Loading...
HomeMy WebLinkAboutP03-0033 PlansGENE SAL= M ECHANI 5 C I I CAT I ON5 1. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF Ad Ilk WORK. - 2. IT IS THE INTENT OF THESE DRAWINGS AND SPEC, TO ESTABLISH A STANDARD r C OF QUALITY. THE ENGINEER RESERVES THE RIGHT TO TAKE ;EXCEPTIONS TO APPROVE r4 METHODS AND MATERIALS NOT REFLECTED HEREIN. 3. VISIT SITE PRIOR TO BID AND VERIFY THE CONDITIONS. INCLUDE IN THE BID, COSTS --� REQUIRED TO MAKE WORK MEET EXISTING CONDITIONS, WHETHER INDICATED OR NOT, ts. 1 4. FAILURE- TO ORDER, OR RELEASE ORDER, FOR MATERIALS AND /OR EQUIPMENT WILL " tu NOT BE ACCEPTED AS A REASON TO SUBSTITUTE ALTERNATE MATERIALS, EQUIPMENT, COR 0 ? INSTALLATION METHODS. ' , > X w ul 5. WORK SHALL BE PERFORMED IN -A WORKMANLIKE MANNER TO THE SATISFACTION OF THE � ARCHITECT d MECHANICAL ENGINEER. uj N q I 6. LABOR, MATERIALS, AND EQUIPMENT SHALL CONFORM TO THE LATEST APPLICABLE � u- EDITIONS OF LOCAL, STATE OF COLORADO, AND NATIONAL CODES AND ORDINANCES. IF j CONFLICT BETWEEN THOSE PUBLICATIONS EXIST, THE MOST STRINGENT REQUIREMENT SHALL APPLY, uj tip w I. MEDIUM PRESSURE GAS LINE 15 51ZED WITH 0.5 P51 DROP. t S. INSTALL ALL EQUIPMENT /COMPONENTS PER 1" IANUFACTURER'S INSTALLATION t INSTRUCTIONS AND INDUSTRY STANDARDS. 9. SYSTEMS A TESTED E S SH LL BE TES ED FOR PROPER OPERATION. IF TESTS SHOW WORK 15 seal � DEFECTIVE, CONTRACTOR SHALL MAKE CORRECTIONS NECESSARY AT NO COST TO OWNER. - go,RE a 10. IN AS MUCH AS DESIGN FOR REMODEL AND /OR REHABILITATION REQUIRES THAT W i''•r�9 CERTAIN ASSUMPTIONS BE MADE REGARDING EXISTING CONDITIONS AND 5ECAU5E SOME OF THESE ASSUMPTIONS CANNOT BE VERIFIED WITHOUT DESTROYING OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE BUILDING, THE ENGINEER CANNOT ASSURE THE OWNER OR THE CONTRACTOR THAT THE :PROFESSIONAL CONSULTING SERVICES HEREIN z. ENCOMPASS ALL CONTINGENCIE5. FIELD COORDINATION DURING CONSTRUCTION IS IMPERATIVE. CONTRACTORS BIDDING TH15 WORK MUST MAKE REASONABLE ALLOWANCES cQ FOR UNSEEN CONDITIONS. U Q 11. PROVIDE NECESSARY TRENCHING, BACKFILL, EXCAVATION, SUPPORTS, PIPING, INSULATION, 5AWCUTTING AND PATCHING, CONCRETE /PAVING, ETC,, AS REQUIRED. BACKFILL a TRENCHES IN 6" LAYERS AND TO'c3O% COMPACTION AN D PATCH TO MATCH EXISTING GRADE. r� _' O (A �w 12. FIELD VERIFY LOCATIONS OF ALL EXISTING PIPING, EQUIPMENT, DUCTWORK, ETC- o kn n- a ALLOWABLE GAS LOAD5 SUMMARY INSTALL VENT FOR -- '- SEE FLOOR PLANS MBH METERS FOR EACH UNIT. GAS METERS SHALL NOT BE LOCATED IN BOILER, HEATER OR FOR CONTINUATION d 309 250 REGULATOR IN THI5 309 PIPE SIZES (NOT G 309 CONTRACT AS REQ'D ROUTE . � APPLICABLE FOR 309 250 TO EXTERIOR AS REQ`D. SEE 309 SOME UNITS) F 309 FOOTNOTE BELOW. G 309 250 J 309 250 K 3O9 250 L 309 250 O 309 WHEN INSTALLED, SIZE ' P } 250 CAP PIPE FOR 309 250 REGULATOR 4 SUB -METER 309 L -� - FUTURE USE. 309 250 FOR ALLOWABLE GAS 310 I I PROVIDE ADEQUATE 1,Ota 0 TOTAL LOADS - SEE TABLE 5,110 - "I" 8 "MN" ALREADY HAVE GA5. - "U" d "V" - NO GA5 - "H" 4 "Q" DON'T EXI5T. CLEARANCE FOR p (THIS SHEET) I FUTURE INSTALL'N OF ' X W 29. GAS VALUE USED FOR DESIGN 15 810 BTU /CF. 1 I METER 4 REG. Date: DASHED BOX 5/1/03 L _ _ _ _ J COORD. WITH G.C. a 61 INDICATES FUTURE Checked By: BJH JDR z WORK (SEPARATE `-' INSTALL GAS CONTRACT) SHUT - OFF VALVE IN THIS CONTRACT SOLID BOX SHOWN ON FLOOR PLANS SEE FLOOR PLANS FOR CONTINUATION 4 PIPE SIZES DETA 11 CONTRACTOR TO INSTALL GAS PI PING TO - ACCOMODATE D ACTTAKE - OUT D ISTANCE NO SCALE FOR FUTURE SUB -METER 4 REGULATOR FOOTNOTE: THE INSTALLATION OF VENTS FOR FUTURE REGULATORS IS REQUIRED IN TH15 ,CONTRACT FOR ALL 'APARTMENTS EXCEPT UNIT5 11 5" AND "L". ALSO; VENTS ARE NOT REQUIRED FOR THE LAUNDRY AND M ECH ROOMS. GENE SAL= M ECHANI 5 C I I CAT I ON5 1. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF Ad Ilk WORK. - 2. IT IS THE INTENT OF THESE DRAWINGS AND SPEC, TO ESTABLISH A STANDARD r C OF QUALITY. THE ENGINEER RESERVES THE RIGHT TO TAKE ;EXCEPTIONS TO APPROVE r4 METHODS AND MATERIALS NOT REFLECTED HEREIN. 3. VISIT SITE PRIOR TO BID AND VERIFY THE CONDITIONS. INCLUDE IN THE BID, COSTS --� REQUIRED TO MAKE WORK MEET EXISTING CONDITIONS, WHETHER INDICATED OR NOT, ts. 1 4. FAILURE- TO ORDER, OR RELEASE ORDER, FOR MATERIALS AND /OR EQUIPMENT WILL " tu NOT BE ACCEPTED AS A REASON TO SUBSTITUTE ALTERNATE MATERIALS, EQUIPMENT, COR 0 ? INSTALLATION METHODS. ' , > X w ul 5. WORK SHALL BE PERFORMED IN -A WORKMANLIKE MANNER TO THE SATISFACTION OF THE � ARCHITECT d MECHANICAL ENGINEER. uj N q I 6. LABOR, MATERIALS, AND EQUIPMENT SHALL CONFORM TO THE LATEST APPLICABLE � u- EDITIONS OF LOCAL, STATE OF COLORADO, AND NATIONAL CODES AND ORDINANCES. IF j CONFLICT BETWEEN THOSE PUBLICATIONS EXIST, THE MOST STRINGENT REQUIREMENT SHALL APPLY, uj tip w I. MEDIUM PRESSURE GAS LINE 15 51ZED WITH 0.5 P51 DROP. t S. INSTALL ALL EQUIPMENT /COMPONENTS PER 1" IANUFACTURER'S INSTALLATION t INSTRUCTIONS AND INDUSTRY STANDARDS. 9. SYSTEMS A TESTED E S SH LL BE TES ED FOR PROPER OPERATION. IF TESTS SHOW WORK 15 seal � DEFECTIVE, CONTRACTOR SHALL MAKE CORRECTIONS NECESSARY AT NO COST TO OWNER. - go,RE a 10. IN AS MUCH AS DESIGN FOR REMODEL AND /OR REHABILITATION REQUIRES THAT W i''•r�9 CERTAIN ASSUMPTIONS BE MADE REGARDING EXISTING CONDITIONS AND 5ECAU5E SOME OF THESE ASSUMPTIONS CANNOT BE VERIFIED WITHOUT DESTROYING OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE BUILDING, THE ENGINEER CANNOT ASSURE THE OWNER OR THE CONTRACTOR THAT THE :PROFESSIONAL CONSULTING SERVICES HEREIN z. ENCOMPASS ALL CONTINGENCIE5. FIELD COORDINATION DURING CONSTRUCTION IS IMPERATIVE. CONTRACTORS BIDDING TH15 WORK MUST MAKE REASONABLE ALLOWANCES cQ FOR UNSEEN CONDITIONS. U Q 11. PROVIDE NECESSARY TRENCHING, BACKFILL, EXCAVATION, SUPPORTS, PIPING, INSULATION, 5AWCUTTING AND PATCHING, CONCRETE /PAVING, ETC,, AS REQUIRED. BACKFILL a TRENCHES IN 6" LAYERS AND TO'c3O% COMPACTION AN D PATCH TO MATCH EXISTING GRADE. r� _' O (A �w 12. FIELD VERIFY LOCATIONS OF ALL EXISTING PIPING, EQUIPMENT, DUCTWORK, ETC- o kn n- a ALLOWABLE GAS LOAD5 SUMMARY APT. CPH MBH METERS FOR EACH UNIT. GAS METERS SHALL NOT BE LOCATED IN BOILER, HEATER OR A 309 250 B 309 250 G 309 250 D 309 250 E 309 250 F 309 250_ G 309 250 J 309 250 K 3O9 250 L 309 250 O 309 250 P 309 250 R 309 250 5 309 250 T 309 250 LAUNDRY 310 300 MECH 1,309 1,Ota 0 TOTAL ro,309 5,110 - "I" 8 "MN" ALREADY HAVE GA5. - "U" d "V" - NO GA5 - "H" 4 "Q" DON'T EXI5T. 13. SUPPORT PIPE WITH ROD AND CLEVIS OR CLAMPS. NO PIPE TAPE ALLOWED. P4 0 � 00 14. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR ALL CEILING PENETRATIONS. Q 0 ul 15. COORDINATE ARCHITECTURAL, STRUCTURAL, ELECTRICAL, LANDSCAPING, FIRE PROTECTION, AND INTERIOR DE51GN DRAWINGS WITH MECHANICAL DRAWINGS` PRIOR TO W d z INSTALLATION. ' 16. ALL EXISTING SUPPORT RODS AND STRAPS NOW SUPPORTING DUCTS, PIPES, ELECTRICAL CONDUIT, ETC. THAT ARE REMOVED TO ALLOW ROOM FOR INSTALLATION OF - NEW EQUIPMENT SHALL BE RELOCATED AND REINSTALLED, OR REPLACED IF DAMAGED. a d) 1 OFFSET PIPING AS NECESSARY TO ACCOMMODATE STRUCTURE, BEAMS, COLUMNS, AND I EXISTING EQUIPMENT. u QC �i 18. VERIFY EXACT LOCATIONS OF EXISTING AND NEW UNDERGROUND °UTILITIES, PIPING, AND Q RACEWAY SYSTEMS PRIOR TO TRENCHING_ CONTRACTOR SHALL OBTAIN AND VERIFY f- EXACT UTILITY COMPANY DRAWINGS AND REQUIREMENTS. w 1(B. GAS PIPING - SCHEDULE 40: BLACK STEEL: PIPE, 150 LB: MALLEABLE IRON 5CREWED �- FITTING ON A50VE GROUND PIPE, WELDED FITTING 5 WITH ALL PIPING COATED AND w WRAPPED 'ON BURIED PIPE. APPROVED PE PIPE MAY 8E USED IN EXTERIOR BURIED PIPING SYSTEMS. � ,t 20. GAS VALVES - LUBRICATED PLUG VALVE 115 LB. W.O.G. - IRON SCREWED OR FLANGED. w Issued For z =w 21. ROUTE ALL PIPING PLUMB AND PARALLEL TO STRUCTURE. `� a No. Date ent W 1 5A/03 RUCTION fl 22. IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES. x a 23. MECHANICAL CONTRACTOR TO COORDINATE INSTALLATION OF GAS PIPING d SERVICE m p WITH XCEL ENERGY. 4 24. MECHANICAL CONTRACTOR SHALL COORDINATE` EXACT CONCEALED GAS ` STUB LOCATIONS WITH ARCHITECT. ARCHITECT SHALL BE RESPONSIBLE TO PROVIDE AS -BUILT Q DRAWINGS SHOWING THESE LOCATIONS. 25. MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF FUTURE GA' METERS FOR EACH UNIT. GAS METERS SHALL NOT BE LOCATED IN BOILER, HEATER OR ELECTRIC METER ROOMS. 26. MECH CONTRACTOR SHALL FIELD VERIFY EXACT ROUTING OF ALL GAS PIPING. INSTALL " 3 TO MINIMIZE PIPING LENGTHS AND FITTINGS AND TO MINIMIZE DEMOLITION REQUIRED, 0 v ROUTE LINES WITH FIRE PR O TECTIO N LINES WHERE POSSIBLE, � 2 FERROUS GAS PIPING INSTALLED UNDERGROUND IN EXTERIOR LOCATIONS SHALL BE ' ME CHANICAL w PROTECTED 'FROM CORROSION BY APPROVED COATINGS OR WRAPPING MATERIALS OR COVER SHEET BY ANY OTHER APPROVED MANNER.+- z 28. BURIED MEDIUM PRESSUR CHAS PIPING SHALL PROTECTED FROM CORROSION S n E ED PRE RE P P LL BE PR E ED FR RR S10N A a REQUIRED BY CHAPTER 12 OF THE IS U AND SHALL HAVE A MINIMUM EARTH COVER OF EIGHTEEN (18) INCHES. SUCH PIPING SHALL BE COVERED WITH AT LEAST 51X (6) INCHES 'ROCKS, p OF HAND PLACED SELECTED BACtCFILL DEVOID OF BUILDING MAT'LS OR OTHER w MATTER THAT MAY DAMAGE THE PIPE OR WRAPPING- ' X W 29. GAS VALUE USED FOR DESIGN 15 810 BTU /CF. Project No. Date: 301h;00 5/1/03 o 30. F LEXIBLE GRAS PIPING` 16 NOT ALLOWED a 61 Drawn EN:' Checked By: BJH JDR z 31. MECH CONTRACTOR SHALL COORD EXACT ROUTING OF ALL NEW GAS PIPING AND w - EXACT LOCATIONS OF ALL FUTURE STUB - OUTS /CAPS`WITH G.C. PRIOR TO INSTALLATION, -%-eat No. 1 uj 32. FOR FUTURE REFERENCE, CONTRACTOR SHALL SIZE GAS REGULATOR FOR EACH UNIT Q B ASED ON 2 PSI MAX INLET STATIC PRESSURE, 1.5 PSI MIN INLET OPERATING PRESSURE 4 of `t I" li)r T'7I`_Al;P ;= '7 ni 1T1 PT Pi�FSSI lid ' . SEE SHEET M2.1 FOR CONT, N 3 11 C-i tin >- Ul w coo (P lu ]z lu Z > X lu W z LLS L" c') z o ui ^I w 6 w V-"O- %/",-* 0 Re 0 lu ���� I ul 1: CE) STOR ci OFFICE TRAS TRASH ROOM lu 0 0� ci WH (X2) 00 w Do 0 ul Z 1 li /4 PARKING GARAGE ROUTE GAS F=>If=>E IN GARAGE TO MAXIMIZE HEAD HEIGHT. IF GAS LINE REDUCES CLEAfRANCE, NOTIFi' GENERAL CONTRACTOR. COOfRD EXACT 2 ROUTING 5EFOfRE IN,5TALLATION. T tu z w IL -MG Ju 0 EL- W IL QC J�E L E - I V w EQUIP l6sued For z w iL No. Date Comment w 0 1 5/1/03 CONSTRUCTION 2 it MG Uf= Lu STOR VEST. 3: --t - — ---------- STOR STOR STOR STOR STOR STOR STOR STOR STOR STOR] I Z uj n A2 i i � iii i i iii ii i i i � -i i i�� 3/4 1 rl m m m m r ^ LAJ LLI / \ FP \ \ a � � 2 (P v ° l v e� P -/ 7 FP ' EXISTING CHAS METER R Cx SEVIN \\ \\ :� rr APT " I" TO REMAIN P \\ � P LLJ LAJ E X15TINGx CAS METER SERVING M \ \\ POOL TO REMAIN \ \ \ X rte -- C-, \\ \ \ \ W _ \ TO S MAIN 3,4 fR P�` \ 3/4 NEW CHAS METER. CHAS SERVICE SY XCEL ENERG T. NEW CONNECTED R�.a!s, 3 LOAD 16 5110 MBH 4 6309 CFH. ' ; %• �; ,9� w GONTRACTOR SHALL COORD \ rf l 1 {�� rr INSTALLATION WITH XCEL ENERGY. ° ° MGM ,N �� COORD EXACT LOCATION IN FIELD. \\ � '••... � ,�.• LU 1 \ AL � i - - \ p ::3z 1 1, " u r r t (� � -- 4 -- SEE DETAIL A SHEET 1" I1.0 FOR DETAILS WITHIN °� t � BOX SH OWN (TYP.) S E C O I [D F L O O M C WEST WING \ 00 W P BURIED CHAS PIPE \ w \ SEE SHEET �g \ M2.0 FOR AT POINT OF ENTRY INTO tk �' CONT. BUILDING -s, CHAS PIPE SHALL BE M 15T FLOOfR M ECH FLAN 45OVE GRADE. PIPE SHALL JEST WING � 0 ENTER BUILDING NEAR CEILINCx S< OF LAUNDRY ROOM. EXISTING CHAS METER SERVING AFT " TO W z \ \V�, REMAIN a z 4 � BEDROOM BEDROOMN :�i 5E3a o R 4 0+-4+N- APT G U W {- v E = ° � P °� APT R a i , r LEVEL 1„ Issued For w �1 \ � _ _ _ _ _ -- -- a G / ` tL!E _� _ _ __ m __ No. Date Comment LU i rr 1'/ If I B =TH up _ 1 {, rr P 5/1/03 CON5TRUCT1oN ju 1 {, " BATH BATH LAUN 21,2" MCA RISER p 3, {, 3, n 4" Q MGM 1{j2 ----------- T JACUZZI 4 LOBBY �\ \\ E N T R L � t \ \�` ° \\ I I I I I z aaL EQUIP* _ -A W _ \ UP jX Z FP F=,) TA r L AT JACUZZI ►- NORTH z LU Y $r� ! Ir_0ir X w W W JACUZZI Projec No. Date. 3016.0 5/If03 O z Drawn By: Checked By: U tu 8JH JDR W z 1 13 ( D4 15 W a' M -201 0 �- o z F,lf;P,.,5T FLOOF� I" F'LAN J, THIfP.,D FLOG WEST WING FOU�TH ��oo� r WE5T WING ui CIA Oak^ >- lU CY SWAM! �J l LA C m C cr, LA J CV Ul i�'1 tQ Ln 1H 94 0 �3 t iz U LIJ ~ Ui L.L.! 0 Ll r A CO r (P sea l O �pO REG� � ,. IID�% 0 A 00 w 00 > 0 o> Issued For No. Date Comment I E0103 CONSTRUCTION NORTH Ya" = 1' -0 Project No. Date: 3016.00 5/l/03 Drawn By: Checked By: BJN JDR shset No. I M of l