Loading...
HomeMy WebLinkAboutB10-0125NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES l� TOM OF YA[L ' Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT SFR BUILD PERMIT Permit #: 1310 -0125 Project #: Job Address: 433 GORE CREEK DR VAIL Location......: UNIT 16B, VAIL TRAILS EAST Parcel No....: 210108234024 OWNER BRUECKER WOOD REAL ESTATE TR 06/01/2010 330 OLD Y RD GOLDEN CO 80401 APPLICANT BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800 P.O. BOX 4030 VAIL CO 81658 License: 117 -A CONTRACTOR BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800 P.O. BOX 4030 VAIL CO 81658 License: 117 -A Description: INTERIOR REMODEL & ADDITION (BAY WINDOW) Status .. : Applied.. Issued ... Expires ...: PRJ 10 -0019 ISSUED 06/01/2010 07/27/2011 07/02/2011 Occupancy: R2 Valuation: $155,000.00 Type Construction:VB Total Sq Ft Added: 0 ......... FEE SUMMARY .+..:. Y . i +L. +ffw. +.. +... .tr.AArt /R44 R. ..i..wi. kRlk4A } fRRVfff x4VRftrtYffltfM Building Permit Fee ------ > $1,301.75 Will Cal Fee -------------- - - - -> $5.00 Total Calculated Fees----- - - ---> $5,272.89 Plan Check --------- — --------- > $846.14 Use Tax Fee--------- - - - - -- $2,900.00 Additional Fees------------------ - - - - -> $0.00 Add'I Plan Check Hours- $220.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES --- ------- - -> $5,272.89 Investigation--------- - - ---> $0.00 Recreation Fee -------------- - -> $0.00 Payments--------------------- - - - - -> $5,272.89 Total Calculated Fees --- — --- > $5,272.89 BALANCE DUE--------------- - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the informatior as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SWA E MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM r / C Signal of Owner or Contractor Date Print Name bld _alt construction_pe rmit_041908 APPROVALS Permit #: B10 -0125 as of 07 -27 -2011 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 06/11/2010 cg Action: AP 09/22/2010 cg Action: AP APPROVED REVISION S1 07/20/2011 JRM Action: AP APPROVED REVISION A1.1 Item: 05400 PLANNING DEPARTMENT 06/01/2010 bgibson Action: AP plans routed to C3 07/11/2011 bgibson Action: AP Revisions dated 7/1/11 approved by Planning. Plans routed to A -2. Item: 05600 FIRE DEPARTMENT 06/03/2010 drhoades Action: DN Asbestos abatement/final air cleanance must be applied for and completed prior to issuance of building permit. 09/01/2010 drhoades Action: AP Air Clearance Letter Received. See the Conditions section of this Document for any that may apply. bld_a It_con stru ction _perm it_041908 CONDITIONS OF APPROVAL Permit #: B10 -0125 as of 07 -27 -2011 Status: ISSUED Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 Cond: 51 (FIRE 2007): MONITORED FIRE ALARM SYSTEM REQUIRED AND SHALL COMPLY WITH NFPA 72(2007) AND VFES STANDARDS. bid_a It_con struction_pe rm it_041908 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R110000859 Amount: $257.20 07/27/201111:52 AM Payment Method:Credit Crd Init: SAB Notation: MC - STEPHEN BODERCK /BECK BLDG. ----------------------------------------------------------------------------- Permit No: B10 -0125 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 2101 - 082 - 3402 -4 Site Address: 433 GORE CREEK DR VAIL Location: UNIT 16B, VAIL TRAILS EAST Total Fees: $5,272.89 This Payment: $257.20 Total ALL Pmts: $5,272.89 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- BP 00100003111100 BUILDING PERMIT FEES 28.00 PF 00100003112300 PLAN CHECK FEES 128.20 UT 11000003106000 USE TAX 4 9 6 100.00 WC 00100003112800 WILL CALL INSPECTION FEE 1.00 Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: — — v Project Street Address: / I / ' —I L2 (Number) (Street) (Suite #) .Revisions ( ) Response to Correction Letter _attached copy of correction letter () Deferred Submittal ( ) Other Description / List of Changes: Building /Complex Name: VA Contact Information: i � 3 Company: _RTC y_ Company Address: Al, L_r � n s City: A P e , , State: _ Zip: / Contact Name: � . , 4 Contact Phone: Q - 7 o L-( - 7 1 / S E -Mail - I?a- c L_ . . iD ",_i_ t_ 1 1 Valuations (Labor & Material)) Building: Plumbing .r .r • Electrical: $ -- Mechanical: $ Total: $ - ocn O I*Jcinll nD1r_..1AP + 54c-FT d/. ' (use additional sheet if necessary) _._....... .... .... ...__...._.. - -- .. ----- ._.... -- . __..- ... - - - - -- - -_J Date Rece JUL 012011 / TOW OF VAIL 1- Sep -09 TRANSMITTAL FORM Revision Submittals: 1. "Field Set' of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: 6 -- le) — o l�S Attention: () Revisions () Response to Correction Letter _a ied copy of correction letter () ferred Submittal ( Other Project Street ddress: (Number) (Street) (Suite #) Building /Complex Name: W4-- Contact Inform t Company: Company Address: Address: -6per City: State: Zip: b161 Contact Name: �� &Z ad AIJL41t 1 r Contact Phone: � / ne: / - L 2­ &/ & - / - 7 E -Mail ZJo (� 1 �_ h ckh14 Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Description / List of Changes: Building: $ ° (use additional sheet if necessary) Plumbing: $ j Date Received: Electrical: Mechanical: Total: OCT 12 2010 TOWN OF VAIL 01 -Jan-10 TRANSMITTAL FORM KR M. CONSULTANTS, INC. P.O. Box 4572 970- 949 -9391 Vail, Colorado 81 656 FAX 949 -1577 FIELD REPORT TO: DATE: 10/5/2010 Bob Brownlee ARRIVE: DEPART: i WEATHER: ATTENTION: I JOB NUMBER. 1004 -16 PROJECT.- Wood Bruecker Remodel PRESENT AT SITE: Bob STATUS OF COMPLETION: Structural framing complete On October 5, 20101 visited the above referenced site to observe the completed framing. The bay windows had been installed, the exterior wall was framed, and the steel beam was in place. The general structural framing appeared to conform to the intent of the structural drawings. However, solid blocking shall be added above the new steel beam, in line with the comer of the kitchen above, if this has not been installed. Please call with any questions. j KRM Consultants, Inca SIGNED: �� A' :� F NN��k ° o COPY TO: w Tim. D. Hennum, PE m REVIEWED: ; �ti �F /18/2008 05:04 3035265891 WOOD- ERUECKER PAGE 01/02 � r % r.7 , ' .] ' lVM11 Of . V V Job Name: F OOD 1L �t e� Job Address: �3.� 6a6a 2 ,p�2 ✓� Permit No.: 10 -- lf/Z•�6 SPECIAL INSPECTION AND TESTING AGREEMENT go applicants of projects requiring Special Inspection or Testing per Section 1701 of the 16C) The owner or hls/her representative, on the advice of the design professional in responsible charge, shall complete, seat, sign and submit a copy of the Special Inspection Agreement and Structurat Tests Scheduled to the Town of Vail for review and approval. - Signatures .are required. or) both pages; photocopied or faxed signatures are acceptable. The owner and his/her, general' contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection Testing: 1_ Contractor is responsible for proper notification to the Inspection or Testing ' agency for items - listed,(Page 1). (IBC 1704) . 2. Only the .testing 1aboratoiy should take samples and transport them to their laboratory, . •3. Copies of all laboratory reports and Inspections are to be sent directly to the Town of Vail by the Testin agency on'a weekly basis, g 4. Inspection agency to submit names and of on - s)te special inspectors to the Town of Vail 'for review and, approval. ('Page 2) 5. The special, inspector is responsible to immediately notify the Town of Vail Building Official in writing of any concerns and/or problems encountered. 6. It' is the responsibility • of the,: contractor to 'review . the' Town of Vail a pproves? plans for additional Inspection or testing requirerpents that may be rioted_ A pre - construction conference at the job site is recommended to review special Inspection procedures_ 7. The:special inspector shall use only the Town of Vail approved drawings. 8, All special inspection fteici reports must be left on site for review by the' Town of Vail staff prior to required inspections or re- inspections. BEFORE OCCUPANCY WILL BE GRANTED, The special inspection agency shall submit a signed and sealed statement that all items requirinng testing and ln'spectlori were fulfilled and reported, Those items not tested and/or Inspected shall be noted In'this state►neirt. A copy Of the statement shall be maintained at the job site for the Building Inspector's review prior to .final Inspection. Acknowledgem t: Owner: f �t�'c3-fi �� 1•� 1 ° � Signature c7 Print Name- , D to .Special Inspe ��OtJJJ Agency: • ( /<Q��a Signal re Project Yrint Nam bate Arch/ Print•Name Rate Contractor. / gnaturc ` lI lv Print ame D e 08/18/2908 85:04 3835265891 WOOD - BRUECKER P A J , SPECIAL. INSPECTION AND TESTING SCHEDULE (iBC 1704) Project Marne: Owner's Name Testing inapt PAGE 02/02 /�'y- / • Permit# '/S /0 d 'PrinrNAme Agency: 6 �` ` "� na � �I��+t'T71V r��'�Y� Testing ins Print Nerne Date ! csrtifies that the Testing/tnspection'Agency named above has been engaged to Perform-structural tests and Inspections during Construction as checked below, to satisfy all applicable portions of the Building Code. Prior to final Inspection, the Inspection Agency shall submit a'statement that all items of designated work' performed were reported. Any items checked but not tested or Inspected will be noted and explained. Whenever any dessignated items on the list are ready for sampling, testing, or Inspection, It shall be the responsibility of the coritractor to give timely notice to the inspection agency so that the required services may be performed. i REINFORCING STEEL: Tenslle & 8end, one set per heat pAr tons Inspection of Placement Ip9pection of Welding Epoxy fteinforctng Tests lnspaction of Reinforcing Placement Tendon Tests Inspection of Tendon Placement Inspection of Concrete Placement Inspection df Concrete Batching Inspection of Panel Attachment & inserts Compression Tests Inspection of Stressing/Transfer FILiNG, CAISSONS; CAPS, TIES: InsPection.of Refnforcing Plac®ment Inspection of Concrete Placement inspection of Concrete Belching Spectiry othartests, inspections orspecial inatrucflonsrequftd. UNDERPINNING! Temporary/permanent Inspection of Steel Fabrication Inspection of Reinforcing & Forms Inspection of Concrete Placement inspection of Tiebacks SOIL NAILS- Temporary Shoring Per manent Wail STRUCTURAL STEEL: Sample & Test (List specific members below) Shop identlRcation a Welding Inspection Shop Ultrasonic Inspection Shop Radiography Field Welding Inepectfony Feld Bolting Inspection Field Ultrasonic inspection Field Radiography Motet Deck Welding Inspection FIREPROOFING: Inspection & Placement SOILS: Acceptance Tests Moisture- Denefty Determination Field Density ' :)rifled Piers Deep Foundation STRUCTURAL WOOD; lnspectlon of Fabrication inspection of Truss Joint 'Fabrication Sample & Test Components inspecdon.of GIu Lain Fabrication SMOKE CONTROL: SPECIAL CASES: SPECIAL, INSPECTION; Seismic Resistance Wind Requirements MASONRY: Prelim. Acceptance Tests (Masonry Units, Wall Priem9) Subsequent Tests (Mortar. Grout, Field Wail Prisms) Inspection of Placement and Grouting . NOTE; THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES 7OWW vn¢ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT SFR BUILD PERMIT Permit #: B10 -0125 Project #: PRJ10 -0019 Job Address: 433 GORE CREEK DR VAIL Location......: UNIT 16B, VAIL TRAILS EAST Parcel No....: 210108234024 OWNER BRUECKER WOOD REAL ESTATE TR 06/01/2010 330 OLD Y RD GOLDEN CO 80401 APPLICANT BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800 P.O. BOX 4030 VAIL CO 81658 License: 117 -A CONTRACTOR BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800 P.O. BOX 4030 VAIL CO 81658 License: 117 -A Description: INTERIOR REMODEL & ADDITION (BAY WINDOW) Occupancy: R2 Type Construction:VB Status .. : ISSUED Applied ..: 06/0112010 Issued...: 10/12/2010 Expires ...: 03/01/2011 Valuation: $150,000.00 Total Sq Ft Added: 0 **************************************** rtrt******** * * * * * * *** * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY * * * * * rt * * * ** Building Permit Fee - ---> $1,273.75 Will Cal Fee -- ----- - - - - -> $4.00 Total Calculated Fees--- - - - - -> $5,015.69 Plan Check -- ---------- - - -> $827.94 Use Tax Fee --- --------- — ----- > $2,800.00 Additional Fees ------- ---- -- ----- > $0.00 Add'I Plan Check Hours -> $110.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES------ ---- -> $5,015.69 Investigation ------- - - - - -> $0.00 Recreation Fee---- - - - - -> $0.00 Payments - - -- -- ----------- --- - -> $5,015.69 Total Calculated Fees--- - - - - -> $5,015.69 BALANCE DUE--------------- - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUES FOR NSP TON SHA BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8: AM 4:00 P Signature of Own VA, Contractor Date Print Name b Id_a It_co n stru ct io n _pe rm it_041908 APPROVALS Permit #: B10 -0125 as of 10 -12 -2010 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 06/11/2010 cg Action: AP 09/22/2010 cg Action: AP APPROVED REVISION S1 Item: 05400 PLANNING DEPARTMENT 06/01/2010 bgibson Action: AP plans routed to C3 Item: 05600 FIRE DEPARTMENT 06/03/2010 drhoades Action: DN Asbestos abatement/final air cleanance must be applied for and completed prior to issuance of building permit. 09/01/2010 drhoades Action: AP Air Clearance Letter Received. See the Conditions section of this Document for any that may apply. b Id_a It_construction_perm it_041908 CONDITIONS OF APPROVAL Permit #: B10 -0125 as of 10 -12 -2010 Status: ISSUED #* 444** k** fr## Y# Y# Y Y YY * Y * * # # # # # # # #Y#YY#Y *Y * * #RY *# *## 444444 R*#** k**####*# Y* YYYY##*# kk**###### YrtrtrtYYY # #** * # # # * # # # # * *rt * # # *R #* * * # * *# 4444444##** R##*#* # * ***#YYYrtrt # # # * **# # * # # # # # # #YNYY Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 Cond: 51 (FIRE 2007): MONITORED FIRE ALARM SYSTEM REQUIRED AND SHALL COMPLY WITH NFPA 72(2007) AND VFES STANDARDS. bld_alt_construction _perm it_041908 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R100001552 Amount: $110.00 10/12/201008:05 AM Payment Method: Check Init: SAB Notation: 18973 BECK BUILDING ----------------------------------------------------------------------------- Permit No: B10 -0125 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 2101- 082 - 3402 -4 Site Address: 433 GORE CREEK DR VAIL Location: UNIT 16B, VAIL TRAILS EAST Total Fees: $5,015.69 This Payment: $110.00 Total ALL Pmts: $5,015.69 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- PF 00100003112300 PLAN CHECK FEES 110.00 Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. erml s information applies to: Attention: 'q / O - d / 2 _'5 ��- f pe> iC Project Street Address: I'33 6aa E Cl�r->wA_ (Number) (Street) '9/L d /G ' L (Suite #) Building /Complex Name: k' - /L %il,f7L_5 Contact Information: Company: Company Address: Box -A0 City: _vim / L �J State: GO Zip: g /(cS'S Contact Name: O� 2 O cJ nJ Z 67;&�_ Contact Phoo / ne: 7 — (p (o 7 /// E -Mail a /dS GDS Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) (WRevisions ( ) Response to Correction Letter _attached copy of correction letter () Deferred Submittal () Other Description / List of Changes: lJ �GCP�j /,S i lill(!;-- VfLcaor Building: $ Plumbing: $ Electrical: $ Mechanical: $ Total: c (use additional sheet if necessary) _ ... Date Received: (r Fr T(7,` E 01- Tan - 10 TRANSMITTAL FORM NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MWWOFVIK Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT SFR BUILD PERMIT Permit #: B10 -0125 Project #: PRJ10 -0019 Job Address: 433 GORE CREEK DR VAIL Location......: UNIT 16B, VAIL TRAILS EAST Parcel No....: 210108234024 OWNER BRUECKER WOOD REAL ESTATE TR 06/01/2010 330 OLD Y RD GOLDEN CO 80401 APPLICANT BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800 P.O. BOX 4030 VAIL CO 81658 License: 117 -A CONTRACTOR BECK BUILDING COMPANY 06/01/2010 Phone: 970 - 949 -1800 P.O. BOX 4030 VAIL CO 81658 License: 117 -A Description: INTERIOR REMODEL & ADDITION (BAY WINDOW) Occupancy: R2 Type Construction:VB Status .. : ISSUED Applied..: 06/01/2010 Issued ...: 09/02/2010 Expires ...: 03/01/2011 Valuation: $150,000.00 Total Sq Ft Added: 0 #########*#####*###################**#**########## # # # # # # # # # # # # # # # # # # # # # # # # # # # # # ## FEE SUMMARY ################**########################****## # # # # ### # # # # # # # # # ### # # # # # * * # # ### Building Permit Fee -- $1,273.75 Will Cal Fee--------------- - - - - -> $4.00 Total Calculated Fees--- - - - - -> $4,905.69 Plan Check--------- - - - - -> $827.94 Use Tax Fee ------ ---------- > $2,800.00 Additional Fees --- ------ -- - - - - -> $0.00 Add'I Plan Check Hours -> $0.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES--- - - - - -> $4,905.69 Investigation- --------------> $0.00 Recreation Fee--------- - - - - -> $0.00 Payments------------------ - - - - -> $4,905.69 Total Calculated Fees--- - - - - -> $4,905.69 BALANCE DUE — ------- --- ------- > $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. RE EST F PE TION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0 AM - 2 Signature of Ownero Contractor Ofate ,; /Qp��Z� L. /.� �v W .✓ LCD Print Name bld alt constructio n_perm it- 041908 APPROVALS Permit #: B10 -0125 as of 09 -02 -2010 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 06/11/2010 cg Action: AP Item: 05400 PLANNING DEPARTMENT 06/01/2010 bgibson Action: AP plans routed to C3 Item: 05600 FIRE DEPARTMENT 06/03/2010 drhoades Action: DN Asbestos abatement/final air cleanance must be applied for and completed prior to issuance of building permit. 09/01/2010 drhoades Action: AP Air Clearance Letter Received. See the Conditions section of this Document for any that may apply. bld_alt_constru ctio n _perm it_041908 CONDITIONS OF APPROVAL Permit #: B10 -0125 as of 09 -02 -2010 Status: ISSUED Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 Cond: 51 (FIRE 2007): MONITORED FIRE ALARM SYSTEM REQUIRED AND SHALL COMPLY WITH NFPA 72(2007) AND VFES STANDARDS. bld_alt_construction _perm it_041908 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R100001219 Amount: $3.94 09/02/201004:39 PM Payment Method: Check Init: SAB Notation: 18897 beck building ----------------------------------------------------------------------------- Permit No: B10 -0125 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 2101 - 082 - 3402 -4 Site Address: 433 GORE CREEK DR VAIL Location: UNIT 16B, VAIL TRAILS EAST Total Fees: $4,905.69 This Payment: $3.94 Total ALL Pmts: $4,905.69 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- WC 00100003112800 WILL CALL INSPECTION FEE 3.94 Separate permits are required for electrical, plumbing, mechanical, fireplace, etc. Project Street Address: 1F33 oe 9—e 62.E (Number) (Street) (Suite #) Building /Complex Name: VI}-( U -P-A -f LS k5A!�c Contractor Information: Company: �' 07" [. 60µ' >°A*-) V Company Address: PO 80K 4 p sc) City: ( L ( State: 6 62 Zip: Pj( tV S Contact Name: 0.o F e2- O [,J td LSD Contact Phone: '11 q'1 :7 — &6 1 E -Mail bob (�,' Od?-� U,--. Town of Vail Contractor Registration No.: Contractor Signature (required) Office Use: ,� 1 Project #: PI`-V I d - Q� DRB #: ���jl (100 1 Building Permit #: I —O 1 ZS Lot J ( 0 Block # 4 - Subdivision: � i ll ow 1 Detailed Scope and Location of Work: Q eSwGV 6 A-L-f- 04129LtOWL I a5 A-J-L- A19P- 6- W ��LDv�.JS. po�✓� (use additional shee4 if necessary) Work Class: New ( ) Addition ( ) Remodel (y) Repair ( ) Other ( ) Work Type Interior (V) Exterior (Y) Both Property Information Parcel #: Z 10 / OS 2- L 5;1Z (For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or visit www.eaglecounty.us /patie) Tenant Name: Owner Name: 9A a* 2Ar 9 G6rr ►'L l S'T`S l,._�t� 0 t7 Valuations (Labor & Materials) Building: $ _ /15 DOO" d0 Plumbing: $ 1 1a c Electrical: $ �Alf Mechanical: (including fireplace) $ / ✓1 G Total: $ - / D., 00 Q, 00 Type of Building: Single - Family ( ) Duplex ( ) Multi - Family Commercial( ) Other( ) Does a Fire Alarm Exist? Yes ( ) No ( FI Monitored Alarm? Yes ( ) No( 14 Does a Sprinkler System Exist? Yes ( ) No (i) # & Type of Existing Fireplaces: Gas Appliances Gas Log A— Wood /Pellet Wood Burning # & Type of Proposed Fireplaces: Gas Appliances Gas Log J_ Wood /Pellet Wood Burning Date Received: D (� MAY 2 8 2010 TOWN OF VAIL 01- Jan -10 BUILDING PERMIT APPLICATION ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R100000588 Amount: $4,901.75 06/01/201010:28 AM Payment Method: Check Init: JLE Notation: 18576 BECK BUILDING CO ----------------------------------------------------------------------------- Permit No: B10 -0125 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 2101 - 082 - 3402 -4 Site Address: 433 GORE CREEK DR VAIL Location: UNIT 16B, VAIL TRAILS EAST Total Fees: $4,905.69 This Payment: $4,901.75 Total ALL Pmts: $4,901.75 Balance: $3.94 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - BP 00100003111100 - -- ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES 1,273.75 PF 00100003112300 PLAN CHECK FEES 827.94 UT 11000003106000 USE TAX 4 1 6 2,800.00 WC 00100003112800 WILL CALL INSPECTION FEE .06 F,10 - Vail Fire Department Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu- lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two - Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including multi - family /condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State - certified and Vail- registered abate- ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the Town of Vail before the building permit will be issued. I r1% r-= e--\ r-;:= n n n F775 r5 Project Checklist lul II My project falls into the category checked below MAY 2 8 2010 U Will not disturb more than the threshold limits identified above TOWN OF VAIL �Teed negative, or at 1% or below (2 copies of test results included) Tested positive at more than 1 %, requires abatement (2 copies of test results included) Tips & Facts: • Even recent construction projects may include asbestos- containing materials, so buildings of �jny age require testing. • The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos- containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: David Rhoades, Fire Inspector Vail Fire Department 75 S Frontage Rd drhoades @vailgov.com 970- 477 -3454 www.vailgov.com State of Colorado Contact: Colorado Department of Public Health and Environment Asbestos Compliance Assistance Group 303 - 692 -3158 asbestos@state.co.us www.cdphe.state.co.us 01- Jan -10 o 4 Asbestos Inspection and Sampling Report 433 Gore Cr eek Dr, Unit 16B, Vail, Colorado 81657 Presented to: Mr. Bob Brownlee BECK Building Company PO Box 4030 Vail, CO 81658 Performed & Prepared by: Mr. Steve Shurtliff DS Consulting, Inc. PO Box 6864 Avon,CO 81620 (303) 378 -1544 Project Details: DSC Project #: 2179 Conducted: April 20, 2010 �p( MAY 28 2010 IUI TOWN OF VAIL Consulting EXECUTIVE SUMMARY On April 20, 2010, Mr. Steve Shurtliff of DS Consulting, Inc. (DSC) performed a limited inspection and asbestos sampling at 433 Gore Creek Dr, Unit 1613, Vail, Colorado, in order to identify potentially hazardous friable and non - friable asbestos - containing materials (ACM) within a portion of the above - referenced, single- family residence in which renovations are scheduled. The Colorado Department of Public Health and Environment's (CDPHE) Regulation 8, Part B defines an asbestos - containing material (ACM) as a material containing more than 1% asbestos. Mr. Shurtliff performed asbestos bulk - sampling of two (2) types of drywall (surfacing materials) in a total of six (6) locations, acoustical ceiling texture (surfacing material) in a total of three (3) locations, vinyl flooring (miscellaneous material) in a total of two (2) locations and resilient floor tile (miscellaneous material) in a total of one (1) location within the residence (see Appendix A for sample locations). All twelve (12) bulk - samples were analyzed by Aerobiology Laboratory Associates, Inc. (NVLAP #200860 -0) with three (3) laboratory results of drywall, acoustical ceiling texture, and resilient floor tile being positive for asbestos between 3% and 4% Chrysotile (see Appendix C for laboratory results). The following sampled materials were found to contain asbestos greater than 1 % (ACM): salliple Material ID Description Sample Material Location classilicatioll Friable/ Non- Friable Estiniated Quantities Material Condition Asbestos Content DW01 -01 Drywall Hallway Wall Surfacing Material Friable +/- 450ft2 Good 4% Chrysotile ACO1 -02 Acoustical Ceiling Hallway Ceiling Surfacing Material Friable +/- 125ftz Good 3% Chrysotile FTO1 -01 Resilient Floor Tile Kitchen Floor Miscellaneous Material Non- Friable 30ft Good 3% Chrysotile *Quantities are approximations and subiect to field verification. 2 PROJECT OVERVIEW I. Introduction A limited inspection and bulk - sampling for ACM was conducted at 433 Gore Creek Dr, Unit 16B, Vail, Colorado, by Mr. Shurtliff on April 20, 2010, at the request of Mr. Bob Brownlee with BECK Building Company. Mr. Shurtliff is a Colorado State Certified Building Inspector; having EPA Accreditation #15413 (see Appendix B for certificate). The purpose of the inspection was to identify, sample and assess potentially hazardous friable and non - friable ACM within the residence. II. Structural Design The structure is a wood - framed, single - level, single - family residence. III. Sampling and Analytical Procedures The inspection, assessment and sampling were conducted by an EPA and AHERA accredited Building Inspector qualified by experience, education and training in the recognition of potential ACM and approved bulk - sampling techniques. The asbestos bulk - sampling was conducted on suspect ACM with a limited number of bulk - samples being collected within the residence. The inspection, assessment and sampling were performed in accordance with Environmental Protection Agency / AHERA recommended procedures. These procedures call for the visual inspection of the area of concern and the collection and analysis of representative bulk - samples of suspect material. Some minor destructive sampling was conducted. Walls, columns and perimeter pipe chases were not broken into in order to locate and quantify suspect ACM. It should be noted that additional ACM might be located in these and other inaccessible areas. Random bulk - samples, representative of the suspect asbestos - containing building materials (ACBM) of each homogeneous area (HA), were collected according to the guidelines published as Environmental Protection Agency (EPA) Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763. Representative sampling is based on the following criteria: 1. The distribution of the suspect material throughout the HA. 2. The suspect material's physical characteristics and application. 3. Random sampling patterns determined for each HA. Suspect materials sampled and analyzed should be considered to be representative of materials in each HA if they exhibit similar physical characteristics and the application of the sampled material can be correlated to the application of un- sampled material. Bulk- samples collected were analyzed utilizing the EPA's Method for the Determination of Asbestos in Bulk Building Materials (EPA 600/R/116, July, 1993) and the McCrone Research Institute's The Asbestos Particle Atlas as methods references. Analysis of the bulk- samples was performed on the "date reported," as listed in the bulk - sample analysis report. IV. Notes on Report Format Suspect materials alike in appearance and application were sampled as HAs. Suspect materials were divided into three classifications: 1. Surfacing Material: sprayed or troweled onto structural building member. 2. Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation. 3. Miscellaneous Material: other suspect materials, floor tile, sheet vinyl /linoleum, ceiling tiles, insulation, and finishing materials. Condition assessments were performed by the accredited inspector at the time of inspection. Condition assessments are listed in the following section. Ratings of "good," "damaged," and "significantly damaged" are meant to indicate the overall condition of the material. A material in "good" condition has no visible damage or deterioration, or showing only very limited damage or deterioration. A material in "damaged" condition has the following characteristics: The surface is crumbling, blistered, water - stained, gouged, marred or otherwise abraded over less than one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). Accumulation of powder, dust or debris similar in appearance to the suspect material on surfaces beneath the material can be used as confirmatory evidence. A material in "significantly damaged" condition has one or more of the following characteristics: The surface is crumbling or blistered over at least one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). One -tenth (one - quarter, if localized) of the material is hanging from the surface, deteriorated, or showing adhesive failure. Water stains, gouges, or mars are over at least one -tenth of the surface if the damage is evenly distributed (one - quarter if the damage is localized). Accumulation of powder, dust or debris similar in appearance to the suspect material on surfaces beneath the material can be used as confirmatory evidence. Response- action recommendations for asbestos - containing HAs are listed in the section VII. Recommendations may be for more than one HA, if materials are alike. Recommendations are either "general' or "immediate." An immediate recommendation indicates the presence of asbestos greater than 1% within the bulk - sample, or a bulk - sample in the same HA, and should be addressed accordingly. A general recommendation indicates asbestos does not exist greater than 1% within the bulk- sample, or a bulk - sample in the same HA, and no further abatement activities are required for removal of the material. Any sample reporting a "TRACE" amount of asbestos must be considered to be positive for asbestos greater than 1% unless it is analyzed by the point -count method to be less than 1 %. V. Inspector Comments Asbestos was identified during the bulk- sampling conducted at 433 Gore Creek Dr, Unit 1613, Vail, Colorado. A total of twelve (12) bulk - samples were collected from the residence. Three (3) bulk - samples tested positive greater than 1% for asbestos. ■ Asbestos was identified in the hallway wall drywall (surfacing material) sample DWO1 -01 at 4% Chrysotile 4 • Asbestos was identified in the hallway acoustical ceiling (surfacing material) sample AC01 -02 at 3% Chrysotile • Asbestos was identified in the kitchen resilient floor tile, located under vinyl tile (miscellaneous material) sample FT01 -01 at 3% Chrysotile. The mastic was non - detect. VI. Homogeneous Area Descriptions The following section contains sampled HA descriptions and sample locations. Percent - asbestos content for each sample indicated can vary depending on sample locations, homogeneity of the materials, and type of application. The quantities are approximations and are subject to field verification: Homogeneous Area #01 Sample #: DW01 -01 Honiogeneous Area #01 Sample #: DW01 -02 Sample Description: Drywall Sample Description: Drywall Sample Location: Hallway Wall Sample Location: Hallway Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity. +/- 450ft Material Quantity: +/- 450ft Material Condition: Good Material Condition: Good Physical Description (layers): White tape; White paint; White joint compound; White texture; White tan drywall Physical Description (layers): White tape; White texture w /white paint; White joint compound; White tan drywall Asbestos Content (layers): Negative; Negative; 4% Chrysotile; 4% Chrysotile; Negative Asbestos Content (layers): Negative; Negative; Negative; Negative Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII Honiogeneous Area #01 Sample #: DW01 -03 Homogeneous Area #02 Sample #: DW02 -01 Sample Description: Drywall Sample Description: Drywall Sample Location: Living Room Wall Sample Location: Bedroom Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: +/- 450ft Material Quantity. +/- 375ft Material Condition: Good Material Condition: Good Physical Description (layers): Brown fibrous material; White texture w /white paint; White joint compound; White texture w white paint Physical Description (layers): White tape; White texture w /white paint; White joint compound Asbestos Content (layers): Negative; Negative; Negative; Negative Asbestos Content (layers): Negative; Negative; Negative Recommendations: IMMEDIATE - See Section VII Recommendations: GENERAL - See Section VII Honiogeneous Area #02 Sample #: DW02 -02 Homogeneous Area #02 Sample #: DW02 -03 Sample Description: Drywall Sample Description: Drywall Sample Location: Bedroom Wall Sample Location: Bedroom Wall Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: +/- 375ft Material Quantity: +/- 375ft Material Condition: Good Material Condition: Good Physical Description (layers): White tape; White texture w /white paint; White joint compound; White tan drywall Physical Description (layers): White tape; White texture w /white paint (2 layers); White joint com ound 2 layers Asbestos Content (layers): Negative; Negative; Negative; Negative Asbestos Content (layers): Negative; Negative; Negative Recommendations: GENERAL - See Section VII Recommendations: GENERAL - See Section VII Homogeneous Area #03 Sample #: AC01 -01 Honiogeneous Area #03 Sample #: AC01 -02 Sample Description: Acoustical Ceiling Sample Description: Acoustical Ceiling Sample Location: Living Room Ceiling Sample Location: Hallway Ceiling Material Classification: Surfacing Material Material Classification: Surfacing Material Material Quantity: +/ -125ft Material Quantity: +/ -125ft Material Condition: Good Material Condition: Good Physical Description (layers): White /tan drywall w /white paint; White tape; White joint compound; White foamy texture w /white paint Physical Description (layers): White tape; White joint compound; White texture w /white paint; White foamy texture w /white paint; White /tan drywall Asbestos Content (layers): Negative; Negative; Negative; Negative Asbestos Content (layers): Negative; 3% Ch sotile; 3% Ch sotile; Negative; Negative Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII Homogeneous Area #03 Sample #: AC01 -03 Homogeneous Area #04 Sample #: VF01 -01 Sample Description: Acoustical Ceiling Sample Description: Vinyl Flooring Sample Location: Hallway Ceiling Sample Location: Kitchen Floor Material Classification: Surfacing Material Material Classification: Miscellaneous Material Material Quantity. +/- 125ft Material Quantity. +/- 30ft Material Condition: Good Material Condition: Good Physical Description (layers): White /tan drywall; White foamy texture w /white paint; White foamy texture w white paint physical Description (layers): White tile w /cream mastic Asbestos Content (layers): Negative; Negative; Negative Asbestos Content (layers): Negative Recommendations: IMMEDIATE. See Section VII Recommendations: GENERAL - See Section VII Homogeneous Area #05 Sample #: VF02 -01 Homogeneous Area #06 Sample #: FT01 -01 Sample Description: Vinyl Flooring Sample Description: Resilient Floor Tile Sample Location: Entry Floor Sample Location: Kitchen Floor Material Classification: Miscellaneous Material Material Classification: Miscellaneous Material Material Quantity: + / -15ft Material Quantity. +/- 30ft Material Condition: Good Material Condition: Good Physical Description (layers): Brown mastic; Brown sheet vinyl w white fibrous backing Physical Description (layers): Black mastic; Tan tile Asbestos Content (layers): Negative; Negative Asbestos Content (layers): Negative; 3% Chrysotile Recommendations: GENERAL - See Section VII Recommendations: IMMEDIATE - See Section VII VII. Recommendations IMMEDIATE: The laboratory results of the potential ACM sampled at 433 Gore Creek Dr, Unit 16B, Vail, Colorado, on April 20, 2010, indicate that three (3) bulk - samples of drywall, acoustical ceiling texture and resilient floor tile collected from the residence were reported as positive for asbestos between 3% and 4% Chrysotile. If the above - referenced ACM is to be removed from the residence and the total quantity exceeds any of the regulatory trigger levels of 50 linear feet on pipes, 32 square feet on other surfaces, or the volume equivalent of a 55- gallon drum, a Colorado - licensed asbestos abatement contractor is required to perform the removal, including formal notification to the Colorado Department of Public Health and Environment prior to the abatement of the ACM. 7 APPENDIX A SAMPLE LOCATIONS OVF02.01 KITCHEN LIVING ROOM 1 VFOI -01 OFT01 -01 M 5 1-02 01 -01 BATHCLO. RAGE BEDROOM M 4 M 3 a not to APPENDIX B CERTIFICATION STATE OF COLORADO ASBESTOS CERTIFICATION* Colorado Department of Public Health and Environment Air Pollution Control Division This certifies that Steve Shurtliff Certification No: 15413 has met the requirements of 25 -7 -507, C.R.S. and Air Quality Control Commission Regulation No. 8, Part B, and is hereby certified by the state of Colorado in the following discipline: Building Inspector* Issued: 6/12/2009 Expires on: 6/12/2010 *M "Yk.r6r W-&W&aer mL..J. ernvrDtkb qp* W&.LLtj —djk"m I. We A ip&, yedJkl.1►.c APPENDIX C LABORATORY ANALYSIS E Nk, LAbORATORy ASS ZLTINSU ' GM TES RPORATED A ?ORY Cer tificate of Analysis 13949 W. Colfax Ave Suite 205 Lakewood, CO 80401 303.232.3746 Hnn/w. aerobioloay. net Client Name DS Consulting, Inc. Date Collected: 04/20/10 Street address 3247 S. Indiana St. KWO I Date Received: 04/20/10 City, State ZIP Lakewood, CO 80228 Date Analyzed: 04/20/10 Attn: Steve Shurtliff #200860 -0 Date Reported: 04/20/10 Client Project Name: 433 Gore Creek Dr, Unit 16B, Vail, CO Project ID: 102450 102450 -1B White Paint Job ID: 5,3% Test Requested: 3002, Asbestos in Bulk Samples Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA- 600/R- 93/116, July 1993. Sample Identification Physical Description of Sample; Additional Comments Homo- geneous es /no Number of La ers % Asbestos Detected Non - Asbestos Fibers area % Non - Fibrous Material (area %) Matrix Material (composition Client Lab Sam le Number DWO1 -01 102450 -1A White Tape N 5,3% Negative 98% CELL 2 102450 -1B White Paint N 5,3% Negative 100 1024504C White Joint Compound N 5,5% POSITIVE 4% CHRY 96 C 1024504D White Texture N 5,10% POSITIVE 4% CHRY 96 C 102450 -1E White /Tan Drywall N 5,79% Negative 15% CELL 85 G DWO1 -02 102450 -2A White Tape N 4,5% Negative 98% CELL 2 102450 -2B White Texture w /White Paint N 4,15% Negative 100 C,G 102450 -2C White Joint Compound N 4,20% Negative 100 G 102450 -2D White /Tan Drywall N 4,60% Negative 15% CELL 85 G DWO1 -03 102450 -3A Brown Fibrous Material N 4,5% Negative 98% CELL 2 A = Amosite CELL = Cellulose AC = Actinolite MW = Mineral Wool AN Anthophylle FBG = Fiberglass --'"�- CHRY= Chrysotile SYN = Synthetic CR = Crocidolite WO = Wollastonite TR = Tremolite NTR = Non- Asbestiform TR Paul appe Adam Humphreys Trace =Less Than I% NAC = Non- Asbestiform AC Laboratory Analyst Asbestos Laboratory Supervisor FT = Fibrous Talc AH =Animal Hair Page 1 of 5 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746 Q = Quartz C = Carbonates V = Vermiculite G = Gypsum M = Mica T =Tar P = Perlite O = Organic B = Binder OP = Opaques D = Diatoms 'Nk, AERobiotocly LAbORATORy ASSOCIATES, INCORPORATED CONSULTING LABORATORY Certificate of Analysis 13949 W. Colfax Ave Suite 205 Lakewood, CO 80401 303.232.3746 www.aerobiolociv.net Client Name DS Consulting, Inc. Street address 3247 S. Indiana ® Date Collected: 04/20/10 City, State ZIP Lakewood, CO 800 228 m Date Received: 04/20/10 Attn: Steve Shurtliff U #200860 -0 Date Analyzed: 04/20/ 10 Client Project Name: 433 Gore Creek Dr, Unit 16B, Vail, CO Date Reported : 04/0/ 2 d 4/10 I Project 2 0 Job ID: Test Requested: 3002, Asbestos in Bulk Samples Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA- 600/R- 93/116, July 1993. Sample Identification Physical Description of Sample; Homo- geneous Number of Asbestos Detected Non- Asbestos Non - Fibrous Matrix Client Lab Sample Number Additional Comments es /no La ers % Fibers area %) Material Material area % (composition 102450 -3B White Texture w /White Paint N 4,20% Negative 98% CELL 2 DWO1 -03 102450 -3C White Joint Compound N 4,20% Negative 100 C 102450 -3D White Texture w /White Paint N 4,55% Negative 100 C 102450 -4A White Tape N 3,10% Negative 98% CELL 2 DW02 -01 1024504B White Texture w /White Paint N 3,30% Negative 100 C 1024504C White Joint Compound N 3,60% Negative 100 C 102450 -5A White Tape N 4,5% Negative 98% CELL 2 102450 -513 White Texture w /White Paint N 4,10% Negative 100 C DW02 -02 102450 -5C White Joint Compound N 4,15% Negative 100 C 102450 -5D White /Tan Drywall N 4,70% Negative 15% CELL 85 G A = Amosite CELL = Cellulose Q = Quartz AC = Actinolite AN = Anthophyllite CHRY = MW = Mineral Wool FBG = Fiberglass C = Carbonates V = Vermiculite Chrysotile SYN = Synthetic G = Gypsum CR = Crocidolite WO = Wollastonite M = Mica Paul Laborato Anal Analyst rY Y am ump eYS Asbestos Laboratory Supervisor TR = Tremolite Trace =Less Than 1% NTR = Non- Asbestiform TR T = Tar NAC = Non - Asbestiform AC P = Perlite FT = Fibrous Talc O = Organic AH =Animal Hair B = Binder Page 2 of 5 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746 OP = s D = Diatoms Diatoms ' %.,AERobio1OC,jy LAbORATORy ASSOCIATES, INCORPORATED CONSULTING LABORATORY Certificate of Analysis 13949 W. Colfax Ave Suite 205 Lakewood, CO 80401 303.232.3746 www.aerobiologv.net Client Name DS Consulting, Inc. Date Collected: 04/20/10 Street address 3247 S. Indiana St, K V lam: J Date Received: 04/20/10 City, State ZIP Lakewood, CO 80228 Date Analyzed: 04/20/10 Attn: Steve Shurtliff #200860 -0 Date Reported: 04/20/10 Client Project Name: 433 Gore Creek Dr, Unit 16B, Vail, CO Project ID: 102450 3,10% Job ID: 98% CELL Test Requested: 3002, Asbestos in Bulk Samples 102450 -6B Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA -600/R- 93/116, July 1993. 3,30% Sample Identification Physical Description of Sample; Additional Comments Homo- geneous es /no Number of La ers % Asbestos Detected Non - Asbestos Fibers area % Non - Fibrous Material area % Matrix Material (composition CR = Crocidolite Client Lab Sample Number DW02 -03 102450 -6A White Tape N 3,10% Negative 98% CELL 2 102450 -6B White Texture w /White Paint (2 Layers) N 3,30% Negative 100 C 102450 -6C White Joint Compound (2 Layers) N 3,60% Negative 100 G A01 -01 102450 -7A White /Tan Drywall w /White Paint N 4,10% Negative 15% CELL 85 G 102450 -7B White Tape N 4,10% Negative 98% CELL 2 102450 -7C White Joint Compound N 4,30% Negative 100 C 102450 -7D White Foamy Texture w /White Paint N 4,60% Negative 100 C ACO1 -02 102450 -8A White Tape N 5,10% Negative 98% CELL 2 102450 -8B White Joint Compound N 5,10% POSITIVE 3% CHRY 97 C 102450 -8C White Texture w/White Paint N 5,15% POSITIVE 3% CHRY 97 C Adam Humphreys Asbestos Laboratory Supervisor A = Amosite CELL = Cellulose AC = Actinolite MW = Mineral Wool AN = Anthophyllite FBG = Fiberglass CHRY = Chrysotile SYN = Synthetic CR = Crocidolite WO = Wollastonite TR = Tremolite NTR = Non - Asbestiform TR Trace =Less Than 1% NAC = Non - Asbestiform AC FT = Fibrous Talc AH =Animal Hair Q = Quartz C = Carbonates V = Vermiculite G = Gypsum M = Mica T =Tar P = Perlite O = Organic B = Binder OP = Opaques D = Diatoms Paul appe Laboratory Analyst Page 3 of 5 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746 '%k, AERobio1oc j y LAbORATORy ASSOCIATES, I NCORPORATED CONSULTING LABORATORY 13949 W. Colfax Ave Suite 205 Lakewood, CO 80401 Certificate of Analysis 303.232.3746 www.aerobioloav net Client Name DS Consulting, Inc. Street address 3247 S. Indiana St. m fV15�/a (1 Date Collected: 04/20/10 City, State ZIP Lakewood, CO 80228 IJ�1 V .cU�J Date Received: 04/20/10 Attn: Steve Shurtliff Client Project Name: 433 Gore Creek Dr, Unit 16B, Vail, CO #200860 -0 Date Analyzed: Date Reported: 04/20/10 04/20/10 Project ID: 102450 Test Requested: 3002, Asbestos in Bulk Samples Job ID: Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA -600/R- 93/116, July 1993. Homo- Numb Sam le Identification Physical Description of Sample; geneous of ab Sam le Client L Number Additional Comments es /no °/ La ers 102450 -8C White Foamy Texture w /White Paint N 5,20% ACO 1 -02 102450 -8D I White /Tan Drywall I N I 5,45% 102450 -9A I White /Tan Drywall I N 1 3,25% ACO 1 -03 102450 -9B I White Foamy Texture w /White Paint I N 1 3,25% 102450 -9C I White Foamy Texture w /White Paint I N 1 3,50% VFO1 -01 VF02 -01 102450 -10 I White Tile w /Cream Mastic I N 1 1, 100% 102450 -11A I Brown Mastic I N I 2,5% 102450 -11B Brown Sheet Vinyl w /White Fibrous Backing N 102450 -12A Black Mastic N FTO 1 -01 102450 -12B Page 4 of 5 Tan Tile F`1 2,95% 2,5% 2,95% er Asbestos Detected Non - Asbestos Non - Fibrous Matrix Fibers Material Material ° area % area % (composition Negative 100 C 15% Negative CELL 85 G 15% Negative CELL 85 G Negative 100 G Negative 100 C Negative 100 Negative 100 B 30% Negative CELL,FBG 70 B Negative 100 B POSITIVE 3% CHRY 97 — n.uusnc AC = Actinolite AN = Anthophylle w� CHRY= Chrysotile CR = Crocidolite TR = Tremolite Laboratory Anal t am amp eys Trace =Less Than 1% rY Ys Asbestos Laboratory Supervisor 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746 ULLL = Cellulose Q = Quartz MW = Mineral Wool C = Carbonates FBG = Fiberglass V = Vermiculite SYN — Synthetic G = Gypsum WO = Wollastonite M = Mica NTR = Non- Asbestiform TR T = Tar NAC = Non- Asbestiform AC P = Perlite FT = Fibrous Talc O = Organic AH =Animal Hair B = Binder OP = Opaques D = Diatoms — n.uusnc AC = Actinolite AN = Anthophylle w� CHRY= Chrysotile CR = Crocidolite TR = Tremolite Laboratory Anal t am amp eys Trace =Less Than 1% rY Ys Asbestos Laboratory Supervisor 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746 ULLL = Cellulose Q = Quartz MW = Mineral Wool C = Carbonates FBG = Fiberglass V = Vermiculite SYN — Synthetic G = Gypsum WO = Wollastonite M = Mica NTR = Non- Asbestiform TR T = Tar NAC = Non- Asbestiform AC P = Perlite FT = Fibrous Talc O = Organic AH =Animal Hair B = Binder OP = Opaques D = Diatoms Nkt qy LA owoRy ASSOCIATES, INCORPORATED CONSULTING LABORATORY Certificate of Analysis 13949 W. Colfax Ave Suite 205 Lakewood, CO 80401 303.232.3746 www.aerobioloay.net Consulting, Inc. 32 3247 S. Indiana Date Collected: 04/20/10 Lakewood, CO 800 228 ���ae Date Received: 04 /20/10 Steve Shurtliff Date Analyzed: � 04/20/10 Client Project Name: 433 Gore Creek Dr, Unit 16B, Vail, CO #200860 -0 Date Reported: 04/20/10 Project ID: 102450 Job ID: General Notes ♦ Negative indicates no asbestos was detected; the method detection limit is 1 %. ♦ Trace or " <l" indicates asbestos was identified in the sample, but the concentration is less than the method detection limit of 1% ♦ All regulated asbestos minerals (i.e. chrysotile, amosite, crocidolite, anthophyllite, tremolite, and actinolite) were sought in every layer of each sample, but only those asbestos minerals detected are listed. Amosite is the common name for the asbestiform variety of the minerals cummingtonite and grunterite. Crocidolite is the common name used for the asbestiform variety of the mineral reibekite. ♦ Tile, vinyl, foam, plastic, and fine powder samples may contain asbestos fibers of such small diameter (< 0.25 microns in diameter) that these fibers cannot be detected by PLM. For such samples, more sensitive analytical methods (e.g. TEM, SEM, and XRD) are recommended if greater certainty about asbestos content is required. Semi - quantitative bulk TEM floor tile analysis is accepted under the NESHAPS regulations. ♦ These results are submitted pursuant to Aerobiology Laboratory Associates, Inc.'s current terms and conditions of sale, including the company's standard warranty and limitation of liability provisions. No responsibility or liability is assumed for the manner in which the results are used or interpreted. ♦ Unless notified in writing to return the samples covered by this report, Aerobiology Laboratory Associates, Inc. will store the samples for a minimum period of thirty (30) days before discarding. A shipping and handling charge will be assessed for the return of any samples. Notes Required by NVLAP ♦ This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. ♦ This test report relates only to the items tested or calibrated. ♦ This report is not valid unless it bears the name of a NVLAP- approved signatory. ♦ Any reproduction of this document must include the entire document in order for the report to be valid. 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746 Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: () Revisions () Response to .Correction Letter /"A> 7'L /A/ O 2 attached copy of correction letter () Otherred Submittal Project Street Address: 4,144- (Number) (Street) (Suite #) Building /Complex Name: k 7�We9 /LS 6>1 Contact Information: Company: e5k Company Address: �� '60X �o3a City: State: GO Zip: 0 /6,5�S Contact Name: 70 8 �ele-y W /U ce Contact Phone: 4 - 57,0 1 _ E -Mail ib�' �c°G!� -�H / la&, Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: Plumbing: Electrical: Mechanical: Total: $ $ Description / List of Changes: / IVS , T/o A/ [ (use additional sheet if necessary) Date Received NOV 18 2010 iWN OF VAIL Al T.... 1A TRANSMITTAL FORM November 4, 2010 Subject: Summary of Structural Steel Special Inspection Services, 433 Gore Creek, Wood / Bruecker Residence Improvements, Vail, Colorado Job Number: 10 -6589 TOV Permit Number: B 10 0125 Steven James Riden Architects PO Box 3238 Vail, Colorado 81658 Attn: Mr. Steven Riden, This letter summarizes the special inspections GROUND Engineering Consultants, Inc. (GROUND) performed during the improvements to Wood / Bruecker Residence, located at 433 Gore Creek in Vail, Colorado. The special inspection services were performed at times scheduled by the Client, Contractor and /or Subcontractors. The structural steel welded and bolted connections for the improvements in to the Residence were observed during construction by a certified welding inspector (CWI). These observations were completed on September 28, 2010 as scheduled by the Client, Contractor or Subcontractor. Based on our observations on this date and the documentation received from the Contractor, it is our opinion that the materials tested and /or observed for the structural steel improvements were in general accordance with project plans, specifications, or applicable RFI's. The observations and materials testing as indicated above were performed periodically to provide data to the Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of the tested materials and /or work with the contract documents at the times of our observation and testing. We did not supervise, direct or have any control over any of the Contractor's or Subcontractor's work. We were not responsible for the Contractor's or Subcontractor's scheduling of our services, means, methods, procedures, techniques, or sequences of construction, nor responsible for ensuring that any Contractor or Subcontractor performed or completed the work in accordance with the contract documents or construction industry standards. If you have any questions concerning this letter, please contact our office. Sincerely, GROUND Engineering Consultants, Inc. eL Evan E. Kuhn � RE G�SJ" •K �Ve °• �9 ,tm Reviewed by Michael K. Wariner, P.E. ROUN ENGINEERING CONSULTRNTS INC. 101AAirpark Dr., Unit 9, PO Box 464, Gypsum, CO 81637 Phone (970) 524 -0720 Fax(970)524-0721 www.groundeng.com Office Locations: Englewood Commerce City Loveland Granby Gypsum GROUND ENGINEERING CONSULTRNTS VISUAL OBSERVATION REPORT Project Name: Wood /Bruecker Residence Project No: 10 -6589 Client: Steven James Riden Architects Address: PO Box 3238 Vail, Colorado 81658 Attn: Mr. Steven Riden Date: September 28, 2010 Report No: 1 As requested, a representative of GROUND arrived at the project site to observe field- welded connections. The following is a summary of the observations performed on this date: 1) Observed the field - welded connections for the floor support beam and found them to be in general compliance with the project plans and specifications. 2) GROUND is requesting the Welding Procedure Specification (WPS) and Welder Qualification Test Record (WQTR) per AWS D1.1 from the ironworker on this project. a. Received WQTR for Jimmy Gauer on 10/8/10. Bob Brownlee with Beck was present during our observations and received a copy of this report. Submitted By: GROUND Engineering Consultants, Inc. Billy Horn Field Representative South Metro Office North Metro Office Gypsum Office 41 Inverness Drive East 7393 Dahlia Street, P.O. Box ice Englewood, CO 80112 -5412 Commerce City, CO 80022 -1834 Tel: (303) 289 1989 Tel: (303) 289 1989 Gypsum, Colorado 81637 Fax: (303) 2891686 Fax: (303 289 6742 Tel: (970) 524 0720 Fax: (970) 524 0721 ��Awr�' � a:�; (D - c - 6 l I 12 -30 -2010 Inspection Request Reporting Page 2 4:20 pm Vail, CO - City Of Requested Inspect Date: Inspection Area: Site Address: A/P /D Information Activity: B10 -0125 Type: A -BUILD Const Type: Occupancy: Owner: BRUECKER WOOD REAL ESTATE TRUST Contractor: BECK BUILDING COMPANY Description: INTERIOR REMODEL & ADDITION (BAY WINDOW) Requested Inspection(s) Item: 90 BLDG -Final Requestor: BECK BUILDING COMPANY Comments: 471 -1 5 Assigned To: ** Action. Time Exp: Item: 542 PLAN -FINAL Requestor: BECK BUILDING COMPANY Comments: 471 -1654 Assigned To: BGIBSON Action: Time Exp: SAO/ Sub Type: ATH Use: VB Phone: 970 - 949 -1800 Status: ISSUED Insp Area: CG Requested Time: 10:30 AM Phone: 970 - 949 -1800 -or- 970 -949- 4335 Entered By: JMONDRAGON K Requested Time: 08:00 AM Phone: 970 - 949 -1800 -or- 970 -949- 4335 Entered By: JMONDRAGON K �7 M onday, January 03, 2011 433 GORE CREEK DR VAIL UNIT 16B, VAIL TRAILS EAST REPT131 Run Id: 12342 A Inspection History Item: 10 BLDG - FOOTING "Approved" 09/10/10 Inspector: CG Action: AP APPROVED Comment: SLAB REBAR VOID FORM TO BE INSTALLED AFTER POUR PER PLANS Item: 30 BLDG - Framing ** Approved ** 10/21/10 Inspector: JRM Action: AP APPROVED Comment: APPROVED FRAMING, U VALUE ON WINDOWS APPROVED Item: 50 BLDG - Insulation **A pproved ** 10/25/10 Inspector: JRM Action: AP APPROVED Comment: Item: 60 BLDG - Sheetrock Nail ** Approved ** 10127/10 Inspector: Martin Action: AP APPROVED Comment: Item: 70 BLDG -Misc. Item: 542 PLAN -FINAL Item: 90 BLDG -Final Item: 410 Special Inspect- progress rept "Approved" 11/26/10 Inspector: JRM Action: AP APPROVED Comment: Item: 420 Special Inspect -final rept ** Approved ** 11/26/10 Inspector: JRM Action: AP APPROVED Comment: M onday, January 03, 2011 433 GORE CREEK DR VAIL UNIT 16B, VAIL TRAILS EAST REPT131 Run Id: 12342