PROJECT REVIEW COMMENTS
DATE: 5/18/2010
TO: JL Viele Construction
lindsey@vieleconstruction.com
PERMIT APPLICATION #: B10-0098
PROJECT ADDRESS: 63 Willow Place unit 2
OCCUPANCY GROUP: R-2
TYPE OF CONSTRUCTION: VA
NUMBER OF STORIES: existing
BUILDING AREA: 74 s.f. addition
● Submit two complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified.
● Please respond in writing to each comment with a response letter addressing each comment.
BUILDING DEPARTMENT COMMENTS
Architectural Comments:
1 Revise plans to reference the 2009 IBC, R-2 occupancy
2 Revise plans to include a 1 hour roof/ceiling construction detail for the new roof area, and 1 hour construction for the new steel framing in the garage level per IBC table 601.
3 Revise window schedule to show safety glazing and windows W1/3 and W1/4
4 Revise building section to show insulation R-values at new walls and roof. R-20 and R-49 minimum are required per 2009 IECC.
5 Revise building section to show roof material and underlayment
6 Revise wall section to show wall finish materials, insulation, weather resistive barrier, flashing at the exterior wall per IBC 107.2.4.
7 North elevation is not in the plan sets. Show overhang height above finish level at exterior patio
8 Revise window schedule to show minimum .35 U-value at all new windows per 2009 IECC
Structural Comments:
9 Please complete pages 3&4 of the attached Town of Vail Special inspection packet
Plumbing Comments:
10 Include plumbing plans for the new parking level bathroom.
11 Include gas piping plan and BTU sizing for the new gas fireplace
Electrical Comments:
12 Please include the panel schedule, load calculations and one line drawing on the full size plan sheets
13 Include notes on the electrical lighting plan for a minimum of 50% of new lighting to be high efficacy per 2009 IECC