
SET FORTH FY UL LISTED
A55EM13LY #U-465
Wall Type, "A" -1 Hour Rated
scale,: 3/4"=1'-0
Reflected Ceiling Flan
Scale: 114
Title:
DEMO PLAN
FLOOR PLAN/
REFLECTED CEILING
PLAN
Scale: Varies
N Sheet No.
CD A� 10
I Copyright @ 2008 Atlantis 1, LLC
Iq
0 NT CY)
(N t37 Cfa
C"
T) QQ
00 C14 N
0) M
U) 0 b
U)
5
CU
0
0) W rL LL-
C
0
CL
X
LLJ
a)
E
S
0
a)
0
nroo
>
0 in
4-J
CU
000
( D 0
M
U j
0
0
m
—J
, >
Project No. 07.104.vri
Date: Issue:
03/17/08 AASI #01
Title:
PATH OF EXIT
ACCESS PLAN
Scale: 1/16" - T-O"
Sheet No.
Path of Exit Acc000 Man rA-"
5calp,: 1 116 "�1' -D" ,A �11
A�l 1
1 Copyright (9) 2008 Atlantis 1, LLC
MECHANICAL SPECIFICATIONS
1. GENERAL:
a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH,
FABRICATE DELIVER, STORE AND INSTALL Al L WORK NOTED ON THE DRAWINGS ANDOR SPECIFIED HEREIlm
b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM
WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUT
WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT
ARE SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING
INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2. WORKMANSHIP:
a. THE WORK SHALL BE ACCOMPLISHED IN ATHOROUGH AND WORKMANLIKE MANNER SATISFACTORY TO AND
MEETING THE APPROVAL OF THE OWNER AND ARCHITECT.
3. MATERIALS:
a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OFTHEIR RESPECTIVE KIND, FREE FROM ALL
DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED.
4. SITE INSPECTION:
a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE
HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK.
t >, S B'W134ION OF A BID ACKNOWLEDGES, FULL RESPONSIBILITY FOP, ,=tJRNI ,itk:.G A �, PLr -I'E. AND FUt CTIONAL
SYSTEM.
c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION
WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION.
5. CODES AND PERMITS:
a. ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TOTHE 2003 IMC CODE AND ORDINANCES
AS INTERPRETED BY THE TOWN OF VAIL BUILDING DEPARTMENT.
b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS. C. COPIES OFALL PERMITS AND
INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT.
6. AS- BUILTS:
a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS- BUILTS DOCUMENTS WITH ALL CHANGES NOTED
THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT.
7. GUARANTEE:
a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALLWORKAGAINST
DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION.
8. SUBMITTALS:
a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES SHALL BE SUBMITTED TOTHE ARCHITECT
FOR REVIEW (SIX COPIES OF EACH).
9. COORDINATION:
a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF
ALL DUCTS, PIPES, CONDUIT, ETC.
10. CUTTING AND PATCHING:
a.
ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER
OTHER SECTIONS OF THE WORK.
b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c. X -RAY SLABS PRIOR TO CORING.
11. CLEANUP:
a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS
MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS tts. /ORKAND LEAVE THE PREMISES CLEAN AND
ORDERLY.
d. PIPING SHALL BE SIZED AT A MAXIMUM PRESSURE DROP OF 3.5 FT PER 100 FEET & 4 FEETISEC VELOCITY.
e. CONTROL VALVE Cv RATINGS SHALL BE SELECTED ATA MAXIMUM PRESSURE DIFFERENTIAL ACROSS THE VALVE
OF 2 PSL
15. REFRIGERANT PIPING:
a. REFRIGERANT LINE SETS SHALL BE FURNISHE BY THE CONDENSING AND BE
r REFRIGERANT PIPING C ONNECTI ONS i FL OSS . '•
WHILE BRAZING.
c. PROVIDE HANGERS, SUPPORT'S AND INSULATION SADDLES AS REQUIRED AND PER ANSI REQUIREMENTS.
PLUMBERS TAPE i WIRE ARE NO
• REFRIGERANT PIPING INDICATED IS SCHEMATIC ONLY ! DESIGN THE ACTUAL PIPING LAY
INCLUDING OIL TRAPS, DOUBLE RISERS, SPECIALTIES, AND PIPE AND TUBE SIZES, TO ENSURE PROPER
OPERATION AND COMPLIANCE WITH WARRANTIES OF i
e. EVACUATE THE ENTIRE REFRIGERANT SYSTEM WITH A VACUUM PUMP T A VACUUM OF 0 0 MICROMETER FOR .
PERI i • PRIOR !
16. TEMPERATURE CONTROL DEVICES:
a. THE HVAC SYSTEM SHALL BE PROVIDED WITH AN AUTOMATIC SPACE TEMPERATURE CONTROL DEVICE
THAT SHALL BE CAPABLE OF BEING SET TO MAINTAIN SPACE TEMPERATURE SET POINTS FROM 55
85 *F AND SHALL BE CAPABLE OF OPERATING THE SYSTEM HEATING AND COOLING IN SEQUENCE.
b. CONTROLS SHALL BE ADJUSTED TO PROVIDE A TEMPERATURE RANGE OFAT LEAST 5°F AND UP TO 10 °F
BETWEEN FULL HEATING AND COOLING, AND HAVE A CAPABILITY OF TERMINATING ALL HEATING ATA
TEMPERATURE OF NO MORE THAN 70 °F AND COOLING AT A TEMPERATURE NOT LESS THAN 78 °F.
c. THERMOSTATS SHALL HAVE NUMERIC SET POINTS IN °F, ADJUSTABLE SETPOINT STOPS AND SHALL BE
MOUNTED AT 54" ABOVE FINISHED FLOOR ADJACENTTOTHE ROOM'S LIGHT SWITCH.
17. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OFTHE WORK SHALL EXAMINE A
COMPLETE SET OF DRAWINGS FOR ALLTRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC,
ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF
CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO
AVOID CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OFTHE OTHER TRADES SHALL BE
MADE. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR.
.•. #
19. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 3UP CLEAR WORKING SPACE
IN FRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLY AND AIR FILTER SECTION OF
THE EQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR.
20. ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED
V113RATION ISOLATORS.
21. EACH PIECE OF ! AND ALL ADJUSTED • ! RE-ADJUSTED ! INSURE
PROPER FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF FLOWS AND
CAPACITIES, ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER OPERATING
C ONDITIO N.
22_ TEST & BALANCING:
a. THE ENTIRE HEATING AND VENTILATING SYSTEM SHALL BE BALANCED BY AN INDEPENDENT CERTIFIED
TEST AND BALANCE COMPANY.
b. 5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND
APPROVAL.
c. ALL REQUIRED RE- SHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE MADE BY THE TEST & BALANCE
CONTRACTOR.
d. ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10% OF THOSE INDICATED ON THE PLANS.
23. FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL PLANS,
ELEVATIONS OR AS PER FIELD REQUIREMENTS.
24. THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS IN THE
DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT. EQUIPMENT WITH MANUFACTURER
MANDATED SERVICE REQUIREMENTS, INSTALLED WITHIN CRAWLSPACES MUST BE A MAXIMUM OF 20 FEET
FROM AN ACCESS PANEL.
25. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURE'S INSTALLATION OPERATION &
MAINTENANCE MANUALS RECOMMENDATIONS ESPECIALLY FOR SERVICE CLEARANCES.
26. FILTERS:
a. SHALL BE U.L. RATED AND APPROVED.
b. PRESSURE DROPS SHALL NOT EXCEED AW STATIC PRESSURE.
27. ELECTRICAL C ONNECTIO NS:
a. UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMAL OVERLOADS, i •
THERMOSTATS, CONTROL RELAYS, CONTROL TRANSFORMERS AND SOLINOIDVALVES SHALL BY
FURNISHE BY • ••
b. P ROVI DE • •' AND EQUIPMENT FOR ONLY • SE CURRENT CHARACTERISTICS INDICATED O
c. IT IS THE INTENT OF DIVISION TO RE QUIRE i. rr
d. COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OF VOLTAGE, WITH OTHER
TRADES, • THAT ALL SYSTEMS ARE COMPLETE AND OPERATIONAL
e. ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION
f. ALL SINGLE ! THREE PHASE MOTORS AND DISCONNECTS PROVIDE BY MECHANICAL
C ONTRACTOR • r WIRE BY THE ELECTRICAL C ONTRACTOR .
E�H N 'CAL LEGEND
NOTE,
LY U SE ON LEGEN
i
C s
OT NECE
i#
i►
• if
s
i
--HWS—
HEATING WATER SUPPLY
CIA
OUTDOOR AIR
- --HWR—
HEATING WATER RETURN
RA
RETURN AIR
—CWS—
CHILLED WATER SUPPLY
SA
SUPPLYAIR
—CWR --
CHILLED WATER RETURN
EA
EXHAUST AIR
- --SMS—
SNOWMELT SUPPLY
RAO
RETURN AIR DAMPER
—SMR --
SNOWMELTRETURN
SAD
SUPPLYAIRDAMPER
—RFS—
RADIANT FLOOR SUPPLY
SG
SUPPLY GRILLE
—RFR—
RADIANT FLOOR RETURN
RG
RETURN GRILLE
—G—
GAS
TG
TRANSFERGRILLE
— MPG —
MEDIUM PRESSURE NATURAL GAS
SD
SUPPLY DIFFUSER
—O
PIPE RISER
RD
RETURN DIFFUSER
—0
PIPE DROP
TO
TRANSFER DIFFUSER
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
THERMOSTAT
- --CI-°
PIPETAKEOFF (FROM TOP OF MAIN)
�
SENSOR (GALL OUT ON DRAWINGS)
—�
PIP END CAP
-----
PIPE CONTINUATION
FIREISMOKE DAMPER
PIPE EXPANSION GUIDE
_
—((—
PIPE UNION
FIRE DAMPER
-- --
PIPE ANCHOR
'
MOTOR OPERATED DAMPER (MOD)
_..
FLEXIBLE PIPE CONNECTION
MAN UAL BALANCING DAMPER
——
PIPE EXPANSION JOINT
POINT OF NEW CONNECTION
CHANGE OF ELEVATION
-- {�jl --
PLUG VALVE
(D) DROP (R) RISE
FLEXIBLE DUCT CONNECTION
—L %4— -
CHECK VALVE
—}—
BALL VALVE
TURNING VANES IN 90° ELBOW
BALANCING VALVE
DUCT SIZES ARE NET F REE AREA
——
FLOW REGULATOR VALVE
1ST NO; IS DUCT WIDTH.
2ND NO. IS DUCT DEPTH.
-- { 4(-- -
BUTTERFLY VALVE
SEC-PON - W U ROUND DUCT
PRESSURE REDUCING VALVE
SECTION THRU SUPPLY AIR DUCT
2-WAY CONTROL VALVE
sranoN T14RU RI URN)EXHAiUST AIR DUCT I'
3-WAY CONTROL VALVE
ROUND DUCT TURN DOWN
4 -WAY CONTROL VALVE
a
SUPPLY DUCT TURN DOWN
DIFFERENTIAL BYPASS VALVE
,,,.
RETURNIEXHAUST DUCT TURN DOWN
--#- --
STRAINER
CF
SUPPLY REC�IS7 dFFL1SEF211 I
NATURAL GAS PRESSURE REGULATOR
NECK SSIZ E\ t
C__�Nt
0
RETURN REGISTERfDIFFUSERILOUVER
NECK SIZE�
AIR VENT
NCFM- OZES...A
OUTSIDE AIR REGISMR11DIFFUS 'S UIJER
PRESSURE - TEMP. TAP
C. _ /–\
NECK SIZE
EXHAUST REGISTERIDIFFUSERILOLIVER
PRESSURE GAUGE
II CFN DOOR UNDER
--{
THERMOMETER
(A) SECTION CUT LINE
$
(B) SHEET SHOWN ON
1
3
r•
i
C s
r
#
i#
i►
• if
s
i
t #
s
c o
# t
y s
i
t � •
.•
i • ••
! • to ••
i,
!
it
,e
!
i*
•# •
i
it
C
C i C
00
Do
C!
#t
r
SCALE. 3/16` =1'0"
28. TEMPORARY HEATING DURING CONSTRUCTION:
a. MECHANICAL EQUIPMENT SHALL NOT BE UTILIZED FOR TEMPORARY HEATING.
Ak'
, - 1 INSULATED RIGID DUCT
NO ,. TWIN -IN FITTING W/
MANUALDAMPER,
HANDLE, & LOCK NUT
'Xx3 f ,
� s
li
----
CONNECT RETURN DUCTWORK FROM t
ERV INTO NECK OF SOUND BOOT
WORM DRIVE S.S.
°a f / CLAMP
I\ ' ---------
I I DINNER
IF il ffi*Wm��
p 1rd =I
o' '.....
1
1 � l: i w11
1
•
•
.•
•
•
I
C A
IM
i i�i
Cal
1
+rt* ;�
r 1a�i •
« «
(. .
•*
4 • d )
4 i to 00
t �
�
cu
� I
I,
I
♦
it Ci" • 4141
-rr
!'
!! •' .:"`ti •
i�..i
tit
.M ! ; MUM I • 0 .i i 1 1 1 30 - 41 # • • ! V. " i • i . r �i «.
4►
!!
I
i tsar' s••..�
I
eii R. ' ""',"�' ira` • • i .i a
r t
i' Li • T• "• i
a•
i
r .i� i�4!
o '` r'r
. .. ♦4M � �i
r
r
i441ri
♦ ohs A A A Syr wR 44w'" r
"� as ' iCs ��" ' /;:v. `
,�.
, - 1 INSULATED RIGID DUCT
NO ,. TWIN -IN FITTING W/
MANUALDAMPER,
HANDLE, & LOCK NUT
'Xx3 f ,
� s
li
----
CONNECT RETURN DUCTWORK FROM t
ERV INTO NECK OF SOUND BOOT
WORM DRIVE S.S.
°a f / CLAMP
I\ ' ---------
I I DINNER
IF il ffi*Wm��
p 1rd =I
o' '.....
1
1 � l: i w11
1
IK _ * C
a
k 0
•
•
.•
•
•
C A
IM
f
Cal
4 !
s
� •
« «
(. .
•*
4 • d )
4 i to 00
t �
�
cu
� I
I,
•• 4
i
s
{
i
tit
4►
!!
I
IK _ * C
a
k 0
i ii
m
0
•
r 7,\L7;5-S
\.�j24x6
00
m
m
m
1 a
24x6'
�8" 0
0 0c)
I KITCHEN HOOD
EXISTING IN-LINE -
EXHAUST FAN
10"o
Em
m
mis
Lei iNLI 4 M&K01 I N I A 1 INTITI kilo] I I
SHALL BE 41TIVRAPPElYfilM
MINIMIZE IMPACT CEILING HEIGHTS.
Arc-AO xv
CONICAL TEES,
D
ALL DUC"Q� SHALL BE RUN TIGHT Tf
NOTED.
oji-si J r_ 2k llLl*j2_T_p_ 0 S, R-MG�T-w1i 241 _LGM
COORDINATE ALL ACCESS PANEL LOCAT
I
. SHALL INCLUDE T'
N
0 C�
4�
EXISTING FAN COIL
DE A11 fWfkk t D
T I xi
PLAN NUT =51■ ,
ROUND DUCTWORK
•
EATWSTEEL BEAMS TO
Q)
- -----
P
o C
CAP EXISTING, -OFF/SPIN-IN.
RE
TA
jc SHALL BE
RELOCATE FC- O 3THERMOSTAT FROM HALLWAY TO INSIDE BOARDROOM.
0
C)
50 >1
g- p
u) Co
EXACT ROUTING ?F DUCTWORK TO BE COORDINATED IN THE FIELD.
TURNING VANES.
C:
V IDE SOUND�',, BOOT. GRILLE OPEN TO PLENUM CEILING.
u-
:R81DE OF STEEL
bTS UNLESS OTHERWISE
(D
INSTALL EDH-fAi LEAST 49" FROM ERV-1 OR ANY ABRUPT DUCT SIZE CHANGES.
04
DUCT EI_Bows. CSR TURNS MUST BE LOCATED AT LEAST 48" FROM THE INLET OF
m w co
w
THE HEATER ANC7 24" FROM THE OUTLET OF THE HEATER.
- D ASSEMBLIES SHALL
CONNECT OUTSIDE AIR INTAKE FROM ERV-1 INTO THE EXISTING MAKE UP AIR
yT OF THE ASSEMBLY.
DUCTWORK. PROVIDE BACKDRAFT DAMPER,
IVITH THE ARCHITECT.
U J #r g
C: Ui Co 0
CONNECT EXHAUST FROM ERV-1 INTO THE EXISTING TYPE 11 EXHAUST
DUCTWORK. PROVIDE DACKDRAFT DAMPER.
is
A
L
A
INW-IS
0
AEC •ROJECT* 28883
Dmvm %f. Checked Sy:
RSM RPC
EXISTING &
REVISED
l�
SCALE:
Q►�17
CD
C
•
T_
oo
Q)
o C
75
Co
1
a) -oo
0
C)
50 >1
g- p
u) Co
a)
C:
th 04 X
u-
(D
04
m w co
w
ti
< tl--
C/) 0 - )
U J #r g
C: Ui Co 0
(D
s
x
0
Lm
0
a-
0
AEC •ROJECT* 28883
Dmvm %f. Checked Sy:
RSM RPC
EXISTING &
REVISED
l�
SCALE:
Q►�17