Loading...
HomeMy WebLinkAboutApril 7, 2025 AIPP Agenda1.Call to Order 2.Citizen Participation 3.Main Agenda 3.1 Swearing in Ramsey Cotter and Susanne Graff to serve two- year terms to the AIPP Board. (5 mins) 3.2 Approval of March 3 and 17 AIPP Board meeting minutes. 3.3 Review of proposed sculptures to be sited on Town of Vail property as a part of the Temporary Art Program, Frank Cafaro for J. Cotter Gallery. (15 mins) 3.4 Discussion of site-integrated public art at the Dobson Ice Arena. (20 mins) 3.5 Summer 2025 AIPP programming. (20 mins) 4.Coordinator Updates 5.Adjournment ART IN PUBLIC PLACES MEETING Agenda Vail Town Council Chambers Via Zoom Webinar: https://vail.zoom.us/j/85445126211 8:30 AM, April 7, 2025 March 3, 2025 Minutes.pdf March 17, 2025 Minutes.pdf J. Cotter x J. Cotter Temporary art Application .docx.pdf Squash Bed x J. Cotter Temporary art Application .docx.pdf Don't Fence Me In (1).JPEG Ranch Rocks.JPEG FC Statement.docx.pdf Frank Carfaro CV Final.docx.pdf 2025-0203 Art Meeting Update.pdf Meeting agendas and materials can be accessed prior to meeting day on the Town of Vail website www.vail.gov. All Town Council meetings will be streamed live by High Five Access Media and available for public viewing as the meeting is happening. The meeting videos are also posted to High Five Access Media website the week following meeting day, www.highfivemedia.org. Please call 970-479-2460 for additional information. Sign language interpretation is available upon request with 48 hour notification dial 711. 1 Art in Public Places Board Meeting Minutes Monday, March 3, 2025 AIPP Board members present: Lindsea Stowe - Chair, Tracy Gordon, Kathy Langenwalter, Courtney St. John & Susanne Graff Others present: Molly Eppard - AIPP Coordinator, Gregg Barrie and Mia Vlaar – TOV staff 1. Call to Order 2. No citizen participation 3. Main Agenda 3.1 Approval of February 3, 2025 AIPP Board meeting minutes. February 3, 2025 Minutes.pdf • Kathy motions to approve the minutes, Tracy seconds and all in favor. 3.2 Gore Creek Promenade design and public art integration update. Gregg Barrie, Town of Vail Landscape Architect. approved concept 2-20-2025.pdf Perspective A- Proposed Concept.jpg Perspective B- Proposed Concept.jpg Perspective C- West View-Proposed Concept.jpg Perscpective D- East View-Proposed Concept.jpg • Gregg updates the Board on the approval process for this level of concept. • He discusses the next steps for integrating site-specific art (stone benches, fire pit design), temporary art placement and permanent placement. • The timeline is for Fall 2025 and in Spring 2026. • The Board discusses site-specific art and the process for working with an artist on the Gore Creek Promenade project and design. • Kathy would like to look at multiple artists and pursue who may be willing to submit for consideration. • Molly asks the Board to research this type of work, stone artists, what a call to artists may look like and to review it at a future meeting. • Gregg asks that this be resolved by the April 2025 meeting. 3.3 Discover Vail: Vail's Destination Marketing Organization update, Mia Vlaar Director Economic Development Town of Vail. Discover Vail Destination Marketing Organization Overview • Mia reviews the VLMD history (lodging/promotions marketing tax, summer marketing), Stewardship Roadmap and Vail’s newly formed Destination Marking Organization. • Special Events budget ($3 million) is now moved into the VLMD’s purview, as well as the Welcome Centers. 2 • Customer data analytics/collection and Discover Vail website is discussed. • The three-year Strategic Plan is reviewed which is in alignment with the Town Council’s Strategic Plan. • Molly inquires about the Vail Experience mission and any synergy with AIPP, perhaps an audio tour of the public art collection and map may be a good cultural offering. • Lindsea asks Mia to speak to cultural vitality as a priority and experience within the community. She discusses the many facilities within the town and especially the Welcome Centers which can be utilized for cultural experiences. She also discusses the importance of embracing and supporting the artists and craftsmen/creators in the community. • Mia informs the Board about the Business Tool Kit on Discover Vail which would be helpful for promoting AIPP programs, as well as looking into QR codes and researching where public art lands in general internet searches. 3.4 Summer 2025 AIPP program updates. • The Board will meet in the coming weeks to review a potential summer temporary installation with HYBYCOZO. 4. Coordinator Updates • Studio construction now scheduled for completion by mid-June with a potential unveiling August 3. • The potential installation of donated works is discussed. • GoPro is working on potential artists for the event. • Lot 10 is scheduled to propose at the April meeting. • J Cotter Gallery is interested in placing a sculpture in front the gallery in a TOV planter. Molly sent a copy of the standard agreement for them to review. 5. Adjournment 3 Art in Public Places Board Special Meeting Minutes Monday, March 17, 2025 AIPP Board members present: Lindsea Stowe - Chair, Tracy Gordon, Kathy Langenwalter, Courtney St. John & Susanne Graff (via zoom) Others present: Molly Eppard - AIPP Coordinator, Gregg Barrie – TOV staff 1. Call to Order 2. No citizen participation 3. Main Agenda 3.1 Summer 2025 Program Discussion with HYBYCOZO. HYBYCOZO_Vail_Summer2025 • The collaborative studio HYBYCOZO, Serge Beaulieu and Yelena Filipchuk, present a proposal for a temporary installation (late June – through October) in Ford Park. • The three large scale geometric artworks explore sculpture, light, and shadow and are proposed for installation in proximity to the new Vail Art Studio. • The sites will be compromised from the winter construction, so it is a good opportunity to install temporary surfaces on the locations to facilitate an installation. • The Board unanimously approves the installation proposal and to enter into a contract. 3.2 Gore Creek Promenade site-integrated art, Gregg Barrie–TOV Landscape Architect • Gregg discusses the renovation of the Gore Creek Promenade and the possibilities of integrating art into the park from free standing locations to site-specific. • The Board agrees with Gregg to contact stone artists who have worked in Vail parks to see if they may be interested collaborating on design concepts. 3.3 Final approval of proposed gifted artwork from the collection of Vicki and Kent Logan. • The Art Board unanimously approves the donation of two works into the Town of Vail’s Public Art Collection: o Matt Wedel, Flower Tree, 2013, Ceramic, 72 x 42 x 52 inches sited at the Lionshead Welcome Center: 4 o Thomas Houseago, Rattlesnake Figure (bronze), 2011, Edition 2/2, Bronze, 128.75 x 29 x 29 inches sited in proximity to the Vail Art Studio in Ford Park 4. Adjournment 5 Art in Public Places Temporary Art Program Art Sited on Town of Vail Property Applicant Information Date: April 2nd, 2024 Town of Vail Business: J. Cotter Gallery Contact Person: Ramsey Cotter Address: 234 Wall St. City: Vail State: CO Zip Code: 81657 Phone: 970.390.5705 Email: ramsey@jcottergallery.com Artwork Details Artist: Frank Carfaro Artwork Title: Ranch Rocks Media/Materials: Wood and Steel Dimensions of artwork and footprint: (Q-3) 20” x 20” x 42” Date Of Artwork: 2024 PLEASE SUBMIT THE FOLLOWING SUPPORT MATERIALS: ● Proposed Town of Vail owned site(s) location. = Garden bed in front of J. Cotter Gallery ● Maquette, images, or renderings of artwork/artist concept. = Attached to email ● Artist statement, resume/cv. = Attached to email ● Installation plan/needs. = Attached to email 6 ART SELECTION CRITERIA The AIPP Board will consider the following criteria when reviewing works the Temporary Art Program on Town of Vail Property. The AIPP Board may include additional criteria for a specific project. ● Be original works of art or of a limited edition demonstrating the highest level of artistic excellence. ● Diversify the collection in terms of artists, perspectives, materials, and/or media. ● Enhance and activate our public spaces and community experiences. ● Be accepted through a public process. ● Be complete, in good physical condition, of excellent workmanship, and able to withstand the environment in which it is to be placed. ● Be of a size and scale that can be appropriately and safely displayed in the limited sites available in Vail. ● Does not present safety or liability concerns to the public or the Town of Vail. If artwork is accepted by the AIPP Board the Business owner will enter in an agreement with the Town of Vail in the form of an Art Revocable License prior to installation of artwork. Please contact Molly Eppard, Art in Public Places Coordinator if you have further questions or to submit your proposed work of art for donation. meppard@vail.gov or 970-479-23344 7 Art in Public Places Temporary Art Program Art Sited on Town of Vail Property Applicant Information Date: April 2nd, 2024 Town of Vail Business: J. Cotter Gallery Contact Person: Ramsey Cotter Address: 234 Wall St. City: Vail State: CO Zip Code: 81657 Phone: 970.390.5705 Email: ramsey@jcottergallery.com Artwork Details Artist: Frank Carfaro Artwork Title: Don't Fence Me In Media/Materials: Corton Steel Dimensions of artwork and footprint: (Q-3) 18” x 22” x 34” Date Of Artwork: 2024 PLEASE SUBMIT THE FOLLOWING SUPPORT MATERIALS: ● Proposed Town of Vail owned site(s) location. = Garden bed in front of Squash Blossoms Vail ● Maquette, images, or renderings of artwork/artist concept. = Attached to email ● Artist statement, resume/cv. = Attached to email ● Installation plan/needs. = Attached to email 8 ART SELECTION CRITERIA The AIPP Board will consider the following criteria when reviewing works the Temporary Art Program on Town of Vail Property. The AIPP Board may include additional criteria for a specific project. ● Be original works of art or of a limited edition demonstrating the highest level of artistic excellence. ● Diversify the collection in terms of artists, perspectives, materials, and/or media. ● Enhance and activate our public spaces and community experiences. ● Be accepted through a public process. ● Be complete, in good physical condition, of excellent workmanship, and able to withstand the environment in which it is to be placed. ● Be of a size and scale that can be appropriately and safely displayed in the limited sites available in Vail. ● Does not present safety or liability concerns to the public or the Town of Vail. If artwork is accepted by the AIPP Board the Business owner will enter in an agreement with the Town of Vail in the form of an Art Revocable License prior to installation of artwork. Please contact Molly Eppard, Art in Public Places Coordinator if you have further questions or to submit your proposed work of art for donation. meppard@vail.gov or 970-479-23344 9 10 11 My journey is anchored in creating processes and techniques which transcend boundaries, aiming to embody and communicate mental states. I strive to elevate ordinary materials to extraordinary, creating a harmonious interplay between organic and inorganic, fostering a dynamic balance between order and chaos, tradition and modernity. I am a passionate advocate for mental health awareness since my diagnosis with bipolar in 2020. My work, such as Trust Tree, Inside Out and Onwards + Upwards, serve to ignite conversations around the the global challenges of mental well-being. Through my work, I aim to inspire individuals to reflect on their internal struggles, seek pathways to manage their condition and help to destigmatize mental health. Art is my therapy which creates balance and clarity. Bipolar itself is managing extremes and finding harmony. Previously, I founded the successful furniture brand DESIRON. However, as the business expanded, I found myself drifting from my initial passion: hands-on creation. I have since dedicated my time to creating art which has brought me back to my roots. I am enthusiastic about the prospect of joining the Hayama residency, where I can delve deeper into Japanese methodologies and artistic traditions. To draw inspiration from the intricate relationship between nature and human emotion. The geographic and geologic transition from a mountainous environment to the coast would provide me a needed reconnection with the ocean: offering a new cultural perspective to enrich my creativity. My work incorporates elements of Japanese arts and tradition such as Kintsugi and Shou Sugi Ban which I hope to better understand. I am eager to learn, collaborate and innovate. This is an opportunity to immerse myself in Japanese culture, explore its perspectives on mental health, and further integrate these insights into my art, sharing them with a global audience. My artistic journey is founded on the development of innovative processes and methods that break traditional boundaries. I aim to represent and convey various psychological states through my art, transforming ordinary materials into something extraordinary. My work creates a harmonious blend of natural and synthetic elements, striking a balance between order and chaos, as well as between the traditional and the contemporary. I am deeply committed to raising awareness about mental health, a cause close to my heart since my bipolar diagnosis in 2020. My artworks, including "Trust Tree," "Inside Out," and "Onwards + Upwards," are designed to spark discussions about global mental health challenges. Through my creations, I encourage people to contemplate their personal battles, find ways to cope with their conditions, and contribute to the destigmatization of mental health issues. For me, art is a therapeutic practice that helps in achieving balance and clarity, mirroring the essence of managing bipolar disorder by balancing extremes and finding harmony. Before this, I established the successful furniture brand DESIRON. But as the business grew, I felt a disconnect from my original passion: creating with my own hands. I have since returned to my roots, dedicating my time to creating art. I am excited about the possibility of joining the Hayama residency. I look forward to immersing myself in Japanese artistic methods and traditions, drawing inspiration from Japan's deep connection between nature and human emotions. The transition from a mountainous region to the coast in this residency offers a chance to reconnect with the ocean and gain new cultural insights that can enhance my creativity. 12 My artwork already integrates elements of Japanese art and traditions, like Kintsugi and Shou Sugi Ban, and I look forward to deepening my understanding of these techniques. I am ready to learn, collaborate, and innovate. This residency represents a unique opportunity to fully engage with Japanese culture, explore its viewpoints on mental health, and weave these insights into my art for a global audience. 2 13 CV Final Frank J Carfaro Birthplace: Summit, NJ, USA Current Residence: Edwards, CO, USA Website: www.frankandhank.us Educational Background Rutgers College, New Brunswick, NJ (1984 - 1992) Universite de Grenoble, Architecture, Grenoble, France (1991) Professional Career Artist at Frank + Hank, Vail, CO (2020 - Present) Founder & CEO of DESIRON, New York, NY (1997 - 2021) Founder & Creative Director of ‘D Gallery’, SoHo, NYC (2012 - 2019) Collaborative Works Workshop APD Architecture, New York, NY (2019) Lincoln Center Print Collection Partnership, SoHo, NYC (2014) Collaboration with David Rockwell, New York, NY (2013) Partnership with Cerno Group, New York, NY (2009) Collaboration with Jennifer Post, New York, NY (2004) Exhibitions Designer for Vogue VIP Lounge, Fashion Week, New York, NY (1999, 2005) Coast-to-Coast Exhibition, New York, NY (2003) Participation in Fairs International Contemporary Furniture Fair (ICFF), New York, NY (2010, 2017) Neocon, Chicago, IL (2011) West Week, Los Angeles, CA (2012) Maison Object, Paris, France (2014) Salone del Mobile, Milan, Italy (2019) Awards and Honors Furnishing for MOMA PS1 Public Space (2018) NJ Small Business Manufacturer of the Year (2017) Maker of the Year by Martha Stewart Group (2012) American Express Small Business Brand Ambassador (2009) Featured Publications Women's Wear Daily (WWD) (2019) Architectural Digest (2018, 2017, 2005) Elle Décor (2017, 2001) New York Times (2012) Vogue (2009) Wallpaper Magazine (2006) Interior Design Magazine (2002) Interni (1999) Private and Public Collections Vail Behavioral Health, Edwards, CO Amanda Precourt, Collector, Denver, CO The Cookie Factory, Gallery, Denver, CO 14 TOWN OF VAILDobson ArenaRenovations ART OPPORTUNITIES FEBRUARY 03, 2025 15 W D DN LOADING 2149 SF BOH / LOADING 00.04.01 367 SF AUX LOCKER 3 00.02.09 366 SF AUX LOCKER 4 00.02.05 164 SF TLT/SHOWER -LR 4 00.02.06 172 SF TLT/SHOWER -LR 3 00.02.10 142 SF OFFICIAL LOCKER 1 00.03.03 63 SF TLT/SHOWER -OLR 1 00.03.04 373 SF AUX LOCKER 5 00.03.02 164 SF TLT/SHOWER -LR 5 00.03.01 342 SF AUX LOCKER 6 00.03.07 188 SF TLT/SHOWER -LR 6 00.03.08 142 SF OFFICIAL LOCKER 2 00.03.05 63 SF TLT/SHOWER -OLR 2 00.03.06 433 SF AUX LOCKER 1 00.02.01 349 SF AUX LOCKER 2 00.02.04 161 SF TLT/SHOWER -LR 2 00.02.03 2679 SF LOBBY 00.06.02 302 SF ELECTRICAL 00.02.07 241 SF VESTIBULE 00.06.01 69 SF PENALTY BOX 1 00.06.06 89 SF SCORE TABLE 00.06.05 66 SF PENALTY BOX 2 00.06.04 21 @ 28"21 @ 28" 130 SF SKATE REPAIR 96 SF ASSOC. DIRECTOR 435 SF SKATE RENTAL 248 SF MEN 523 SF WOMEN 124 SF ELEC 154 SF AV / IT 80 SF ELECTRICAL 00.04.02 ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF TLT/SHOWER -LR 1 00.02.02 90 SF LAUNDRY / JANITOR 00.02.08 20 @ 24" 20 @ 24" 20 @ 24" 20 @ 24" 84 SF ELEV 00.09.01 250 SF ZAMBONI 00.09.05 SE LOFTSTORAGE151 SF MIN. ~6 FT OF CLEARANCE HOCKEYSTORAGE168 SF LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF UNIVERSAL 00.09.02 489 SF MEP 00.09.03 409 SF WORKSHOP 00.09.04 205 SF CORRIDOR 00.10.01 262 SF BOILER ROOM 00.10.04 974 SF ICE PLANT 00.10.03 397 SF ELECTRICAL 00.10.02 142 SF FLEX SPACE 00.05.02 STAFF LOCKER 00.07.03 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena South Entry SOUTH ENTRYEVENT LEVEL - OVERALL PLAN NOT TO SCALE 16 W D DN LOADING 2149 SF BOH / LOADING 00.04.01 367 SF AUX LOCKER 3 00.02.09 366 SF AUX LOCKER 4 00.02.05 164 SF TLT/SHOWER -LR 4 00.02.06 172 SF TLT/SHOWER -LR 3 00.02.10 142 SF OFFICIAL LOCKER 1 00.03.03 63 SF TLT/SHOWER -OLR 1 00.03.04 373 SF AUX LOCKER 5 00.03.02 164 SF TLT/SHOWER -LR 5 00.03.01 342 SF AUX LOCKER 6 00.03.07 188 SF TLT/SHOWER -LR 6 00.03.08 142 SF OFFICIAL LOCKER 2 00.03.05 63 SF TLT/SHOWER -OLR 2 00.03.06 433 SF AUX LOCKER 1 00.02.01 349 SF AUX LOCKER 2 00.02.04 161 SF TLT/SHOWER -LR 2 00.02.03 2679 SF LOBBY 00.06.02 302 SF ELECTRICAL 00.02.07 241 SF VESTIBULE 00.06.01 69 SF PENALTY BOX 1 00.06.06 89 SF SCORE TABLE 00.06.05 66 SF PENALTY BOX 2 00.06.04 21 @ 28"21 @ 28" 130 SF SKATE REPAIR 96 SF ASSOC. DIRECTOR 435 SF SKATE RENTAL 248 SF MEN 523 SF WOMEN 124 SF ELEC 154 SF AV / IT 80 SF ELECTRICAL 00.04.02 ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF TLT/SHOWER -LR 1 00.02.02 90 SF LAUNDRY / JANITOR 00.02.08 20 @ 24" 20 @ 24" 20 @ 24" 20 @ 24" 84 SF ELEV 00.09.01 250 SF ZAMBONI 00.09.05 SE LOFTSTORAGE151 SF MIN. ~6 FT OF CLEARANCE HOCKEYSTORAGE168 SF LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF UNIVERSAL 00.09.02 489 SF MEP 00.09.03 409 SF WORKSHOP 00.09.04 205 SF CORRIDOR 00.10.01 262 SF BOILER ROOM 00.10.04 974 SF ICE PLANT 00.10.03 397 SF ELECTRICAL 00.10.02 142 SF FLEX SPACE 00.05.02 STAFF LOCKER 00.07.03 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena South Entry SOUTH ENTRYEVENT LEVEL - OVERALL PLAN NOT TO SCALE 17 W D DN LOADING 2149 SF BOH / LOADING 00.04.01 367 SF AUX LOCKER 3 00.02.09 366 SF AUX LOCKER 4 00.02.05 164 SF TLT/SHOWER -LR 4 00.02.06 172 SF TLT/SHOWER -LR 3 00.02.10 142 SF OFFICIAL LOCKER 1 00.03.03 63 SF TLT/SHOWER -OLR 1 00.03.04 373 SF AUX LOCKER 5 00.03.02 164 SF TLT/SHOWER -LR 5 00.03.01 342 SF AUX LOCKER 6 00.03.07 188 SF TLT/SHOWER -LR 6 00.03.08 142 SF OFFICIAL LOCKER 2 00.03.05 63 SF TLT/SHOWER -OLR 2 00.03.06 433 SF AUX LOCKER 1 00.02.01 349 SF AUX LOCKER 2 00.02.04 161 SF TLT/SHOWER -LR 2 00.02.03 2679 SF LOBBY 00.06.02 302 SF ELECTRICAL 00.02.07 241 SF VESTIBULE 00.06.01 69 SF PENALTY BOX 1 00.06.06 89 SF SCORE TABLE 00.06.05 66 SF PENALTY BOX 2 00.06.04 21 @ 28"21 @ 28" 130 SF SKATE REPAIR 96 SF ASSOC. DIRECTOR 435 SF SKATE RENTAL 248 SF MEN 523 SF WOMEN 124 SF ELEC 154 SF AV / IT 80 SF ELECTRICAL 00.04.02 ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF TLT/SHOWER -LR 1 00.02.02 90 SF LAUNDRY / JANITOR 00.02.08 20 @ 24" 20 @ 24" 20 @ 24" 20 @ 24" 84 SF ELEV 00.09.01 250 SF ZAMBONI 00.09.05 SE LOFTSTORAGE151 SF MIN. ~6 FT OF CLEARANCE HOCKEYSTORAGE168 SF LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF UNIVERSAL 00.09.02 489 SF MEP 00.09.03 409 SF WORKSHOP 00.09.04 205 SF CORRIDOR 00.10.01 262 SF BOILER ROOM 00.10.04 974 SF ICE PLANT 00.10.03 397 SF ELECTRICAL 00.10.02 142 SF FLEX SPACE 00.05.02 STAFF LOCKER 00.07.03 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena South Entry SOUTH ENTRYEVENT LEVEL - OVERALL PLAN NOT TO SCALE 18 W D DN LOADING 2149 SF BOH / LOADING 00.04.01 367 SF AUX LOCKER 3 00.02.09 366 SF AUX LOCKER 4 00.02.05 164 SF TLT/SHOWER -LR 4 00.02.06 172 SF TLT/SHOWER -LR 3 00.02.10 142 SF OFFICIAL LOCKER 1 00.03.03 63 SF TLT/SHOWER -OLR 1 00.03.04 373 SF AUX LOCKER 5 00.03.02 164 SF TLT/SHOWER -LR 5 00.03.01 342 SF AUX LOCKER 6 00.03.07 188 SF TLT/SHOWER -LR 6 00.03.08 142 SF OFFICIAL LOCKER 2 00.03.05 63 SF TLT/SHOWER -OLR 2 00.03.06 433 SF AUX LOCKER 1 00.02.01 349 SF AUX LOCKER 2 00.02.04 161 SF TLT/SHOWER -LR 2 00.02.03 2679 SF LOBBY 00.06.02 302 SF ELECTRICAL 00.02.07 241 SF VESTIBULE 00.06.01 69 SF PENALTY BOX 1 00.06.06 89 SF SCORE TABLE 00.06.05 66 SF PENALTY BOX 2 00.06.04 21 @ 28"21 @ 28" 130 SF SKATE REPAIR 96 SF ASSOC. DIRECTOR 435 SF SKATE RENTAL 248 SF MEN 523 SF WOMEN 124 SF ELEC 154 SF AV / IT 80 SF ELECTRICAL 00.04.02 ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF TLT/SHOWER -LR 1 00.02.02 90 SF LAUNDRY / JANITOR 00.02.08 20 @ 24" 20 @ 24" 20 @ 24" 20 @ 24" 84 SF ELEV 00.09.01 250 SF ZAMBONI 00.09.05 SE LOFTSTORAGE151 SF MIN. ~6 FT OF CLEARANCE HOCKEYSTORAGE168 SF LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF UNIVERSAL 00.09.02 489 SF MEP 00.09.03 409 SF WORKSHOP 00.09.04 205 SF CORRIDOR 00.10.01 262 SF BOILER ROOM 00.10.04 974 SF ICE PLANT 00.10.03 397 SF ELECTRICAL 00.10.02 142 SF FLEX SPACE 00.05.02 STAFF LOCKER 00.07.03 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena South Vomitory SOUTH VOMITORYEVENT LEVEL - OVERALL PLAN NOT TO SCALE 19 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena Southwest Wall CONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE SOUTHWEST WALL 20 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena Northwest Wall CONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE NORTHWEST WALL 21 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena Northeast Wall CONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE NORTHEAST WALL 22 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena North Wall NORTH WALLCONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE 23 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena South Lounge SOUTH LOUNGECONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE 24 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena South Lounge Railing SOUTH LOUNGE RAILINGCONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE 25 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena Arena Duct ARENA DUCTCONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE 26 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena West Entry Vestibule WEST ENTRY VESTIBULECONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE 27 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena West Entry Ceiling WEST ENTRY CEILINGCONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE 28 24 " x 3 6 " FD J 24" x 48"24" x 48" 24 " x 4 8 " FD FD FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF WHEELCHAIR PLATFORM 01.06.02 1171 SF SOUTH SPECTATOR SEATING 01.05.011061 SF SOUTH SPECTATOR SEATING01.07.05 65 SF UNIVERSAL 01.04.01 82 SF OFFICE 01.04.04 180 SF CONFERENCE ROOM 01.04.02 735 SF ADMIN SUITE CIRCULATION 01.04.03 1699 SF CONCESSIONS 01.09.03 518 SF NEW ENTRY LOBBY 01.09.02 1284 SF LOUNGE AREA 01.06.01 1638 SF WEST CONCOURSE 01.09.01 1111 SF NORTH CONCOURSE 01.12.01 1091 SF EAST CONCOURSE 01.03.01 1082 SF FOOD SERVICE 01.05.03 3868 SF NORTH SPECTATOR SEATING 01.12.02 40 SF BEVERAGE CART 01.02.01 3251 SF MECHANICAL 01.02.01 129 SF MEP 01.07.03 298 SF WOMEN 01.07.01278 SF MEN 01.07.02 Redundant Room MECHANICAL 01.10.01 1554 SF CONCOURSE 00.08.04 439 SF WOMEN 01.12.03 239 SF MEN 01.12.06 89 SF CONCESSIONS 01.12.05 18 SF JAN 01.12.04 RINK DIRECTOR 01.04.05 PROJECT NORTH Copyright 1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL Town of Vail Dobson Arena Renovations // February 3, 2025 Dobson Arena Arena Duct WEST ENTRY SCOREBOARD WALLCONCOURSE LEVEL - OVERALL PLAN NOT TO SCALE 29 Town of Vail Dobson Arena Renovations // February 3, 2025 30