HomeMy WebLinkAboutApril 7, 2025 AIPP Agenda1.Call to Order
2.Citizen Participation
3.Main Agenda
3.1 Swearing in Ramsey Cotter and Susanne Graff to serve two-
year terms to the AIPP Board. (5 mins)
3.2 Approval of March 3 and 17 AIPP Board meeting minutes.
3.3 Review of proposed sculptures to be sited on Town of Vail
property as a part of the Temporary Art Program, Frank Cafaro
for J. Cotter Gallery. (15 mins)
3.4 Discussion of site-integrated public art at the Dobson Ice
Arena. (20 mins)
3.5 Summer 2025 AIPP programming. (20 mins)
4.Coordinator Updates
5.Adjournment
ART IN PUBLIC PLACES MEETING
Agenda
Vail Town Council Chambers
Via Zoom Webinar: https://vail.zoom.us/j/85445126211
8:30 AM, April 7, 2025
March 3, 2025 Minutes.pdf
March 17, 2025 Minutes.pdf
J. Cotter x J. Cotter Temporary art Application .docx.pdf
Squash Bed x J. Cotter Temporary art Application .docx.pdf
Don't Fence Me In (1).JPEG
Ranch Rocks.JPEG
FC Statement.docx.pdf
Frank Carfaro CV Final.docx.pdf
2025-0203 Art Meeting Update.pdf
Meeting agendas and materials can be accessed prior to meeting day on the Town of Vail website
www.vail.gov. All Town Council meetings will be streamed live by High Five Access Media and available
for public viewing as the meeting is happening. The meeting videos are also posted to High Five Access
Media website the week following meeting day, www.highfivemedia.org.
Please call 970-479-2460 for additional information. Sign language interpretation is available upon
request with 48 hour notification dial 711.
1
Art in Public Places Board Meeting Minutes
Monday, March 3, 2025
AIPP Board members present: Lindsea Stowe - Chair, Tracy Gordon, Kathy Langenwalter, Courtney St.
John & Susanne Graff
Others present: Molly Eppard - AIPP Coordinator, Gregg Barrie and Mia Vlaar – TOV staff
1. Call to Order
2. No citizen participation
3. Main Agenda
3.1 Approval of February 3, 2025 AIPP Board meeting minutes.
February 3, 2025 Minutes.pdf
• Kathy motions to approve the minutes, Tracy seconds and all in
favor.
3.2 Gore Creek Promenade design and public art integration update. Gregg Barrie, Town of
Vail Landscape Architect.
approved concept 2-20-2025.pdf Perspective A- Proposed Concept.jpg Perspective B-
Proposed Concept.jpg
Perspective C- West View-Proposed Concept.jpg
Perscpective D- East View-Proposed Concept.jpg
• Gregg updates the Board on the approval process for this level of concept.
• He discusses the next steps for integrating site-specific art (stone
benches, fire pit design), temporary art placement and permanent
placement.
• The timeline is for Fall 2025 and in Spring 2026.
• The Board discusses site-specific art and the process for working with an
artist on the Gore Creek Promenade project and design.
• Kathy would like to look at multiple artists and pursue who may be willing
to submit for consideration.
• Molly asks the Board to research this type of work, stone artists, what a
call to artists may look like and to review it at a future meeting.
• Gregg asks that this be resolved by the April 2025 meeting.
3.3 Discover Vail: Vail's Destination Marketing Organization update, Mia Vlaar Director
Economic Development Town of Vail.
Discover Vail Destination Marketing Organization Overview
• Mia reviews the VLMD history (lodging/promotions marketing tax, summer
marketing), Stewardship Roadmap and Vail’s newly formed Destination Marking
Organization.
• Special Events budget ($3 million) is now moved into the VLMD’s purview, as
well as the Welcome Centers.
2
• Customer data analytics/collection and Discover Vail website is discussed.
• The three-year Strategic Plan is reviewed which is in alignment with the Town
Council’s Strategic Plan.
• Molly inquires about the Vail Experience mission and any synergy with AIPP,
perhaps an audio tour of the public art collection and map may be a good
cultural offering.
• Lindsea asks Mia to speak to cultural vitality as a priority and experience within
the community. She discusses the many facilities within the town and especially
the Welcome Centers which can be utilized for cultural experiences. She also
discusses the importance of embracing and supporting the artists and
craftsmen/creators in the community.
• Mia informs the Board about the Business Tool Kit on Discover Vail which would
be helpful for promoting AIPP programs, as well as looking into QR codes and
researching where public art lands in general internet searches.
3.4 Summer 2025 AIPP program updates.
• The Board will meet in the coming weeks to review a potential summer
temporary installation with HYBYCOZO.
4. Coordinator Updates
• Studio construction now scheduled for completion by mid-June with a potential
unveiling August 3.
• The potential installation of donated works is discussed.
• GoPro is working on potential artists for the event.
• Lot 10 is scheduled to propose at the April meeting.
• J Cotter Gallery is interested in placing a sculpture in front the gallery in a TOV
planter. Molly sent a copy of the standard agreement for them to review.
5. Adjournment
3
Art in Public Places Board Special Meeting Minutes
Monday, March 17, 2025
AIPP Board members present: Lindsea Stowe - Chair, Tracy Gordon, Kathy Langenwalter, Courtney St.
John & Susanne Graff (via zoom)
Others present: Molly Eppard - AIPP Coordinator, Gregg Barrie – TOV staff
1. Call to Order
2. No citizen participation
3. Main Agenda
3.1 Summer 2025 Program Discussion with HYBYCOZO.
HYBYCOZO_Vail_Summer2025
• The collaborative studio HYBYCOZO, Serge Beaulieu and Yelena Filipchuk, present a
proposal for a temporary installation (late June – through October) in Ford Park.
• The three large scale geometric artworks explore sculpture, light, and shadow and
are proposed for installation in proximity to the new Vail Art Studio.
• The sites will be compromised from the winter construction, so it is a good opportunity
to install temporary surfaces on the locations to facilitate an installation.
• The Board unanimously approves the installation proposal and to enter into a contract.
3.2 Gore Creek Promenade site-integrated art, Gregg Barrie–TOV Landscape Architect
• Gregg discusses the renovation of the Gore Creek Promenade and the possibilities of
integrating art into the park from free standing locations to site-specific.
• The Board agrees with Gregg to contact stone artists who have worked in Vail parks to
see if they may be interested collaborating on design concepts.
3.3 Final approval of proposed gifted artwork from the collection of Vicki and Kent Logan.
• The Art Board unanimously approves the donation of two works into the Town of Vail’s
Public Art Collection:
o Matt Wedel, Flower Tree, 2013, Ceramic, 72 x 42 x 52 inches sited at the
Lionshead Welcome Center:
4
o Thomas Houseago, Rattlesnake Figure (bronze), 2011, Edition 2/2, Bronze,
128.75 x 29 x 29 inches sited in proximity to the Vail Art Studio in Ford Park
4. Adjournment
5
Art in Public Places Temporary Art Program
Art Sited on Town of Vail Property
Applicant Information
Date: April 2nd, 2024
Town of Vail Business: J. Cotter Gallery
Contact Person: Ramsey Cotter
Address: 234 Wall St.
City: Vail State: CO Zip Code: 81657
Phone: 970.390.5705 Email: ramsey@jcottergallery.com
Artwork Details
Artist: Frank Carfaro
Artwork Title: Ranch Rocks
Media/Materials: Wood and Steel
Dimensions of artwork and footprint: (Q-3) 20” x 20” x 42”
Date Of Artwork: 2024
PLEASE SUBMIT THE FOLLOWING SUPPORT MATERIALS:
● Proposed Town of Vail owned site(s) location. = Garden bed in front of J. Cotter
Gallery
● Maquette, images, or renderings of artwork/artist concept. = Attached to email
● Artist statement, resume/cv. = Attached to email
● Installation plan/needs. = Attached to email
6
ART SELECTION CRITERIA
The AIPP Board will consider the following criteria when reviewing works the Temporary Art
Program on Town of Vail Property. The AIPP Board may include additional criteria for a specific
project.
● Be original works of art or of a limited edition demonstrating the highest level of
artistic excellence.
● Diversify the collection in terms of artists, perspectives, materials, and/or media.
● Enhance and activate our public spaces and community experiences.
● Be accepted through a public process.
● Be complete, in good physical condition, of excellent workmanship, and able to
withstand the environment in which it is to be placed.
● Be of a size and scale that can be appropriately and safely displayed in the limited
sites available in Vail.
● Does not present safety or liability concerns to the public or the Town of Vail.
If artwork is accepted by the AIPP Board the Business owner will enter in an agreement with the
Town of Vail in the form of an Art Revocable License prior to installation of artwork.
Please contact Molly Eppard, Art in Public Places Coordinator if you have further
questions or to submit your proposed work of art for donation. meppard@vail.gov or
970-479-23344
7
Art in Public Places Temporary Art Program
Art Sited on Town of Vail Property
Applicant Information
Date: April 2nd, 2024
Town of Vail Business: J. Cotter Gallery
Contact Person: Ramsey Cotter
Address: 234 Wall St.
City: Vail State: CO Zip Code: 81657
Phone: 970.390.5705 Email: ramsey@jcottergallery.com
Artwork Details
Artist: Frank Carfaro
Artwork Title: Don't Fence Me In
Media/Materials: Corton Steel
Dimensions of artwork and footprint: (Q-3) 18” x 22” x 34”
Date Of Artwork: 2024
PLEASE SUBMIT THE FOLLOWING SUPPORT MATERIALS:
● Proposed Town of Vail owned site(s) location. = Garden bed in front of Squash
Blossoms Vail
● Maquette, images, or renderings of artwork/artist concept. = Attached to email
● Artist statement, resume/cv. = Attached to email
● Installation plan/needs. = Attached to email
8
ART SELECTION CRITERIA
The AIPP Board will consider the following criteria when reviewing works the Temporary Art
Program on Town of Vail Property. The AIPP Board may include additional criteria for a specific
project.
● Be original works of art or of a limited edition demonstrating the highest level of
artistic excellence.
● Diversify the collection in terms of artists, perspectives, materials, and/or media.
● Enhance and activate our public spaces and community experiences.
● Be accepted through a public process.
● Be complete, in good physical condition, of excellent workmanship, and able to
withstand the environment in which it is to be placed.
● Be of a size and scale that can be appropriately and safely displayed in the limited
sites available in Vail.
● Does not present safety or liability concerns to the public or the Town of Vail.
If artwork is accepted by the AIPP Board the Business owner will enter in an agreement with the
Town of Vail in the form of an Art Revocable License prior to installation of artwork.
Please contact Molly Eppard, Art in Public Places Coordinator if you have further
questions or to submit your proposed work of art for donation. meppard@vail.gov or
970-479-23344
9
10
11
My journey is anchored in creating processes and techniques which transcend boundaries, aiming to embody and
communicate mental states. I strive to elevate ordinary materials to extraordinary, creating a harmonious interplay
between organic and inorganic, fostering a dynamic balance between order and chaos, tradition and modernity.
I am a passionate advocate for mental health awareness since my diagnosis with bipolar in 2020. My work, such as
Trust Tree, Inside Out and Onwards + Upwards, serve to ignite conversations around the the global challenges of
mental well-being. Through my work, I aim to inspire individuals to reflect on their internal struggles, seek pathways
to manage their condition and help to destigmatize mental health. Art is my therapy which creates balance and
clarity. Bipolar itself is managing extremes and finding harmony.
Previously, I founded the successful furniture brand DESIRON. However, as the business expanded, I found myself
drifting from my initial passion: hands-on creation. I have since dedicated my time to creating art which has brought
me back to my roots.
I am enthusiastic about the prospect of joining the Hayama residency, where I can delve deeper into Japanese
methodologies and artistic traditions. To draw inspiration from the intricate relationship between nature and human
emotion. The geographic and geologic transition from a mountainous environment to the coast would provide me a
needed reconnection with the ocean: offering a new cultural perspective to enrich my creativity.
My work incorporates elements of Japanese arts and tradition such as Kintsugi and Shou Sugi Ban which I hope to
better understand. I am eager to learn, collaborate and innovate. This is an opportunity to immerse myself in
Japanese culture, explore its perspectives on mental health, and further integrate these insights into my art, sharing
them with a global audience.
My artistic journey is founded on the development of innovative processes and methods that break traditional
boundaries. I aim to represent and convey various psychological states through my art, transforming ordinary
materials into something extraordinary. My work creates a harmonious blend of natural and synthetic elements,
striking a balance between order and chaos, as well as between the traditional and the contemporary.
I am deeply committed to raising awareness about mental health, a cause close to my heart since my bipolar
diagnosis in 2020. My artworks, including "Trust Tree," "Inside Out," and "Onwards + Upwards," are designed
to spark discussions about global mental health challenges. Through my creations, I encourage people to
contemplate their personal battles, find ways to cope with their conditions, and contribute to the
destigmatization of mental health issues. For me, art is a therapeutic practice that helps in achieving balance
and clarity, mirroring the essence of managing bipolar disorder by balancing extremes and finding harmony.
Before this, I established the successful furniture brand DESIRON. But as the business grew, I felt a
disconnect from my original passion: creating with my own hands. I have since returned to my roots, dedicating
my time to creating art.
I am excited about the possibility of joining the Hayama residency. I look forward to immersing myself in
Japanese artistic methods and traditions, drawing inspiration from Japan's deep connection between nature
and human emotions. The transition from a mountainous region to the coast in this residency offers a chance
to reconnect with the ocean and gain new cultural insights that can enhance my creativity.
12
My artwork already integrates elements of Japanese art and traditions, like Kintsugi and Shou Sugi Ban, and I
look forward to deepening my understanding of these techniques. I am ready to learn, collaborate, and
innovate. This residency represents a unique opportunity to fully engage with Japanese culture, explore its
viewpoints on mental health, and weave these insights into my art for a global audience.
2
13
CV Final
Frank J Carfaro
Birthplace: Summit, NJ, USA
Current Residence: Edwards, CO, USA
Website: www.frankandhank.us
Educational Background
Rutgers College, New Brunswick, NJ (1984 - 1992)
Universite de Grenoble, Architecture, Grenoble, France (1991)
Professional Career
Artist at Frank + Hank, Vail, CO (2020 - Present)
Founder & CEO of DESIRON, New York, NY (1997 - 2021)
Founder & Creative Director of ‘D Gallery’, SoHo, NYC (2012 - 2019)
Collaborative Works
Workshop APD Architecture, New York, NY (2019)
Lincoln Center Print Collection Partnership, SoHo, NYC (2014)
Collaboration with David Rockwell, New York, NY (2013)
Partnership with Cerno Group, New York, NY (2009)
Collaboration with Jennifer Post, New York, NY (2004)
Exhibitions
Designer for Vogue VIP Lounge, Fashion Week, New York, NY (1999, 2005)
Coast-to-Coast Exhibition, New York, NY (2003)
Participation in Fairs
International Contemporary Furniture Fair (ICFF), New York, NY (2010, 2017)
Neocon, Chicago, IL (2011)
West Week, Los Angeles, CA (2012)
Maison Object, Paris, France (2014)
Salone del Mobile, Milan, Italy (2019)
Awards and Honors
Furnishing for MOMA PS1 Public Space (2018)
NJ Small Business Manufacturer of the Year (2017)
Maker of the Year by Martha Stewart Group (2012)
American Express Small Business Brand Ambassador (2009)
Featured Publications
Women's Wear Daily (WWD) (2019)
Architectural Digest (2018, 2017, 2005)
Elle Décor (2017, 2001)
New York Times (2012)
Vogue (2009)
Wallpaper Magazine (2006)
Interior Design Magazine (2002)
Interni (1999)
Private and Public Collections
Vail Behavioral Health, Edwards, CO
Amanda Precourt, Collector, Denver, CO
The Cookie Factory, Gallery, Denver, CO
14
TOWN OF VAILDobson ArenaRenovations
ART OPPORTUNITIES
FEBRUARY 03, 2025
15
W D
DN
LOADING
2149 SF
BOH / LOADING
00.04.01
367 SF
AUX LOCKER 3
00.02.09
366 SF
AUX LOCKER 4
00.02.05
164 SF
TLT/SHOWER -LR 4
00.02.06
172 SF
TLT/SHOWER -LR 3
00.02.10
142 SF
OFFICIAL LOCKER 1
00.03.03 63 SF
TLT/SHOWER -OLR 1
00.03.04
373 SF
AUX LOCKER 5
00.03.02
164 SF
TLT/SHOWER -LR 5
00.03.01
342 SF
AUX LOCKER 6
00.03.07
188 SF
TLT/SHOWER -LR 6
00.03.08
142 SF
OFFICIAL LOCKER 2
00.03.05
63 SF
TLT/SHOWER -OLR 2
00.03.06
433 SF
AUX LOCKER 1
00.02.01
349 SF
AUX LOCKER 2
00.02.04
161 SF
TLT/SHOWER -LR 2
00.02.03
2679 SF
LOBBY
00.06.02
302 SF
ELECTRICAL
00.02.07
241 SF
VESTIBULE
00.06.01
69 SF
PENALTY BOX 1
00.06.06
89 SF
SCORE TABLE
00.06.05
66 SF
PENALTY BOX 2
00.06.04
21 @ 28"21 @ 28"
130 SF
SKATE REPAIR
96 SF
ASSOC. DIRECTOR
435 SF
SKATE RENTAL
248 SF
MEN
523 SF
WOMEN
124 SF
ELEC
154 SF
AV / IT
80 SF
ELECTRICAL
00.04.02
ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF
TLT/SHOWER -LR 1
00.02.02
90 SF
LAUNDRY / JANITOR
00.02.08
20 @ 24"
20 @ 24"
20 @ 24"
20 @ 24"
84 SF
ELEV
00.09.01
250 SF
ZAMBONI
00.09.05
SE LOFTSTORAGE151 SF
MIN. ~6 FT OF CLEARANCE
HOCKEYSTORAGE168 SF
LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF
UNIVERSAL
00.09.02
489 SF
MEP
00.09.03
409 SF
WORKSHOP
00.09.04
205 SF
CORRIDOR
00.10.01
262 SF
BOILER ROOM
00.10.04
974 SF
ICE PLANT
00.10.03
397 SF
ELECTRICAL
00.10.02
142 SF
FLEX SPACE
00.05.02
STAFF LOCKER
00.07.03
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Entry
SOUTH ENTRYEVENT LEVEL - OVERALL PLAN
NOT TO SCALE
16
W D
DN
LOADING
2149 SF
BOH / LOADING
00.04.01
367 SF
AUX LOCKER 3
00.02.09
366 SF
AUX LOCKER 4
00.02.05
164 SF
TLT/SHOWER -LR 4
00.02.06
172 SF
TLT/SHOWER -LR 3
00.02.10
142 SF
OFFICIAL LOCKER 1
00.03.03 63 SF
TLT/SHOWER -OLR 1
00.03.04
373 SF
AUX LOCKER 5
00.03.02
164 SF
TLT/SHOWER -LR 5
00.03.01
342 SF
AUX LOCKER 6
00.03.07
188 SF
TLT/SHOWER -LR 6
00.03.08
142 SF
OFFICIAL LOCKER 2
00.03.05
63 SF
TLT/SHOWER -OLR 2
00.03.06
433 SF
AUX LOCKER 1
00.02.01
349 SF
AUX LOCKER 2
00.02.04
161 SF
TLT/SHOWER -LR 2
00.02.03
2679 SF
LOBBY
00.06.02
302 SF
ELECTRICAL
00.02.07
241 SF
VESTIBULE
00.06.01
69 SF
PENALTY BOX 1
00.06.06
89 SF
SCORE TABLE
00.06.05
66 SF
PENALTY BOX 2
00.06.04
21 @ 28"21 @ 28"
130 SF
SKATE REPAIR
96 SF
ASSOC. DIRECTOR
435 SF
SKATE RENTAL
248 SF
MEN
523 SF
WOMEN
124 SF
ELEC
154 SF
AV / IT
80 SF
ELECTRICAL
00.04.02
ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF
TLT/SHOWER -LR 1
00.02.02
90 SF
LAUNDRY / JANITOR
00.02.08
20 @ 24"
20 @ 24"
20 @ 24"
20 @ 24"
84 SF
ELEV
00.09.01
250 SF
ZAMBONI
00.09.05
SE LOFTSTORAGE151 SF
MIN. ~6 FT OF CLEARANCE
HOCKEYSTORAGE168 SF
LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF
UNIVERSAL
00.09.02
489 SF
MEP
00.09.03
409 SF
WORKSHOP
00.09.04
205 SF
CORRIDOR
00.10.01
262 SF
BOILER ROOM
00.10.04
974 SF
ICE PLANT
00.10.03
397 SF
ELECTRICAL
00.10.02
142 SF
FLEX SPACE
00.05.02
STAFF LOCKER
00.07.03
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Entry
SOUTH ENTRYEVENT LEVEL - OVERALL PLAN
NOT TO SCALE
17
W D
DN
LOADING
2149 SF
BOH / LOADING
00.04.01
367 SF
AUX LOCKER 3
00.02.09
366 SF
AUX LOCKER 4
00.02.05
164 SF
TLT/SHOWER -LR 4
00.02.06
172 SF
TLT/SHOWER -LR 3
00.02.10
142 SF
OFFICIAL LOCKER 1
00.03.03 63 SF
TLT/SHOWER -OLR 1
00.03.04
373 SF
AUX LOCKER 5
00.03.02
164 SF
TLT/SHOWER -LR 5
00.03.01
342 SF
AUX LOCKER 6
00.03.07
188 SF
TLT/SHOWER -LR 6
00.03.08
142 SF
OFFICIAL LOCKER 2
00.03.05
63 SF
TLT/SHOWER -OLR 2
00.03.06
433 SF
AUX LOCKER 1
00.02.01
349 SF
AUX LOCKER 2
00.02.04
161 SF
TLT/SHOWER -LR 2
00.02.03
2679 SF
LOBBY
00.06.02
302 SF
ELECTRICAL
00.02.07
241 SF
VESTIBULE
00.06.01
69 SF
PENALTY BOX 1
00.06.06
89 SF
SCORE TABLE
00.06.05
66 SF
PENALTY BOX 2
00.06.04
21 @ 28"21 @ 28"
130 SF
SKATE REPAIR
96 SF
ASSOC. DIRECTOR
435 SF
SKATE RENTAL
248 SF
MEN
523 SF
WOMEN
124 SF
ELEC
154 SF
AV / IT
80 SF
ELECTRICAL
00.04.02
ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF
TLT/SHOWER -LR 1
00.02.02
90 SF
LAUNDRY / JANITOR
00.02.08
20 @ 24"
20 @ 24"
20 @ 24"
20 @ 24"
84 SF
ELEV
00.09.01
250 SF
ZAMBONI
00.09.05
SE LOFTSTORAGE151 SF
MIN. ~6 FT OF CLEARANCE
HOCKEYSTORAGE168 SF
LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF
UNIVERSAL
00.09.02
489 SF
MEP
00.09.03
409 SF
WORKSHOP
00.09.04
205 SF
CORRIDOR
00.10.01
262 SF
BOILER ROOM
00.10.04
974 SF
ICE PLANT
00.10.03
397 SF
ELECTRICAL
00.10.02
142 SF
FLEX SPACE
00.05.02
STAFF LOCKER
00.07.03
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Entry
SOUTH ENTRYEVENT LEVEL - OVERALL PLAN
NOT TO SCALE
18
W D
DN
LOADING
2149 SF
BOH / LOADING
00.04.01
367 SF
AUX LOCKER 3
00.02.09
366 SF
AUX LOCKER 4
00.02.05
164 SF
TLT/SHOWER -LR 4
00.02.06
172 SF
TLT/SHOWER -LR 3
00.02.10
142 SF
OFFICIAL LOCKER 1
00.03.03 63 SF
TLT/SHOWER -OLR 1
00.03.04
373 SF
AUX LOCKER 5
00.03.02
164 SF
TLT/SHOWER -LR 5
00.03.01
342 SF
AUX LOCKER 6
00.03.07
188 SF
TLT/SHOWER -LR 6
00.03.08
142 SF
OFFICIAL LOCKER 2
00.03.05
63 SF
TLT/SHOWER -OLR 2
00.03.06
433 SF
AUX LOCKER 1
00.02.01
349 SF
AUX LOCKER 2
00.02.04
161 SF
TLT/SHOWER -LR 2
00.02.03
2679 SF
LOBBY
00.06.02
302 SF
ELECTRICAL
00.02.07
241 SF
VESTIBULE
00.06.01
69 SF
PENALTY BOX 1
00.06.06
89 SF
SCORE TABLE
00.06.05
66 SF
PENALTY BOX 2
00.06.04
21 @ 28"21 @ 28"
130 SF
SKATE REPAIR
96 SF
ASSOC. DIRECTOR
435 SF
SKATE RENTAL
248 SF
MEN
523 SF
WOMEN
124 SF
ELEC
154 SF
AV / IT
80 SF
ELECTRICAL
00.04.02
ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF
TLT/SHOWER -LR 1
00.02.02
90 SF
LAUNDRY / JANITOR
00.02.08
20 @ 24"
20 @ 24"
20 @ 24"
20 @ 24"
84 SF
ELEV
00.09.01
250 SF
ZAMBONI
00.09.05
SE LOFTSTORAGE151 SF
MIN. ~6 FT OF CLEARANCE
HOCKEYSTORAGE168 SF
LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF
UNIVERSAL
00.09.02
489 SF
MEP
00.09.03
409 SF
WORKSHOP
00.09.04
205 SF
CORRIDOR
00.10.01
262 SF
BOILER ROOM
00.10.04
974 SF
ICE PLANT
00.10.03
397 SF
ELECTRICAL
00.10.02
142 SF
FLEX SPACE
00.05.02
STAFF LOCKER
00.07.03
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Vomitory
SOUTH VOMITORYEVENT LEVEL - OVERALL PLAN
NOT TO SCALE
19
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Southwest Wall
CONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
SOUTHWEST WALL
20
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Northwest Wall
CONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
NORTHWEST WALL
21
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Northeast Wall
CONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
NORTHEAST WALL
22
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena North Wall
NORTH WALLCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
23
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Lounge
SOUTH LOUNGECONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
24
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Lounge Railing
SOUTH LOUNGE RAILINGCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
25
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Arena Duct
ARENA DUCTCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
26
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena West Entry Vestibule
WEST ENTRY VESTIBULECONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
27
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena West Entry Ceiling
WEST ENTRY CEILINGCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
28
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Arena Duct
WEST ENTRY SCOREBOARD WALLCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
29
Town of Vail Dobson Arena Renovations // February 3, 2025 30