Loading...
HomeMy WebLinkAboutDRB100197Design Review Board ACTION FORM TOiVrI Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: VAIL TENNIS CENTER DRB Number: DRB100197 Project Description: REPLACE RETAINING WALL AND FENCE AROUND TENNIS COURTS 1 AND 2 Participants: OWNER TOWN OF VAIL 06/04/2010 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 APPLICANT VAIL RECREATION DISTRICT SCOTT O'CONNELL 700 S FRONTAGE RD E VAIL CO 81657 Project Address: 1980 S FRONTAGE RD E VAIL 06/04/2010 Location: FORD PARK Legal Description: Lot: Block: Subdivision: UNPLATTED /FORD PARK Parcel Number: 2101 - 092 - 0000 -2 Comments: BOARD /STAFF ACTION Motion By: Action: STAFFAPP Second By: Vote: Date of Approval: 06/11/2010 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and /or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS. Cond:202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Bill Gibson DRB Fee Paid: $0.00 D - •�-. _.AV ,of Community Development 75 South Frontage Road VaikiiCaLorkdiLAbY.. Application for Design Review i n JUN 04 2010 Minor Exterior Alteration 1 TOWN OF VAIL * General Information: This application is required for all proposals involving minor changes to buildings and site im- provements, such as roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town Code sections can be found at www.vailgov.com under Vail Information — Town Code Online. All projects re- quiring design review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and /or the Plan- ning and Environmental Commission. Design review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Fee: $250 for Multi - Family /Commercial $20 for Single Family /Duplex Single Family Duplex Multi - Family V Commercial Description of the Request: Replace existing retaining wall and fencing around tennis courts 1 &2 at the Vail Tennis Center Physical Address: Vail Tennis Center at 700 South Frontage Rd. East Z 10 1 o u0002 Parcel Number: (Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.) Property Owner: T of Vail Mailing Address: 75 South Frontage Rd. Vail, CO 81 Owner's Signature: Primary Contact/ Owner Representative: S cott F. O'Connell Mailing Address: 700 South Frontage Rd East Vail, CO 81657 E -Mail: soconnell @vailrec.com (970) 477 -526 Fax: (9 479 -2197 For Office Use Only: Cash_ CC: Visa / MC Last 4 CC # Auth # Check # Fee Paid: - Received From: Meeting ate: 6/14 DRB No.: n jO 0 q Planner: ff Project No: Zoning: Location of the Proposal Lot: Block: Phone: (970) 477 -5264 Land Use: Subdivision: I 01- Jan -10 rWNOFVA(L JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER This form is applicable to all Design Review applicants that share ownership of the subject property. For exam- ple, the subject property where construction is occurring is a duplex, condominium or multi- tenant building. This form shall be completed by the applicant's neighbor/ joint property owner. In the case of a multiple - family dwell- ing or multi- tenant building, the authority of the association shall complete this form and mail to: Community Development Department, 75 South Frontage Road, Vail, CO 81657 or fax to 970.479.2452. I, (print name) , a joint owner, or authority of the association, of property located at 700 South Frontage R E (T courts 1 & 2) , provide this letter as written approval of the plans dated 06/04/2010 which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the ad- dress noted above. I understand that the proposed improvements include: Replace o f M and brick retaining wall with a concrete retaining wall. Replacement and modification of fence surrounding courts 1 & 2. (Signature) (Date) Additionally, please check the statement below which is most applicable to you: I understand that minor modifications maybe made to the plans over the course of the review process to en- sure compliance with the Town's applicable codes and regulations. (Initial here) I request that all modifications, minor or otherwise, which are made to the plans over the course of the re- view process, be brought to my attention by the applicant for additional approval before undergoing further re- view by the Town. (Initial here) f: \cdev\ forms \permits \Planning \DRB \DRB_Minor Exterior Alteration_010110 0 PROPOSED MATERIALS Building Materials Type of Material Color Roof Siding Other Wall Materials Fascia Soffits Windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls concrete natural Exterior Lighting Other fence posts and fabric black Notes: Please specify the manufacturer's name, the color name and number and attach a color chip. fAcdev \forms \permits \Planning \DRB \DRB_Minor Exterior Alteration_010110 PROPOSED TREES PROPOSED LANDSCAPING Botanical Name Common Name Ouantit AND SHRUBS Cornus Alba EXISTING TREES TO BE REMOVED Minimum Requirements for Landscaping Red Twig Dog Wood 12 Deciduous Trees — 2" Caliper Coniferous Trees — 6' in height Shrubs — 5 Gal. Type Square Footage GROUND COVER SOD SEED native grass 1200 IRRIGATION existing TYPE OF EROSION CONTROL silt fence 80' Size 18" Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.) We will be installing a concrete retaining wall and black powder coated fence posts. The fence fabric will be coated black vinyl. f: \cdev \forms \permits \Planning \DRB \DRB Minor Exterior Alteration 010110 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new won and should be used in conjunction with preparing your utility plan and schedul- ing installations. A site plan, including grading plan, floor plan, and elevations, shag be submitted to the following unties for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that timeframe please contact The Town of Vad. Subject Property Address: Ford Park (Tennis Courts 1 & 2) Lot N/A Block N/A Subdivision. Unpiattsd Primary tact Onager Repr�sen Scott F. O'Connell Primary CentwWbwwr Represeatative Signature Phone= ( 970) 477 -5264 Plans Dam, 05/1912010 TES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verdication if the submitted plans are altered in any way after the authorized signature date. 03 -Mar-10 Authorized Signature Comments Date QWEST 970.468.6860(tel) /q ! 970.46&0672(fax) Contacts: Samuel Tooley muel.tool est.com l� XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact Rich Sisneros EM ard.sisnerosOxceleneray.com HOLY CROSS ENERGY 970.947.5471 (let) 970.945.4081 (fax) Contact: Diana Goes dqolis@holycrcw XCIEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert ert xcelener .com EAGLE RIVER WATER & SANITA- TION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhaslee0erwsd &LQ COMCAST CABLE 970.619.0752 (bel) 970.468 -2672 (fax) Contact: Tony Hildreth tony_hiklreth@cable.wmeast.com CDOT (Only in CDOT Right -of -way) 970.683.6284 (let) Contact Dan Roussn Daniel.roussin@dotstate.co.us TES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verdication if the submitted plans are altered in any way after the authorized signature date. 03 -Mar-10 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul- ing installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: Ford Park (Tennis Courts 1 & 2) Primary ice' Co tact / Owner Re - �--- � -.�� -. Scott F. O'Connell Lot N/A Block N/A Subdivision: Unplatted Phone: (970) 477 -5264 Plans Dated: 05/19/2010 Primary Contact/Owner Representative Signature NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact /Owner Representative Is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date, 03 -Mar -10 Authorized Signature Comments Date QW EST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley samuel.tooley@qwest.com XCEL HIGH PRESSURE GAS �J b 970.262.4076 (tel) 970.262.4076 970.468.1401 (fax) - -- t6_?A -`r T--o rC,,-t ZO Contact: Rich 5isneros richard.slsneros@xcelenergy.com j { ��lc c f1�S ,1KO t a t HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) Contact: Diana Golis dgolls@holycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kathryn. B ert xcelener .com EAGLE RIVER WATER & SANITA- TION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhasleeraerwsd.org COMCAST CABLE 970.619.0752 (tel) 970.468 -2672 (fax) Contact: Tony Hildreth tony_hildreth @cable.comcast,com CDOT (Only in CDOT Right -of -way) 970.683.6284 (tel) Contact: Dan Roussin Daniel. roussiri@dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact /Owner Representative Is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date, 03 -Mar -10 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed Improvements will not Impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used In conjunction with preparing your utility plan and schedul- ing installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: Ford Park (Tennis Courts 1 & 2) Lot NIA Block NIA Subdivision: Unplatted Phone: (9 70) 477 -5264 Primary Coptact / Owner Scott F. O'Connell Primary Contact /Owner Representative Signature Plans Dated: 05 NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact /Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. 03- Mar -10 Authorized Signature Comments Date QW EST 970.468.6860(tei) 970.468.0672(fax) Contacts: Samuel Tooley samuel.tooley@owest.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisneros@xcelenergy.co HOLY CROSS ENERGY 970.947.5471 (tel) oil Yq ` i n G 970.945.4081 (fax) ?As4t L V tc of X45 Contact: Diana CoJ4 . _ — r ^ (i„ '„ U� \ d olis @hol cross.co s.com lltk.Wx XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kath n. Bgg ert@ xcel energy, com EAGLE RIVER WATER & SANITA- TION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhaslee @erwsd.org COMCAST CABLE 970.619.0752 (tel) 970.468 -2672 (fax) Contact: Tony Hildreth tony_hiidreth @cable.comcast.com CDOT (Only In CDOT Right -of -way) 970.683.6284 (tel) Contact: Dan Roussfn Daniel.roussln @dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact /Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. 03- Mar -10 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed Improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul- ing Installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtairrtomments within that timeframe please contact The Town of Vail. Subject Property Address: Ford Park (Tennis Courts 1 & 2) Lot NIA Block NIA Subdivision: Unplatted Prima tac / O wner Scott F. O'Connell Primary Contact /Owner Representative Signature Phone: (9 70) 477 -5264 Plans Dated: 05/19/2010 NOTES: 1. Utility locations must be obtained before digging. 2, A Revocable Right -of -Way Permit may be required for any Improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3, It Is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. 03- Mar -10 Authorized Signature Comments Date QW EST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley sa m ue l . too i eyP gyrsres t.co XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisneros @xcelenergy.com HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) Contact: Diana Golis dqolis@holycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert !! /d Kath n.6 ert xcelener EAGLE RIVER WATER & SANITA- TION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee hasleeaerwsd.org COMCAST CABLE 970.619.0752 (tel) 970.468 -2672 (fax) Contact: Tony Hildreth tony_hildreth @cable.comcast.com CDOT (Only in CDOT Right -of -way) 970.683.6284 (tel) Contact: Dan Roussin Danlel.roussin@dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2, A Revocable Right -of -Way Permit may be required for any Improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3, It Is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. 03- Mar -10 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul- ing installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: Ford Park (Tennis Courts 1 & 2) Lot N/A Block N/A Subdivision: Unplatted Primary Co tact / Owner Scott F. O'Connell Primary Contact /Owner Representative Signature NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact /Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. Phone: (9 70) 477 -5264 Plans Dated: 05/19/2010 03- Mar -10 Authorized Signature Comments Date Q W EST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley samuel.tooleyOgwest.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisneros@xcelenergy.com HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) Contact: Diana Golis dgolis@holycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kath n.Bo ert@xceIenergy.com EAGLE RIVER WATER & SANITA- TION DISTRICTkrrn�+� 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Ha91ee fhasleeerwsd.or @ / 1 COMCAST CABLE 970.619.0752 (tel) 970.468 -2672 (fax) Contact: Tony Hildreth tony_hildreth @cable.comcast.com CDOT (Only in CDOT Right -of -way) 970.683.6284 (tel) Contact: Dan Roussin Daniel.roussin @dot.state.co. us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact /Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. Phone: (9 70) 477 -5264 Plans Dated: 05/19/2010 03- Mar -10 1 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul- ing installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for ap- proval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: Ford Park (Tennis Courts 1 & 2) Primary Cv�ta / Owner Re w Scott F. O'Connell Primary Contact/Owner Representative Signature Lot N/A Block N/A Subdivision: Unplatted Phone: (970) 477 -5264 Plans Dated: 05/19/2010 NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. 03- Mar -10 Authorized Signature Comments Date Q W EST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley samuel.tooley@gwest.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros nchard.sisneros2xcZLa&L2LcoM HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) Contact: Diana Golis dqolis@holycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kath n.Bo ert x celener .com_ EAGLE RIVER WATER & SANITA- TION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fh aslee_Perwsd .org COMCAST CABLE 970.619.0752 (tel) 970.468 -2672 (fax) Contact: Tony Hildreth tony—hildreth@cable.comcast.com CDOT (Only in CDOT Right -of -way) 970.683.6284 (tel) Contact: Dan Roussin Daniel. roussin @dot.state.co. us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right -of -Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. 03- Mar -10 N" VAIL RECREATION D I S T R I C T To: Design Review Board From: Vail Recreation District Date: 06 /03/2010 RE: Specifications for VRD Ford Park Tennis Court Retaining Walls This is an attachment to the DRB review application submitted by the Vail Recreation District regarding the replacement of the retaining wall on courts # 1 & 2 at the Vail Tennis center. The retaining walls on courts #3 & 4 were replaced in the Fall of 2007 and we would like the walls on courts # 1 & 2 to look exactly like the walls on # 3 & 4. 1 have detailed existing conditions for both sets of courts. Existing Conditions: Wall and Fence detail: This is the existing retaining wall and fence on courts # 1 & 2 that we would like to replace. The old wall is an MSE block wall with a brick ridge top. This wall is falling in multiple locations and has damaged the liner of the clay court irrigation system. MSE & brick retaining wall on courts 1 & 2 This is the new retaining wall on courts # 3 & 4. It is a concrete retaining wall with steel reinforcement. We are very happy with this wall and feel the natural concrete creates a nice "frame" of the green clay court as well as compliments the court lines and netting. The black fence posts and fabric also match the black tennis net posts. Concrete retaining wall on courts 3 & 4 Post Connection Detail: The posts on courts # 1 & 2 are currently on the exterior of the retaining wall and the fence terminates on the exterior of the wall. This fence condition has resulted in an injury during the 2009 tennis season. The posts on courts # 3 & 4 are mounted through the center of the concrete retaining wall providing better support for the post as well as eliminating the opportunity for a guest to slide off the court and under the fence. Post detail on courts 1 & 2 Post detail on courts 3 & 4 Fence Extension: Courts # 3 & 4 currently have a 10' high fence on the West side. This helps keep balls in the court. We propose to 10' fence on courts 3 & 4 replace the existing 4' fence on the West side of courts 1 & 2 with a 10' fence. 4' fence on courts 1 & 2 Specifications: We propose that all posts, horizontals and struts be powder coated black to match existing fencing on courts 3 & 4. The fence fabric will be vinyl coated black also matching the existing fence on courts 3 & 4. Posts — 3" Top & middle horizontal rails — 1 - 5/8" Vertical struts — 1 — 7/8" Fence fabric — 9 gauge We also propose to landscape in front of the wall located on the South side of courts 1 & 2. We will be planting shrubs and bushes to conceal the concrete retaining wall from sight of guest utilizing the bike path to the Ford Amphitheater. Please feel free to contact me regarding any of the information above or if you would like to meet a member of the VRD staff on sight to discuss this project further. Thank you Scott F. O'Connell Building, Facility & Maintenance Manager Vail Recreation District P: (970) 477 -5264 C: (970) 390 -9731 E: soconnell @vailrec.com South retaining wall on courts 1 & 2 sr fi a AN IT - TOPOGRAPHIC MAP Gore Range A PART OF FORD PARK Surveying,LLC TOWN OF VAIL 5 EAGLE COUNTY, COLORADO 10-1 '/7/7' - TOPOGRAPHIC MAP Gore Range A PART OF FORD PARK Surveying,LLC TOWN OF VAIL 5 EAGLE COUNTY, COLORADO 10-1