Loading...
HomeMy WebLinkAboutB10-0111 comment letterDepartment of Community Development 5 South Frontage Road Vail, Colorado 81657 970-479-2138 FAX 970-479-2452 www.vailgov.com ______________________________________________________________________ PROJECT REVIEW COMMENTS DATE: 5/25/2010 TO: Ferrucco Vail Ventures LLC sparks@vailplazahotel.com PERMIT APPLICATION #: B10-0111 PROJECT ADDRESS: 16 Vail Road OCCUPANCY GROUP: mixed TYPE OF CONSTRUCTION: IB NUMBER OF STORIES: existing BUILDING AREA: existing ● Submit three complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. ● Please respond in writing to each comment with a response letter addressing each comment. BUILDING DEPARTMENT COMMENTS 1 Please revise plan submittal to use a consistent plan sheet size. All plans submitted shall be drawn to scale and plotted on the same sheets size Architectural Comments: 2 All sheets of the architectural plans are required to be stamped and signed by a Colorado State Licensed Architect. IBC 107.1 3 Include floor plan, or site plan showing proposed location of the new firepit. IBC 107 4 Revise architectural plans to provide an accessible service counter area at the new pool bar per ANSI 117.1 2003 5 Revise plans to show accessible route and access to the pool and spas. ANSI 117.1 2003 6 Revise plans to show 4’ minimum height for pool enclosure per IBC 3109.3. All gates shall have self closing and self latching gates. Structural Comments: 7 Please include complete structural plans stamped and signed by a Colorado State Licensed Engineer for the proposed gunite pool and spa construction. IBC 107 8 Please include analysis from the structural engineer for the proposed additional dead loads in the pool deck planting areas and patio areas. IBC 107 9 Revise plans to include construction plans for the relocation and support of the stainless steel hot tubs. IBC 107 Plumbing Comments: 10 Revise plans to include a gas piping plan for the proposed new firepit per IFGC 11 Please include notes on plans for all suction outlets to comply with IBC 3109.5