HomeMy WebLinkAboutM10-0089NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT
.�
�wxo�vn� •
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970-479-2139 f.970.4792452 inspections. 970.479.2149
MECHANICAL PERMIT
ACOM
Job Address: 181 W MEADOW DR VAIL
Location.....: WMC
Parcel No...: 210107101013
OWNER VAIL CLINIC INC 06/03J2010
IN CARE OF VAIL VALLEY MEDICAL CENTER
PO BOX 40000
VAIL
CO 81658
APPLICANT AMERICAN MECHANICAL SERVICES 06/03/2010 Phone: 877-637-7397
GYPSUM OFC - 770 IINDBERGH DR
3231 S ZUNI ST
ENGLEWOOD
CO 80110
License: 128-M
CONTRACTOR AMERICAN MECHANICAL SERVICES 06/03/2010 Phone: 877-637-7397
GYPSUM OFC - 770 LINDBERGH DR
3231 S ZUNI ST
ENGLEWOOD
CO 80110
License: 128-M
Desciption: REPLACE BOILER
Valuation: $55,831.00
ALL TIMES
Perm it #: M 10-0089
Project #: PRJ10-0239
Status . . . : ISSUED
Applied . . : O6/03/2010
Issued . . : 07/O6/2010
Expires . .: 01/02/2011
.................<.........................�........................«...........FEE SUMMARY...........�..........«.........,.x....»............................::,,,....*..........
Mechanical Permit Fee---> $1,120.00 Will Call------------> $4.00 Total Calculated Fees--->
Plan Check-----------------> $280.00 Use Tax Fee------> $2,320.62
$916.62 Additional Fees--------> $0.00
Investigation-----------------> $0.00 TOTAL PERMIT FEE--> a2,320.62
Total Calculated Fees--> $2,320.62 Payments-------------> a2,320.62
BALANCE DUE------> 50.00
.....:..........».« .............«.«...*.......«...:.....................*+,.:....................,........«....+...........�:...........,....�..:............:.......,.....,.««.............»
APPROVALS
Item: 05100 BUILDING DEPARTMENT
06/04/2010 JRM Action: CR DENIED, EMAIL SENT TO CONTRACTOR REQUIRING BOILER TO
BE 92% EFFICIENT AS PER ADOPTED CODE.
O6/29/2010 JRM Action: AP
....«...« ..............««........................+......«..»...:..................:............».....:..:..........»«..::...«..,..,..............:..............«,......::.......,......:..
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315
....« ...............,...«...........,...............,...,t...«...................«..,.........,..........................«...........:............,...................>..............3.�.....«
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
AM - 4 PM.
�%/,�
Signature of Owner or Contractor —TDate
m e c h c a n i ca I_pe rm it_041908
********r*********************+***************************************�***�*****************
TOWN OF VAIL, COLORADO Statement
*�*************+**��**********************�****�*�*****++*****�****«****+****��*************
Statement Number: R100000804 Amount: $2,320.62 07/06/201011:35 AM
Payment Method: Check Init: SAB
Notation: 60200 AMERICAN
MECHANICAL SERVICES
-----------------------------------------------------------------------------
Permit No: M10-0089 Type: MECHANICAL PERMIT
Parcel No: 2101-071-0101-3
Site Address: 181 W MEADOW DR VAIL
Location: WMC
Total Fees: $2,320.62
This Payment: $2,320.62 Total ALL Pmts: $2,320.62
Balance: $0.00
******�************�**************�++++**************+***************************+**********
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 1,120.00
PF 00100003112300 PLAN CHECK FEES 280.00
UT 11000003106000 USE TAX 4� 916.62
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
MECHANICAL PERMIT
Boiler / Furnace & Fireulace Auulications MUST include:
d Complete Mechanical Room Floor Plan with Dimensions r�/ Boiler size & efficiency
d Combustion Air Duct Size and Location ❑ Equipment Cut Sheets for Fireplaces/Log Sets
� Flue detail or Vent size, laation & termination (Manufacturer's info showin make, model & approval listin )
d Gas Piping layout including development length calculations O�ce Use: 1 G�
� Heat Loss Calculations Project #: ��V � Q` Q 2�(
Project Street Address:
� �� w m� `�.
, (Number) (Street)
(Suite #)
Building/Complex Name: �A�l �/W� E��r.a� ��e•
Building Permit #:
Mechanical Permit #: ,M � d— Q va�
Lot #:��Block # Subdivision: V(�� � Q� L
Define Scope and Location of Work:
Contractor Information: / , /
Company: QMEL.��Ar►J �E�wuu+� J£FX�CES ��AcaE boi�EG i,v �� bvr�El. ,
', Company Address: 77p �^; � bE.� �
City: S M State: � Zip ^�j� 6 3% ', (use additional sheet if necessary)
� r�� � IVI�a.4 ..
' Contact Name: _ _.
� � Gas Piping Included
Contact Phone: �t70 - 3T 6' 0�ia3 '❑ Gas Piping by Others
E-Mail � mo6Eaa, I�J/14Sof USA . Con'� • ° W� to Gas Fireplace Conversion
— � . . .. . ... ... ... . . .. . .
Town of Vail Contractor Registration No.: �� %" 1 ° Boiler Location:
Interior ( � Exterior ( ) Other ( )
i� _.. .., ... ..... ,
• Number of Existing Fireplaces:
Contractor Signature (required) ,
_ : Gas Appliances Gas Logs Wood/Pellet
Property Information ,. ., _ _. .
Parcel #: ��O � p7� D/ O/3 ' Number of Proposed Fireplaces: '
(For parcel #, contact Eagle County Assessors Office at 970-328-8640 or '' Gas ApplianCes Gas LOgs WoOd/Pellet
visitwww.eaglecounty.us/patie) .... . . ,�....... ,.. _ ...., . .
' Tenant Name: Type of Building:
VA�I Ci ��.,� C,
' (Commercial Properties) Single-Family ( ) Duplex ( ) Multi-Family ( ) Commercial ( �
' Owner Name: �A�� C�i��� `='wc. : Restaurant ( ) Other ( )
_.,4.. . _ ..�.. .. ... _ . ,.�, ,,.. ._ Date Received:
Complete Valuation for Mechanical Permit: (including fireplaces)
Mechanical $: � 5S�3i• �
l0���0��
D � --
JUN 0 3 2010
C:\edev\forms\permits\building\mechanical�ermit_010110 I TOWN OF VAIL
Job: MVB TM - Type H
Engineer:
cont�acto�: Heating/Hot Water Supply Boilers
Prepared By: �ate: Models H7 504-2004
Model: Indoor/Outdoor:
84% Thermal Efficiency at Full Rate
100% Factory Fire Tested
Maximum Outlet Water Temperature: 220°F
Minimum Acceptable Iniet Water Temperature: 120°F
Full Safety Diagnostics with History
Footprint: Less Than 5-112 ftZ
Limited Twenty-Year Thermal Shock Warranty
Limited Ten-Yea� Heat Exchanger Warranty
Electronic Modulation, Constant Ratio 1.4:1 Turndown
TempTracker Mod Controller with LCD Display
Status Display Lights
� ,:�
�' ,,_�
Heat Exchanger
• Bronze Headers
■ ASME H Stamped
160 PSIG Working Pressure
• National Board Approved
■ Fin Tubing
❑ Copper — Standard
❑ Cupro Nickel — Option A-3
■ ASME Powder-Coated Tube Sheet
■ Silicone High Temp O-Rings
■ ASME Pressure Relief Valve
❑ 60 PSIG — Standard
❑ _ PSIG — Optional
• Temperature and Pressure Gauge,
Shipped Loose
• Stainless Steel Evaporator Plate
Control
• 120V, 60Hz, 1QJ, Power Supply
■ 120/24V 60Hz Transformer
■ Ignition Module
❑ 3-Try — Standard
❑ Single-Try — Option C-6
• Hot Surface Ignition (HSI)
■ Remote Flame Sensor
■ High Limit, Manual Reset, Fixed,
240°F
• On/Off Power Switch
• Flow Switch
■ Blocked Vent Pressure Switch
• Combustion Air Proving Switch
■ Pump Switch
■ Pump Time Delay
• Diagnostics Panel
■ Modulating Temperature Control
■ Water Temperature Sensors (3)
Bumer
■ Ultra-low NOx: Less than 20 PPM
Gas Train
• Fuel
❑ Natural Gas
❑ Propane
■ Zero Govemor Regulator
■ Dual-Seat Combination Valve
■ Electronic Modulating Firing Mode
Construction
• IndooNOutdoor Construction
• Front Controls Enclosed
■ PolyTuf Powder Coat Finish
• Rear Connections (Water, Eledrical,
Gas, Vent, Combustion Air)
■ Design Certified ANSI Z21.13/
CSA 4.9
Venting
• Vent Termination Cap
❑ Outdoor - Option D-11
❑ Indoor, Horizontal — Op6on D-15
❑ Indoor, Vertical (by others)
• Combustion Air
❑ In-Line Filter Kit — Option D-17
❑ Air Intake Elbow — Option D-16
■ Extractor — Optional
❑ By others
❑ Not required
/A\ �
'I�t� �• >
Catalog No.: 2000.364 Effective: 6-15-07 Replaces: NEW
Temperature Controllers
❑ B-36 Temp-Tracker Mod+ Digital
Controller, Up to 4 Boilers,
OA Reset
❑ 8-37 Temp-Tracker Mod+ Digital
Controller, Up to 10 Boilers,
OA Reset
❑ B-38 Temp-Tracker Mod+ Digital
Controller, Up to 16 Boilers,
OA Reset
❑ Y-241 Electronic Sequencer,
Up to 4 Boilers
❑ Y-281 Electronic Sequencer,
Up to 8 Boilers
Options
❑ A-13
❑ F-10
o �-�
D i-2
❑ P-_
❑ P-
❑ P-_
❑ S-1
❑ S-2
Air Vent, Auto, 150 PSI
Low Water Cut-Off, Remote Probe
High Limit, Auto Reset, Adj.,
100-240°F
High Limit, Manual Reset, Adj.,
100-240°F
Pump: HP, 120V, 1 Q�, 60Hz
Water Hardness: GPG
❑ Cast Iron ❑ Bronze
❑ Loase ❑ Mounted
Cold Water Start
Cold Water Run
Low Gas Pressure Switch,
Manual Reset
High Gas Pressure Switch,
Manual Reset
R❑egulatory Agency Requirements
MVB TM - Type H
Models H7 504-2004 Model
�aPna�w w�
, � rZUE conNECnan
�
ze.o
L
I�Ef�
B
�:•,. , a,
G—c�s
�I
- ..,, ��.
oun.Er
E �
F
�
M
�K- Ftue ca+NECnaa—
I�»�:i`T_3;7
R��N COMBUS110N NR
�-- H� w�ha
caa+�cna+s
�ff � P
v,ti`� D
CLEARANCES
PUMP HP - AMPS*
' Current draw is for pump oniy
Modei MBTUH Dimensions (in.) Ship Foot-
(H�_) B D E F G H K M N P R V Wef�ht print Amps'
Input Output Hei�ht NPT NPT Flue 0 C/A 0 (�•) (F�)
504 500 420 43 30 35 23-3/4 1 2 8 141 /8 6 36 6 2 600 5.4 12
754 750 630 49 36 41 29-3/4 1 2 10 18 6 42 6 2 670 5.4 12
1104 1100 924 55 43 47 35-3/4 1-1/4 2-1/2 12 18 6 49 6 2 720 5.4 12
1504 1500 1260 61 50 53 41-3/4 1-1/4 2-1/2 12 1&1/8 8 53 8 2 780 5.4 12
2004 1999 1679 75 61 65 53-3/4 2 2-1/2 14 20-1/8 8 89 9 5 940 5.4 18
- Ratings shown are for elevations up to 4,500 feet. For installati�ons at elevations
above 4,500 feet, please consuft the factory for additional instructions.
- For direct vent applications, please contact the factory about relocating the pump.
RATES OF FLOW AND PRESSURE DROPS
' Current draw is for heater only.
(Supply breaker must have delayed Vip.)
' Closed systems only
Raypak, Inc. • 2151 Eastman Avenue, Oxnarci, CA 93030 •(805) 278-5300 • Fax (800) 872-9725 • www.raypak.com
Raypak Canada Ltd. • 2805 Slough St., Mississauga, Ontario, Canada L4T 1G2 •(905) 677-7999 ■ Fax (905) 677-8036 ■ www.raypakcanada.com
Catalog No.: 2000.364 Effective: 6-15-07 Replaces: NEW
��
�
�p,�.�,��
�a�
u
� ��K �
� �: s�;,.� b�,i�
.. � � �,�..
. ��� ��. C�A°.�
.� �� P��-�' - �.s'
�.�
-� +�,�.�
1�.�
► �;p��- a,� �p� �: �►- ��n� ��� A��.. ,�,�X
���. ���- �E� �� c� �;� - �°I ��.
►��v �- - 3�°l� _ �� ��t �/ 7�o a-�clr_
.; �4
� � v �� �.
�
_ r
Modulating Vertical Boilers & Water Heaters
aa.� `
a"
Ca te or 1*-u to S5 % efficienc
g y � y
Cate or /V-u to 88.4 % efficienc
� y p y
Raypak's Next Generation
Modulating Boiler
Time-honored technologies unite with cutting-edge advancements in
Raypak's MVB� modulating vertical boiler. Never before has a vertical
boiler provided both the installer and building owner such installation
flexibility, ease-of-commissioning, reliability and long-term perform-
ance. Small space, not a problem. The MVB has the smallest installed
footprint of any vertical boiler, only 5.4 square feet. Raypak's MVB is
built with commercial-grade components and materials. From our
steel channel base to our stainless steel flue wrapper, you can tell the
MVB is built to last. It's easy to handle and install, but still user
friendly to seroice. Our compact design fits through a 30" door open-
ing making it the perfect choice for those hard to reach retrofit proj-
ects. Now is the perfect time to take a closer look at Raypak.
Flexibility
Small diameter vents and industry-leading vent length allowances
afford greater vent location options, thus reducing wasted space. Vent
versatility is further enhanced by the self-tuning combustion system
which compensates for unusual chimney and vent configurations.
Category I'` -CSA-certified 84% boiler and up to 85% water heater
models available. Our category I solution is the perfect replacement
for your retro-fit applications. This reduces the installed cost by using
existing category I venting or chimney. Installation couldn't be easier;
all connections are on the back of the unit. Start-up is a snap, it's as
close to plug-n-play as a boiler can get.
Category IV -CSA-certified 87% efficiency at full fir�the highest
possible for non-condensing boilers (Up to 88.4% at part load!)
When the job requires high efficiency, our category IV solution meets
your needs.
At the heart of every Raypak MVB is a unique integral evaporator
system - the first defense against harmful condensation. Raypak's
evaporator system colleds and re-evaporates condensate which may
form during initial start-up or brief periods of cold-water operation,
eliminating the need for a boiler condensate drain. This saves you
money on installation costs as well as the headache of dealing with
multiple condensate drains.
L'
True Modulation
Modulation is nothing new to Raypak, we have honed our gas modu-
lation experience for over 50 years. The Raypak MVB will infinitely
track the heating load precisely with it's built in TempTracker Mod
control, eliminating costly overshooting. Utilizing the latest European
technology for the blower-gas valve package, the optimum fuel-air
ratio is maintained throughout the entire range of the load-tracking
operation. Our smooth 4:1 turndown (503 thru 2003) ensures effi-
ciency is maintained through out the firing rate and adually increases
during part load, right when you want it! The MVB automatically self-
tunes to accommodate the widest range of gas supply pressures. The
high quality integrated blower-gas valve is self-correding and allows
smooth operation with fluctuating gas supply pressures. The Raypak
MVB is cutting edge technology with atmospheric simplicity.
Key Features
• 12 models from 500,000 to 2,000,000 BTUH
• Up to 85% efficiency (Cat. I');
• Up to 88.4% efficiency (Cat. IV)
• No boiler condensate drain required (proprietary design)
• Lowest minimum required inlet water temperature (120F)
• Modulating gas valve and burner,
up to 4:1 (503 thru 2003) turndown
• Engineered with precisely matched system components
• Smallest installed footprint (5.4 square feet) design fits tight
spaces and easily replaces larger boilers
• Advanced diagnostics center, real English fault codes
• All models indoor/outdoor certified
• Complete cabinet protects all controls and wiring
• Meets all current Low NOx regulations, including the new
2010 SCAQMD revisions
• Suitable for altitudes up to 10,000 ft. (derate above 5,000 ft.)
• With all copper and optional bronze waterways, the MVB is
available in boiler and water heater configurations
• Inline combustion air filter (MERVB)
'Category I with vertical vent, category III with horizontal venting and no extractor.
r
O
t. Control Panel
Fully enclosed controls and wiring protect against dam-
age or vandalism. Cabinet design affords easy access to
controls for installation and service.
2. Temp-Trecker Mod Control
This factory-mounted multi-function control
delivers precise load-tracking with selectable
mode displays that are easy to access and read.
3. On Board Diagnostic Center
Factory-mounted standard equipment. Gives relevant
service feedback as well as possible solutions to clear
the fault. All in plain English, no cryptic codes to deci-
pher. The control also stores up to 16 fault codes in its
history file for the service technician to review.
4. Weather-Proof lacket
Heavy gauge galvanized steel with a UV-resistant
Polytuf powder coat finish is impervious to weather and
corrosion.
Cold Water Solutions
r � �' -
�
'�r
State of the art European combustion technology
5. Combustion Air Fan
Cast aluminum, non-sparking construction
6. Vent Pressure Switch
Monitors vent pressure and provides safe shut down if
back pressure is excessive.
7. Minimum Clearance Requirements
Only one inch of side clearance is required from
combustible surfaces.
8. VerYical Heat Exchanger
Cylindrical, multi-pass heat exchanger captures all radi-
ant energy, eliminating the need for heavy refractory.
9. Rugged Cast Headers
Bronze headers standard on water heater models. Cast-
iron standard on boiler models, with bronze headers
optional.
Optional Equipment
Cold Water Start – For applications that
r'�"'�''� require reliable protection against harmful con-
�. :' ; densation caused by frequent, extended, cold
;�, � water start-ups. Raypak's Cold Water Start pro-
� tection system utilizes a proportional three-
- way valve to bypass water from the boiler out-
let to the inlet during start-up, when the sys-
tem return water temperature is below the minimum acceptable
level. (See Cat. #1000.19)
Cold Water Run – For applications requir-
�., ing constant condensation protection. Raypak's
� �—' Cold Water Run system utilizes a variable-
,�- �:: speed pump to inject just the right amount of
�� �`:� water from the main system loop into the boil-
� er to maintain the optimum inlet temperature.
' This approach allows the full capacity of the
!- ------ boiler to be utilized to meet the system load,
while at the same time continuously maintaining the optimum inlet
water temperature to prevent condensation. (See Cat. #1000.19)
z
;;C§' _
10. Tube Sheet Construction
Eliminates the repair & maintenance problems associat-
ed with rolled-tube construction. Easy, cost-effective
component replacement.
11. Viewing Port
Allows easy burner inspection.
12. Low Voitage Wiring Connections
Up front and easy to get to. Makes sensor wiring and
external control wiring simple and clean.
13. Drain Valves
One of two drain valves located at the bottom of the
heat exchanger. This allows for complete winterizing
and drainage ofthe heater.
nli�,�±! iarfrr�• So�Utloii$
TempTracker Mod+ Hybrid– Controls up
�"�"�� to 16 Raypak boilers with PID logic. Automatic
or manually selectable lead-lag boiler opera-
tion. TempTracker Mod+ Hybrid monitors and
displays supply water temperatures on all
applications including outdoor temperature
when outdoor reset mode is selected. Can also
be use to control a mix of condensing and non condensing boilers
using our Hybrid control algorithm. (See Cat. # 5100.22)
sw..c aww.
3{
_�
..� . �.._ . ,��;.. ,
Smallest Installed Footprint
The MVB's compact design allows for easy installation in the most challenging equip-
ment rooms. It's easy to handle and install, but still user friendly to service. The MVB has
the smallest installed footprint of any vertical boiler, only 5.4 square feet. The MVB con-
tains ali of it's components to the inside of the cabinet, so there won't be any fans or
valves hanging off the cabinet that need extra clearance. The compact design fits
through a 30" door opening making it the perfect choice for those hard to reach retrofit
projects.
r
:
-�
503 IV 500 435 87% 500 435 87% 125
753 IV 750 653 87% 750 653 87% 188
1003 IV 999 869 87% 999 869 87% 250
1253 IV 1250 1088 87% 1250 1088 87% 312
1503 IV 1500 1305 87% 1500 1305 87% 375
1753 IV 1750 1523 87% 1750 1523 87% 438
2003 IV 1999 1739 87% 1999 1739 87% 500
504 I" 500 420 84% 500 420 84% 357a
754 I* 750 630 84% 750 630 84% 536a
1104 I* 1100 924 84% 1045 888 85% 786a
1504 I* 1500 1260 84% 1425 1211 85% 1071a
2004 I* 1999 1679 84% 1900 1615 85% 1428a
"Category I with vertical vent, category III with horizontal vennng and no extractor.
tCategory N requires sealed vent with condensate drain. Category I uses conventional B vent.
aBoilers only.
Note: Ratings are for natural or propane gas and for elevations up to 5,000 ft. above sea level. For higher elevations, consult the factory.
��' � 1 �
��• �
4 U �' �
: � � � . . . . . ' � , � : _,,,� � .
504 503 43 32 35 23-3/4 1 2 8 6 14-1/8 14-1/2 6 35 6 2 600 12
754 753 49 38 41 29-3/4 1 2 10 6 16 14-1/2 6 41 6 2 660 12
1104 1003 55 44 47 35-3/4 1-1 /4 2-1 /2 10 6 16 14-1/2 6 47 6 2 720 12
1504 1253 61 50 53 41-3/4 1-1 /4 2-1 /2 12 8 18-1/8 17-3l4 8 53 6 2 780 12
1503 67 56 59 47-3/4 1-1 /4 2-1 l2 8 17-3/4 8 59 6 2 840 12
2004 1753 75 62 65 53-3/4 2 2-1/2 14 8 20-7/8 17-3/4 8 68 9 5 940 18
■ 2003 81 68 71 59-3/4 2 2-1 /2 8 17-3/4 8 74 9 5 1000 18
`Category I with vertical vent, category III with horizontal venting and no extractor.
tNPT is for Natural Gas. For Propane, NPT= 1" for all water heatedboiler sizes.
#Current draw is for heater only. (Supply breaker must have a delayed trip.)
x
i
U
E
�
0
0
�
v
S.
a`
GENERALNOTES:
ALL LOCpI OROINANCES pND AMENDMENTS ANO MANUFACNRER'S OUCTS OR OPENINGS.
1. 00 NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIElO PRIOR TO INSTALlATiON RECOMMENDATIONS. IF A CONFLICT 6ETWEEN 7HOSE
COMMENCEMENT OF WORK. PUBLICATIONS E%ISTS, TNE MOST STRINGENT REQUIREMENT SHALI
APPLY.
2. INASMUCH AS OESIGN FOR qEM00EL AND/OR REHABIL�TATION
REOUIRES THAT CERtAIN ASSUMPTIONS 6E MADE REGAROING EXISTiNG
CONDITIONS, AND BECAUSE SOME OF THESE ASSUMPTIONS CANNOT 8E
VERIFIED WiTH0U7 DESTR011NG OTHERNiSE AOEDUATE OR SERVICEABLE
POR710N5 OF THE BUI(.�ING, THE ENGINEER CANNOT ASSURE THE
OWNER OR THE CONTRACTOR THAT THE PROFESSIONAL CONSUITING
SERVICES HEREIN ENCOMPASS ALL CONTINGENCIES. FIEL�
CO�R�INATION DURMG CONSTRUC710N IS IMPERATIVE. MAKE
REASONABLE AILOWANCES FOR UNSEEN CONOITIONS.
3. THE EXISTINC 6UILOING W1LL BE OCCUPIED 8Y THE OWNER DURING
CONSTRUCTION. CONiINUEO OPERA7ION OF THE FACILI7Y SHALL NOT
8E HINOEREO BY'fH15 WORK. ACWt1NT FOR AlL A��ITIONAL WSTS
tYiICH MAY BE INCURRED OUE TO THE DIFFICUL7Y OF WORKING OVER
AND AROUND EMPLOYEES, FURNITURE, EOUIPMENT, ETC.; AN� DUE TO
THE HOURS OF THE DAY IN WHICH AN AREA MAY 8E ACCESSIBLE
WHEN COMPIIJNG HIS BID.
4. BE RESPONSIBIE TO FlElO VERIFY EXISTING EQUIPMENT OR �UCTWORK
REMAINING TO 8E CONNECTEO TD NEW SYSTEMS. PRON�E OUCTWORK,
PIPINC, CON7ROLS, DIFFUSERS, ETC., AS REOUIREO TO RESTORE
CONTINUITY OF SYSTEM (5), OR TO MAKE NEW WORK MEET EXISTING
COND1710N5, WHETHER INDICATEO OR NOT.
5. PROVt�E MECHANICAL �EMOUTiON AS REOUIREO. EXISTING FIXTURES,
MECHANICAL EaUIPMENT, ETC„ BEING FEMOVED SHALL BE RENftNED
TO THE OWNER. DISPOSE OF ALl REMOVEO PIPING, OUCTWORK, ETC.
UNlE55 NOTED OTHERWISE. PIPES, DUCTWORK, EQUIPMENT, ETC. TO
6E REMOVED, ARE SHOWN HATCHED, UNLESS 07HERWiSE NOTED.
6. ALI. OUCTWORK, OIFFUSERS, PIPING, FI%TURES, AND EQUIPMENT SHOWN
M I.IGHT LINE WEIGHT IS EXISTING, NEW INOICATED BY HEAVIER LINE
WEIGH7, E%CEPT WHERE NOTED. PIPES, OUCTWORK, EOUIPMENT, ETC.
TO BE REMOVED, ARE SHOWN HATCHED.
7. OFFSET PIPING, �UCTWORK, ETC. AS NECESSARY TO ACCOMMODATE
STRUCTURE, 9EAM5, ANO COLUMNS, AN� EXIS7ING EQUIPMENT.
8. ALL EXISTING SUPPORT R0�5 AN� STRAPS NOW SUPPORTiNC OUCTS,
PIPES, AIR N81NG, ELECTRICAL CONDUIT, ETC. THAT ARE REMOVED TO
ALLOW ROOM FOR INSTALLATION OF NEW E�UIPMENT SHALL BE
RELOCATED AND REINSTAL(.ED, OR REPIACE� IF DAMAGED.
9. IT IS THE CONTRACTOR'S RESPONS181LITY TO PERFORM HISMER WORK
IN CONFORMANCE Wi7H ALL APPIlCABLE CO�ES, OROINANCES AND UFE
SAFETY FEANRES AS REOUIRED BY IOCAI, STATE, OR NATIONAL
AU7HORITIES. THE CONTRACTOR SHALL VERIFY WITH THE ARCHItECT IP
MOOIFICATION OF HIS/HER WORK IS REOUIRED FOR COMPUANCE.
10. All WORK OF ALL 7RADE5 MUST 8E IN STRIGT COMPIIANCE, OR
E%CEED THE MINIMUM MATERIAL AND METHOD REOUIREMENTS OP THE
2009 INiERNATIONAL BUIL�ING, MECHANICAL, PU1M61NG, fIRE, Ft1El
GAS AN� 2008 NATIONAI ELECTRICAL CO�ES, MOST CIJRRENT NFPA,
il. SYSTEMS SHAII 8E COMPLE7E, OPERABLE, ANO REAOY FOR
CONTINUOUS OPERATION PRIOR TO ACCEPTANCE BY THE OWNER.
12. SYSTEMS SHAIL BE TESTED FOR PROPER OPERATION. PERFORM AT A
MINIMUM ALL CO�E REOUIRED TE575 OR SYSTEMS. IF TESTS OF WORK
ARE �EFECTIVE, CONTRACTOR SHALL MAKE CORRECTIONS NECESSARY
AT ND AUOITIONAL COST TO OWNER.
13. ALL MATERIALS AND/OR EOUIPMENT SHALI 8E HANDLE� AND
INSTALLE� AS PER MANUFACTURER'S SPEGFICA710N5 AN�
RECOMMENDATIONS.
14. REPNR ALl ACCIDENTAI OR INTEN710NAL DAMAGE TO MATCH EXISTING
CONSTRUCTION W17H NO NOTICEABLE OIFFERENCE IN CON7INUITY,
APPEARANCE OR FUNCTION.
15. PROVIDE 4' HIGH CONCRETE EWIPMENT PAOS BENEATH F100R
MOUNTE� MECHANICAL EqUIPMENT, IN A�DITION TO ANY BASE
ASSEMBLIES REOUIRED OR RECOMMENDED 8Y THE MANUFACTURER.
i6. FIRE STOPPING REQUIREMENT, PENETRAilONS THROUGH RATED WAlLS
ANO FLOORS SHALL BE SEALE� WiTH A MATEftiAL CAPABLE OF
PREVENTING THE PASSAGE OF FLAMES AND HOT GASSES WFiEN
SUB�ECTEO TO THE REOUIREMENTS OF 7HE TEST STANDARD SPECIFlC
FOR FIRE STOPS AS7M-E-814. ACCEPTABLE MATERIAlS INCLU�E:
DOW CORNING RTV FIRE STOP FOAM FOR BARE PIPE, METAL CONDUIT,
AN� ElEC7F21CAl CABLE; 3M FIRE DAM 750 CAUIK FOR BARE PIPE,
METAi. CONDUIT, AN� BWLbiNG CONSTRUC710N GAPS; 3M CP-25
CAUUC AND FS-195 INNMESCENT STRIPS FOR INSULATED PIPES,
PlASTIC PIPE OR CONDUIT, AND EIECTF2ICAL CABIE. SUBMIT UL
LISTED APPLICATION �ATA FOR EACH T1PE OF PENETRATION
ENCDUNTERE�.
77. �UCTS PENETRAiING TNROUGH ROOF SHALL HAVE ft00F FI.ASHING
COMPAi18LE WITH THE ROOFING SYSTEM. SEE ARCHITECTURAL
ORAWINGS. IN THE ABSENCE OF ANY OTHER REQIJIREMENTS, PROVI�E
SHEET LEAD TYPE F�ASHING FOR PI.UMBINC VENTS IN BUILT-UP
ROOFS, TAII CONE W1TH EPDM 800T FOR PIPE AND CONDUIT IN
SINGLE PLY MEMBRANE ROOFS, AND CURBED ROOf PENE1RAilONS IN
ALL TYPES OF ROOF. INSTALlAT10N SHALI BE WATERTiGHT.
18. SUBMIT A WRITfEN 6ALANCE REPORL BALANCING PROCE�URES SHAII
BE IN ACCORDANCE WiiH NEBB OR AABC GUI�ELINES FOR
PROPORTIONAL BALANCE. MEASUREMENTS SHALI.INCLUDE ALL MOTOR
AMPERAGE AND VOLTAGE flEA�iNGS; WATER FLOW AT ALL ROW
MEASUREMENT STA710N5; INIET ANO OUTLET PRESSURE AT PUMPS
WITH FLOW CALCULATED FROM THE PUMP CURVE. ADdUST FLOWS TO
WI7HIN 108 OF REOUIREO �UANTITY. SUBMITfAL OF BALANCE REPORT
WtTH LE55 THAN REOUIRE� FLOWS WITNOUT EXPI,ANATION IS CAUSE
FOR REJECTION OF ftEPORT.
19. PROVI�E �' GAWANI2ED MESN SCREEN ON ALL COMBUSTION AIR
PUMP SCHEDU�E
MOTOR MANUFACTURER*
MARK SERVICE 7YPE GPM T�H (Fi) FI.UI� HP I VO�H/ & MODEI. # ACCESSORIES REMARKS
P_� BOILER INLINE 60 8 30x P.G. 7/3 120/i GRUNDFOS UPS _ _
INJECTION 40-80/4
MANUFACTURERS:
8&G, TACD OR AURORA EOUIVALENT
GENERAI NOTES:
A
B:
20. SUPPORT PIPE WITH ROD AND CLEVIS, RINC HANGERS, TRAPEZE, OR
CLAMPS. NO PIPE TAPE OR STRAPPING ALIOWED. ALl NANGERS
SHALL BE SIZED FOR OD OF INSU�A710N, IF ANY. PRO7ECT INSl1LATE0
LINES WiTH 20 CA SHEET METAI. SHIELOS FOR PIPING 1-i/2' AN�
IESS. PROVIDE CALCIUM SILICATE INSULATION �NSERTS FOR All
INSUI.ATED PIPING 2' AND IARGER. MAINTAIN VAPOR BARRIER ON ALL
WLO LINES. ISOLATE 6ARE COPPER �INES PftOM HANGERS WITH
VIBRASORB OR EOUIVALENT, COPPER COATECI HANGERS ARE NOT
Sl1FFICIENT, NRAPPING PIPE W1TH TAPE NOT ACCEPTABLE.
21. GAS PIPING-SCHE�ULE 40 BLACK STEEL PIPE, 750 lB. MAlLEABIE
IRON SCREWED FITTINGS ON A80VE GROUND PIPE. WELDE� FlTfINGS
VNTH ALL PIPING COATED AND KRAPPED ON BUflIEO PIPE.
22. GAS VALVES--NON-LUBRICA7E� BALLSME VALVE 157TH RESIUENT
SEATS, ANP A�JUSTABLE GLAND PACKINC NUT, AGA AND UL LISTED
FOR NATURAL CAS SERNCE.
23. HEATING WATER SYSTEM SHAIL MATCH E%ISTING SOLUTION.
24. GftAOE AND VALVE All HEATING WATER PIPING WiTH 3/4' HOSE END
VALVES TO PERMIT COMPLETE ORAINAGE OF THE SYSTEM. VENT ALL
HIGH POINTS IN EQUIPMENT ROOMS AS NECESSARY W1TH AUTOMATIC
A�R VENTS PIPED TO CONVENIENT DRAIN. AlL HIGH POINTS IN SYSTEM
OUTS�OE OF EOUIPMENT ROOMS WiTH COMBINA7ION AUTOMA7IC/MANUAI
AIR VENTS AS REOUIRED TO REUEVE AIR �N THE SYSTEM.
25. MAiERiAlS; HYDRONIC PIPING
A. ABOVE GRADE, UP THROUGH 2-7/25 SGHE�ULE 40 STEEI PIPE
WiTH MALLEABLE �RON THREAOED FIiTINGS, OR TYPE t' COPPER
NBE 4A7H WROUGHT COPPER FITiINGS AND 95-5 NO LEAD
SOL�ER.
8. A80VE GRAOE, 3' ANO LARCER; SCHEOULE 40 STEEL PIPE K7TH
CAST IRON OR 57EEL WELOING FITTINGS.
26. INSULATE ALL NEW HEATING WATER PIPING WiTH U.l. APPROVEO,
WHITE, ALl SERVICE, GLA55 FIBER, SNAP-ON, PIPE INSULATION.
INSULATE FlTTINGS W1TH GLA55 FIBER BIANKET INSl1LATI0N AN�
PREMOLOEO P.V.C. COVERS. All MATERIALS SHALL HAVE A SMOKE
DEVEIOPED RATING OF 50 OR LE55 AN� A FLAME SPREAD RATiNC OF
25 OR LE55. INSULATION SHALL PA55 UNINTERRUPTEO THROUGH
HANGERS. VAPOR BARRIERS SHALL BE CONTINUOUS, AND SEALEO
WITH NON-BREATHING' MASTC ON COLD PIPING. ALL RAW EDGES OP
INSULATION SHAII 8E NEA7LY TRIMMED AND SEALED WI1H MASTIC.
A. INSULATION THICKNE55:
7) HEATING AND CHILIED WATER: ALL S�ZES - 1' RUNOUTS
27. EOUIPMENT LABElS: lABEL ALl NEW PIPING. PROVIDE FULI BANO OR
STRIP T1PE MARKERS ANO FLOW ARROWS ON PIPING. PROVIUE
ENGRAVED PI.AS71C VAIVE TAGS VNTH VALVE NUMBER ANO ATTACH
'MTH STANDARO CHAIN OR 5-HOOKS.
BOILER SCHEDULE
HEATING CAPACIIY E�ECTRICAL
801LER FUEL INPUT L.W.T. E.W.T. VENT MANUFACTURER' qCCESSORIES REMARKS
MARK SERVICE �.PE TYPE � S.L OUTPUT MINIMUM �•p� ('p) AMPS VOLT/ �yPE & MODEI �
(MBH) � ALT. A.F.U.E. PH
CAT. I,
HEATING NATURAL iYPE 8 RAYPAK MV8 SEf UP TO BE
8-1-2R WATER CONOEN. �A'` �'��0 740 84R 18� 160 12 �ZQ/� yENT H7-1104 CSD-t CONTROLS NON-CONDENSING
MANUFACTURERS:
• PATTERSON KELLEY, BUDERUS, VIESSMANN
GENERAI NOTES:
a
a:
�,-4 .; = 8
� �`�`� � � � ' , � �, � � � �:
� � r� �
�� � �� � � � .�
� � ��; � z ; • � ;�
� ,�
��i��sz � �
� ' �
� � � U V �
D
ti�� �� � ,���. ���o
I T�i1U3� �� �`�$�. -
PROJEGT ALTITUDE
8,150' ABOVE SEA �EVEL
`t_/J
�
W
�
z
W
U
J
U
�
W
�
i
w
J
i
J
>
F-
L��-L^�
W
U
d
W
Q..'
d'
W
0
m
M1
�
aw
�_
�
=w
wp
�V
x
�
E
R1
i
0
0
Y�
a`
(E) c.a
(E) 20"0
4 MECHANICAL NEW F�OOR PLAN
CONNECT (N) FI.IIE (ENCASEMENT)
PIPE TO TO E%TEND MIN. 3FT
ABOVE (E) COMBUSTION AIR
INTAKE. REliSE (E) FIUE
TERMINAiION.
CONNECT (N) 12"m I.1
TYPE 8 BOII.ER FI.UE:
TO (E) FI.UE, TYP. 2.
6 NEW ELEVATION
SCALE: i!4" = i'-0'
CONNECT (N) 9'0 SEALE� COMBUSTION
OUCTS, MATERIALS PER BOILER
MANUFACNRER'S LITERATURE. TO (E)
8x24 C.A. OUCT, TYP. 2,
CONNECT (N) 12"d LD. T1PE B
BOI�ER FI.UES TO (E) RUE,
TW. 2.
(tJ) 8�. TVP. 2.
;,,� CONNECT (N) FLUE (ENCASEMENT) PIPE
%�i� TO EXTEN� MIN. 3FT ABOVE (E)
'� COMBUSiION AIR INTAKE. REUSE (E)
� FI.UE TERMINATION.
e
� � �
CONNECT (N) 9"0 SEALE�
COMBUSTION OUCTS, MATERIALS PER
80ILER MANUFACTURER'S LITERATURE, CONNECT (N) 12"0 I.O.
TO (E) en24 C.A. OUCT, TYP. T. T1PE B BOII.ER FLUES
TO (E) F�UE, TYP. 2.
�CAP (E) C,A. OUCT. ` e (N) @y TYP, 2,
0
CONNECT (N) DRAIN PIPE 1
70 BO770M OF (E) 90'
Fl.VE ELBOW. PIPE TO
NEAREST ORAIN.
5 NEW ELEVATION
SCALE: 1/4" = 1'-0'
(E) C.A.
(E) 20'C
(E) COMF
OISCONNE
TEMPORAI
801�ER FI
OISCONNE
(E) BOILE
(E) PRIM/
Pl1MPS.
(E) OOME
HEATERS.
(E) ZERO
(E) SPRI�
STATION.
�
1 MECHANICAL DEMO FLOOR PLAN
SCALE: 1/4" _ �'-0"
DISCONNECT (E) FLUE
TERMINATiON AND
PREPARE FOR �
EXTENS�ON.
�
�ISCONNECT AN� CAP
(E) 801LER FLUES.
0
3 DEMO ELEVATION
SCALE: 1/4" = T-0"
�
�ISCONNECT ANO
TEMPORARY BACM
801LER FLUE.
CURB TO REMAIN.
BOILER TO BE �EMOEO AN�
�IOVEO.
AIR HANDUNG UNIT AND
CTWORK. ([
{
EXPANSION TANK.
I
HEAT EXCHANGER.
GLYCOL FEEDER.
2 DEMO_Ea EVATION
AND CAP
FLUES.
OILER.
) REMAIN.
� i
j
. �
o � �
°' c t"++ � � s 'o
m �tN � 's
ao
�
W
�
z
W
U Z
a � 0
�
U cWi �
p go
� �o
J W > C.)
a m Q
� �
J W
Q =
> J �
V >
z W
z
� W W
_ �o
�
IVIL
��
x
�
�
E
�
a
I
s.
a`
TO BOIIER R�
PIIMP FOR 'i
PRIMARY SY�
ROM NORTH
iII.ER ROOM.
A05 WEST OF
2 ROOM.
TO ZERO
INNECT (N)
IILER PIPING
�NIFOLD TO (E)
qNS.
INNECT (N) tVi"
IANCH GAS
IPPLY TO EACH
A�ER FROM (E)
�IN.
ro eoi�ei
PUMP F01
PRIMARY
SEQUENCE OF CONTROL:
HWS SETPOINT SHALL BE MAINTAINEO BY STAGING ON BOILERS IN SEOUENCE VIA A tEKMAR OR
JOHNSON CONTROLS STAGING CONTROLLER. BOIIER CONTROI VALVE SHAII BE OPEN Wi1EN
ASSOCIATE� BOIIER IS ENABIED AND CLOSED WHEN ASSOCIATED BOILER IS DISABLEO. ALL
BOI�ERS SHALL OPERATE VIA INTERNAL CONiROLS TO PROVIDE HWS SETPOINT.
HEA7ING WATER SUPPLY (HWS) SETPOINT SHALL 8E ABLE TO RESET FROM 180F TO 170F AS
OUTSIDE AIR TEMPERATURE RISES FROM 10F TO 50' VIA JOHNSON CONTROIS HOT WATER
RESET MOOULES. PROViOE AN OUTDOOR AIR SENSOR LOCATED ON THE NORTH EXPOSURE.
MINIMUM HWR TO BOILERS TO 8E SET AT 140F.
BOILER'S INTERNAL CONTROlS SHALL 8E INTERLOCKED WiTH ASSOCIATEO BOILER CIRCULATING
PUMP. WHEN BOILER IS ENABLED, CIRCULATING PUMP SHALL STARL CONVERSELY, WHEN
BOIIER IS OISABlEO, CIRCULATING PUMP SHALL STOP.
THE (E) HEA7ING WATER CIRWlATiON PUMPS SHALI ENABIE AND DISABIE AS CIIRRENTLY
PROGRAMMED AND SHAII NOT BE MODIFlED FOR THIS WORK.
PROVIOE BOILER SHUTDOWN SWiTCH LOCATE� AT BOILER ROOM EXIT �OORS, SHUTOOWN SYSTEM
SHALL COMPLY YATH ASME-C�S-i. DIVISION 15 CON'iRACTOR SHAII PRONDE THE SW7TCH
AND ALI. REQUIRED CONTROI WiRWG, ALL WIRING SHALL 8E �N CIXJDUiT. A CIEAR
POIYCAR90NATE HINGEO COVER SHALL BE PROVIOED TO PREVENT ACCIOENTAL OPERATION OF
SWITCH. SW7TCH SHALL HAVE ENGRAVED NAMEPLATES TO IDENTITY SVATCH AS '801�ER
EMERGENCY SHUT�OWN'. DINSION 15 CON7ROL5 CONIRACTOR SHALL COOROINATE WiTH
OINSION i6 FOR SAFE SHUTOOWN OF BOII.ERS.
j.�
BEAUDIN
GANZE
Consulting Engineers, Inc.
VaIL (870)84B�610B
LakeTahoe: (530)550�7334
�envar. (303)27&3820
ForlCaiilns (870)221-5691
wwwbg
\` •,�tl� iRiftii II//
/
�\� "
\ : '6
\�\ ft V /���i
; �\ ��, ` ,� t. �' °m �4' ��ir
� o � , `�: ; �`/ e � ` '
0
a �0
•p eC�+'�-
c
o /� � -
""� o ci �....a C ° _
9t�^ (� � �c+ �
o ���,� :
.,�,o l� o�;
; ��c : :
, �
''��•,,,`�rc � ,g ..,���
)RTH
I�M.
ST OF
G
� m
�
rc
a
H a a
m a�
°ow c�` sQ
e°m aN � .s
0 0
�
W
�
z
W
U Z
Q � �
O
U c� �
p a0
� �o
� ��
J � >
J m
�
J
� Z
a �?
aQ
� �
� W W
~ � _
� m �
Z
N
M3
M10-0089: Entries for Item:390
- MECH-Final
Action Comments � By I Date I Unique_
AP
Total Rows: 1