Loading...
HomeMy WebLinkAboutB06-0280 Pool & Spa Plans(;;A , N) RAN E L SO N BUILDING MOUNT41N RESORT COMMUNITIES TO: SAFEbuilt Inc. Colorado ATTN: John Plano RE: Plan Review Comments for: BUILDING PERMIT #: INTERNAL REFERENCE # REVISION #: PROJECT # OWNERS NAME: SITE ADDRESS: SUBDIVISION: Mr. Plano, B06 -0280 8774 10 20713 Lunar Vail 442 S. Frontage Rd Mountain View 51 Eagle Road #2 P O Drawer 5400 Avon, Colorado 81620 t. 970.949.5152 f. 970.949.5379 www.ranelson.com e SAFFbuiil Colorado I am writing to address the plan review comments RA Nelson received regarding the delayed submittal for the swimming pool and hot tub. I will address your comments in order. 1) Please provide an analysis of the hazardous materials used or stored in the Pool /Spa Equipment Room, the Acid Feed Room and Chlorine Feed Room. Indicate the classification of each material to Table 307.7(1)/(2). Response: The use of each of the rooms in question has changed since the Owner has opted to upgrade to a self contained automatic salt feed chlorine generating system. The upgraded system eliminated the need for a chlorine storage tank, and the only added material is table salt. I have attached a copy of the change order to the pool Subcontractor showing the purchase of the upgraded system. Each room will now only house one thirty -five (35) gallon storage /feed tank for muriatic acid. The tank allocated for the pool will contain a 100% muriatic acid solution, and the tank allocated for the hot tub will contain a 50150 dilution of muriatic acid and water. In reviewing Table 307.7(1)(2) the maximum allowable quantity of a corrosive material is 500 liquid gallons for both storage and use - closed systems and 100 liquid gallons is allowed for use -open systems. The specified thirty -five gallon tank does not exceed the code limits for the corrosive classification. I have also attached an MSDS sheet for your review. 2) The drawings are indicating mechanical to exhaust vent acid and chlorine rooms separately. Engineer stamped drawings will be required for the venting. Response: Please see the attached Architectural Supplemental Information showing two separate exhaust systems. A r^ 3) It appears these two rooms are control areas? These rooms are not shown on the original drawings. Control areas are limited based on IBC 414.2, the amount of materials, number of control areas, where in the building, etc ... Please provide an analysis to verify compliance. Response: Yes, per IFC these two rooms are control areas. a) § 414.2.1: We will separate the rooms using our W20 one -hour wall type (3 -518" metal studs w/ 5/8" gypboard on each side), as drawn. A required one -hour separation is required per table 414.2.2 b) § 414.2.2 Per Table 414.2.2 a total of three control areas are permissible for a floor area located one level below grade, we have two. The thirty -five gallon tanks do not exceed 375 gallons ( 75% of the maximum allowable quantity). This project does not have more than the sixteen allowed control areas. c) § 414.2.3: One hour wall construction meets the requirements for this Type `U' area. The Concrete slab on grade exceeds the required two hour minimum for supporting floors. d) § 414.2.4: Not applicable as these areas are not in the Group `M' or Group `S'. This comment and response from the design team is from the original plan review Provide a hazardous material list for pool equipment room and the generator. Indicate the classification of 11 each material to Table 307.7(1)/(2) and indicate if it is under the exempt amounts. Deferred submittal at the time of the pool package the building owner will provide a letter verifying that hazardous materials will not be stored in excess of amounts outlined in table 307.7 1 & 2. Response: The muriatic acid is classified as a corrosive, and per the above response we are under the maximum allowable amounts. The generator is no longer contained within the garage and has been moved outside per ASI 27. The generator has a self contained fuel bladder. The attached letter from Lunar Vail, LLC addresses the storage of muriatic acid within the allowable quantities. If you have any questions regarding our response, please do not hesitate to conatact me directly. Sincerely, Rob Parrish Assistant Project Manager Vail Mountain View at Gore Creek 970.748.7684 Office 970.476.0416 Fax 970.471.0360 Cell rparrish @ranelson.com R-A. Nelson Assocjafes. i -4 1 !V ' 'evv Of 'rc p-, 1 j , d ATF- S i - i 0 N T R M N0 r DESCRIPTION OF CHANGE: P a d d; t i o! ` ;; �' (,, () I) C - �' Exhiho Exhibit "D" sCi Secti,.;') It 1 R St.ib -parac „ rapjl, 4 0f Item Description (10f)(31 W�)x 1 6 x 38 �-c tarquia, Clutdwl Pool -af) 111 plans dated 5,2;08i -1 1411 1- r P,1 PL Sheets Amount 1002 file LaiD Lane %v end wait fargets 0000 Ozone •y5lein <— 00004 Chlorine Generator system <-- a2,400 ()o 00005 Automated C"IeMical Controller (()RP 00 00006 Thermal Cover for Lap Pool w/ Cninnnerctal 00007 Pool Cove Storage Reel Handicap Manual EZ-L ift w / Anchor , ' $5.400 00 00008 Outdoor Spa = 8 'y , 8'Squate. 42” depth $4.600.00 00009 (Per PL Sheets 1 00 %CD Plans dated 5/2108) Ozone System <— $2.10000 000 Chlorine Generator Systen, <— $58,200.00 $2,20000 00011 Automated Chemical Ccntroller iORP;pH) <-- $4,70000 $5.40000 Subtotal: $206,200.00 Tota $206,200.00 R-A. Nelson Assocjafes. i -4 1 r r : ';tjbz Cat :fi`a�l r l r C£FI E _ _ ..... . -- a t r- ..-,�..rr No r d �t1v O rdCt }t }@ 3' +,r, . Ac reeroer N '�It 1r1ne L', a"l" —ot sfy 4tiIhotized ;'3ohcontrfi�t 1.9 00;," oC. y Eerr?ertT C,I'k8:'aCJE Ji,tf.t a18 milt P3GG?itT'aC•t ACPYPE:FTi f?r;t SUP', Prf,tr to hlt: iubcoi) tract f.r' r *V titl Y'!F v - 1•4tr,.: .;ft'r f:r11 f�i ?8i1gf: �`P e - dr vi'fi5 lit3COntrIct Agreent -r?t 0111 Will be IncreaSe,-t k9.Qiti3 €Sf} The New Stlbcnntract Agreement Sure Including This :Subcont €ae t ' 206 200,00 0 The Subcontract Agreemetit . f if12e Will NOT BE CHANGE -D �greetr)ell! Change Order � y 2 15 :,QQ 0e, Acceptance of the terms and Conditions � �-- onditions of below C+?nStitle4es €!)lP and final se this Subcontract Change Order by the SUbcOntractor s signature and 4tlefl - terrt of all costs agrees to waive all rights to matte any further claim arising t out of. so of re�ul tra this change Except as (Modified by this Subcontract Change Order, all teT� and C onditions of the Subcontract A`reelrna 1tlrronEractor Unchanged and in full force and effect. g enjain ACCEPTED: Colorado Pool¢c p g l `1 I11E " 1I By: r, P�Itar,jlaq Foote Date: DISTRIBUTION OF CHANGE: Cost Code Description Gunnite Hot T Ut� Cost Code Gunnile Hui Tut; 013 -311,) Gunnite Hot Tub 0133110 Gunnite Hof T�.tt, 01-3-31 1(1 013 -3110 hml Subtotal of Cost c ije Pool 013-3210 Pool 013 -3210 Pool 013 -3210 P ool 013-3210 Pool 013 - 3210 Pool 013 32 to 013-3210 Subtotal of Cost Code R.A. Nelsoij & Associates L / Jeff uynlire Date: Total Distributed Value: 5206 200 01- Distributed Value S5.40ia 00 .S2.20000 $4,700 00 $58.200.00 5'0,500.00 rL, 100 0(i 5113.400 00 $5,400.00 $2 500 00 S5 :300 0;) S4 600 00 52.400 00 $ 135 700 00 i R.A. Netson Associates, irac. 1 LL LLJ Z L'� 00 < 00 0 06 0 0 UO 00 1 00 CO 0 Ix <1 m > z iv < MOUNTAIN VIEW ENGINEERING BY: JOBS 06067 BELFAY FILE 06067MI VAIL, CO ENGINEERING ENG.'EO By KJS 281 WEST 9TH AVE, CHECKED By DENVER, CO 80204 KJS (303) 892-5980 REFERS TO M2.18 FAX: 892-5979 THIS DOCUMENT INCLUSIVE OF THE belfoy@belfay corn IDEAS INCORPORATED HEREIN IS THE PR OERTY BELPAY ENGINEERING S HEET I OF I DE SCRIPTION: POOL EQUIP. ROOM ASI 179 ANY P U SE Of T OF HS DOCUMENT OR lf)Ei� 09/24/08 WITHOUT THE WRITTEN CONSENT OF I SELFAY ENGINEERING IS PROHIBITED. Thatcher Company Material Safety Data Sheet Thatcher Company Material Safety Data Sheet Product: Hydrochloric Acid, (20 %Baum) MSDS Date: February 28, 2000 Emergency Contact: 1 -800- 424 -9300 SECTION I PRODUCT NAME: Hydrochloric Acid, (20° Baume) SYNONYMS: Muriatic Acid DOT SHIPPING INFORMATION: Hydrochloric Acid Solution 8, UN 1789, PG I1 Pagel of 3 CHEMICAL NAME: Hydrochloric acid CHEMICAL FAMILY: Inorganic acids SECTION II - HAZARDOUS INGREDIENTS This material contains no ingredients which are known by Thatcher Company to be hazardous unless listed below. H MAT ERIAL II CAS NUMBER acid 11 7647 -01 -0 W/W % EXPOS LIM I N A IR 31.45 T LV = 5 ppm (7 mghn3)(ACGI1i The specific identity of some ingredients may be withheld for confidential business purposes. However, all known potential health effects from exposure to these ingredients are being addressed. Hydrochloric acid is subject to the reporting requirements of EPCRA Section 313 (40 CFR Part 372) SECTION III - PHYSICAL DATA BOILING POINT (F): 182 SPECIFIC GRAVITY: 1.16 VAPOR PRESSURE (mm Hg): Unknown % VOLATILE, BY VOLUME: 100% VAPOR DENSITY (air =1): 1.268 EVAPORATION RATE: Similar to water SOLUBILITY IN WATER: Complete APPEARANCE AND ODOR: Clear, colorless to slightly yellow liquid with a pungent odor. FLASH POINT: Nonflammable SECTION IV - FIRE AND EXPLOSION DATA FLAMMABLE LIMITS: Lel: N/A Uel: N/A EXTINGUISHING MEDIA: Water spray, dry chemicals, foam or carbon dioxide. SPECIAL FIRE- FIGHTING PROCEDURES: When heated, hydrochloric acid releases hydrogen chloride gas. Use a self - contained respirator if heating occurs. UNUSUAL FIRE- FIGHTING AND EXPLOSION HAZARDS: Hydrochloric acid reacts with steel and many common metals to produce hydrogen gas, which is highly flammable and a fire and explosion hazard. STABILITY: Stable SECTION V - REACTIVITY DATA I ' tt P ://www. conelyco.cOM/Pool-Spa/acid.htm 9/24/2008 Thatcher Company Material Safety Data Sheet Page 2 of 3 HAZARDOUS POLYMERIZATION: Will not occur. CONDITIONS OR MATERIALS TO AVOID: Avoid contact with metals and sulfides. Contact with metals produces flammable or explosive hydrogen. Contact with metals releases poisonous hydrogen sulfide gas. Avoid contact with bases or any other chemicals. HAZARDOUS DECOMPOSITION PRODUCTS: Hydrochloric acid is stable; however, highly corrosive hydrogen chloride gas and hydrochloric acid vapor is released at above boiling temperatures. CARCINOGENIC LISTING: SECTION VI - HEALTH HAZARD DATA NTP: No ingredients listed in this section. IARC MONOGRAPHS: No ingredients listed in this section. OSHA 29 CFR 1910: No ingredients listed in this section. ENTRY ROUTES & EFFECTS OF OVEREXPOSURE: Contact: Can cause severe bungs to eyes, skin and mucous membranes. Inhalation: Vapor can cause severe irritation or bunts to respiratory tract. Ingestion: Can cause severe burns to the gastrointestinal system, which could result in death. STATEMENT OF PRACTICAL TREATMENT: Contact: Immediately flush exposed area thoroughly with water for at least 15 minutes while removing contaminated clothing and shoes. Consult a physician. For eyes, flush with large amounts of cool water for at least 15 minutes. Get medical attention immediately. Inhalation: Remove to fresh air. If not breathing, begin artificial respiration. If breathing is difficult, give oxygen. Get medical attention immediately. Ingestion: If swallowed, do not induce vomiting. Give several glasses of water or milk. If vomiting occurs spontaneously, keep airway clear. Get medical attention immediately. SECTION VII - SPECIAL PRECAUTIONS HANDLING AND STORAGE PRECAUTIONS: Keep container tightly closed. Store in a cool, dry area protected from corrosion, Store away from other chemicals such as oxidizing agents, bases or metals. STEPS TO BE TAKEN IF MATERIAL SPILLS OR LEAKS: Evacuate area. Wear proper safety gear. For small spills, neutralize with soda ash and, if permitted, flush to sewer with large amounts of water. For larger spills, dike the liquid and recover as much as possible into polyethylene drums. Neutralize residue with soda ash and flush to sewer with large amounts of water, if permitted. Comply with applicable goverment regulations. WASTE DISPOSAL METHOD: htt p ://www. conelyco.cOnl/Pool-Spa/acid.htin 9/24/2008 Thatcher Company Material Safety Data Sheet Page 3 of 3 Hydrochloric acid is an EPA hazardous waste due to corrosivity and must be disposed of by an EPA approved hazardous waste facility. Comply with all local, state and federal regulations. SECTION VII - SPECIAL PROTECTION INFORMATION RESPIRATORY PROTECTION: Self- contained organic respirator should be available. VENTILATION: Use ventilation to maintain TLV below 5 ppm. EYE PROTECTION: Full face shield, chemical goggles. SKIN PROTECTION: Acid suit, rubber boots, impervious gloves. OTHER PROTECTIVE EQUIPMENT: As needed to avoid all bodily contact and breathing of vapor ACGIH = American Conference of Government Industrial Hygienist CL =Ceiling Level IARC = International Agency for Research on Cancer: Monographs OSHA = Occupational Safety and Health Administration N/A = Not Applicable NTP = National Toxicology Program: Annual Report on Carcinogens PEL = Permissible Exposure Level (OSHA) TLV = Threshold Limit Value (ACGIH) TWA = Time Weighted Average over 8 Hours STEL = Short Tenn Exposure Limit (ACGIH) ND - Not Determined This information is, to the best of our knowledge, accurate but may not be complete. THATCHER COMPANY furnishes this information in good faith, but without warranty, representation or guarantee of it's accuracy, completeness, or reliability. htt www . conelyco.com/Pool- Spa/acid.ht 9/24/2008 8UILDING F'ERt�il i u 3Ct(- i'c'st) INi ERWAl_ l t t:;i= g,% .: REVISION PROJECT 4' 207'f 3 OWNERS NAME Lunar" `Jail SITE ADDRESS: 142 S. Front�3re F'd SUBDIVISION Mountain View Lunar Vail is writing to verify that our pool a stor require the stornrt Spa maintenance plan and facilities will not age of n uriatic acid in excess of the allowed 375 per plan and will b gallons. Two thirty -five gallon tanks will be installed per periadir_.ally re - filled during roufine maintenance with minimal quantities brought on -site at the time of maintenance. K irrdesi r f`g E Rig❑ (on'zlie'n t 7 u)rt I I�'t Z1I)11N! 1_Uti81' \`811. t I 09/24/2008 Wed 13:13 Weaver General Construction Co. 303 - 789 -4310 ID: #1140 Page 1 of 1 Weaver General Construction Cc 3679 South Huron St., Suite 404 Englewood, CO 80110 (303) 789 -4111 Fax (303) 789 -4310 bruce(c)weaver com September 23, 2008 Weaver General Construction Co. needs your help. We are requesting a bid from you on Rockwell Hall Addition, located in Fort Collins, CO., at Colorado State University. Please have your scope letters to us by September 26 and your pricing by September 29 We bid the project on September 30, 2008, at 2:00 pm. Please pay attention to the bid form. The alternates will effect how you submit your bid. Value of this work is estimated at $ 15,000,000. Drawings may be viewed in our office. Please call Bud Burns, at our office, (303) 789 -4111, to setup a convenient time to view the drawings. Drawings, specs, addendums and pictures may also be viewed and /or downloaded online at www.weavergc com . Please email bruce@weaverqc.com so we can make the necessary arrangements to enable you to bid this project. Drawings may also we viewed on ISgFt and BBBid. Drawings may be purchased from Horizon Reprographics at (303) 623 -2035. Please visit our website to view the addendums, www,weoyergc_com. The use of email is encouraged. Please email questions and scope letters to bruce@we avergc.com If you are interested in the bid results, please email bruce@weavernc.com after the bid and we will gladly send you a recap of the results. Thank you. Section bidding: Name of Company: Bidding: yes no (please circle one) Phone Number: Sincerely, Weaver General Construction Co. Bruce M. Herman Chief Estimator ■ GENERAL CONTRACTOR WORK: I . ALL SITE WORK SHALL BE THE FULL RESPONSIBILITY OF THE GENERAL CONTRACTOR. INCLUDING 51TE PREPARATION AND EXCAVATION INCLUDING ANY TRENCHING FOR PLUMBING AND CONDUIT RUNS. ALL COSTS RELATED TO SPECIAL 50€L PREPARAT ION, STABILIZATION, FLASH COATS (IF REQUIRED), BACK FILL AND DRAINAGE AROUND THE POOL/ SPA, FOR SPECIAL REQUIREMENT5 OF THE PNEUMATICALLY APPLIED CONSTRUCTION METHOD 50 THAT THE STRUCTURAL DE51GN AND CONSTRUCTION RESULTS IN A COMPLETE SYSTEM WITHOUT ANY ADDITIONAL CO5T TO THE OWNER. 2. ALL BENCHMARKS AND LAYOUT POINTS. 3. ALL SITE WORK SHALL NOT BE STARTED UNTIL THE GENERAL CONTRACTOR HAS LOCATED ALL EXISTING UNDERGROUND UTILITIES, NOTIFIED THE LOCAL GAS, ELECTRICAL OR OTHER UTILITY COMPANIES. 4. IT IS THE FULL RESPONSIBILITY OF THE GENERAL CONTACTORTO MAINTAIN EXISTING SITE WORK CONSTRUCTION AND MAINTAIN EXISTING VEGETATION, PERTHE ARCHITECTURAL AND LANDSCAPE DRAWINGS. 5. GENERAL CONTRACTOR 15 RESPONSIBLE FOR PROVIDING FRESH WATERTO FILLTHE POOLAND/QR SPAS. G. GENERAL CONTRACTOR 15 RESPONSIBLE FOR MAINTAINING A CLEAN AND SAFE SITE. 7. GENERAL CONTRACTOR. 15 RE5PON515LE FOR SOILS CONDITIONS AND ANY UNDER DRAINAGE SYSTEMS REQUIRED. POOL AND /OP, 5PA5 SHALL NOT BE LOCATED WHERE GROUND WATER EX €5T5, ABOVE BOTTOM OF POOL DURING HIGH WATER TABLE, UNLE55 HYDRO STATIC RELIEF VALVES ARE INSTALLED AT THE LOW POINT IN THE POOL, AND ALL PUMPING OR DE- WATERING NECESSARY TO KEEP EJ(CAVATION5 FREE FROM WATER. POOL CONTRACTOR SHALL BE NOTIFIED If HYDRO STATIC RELIEF VALVES ARE REQUIRED, PRIOR TO INSTALLATION. SOILS REPORT REQUIREMENT5 5HALL BE FOLLOWED. 8, ALL BACK FILL WORK PER 501L5 AND STRUCTURAL RECOMMENDATIONS. 9. ANY OVER EXCAVATION AND PLACEMENT OF STONE OR COMPACTED ENGINEERED FILL REQUIRED ELSEWHERE BY THE DOCUMENTS FOR BUILDING STRUCTURES AND COMPONENTS, SHALL ALSO APPLY TO THE POOL AND SPAS AND BURIED PIPING. W15HA / OSHA REGULATIONS SHOULD BE ADHERED TO, 10. PROVIDE THAT ALL 50€L5 ENGINEERING RECOMMENDATIONS HAVE BEEN EXECUTED. GENERAL CONTRACTOR 15 TO PROVIDE COMPACTED STRUCTURAL FILL, WITH CLEAN GRAVEL AS REQUIRED BY SOILS REPORT. 1 1 . PROVIDE THAT ALL STRUCTURAL ENGINEERING RECOMMENDATIONS HAVE BEEN EXECUTED. 12. PROVIDE AND INSTALL ANY WATERPROOFING 5Y5TEM5 OUTSIDE OF POOL STRUCTURE IN REGARDS TO STRUCTURAL 5LAB PENETRATIONS AND OR ARCHITECTURAL BUILDING PENETRATIONS. 13. PROVIDE AND INSTALL ALL CHLORINE RESISTANT SEALANT AND EXPANSION JOINTS OUTSIDE THE POOL STRUCTURE WITHIN AREAS OF POOLS / SPAS OR DECK, INCLUDING BACKER RODS, PRIMERS AND ACCESSORIES REQUIRED. 14. PROTECT ALL TILE SURFACES AND/ OR FIN15HE5 FROM CONCRETE OR PAINT SPLASH OR DAMAGE UNTIL ACCEPTED BY OWNER. 15. IF SAFETY FENCING 15 REQUIRED, THE GENERAL CONTACTOR SHALL BE RESPONSIBLE FOR THE REQUIREMENTS, LOCATION AND CONSTRUCTION. IF HANDRAILS OR HANDICAP RA.MP5 OR UFT5 ARE REQUIRED, THE GENERAL CONTRACTOR 15 RESPONSIBLE FOR INSTALLATION OF DECK ANCHORS WITH BONDING, AS REQUIRED. IC. ALL STATE AND LOCAL DEPARTMENT OF PUBLIC HEALTH CONSTRUCTION PERMITTING. 17. ALL STATE AND LOCAL BUILDING DEPARTMENT CONSTRUCTION PERMITTING. 18. IT 15 THE FULL RESPONSIBILITY OF THE GENERAL CONTRACTORTO MAINTAIN ALL NECESSARY BARRICADES, SIGNS, LIGHTS, FLARE5 AND SAFETY EQUIPMENT AS REQUIRED TO PROTECT WORKERS AND THE PUBLIC, 19. PROVIDE AND MAINTAIN PROPER SHORING AND BRACING FOP. EXISTING UTILITIES, 5EWER5, BUILDING FOUNDATIONS, OR ANY BUILDING COMPONENTS. 20. PROVIDE MECHANICAL/ POOL EQUIPMENT ROOM WITH NECESSARY PUMP HOUSEKEEPING PADS AND METAL EQUIPMENT RACKS AS REQUIRED. STRUCTURAL NOTES: I , STRUCTURAL ENGINEER SHALL PROVIDE ALL BUILDING AND SITE STRUCTURAL IMPROVEMENTS REQUIRED FOR POOL AND SPA CONSTRUCTION. 2. SOIL SHALL HAVE A MINIMUM BEARING VALUE OF 1000 P5F, CONCRETE SHALL BE PLACED AGAINST UNDISTURBED 501L OR BUILDING DEPARTMENT APPROVED 90 % COMPACT FILL. TH15 PLAN 15 NOT SUITABLE WHERE POTENTIAL EXISTS FOR DIFFERENTIAL MOVEMENT FROM D1551MILAP1501L CONDITIONS UNDER POOL, SUCH AS CUT -FILL TRANSITIONS. 3, ALL REINFORCING STEEL SMALL BE DEFOP.MEC 8AR5 AND CONFORM TO A5TM AG 15 GRADE 40 FOR #4 BARS. SPLICES TO BE LAPPED 22" MIN; MIN. CLEARANCE BENvTEN PARALLEL BAR5 15 21/2". 4. GROUNDING PER N.E.C. /C.E.0 OF THE 5TRUCTURAL REINFORCING MUST BE INSTALLED PRIOR TO PLACEMENT OF CONCRETE. 5. SHOT CRETE (GUNITE) TO BE IN CONFORMANCE WITH UBC /IBC SECTION 1914 AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 P5€ AT 28 DAYS, AND CONSIST OF I PART PORTLAND CEMENT TO 4 1 /2 PART5 SAND t 3 GALLONS OF WATER PER SACK OF CEMENT. G. CEMENT SHALL CONFORM TO UBC/ IBC STD 19 -1, A5TM 150.G. 7. USE TYPE V PORTLAND CEMENT IN AREAS WITH MORE THAN 2 % SULFATE CONTENT AND AS DIRECTED BY LOCAL BUILDING CODES. 8. KEEP CONCRETE DAMP CONTINUOUSLY FOR 14 DAYS. 9. ALL INTERIOR SURFACES OF POOL AND SPA SHALL BE COATED WITH A WATERPROOF PLASTER FINISH. CONCRETE WORK: I . ALL 51TE CONCRETE WORK SMALL BE THE FULL RE5PON51511.ITY OF THE CONCRETE CONTRACTOR. 2. PROVIDE ALL BLOCK OUT5 AS REQUIRED. 3. PROVIDE ALL EQUIPMENT HOU5EKEEP€NG PADS AS SHOWN ON DRAWINGS, COORDINATE WITH MECHANICAL / PLUMBING FOR REQUIRED DRAINS AND SLOPES. 4. IF CHEMICAL ROOMS ARE REQUIRED, PROVIDE 4" H. CURB CONTINUOUS AT BASE OF ROOMS (UNDER DOORS AND WALLS). 5. PROVIDE ALL 5 RUCTURAL CONCRETE WORK OUTSIDE OF POOL SHELL PER 5TKUCTURAL ENGINEER. G. PROVIDE ALL NON STRUCTURAL CONCRETE WORK OUTSIDE OF POOL SHELL, PER ARCHITECTURAL / LANDSCAPE DRAWINGS. 7. ALL DECK AND COPING WORK (MAY BE COVERED UNDER MASONRY SUB CONTRACTOR.) 8, INSTALL ALL ANCHORS, SOCKETS, IN5ERT5 AND HANDRAIL /GRAB BAR GOODS THAT ARE NOT I- OCATED WITHIN THE POOL SHELLS, PROVIDED AND COORDINATED WITH POOL CONTRACTOR. 9. COORDINATE WITH POOL CONTRACTOR AND INSTALL ANY DECK 5URFACE DEPTH MARKERTILE5 / IMBEDS AND 'NO DIVING' TILES / IMBEDS, PROVIDED BY POOL CONTRACTOR. 10. PROVIDED ALL PIPE SLEEVES AND INSTALL SLEEVES IN FORMS FOR OTHERS CONTRACTORS AT THE PROPER LOCATIONS. ANY STONE / TILE WORK VENEER WORK OUTSIDE OF POOL SHELL, PER ARCHITECTURAL DRAWINGS O COORDlNATION NOTES ELECTRICAL WORK: I . ELECTRICAL CONTRACTOR 15 RESPONSIBLE FOR ALL ELECTRICAL CONNECTIONS, EQUIPMENT, HOOK -UPS, WIRING AND CONDUIT. ALL WIRING TO CONFORM TO THE NATIONAL ELECTRICAL CODE AND STATE ELECTRICAL CODES. 2. POOL CONTRACTOR SHALL PROVIDE THE FILTER PUMPS, MOTORS, AUTO -FILL 501 FNOID5 AND PRE -WIRED CONTROL ASSEMBLIES AS CALLED FOR ON PLANS AND OR REQUIRED BY POOL SYSTEMS EQUIPMENT MANUFACTURER. THE ELECTRICAL CONTRACTOR 5HALL INSTALL AND WIRE ALL ELECTRICAL EQUIPMENT FURNISHED BY THE POOL CONTRACTOR AND SHALL PROVIDE ALL DISCONNECT SWITCHES, EMERGENCY SHUT OFF SWITCHES, PANELS, GROUNDING, CONDUIT AND MOTOR STARTERS OR RELAYS IF REQUIRED, AS INDICATED OR REQUIRED BY CODES. 3. THE ELECTRICAL CONTRACTOR 5HALL PROVIDE POOL SHELL GROUNDING PER N.E.C. ARTICLE G80. 4. PROVIDE AND INSTALL ALL POWER AND CONTROL WIRING AS INDICATED BY SCHEMATIC DETAIL OF DRAWINGS AND ELECTRICAL COORDINATION TABLE. 5. ALL ELECTRICAL DISCONNECTS, SWITCHES, MAGNETIC STARTER, STOP -START STATIONS, RECEPTACLES AND RELAYS SHALL BE SPECIFIED BY C51- DIV15ION I G WORK, AND COORDINATED WITH THE POOL CONTRACTORS WORK. FURNISH AND INSTALL ALL CONDUIT, WIRING FOR DISCONNECTS, MAGNETIC STARTERS, STOP -START STATIONS, RELAYS AND CONTROLS AS REQUIRED AND INCLUDING THE FOLLOWING PUMP MOTORS, ETC... G. FURNISH AND INSTALL ALL OUTLETS AND SERVICE NEEDED FORTHE CHEMICAL FEED AREA EXHAUST FANS, CHLORINE AND CHEMICAL FEED PUMPS, AUTOMATIC WATER LEVEL CONTROLS AND 50LENOID VALVE, WATER CHEMICAL ANALYZER EQUIPMENT (INCLUDING TELEPHONE TERMINALS BY CODE) AND RELATED CONTROLLED PUMPS, FLOW SWITCHES, AS WELL AS ADEQUATE LIGHTING IN THE MECHANICAL / POOL EQUIPMENT AND RELATED 5PACE5 IN ACCORDANCE WITH THE SPECIFICATIONS AND AS SHOWN ON THE DRAWINGS. INTERLOCK ALL CHEMICAL FEED EQUIPMENT AS SHOWN ON THE ELECTRICAL CONTROL SCHEMATIC. 7. ELECTRICAL AND BONDING CONNECTIONS FOR THE STEEL CAGE OF POOLS, ANY HANDRAILS, ALL EQUIPMENT, INCLUDING LIGHTS (NEED CONDUIT RUN FROM POOL UGHT TO DECK B0X AND THEN TO EQUIPMENT ROOM) AND ALL NECESSARY OUTLETS FOR EQUIPMENT. 8. INSTALLATION OF ANY POOL OR SPA LIGHTS WITH GROUNDING WIRES. POOL CONTRACTOR WILL SUPPLY POOL/ SPA LIGHTS. 9. ALL LIGHT RUNS NEED TO GO FROM SHELL LIGHT NICHE TO DECK BOX LOCATED AT LEAST 18" ABOVE WATER LEVEL. THEN FROM THE DECK BOX TO THE CONTROL BOX, 10. ALL CONDUIT RUNS FOR HIGH VOLTAGE, INCLUDING CONDUIT FROM POOL UGHT NICHE TO DECK BOX JUNCTION TO EQUIPMENT ROOM. 1 1 . ALL GROUNDING AND BONDING OF ALL NECESSARY WATER FEATURES OR ITEMS IN OR NEAR ALL WATER FEATURES, PER LOCAL AND NATIONAL ELECTRICAL CODES. 12. NO OUTLETS LOCATED WITHIN 10 FEET OF POOL. ALL OTHER OUTLETS SHALL BE G.F.I. PROTECTED AS REQUIRED, REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS AND SPECIFICATIONS. 13. PROVIDE A5515TANCF TO POOL CONTRACTOR AT TIME OF START UP, MECHANICAL/ PLUMBING WORK: 1. PROVIDE FOR FRE5H AIR VENTING / AIR HANDLING (AND HEATING OR COOLING AS REQUIRED) IN MECHANICAL ROOMS, POOL/ SPA EQUIPMENT ROOMS, CHEMICAL STORAGE * INDOOR POOL/ SPA FACILITIES. 2. HEAT EXCHANGERS NEED SPECIFIC Btu REQUIREMENTS PROVIDED THROUGH HOUSE BOILER SYSTEM W/ ZONE VALVE REQUIRED. PROVIDE 24V, ALL BOILER CONTROL WIRING FROM CONTROL THERM05TAT (DRY SWITCH) TO 5011 ER CONTROLS. 3. PROVIDE AND INSTALL BOILER 5Y5TEM5. MECHANICAL CONTRACTOR SHALL INSTALL ALL GAS PIPING AND VENTING, INCLUDING EXHAUST, COMBUSTION AND MAKEUP AIR VENTING. GAS HEATERS NEED SPECIFIC GAS AND VENTING REQUIREMENTS AND WILL NEED TO BE INSTALLED PER MANUFACTURER REQUIREMENTS. 4. PROVIDE AND INSTALL HEATER VENTING, AND COMBUSTION AIR., IF NECESSARY. 5. ALL GAS PIPING, IF NECESSARY. G. PLUMBING CONTRACTOR SHALL PROVIDE FRESH WATER CONNECTION TO POOL, AND WATTS WATER CONNECTION FROM FILTER, INCLUDING BACK FLOW PREVENTER (SUPPLIED TO POOL MECHANICAL ROOM WITH THREADED ADAPTER FOR POOL CONTRACTOR TO HOOKUP TO POOL PLUMBING) AS SPECIFIED AND SHOWN ON DRAWINGS. 7. FLOOR DRAINS: AT LEAST ONE TO SANITARY SEWER FOR ANY M015TURE FROM EQUIPMENT AND MAINTENANCE IF A :SAND FILTER 15 USED A DRAIN TO SANITARY SEWER FOR BACK WASHING (TO HANDLE 140 GPM BY GRAVITY). FURNISH AND INSTALL THE FILTER BACKWASH FLOOR SINKS AND / OR5TANDPIPE5 AND LINE BEYOND AIR -GAP TO WASTE. 8. FURNISH AND INSTALL H05E BI135 IN MECHANICAL/ POOL EQUIPMENT ROOMS AND IN DECK AREAS AS SHOWN IN DRAWINGS, OKA5 REQUIRED. 9. FURNISH AND INSTALL ALL'DECK DRAINS' TO WASTE AS REQUIRED BY CODE. PROVIDE FOR ADDITIONAL DECK DRAINAGE AS SHOWN ON ARCHITECTURAL AND LANDSCAPING DRAWINGS. 10. EYE WASH OR EMERGENCY SHOWER STATION SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR, THEY SHALL BE INSTALLED PER 05HA AND AN51 REQUIREMENTS. 1 1. PLUMBING CONTRACTOR SHALL PROVIDE FRESH WATER CONNECTION TO POOL, AND WASTE WATER CONNECTION FROM FILTER, INCLUDING BACK FLOW PREVENTER (SUPPLIED TO POOL MECHANICAL ROOM WITH THREADED ADAPTER FOR POOL CONTRACTOR TO HOOKUP TO POOL PLUMBING) AS SPECIFIED AND SHOWN ON DRAWINGS. 12. FURNISH AND INSTALL RPZ BACK FLOW PREVENTER AND ISOLATION VALVES FOR DOMESTIC FRESH WATER SUPPLY. 13. FURNISH AND INSTALL FRESH WATER AND WASTE WATER., PLUMBING TO MECHANICAL/ POOL EQUIPMENT ROOM. 14. A5515T POOL CONTRACTOR AT TIME OF START UP. LANDSCAPING WORK: I . ALL LANDSCAPING WORK SHALL BE THE FULL RE5PON5113ILITY OF THE GENERAL CONTRACTOR. w m a l l r w 1 srelmal ARCH ARCHITECT MIN MINIMUM A5TM AMERICAN STANDARD TE5TING AND MC MECHANICAL CONTRACTOR 3' -G" MATERIALS NEC NATIONAL ELECTRICAL CODE BTU BRITISH THERMAL UNITS 05HA OCCUPATIONAL SAFETY HAZARD BTUH BRITISH THERMAL UNITS PER HOUR TURNOVER: A550CIATION ELEC ELECTRICAL PC POOL CONTRACTOR EC ELECTRICAL CONTRACTOR P5F POUNDS PER SQUARE FOOT FT FOOT P51 POUNDS PER SQUARE INCH GC GENERAL CONTRACTOR REQ REQUIRED ?SQ FT SQUARE FEET GFI GROUND FAULT INTERRUPTER TBD TO BE DETERMINED GFCI GROUND FAULT CIRCUIT INTERRUPTER TDH TOTAL DYNAMIC HEAD GPM GALLONS PER MINUTE TYP TYPICAL HP HORSEPOWER UBC UNIFORM BUILDING CODE IBC INTERNATIONAL BUILDING CODE V VOLT MECH MECHANICAL W WATT 1 \� 1 . OWNER TO KEEP DAILY RECORDS ON POOL OPERATIONS AND MAINTENANCE TO BE SUBMITTED AS REQUIRED TO THE HEALTH DEPARTMENT WHILE THE POOL 15 IN OPERATION. 2. AN APPROVED DPD TEST KIT CONTAINING ALL COLOR STANDARDS AND MEANS FOR DETERMINING TOTAL ALKALINITY, pH, CHLORINE, CYAN URIC ACID LEVELS AND SALT CONTENT. (�� MAHNFENANCE NOTES I . ANY STRUCTURAL OR 501 L5 ENGINEERING 2. ANY CORE DRILLING AND /OR ACCESS THROUGH FOUNDATIONS. 3. ANY EXCAVATION. 4. ANY TRENCHING, INCLUDING SAND BEDDING. 5. ANY BACK FILLING. G. ANY HIGH VOLTAGE WIRING, INCLUDING HIGH VOLTAGE CONDUIT INSTALLATIONS, BONDING (POOL STEEL AND ALL EQUIPMENT) AND INSTALLATION OF ALL HIGH VOLTAGE WIRING TO ALL POOL/5PA MECHANICAL. (INCLUDING LIGHT CONDUIT, POOL COVER AND J- BOXES). 7. ANY BOILER INSTALLATION, ALL BOILER PLUMBING, ANY COPPER PLUMBING, GAS PLUMBING, VENTING AND CONTROLS (EXCEPT FOR POOL/SPA TEMPERATURE CONTROL WHICH WILL ONLY BE A DRY SWITCH (NO 24V POWER PROVIDED). 8. ANY FRESH WATER PLUMBING FOR AUTO -FILL AND HOSE BIB, INCLUDING BACK FLOW PREVENTOR5. 9. ANY MECH. ROOM DRAINS, INCLUDING SEWER DRAIN AND FILTER BACKWASH DRAIN. 10. ANY MECH. ROOM VENTING, INCLUDING MAKE -UP AIR, COMBUSTION AND EXHAUST VENTING. 1 1. ANY POOL / SPA COPING. 12. ANY BUILDING OR DECK +)E51GN, ENGINEERING OR INSTALLATION, INCLUDING ALL EXPAN5ION JOINTS AND DECK DRAINS. 13, ANY DECK ANCHOR INSTALLATION FOR HANDRAILS - COORDINATE WITH POOL CONTRACTOR. 14. COORDINATE ANY POOL/ SPA SKIMMER EXTENSION COLLAR INSTALLATION WITH POOL CONTRACTOR PRIOR TO DECK INSTALLATION. 15. ANY WINTER TENTING AND HEATING -If AMBIENT AIR TEMPERATURE 15 BELOW GOOF. I G. ANY UP- CHARGES ON TILE OVER $5.00 /5Q. FT. TILE ALLOWANCE. 17. COLORADO POOLSCAPE5 OR ANY OF I75 REPRESENTATIVES SHALL NOT BE HELD LIABLE OR RESPONSIBLE FOR ANY LIFE SAFETY ISSUES REGARDING THE OPERATION OF THE POOL AND /OR SPA OR POOL FACILITIES. 18. LOCATION OR REQUIREMENTS OF REQUIRED FENCING FOR POOL AND/ OR SPA AREA. 19. DIVING BOARDS ARE NOT PERMITTED ON THI5 POOL /SPA. 1. ANY QUESTIONS OR DISCREPANCIES SHALL BE VERIFIED PRIOR TO THE START OF ANY CONSTRUCTION. 2. POOL CONFIGURATION SHALL MEET PUBLISHED STANDARDS OF THE COLORADO DEPARTMENT OF HEALTH AND SWIMMING POOL REGULATIONS. 3. GENERAL CONTRACTOR SHALL COORDINATE ALL ELEMENTS WITH ALL OTHER TRADES. 4. SEE CIVIL DRAWINGS FOR SITE UTILITIES AND SUBSURFACE DRAINAGE. 5. DECK SHALL BE NON. SLIP FINISH, SLOPE DECK AWAY FROM POOL TO AREA DRAINS. G. DEPTH MARKERS: (IF REQUIRED) A. DEPTH MARKERS SHALL BE G" MIN. HIGH NUMERALS ON POOL DECK AND 4" AT THE POOL WALL WITH A MAXIMUM OF 25' INTERVALS. "NO DIVING" MARKERS WILL BE THE SAME. B. POOL DEPTH MARKERS ON THE FACE OF THE POOL WALL SHALL BE LOCATED AT OR ABOVE THE WATER SURFACE OF THE SWIMMING POOL IN PLAIN VIEW TO BATHERS. C. DEPTH MARKERS SHALL BE OF COLOR CONTRASTING WITH BACKGROUND COLOR. 7. ALL POOL STEPS AND 55%T EDGE5 SHALL HAVE A MIN. OF 2" TILE BAND OF CONTRASTING COLOR. 8. ALL JUNCTIONS BETWEEN ::SWIMMING POOL WALLS AND THE SWIMMING POOL FLOOR SHALL BE COVED. 9. ALL WATER INLETS SHALL BE A MINIMUM OF 15' 1NTERVAL5. JO, IF TOILET/ DRESSING ROOMS ARE INCLUDED, THEY SHALL. HAVE NON SLIP FLOORING. 1 1 . EMERGENCY 5HUTOFF SHALL BE LOCATED IN CLOSE PROXIMITY AND VISIBLE FROM POOL /5PA. �PLAN NOTF-5_ POOL SPECIFICATIONS BATHERS: 8 SIZE: EARTH 8' -O" x 8' -0" DEPTH: CONC"Zi'E 3' -G" PERIMETER: 32' - 4 " SURFACE: AUTO FILL G5.34 5Q. FT. CAPACITY. I ,100 GALLONS TURNOVER: 15 MINUTES GPM: 7G GPM @ GO TDI FITTINGS: MAIN DRAINS, SKIMMERS, INLETS ALL OTHER PVC FITTING5 (T.B.D.) LIGHT: � LIGHTS WILL HAVE STANDARD STAINLESS STEEL FACE RING POOL WALL SURFACE: cd SGM PEARL BRITE (WHITE) WATER LINE TILE: co .� 0 LO G" WATER LINE TILE BAND STEP EDGE * BENCH EDGE TILE: 2" x 2" CERAMIC TILE BAND, CONTRASTING COLOR COPING: P COPING AND ANY EXTERIOR VENEER BY G.C. DECKING: 'd L ALL DECKING, EXPANSION JOINTS 4� DECK GUTTERS T.B.D. FURNISHED cd INSTALLED BY G.C. O SPA SPECIFICATIONS ti rZ POOL COPING a -. r`ff EARTH CONC"Zi'E f STRUCTURE SKIMMER AUTO FILL ran HYDRO THERAPY JETS .... j 10 SYMBOLS 0 00 CIRCULATION PUMP G WATER INLET BALL VALVE Lm BALL VALVE CHECK VALVE BUTTERFLY VALVE µ OZONE MAZZI I NJ SOLENOID VALVE MOTORIZED COMPOOL VALVE PEOPLE THE FOLLOWING LIFESAVING EQUIPMENT SHALL BE PROVIDED BY THE POOL CONTRACTOR (UNLESS SHEET 5HEET TITLE OTHERWISE STATED) AND SHALL BE ACCESSIBLE WITHIN THE CONFINES OF THE POOL AREA. NUMBER PROVIDE 1 UNIT OF LIFESAVING EQUIPMENT PER 2,000 5Q. FT. OF WATER SURFACE AREA OR FRACTION THEREOF: PLO. I 5PECIFICATION5 * GENERAL NOTES I . U.S. COAST GUARD APPROVED RING BUOY WITH A LENGTH OF ROPE AT LEAST EQUAL TO THE PL I 51TE PLAN * PIPING LAYOUT MAXIMUM WITH OF THE POOL. 2. A SHEPHERD'S CROOK AT LEAST I GIN LENGTH. PL I . I POOL / 5PA PLAN 3. FIRST AID KIT MUST MEET 0.5.H.A. REQUIREMENTS AND CONTAIN THESE ITEMS: PL I . 2 POOL / 5PA SECTIONS 0 2 UNITS - I" x 3" ADHESIVE COMPRESS 0 2 UNITS - 2" x 3" NON GAUZE PADS PL 1.3 POOL / 5PA DETAILS 0 2 UNITS - I " x 5 YARDS STRETCH GAUZE BANDAGE 0 2 ROLLS -Y" x 10 YARDS ADHESIVE WATERPROOF TAPE PL2.1 EQUIPMENT LAYOUT 4 EQUIPMENT 5CHEDULE5 0 1 UNITS - 4 OZ. OPHTHALMIC IRRIGATING SOLUTION 0 2 PAIRS - SURGICAL 5C155OR5 SHEARS PL2.2 EQUIPMENT COORDINATION SCHEDULE.5 0 3 UNITS - LATEX GLOVES 0 2 POCKET MA5K5 AND FACE SHIELDS EACH PL2.3 EQUIPMENT SCHEMATICS 0 2 UNITS - 3" x 3" GAUZE PADS 0 2 ANTISEPTIC OINTMENT PACKETS PLS. I POOL / 5PA 5TRUCTURAL PLANS 4. SPINE BOARD WITH HEAD IMMOBILIZING AND RESTRAINT STRAPS. 5, EMERGENCY PHONE - BY GENERAL CONTRACTOR PL3.2 =POOL / 5PA STRUCTURAL SECTIONS 7 SAfETA` EQUIPMENT NOTES aH EET INDff X We • z A P;) 11 _ovLi o inspection and Compliance to opted Builizin cud mu C es in Plan MU --o e By D a. LLI LL LL b C> ti s GO C\2 c , 0 f� � �v tC$ cd ` co .� 0 LO r All .we, (` P � 1 'd L � 4 cd 0 0 9J 0 We • z A P;) 11 _ovLi o inspection and Compliance to opted Builizin cud mu C es in Plan MU --o e By D a. LLI LL LL b C> ti s GO ti 1 Flp� S T�IG Nc T OPTIONAL WALL JET AIR LOOr 0. 11 �, • � a► co !i • cn 0.4 A i 06 •i M Xg C) M 6 tu p.. 1 REVIE B Y S. 4k °4 SAFEbuilt Colorado S 1TE PLAN SCALE: 118 " = I' -O" NEED TO SITE VERIFY LOCATIONS WITH ARCHITECT FOR: - SPA JET ACTUATOR SWITCH - EMERGENCY SHUT -OFF SWITCH - ELECTRICAL JUNCITON BOXES - SPA AIR HARTFORD LOOP TERMINATION - SIGNAGE - SHEPARDS CROOK AND RING BODY - HANDICAP POOL/SPA ACCESS P LAN .. ,. DIMENSIONS 1► LAYO PROJECT NO, 20713 155UET DATE 5D 50% CD 3 -18 -08 00% CD 4-11-05 95%CD 4-14-08 100% CD 5 -2 -08 REV A G -30 -08 REV 6 7 -15 -08 f J -PDX BY G.C. (FAUX PAINT FACE TO MATCH STONE BY G.C.) I " ELECTRICAL CONDUIT TO ELECTRICAL PANEL, BY E.C. VALL FINISH MATERIAL AND WALL BY G.G. I" ELECTRICAL CONDUIT FROM SPA BY E.C. OPTION ► J­DYA HARTFORD AIR LOOP WITH INSECT SCREEN ON FACE (FAUX PAINT TO CONCEAL IN FINISH STONE, PY G.C.) WALL FINISH MATERIAL AND WALL BY G.C. SPA JET AIR LINE MUST BE G" OVER COPING ELEVATION, TERMINATION POINT NOT FURTHER THAN W -0° a 0 5 = lu MI CL/ F , DRAIN TO SITE DRAINAGE, BY G.C. 2" CONDUIT FOR HYDRAULIC H05E 2 II UMOV BL �,�� fr > PL3.2 PL I.3 PL?.2 8 1.0 1, 1 21-411 ALL D IMENSIONS ARE TO fAC`E , ftr,5" 5TEEL EXIT GRAII BARS , -pil QH1PhAFt\1T lrnr'HFnHi F -Jiff 5TAI N LE55 STEEL 'DrA 'r I LLIJ PLI .3 1 6 .41121 DETAIL I / PLI.3 HANDRAILS SKIMMER, REFER TO EQUIPMENT co SCHEDUL SEE DETAIL Of P1 I DETAIL 4 / PL I V ALL DIMENSIONS ARE TO FACE Of FOOL 15FA P1 AN L—r 5CALE: 1/2 " = 1' -0 5 PL 1.2 FACE Of TIL DRAINS 155UE REFER TO 6 EQUIPMENT ri MAIN 150 %a CD SCHEDULE 90% CD I � 2" BENCH EDGE 95%CD TI LE, SEE DETAI 4 Zk PL 1.3 REV A 00 C, Z6� "JI o co 0 0 0 0 B - - 0 Q) Z 0 Q z C? U—J 0 I > z F , DRAIN TO SITE DRAINAGE, BY G.C. 2" CONDUIT FOR HYDRAULIC H05E 2 II UMOV BL �,�� fr > PL3.2 PL I.3 PL?.2 8 1.0 1, 1 21-411 ALL D IMENSIONS ARE TO fAC`E , ftr,5" 5TEEL EXIT GRAII BARS , -pil QH1PhAFt\1T lrnr'HFnHi F -Jiff 5TAI N LE55 STEEL 'DrA 'r I LLIJ PLI .3 1 6 .41121 DETAIL I / PLI.3 HANDRAILS SKIMMER, REFER TO EQUIPMENT co SCHEDUL SEE DETAIL Of P1 I DETAIL 4 / PL I V ALL DIMENSIONS ARE TO FACE Of FOOL 15FA P1 AN L—r 5CALE: 1/2 " = 1' -0 5 PL 1.2 FACE Of TIL 2" STEP EDGE TILE, 5EE DETAI 4 / PL . 3 ` -HYDROTHERAPY JETS TYPICAL I I Of 12, REFER TO EQUIPMENT SCHEDULE DRAINS 155UE REFER TO 5D EQUIPMENT ri MAIN 150 %a CD SCHEDULE 90% CD I � 2" BENCH EDGE 95%CD TI LE, SEE DETAI 4 100% CD PL 1.3 REV A 00 REV B o co 0 0 0 0 2" STEP EDGE TILE, 5EE DETAI 4 / PL . 3 ` -HYDROTHERAPY JETS TYPICAL I I Of 12, REFER TO EQUIPMENT SCHEDULE REM-,kAfF,D BW S E P 2 4 SAFEbuillt Colorad OPEN KEY 5LOT5 TO REMOVE COPING PANELS BY G.C. C.I.P. CONCRETE BY G.C. CONCRETE TO MATCH COPING AT FACE Of SITE STEP REMOVABLE COPING 5ET IN ALUMINUM PAN BY G.C. 1 1 -1 111 2 N I 5TAINLE55 5TEFL/ ALUMINUM BRACKET5, EACH 51DE, BY G.C. METAL PLATES IMBEDS L i TILE TOP OF WALL t UNDERSIDE Of EAM L AUTO COVER MFCHANI5M ENLACED COVER SECTION 5CALE: 1 1/2"=P-0 z� Z& 130 NOTE: f OR STRUCTURAL SEE DETAIL PL3.1 PROJECT NO. 20713 155UE cc 5D 0 Lo 150 %a CD �-q Q) 0 CSa 90% CD Q) u Z 95%CD 4-14-08 100% CD c d 0 Lo 0 REV A 00 REV B o co 0 0 0 0 B - - 0 Q) 0 U—J I > 0 (s) 0 7 Lu C) __j 0 Z REM-,kAfF,D BW S E P 2 4 SAFEbuillt Colorad OPEN KEY 5LOT5 TO REMOVE COPING PANELS BY G.C. C.I.P. CONCRETE BY G.C. CONCRETE TO MATCH COPING AT FACE Of SITE STEP REMOVABLE COPING 5ET IN ALUMINUM PAN BY G.C. 1 1 -1 111 2 N I 5TAINLE55 5TEFL/ ALUMINUM BRACKET5, EACH 51DE, BY G.C. METAL PLATES IMBEDS L i TILE TOP OF WALL t UNDERSIDE Of EAM L AUTO COVER MFCHANI5M ENLACED COVER SECTION 5CALE: 1 1/2"=P-0 z� Z& 130 NOTE: f OR STRUCTURAL SEE DETAIL PL3.1 PROJECT NO. 20713 155UE DATE 5D 1 7-0 150 %a CD 3-15-08 90% CD 4-11-0 95%CD 4-14-08 100% CD 5-2-05 REV A G-30-08 REV B 7-15-08 5TAINLE55 STEEL EXIT GRAB BARS, REFER TO EQUIPMENT SCHEDULE SEE DETAIL I /PLI.3 COVER, MECHAN15M BY G.C. CONCRMTO MATCH COMNG--x mi nim P I WA5 5TrF5 .. == =7 — �)RMTKTO EQUIPMENT 5CHEDULE. 5EE DETAIL I)FLI.3 SEE DETAIL 2 / PL 1.1 FOR ENLARGED COVER BOX 'A 1 2 MAN51 G.C. OT5 TO REMOVE COPING .c. JOINT, BY G C. A 2 PER COPING PANEL DECKING AND UNDER, LAYMENT A V AB - LE COPING TO ACCE55 T.r G.C MECHAI415M BY G.C. TI .3 PAVING 7 LE TOP OF WALL INTO COVER BCD(* UNDMIDE OF BEAM A A2 AAAAAAAA Ak/AkAL A�AIAA,IAkl &.&LWZjr 1,kk1Ak1,&A1AAA A I A I A I A A A A A Lk A JA A 1A A JA Al A A A 5TOAINLE55 STEEL F M A DED DED ANC"OR STUDS EACH 51DE POOL EDGE TILE, REFMT0 POOL SPECIFICATIONS L L r -MAIN SUCTION DRAINS REFER, TO EQUIPMENT SCHEDULE N . ... . .... �.::' V FL1.3... .. .. . -& T.O. COK 8205'-G" S 1 (7- 1 Ok S TRUCTURAL \ KU FILL BY . . --------- - DRAIN MAT SLOPE TO DRAIN -. RIGID. CELLULAR POLY5rYRENE, A5TM 6817 SEE DETAIL 2 PL 1.1 FOR SUMP PUMP, BY G.C. !-J/ 1.15 LB/M DEN51TY OR GREATER. BY G.C. ENLARGED COVER 13OX POOL 5ECTIO` 0 (D CALE: 1/2'- 1-0` I= SPA 114 rej r «a V 10 0 im DRAIN MAT SLOPE TO DRAIN SUMP PUMP, BY G.C. — WAN51ON JOINT, BY G.C. /–IMICKNAMMAL EDGE TILE REITK TO DEPTH MARKERS. L PING BY G.C. —POO SEE DETAIL 9 ACE` SKIMMER SPECI PL I.3 T.O. PAVING 8212'-U 1-1 2 = 4 POOL LIGW PIM TO EWIPMENT SCHEDULE ............. MAIN 5LICTION A' DRAINS " T.O. CON z 8205' -6" RIGID. CELLULAR FOLYWYME. A5TM 6817 1.15 LBO" DEN51TY OR GREATER. BY G.C. DRAIN MAT SLOPE TO DRAIN SUMP PUMP, BY G.C. STRUCTURAL FILL BY 1 'A mow TYP. 5PA JET AIR LINE MUST BE JGID, CELLULAR AT LEA5T Go OVER COPING OLY5TYRENE, A5TM ELEVATION, TERMINATION POINT NOT B17 1.15 LB/FT3 FLIMER. THAN 2a-0" IEN51TY OR GREATER, BY X. • 111117 !1111� 'Ask w 9 T.O. PAVING 8212'-A 91 9 C\2 C\2 00 0 cd �L4 ;-4 0 ' 0 CSC P R 0 0 P-4 CO "I A, 0 0 L6 0 0 '-q 0 0 �I 4 Z 0 IL I < 0 2 - R E Vil 'Vti D B Y 5 Erl 2 4 SAFE built Colorado PROJECT NO, 20713 155UE DATE 5D 1-17-08 50% CD 3-15-08 90% CD 4-1 1-08 95 o D 4-14-05 100% CD 5-2-05 REV A G-30-08 REV F3 7-15-08 L • PREFA EQL u TOOL EXIT l SCALE: 3/4 "= I' -O" n M- i � d t-- eu NOTE: CLEAR DECK SPACE OF 30W. x 48" FORWARD FROM A LINE LOCATED 12" BEHIND THE REAR OF THE SEAT u tp 4a {3) B DECK ANCHORS BY G.C. REFER TO DETAIL 4/ PL 1 .2 FOR ANCHOR ENLARGEMENT G.C. 51ON JOINT" EXPANSION JOINT BY G.C. {3 -- PING BY G.C. WATER LINE TILE F L � SCALE: 3/4 "= P -0" MINE PROVIDE CONCRETE AROUNI BASE OF LIFT POLE, EPDXY GROUT PER MANUFACTURES RECOMMENDATION,BY G.C. a a 2' , 2' !c1 a . 4 a . � Q • d a• a a POOL MAIN D F- AI N5 SCALE: 3/4 " =1' -O" I POOL FINISH REFER TO SPECIFICATIONS 2° 2" d MAIN SUCTION DRAINS REFER a a TO EQUIPMENT SCHEDULE CONTINUOUS 2" x 2" NON a SLIP TILE EDGE AT 5TEP�. REFER TO POOL SPECS o f 5PA OR POOL FINISH REFER TO POOL SPECS TEF 13EN H EDGE TILE SCALE: 3/4 " =1 " -0" STANDARD SIGN WHITE WITH RED LETTERS, ANY OTHER TO BE CUSTOM BY G.C. EXTERIOR ,51 NA E SCALE: 3/4 "= P -0" 1 " CONDUIT TO " ELECTRICAL PANEL MfN. 5' -0 J BOX PROVIDED ---`� BY E.C., LOCATION AND INSTALLED I T.B.D. BY E.C. RE LAMP POSITION, PROVIDE ENOUGH, L t CORD V ., a ;ter I' CONDUIT BY E.C. a. a / 4 'v a a � 120 V. 100 WATT LIGHT AND NICHE PROVIDED AND INSTALLED BY P.C. PER SPECS GROUND CLAMP AND #8 AWG GROUNDING WIRE TO LIGHT NICHE BY E.C. . PA LIGHT SCALE: 3/4 " =1' -0" A D I CAI 5 L II ' SCALE: 3/4 "= P -9 SHEPHERD'S CROOK 5TAINLE55 5TEEL HANDRAIL 110'"al Mol 11 I'm G" CLEARANCE TO ALL EXPANSION JOINTS, REFER TO MANUFACTURE SPECS, BY G.C. -- ---- -- LIFT SHALL BE CAPABLE OF UNA5515TED OPERATION FROM BOTH THE DECK AND WATER LEVEL SINGLE PERSON LIFT W/ WEIGHT CAP. OF 300 L155.. MUST SUBMERGE AT LEAST 18" BELOW WATER LEVEL SEAT WIDTH I G" MIN.. W/ FOOT RESTS THAT MOVE WITH SEAT SEE ENLARGEMENT BELOW 24'U.-9, COAST GUARD APPROVED RING BUOY WITH A LENGTH Of ROPE AT LEAST EQUAL TO THE MAX... IMDTI Of THE POOL �+1 12' -O" ALUMINUM POLE I' CONDUIT TO MIN. 5' -U' ELECTRICAL PANEL J BOX PROVIDED BY E.C., LOCATION AND INSTALLED BY T.B.D. E.C. RE LAMP POSITION; PROVIDE ENOUGH , E1 ,� r L CORD' ;s / Via �� _AL_ I " CONDUIT BY E.C. 120 V. 500 WATT LIGHT AND NICHE PROVIDED AND INSTALLED BY P.C. PER SPECS - GROUND CLAMP AND #8 AWG GROUNDING WIRE TO LIGHT NICHE BY E.C. SCALE: 3/4 "= P -0" TOP OF COPING CONTINUOUS 2" X 2" TILE EDGE AT BENCH SEAT t STEPS REFER TO POOL DATA 5PA OR POOL FINISH REFER TO POOL SPECS �-- LINE OF WATER `�-- -- WATER LINE TILE REFER TO SPECS FLEVATION VIFW \ . -I NTERNATIONAL DEPTH MARKER t"NO DIVING" MARKER NOTES: 1. DEPTH MARKERS' SHALL BE NON -SLIP TILES WITH BLACK NUMERALS AND LETTERS. 2. "NO DIVING" MARKER5 5HALL BE NON -SLIP TILES WITH BLACK LETTERS. THE NO DIVING 5YMB0L SHALL BE IMPRINTED ON THE TILE. THE TILES SHALL BE RECESSED 50 THAT THE FACE OF THE TILE 15 FLUSH WITH FINISHED SURFACE OF POOL DECK OR SPA WALL. 3, DEPTH SHALL BE VERIFIED BY CONTRACTOR AND MARKERS SHALL BE INSTALLED TO INDICATE ACTUAL DEPTH OF WATER. 4. WALL AND DECK DEPTH MARKERS SHALL BE SPACED AT NOT MORE THAN 25 FOOT INTERVALS, MEASURED PERIPHERALLY. REFER TO PLAN FOR APPROXIMATE LOCATIONS. 5. POOL DEPTH MARKER5 SHALL BE MIN., 4" HIGH NUMERALS, AND SHALL BE LOCATED AT OR ABOVE THE WATER SURFACE AND IN PLAIN VIEW OF THE BATHERS. I�ITIi�AT1ONAL DEPTH IO1TVIEW SCALE: 3/4 "= P -0" 23�r 4 SPA JETS Q FACE SPA ,JET ACTUATOR 2 STANDARD FINISH ON SWITCHES IS ALUMINUM CQ Lo s ""tt .; C 5 d co s I. s o d op Lo C C} O ( m 0 I� 0 >0 I R- t S I� ISSUE CIRCULATION MAIN DRAIN 5D SUCTION SPLIT TO BOTH 50 % CD DRAINS )NTINUED BOND 4-11-05 AM STEEL 4 -14 -08 >OL SKIMMER 5 -2 -08 'FER TO SPECS G -30 -08 UMMER JET MAIN DRAIN �UALIZER LINE SUCTION SPLIT TO BOTH DRAINS F L � SCALE: 3/4 "= P -0" MINE PROVIDE CONCRETE AROUNI BASE OF LIFT POLE, EPDXY GROUT PER MANUFACTURES RECOMMENDATION,BY G.C. a a 2' , 2' !c1 a . 4 a . � Q • d a• a a POOL MAIN D F- AI N5 SCALE: 3/4 " =1' -O" I POOL FINISH REFER TO SPECIFICATIONS 2° 2" d MAIN SUCTION DRAINS REFER a a TO EQUIPMENT SCHEDULE CONTINUOUS 2" x 2" NON a SLIP TILE EDGE AT 5TEP�. REFER TO POOL SPECS o f 5PA OR POOL FINISH REFER TO POOL SPECS TEF 13EN H EDGE TILE SCALE: 3/4 " =1 " -0" STANDARD SIGN WHITE WITH RED LETTERS, ANY OTHER TO BE CUSTOM BY G.C. EXTERIOR ,51 NA E SCALE: 3/4 "= P -0" 1 " CONDUIT TO " ELECTRICAL PANEL MfN. 5' -0 J BOX PROVIDED ---`� BY E.C., LOCATION AND INSTALLED I T.B.D. BY E.C. RE LAMP POSITION, PROVIDE ENOUGH, L t CORD V ., a ;ter I' CONDUIT BY E.C. a. a / 4 'v a a � 120 V. 100 WATT LIGHT AND NICHE PROVIDED AND INSTALLED BY P.C. PER SPECS GROUND CLAMP AND #8 AWG GROUNDING WIRE TO LIGHT NICHE BY E.C. . PA LIGHT SCALE: 3/4 " =1' -0" A D I CAI 5 L II ' SCALE: 3/4 "= P -9 SHEPHERD'S CROOK 5TAINLE55 5TEEL HANDRAIL 110'"al Mol 11 I'm G" CLEARANCE TO ALL EXPANSION JOINTS, REFER TO MANUFACTURE SPECS, BY G.C. -- ---- -- LIFT SHALL BE CAPABLE OF UNA5515TED OPERATION FROM BOTH THE DECK AND WATER LEVEL SINGLE PERSON LIFT W/ WEIGHT CAP. OF 300 L155.. MUST SUBMERGE AT LEAST 18" BELOW WATER LEVEL SEAT WIDTH I G" MIN.. W/ FOOT RESTS THAT MOVE WITH SEAT SEE ENLARGEMENT BELOW 24'U.-9, COAST GUARD APPROVED RING BUOY WITH A LENGTH Of ROPE AT LEAST EQUAL TO THE MAX... IMDTI Of THE POOL �+1 12' -O" ALUMINUM POLE I' CONDUIT TO MIN. 5' -U' ELECTRICAL PANEL J BOX PROVIDED BY E.C., LOCATION AND INSTALLED BY T.B.D. E.C. RE LAMP POSITION; PROVIDE ENOUGH , E1 ,� r L CORD' ;s / Via �� _AL_ I " CONDUIT BY E.C. 120 V. 500 WATT LIGHT AND NICHE PROVIDED AND INSTALLED BY P.C. PER SPECS - GROUND CLAMP AND #8 AWG GROUNDING WIRE TO LIGHT NICHE BY E.C. SCALE: 3/4 "= P -0" TOP OF COPING CONTINUOUS 2" X 2" TILE EDGE AT BENCH SEAT t STEPS REFER TO POOL DATA 5PA OR POOL FINISH REFER TO POOL SPECS �-- LINE OF WATER `�-- -- WATER LINE TILE REFER TO SPECS FLEVATION VIFW \ . -I NTERNATIONAL DEPTH MARKER t"NO DIVING" MARKER NOTES: 1. DEPTH MARKERS' SHALL BE NON -SLIP TILES WITH BLACK NUMERALS AND LETTERS. 2. "NO DIVING" MARKER5 5HALL BE NON -SLIP TILES WITH BLACK LETTERS. THE NO DIVING 5YMB0L SHALL BE IMPRINTED ON THE TILE. THE TILES SHALL BE RECESSED 50 THAT THE FACE OF THE TILE 15 FLUSH WITH FINISHED SURFACE OF POOL DECK OR SPA WALL. 3, DEPTH SHALL BE VERIFIED BY CONTRACTOR AND MARKERS SHALL BE INSTALLED TO INDICATE ACTUAL DEPTH OF WATER. 4. WALL AND DECK DEPTH MARKERS SHALL BE SPACED AT NOT MORE THAN 25 FOOT INTERVALS, MEASURED PERIPHERALLY. REFER TO PLAN FOR APPROXIMATE LOCATIONS. 5. POOL DEPTH MARKER5 SHALL BE MIN., 4" HIGH NUMERALS, AND SHALL BE LOCATED AT OR ABOVE THE WATER SURFACE AND IN PLAIN VIEW OF THE BATHERS. I�ITIi�AT1ONAL DEPTH IO1TVIEW SCALE: 3/4 "= P -0" 23�r 4 SPA JETS Q FACE SPA ,JET ACTUATOR 2 STANDARD FINISH ON SWITCHES IS ALUMINUM CQ Lo s ""tt .; C 5 d co s I. s o d op Lo C C} O ( m 0 I� 0 >0 I R- t S I� ISSUE DATE 5D J-17-08 50 % CD 3 -18 -08 90 % CD 4-11-05 95 %CD 4 -14 -08 100% CD 5 -2 -08 REV A G -30 -08 REV B 7-15-05 PL1.3 � F7 . IN � i9� FACE OF POOL OR 5PA5 CALL "T I QUAILTITY EQUIPMENT MAKE t MODEL OR DESCRIPTION - - CIRCULATION RATE G I GPM - - TURN OVER PERIOD G HOURS - I SAND FILTER TYPE/ VOLUME PENTAIR TR- I OOC, HIGH RATE SAND, 4.91 FILTER AREA - - UNIT FILTER RATE 13.4 GPM/ SF - - E BACKWASH FLOW RATE 1 10 GPM - - HEATER REQUIREMENTS 75,000 BTUH (SUMMER), 500,000 BTUH (WINTER) - 4 POOL LIGHTS PENTAIR AMERLITE SERIES, POOL LIGHT W/ 5/5 RINGS, W1 GFCI NEEDED, CORD LENGTH AS REQUIRED LONGER THAN 100" - 4 POOL SKIMMERS PENTAIR, 13ERMUDA, 2" PORTS, MODEL 509300 (WHITE- T,B.D.) - 5 POOL INLETS IY2" WALL INLETS W1 1" INSIDER, PENTAIR ADJUSTABLE WALL INLETS (WHITE- T.B.D.) MODEL 540035 - 2 MAIN DRAIN SUCTIONS PENTAIR 12'' x 1 2" DRAINS WHITE PLASTIC FRAME t GRATES MODEL 543035 - - SANITATION TYPE CHLORINE GENERATOR - - PH CONTROL TYPF BUL MURiATIC AC CP -I I CIRCULATION PUMP PENTAIR, WHISPER -FLO, I HP, 80 GPM @ 55' TDH F -1 ! FILTER PENTAIR, TR -I OOC, 4.91 TOTAL SURFACE AREA H -1 I HEA EXCHANGER DIVERSIFIED HEAT TRANSFER, EZ -180, 180,000 BTU HEAT EXCHANGER - I EN i ( HANDRAIL COMMERCIAL STAIR HANDRAIL STAINLESS STEEL 1.90 DIA.. W/ BRONZE ANCHOR SETS - I PAIR EXIT GRAB BARS PRETZEL STYLE COMMERCIAL GRAB BARS, STAINLES5 STEEL 1.90 DIA. W/ BRONZE ANCHOR SET5 - 1 SET OF 3 BUILT IN STEPS PENTAIR ABS STEPS, SET OF THREE, WHITE # 82400700 - AS KFQ,'D. DEPTH MARKERS COMMERCIAL STAIR HANDRAIL STAINLESS 5TEEL 1.90 DIA.. W/ BRONZE ANCHOR SETS - 2 PRESSURE GAUGES - 1 FLOW METERS - 2 THERMOMETERS - T1 Ci C 101 , LIGHT CONTROLS PC -i 1 POOL COVER AQUAMATIC HYDROLUX AUTOMATIC FLOATING THERMAL COVER Q I L1 R L D BY G.C. 1 DF C -1 I POOL CONTROLLER PENTAIR- LX 802 CONTROL SYSTEM W1 TEMP CONTROL, LOW VOLTAGE 4� EMERGENCY SHUT OFF SWITCH I CHEMICAL FEEDER PENTAIR RAINBOW / LIFEGUARD # HC3315 HIGH CAPACITY CHLORINE CHEMICAL IN- LINE EROSION FEEDER OG -I I POOL OZONE GENERATOR (OPTIONAL) DEL ECLIPSE, EC -2, CORONA DISCHARGE OZONATOR W1 MIXING CHAMBER (OPTIONAL) CG -I I POOL CHLORINE GENERATOR (OPTIONAL) DEL GOLDLINE CHLORINE GENERATOR SYSTEM (OPTIONAL) AF -I I AUTO FILL CONTROLLER SYSTEM DYNAMICS, K -I 100 LEVELOR., 3 f4" SOLENOID VALVE CF -1, 2 CHEMICAL FEED PUMPS (OPTIONAL) STENNER SERIES 45MHP PERISTALTIC CHEMICAL METERING FEED PUMP CF -2 - 2 CHEMICAL STORAGE TANK (OPTIONAL) PULSAFEEDER SERIES GO00 35 GALLON CHEMICAL TANK i COVER REEL COMMERCIAL HEAVY DUTY STAINLESS STEEL COVER REEL POOL EQUIFMENT CALL OUT QUAN s TTY EQUIPMENT 1 MAKE * MODEL OR DF-5CRIPTION - - CIRCULATION RAZE 81 GPM - - TURN OVER PERIOD 20 MINUTES - I SAND FILTER TYPE/ VOLUME PENTAIR TR- I OOC, HIGH RATE SAND, 4.91 FILTER AREA - - UNIT FILTER RATE I G.5 GPM /SF _ - BACKWASH FLOW RATE 1 10 GPM - - HEATER REQUIREMENTS 75,000 BTUH (SUMMER), 500,000 BTUH (WINTER) - - ENTRY HANDRAIL COMMERCIAL STAIR HANDRAIL STAINLESS 5TEFL 1.90 DIA.. W1 BRONZE ANCHOR SETS _ AS REQ.'D, DEPTH MARKERS - I SPA LIGHT PENTAIR AMFRLITE SERIES, POOL LIGHT W1 515 RINGS, W/ GFCI NEEDED, CORD LENGTH AS REQUIRED LONGER THAN 100" - I SPA SKIMMER PENTAIR, BERMUDA, 2" PORT5, MODEL 5OG300 (WHITE- T.B.D.) 3 SPA INLETS PENTAIR, IN5IDF-R DIRECTIONAL INLETS, I /�' (WHITE- T.B.D.) - 2 MAIN DRAIN SUCTIONS PFNTAIR 12" x 12" DRAINS WHITE PLASTIC FRAME * GRATES MODEL 543035 - - SANITATION TYPE CHLORINE GENERATOR - - PH CONTROL TYPE BULK MURIATIC ACID CF-2 I CIRCULATION PUMP PENTAIR, WHI5PFR -FLO, I HP, 80 GPM @ 55' TDH JP -1 I HYDRO-THERAFY JET PUMP PENTAIR, CHALLENGER, 5 HP, 210 GPM @ 50' TDH F -2 I FILTER PENTAIR, TR -1 OOC, 4.91 TOTAL SURFACE AREA H -2 1 HEAT EXCHANGER DIVERSIFIED HEAT TRANSFER, EZ -180, 180,000 BTU HEAT EXCHANGER - i ENTRY HANDRAIL COMMERCIAL STAIR HANDRAIL STAINLESS 5TEEL 1.90 DIA.. W/ BRONZE ANCHOR SETS - 2 PRESSURE GAUGES - I FLOW METERS - 2 THERMOMETER5 - - I TIME CLOCKS INTFRMATIC (OR ALTERNATE), T 101, LIGHT CONTROLS - I SPA COVER FLOATING THERMAL COVER C -2 I ,SPA CONTROLLER PFNTAIR - LX 502 CONTROL SYSTEM W1 TEMP CONTROL, LOW VOLTAGE, EMERGENCY SHUT OFF SWITCH * JET CONTROL BUTTON WITH TIMER CF -2 I CHEMICAL FEEDER PENTAIR RAINBOW! LIFEGUARD # HC3315 HIGH CAPACITY CHLORINE CHEMICAL IN- LINE EROSION FEEDER OG -2 I SPA OZONE GENERATOR (OPTIONAL) DEL ECLIPSE, EC -2, CORONA DISCHARGE OZONATOR W1 MIXING CHAMBER't INJECTOR ASSEMBLY (OPTIONAL) CG -2 I SPA CHLORINE GENERATOR (OPTIONAL) DEL GOLDLINE CHLORINE GENERATOR SYSTEM (OPTIONAL) AF -2 I AUTO FILL CONTROLLER SYSTEM DYNAMICS, K l 100 LEVELOR, %" SOLENOID VALVE CF -3' CF-4 2 CHEMICAL FEED PUMPS (OPTIONAL) 5TFNNFK SERIES 45MHP PERISTALTIC CHEMICAL METERING FEED PUMP - ; POOL CHEMICAL STORAGE TANK (OPTIONAL) PULSAFFEDER SERIES G000 35 GALLON CHEMICAL TANK (( EQUIPMENT 5CHEDULE e WALL FRAMING BY G.C. CHEMICAL STORAGE ROOM CHEMICAL U515TANT J CONCRETE COATING BY G.C. v as CONCRETE CURB BY G.C. EQUIPMENT ROOM SLAB BY G.G. C HEMICAL Ru"OM 5 ECTIOIU SCALE: 3/4" =1' -0 POOL MAIN DRAIN SUCTION LIME ?" POOL SKIMMER SUCTION LINE POOL CHLORINE GENERATOR POOL OZONE GENERATOR H05E BIB BY G.C. FLOOR SINK OR AREA DRAIN TO HANDLE 120 GPM, TO SANITARY BY G.C, POOL HEAT EXCHANGER SPA HEAT EXCHANGER -4" SPA JET RETURN LINE 4 ".SPA JET SUCTION LINE 3" SPA JET AIR LINE, LOCATION T.B.D. MUST HAVE AIR LOOP TO PREVENT SPA DRAINAGE 2" SPA MAIN DRAIN SKIMMER SUCTION LINE 3" SPA MAIN DRAIN SUCTION Z LINE CHLORINE FEED STORAGE TANKS ACID FEED PUMPS ACID FEED STORAGE TANKS m POOL /5PA EQUIPMENT ROOM c AA m CALL OUT QUANTITY EQUIPMENT NAME VOLT PHASE HP/SYbV AMPS FURNISHED LOCATION CONTROLS OR INTERLOCKING HIGH VOLTAGE WIRING, LOW VOLTAGE CONTROL WIRING VENTING, GAS, COPPER * WATER � SET 13Y PIPING EACH SWITCHES * CONTACTORS 24 VOLTS OR LESS CP -) 1 CIRCULATION 230V 1 2 HP 10.2 A PC EQUIPMENT ROOM INTERLOCKED W/ POOL CONTROL t. EC (MAY PROVIDE 3 PHASE MC _ PUMP EMERGENCY SHUT OFF CONTRACTOR( RELAY) JP -I I JET PUMP 230V 1 5 HP 19.4 A PC EQUIPMENT ROOM INTERLOCKED W/ CONTROL SYSTEM EC (MAY PROVIDE 3 PHASE PC MC TO PROVIDE DRAIN FOR F -1 I SAND FILTER - -- PC EQUIPMENT ROOM - -- - -- - -- BACKWASH WITH AIR GAP TO HANDLE 140 GPM H -1 1 HEAT EXCHANGER - -- - -- 500,000 - -- PG EQUIPMENT ROOM INTERLOCKED W/ POOL CONTROL * FLOW EC PC MC TO PROVIDE BOILERS, COPPER PLUMBING $13011 r BTU SWITCH $ HIGH LIMIT HANDLE 140 GPM H -2 1 HEAT EXCHANGER - - 250,000 - -- PC EQUIPMENT ROOM INTERLOCKED W/ SPA CONTROL * FLOW EC MC CONTROLS UNDER WATER BTU INTERLOCKED W/ TIME CLOCK OR PHOTO PLUMBING t- BOILER CONTROLS _ 4 LIGHTS 120V 1 300 W 5.0 A PC POOL VOLTAIC CELL, NICHE $ LAMP BY PC, EC PC - -- _ I LIGHT 120V I 100 W 5.0 A PC SPA CONDUIT, J -BOX �, WIRING BY EC EC PC - -- C -I I POOL CONTROL 120v/ 1 --- < 15.0 A PC EQUIPMENT ROOM INTERLOCKED W/ BOILER CONTROLS, EC PC - -- C -2 1 POOL CONTROL 240V I - -- < 15.0 A PC EQUIPMENT ROOM PUMPS, EMERGENCY SHUT -OFF EC PC - -- OZONE 240V PUMPS, EMERGENCY SHUT -OFF OG -I I GENERATOR 120V I - -- < 15.0 A PC EQUIPMENT ROOM INTERLOCKED W/ POOL CONTROLS. EC TO EC PC - -- OG -2 I (OPTION) 120V 1 - -- < 15.0 A PC EQUIPMENT ROOM PROVIDE CONTACTOR/RELAY EC PC -- CHLORINE FLOW SWITCH HIGH LIMIT CG -1 1 GENERATOR 120V I - -- < 15.0 A PC EQUIPMENT ROOM INTERLOCKED W/ POOL CONTROL t FLOW EC PC - -- CG -2 I (OPTION) 120V I - -- < 15.0 A PC EQUIPMENT ROOM SWITCH HIGH LIMIT EC PC - -- AF -1 I WATER LEVEL 120V 1 - -- <5.0 A PC EQUIPMENT ROOM INTERLOCK W/ SOLENOID VALVE, MC TO t. EC PC MC TO FURNISH FRESH WATER LINE W/ BACK FLOW PREVENTER CONTROL AUTO FILL SENSOR MC TO FURNISH FRESH WATER AF -2 I CONTROL 120V I - -- <5.0 A PC EQUIPMENT ROOM FURNISH FRESH WATER LINE W/ BACK EC PC MANUAL SHUT OFF CP -I, 2 ACID FEED PUMP CHLORINE FEED 120V I - < 15.0 A PG EQUIPMENT ROOM INTERLOCKED W/ CHEMICAL CONTROL EC PC - CF-2 2 PUMP (OPTION) 120V I - < 15.0 A PC EQUIPMENT ROOM SYSTEM EC PC CP-4 AUTOMATIC POOL EQUIPMENT ROOM SYSTEM PC- I I COVER 120V 1 - 20.0 A PC AND COVER DRY INTERLOCK W/ COVER KEY SWITCH EC PC MC TO AREA DRAIN IN DRY SUMP SUMP � LF � 0C LC C �JI�.DI NATION 5CN I�DU LE CALL OUT QUANTITY EQUIPMENT NAME VOLT PHASE HP/BY/W AMPS FURNISHED LOCATION CONTROLS OR INTERLOCKING HIGH VOLTAGE WIRING. LOW VOLTAGE CONTROL WIRING VENTING, GAS, COPPER* WATER SET BY PIPING EACH SWITCHES t CONTACTORS 24 VOLTS OR LESS CP -2 1 CIRCULATION 230V 1 2 HP 10.2 A PC EQUIPMENT ROOM INTERLOCKED W/ POOL CONTROL t EC (MAY PROVIDE 3 PHASE PC PUMP EMERGENCY SHUT OFF CONTRACTOR/ RELAY) JP -I I JET PUMP 230V 1 5 HP 19.4 A PC EQUIPMENT ROOM INTERLOCKED W/ CONTROL SYSTEM EC (MAY PROVIDE 3 PHASE PC EMERGENCY SHUT OFF $ JET BUTTON CONTRACTOR/ RELAY) MG TO PROVIDE DRAIN FOR F -2 I SAND FILTER -- - -- - -- - -- PG EQUIPMENT ROOM - -- - -- - BACKWASH WITH AIR GAP TO HANDLE 140 GPM H -2 1 HEAT EXCHANGER - - 250,000 - -- PC EQUIPMENT ROOM INTERLOCKED W/ SPA CONTROL * FLOW EC MC MG PROVIDE BOILERS, COPPER BTU SWITCH t HIGH LIMIT PLUMBING t- BOILER CONTROLS UNDER WATER INTERLOCKED W/ TIME CLOCK OR PHOTO _ I LIGHT 120V I 100 W 5.0 A PC SPA VOLTAIC CELL, NICHE t LAMP BY PC. EC PC - -- CONDUIT, J -BOX * WIRING BY EC C -2 1 POOL CONTROL 1 20V/ I - -- < 15.0 A PC EQUIPMENT ROOM INTERLOCKED W/ BOILER CONTROLS, EC PC - -- 240V PUMPS, EMERGENCY SHUT -OFF OZONE OG -2 I GENERATOR 120V 1 - -- < 15.0 A PC EQUIPMENT ROOM INTERLOCKED W/ POOL CONTROLS t EC PC -- (OPTION) FLOW SWITCH HIGH LIMIT CHLORINE CG -2 I GENERATOR 120V I - -- < 15.0 A PC EQUIPMENT ROOM INTERLOCKED W/ POOL CONTROL * FLOW EC PC - -- (OPTION) SWITCH HIGH LIMIT WATER LEVEL INTERLOCK W/ SOLENOID VALVE, MC TO MC TO FURNISH FRESH WATER AF -2 I CONTROL 120V I - -- <5.0 A PC EQUIPMENT ROOM FURNISH FRESH WATER LINE W/ BACK EC PC LINE W/ BACK FLOW PREVENTER $ FLOW PREVENTER * MANUAL SHUT OFF MANUAL SHUT OFF CP -3, 2 ACID FEED PUMP t CHLORINE FEED 120V I - < 15.0 A PC EQUIPMENT ROOM INTERLOCKED W/ CHEMICAL CONTROL EC PC CP-4 PUMP (OPTION) SYSTEM (',� COORDINATION 5CN�DULI BOILER SUPPLY LINES WITH ZONE VALVE AND /OR CIRCULATION PUMP BY M.C. CHLORINE EROSION EMERGENCY I ,!T JET ACTUATOR i •• ti .- POOL LIGHTS AUTO COVER KEY SWITCH (AC -1) � o 0 AUTO -PILL CONTROL (AF -1) FEEDER (CF -1) 17 BY M.G. GFCI OUTLETS GFCI BY E.C. OUTLETS BY fol ❑ E.C. HEAT 0 EXCHANGER OZONE GENERATOR BY (OG -1) - OPTIONAL P.C. CHLORINE GENERATOR (CG -1) - OPTIONAL CHLORINE FEED PUMP ACID FEED CF- I ACID FEED (OPTIONAL) n Lo PUMP 1­4 . g CIRC. PUMP FLOOR SUCTION LINE CF -2 CIRC. PUMP SKIMMER SUCTION LINE (OPTIONAL} FLOW METER W/ 3' STRAIGHT SECTION OF PIPE HYDRAULIC LINE TO EQUIPMENT ROOM ELECTRICAL CONDUIT TO COVER MOTOR FEEDER (CF -1) CHLORINE EROSION MUM 0 EMERGENCY SHUT -OFF a SPA LIGHT DECK BOX - BY E.C. FOK LIGHT DETAILS SEE S PLI. SPA LIGHT HYDRO - THERAPY JET PUMP SUPPLY LINE FOR ACTUAL PLAN LAYOUT SEE I L 1. ! JET PUMP FLOOR SUCTION LINE FLOW SWITCH ,�— FLOW METER PLOW SWITCH r- FLOW METER --HIGH LIMIT CHEMICAL CONTROLLER (CC-1) - OPTIONAL 1_ D FILTER BACKWASH LINE BY M.C. WITH MIN, 4" DRAIN WITH AIR GAP TO SANITARY SEWER CIRCULATION PUMP POOL CONTROL (PC -1) OZONE GENERATOR (OG-1) CHLORINE GENERATOR (CG -1) AUTO -FILL CONTROL AUTO CIRCULATION PUMP (CP -1) JIM LOAD CENTER PROVIDED AND INSTALLED 13Y G. NEED 30" x 3G" x G' -G" CLEARANC DRY CONTACT END SWITCH FOR BOILER INTERFACE TO SAFETY CIRCUIT (PRE55URE/FLOW SWITCH AND HIGH LIMIT SWITCH) M.C. TO PROVIDE 24V CONTROL WIRING DRY CONTACT END SWITCH FOR BOILER INTERFACE TO TEMPERATURE CONTROL IN POOL CONTROL BOX. M.C. TO PROVIDE 24V CONTROL WIRING DRY CONTACT END SWITCH FOR BOILER INTERFACE TO SAFETY CIRCUIT (PRESSUKE/FLOW SWITCH AND HIGH LIMIT SWITCH) M.C. TO PROVIDE 24V CONTROL WIRING DRY CONTACT END.SWTCH FOR BOILER INTERFACE TO TEMPERATURE CONTROL IN POOL CONTROL BOX. M.C. TO PROVIDE 24V CONTROL WIRING 5PA FILTER (F -1) roo CIRCULATION PUMP (CP -1) HYDRO - THERAPY JET PUMP (JP -1) .. , EQUI A # SCALE: 112"= i -O"" AUTO -FILL A U T � -' X AUTO -FILL CONTROL :• (AF -1) RC. PUMP SUPPLY LINE CHLORINE FEED PUMP CF -3 (OPTIONAL) BOILER SUPPLY LINES WITH ZONE VALVE AND /OR CIRCULATION PUMP BY M.C. -- GFCI GFCI BY IoI OUTLET OUTLETS BY BY E.C. E.G. M.C. HEAT EXCHANGER OZONE GENERATOR CHLORINE (H -1) BY P.C. (OG -1) - OPTIONAL GENERATOR �! it OPTIONAL "- --HIGH LIMIT CHEMICAL CONTROLLER (CC -1) - OPTIONAL I' a 1 ACID FEED CIRC. PUMP SKIMMER SUCTION LINE ' PUMP n Lo CF -•4 1­4 . g CIRC. PUMP FLOOR SUCTION LINE a CIRC. PUMP SKIMMER SUCTION LINE Lo CIRC. PUMP 5KIMMER SUCTION LINE �} C�d co to LU 0 p FOR ACTUAL EQUIPMENT �J LAYOUT SEE � PL2.1 FOR ACTUAL PLAN HYDRAULIC LAYOUT SEE I COVER MOTOR HYDRAULIC LINE TO EQUIPMENT ROOM ELECTRICAL CONDUIT TO COVER MOTOR FEEDER (CF -1) CHLORINE EROSION MUM 0 EMERGENCY SHUT -OFF a SPA LIGHT DECK BOX - BY E.C. FOK LIGHT DETAILS SEE S PLI. SPA LIGHT HYDRO - THERAPY JET PUMP SUPPLY LINE FOR ACTUAL PLAN LAYOUT SEE I L 1. ! JET PUMP FLOOR SUCTION LINE FLOW SWITCH ,�— FLOW METER PLOW SWITCH r- FLOW METER --HIGH LIMIT CHEMICAL CONTROLLER (CC-1) - OPTIONAL 1_ D FILTER BACKWASH LINE BY M.C. WITH MIN, 4" DRAIN WITH AIR GAP TO SANITARY SEWER CIRCULATION PUMP POOL CONTROL (PC -1) OZONE GENERATOR (OG-1) CHLORINE GENERATOR (CG -1) AUTO -FILL CONTROL AUTO CIRCULATION PUMP (CP -1) JIM LOAD CENTER PROVIDED AND INSTALLED 13Y G. NEED 30" x 3G" x G' -G" CLEARANC DRY CONTACT END SWITCH FOR BOILER INTERFACE TO SAFETY CIRCUIT (PRE55URE/FLOW SWITCH AND HIGH LIMIT SWITCH) M.C. TO PROVIDE 24V CONTROL WIRING DRY CONTACT END SWITCH FOR BOILER INTERFACE TO TEMPERATURE CONTROL IN POOL CONTROL BOX. M.C. TO PROVIDE 24V CONTROL WIRING DRY CONTACT END SWITCH FOR BOILER INTERFACE TO SAFETY CIRCUIT (PRESSUKE/FLOW SWITCH AND HIGH LIMIT SWITCH) M.C. TO PROVIDE 24V CONTROL WIRING DRY CONTACT END.SWTCH FOR BOILER INTERFACE TO TEMPERATURE CONTROL IN POOL CONTROL BOX. M.C. TO PROVIDE 24V CONTROL WIRING 5PA FILTER (F -1) roo CIRCULATION PUMP (CP -1) HYDRO - THERAPY JET PUMP (JP -1) .. , EQUI A # SCALE: 112"= i -O"" AUTO -FILL A U T � -' X AUTO -FILL CONTROL :• (AF -1) RC. PUMP SUPPLY LINE CHLORINE FEED PUMP CF -3 (OPTIONAL) BOILER SUPPLY LINES WITH ZONE VALVE AND /OR CIRCULATION PUMP BY M.C. -- GFCI GFCI BY IoI OUTLET OUTLETS BY BY E.C. E.G. M.C. HEAT EXCHANGER OZONE GENERATOR CHLORINE (H -1) BY P.C. (OG -1) - OPTIONAL GENERATOR �! it OPTIONAL "- --HIGH LIMIT CHEMICAL CONTROLLER (CC -1) - OPTIONAL I' a 1 CIRC. PUMP FLOOR 5UCTCON LINE FOR ACTUAL EQUIPMENT LAYOUT SEE / FILTER BACKWASH LINE BY M.C. WITH MIN. 4" DRAIN WITH AIR GAP TO SANITARY SEWER CIRCULATION PUMP (CP -1) HYDRO - THERAPY POOL CONTROL (PC- I ) OZONE GENERATOR (OG -1) CHLORINE GENERATOR C (CG -)) . AUTO -FILL CONTROL (AF -1) LIGHTS r LOAD CENTER PROVIDED AND INSTALLED BY G.0 TIME CLOCK OR (NEED 30" x 30 x G' -G" CLEARANCE) PHOTO VOLTAIC - -__- (BY ELECTRICIAN) POOL CONTROL (C -1) TIME CLOCK OR PHOTO VOLTAIC (BY ELECTRICIAN) ACID FEED ' PUMP Lo CF -•4 1­4 . g (OPTIONAL) a CIRC. PUMP SKIMMER SUCTION LINE CIRC. PUMP FLOOR 5UCTCON LINE FOR ACTUAL EQUIPMENT LAYOUT SEE / FILTER BACKWASH LINE BY M.C. WITH MIN. 4" DRAIN WITH AIR GAP TO SANITARY SEWER CIRCULATION PUMP (CP -1) HYDRO - THERAPY POOL CONTROL (PC- I ) OZONE GENERATOR (OG -1) CHLORINE GENERATOR C (CG -)) . AUTO -FILL CONTROL (AF -1) LIGHTS r LOAD CENTER PROVIDED AND INSTALLED BY G.0 TIME CLOCK OR (NEED 30" x 30 x G' -G" CLEARANCE) PHOTO VOLTAIC - -__- (BY ELECTRICIAN) POOL CONTROL (C -1) TIME CLOCK OR PHOTO VOLTAIC (BY ELECTRICIAN) ' Lo 1­4 . g t a co c Lo �} C�d co to LU 0 p �J LLJ f �.` 0 Lu D 0 JIM E •• LO i * s • i • i 1 i f p• i O i LO i ! 8 CC) s ' i * i s i • i • i e i W Z U E-- F- z � O � a R E c ! : Y t TO Bf STAIN LESS STEEL ENLARGED COVER SECTION SCALE: 1 1/2"= P -0" POOL AND SPA STRUCTURAL NOTES: rej 9 POOL DE51GN ASSUMES THAT STRUCTURAL DECK, BY G.C. 15 CAPABLE OF SUPPORTI G G50 P5F. ALL REINFORCING STEEL SHALL BE DEFORMED BARS * CONFORM TO A5TM AG 15 GRA 40 OR #4 BARS. SPLICES TO BE LAPPED 22" MINIMUM AND THE MINIMUM CLEARANCE BETWEEN PARALLEL BARS 15 2j ". GROUNDING PER N.E.C. /C.E.C. OF THE STRUCTURAL REINFORCING MUST BE INSTALLED PRIOR TO PLACEMENT OF CONCRETE, SHOT CRETE (GUNITE) TO BE IN CONFORMANCE WITH I.B.C. 2003 SECTION 1914 AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI AT 28 DAYS, AND CON515T OF I PART PORTLAND CEMENT TO 4Y PARTS SAND AND 3 GALLONS OF WATER PER SACK OF CEMENT. CEMENT SHALL CONFORM TO "STANDARD 5PECIFICATION5 FOR PORTLAND CEMENT' A5TM C 150. USE TYPE V PORTLAND CEMENT IN AREAS WITH MORE THAN 2 % SULFATE CONTENT AND AS DIRECTED BY LOCAL BUILDING CODES, KEEP CONCRETE DAMP CONTINUOUSLY FOR 14 DAYS. ALL INTERIOR 5URFACE5 OF POOL AND SPA SHALL BE COATED WITH A WATERPROOF PLASTER FINISH. ALL MATERIAL TO BE 5TAINLE55 STEEL PROJECT NO. 20713 155UE DATE 5D 1-17-08 50% CD 3 -18 -08 90% CD 4-11-08 95 %CD 4 -14 -08 100% CD 5 -2 -08 REV A G -30 -08 REV B 7-15-08 P L3. I SAF Ebuilt Colorado a R E c ! : Y t TO Bf STAIN LESS STEEL ENLARGED COVER SECTION SCALE: 1 1/2"= P -0" POOL AND SPA STRUCTURAL NOTES: rej 9 POOL DE51GN ASSUMES THAT STRUCTURAL DECK, BY G.C. 15 CAPABLE OF SUPPORTI G G50 P5F. ALL REINFORCING STEEL SHALL BE DEFORMED BARS * CONFORM TO A5TM AG 15 GRA 40 OR #4 BARS. SPLICES TO BE LAPPED 22" MINIMUM AND THE MINIMUM CLEARANCE BETWEEN PARALLEL BARS 15 2j ". GROUNDING PER N.E.C. /C.E.C. OF THE STRUCTURAL REINFORCING MUST BE INSTALLED PRIOR TO PLACEMENT OF CONCRETE, SHOT CRETE (GUNITE) TO BE IN CONFORMANCE WITH I.B.C. 2003 SECTION 1914 AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI AT 28 DAYS, AND CON515T OF I PART PORTLAND CEMENT TO 4Y PARTS SAND AND 3 GALLONS OF WATER PER SACK OF CEMENT. CEMENT SHALL CONFORM TO "STANDARD 5PECIFICATION5 FOR PORTLAND CEMENT' A5TM C 150. USE TYPE V PORTLAND CEMENT IN AREAS WITH MORE THAN 2 % SULFATE CONTENT AND AS DIRECTED BY LOCAL BUILDING CODES, KEEP CONCRETE DAMP CONTINUOUSLY FOR 14 DAYS. ALL INTERIOR 5URFACE5 OF POOL AND SPA SHALL BE COATED WITH A WATERPROOF PLASTER FINISH. ALL MATERIAL TO BE 5TAINLE55 STEEL PROJECT NO. 20713 155UE DATE 5D 1-17-08 50% CD 3 -18 -08 90% CD 4-11-08 95 %CD 4 -14 -08 100% CD 5 -2 -08 REV A G -30 -08 REV B 7-15-08 P L3. I SAF Ebuilt Colorado P L3. I SAF Ebuilt Colorado RIGID, CELLULAf 1.1 LB/FT DD FOOL REAR 5ECTION 5CALE: 1/2"= I'-0 0 24 11 M, FAI 10 5CALE: 1/2 " = 1' -0" 5FA REBAR 5f- 5CALE: 1/2"=1'-0 BAR5 O il O.C. H WAY JGID, CELLULAR OLYSTYUNE, A5TM ;817 1.15 LB/fT OENSITY OR GREATER, BY - I 'IT Fix 8212'-0" 4 1 1 1 i 1111111 [Jill ludlywrawilill 111111 An Aco 4 0 1 z Lu il o (\J > a : 1 1011 0 MI I. JN. J L 4 d. g T.O. CONC,1 5205 4 BAR5 RIGID, CELLULAR POLYSTYRENE, A5TM G81 7 @ 6' O.C. 1. 15 LB/fT DEN51TY OR GREATER, BY G.C. EACH WAY DRAIN MAT 5LOPE TO DRAIN 5UMP PUMP, BY G.C. STRUCTURAL FILL BY G.C. FOOL RE13AR SECTION _ 5CALE: 1/2"= I' -O" wile i® � # 4 BAK5 Nw @ 5" O.C. N O6> 0: EACH WAY 4 (3) # 4 BAR5 I T.O. PAVING t- 82 2' -0" I m 8205-0 # 4 BARS II 0 0 0 0 4 4 4 A < RIGID, CELLU POLYSTYRENE, A5TM 6817 1. 15 LB/fT DEN51TY OR GREATER, BY G.C. DRAIN MAT 5LOPE TO DRAIN SUMP PUMP, BY G.C. - 5FA * FOOL RE13AR 5f CT10N SCALE: 1/2 " = 1' -0" 4 46 POOL AND SPA STRUCTURAL NOTES: I . POOL DE51GN A55UME5 THAT 5TRUCTURAL DECK, BY G.C. 15 CAPABLE Of 5UPPORTI G r.50 P5f. 2. ALL REINFORCING 5TEEL5HALL BE DEFORMED BAR5 t-CONFORM TO A5TM AG 1 5 GRA 40 OR #4 BARS. SPLICE5 TO BE LAPPED 22" MINIMUM AND THE MINIMUM CLEARANCE BETWEEN PARALLEL BAR5 15 2Y2". 3. GROUNDING PER N.E.C./C.E.C. Of THE STRUCTURAL REINFORCING MUST BE IN5TALLED PRIOR TO PLACEMENT Of CONCRETE. 4. 5HOT CRETE (GUNITE) TO BE IN CONFORMANCE WITH I.B.C. 2003 5ECTION 1914 AND 5HALL HAVE A MINIMUM COMPRE551VE 5TRENGTH Of 3000 P51 AT 28 DAY5, AND CON515T Of I PART PORTLAND CEMENT TO 4/2 PARTS SAND AND 3 GALLON5 Of WATER PER 5ACK Of CEMENT. 5. CEMENT SHALL CONFORM TO "5TANDARD 5PffCIfICATION:5 FOR PORTLAND CEMENT" A5TM C 150. G. U5E TYPE V PORTLAND CEMENT IN AREAS WITH MORE THAN 2 % 5ULfATf CONTENT AND A5 DIRECTED BY LOCAL BUILDING CODE5. 7. KEEP CONCRETE DAMP CONTINUOU5LY FOR 14 DAY5. 8. ALL INTERIOR 5URfACE5 Of POOL AND 5PA 5HALL BE COATED WITH A WATERPROOF PLA5TER fIN15H. 9. ALL MATERIAL TO BE 5TAINLESS 5TEEL