HomeMy WebLinkAbout2025-03 A Resolution Approving an Amendment to the Lionshead Redevelopment Master Plan to Accommodate Future Development on the Evergreen Lodge at Vail Development Site1
RESOLUTION NO. 3
SERIES 2025
A RESOLUTION OF THE VAIL TOWN COUNCIL APPROVING AN
AMENDMENT TO THE LIONSHEAD REDEVELOPMENT MASTER PLAN
TO ACCOMMODATE FUTURE DEVELOPMENT ON THE EVERGREEN
LODGE AT VAIL DEVELOPMENT SITE
WHEREAS, on December 15, 1998, the Town Council adopted the Lionshead
Redevelopment Master Plan (the "Master Plan") by Resolution No. 14, Series 1998;
WHEREAS, on November 8
th, 2024, pursuant to Section 2.8 of the Master
Plan, HCT Member LLC ("Applicant") filed an application to amend the Master Plan
(the "Application")
WHEREAS, on December 9, 2024, the Planning and Environmental Commission
(the "PEC") held a properly-noticed public hearing on the Application, and recommended
that the Town Council approve the Application; and
WHEREAS, on January , 2025, the Town Council held a properly-noticed
public hearing on the Application.
NOW THEREFORE BE IT RESOLVED BY THE TOWN COUNCIL OF THE
TOWN OF VAIL, COLORADO:
Section 1. The Town Council hereby approves the update to the Master Plan
as set forth in Exhibit A, attached hereto and incorporated herein by this reference.
INTRODUCED, READ, APPROVED AND ADOPTED THIS DAY
OF JANUARY, 2025.
______________________________
Travis Coggin, Mayor
ATTEST:
____________________________
Stephanie Kaufmann, Town Clerk
2
EXHIBIT A
Master Plan Amendment
1. Section 5.19.7 of the Master Plan is amended as follows:
5.19.7 Setbacks.
Special consideration should be given to the setback of buildings from the South
Frontage Road. Pursuant to the Lionshead Mixed Use-1 zone district setback
standards, a minimum 10' setback is required. Given the relationship of the
development site to the South Frontage Road, the need for adequate area for
vehicular traffic circulation, the importance of a landscape area to visually screen
the massing of the building, and the existence of a 30-foot wide utility easement
along the southerly edge of the South Frontage Road, the minimum required front
setback for the Evergreen Lodge development site shall be 30'. This increased
setback requirement shall supersede the 10' setback requirement prescribed in
Section 12-7H-10, Setbacks, Vail Town Code.
Based upon the coordinated efforts between the Evergreen Lodge and the Vail
Valley Medical Center, opportunities exist for a covered parking deck and
pedestrian access landscape plaza to be developed between the properties with
the goal of screening surface parking and enhancing the visual quality of the area.
If appropriately designed, a reduced or zero setback in these areas may be
proposed for review during the development review process. Additionally, below
grade improvements, including but not limited to, parking and vehicular circulation
improvements may be developed within the required setbacks, if found to be
consistent with the Town’s development objectives.
Because Lot 10 is to be developed through a coordinated effort with the Evergreen
Lodge and the Town, Figure 4 (below) identifies a new build-to line between the
Evergreen Lodge and Lot 10. This build-to line supersedes the 10' setback of the
zone district.
2. The Master Plan is amended by the addition of a new Section 5.19.10, to read as
follows:
5.19.10 Relationship to Lot 10 Park.
With the land exchange that was completed between Vail Health (formerly the Vail
Valley Medical Center) and the Evergreen Lodge, Lot 10, which is owned by the
Town, becomes an important interface with the future redevelopment of the
Evergreen Lodge. Lot 10 is currently developed as a parking lot used by the Vail
Library, West Meadow Drive connecting to the Vail Civic Center and to Lionshead
Village, and landscape improvements located on the south side of West Meadow
Drive. Pursuant to the Civic Center Plan, the area north of West Meadow Drive of
Lot 10 will be developed as a small park. The Town has granted an access
easement from West Meadow Drive to the Evergreen Lodge property to allow
3
pedestrian access and create some integration of the Evergreen Lodge to the
pedestrian experience on West Meadow Drive.
The Evergreen Lodge will fund, design, construct, and maintain the park
improvements on the north side of Lot 10 as part of the Evergreen Lodge
redevelopment. Recognizing this seamless integration of the two properties, there
is no need for the typical 10' building setback - instead, a build-to line is identified
on Figure 4 below. Lot 10 will also accommodate underground utilities below Lot
10 so as not to interfere with the development of a park. Figure 4 shows a
conceptual integration of the improvements, subject to change through the Town's
standard approval process.