Loading...
HomeMy WebLinkAboutDRB100149 Plans0 1; co It co (TAKEN FROM ORIGINAL BLUEPRINTS DATED 4-4-80 BY SANTANGELOIDAHMAN ARCHITECTS) ORIGINAL JURISDICTION: 1979 UNIFORM BUILDING CODE, TOWN OF VAIL, VAIL ORDINANCE #36 OCCUPANCY: B-2 COMMERCIAL, R-1 CONDOMINIUM DWELLING UNITS, B-1 PARKING GARAGE TYPE OF CONSTRUCTION: TYPE 11 ONE-HOUR COMMERCIAL & CONDOMINIUM DWELLING UNITS TYPE I FIRE RATED PARKING GARAGE OCCUPANCY SEPARATIONS: BUILDING I = B-1/13-2 = 3 HOUR BUILDING 1 = B-1/R-1 = 3 HOUR BUILDING 2 = B-2/R-1 = 1 HOUR BUILDING I / BUILDING 2 = I HOUR SPRINKLER SYSTEM: THE TENANT SPACES INCLUDE AN AUTOMATIC SPRINKLER SYSTEM. OCCUPANTLOAD: B-1 GARAGE: 200 SQ.FT. / PERSON = 222 PERSONS B-2 COMMERCIAL: 30 SQ. FT. PERSON = 373 PERSONS R-1 DWELLINGS: 300 SQ. FT. PERSON =198PERSONS = 793 PERSONS TOTAL OCCUPANT LOAD GRASSY AREA LEVEL ib"��4�� EXISTING WALL TO REMAIN "WAWA *Avow -ftm w*Amw mawAft w9ft-ft "waft AUft -w"m wmkvm RwA• ftw4ft 4mmum -summ ftwAsm awava "A"m oav-1. — — — — — — — — — — — — — — — — — — — — — SUNKEN CONCRETE GREASE-TRAP VAULT APPROX. RE: MECH DRAWINGS EDGE OF (FLUSH FLUSH M : EXCAVATION MANHOLE MANHOLE COVER COVER L - - - - - - - - - - - - - - - - - - - - NOTE: DISTURBED AREA TO BE FINISHED WITH PAVERS TO MATCH PROPOSED RAMP FINISH CONSTRUCTION. FOUNDATION WALL RE: STRUCT. DWGS. I 2 I - 4-11 V LEVEL 0 ma #�m ! •• • L AW v FUTURE RESTAURANT SPACE (BACK OF KITCHEN) ff <( ip, fiffam FUTURE MECHANICAL CONC. SLAB EQUIPMENT L O CATION t- LA i SURFACE, CONCRETE SEE STRUCT. DWGS 1/2" = 1' -0" ADDRESS: 68 EAST MEADOW DRIVE, VAIL, COLORADO A PARCEL OF LAND IN LOTS 0 AND P BLOCK 5-D VAIL VILLAGE FIRST FILING, TOWN OF VAIL, EAGLE COUNTY, COLORADO PARCEL NUMBER = 210108254003 ZONING = SPECIAL DEVELOPMENT DISTRICT #6 SITE AREA: 49,492 SQ. FT. BUILDING COVERAGE: 18,000 SQ FT. (38.7%) LANDSCAPING: 24,694.4 SQ FT. (57.4%) HARD-SURFACED AREA = 1,800 SQ. FT. (3.9%) It I • 'k A • A A SOUND ISOLATION BETWEEN SLAB AND WALL DESIGN BY OTHERS GENVERAL CONTRACTOR TO COORDINATE TOP OF RAMP CONSTRUCTION WITH EXCAVATED AREA APPROVED H.C. RAMP FROM MEADOW DRIVE DESIGN BY OTHERS EXCAVATION AREA ALL PAVER AND SLAB SURFACES TO BE REMOVED AREA = 300 SQ. FT. I ZONE SECOND LEVEL • COMMERCIAL SPACE IN BUILDING 2. 2. A SUNKEN GREASE TRAP VAULT IS PROPOSED AT A LOCATION JUST NORTH OF THE NEW SLAB. THE DISTURBED AREA IS INTENDED TO BE FINISHED IN PAVERS AND TO JOIN SEAMLESSLY WITH THE PROPOSED CONSTRUCTION OF HANDICAP RAMPS AT THE SAME LOCATION. ALL THAT WILL BE VISIBLE OF AT THE WALKWAY SURFACE WILL BE TWO FLUSH MANHOLE COVERS. I I > L d > LIJ 0 _j — • 0 • [)_00' U) rr% wi ui 0 LY 0 -i 0 D� • > U) 0 LLJ 0 3 C) cn (n U) U) 222 75 w to W' cu cu :� ( � IL , 6 0 i u dr E z z w w E cy) 0 U) (D W 5 0 W (0 0 0 a C - 0 SO LL LL 0 c) m 0 x 72 a5a, r 6 o 6 E 75 (n U) 0 0 � Lo T_ W 0 < (L LL a) LO - 'w' 06 C\i E c'? O 0 E 0 CL wo > L d > LIJ 0 _j — • 0 • [)_00' U) rr% wi ui 0 LY 0 -i 0 D� • > U) 0 LLJ 0 3 C) cn (n U) U) 222 75 w to W' cu cu :� ( � IL , 6 0 i u dr E z w w U) (D E 0 W (0 0 CL a C - 0 SO c) m 0 x 72 a5a, r 6 o 6 E 75 (n U) 0 0 � x 0 - -0 0 (' l - u-° 0 < (L LL a) z 0 0 c/) > W _L6 z > L d > LIJ 0 _j — • 0 • [)_00' U) rr% wi ui 0 LY 0 -i 0 D� • > U) 0 LLJ 0 3 C) cn (n U) U) 222 75 w to W' cu cu :� ( � IL , 6 0 i u dr E z w w U) (D E 0 W (0 0 CL a C - 0 SO c) m 0 x 72 a5a, r 6 o 6 E 75 (n U) 0 0 � x 0 - -0 0 (' l - u-° 0 < (L LL a) > L d > LIJ 0 _j — • 0 • [)_00' U) rr% wi ui 0 LY 0 -i 0 D� • > U) 0 LLJ 0 3 C) Q Z Lh 0. z w w E 0 0 0 CL I i 1 I � � p ' ' 4" GREASE WASTE LINE ' COORDINATE INSTALLATION WITH CIVIL ENG. DRAWINGS 780 GALLON CAPACITY GREASE INTERCEPTOR E COORDINATE INSTALLATION WITH CIVIL ENG. DRAWINGS. INSTALLATION TO COMPLY WITH =: I CITY AND STATE CODES AND REGULATIONS! C.O.; ! �, ' C.O� C.O#_ 00 BRIDGE \ ABOVE �� " V I I i i rm m m i ll r � " SANITARY SEWER LINE N. TO EXISTS CONTRACTOR 3 VERIFY SI4E AND OCATION OF ' EXISTING I I 1 � SCALE: 1/8 " =1' -0" GEN ERAL ! 1. INSTALLA11 IS T BE • - AND OPERATIONAL AND IS TO BE IN ACCORD WITH BUIL DING DEPARTMENT REQUIREM i•'i • RES PECT WORK OF OTHER TRADES. EXIS71NG INSTALLATION. UTILITY COMPANY SERVICES AND STANDARDS AN D MANUFACTURERS RECOMMENDATIO 2. CUTTING AND PATCHING SHALL BE IN AN APPROVED MANNER, PATCH TO MATCH ADJACENT ROOF OPENINGS ARE TO BE COORDINATED WITH STRUCTURE MAINTAIN '� • 'ai CLEARANCE BETWE OA INTAK AN D EXHAUSTS 1 PLUMING V E NTS. 3. OBTAIN PAY FOR AND MAINTAIN PERMITS, LJCENSES, CERTIFICATES OF INSPECTION. AND LIABILITY INSURANCE. 4. FIEL CHECK E► (ISTING CON DITIONS AN► INCLU ALL COSTS ► REQUI f ACCOMMODATE EXISTING CONDITIONS AND TO PROVIDE A COMPLETE INSTALLATION. 5. PLUMBING MATE RIALS r E QUIPMENT UNL • a 1 AS EXISTING ► C OPIES UL AND/OR AGA APPROVED WHERE APPLICABLE. THE CONTRACTOR SHALL SUBMIT MINIMUM THREE OF A a INF ORMATI ON a F OR ENGINEERS f• • SHALL BEAR CONTRACT STAT EMENT r • D OCUME NTS. PU RPOSE CONTRACTOR AGREES SUBMITTALS PROCESSED BY THE ENGINEER ARE NOT CHANGE ORDERS; THAT THE OF • D THE CONTRACTOR UND ERSTAN D S DESIGN CONCEPT CONTRACTOR SHALL PROVI ar FOR INSTALLE 6. PLUMBING SYSTEMS UNDER THIS CONTRACT a "i •a' E QUIPMENT WORKING ORDER. REPLACE, AT NO ADDITIONAL COST TO THE OWNER. WORK, MATERIALS OR Ia a. D EFECTS IN DESIGN f • OR WOR KMANSHIP ONE YEAR OF DATE OF FINAL ACCEPTANCE. THIS IS TO INCLUDE DAMAGE AS A RESULT OF SUCH FAILURE. 7. MAINTAIN AS DRAWINGS RECORD CONSTRUCTION VARIATIONS ON DRAWINGS I DENTIFY COMPLETION OF PROJECT SUBMIT DRAWINGS TO THE ARCHITECT. 8. A a ENGRAVED ST OCK M ELAMINE ►a t PLAT . THICK. INDICATE MANUFACTUR M ODE L N O ., S ERIAL N O ., AND AREA SERVE • PROVIDE a► T O MECHANICAL EQUIPMENT REQUIR SE RVICE . a O ADJUSTM 10. NOT ALL PIPING OFFSETS AND TRANSITIONS REQUIRED TO INSTALL THE WORK ARE SHOWN FI EL D MEASURE FOR D= RE QUI REMENTS AN D INSTALL ACC OR DINGLY. 11. PIPING MATERIALS: A. WASTE AN D VENT ABOVE i I RON , CAST • i PVC SCH ! :: STAINL • . B. WASTE AND VENT BEL GRAD I RON . CAST ! f PVC SCH ► :; STAINL r C ONNECT • •. Z F c> t s - Z 40 L 0 hir • 40 L �r� mui V94 i s �'•• z ] c I PLAN VIEW =1� N 1. SEC • a • LUME EQUAL TO OF • 2. ALL PIPE 1 FITTINGS SHALL BE • a W ELDED a► ai ► P.V.C. MIN. 3* DIA. WITHIN TRAP. 3. WALLS ► BOTTOM REINF ORCED THROUGH ! REMES 4. • a' T O BE'REINFORCED LONGITUDINALLY WITH NO REBAR ON CENT • 4 REBAR ON a a' WIDTHWISE, r NO 8 RE13AR DIAG ONALLY AROUND ACC ESS HO LES. 5. CLEAN O UT SHALL BE PVC SCREW PLUG. 6. V ENT BE •f OR PVC SCHEDULE i T O A - . " A BOVE G ROUND . MANH OLE 7. i COVER D ENVER OR EQUAL SEE 4 SPECIFICATIO 8. CHECK WITH SUPPLIER FOR EX447 DIME?VA=.Qp� N. "1 SCALE: NOT TO SCALE S AM A UMBER S • 2 LG1wER LEVEL SITE PLAN SCALE: 1/8 " = 1' -0" NORTH