HomeMy WebLinkAboutB10-0125NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
l�
TOM OF YA[L '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD /ALT SFR BUILD PERMIT Permit #: 1310 -0125
Project #:
Job Address: 433 GORE CREEK DR VAIL
Location......: UNIT 16B, VAIL TRAILS EAST
Parcel No....: 210108234024
OWNER BRUECKER WOOD REAL ESTATE TR 06/01/2010
330 OLD Y RD
GOLDEN
CO 80401
APPLICANT BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800
P.O. BOX 4030
VAIL
CO 81658
License: 117 -A
CONTRACTOR BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800
P.O. BOX 4030
VAIL
CO 81658
License: 117 -A
Description:
INTERIOR REMODEL & ADDITION (BAY WINDOW)
Status .. :
Applied..
Issued ...
Expires ...:
PRJ 10 -0019
ISSUED
06/01/2010
07/27/2011
07/02/2011
Occupancy: R2
Valuation: $155,000.00
Type Construction:VB
Total Sq Ft Added: 0
.........
FEE SUMMARY .+..:. Y . i +L. +ffw. +.. +... .tr.AArt /R44 R. ..i..wi. kRlk4A } fRRVfff x4VRftrtYffltfM
Building Permit Fee ------ >
$1,301.75
Will Cal Fee -------------- - - - ->
$5.00
Total Calculated Fees----- - - --->
$5,272.89
Plan Check --------- — --------- >
$846.14
Use Tax Fee--------- - - - - --
$2,900.00
Additional Fees------------------ - - - - ->
$0.00
Add'I Plan Check Hours-
$220.00
Restuarant Plan Review - - - - ->
$0.00
TOTAL PERMIT FEES --- ------- - ->
$5,272.89
Investigation--------- - - --->
$0.00
Recreation Fee -------------- - ->
$0.00
Payments--------------------- - - - - ->
$5,272.89
Total Calculated Fees --- — --- >
$5,272.89
BALANCE DUE--------------- - - - - ->
$0.00
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the informatior
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SWA E MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM
r /
C
Signal of Owner or Contractor Date
Print Name
bld _alt construction_pe rmit_041908
APPROVALS
Permit #: B10 -0125 as of 07 -27 -2011 Status: ISSUED
Item: 05100 BUILDING DEPARTMENT
06/11/2010 cg Action: AP
09/22/2010 cg Action: AP APPROVED REVISION
S1
07/20/2011 JRM Action: AP APPROVED REVISION
A1.1
Item: 05400 PLANNING DEPARTMENT
06/01/2010 bgibson Action: AP plans routed to C3
07/11/2011 bgibson Action: AP Revisions dated
7/1/11 approved by Planning. Plans routed to A -2.
Item: 05600 FIRE DEPARTMENT
06/03/2010 drhoades Action: DN Asbestos
abatement/final air cleanance must be applied for and
completed prior to issuance of building permit.
09/01/2010 drhoades Action: AP Air Clearance
Letter Received.
See the Conditions section of this Document for any that may apply.
bld_a It_con stru ction _perm it_041908
CONDITIONS OF APPROVAL
Permit #: B10 -0125 as of 07 -27 -2011 Status: ISSUED
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE
INSTALLED PER 2009 IRC R315
Cond: 51
(FIRE 2007): MONITORED FIRE ALARM SYSTEM REQUIRED AND SHALL
COMPLY WITH NFPA 72(2007) AND VFES STANDARDS.
bid_a It_con struction_pe rm it_041908
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R110000859 Amount: $257.20 07/27/201111:52 AM
Payment Method:Credit Crd Init: SAB
Notation: MC - STEPHEN
BODERCK /BECK BLDG.
-----------------------------------------------------------------------------
Permit No: B10 -0125 Type: ADD /ALT SFR BUILD PERMIT
Parcel No: 2101 - 082 - 3402 -4
Site Address: 433 GORE CREEK DR VAIL
Location: UNIT 16B, VAIL TRAILS EAST
Total Fees: $5,272.89
This Payment: $257.20 Total ALL Pmts: $5,272.89
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
BP 00100003111100 BUILDING PERMIT FEES 28.00
PF 00100003112300 PLAN CHECK FEES 128.20
UT 11000003106000 USE TAX 4 9 6 100.00
WC 00100003112800 WILL CALL INSPECTION FEE 1.00
Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to: Attention:
— — v
Project Street Address: / I / '
—I L2
(Number) (Street) (Suite #)
.Revisions
( ) Response to Correction Letter
_attached copy of correction letter
() Deferred Submittal
( ) Other
Description / List of Changes:
Building /Complex Name: VA
Contact Information: i � 3
Company: _RTC y_
Company Address: Al, L_r �
n s
City: A P e , , State: _ Zip: /
Contact Name: � . , 4
Contact Phone: Q - 7 o L-( - 7 1 / S
E -Mail - I?a- c L_ . . iD ",_i_ t_ 1 1
Valuations (Labor & Material))
Building:
Plumbing
.r .r •
Electrical: $ --
Mechanical: $
Total:
$ - ocn O
I*Jcinll nD1r_..1AP +
54c-FT d/.
'
(use additional sheet if necessary)
_._....... .... .... ...__...._.. - -- .. ----- ._.... -- . __..- ... - - - - -- - -_J
Date Rece
JUL 012011
/
TOW OF VAIL
1- Sep -09
TRANSMITTAL FORM
Revision Submittals:
1. "Field Set' of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to:
6 -- le) — o l�S
Attention: () Revisions
() Response to Correction Letter
_a ied copy of correction letter
() ferred Submittal
( Other
Project Street ddress:
(Number) (Street) (Suite #)
Building /Complex Name: W4--
Contact Inform t
Company: Company Address: Address: -6per
City: State: Zip: b161
Contact Name: �� &Z ad AIJL41t 1 r
Contact Phone: � /
ne: / - L 2 &/ & - / - 7
E -Mail ZJo (� 1 �_ h ckh14
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
Description / List of Changes:
Building: $ ° (use additional sheet if necessary)
Plumbing: $
j Date Received:
Electrical:
Mechanical:
Total:
OCT 12 2010
TOWN OF VAIL
01 -Jan-10
TRANSMITTAL FORM
KR M. CONSULTANTS, INC.
P.O. Box 4572 970- 949 -9391
Vail, Colorado 81 656 FAX 949 -1577
FIELD REPORT
TO:
DATE: 10/5/2010
Bob Brownlee
ARRIVE:
DEPART:
i
WEATHER:
ATTENTION:
I
JOB NUMBER. 1004 -16
PROJECT.- Wood Bruecker Remodel
PRESENT AT SITE: Bob
STATUS OF COMPLETION: Structural framing complete
On October 5, 20101 visited the above referenced site to observe the completed framing. The bay windows had been
installed, the exterior wall was framed, and the steel beam was in place. The general structural framing appeared to
conform to the intent of the structural drawings. However, solid blocking shall be added above the new steel beam, in
line with the comer of the kitchen above, if this has not been installed.
Please call with any questions.
j KRM Consultants, Inca
SIGNED: �� A' :� F NN��k ° o COPY TO:
w
Tim. D. Hennum, PE m
REVIEWED: ;
�ti �F
/18/2008 05:04 3035265891 WOOD- ERUECKER PAGE 01/02
� r % r.7 , ' .] '
lVM11 Of . V V
Job Name: F OOD 1L �t e�
Job Address: �3.� 6a6a 2 ,p�2 ✓�
Permit No.: 10 -- lf/Z•�6
SPECIAL INSPECTION AND TESTING AGREEMENT
go applicants of projects requiring Special Inspection or Testing per Section 1701 of the 16C)
The owner or hls/her representative, on the advice of the design professional in responsible charge, shall
complete, seat, sign and submit a copy of the Special Inspection Agreement and Structurat Tests
Scheduled to the Town of Vail for review and approval. - Signatures .are required. or) both pages;
photocopied or faxed signatures are acceptable.
The owner and his/her, general' contractor, where applicable, shall also acknowledge the following
conditions applicable to Special Inspection Testing:
1_ Contractor is responsible for proper notification to the Inspection or Testing ' agency for items
- listed,(Page 1). (IBC 1704) .
2. Only the .testing 1aboratoiy should take samples and transport them to their laboratory, .
•3. Copies of all laboratory reports and Inspections are to be sent directly to the Town of Vail by the Testin
agency on'a weekly basis, g
4. Inspection agency to submit names and of on - s)te special inspectors to the Town of Vail
'for review and, approval. ('Page 2)
5. The special, inspector is responsible to immediately notify the Town of Vail Building Official in writing of
any concerns and/or problems encountered.
6. It' is the responsibility • of the,: contractor to 'review . the' Town of Vail a
pproves? plans for additional
Inspection or testing requirerpents that may be rioted_ A pre - construction conference at the job site is
recommended to review special Inspection procedures_
7. The:special inspector shall use only the Town of Vail approved drawings.
8, All special inspection fteici reports must be left on site for review by the' Town of Vail staff prior to
required inspections or re- inspections.
BEFORE OCCUPANCY WILL BE GRANTED, The special inspection agency shall submit a signed and
sealed statement that all items requirinng testing and ln'spectlori were fulfilled and reported, Those items not
tested and/or Inspected shall be noted In'this state►neirt. A copy Of the statement shall be maintained at the
job site for the Building Inspector's review prior to .final Inspection.
Acknowledgem t:
Owner: f
�t�'c3-fi �� 1•� 1 ° �
Signature c7
Print Name-
, D to
.Special Inspe ��OtJJJ
Agency: • ( /<Q��a
Signal re
Project Yrint Nam bate
Arch/
Print•Name Rate
Contractor. /
gnaturc ` lI lv
Print ame D e
08/18/2908 85:04 3835265891 WOOD - BRUECKER
P A J ,
SPECIAL. INSPECTION AND TESTING SCHEDULE
(iBC 1704)
Project Marne:
Owner's Name
Testing inapt
PAGE 02/02
/�'y- / • Permit# '/S /0 d
'PrinrNAme
Agency:
6 �` ` "� na � �I��+t'T71V r��'�Y�
Testing ins
Print Nerne Date
! csrtifies that the Testing/tnspection'Agency named above has been engaged to Perform-structural tests and
Inspections during Construction as checked below, to satisfy all applicable portions of the Building Code.
Prior to final Inspection, the Inspection Agency shall submit a'statement that all items of designated work' performed
were reported. Any items checked but not tested or Inspected will be noted and explained. Whenever any dessignated
items on the list are ready for sampling, testing, or Inspection, It shall be the responsibility of the coritractor to give
timely notice to the inspection agency so that the required services may be performed.
i
REINFORCING STEEL:
Tenslle & 8end, one set per heat pAr tons
Inspection of Placement
Ip9pection of Welding
Epoxy
fteinforctng Tests
lnspaction of Reinforcing Placement
Tendon Tests
Inspection of Tendon Placement
Inspection of Concrete Placement
Inspection df Concrete Batching
Inspection of Panel Attachment & inserts
Compression Tests
Inspection of Stressing/Transfer
FILiNG, CAISSONS; CAPS, TIES:
InsPection.of Refnforcing Plac®ment
Inspection of Concrete Placement
inspection of Concrete Belching
Spectiry othartests, inspections orspecial inatrucflonsrequftd.
UNDERPINNING!
Temporary/permanent
Inspection of Steel Fabrication
Inspection of Reinforcing & Forms
Inspection of Concrete Placement
inspection of Tiebacks
SOIL NAILS-
Temporary Shoring
Per manent Wail
STRUCTURAL STEEL:
Sample & Test (List specific members below)
Shop identlRcation a Welding Inspection
Shop Ultrasonic Inspection
Shop Radiography
Field Welding Inepectfony
Feld Bolting Inspection
Field Ultrasonic inspection
Field Radiography
Motet Deck Welding Inspection
FIREPROOFING:
Inspection & Placement
SOILS:
Acceptance Tests
Moisture- Denefty Determination
Field Density '
:)rifled Piers
Deep Foundation
STRUCTURAL WOOD;
lnspectlon of Fabrication
inspection of Truss Joint 'Fabrication
Sample & Test Components
inspecdon.of GIu Lain Fabrication
SMOKE CONTROL:
SPECIAL CASES:
SPECIAL, INSPECTION;
Seismic Resistance
Wind Requirements
MASONRY:
Prelim. Acceptance Tests (Masonry Units, Wall Priem9)
Subsequent Tests (Mortar. Grout, Field Wail Prisms)
Inspection of Placement and Grouting .
NOTE; THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
7OWW vn¢
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD /ALT SFR BUILD PERMIT Permit #: B10 -0125
Project #: PRJ10 -0019
Job Address: 433 GORE CREEK DR VAIL
Location......: UNIT 16B, VAIL TRAILS EAST
Parcel No....: 210108234024
OWNER BRUECKER WOOD REAL ESTATE TR 06/01/2010
330 OLD Y RD
GOLDEN
CO 80401
APPLICANT BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800
P.O. BOX 4030
VAIL
CO 81658
License: 117 -A
CONTRACTOR BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800
P.O. BOX 4030
VAIL
CO 81658
License: 117 -A
Description:
INTERIOR REMODEL & ADDITION (BAY WINDOW)
Occupancy: R2
Type Construction:VB
Status .. :
ISSUED
Applied ..:
06/0112010
Issued...:
10/12/2010
Expires ...:
03/01/2011
Valuation: $150,000.00
Total Sq Ft Added: 0
**************************************** rtrt******** * * * * * * *** * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY * * * * * rt * * * **
Building Permit Fee - --->
$1,273.75
Will Cal Fee -- ----- - - - - ->
$4.00
Total Calculated Fees--- - - - - ->
$5,015.69
Plan Check -- ---------- - - ->
$827.94
Use Tax Fee --- --------- — ----- >
$2,800.00
Additional Fees ------- ---- -- ----- >
$0.00
Add'I Plan Check Hours ->
$110.00
Restuarant Plan Review - - - - ->
$0.00
TOTAL PERMIT FEES------ ---- ->
$5,015.69
Investigation ------- - - - - ->
$0.00
Recreation Fee---- - - - - ->
$0.00
Payments - - -- -- ----------- --- - ->
$5,015.69
Total Calculated Fees--- - - - - ->
$5,015.69
BALANCE DUE--------------- - - - - ->
$0.00
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUES FOR NSP TON SHA BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8: AM 4:00 P
Signature of Own VA, Contractor Date
Print Name
b Id_a It_co n stru ct io n _pe rm it_041908
APPROVALS
Permit #: B10 -0125 as of 10 -12 -2010 Status: ISSUED
Item: 05100 BUILDING DEPARTMENT
06/11/2010 cg Action: AP
09/22/2010 cg Action: AP APPROVED REVISION
S1
Item: 05400 PLANNING DEPARTMENT
06/01/2010 bgibson Action: AP plans routed to C3
Item: 05600 FIRE DEPARTMENT
06/03/2010 drhoades Action: DN Asbestos
abatement/final air cleanance must be applied for and
completed prior to issuance of building permit.
09/01/2010 drhoades Action: AP Air Clearance
Letter Received.
See the Conditions section of this Document for any that may apply.
b Id_a It_construction_perm it_041908
CONDITIONS OF APPROVAL
Permit #: B10 -0125 as of 10 -12 -2010 Status: ISSUED
#* 444** k** fr## Y# Y# Y Y YY * Y * * # # # # # # # #Y#YY#Y *Y * * #RY *# *## 444444 R*#** k**####*# Y* YYYY##*# kk**###### YrtrtrtYYY # #** * # # # * # # # # * *rt * # # *R #* * * # * *# 4444444##** R##*#* # * ***#YYYrtrt # # # * **# # * # # # # # # #YNYY
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE
INSTALLED PER 2009 IRC R315
Cond: 51
(FIRE 2007): MONITORED FIRE ALARM SYSTEM REQUIRED AND SHALL
COMPLY WITH NFPA 72(2007) AND VFES STANDARDS.
bld_alt_construction _perm it_041908
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R100001552 Amount: $110.00 10/12/201008:05 AM
Payment Method: Check Init: SAB
Notation: 18973 BECK
BUILDING
-----------------------------------------------------------------------------
Permit No: B10 -0125 Type: ADD /ALT SFR BUILD PERMIT
Parcel No: 2101- 082 - 3402 -4
Site Address: 433 GORE CREEK DR VAIL
Location: UNIT 16B, VAIL TRAILS EAST
Total Fees: $5,015.69
This Payment: $110.00 Total ALL Pmts: $5,015.69
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
PF 00100003112300 PLAN CHECK FEES 110.00
Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
erml s information applies to: Attention:
'q / O - d / 2 _'5 ��- f pe> iC
Project Street Address:
I'33 6aa E Cl�r->wA_
(Number) (Street)
'9/L d /G ' L
(Suite #)
Building /Complex Name: k' - /L %il,f7L_5
Contact Information:
Company:
Company Address: Box -A0
City: _vim / L �J State: GO Zip: g /(cS'S
Contact Name: O� 2 O cJ nJ Z 67;&�_
Contact Phoo / ne: 7 — (p (o 7 ///
E -Mail a /dS GDS
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
(WRevisions
( ) Response to Correction Letter
_attached copy of correction letter
() Deferred Submittal
() Other
Description / List of Changes:
lJ
�GCP�j /,S i lill(!;-- VfLcaor
Building: $
Plumbing: $
Electrical: $
Mechanical: $
Total: c
(use additional sheet if necessary)
_ ...
Date Received:
(r Fr
T(7,` E
01- Tan - 10
TRANSMITTAL FORM
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MWWOFVIK
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD /ALT SFR BUILD PERMIT Permit #: B10 -0125
Project #: PRJ10 -0019
Job Address: 433 GORE CREEK DR VAIL
Location......: UNIT 16B, VAIL TRAILS EAST
Parcel No....: 210108234024
OWNER BRUECKER WOOD REAL ESTATE TR 06/01/2010
330 OLD Y RD
GOLDEN
CO 80401
APPLICANT BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800
P.O. BOX 4030
VAIL
CO 81658
License: 117 -A
CONTRACTOR BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800
P.O. BOX 4030
VAIL
CO 81658
License: 117 -A
Description:
INTERIOR REMODEL & ADDITION (BAY WINDOW)
Occupancy: R2
Type Construction:VB
Status .. :
ISSUED
Applied..:
06/01/2010
Issued ...:
09/02/2010
Expires ...:
03/01/2011
Valuation: $150,000.00
Total Sq Ft Added: 0
#########*#####*###################**#**########## # # # # # # # # # # # # # # # # # # # # # # # # # # # # # ## FEE SUMMARY ################**########################****##
# # # # ### # # #
# # # # # # ### # # # # # * * # # ###
Building Permit Fee --
$1,273.75
Will Cal Fee--------------- - - - - ->
$4.00
Total Calculated Fees--- - - - - ->
$4,905.69
Plan Check--------- - - - - ->
$827.94
Use Tax Fee ------ ---------- >
$2,800.00
Additional Fees --- ------ -- - - - - ->
$0.00
Add'I Plan Check Hours ->
$0.00
Restuarant Plan Review - - - - ->
$0.00
TOTAL PERMIT FEES--- - - - - ->
$4,905.69
Investigation- -------------->
$0.00
Recreation Fee--------- - - - - ->
$0.00
Payments------------------ - - - - ->
$4,905.69
Total Calculated Fees--- - - - - ->
$4,905.69
BALANCE DUE — ------- --- ------- >
$0.00
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
RE EST F PE TION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:0 AM -
2
Signature of Ownero Contractor Ofate
,; /Qp��Z� L. /.� �v W .✓ LCD
Print Name
bld alt constructio n_perm it- 041908
APPROVALS
Permit #: B10 -0125 as of 09 -02 -2010 Status: ISSUED
Item: 05100 BUILDING DEPARTMENT
06/11/2010 cg Action: AP
Item: 05400 PLANNING DEPARTMENT
06/01/2010 bgibson Action: AP plans routed to C3
Item: 05600 FIRE DEPARTMENT
06/03/2010 drhoades Action: DN Asbestos
abatement/final air cleanance must be applied for and
completed prior to issuance of building permit.
09/01/2010 drhoades Action: AP Air Clearance
Letter Received.
See the Conditions section of this Document for any that may apply.
bld_alt_constru ctio n _perm it_041908
CONDITIONS OF APPROVAL
Permit #: B10 -0125 as of 09 -02 -2010 Status: ISSUED
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE
INSTALLED PER 2009 IRC R315
Cond: 51
(FIRE 2007): MONITORED FIRE ALARM SYSTEM REQUIRED AND SHALL
COMPLY WITH NFPA 72(2007) AND VFES STANDARDS.
bld_alt_construction _perm it_041908
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R100001219 Amount: $3.94 09/02/201004:39 PM
Payment Method: Check Init: SAB
Notation: 18897 beck
building
-----------------------------------------------------------------------------
Permit No: B10 -0125 Type: ADD /ALT SFR BUILD PERMIT
Parcel No: 2101 - 082 - 3402 -4
Site Address: 433 GORE CREEK DR VAIL
Location: UNIT 16B, VAIL TRAILS EAST
Total Fees: $4,905.69
This Payment: $3.94 Total ALL Pmts: $4,905.69
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
WC 00100003112800 WILL CALL INSPECTION FEE 3.94
Separate permits are required for electrical, plumbing, mechanical, fireplace, etc.
Project Street Address:
1F33 oe 9—e 62.E
(Number) (Street) (Suite #)
Building /Complex Name: VI}-( U -P-A -f LS k5A!�c
Contractor Information:
Company: �' 07" [. 60µ' >°A*-) V
Company Address: PO 80K 4 p sc)
City: ( L ( State: 6 62 Zip: Pj( tV S
Contact Name: 0.o F e2- O [,J td LSD
Contact Phone: '11 q'1 :7 — &6 1
E -Mail bob (�,' Od?-� U,--.
Town of Vail Contractor Registration No.:
Contractor Signature (required)
Office Use: ,� 1
Project #: PI`-V I d - Q�
DRB #: ���jl (100 1
Building Permit #: I —O 1 ZS
Lot J ( 0 Block # 4 - Subdivision: � i ll ow 1
Detailed Scope and Location of Work: Q eSwGV 6 A-L-f-
04129LtOWL I a5 A-J-L-
A19P- 6-
W ��LDv�.JS. po�✓�
(use additional shee4 if necessary)
Work Class:
New ( ) Addition ( ) Remodel (y) Repair ( ) Other ( )
Work Type
Interior (V) Exterior (Y) Both
Property Information
Parcel #: Z 10 / OS 2- L 5;1Z
(For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or
visit www.eaglecounty.us /patie)
Tenant Name:
Owner Name: 9A a* 2Ar 9
G6rr ►'L l S'T`S l,._�t� 0 t7
Valuations (Labor & Materials)
Building: $ _ /15 DOO" d0
Plumbing: $ 1 1a c
Electrical: $ �Alf
Mechanical: (including fireplace) $ / ✓1 G
Total: $ - / D., 00 Q, 00
Type of Building:
Single - Family ( ) Duplex ( ) Multi - Family
Commercial( ) Other( )
Does a Fire Alarm Exist?
Yes ( )
No ( FI
Monitored Alarm?
Yes ( )
No( 14
Does a Sprinkler System Exist?
Yes ( )
No (i)
# & Type of Existing Fireplaces: Gas Appliances
Gas Log A— Wood /Pellet Wood Burning
# & Type of Proposed Fireplaces: Gas Appliances
Gas Log J_ Wood /Pellet Wood Burning
Date Received: D (�
MAY 2 8 2010
TOWN OF VAIL
01- Jan -10
BUILDING PERMIT APPLICATION
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
*************************************************************
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number:
R100000588 Amount: $4,901.75 06/01/201010:28 AM
Payment Method:
Check Init: JLE
Notation: 18576 BECK
BUILDING CO
-----------------------------------------------------------------------------
Permit No:
B10 -0125 Type: ADD /ALT SFR BUILD PERMIT
Parcel No:
2101 - 082 - 3402 -4
Site Address:
433 GORE CREEK DR VAIL
Location:
UNIT 16B, VAIL TRAILS EAST
Total Fees: $4,905.69
This Payment:
$4,901.75 Total ALL Pmts: $4,901.75
Balance: $3.94
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code
Description Current Pmts
-------------- - - -
BP 00100003111100
- -- ------------------------ - - - - -- ------ - - - - --
BUILDING PERMIT FEES 1,273.75
PF 00100003112300
PLAN CHECK FEES 827.94
UT 11000003106000
USE TAX 4 1 6 2,800.00
WC 00100003112800
WILL CALL INSPECTION FEE .06
F,10 -
Vail Fire Department
Asbestos Testing & Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu-
lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements
at the contact info listed below.
When is asbestos testing required?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two - Family Dwellings: 32 square feet
All Others (commercial spaces, hotel rooms, etc): 160 square feet
Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including
multi - family /condominium units, and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State - certified and Vail- registered abate-
ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the
Town of Vail before the building permit will be issued. I r1% r-= e--\ r-;:= n n n F775 r5
Project Checklist lul II
My project falls into the category checked below MAY 2 8 2010 U
Will not disturb more than the threshold limits identified above TOWN OF VAIL
�Teed negative, or at 1% or below (2 copies of test results included)
Tested positive at more than 1 %, requires abatement (2 copies of test results included)
Tips & Facts:
• Even recent construction projects may include asbestos- containing materials, so buildings of �jny age require testing.
• The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos- containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development,
75 S Frontage Rd, Vail, CO, 81657.
Town of Vail Contact:
David Rhoades, Fire Inspector
Vail Fire Department
75 S Frontage Rd
drhoades @vailgov.com
970- 477 -3454
www.vailgov.com
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303 - 692 -3158
asbestos@state.co.us
www.cdphe.state.co.us
01- Jan -10
o 4
Asbestos Inspection and Sampling Report
433 Gore Cr eek Dr, Unit 16B, Vail, Colorado 81657
Presented to:
Mr. Bob Brownlee
BECK Building Company
PO Box 4030
Vail, CO 81658
Performed & Prepared by:
Mr. Steve Shurtliff
DS Consulting, Inc.
PO Box 6864
Avon,CO 81620
(303) 378 -1544
Project Details:
DSC Project #: 2179
Conducted: April 20, 2010
�p( MAY 28 2010 IUI
TOWN OF VAIL
Consulting
EXECUTIVE SUMMARY
On April 20, 2010, Mr. Steve Shurtliff of DS Consulting, Inc. (DSC) performed a limited inspection and
asbestos sampling at 433 Gore Creek Dr, Unit 1613, Vail, Colorado, in order to identify potentially
hazardous friable and non - friable asbestos - containing materials (ACM) within a portion of the above -
referenced, single- family residence in which renovations are scheduled. The Colorado Department of
Public Health and Environment's (CDPHE) Regulation 8, Part B defines an asbestos - containing material
(ACM) as a material containing more than 1% asbestos.
Mr. Shurtliff performed asbestos bulk - sampling of two (2) types of drywall (surfacing materials) in a total
of six (6) locations, acoustical ceiling texture (surfacing material) in a total of three (3) locations, vinyl
flooring (miscellaneous material) in a total of two (2) locations and resilient floor tile (miscellaneous
material) in a total of one (1) location within the residence (see Appendix A for sample locations).
All twelve (12) bulk - samples were analyzed by Aerobiology Laboratory Associates, Inc. (NVLAP
#200860 -0) with three (3) laboratory results of drywall, acoustical ceiling texture, and resilient floor tile
being positive for asbestos between 3% and 4% Chrysotile (see Appendix C for laboratory results).
The following sampled materials were found to contain asbestos greater than 1 % (ACM):
salliple Material
ID Description
Sample Material
Location classilicatioll
Friable/
Non-
Friable
Estiniated
Quantities Material
Condition
Asbestos
Content
DW01 -01 Drywall
Hallway Wall Surfacing
Material
Friable
+/- 450ft2 Good
4% Chrysotile
ACO1 -02 Acoustical
Ceiling
Hallway Ceiling Surfacing
Material
Friable
+/- 125ftz Good
3% Chrysotile
FTO1 -01 Resilient
Floor Tile
Kitchen Floor Miscellaneous
Material
Non-
Friable
30ft Good
3% Chrysotile
*Quantities are approximations and subiect to field
verification.
2
PROJECT OVERVIEW
I. Introduction
A limited inspection and bulk - sampling for ACM was conducted at 433 Gore Creek Dr, Unit 16B, Vail,
Colorado, by Mr. Shurtliff on April 20, 2010, at the request of Mr. Bob Brownlee with BECK Building
Company. Mr. Shurtliff is a Colorado State Certified Building Inspector; having EPA Accreditation #15413
(see Appendix B for certificate). The purpose of the inspection was to identify, sample and assess
potentially hazardous friable and non - friable ACM within the residence.
II. Structural Design
The structure is a wood - framed, single - level, single - family residence.
III. Sampling and Analytical Procedures
The inspection, assessment and sampling were conducted by an EPA and AHERA accredited Building
Inspector qualified by experience, education and training in the recognition of potential ACM and
approved bulk - sampling techniques. The asbestos bulk - sampling was conducted on suspect ACM with a
limited number of bulk - samples being collected within the residence.
The inspection, assessment and sampling were performed in accordance with Environmental Protection
Agency / AHERA recommended procedures. These procedures call for the visual inspection of the area of
concern and the collection and analysis of representative bulk - samples of suspect material.
Some minor destructive sampling was conducted. Walls, columns and perimeter pipe chases were not
broken into in order to locate and quantify suspect ACM. It should be noted that additional ACM might be
located in these and other inaccessible areas.
Random bulk - samples, representative of the suspect asbestos - containing building materials (ACBM) of
each homogeneous area (HA), were collected according to the guidelines published as Environmental
Protection Agency (EPA) Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections
2641 through 2654 and in compliance with 40 CFR, Part 763. Representative sampling is based on the
following criteria:
1. The distribution of the suspect material throughout the HA.
2. The suspect material's physical characteristics and application.
3. Random sampling patterns determined for each HA.
Suspect materials sampled and analyzed should be considered to be representative of materials in each
HA if they exhibit similar physical characteristics and the application of the sampled material can be
correlated to the application of un- sampled material. Bulk- samples collected were analyzed utilizing the
EPA's Method for the Determination of Asbestos in Bulk Building Materials (EPA 600/R/116, July, 1993)
and the McCrone Research Institute's The Asbestos Particle Atlas as methods references. Analysis of the
bulk- samples was performed on the "date reported," as listed in the bulk - sample analysis report.
IV. Notes on Report Format
Suspect materials alike in appearance and application were sampled as HAs. Suspect materials were
divided into three classifications:
1. Surfacing Material: sprayed or troweled onto structural building member.
2. Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation.
3. Miscellaneous Material: other suspect materials, floor tile, sheet vinyl /linoleum, ceiling tiles,
insulation, and finishing materials.
Condition assessments were performed by the accredited inspector at the time of inspection. Condition
assessments are listed in the following section. Ratings of "good," "damaged," and "significantly
damaged" are meant to indicate the overall condition of the material.
A material in "good" condition has no visible damage or deterioration, or showing only very limited
damage or deterioration.
A material in "damaged" condition has the following characteristics: The surface is crumbling, blistered,
water - stained, gouged, marred or otherwise abraded over less than one -tenth of the surface if the
damage is evenly distributed (one - quarter if the damage is localized). Accumulation of powder, dust or
debris similar in appearance to the suspect material on surfaces beneath the material can be used as
confirmatory evidence. A material in "significantly damaged" condition has one or more of the following
characteristics:
The surface is crumbling or blistered over at least one -tenth of the surface if the damage is evenly
distributed (one - quarter if the damage is localized).
One -tenth (one - quarter, if localized) of the material is hanging from the surface, deteriorated, or
showing adhesive failure.
Water stains, gouges, or mars are over at least one -tenth of the surface if the damage is evenly
distributed (one - quarter if the damage is localized). Accumulation of powder, dust or debris
similar in appearance to the suspect material on surfaces beneath the material can be used as
confirmatory evidence.
Response- action recommendations for asbestos - containing HAs are listed in the section VII.
Recommendations may be for more than one HA, if materials are alike. Recommendations are either
"general' or "immediate." An immediate recommendation indicates the presence of asbestos greater
than 1% within the bulk - sample, or a bulk - sample in the same HA, and should be addressed accordingly.
A general recommendation indicates asbestos does not exist greater than 1% within the bulk- sample, or
a bulk - sample in the same HA, and no further abatement activities are required for removal of the
material. Any sample reporting a "TRACE" amount of asbestos must be considered to be positive for
asbestos greater than 1% unless it is analyzed by the point -count method to be less than 1 %.
V. Inspector Comments
Asbestos was identified during the bulk- sampling conducted at 433 Gore Creek Dr, Unit 1613, Vail,
Colorado. A total of twelve (12) bulk - samples were collected from the residence. Three (3) bulk - samples
tested positive greater than 1% for asbestos.
■ Asbestos was identified in the hallway wall drywall (surfacing material) sample DWO1 -01 at 4%
Chrysotile
4
• Asbestos was identified in the hallway acoustical ceiling (surfacing material) sample AC01 -02 at
3% Chrysotile
• Asbestos was identified in the kitchen resilient floor tile, located under vinyl tile (miscellaneous
material) sample FT01 -01 at 3% Chrysotile. The mastic was non - detect.
VI. Homogeneous Area Descriptions
The following section contains sampled HA descriptions and sample locations. Percent - asbestos content
for each sample indicated can vary depending on sample locations, homogeneity of the materials, and
type of application. The quantities are approximations and are subject to field verification:
Homogeneous Area #01
Sample #: DW01 -01
Honiogeneous Area #01
Sample #: DW01 -02
Sample Description: Drywall
Sample Description: Drywall
Sample Location: Hallway Wall
Sample Location: Hallway Wall
Material Classification: Surfacing Material
Material Classification: Surfacing Material
Material Quantity. +/- 450ft
Material Quantity: +/- 450ft
Material Condition: Good
Material Condition: Good
Physical Description (layers): White tape; White
paint; White joint compound; White texture;
White tan drywall
Physical Description (layers): White tape; White
texture w /white paint; White joint compound;
White tan drywall
Asbestos Content (layers): Negative; Negative; 4%
Chrysotile; 4% Chrysotile; Negative
Asbestos Content (layers): Negative; Negative;
Negative; Negative
Recommendations: IMMEDIATE - See Section VII
Recommendations: IMMEDIATE - See Section VII
Honiogeneous Area #01
Sample #: DW01 -03
Homogeneous Area #02
Sample #: DW02 -01
Sample Description: Drywall
Sample Description: Drywall
Sample Location: Living Room Wall
Sample Location: Bedroom Wall
Material Classification: Surfacing Material
Material Classification: Surfacing Material
Material Quantity: +/- 450ft
Material Quantity. +/- 375ft
Material Condition: Good
Material Condition: Good
Physical Description (layers): Brown fibrous
material; White texture w /white paint; White joint
compound; White texture w white paint
Physical Description (layers): White tape; White
texture w /white paint; White joint compound
Asbestos Content (layers): Negative; Negative;
Negative; Negative
Asbestos Content (layers): Negative; Negative;
Negative
Recommendations: IMMEDIATE - See Section VII
Recommendations: GENERAL - See Section VII
Honiogeneous Area #02
Sample #: DW02 -02
Homogeneous Area #02
Sample #: DW02 -03
Sample Description: Drywall
Sample Description: Drywall
Sample Location: Bedroom Wall
Sample Location: Bedroom Wall
Material Classification: Surfacing Material
Material Classification: Surfacing Material
Material Quantity: +/- 375ft
Material Quantity: +/- 375ft
Material Condition: Good
Material Condition: Good
Physical Description (layers): White tape; White
texture w /white paint; White joint compound;
White tan drywall
Physical Description (layers): White tape; White
texture w /white paint (2 layers); White joint
com ound 2 layers
Asbestos Content (layers): Negative; Negative;
Negative; Negative
Asbestos Content (layers): Negative; Negative;
Negative
Recommendations: GENERAL - See Section VII
Recommendations: GENERAL - See Section VII
Homogeneous Area #03
Sample #: AC01 -01
Honiogeneous Area #03
Sample #: AC01 -02
Sample Description: Acoustical Ceiling
Sample Description: Acoustical Ceiling
Sample Location: Living Room Ceiling
Sample Location: Hallway Ceiling
Material Classification: Surfacing Material
Material Classification: Surfacing Material
Material Quantity: +/ -125ft
Material Quantity: +/ -125ft
Material Condition: Good
Material Condition: Good
Physical Description (layers): White /tan drywall
w /white paint; White tape; White joint compound;
White foamy texture w /white paint
Physical Description (layers): White tape; White
joint compound; White texture w /white paint;
White foamy texture w /white paint; White /tan
drywall
Asbestos Content (layers): Negative; Negative;
Negative; Negative
Asbestos Content (layers): Negative; 3%
Ch sotile; 3% Ch sotile; Negative; Negative
Recommendations: IMMEDIATE - See Section VII
Recommendations: IMMEDIATE - See Section VII
Homogeneous Area #03
Sample #: AC01 -03
Homogeneous Area #04
Sample #: VF01 -01
Sample Description: Acoustical Ceiling
Sample Description: Vinyl Flooring
Sample Location: Hallway Ceiling
Sample Location: Kitchen Floor
Material Classification: Surfacing Material
Material Classification: Miscellaneous Material
Material Quantity. +/- 125ft
Material Quantity. +/- 30ft
Material Condition: Good
Material Condition: Good
Physical Description (layers): White /tan drywall;
White foamy texture w /white paint; White foamy
texture w white paint
physical Description (layers): White tile w /cream
mastic
Asbestos Content (layers): Negative; Negative;
Negative
Asbestos Content (layers): Negative
Recommendations: IMMEDIATE. See Section VII
Recommendations: GENERAL - See Section VII
Homogeneous Area #05
Sample #: VF02 -01
Homogeneous Area #06
Sample #: FT01 -01
Sample Description: Vinyl Flooring
Sample Description: Resilient Floor Tile
Sample Location: Entry Floor
Sample Location: Kitchen Floor
Material Classification: Miscellaneous Material
Material Classification: Miscellaneous Material
Material Quantity: + / -15ft
Material Quantity. +/- 30ft
Material Condition: Good
Material Condition: Good
Physical Description (layers): Brown mastic;
Brown sheet vinyl w white fibrous backing
Physical Description (layers): Black mastic; Tan
tile
Asbestos Content (layers): Negative; Negative
Asbestos Content (layers): Negative; 3%
Chrysotile
Recommendations: GENERAL - See Section VII
Recommendations: IMMEDIATE - See Section VII
VII. Recommendations
IMMEDIATE:
The laboratory results of the potential ACM sampled at 433 Gore Creek Dr, Unit 16B, Vail, Colorado, on
April 20, 2010, indicate that three (3) bulk - samples of drywall, acoustical ceiling texture and resilient
floor tile collected from the residence were reported as positive for asbestos between 3% and 4%
Chrysotile.
If the above - referenced ACM is to be removed from the residence and the total quantity exceeds any of
the regulatory trigger levels of 50 linear feet on pipes, 32 square feet on other surfaces, or the volume
equivalent of a 55- gallon drum, a Colorado - licensed asbestos abatement contractor is required to
perform the removal, including formal notification to the Colorado Department of Public Health and
Environment prior to the abatement of the ACM.
7
APPENDIX A
SAMPLE LOCATIONS
OVF02.01
KITCHEN LIVING ROOM
1 VFOI -01
OFT01 -01
M
5 1-02 01 -01
BATHCLO. RAGE
BEDROOM
M
4
M
3
a
not to
APPENDIX B
CERTIFICATION
STATE OF COLORADO
ASBESTOS
CERTIFICATION*
Colorado Department of Public Health
and Environment
Air Pollution Control Division
This certifies that
Steve Shurtliff
Certification No: 15413
has met the requirements of 25 -7 -507, C.R.S. and Air Quality Control
Commission Regulation No. 8, Part B, and is hereby certified by the
state of Colorado in the following discipline:
Building Inspector*
Issued: 6/12/2009
Expires on: 6/12/2010
*M "Yk.r6r W-&W&aer mL..J. ernvrDtkb qp* W&.LLtj
—djk"m I. We A ip&, yedJkl.1►.c
APPENDIX C
LABORATORY ANALYSIS
E
Nk, LAbORATORy
ASS ZLTINSU ' GM TES RPORATED
A ?ORY
Cer tificate of Analysis
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401
303.232.3746
Hnn/w. aerobioloay. net
Client Name
DS Consulting, Inc.
Date Collected:
04/20/10
Street address
3247 S. Indiana St.
KWO I Date Received:
04/20/10
City, State ZIP
Lakewood, CO 80228
Date Analyzed:
04/20/10
Attn:
Steve Shurtliff
#200860 -0 Date Reported:
04/20/10
Client Project Name:
433 Gore Creek Dr, Unit 16B, Vail, CO
Project ID:
102450
102450 -1B
White Paint
Job ID:
5,3%
Test Requested: 3002, Asbestos in Bulk Samples
Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA- 600/R- 93/116, July 1993.
Sample Identification
Physical Description of Sample;
Additional Comments
Homo-
geneous
es /no
Number
of
La ers %
Asbestos Detected
Non - Asbestos
Fibers
area %
Non - Fibrous
Material
(area %)
Matrix
Material
(composition
Client
Lab Sam le Number
DWO1 -01
102450 -1A
White Tape
N
5,3%
Negative
98%
CELL
2
102450 -1B
White Paint
N
5,3%
Negative
100
1024504C
White Joint Compound
N
5,5%
POSITIVE
4% CHRY
96
C
1024504D
White Texture
N
5,10%
POSITIVE
4% CHRY
96
C
102450 -1E
White /Tan Drywall
N
5,79%
Negative
15%
CELL
85
G
DWO1 -02
102450 -2A
White Tape
N
4,5%
Negative
98%
CELL
2
102450 -2B
White Texture w /White Paint
N
4,15%
Negative
100
C,G
102450 -2C
White Joint Compound
N
4,20%
Negative
100
G
102450 -2D
White /Tan Drywall
N
4,60%
Negative
15%
CELL
85
G
DWO1 -03
102450 -3A
Brown Fibrous Material
N
4,5%
Negative
98%
CELL
2
A = Amosite CELL = Cellulose
AC = Actinolite MW = Mineral Wool
AN Anthophylle FBG = Fiberglass
--'"�- CHRY= Chrysotile SYN = Synthetic
CR = Crocidolite WO = Wollastonite
TR = Tremolite NTR = Non- Asbestiform TR
Paul appe Adam Humphreys Trace =Less Than I% NAC = Non- Asbestiform AC
Laboratory Analyst Asbestos Laboratory Supervisor FT = Fibrous Talc
AH =Animal Hair
Page 1 of 5 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746
Q = Quartz
C = Carbonates
V = Vermiculite
G = Gypsum
M = Mica
T =Tar
P = Perlite
O = Organic
B = Binder
OP = Opaques
D = Diatoms
'Nk, AERobiotocly LAbORATORy
ASSOCIATES, INCORPORATED
CONSULTING LABORATORY
Certificate of Analysis
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401
303.232.3746
www.aerobiolociv.net
Client Name
DS Consulting, Inc.
Street address
3247 S. Indiana
®
Date Collected: 04/20/10
City, State ZIP
Lakewood, CO 800 228
m
Date Received: 04/20/10
Attn:
Steve Shurtliff
U
#200860 -0
Date Analyzed: 04/20/ 10
Client Project Name:
433 Gore Creek Dr, Unit 16B, Vail, CO
Date Reported : 04/0/
2
d 4/10
I
Project 2 0
Job ID:
Test Requested:
3002, Asbestos in Bulk Samples
Method:
Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials.
EPA- 600/R- 93/116, July
1993.
Sample Identification
Physical Description of Sample;
Homo-
geneous
Number
of
Asbestos Detected
Non- Asbestos
Non - Fibrous Matrix
Client
Lab Sample Number
Additional Comments
es /no
La ers %
Fibers
area %)
Material Material
area % (composition
102450 -3B
White Texture w /White Paint
N
4,20%
Negative
98%
CELL
2
DWO1 -03
102450 -3C
White Joint Compound
N
4,20%
Negative
100
C
102450 -3D
White Texture w /White Paint
N
4,55%
Negative
100
C
102450 -4A
White Tape
N
3,10%
Negative
98%
CELL
2
DW02 -01
1024504B
White Texture w /White Paint
N
3,30%
Negative
100
C
1024504C
White Joint Compound
N
3,60%
Negative
100 C
102450 -5A
White Tape
N
4,5%
Negative
98%
CELL
2
102450 -513
White Texture w /White Paint
N
4,10%
Negative
100 C
DW02 -02
102450 -5C
White Joint Compound
N
4,15%
Negative
100 C
102450 -5D
White /Tan Drywall
N
4,70%
Negative
15%
CELL
85 G
A = Amosite
CELL = Cellulose
Q = Quartz
AC = Actinolite
AN = Anthophyllite
CHRY =
MW = Mineral Wool
FBG = Fiberglass
C = Carbonates
V = Vermiculite
Chrysotile
SYN = Synthetic
G = Gypsum
CR = Crocidolite
WO = Wollastonite
M = Mica
Paul
Laborato Anal Analyst
rY Y
am ump eYS
Asbestos Laboratory Supervisor
TR = Tremolite
Trace =Less Than 1%
NTR = Non- Asbestiform TR T = Tar
NAC = Non - Asbestiform AC P = Perlite
FT = Fibrous Talc
O = Organic
AH =Animal Hair
B = Binder
Page 2 of 5
13949 W. Colfax Ave. Suite 205,
Lakewood CO 80401, 303.232.3746
OP = s
D = Diatoms
Diatoms
' %.,AERobio1OC,jy LAbORATORy
ASSOCIATES, INCORPORATED
CONSULTING LABORATORY
Certificate of Analysis
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401
303.232.3746
www.aerobiologv.net
Client Name
DS Consulting, Inc. Date Collected:
04/20/10
Street address
3247 S. Indiana St, K V lam: J Date Received:
04/20/10
City, State ZIP
Lakewood, CO 80228 Date Analyzed:
04/20/10
Attn:
Steve Shurtliff #200860 -0 Date Reported:
04/20/10
Client Project Name:
433 Gore Creek Dr, Unit 16B, Vail, CO Project ID:
102450
3,10%
Job ID:
98%
CELL
Test Requested:
3002, Asbestos in Bulk Samples
102450 -6B
Method:
Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA -600/R- 93/116, July 1993.
3,30%
Sample Identification
Physical Description of Sample;
Additional Comments
Homo-
geneous
es /no
Number
of
La ers %
Asbestos Detected
Non - Asbestos
Fibers
area %
Non - Fibrous
Material
area %
Matrix
Material
(composition
CR = Crocidolite
Client
Lab Sample Number
DW02 -03
102450 -6A
White Tape
N
3,10%
Negative
98%
CELL
2
102450 -6B
White Texture w /White Paint (2 Layers)
N
3,30%
Negative
100
C
102450 -6C
White Joint Compound (2 Layers)
N
3,60%
Negative
100
G
A01 -01
102450 -7A
White /Tan Drywall w /White Paint
N
4,10%
Negative
15%
CELL
85
G
102450 -7B
White Tape
N
4,10%
Negative
98%
CELL
2
102450 -7C
White Joint Compound
N
4,30%
Negative
100
C
102450 -7D
White Foamy Texture w /White Paint
N
4,60%
Negative
100
C
ACO1 -02
102450 -8A
White Tape
N
5,10%
Negative
98%
CELL
2
102450 -8B
White Joint Compound
N
5,10%
POSITIVE
3% CHRY
97
C
102450 -8C
White Texture w/White Paint
N
5,15%
POSITIVE
3% CHRY
97
C
Adam Humphreys
Asbestos Laboratory Supervisor
A = Amosite
CELL = Cellulose
AC = Actinolite
MW = Mineral Wool
AN = Anthophyllite
FBG = Fiberglass
CHRY = Chrysotile
SYN = Synthetic
CR = Crocidolite
WO = Wollastonite
TR = Tremolite
NTR = Non - Asbestiform TR
Trace =Less Than 1%
NAC = Non - Asbestiform AC
FT = Fibrous Talc
AH =Animal Hair
Q = Quartz
C = Carbonates
V = Vermiculite
G = Gypsum
M = Mica
T =Tar
P = Perlite
O = Organic
B = Binder
OP = Opaques
D = Diatoms
Paul appe
Laboratory Analyst
Page 3 of 5
13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746
'%k, AERobio1oc j y LAbORATORy
ASSOCIATES, I NCORPORATED
CONSULTING LABORATORY
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401
Certificate of Analysis
303.232.3746
www.aerobioloav net
Client Name DS Consulting, Inc.
Street address 3247 S. Indiana St.
m
fV15�/a (1
Date Collected:
04/20/10
City, State ZIP Lakewood, CO 80228
IJ�1 V .cU�J
Date Received:
04/20/10
Attn: Steve Shurtliff
Client Project Name: 433 Gore Creek Dr, Unit 16B, Vail, CO
#200860 -0
Date Analyzed:
Date Reported:
04/20/10
04/20/10
Project ID:
102450
Test Requested: 3002, Asbestos in Bulk Samples
Job
ID:
Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the
Determination of Asbestos in Bulk Building Materials. EPA -600/R- 93/116, July 1993.
Homo- Numb
Sam le Identification Physical Description of Sample; geneous of ab Sam le
Client L Number Additional Comments es /no °/
La ers
102450 -8C White Foamy Texture w /White Paint N 5,20%
ACO 1 -02
102450 -8D I White /Tan Drywall I N I 5,45%
102450 -9A I White /Tan Drywall I N 1 3,25%
ACO 1 -03
102450 -9B I White Foamy Texture w /White Paint I N 1 3,25%
102450 -9C I White Foamy Texture w /White Paint I N 1 3,50%
VFO1 -01
VF02 -01
102450 -10 I White Tile w /Cream Mastic I N 1 1, 100%
102450 -11A I Brown Mastic I N I 2,5%
102450 -11B Brown Sheet Vinyl w /White Fibrous Backing N
102450 -12A Black Mastic N
FTO 1 -01
102450 -12B
Page 4 of 5
Tan Tile
F`1
2,95%
2,5%
2,95%
er Asbestos Detected Non - Asbestos Non - Fibrous Matrix
Fibers Material Material
° area % area % (composition
Negative 100 C
15%
Negative CELL 85 G
15%
Negative CELL 85 G
Negative 100 G
Negative 100 C
Negative 100
Negative 100 B
30%
Negative CELL,FBG 70 B
Negative 100 B
POSITIVE
3% CHRY 97
— n.uusnc
AC = Actinolite
AN = Anthophylle
w� CHRY= Chrysotile
CR = Crocidolite
TR = Tremolite
Laboratory Anal t am amp eys Trace =Less Than 1%
rY Ys Asbestos Laboratory Supervisor
13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746
ULLL = Cellulose Q = Quartz
MW = Mineral Wool C = Carbonates
FBG = Fiberglass V = Vermiculite
SYN — Synthetic G = Gypsum
WO = Wollastonite M = Mica
NTR = Non- Asbestiform TR T = Tar
NAC = Non- Asbestiform AC P = Perlite
FT = Fibrous Talc O = Organic
AH =Animal Hair B = Binder
OP = Opaques
D = Diatoms
— n.uusnc
AC = Actinolite
AN = Anthophylle
w� CHRY= Chrysotile
CR = Crocidolite
TR = Tremolite
Laboratory Anal t am amp eys Trace =Less Than 1%
rY Ys Asbestos Laboratory Supervisor
13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746
ULLL = Cellulose Q = Quartz
MW = Mineral Wool C = Carbonates
FBG = Fiberglass V = Vermiculite
SYN — Synthetic G = Gypsum
WO = Wollastonite M = Mica
NTR = Non- Asbestiform TR T = Tar
NAC = Non- Asbestiform AC P = Perlite
FT = Fibrous Talc O = Organic
AH =Animal Hair B = Binder
OP = Opaques
D = Diatoms
Nkt qy LA owoRy
ASSOCIATES, INCORPORATED
CONSULTING LABORATORY
Certificate of Analysis
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401
303.232.3746
www.aerobioloay.net
Consulting, Inc.
32
3247 S. Indiana
Date Collected:
04/20/10
Lakewood, CO 800 228 ���ae
Date Received:
04 /20/10
Steve Shurtliff
Date Analyzed:
�
04/20/10
Client Project Name: 433 Gore Creek Dr, Unit 16B, Vail, CO #200860 -0
Date Reported:
04/20/10
Project ID:
102450
Job ID:
General Notes
♦ Negative indicates no asbestos was detected; the method detection limit is 1 %.
♦ Trace or " <l" indicates asbestos was identified in the sample, but the concentration is less than the method detection limit of 1%
♦ All regulated asbestos minerals (i.e. chrysotile, amosite, crocidolite, anthophyllite, tremolite, and actinolite) were sought in every layer of each sample, but only those asbestos
minerals detected are listed. Amosite is the common name for the asbestiform variety of the minerals cummingtonite and grunterite. Crocidolite is the common name used for the
asbestiform variety of the mineral reibekite.
♦ Tile, vinyl, foam, plastic, and fine powder samples may contain asbestos fibers of such small diameter (< 0.25 microns in diameter) that these fibers cannot be detected by PLM.
For such samples, more sensitive analytical methods (e.g. TEM, SEM, and XRD) are recommended if greater certainty about asbestos content is required. Semi - quantitative bulk TEM
floor tile analysis is accepted under the NESHAPS regulations.
♦ These results are submitted pursuant to Aerobiology Laboratory Associates, Inc.'s current terms and conditions of sale, including the company's standard warranty and limitation
of liability provisions. No responsibility or liability is assumed for the manner in which the results are used or interpreted.
♦ Unless notified in writing to return the samples covered by this report, Aerobiology Laboratory Associates, Inc. will store the samples for a minimum period of thirty (30) days
before discarding. A shipping and handling charge will be assessed for the return of any samples.
Notes Required by NVLAP
♦ This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.
♦ This test report relates only to the items tested or calibrated.
♦ This report is not valid unless it bears the name of a NVLAP- approved signatory.
♦ Any reproduction of this document must include the entire document in order for the report to be valid.
13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746
Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to: Attention: () Revisions
() Response to .Correction Letter
/"A> 7'L /A/ O 2 attached copy of correction letter
() Otherred Submittal
Project Street Address:
4,144-
(Number) (Street) (Suite #)
Building /Complex Name: k 7�We9 /LS 6>1
Contact Information:
Company: e5k
Company Address: �� '60X �o3a
City: State: GO Zip: 0 /6,5�S
Contact Name: 70 8 �ele-y W /U ce
Contact Phone: 4 - 57,0 1
_
E -Mail ib�' �c°G!� -�H / la&,
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
Building:
Plumbing:
Electrical:
Mechanical:
Total:
$
$
Description / List of Changes:
/ IVS , T/o A/
[ (use additional sheet if necessary)
Date Received
NOV 18 2010
iWN OF VAIL
Al T.... 1A
TRANSMITTAL FORM
November 4, 2010
Subject: Summary of Structural Steel Special
Inspection Services, 433 Gore Creek, Wood /
Bruecker Residence Improvements, Vail, Colorado
Job Number: 10 -6589
TOV Permit Number: B 10 0125
Steven James Riden Architects
PO Box 3238
Vail, Colorado 81658
Attn: Mr. Steven Riden,
This letter summarizes the special inspections GROUND Engineering Consultants, Inc. (GROUND)
performed during the improvements to Wood / Bruecker Residence, located at 433 Gore Creek in Vail,
Colorado. The special inspection services were performed at times scheduled by the Client, Contractor
and /or Subcontractors.
The structural steel welded and bolted connections for the improvements in to the Residence were
observed during construction by a certified welding inspector (CWI). These observations were
completed on September 28, 2010 as scheduled by the Client, Contractor or Subcontractor. Based on
our observations on this date and the documentation received from the Contractor, it is our opinion that
the materials tested and /or observed for the structural steel improvements were in general accordance
with project plans, specifications, or applicable RFI's.
The observations and materials testing as indicated above were performed periodically to provide data
to the Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of
the tested materials and /or work with the contract documents at the times of our observation and
testing. We did not supervise, direct or have any control over any of the Contractor's or Subcontractor's
work. We were not responsible for the Contractor's or Subcontractor's scheduling of our services,
means, methods, procedures, techniques, or sequences of construction, nor responsible for ensuring
that any Contractor or Subcontractor performed or completed the work in accordance with the contract
documents or construction industry standards.
If you have any questions concerning this letter, please contact our office.
Sincerely,
GROUND Engineering Consultants, Inc.
eL
Evan E. Kuhn
� RE G�SJ"
•K �Ve °• �9
,tm
Reviewed by Michael K. Wariner, P.E.
ROUN
ENGINEERING CONSULTRNTS INC.
101AAirpark Dr., Unit 9, PO Box 464, Gypsum, CO 81637 Phone (970) 524 -0720 Fax(970)524-0721 www.groundeng.com
Office Locations: Englewood
Commerce City Loveland Granby Gypsum
GROUND
ENGINEERING CONSULTRNTS
VISUAL OBSERVATION REPORT
Project Name: Wood /Bruecker Residence
Project No: 10 -6589
Client: Steven James Riden Architects
Address: PO Box 3238
Vail, Colorado 81658
Attn: Mr. Steven Riden
Date: September 28, 2010
Report No: 1
As requested, a representative of GROUND arrived at the project site to observe field- welded
connections.
The following is a summary of the observations performed on this date:
1) Observed the field - welded connections for the floor support beam and found them to
be in general compliance with the project plans and specifications.
2) GROUND is requesting the Welding Procedure Specification (WPS) and Welder
Qualification Test Record (WQTR) per AWS D1.1 from the ironworker on this project.
a. Received WQTR for Jimmy Gauer on 10/8/10.
Bob Brownlee with Beck was present during our observations and received a copy of this report.
Submitted By:
GROUND Engineering Consultants, Inc.
Billy Horn
Field Representative
South Metro Office North Metro Office Gypsum Office
41 Inverness Drive East 7393 Dahlia Street, P.O. Box ice
Englewood, CO 80112 -5412 Commerce City, CO 80022 -1834
Tel: (303) 289 1989 Tel: (303) 289 1989 Gypsum, Colorado 81637
Fax: (303) 2891686 Fax: (303 289 6742 Tel: (970) 524 0720
Fax: (970) 524 0721
��Awr�' � a:�; (D - c - 6 l I
12 -30 -2010 Inspection Request Reporting Page 2
4:20 pm Vail, CO - City Of
Requested Inspect Date:
Inspection Area:
Site Address:
A/P /D Information
Activity: B10 -0125 Type: A -BUILD
Const Type: Occupancy:
Owner: BRUECKER WOOD REAL ESTATE TRUST
Contractor: BECK BUILDING COMPANY
Description: INTERIOR REMODEL & ADDITION (BAY WINDOW)
Requested Inspection(s)
Item:
90 BLDG -Final
Requestor:
BECK BUILDING COMPANY
Comments:
471 -1 5
Assigned To:
**
Action.
Time Exp:
Item:
542 PLAN -FINAL
Requestor:
BECK BUILDING COMPANY
Comments:
471 -1654
Assigned To:
BGIBSON
Action:
Time Exp:
SAO/
Sub Type: ATH
Use: VB
Phone: 970 - 949 -1800
Status: ISSUED
Insp Area: CG
Requested Time: 10:30 AM
Phone: 970 - 949 -1800 -or- 970 -949-
4335
Entered By: JMONDRAGON K
Requested Time: 08:00 AM
Phone: 970 - 949 -1800 -or- 970 -949-
4335
Entered By: JMONDRAGON K
�7
M onday, January 03, 2011
433 GORE CREEK DR VAIL
UNIT 16B, VAIL TRAILS EAST
REPT131 Run Id: 12342
A
Inspection History
Item:
10 BLDG - FOOTING "Approved"
09/10/10 Inspector: CG
Action: AP APPROVED
Comment: SLAB REBAR
VOID FORM TO BE INSTALLED AFTER POUR PER PLANS
Item:
30 BLDG - Framing ** Approved **
10/21/10 Inspector: JRM
Action: AP APPROVED
Comment: APPROVED FRAMING, U VALUE ON WINDOWS APPROVED
Item:
50 BLDG - Insulation **A pproved **
10/25/10 Inspector: JRM
Action: AP APPROVED
Comment:
Item:
60 BLDG - Sheetrock Nail ** Approved **
10127/10 Inspector: Martin
Action: AP APPROVED
Comment:
Item:
70 BLDG -Misc.
Item:
542 PLAN -FINAL
Item:
90 BLDG -Final
Item:
410 Special Inspect- progress rept "Approved"
11/26/10 Inspector: JRM
Action: AP APPROVED
Comment:
Item:
420 Special Inspect -final rept ** Approved **
11/26/10 Inspector: JRM
Action: AP APPROVED
Comment:
M onday, January 03, 2011
433 GORE CREEK DR VAIL
UNIT 16B, VAIL TRAILS EAST
REPT131 Run Id: 12342