Loading...
HomeMy WebLinkAboutASB10-0009 Application/PermitNOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TO 1 TOW V Town of Vail, Fire Department, 42 Meadow Drive, Vail, Colorado 81657 p. 970 - 479 -2252, f. 970 - 479 -2176, inspections 970 - 479 -2252 ASBESTOS Job Address: 174 E GORE CREEK DR VAIL Location......: UNIT 343, LODGE AT VAIL Parcel No....: 210108221045 OWNER RUTH LAPIDUS QUALIFIED PERSO 06/08/2010 23 DELEVAN LN HARRISON NY 10528 CONTRACTOR EXCEL ENVIRONMENTAL, INC 06/08/2010 1852 JASPER ST, UNIT E AURORA CO 80011 License: 672 -S Desciption: COMPLETE INTERIOR RENOVATION Valuation: $14,153.00 Add Sq Ft: 2200 Phone: (303) 577 -9933 Permit M ASB10 -0009 Project #: T vn 1 Status....: ISSUED Applied .. . : 06/08/2010 Issued ...: 06115/2010 Expires ...: 12/12/2010 #* lrtrtrtlk4k lk} ikf* t* rtkrttrt}}!;* 4}} kxt* t* rtrt* rt rt !!!! } } } }k * *kkk *rtrtrtk *4 # !4 * *R **k FEE SUMMARY Asbestos Permit Fee - -- $144.00 Investigation ----- — ---- — ---- > $0.00 TOTAL FEES---- - - ---> $144.00 Total Calculated Fees - -> $144.00 Additional Fees — --------- > $0.00 TOTAL PERMIT FEES --- > $144.00 Payments--------------- - - - - -> $144.00 BALANCE DUE------ - - - - -> $0.00 #! 4# kkkk*** firtrtrtrt t! k# kkk** k* rtrtrt 44 !!*} kkkkkk* rt* rtrtrtrt#} i!#*!****** k* k* rtrtrtrt* rt} rt!!!}k#}! k* k* xktrtrtrtrtrt}###*}} kk#****** k* rt rtrtrt#}#* t!} k*}*** k* kk** rtxrtrt } # } } k }tkk4 *kfn * *xfikrt*!4 }4f Approvals: Item: 05600 FIRE DEPARTMENT 06/09/2010 drhoades Action: AP See condition regarding fire extinguishers. #! rt!}}} 44 #k fi!** kkkkk** rtrtrt k#### kk fikkftktrtrttrt}; t!# tfi!}!} kkkkrtrtrtrtrtrt}*}}}!!! k! k* kkkfifikkkfik* rtrtrt}!} 4!! 4ltkkkkkkkrtrtYkrtrtlrtrt}} 444fi!}*** krtrtrtrtrt}# rt}## 44k}}}# kfi*} kkk * * * *rt* #rt } } }} } }!!!tt! } * }ltkk *n See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, International Building Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE �p RTY -EIGHT HOURS IN ADVANCE BY TELEPHONE AT 970 -479 -2252. , =� -� a 7-, �4 6 -fS- r0 Signature or Owner or Contractor Date Print Name *********************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** CONDITIONS OF APPROVAL Permit #: ASB10 -0009 as of 06 -15 -2010 Status: ISSUED *********************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Conditions: Cond: 38 (BLDG.): THIS PERMIT IS GOOD FOR ASBESTOS ABATEMENT ONLY. AN ASBESTOS ABATEMENT CERTIFICATE SHOWING THE AREA FREE FROM ASBESTOS IS REQUIRED PRIOR TO ANY FURTHER WORK OCCURING ON THIS SITE. IF FURTHER QUESTIONS ARISE, CONTACT THE VAIL FIRE DEPARTMENT AT 479 -2252. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: CON0011472 A minimum of one handheld fire extinguisher must be placed inside each work area, per level, and one handheld fire extinguisher outside the work area near the decon area. From: 06/08/2010 14:46 ;#756 P.0011010 ASBESTOS ABATEMENT PERMIT Permit application will not be accepted without the following: 1. Copies of General Abatement Certificate and State of Colorado Certification 2. Site plan with details addressing: waste container storage location, waste load out area location, entry and exiting details of abatement area, details of entry and exiting plans for the occupants of the structure in unaffected areas. Project Street Address: 174 E. Gore Creek Dr. 343 (Number) (Street) (Suite #) BuildinglComplex Name: The Lodge Office Use: /J Project #: �/ AJ lD - 016 7 Building Permit M 00 Asbestos Permit A( A56 llo ( Q l Contractor Information: Lot #: _ Block #! Subdivision: Company: Excel Environmental Inc 1852 Jas er St Company Address. p . Unit - Detailed Description of Work: Removal & City: Aurora State: CO zip: 80011 Disposal of appoximatly 2,200 Contact Name: Michael Griffin Contact Phone: 3 03-472-6541 E - Mail mgriffin @excelcorp.net Town of Vail Contractor Registration No.: 672 -8 X `2 Contractor Signature (requ red) sq ft of ACM textured Dr will (use additional sheet I necessary) Amount of Asbestos: Linear Feet: Square Feet: 2 55/Gal Drums: Start Date: Project Marager: _ N/A I End Date: 'Phone: Cell: Air Monitoring Specialist: David Sinkbei 1 Phone: N/A Cell: 720 --201 - 6611 Property Information Parcel #: 21010 (For parcel #, contact Eagle County Assessors Office at 970 -328 -8640 or visit www.eaglecounty.ustpatie) ! Tenant Name: 06 /17/10 0 6 -25 -10 Work Class: New ( ) Addition ( ) Remodel ( ) Repair X ) Other ( ) Type of Building: I Single - Family (K) Duplex ( ) Multi - Family Commercial ( } Restaurant ( ) Other I Work Type: Interior ()o Exterior( ) Both { ) n y`` Does a Fire Alarm Exist? Yes No( ) j Owner Name: i h ` ayiI as Does a Sprinkler System Exist? Yes No( ) Complete Valuation for Asbestos Abatement Permit: --- - - - - -- - -- -~ — — — - - - - - Asbestos Abatement $: 1 $ ° 1 Date Received: 29- May -09 From: 06/06/2010 14:47 #756 P.0021010 Vail Fire Department Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu- lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact Info listed below. When is asbestos testing rqquired? building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two - Family Dwellings: 30 square feet All Others: 160 square feet Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State - certified and Vail- registered abate- ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the Town of Vail before the building permit will be issued Project Checklist My project falls into the category checked below: Will not disturb more than the threshold limits identified above. Tested negative, or at 1% or below (2 copies of test results included) Tested positive at more than 1 %, requires abatement (2 copies of test results included) I Ips aL racm; • Even recent construction projects may include asbestos - containing materials, so buildings of any age require testing. • The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos - containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: David Rhoades, Fire Inspector Vail Fire Department 75 S Frontage Rd drhoadesCvailgov.com 970 - 477 -3454 www.vaiioov.co State of Colorado Contact: Colorado Department of Public Health and Environment Asbestos Compliance Assistance Group 303- 692 -3158 asbestos @state, co, us www.cdphe.state.co.us From: 06108/2010 14:47 #756 P.003i010 w OW LL Z Z:) Ow aW U 0° J J a Qz E" O Q U W aIL 10 Q C L11 M W Z —' O� a Z _U _L OLL Z Z Z F W } Z W i. uJ Qo � U Q Q O� uJ W Li LL Q H v, m a ro a) 0 m U Q 0 •, 2 ro U C O ay v c to _ U � M � a m C. o ° 3 m C � � n Q� � y C � N F o . m y � L v V (U 47 00 ° o U H v, m a ro a) 0 m U Q 0 •, 2 ro U C O ay v c to _ U � M � a m C. o ° 3 m C � � n Q� � y C � N F o . m y � L v 00 -3: (n r Z _a bOj a O o U ea Z! n. ❑ $ O r # L) # O xQ LL ❑ c N m O N r cD N o N o = ` m a Y > c oU a «s CD E N m �' # E° d a u] E r a ° Q a s ? Q m p 7! v N O cQ� U U) U °J `°, v U a LL d U € u' 8� E 0 o N p O W �- tO ❑ # O r M c C l0 O Y 0 CD N a d E M LLJ I Q 1 v G1 0 .6 U ,o w w` ® ', L L; O j In ❑ 07 LL O D -� ~ dJ U C N M O c N cr o c r• U W L a CL d O. D ._ > O o N Da T y E C N - �� o Q m r F o gyp' > U m N p u r U O� C ❑ E� F- y a u T .0 � m cn U m in in U w i # n #C5 n cr Qv V ID i 0 20 w U) ❑ U C13 ❑ X { g U? a p ,LM N ja d d U E CL Z Z � a N m 4) O ❑ K N ^ E 7 w Q = O m o Q g� Z c Z to „ E N m y y €❑ r Z 2 # ❑ # iL E T v Q b O � v ti O o Y Z c �° p N E airo " a d a_ N L a `' u b U b V) U fJ p F d U d '1. U� U N U �U O Q U N Un C H v, m a ro a) 0 m U Q 0 •, 2 ro U C O ay v c to _ U � M � a m C. o ° 3 m C � � n Q� � y C � N F o . m y � L v From: 1�= EMV 0011 E[NI, T ALL. INC Tuesday, June 08, 2010 06/08/2010 14:47 #756 P.0041010 1852 JASPER ST k UNIT E k AURORA, CO 80011 PHONE - 303 -577 -9933 k FAX - 303 -577 -9936 WWW.EXCELCORP.NET Work plan / Site plan for 174 E. Gore Creek Drive To whom it may concern; In regards to the specifics of the asbestos abatement permit application questions: 1. Copies of General Abatement Certification and State of Colorado Certification Attached 2. Site plan with details addressing: 2a. Waste Container Storage location A small trailer clearly marked with Excel Environmental Inc. logo and traffic cones will be on site using no more than 3 parking spaces. 2b. Waste load out area location A waste load out of two (2) chambers will be attached to full containment in design to not interfere with occupant traffic. Area will be restricted from the general public. 2c. Entry and exit details of abatement area A full decontamination unit including a tool room, shower and clean room will be attached to full containment in design to not interfere with occupant traffic. Area will be restricted from the general public. 2d. Details of the entry and exiting plans for the occupants of the structure in unaffected areas Occupant's entry and Exit will not be affected. Area will be restricted from the general public. RESIDENTIAL k COMMERICAL k INDUSTRIAL k GOVERNMENT k MUNICIPAL k EDUCATIONAL From: w v C M1� _ W i D 0 n c1 W 1 O n 1� 06108/2010 14:47 #756 P.0051010 v� "t- 7 � a � d� a� (n d � 3 S m p W • j ;E m lit 3 jWj s + i J l J L,7 r j I f ile Ir {+! I 0 i i J LL I I CL _ J s � r _ ..y tip • � i fill Ills cr A J' � a ! JI 1 R { w II �� � J i z 1- r � N rzip a From: jo 06/08/2010 14:48 #756 P.006 /010 ' R o Y m N N N o ol 0-4 0-0 r { W t'V \ O nJ \ p N f CD Q > W fir" u 00 � p a E ¢ U z o > z 3 O ' ry a oo `� Q `� ' x .�.. a- O W m w o •a y r ' j L M x s E _ Y O Y From: 06/08/2010 14:48 #756 P.0071010 From: 06108/2010 14:49 1756 P.008410 e c o s tinvir+�n►n +snta(h DN.sexut■er Rostc+rat in. Inc_ Date: 04.01.2010 Asbestos Sampling Report Page 1 / 2 To: Viola Regarding: Lodge at Vail, Unit 343 Mr. Viola, Per your request, on 03.25.2010, ECOS Environmental & Disaster Restoration Inc. conducted a limited asbestos inspection of VISIBLE suspect asbestos containing materials which may be impacted during the proposed remodel /demolition throughout Unit 343. If other suspect materials become visible /apparent during demolition or construction activities, work in that area should be halted and more sampling /testing must take place, per Colorado regulations. Limited bulk sampling of suspect ACM from the drywall surfaces) was conducted in accordance with Colorado State Requirements. Said requirements state: For each homogenous area of less than 1000 SF, a minimum of three samples must be collected randomly. For each homogenous area of 1000 -5000 SF, a minimum of five samples must be collected. For areas larger than 5001 SF a minimum of seven samples must be collected, respectively. A homogeneous area is defined as one which shares suspect material, texture, color, location, and /or apparent time of construction. Craig Thompson, a Colorado Department of Public Health & Environment certified building inspector, certification number: 16928, performed the inspection on 03.25.2010. Samples taken were sent to the lab Reservoirs Environmental, in Denver, for PLM (Polarized Light Microscopy) analysis. Attached are the lab's documents with analyses and findings. Please feel free to contact Craig Thompson with queries or to make arrangements for any necessary abatement activities, DESCRIPTION OF SAMPLING AREA Testing area was inside a residential unit in a large commercial structure. Structure is mixed use in nature. From: 0610812010 14:49 #756 P.0091010 SUSPECT MATERIALS SAMPLED Drywall, Texture, Joint Compound, Other TABLE OF LAB RESULTS HOMOGENOUS AREA DESCRIPTION OF AREA NUMBER OF SAMPLES % AND TYPE OF ASBESTOS FOUND A DRYWALL/TEXTURE /COMPOUND 3 None Detected B DRYWALL /TEXTURE /COMPOUND 3 None Detected C DRYWALL/TEXTURE /COMPOUND 5 None Detected D DRYWALL/TEXTURE /COMPOUND 3 None Detected E DRYWALL/TEXTURE /COMPOUND 5 4% CHRYSOTILE F DRYWALL /TEXTURE /COMPOUND 3 4`Yo CHRYSOTILE G DRYWALL /TEXTURE /COMPOUND 3 None Detected H DRYWALL/TEXTURE /COMPOUND 3 4% CHRYSOTILE I DRYWALL/TEXTURE /COMPOUND 7 4% CHRYSOTILE 5% CHRYSOTILE J DRYWALL/TEXTURE /COMPOUND 3 None Detected K DRYWALL/TEXTURE /COMPOUND 3 None Detected CONCLUSIONS Asbestos was found in the samples taken in the kitchenette and the entry area opposite the sink on the bottom level. The top floor tested positive in the bedroom closet and under the vanity. These materials should be remediated in accordance with the CDPHE Regulation No. 8 by a licensed abatement contractor. All Colorado State Regulations and OSHA rules must be followed during this process to protect the general public, the client, and the workers. If it is deemed by the state that the joint compound tests can be considered containing less than the 2% trigger level asbestos, the material may be abated as the reduced consideration mandates. All OSHA regulations must be followed to protect any person exposed during abatement activities.