Project Name: GROTHE PATIO, HOT TUB
Project Description:
PATIO AND HOT TUB (REAR OF HOUSE)
Participants:
OWNER GROTHE, JEFFREY
730 MAGNOLIA ST
DENVER
CO 80220
APPLICANT MPP DESIGN SHOP
MICHAEL PUKAS
PO BOX 288
GYPSUM
CO 81637
Project Address: 1778 ALPINE DR VAIL
06/21/2010
06/21/2010
DRB Number: DRB100235
Location:
Legal Description: Lot: 11 Block: Subdivision: VAIL VILLAGE WEST FIL 1
Parcel Number: 2103-123-1205-6
Comments:
Motion By:
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
Action: STAFFAPP
Date of Approval: 07/08/2010
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond:201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS.
Cond:202
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Planner: RACHEL FRIEDE DRB Fee Paid: $20.00
r* .
Application for Design Review
Minor Exterior Alteration
General Information: This application is required for all proposals involving minor changes to buildings and site im-
provements, such as roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail
Town Code sections can be found at www.vailgov.com under Vail Information — Town Code Online. All projects re-
quiring design review must receive approval prior to submitting a building permit application. An application for Design
Review cannot be accepted until all required infonnation is received by the Community Development Department, as
outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and/or the Plan-
ning and Environmental Commission. Design review approval expires one year from the date of approval, unless a
building permit is issued and construction commences.
Fee: �250 for Multi-Family/Commercial
�20 for Single Famity/Duplex
✓ Single Family Dupleu Multi-Family
Commercial
Description of the Request: _ l� }�/}Tl U � n� � n�.� f) n� �}�iG S�U71t Sl D�� �i� � O F
'l��c �c�l�SPNti NoU� 7"� R-�l.lt �►J�.w I��r` T�t� a�l. Tl�k Gbi �e IS �,QVAaSrurJ
To #3fr w�rl1��1 �}hC �5r,�aw�ri7 L1NI� tS b�' j�rsrUt�sar+cE /S-,�D p5vi� � Ivr h2�v-
Physical Address' � 7�8 Alpine Drive
Parcel Number: 216 3- l Z3- ( 2" 0 3� (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Property Owner: �effrey Grothe
Mailing Address• 730 Magnolia St., Denver, CO 80220
Owne�'s Signature:
Primary Contact/ Owner
Phone: 917-406-9355 or 303-800-0951
/a. _ ' •
Mailing Address: �� � � 2��
C7 yPSUM, La � /6 �� Phone: �o •�jqo - �%31
E-Mail: ►'►� �c,tiael Q rn n� d�'S �yn� n. �Qrv� Fax:
For Office Use Only: Cash_ CC: Visa / MC Last 4 CC #
Fee Paid: � Received From:
Meeting Date: � � � DRB No.: _T
Planner: Project No: �'
Zoning: Land Use:
Location of the ProposaL• Lot: �� Block: Subdivision�
#
0
#
�� �!> '--� �L �`il
��L� 01-Jan-10
i �1IV�� O'� �f?��L
*+*********+*****+*�************************************************************************
TOWN OF VAIL, COLORADO Statement
********************************************�*************+++*****************+*+********�**
Statement Number: R100000712 Amount: $20.00 06/21/201001:50 PM
Payment Method: Check Init: JLE
Notation: 1065 MPP
DEISGN SHOP
-----------------------------------------------------------------------------
Permit No: DRB100235 Type: DRB-Minor Alt,SFR/DUP
Parcel No: 2103-123-1205-6
Site Address: 1778 ALPINE DR VAIL
Location:
Total Fees: $20.00
This Payment: $20.00 Total ALL Pmts: $20.00
Balance: $0.00
*****************�**************************************************************************
ACCOUNT ITEM LIST:
Account Code
--------------------
DR 00100003112200
Description Current Pmts
------------------------------ ------------
DESIGN REVIEW FEES 20.00
-----------------------------------------------------------------------------
PROPOSED MATERIALS
Buildin4 Materials Tvce of Material Color
Roof
Siding
Other Wall Materials
Fascia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashing
Chimneys
Trash Enclosures
Greenhouses
Retaining Walls
Exterior Lighting
Other 1Dh1�i?�1� PbT10 �rl�M����- � ��rut ��s����
Notes: ��� t'� �t'� ��F�N (.� w/ � kQ ru�x i5�7r►c� I�o�S�
�o IZI �o r-� t�(— S)DI r(C�
Please specify the manufacturer's name, the color name and number and attach a color chip.
f:\cdevlforms\permits\Planning\DRB\DRB_Minor Exterior Alteration_010110
LETTER
June 15, 2010
Town of Vail
Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970-479-2139
Fax: 970-479-2452
Project description: Grothe Residence
Hot tub addition
Project location: Lot 11, Vail Village West, Filing No. 1
Parcel no: 2103-123-12-056
1778 Alpine Drive
Vail, CO 81657
Dear sirs,
r�pp design shop
PO Box 288
095 Willowstone Place
Gypsum, CO 81637
c 970-390-4931
michael@mppdesignshop.com
The current owner of 1778 Alpine Drive, Jeffery Grothe, is planning on adding a hot tub to the back of his
house. The installation of the hot tub will require an addition to the existing concrete patio on grade.
The hot tub wiil be screened by a solid railing on two sides - the north and west side - to further screen the
hot tubs from the street to the north and the neighbor to the west. One existing spruce tree will be
relocated strategically to further screen the hot tub f/ the neighbors. The solid railing will be of horizontal
wood to match the siding on the existing house. The face of the exposed foundation walls supporting the
patio will be keystone block.
The size of the patio is constrained to the west by a 5' utility easement from the property line, an existing
block retaining wall down hill to the north, and en existing block retaining wall up hill to the south. The lot
also has a limit of disturbance line that was established during the original development of lot 10, 1 1 and
12, and is deeded with the property. The proposed hot tub and patio addition complies with this limit of
disturbance line.
The following pictures show the existing elevations of the house and the location of the proposed hot tub
and patio addition.
1002_Grothe_leTter-of-intent_06-IS10.doc Page 1 of4
LETTER
The existing north and west elevations as seen from Alpine Drive
,1 , �
� �x , ., ,�x • � N�.,? , �
}� �� _� � �, f �- �, y a _
� �i�� � �f'�i..�S' �}�'it'a �riS?'. �c , , -' �' _. .. e. � °.m. a-��"�� q •.�
rv�� � " : �. � . �. q,' , i-p ►i� ► 'Y T�!� ` r ..r ;' », ... .
f :!"-�
='g�.,l��,�F-.... - : ...:.�,-�. . �� . . -_. __ _ �'` .�e�'�� .
^ ,_ . . � .. �._. � . �, ,..K t
�'�' �k t� . - �•:_- . '"' ;' • - ; � ��
�� � _ ='�'� � _ � �
__
;.,-�� -
. r.
�� -_ _
--;;_
.__, � � .� -1.__ .� — _..� a
��,,. �
�^�� . :r..
r "-
�?'�� � f':�
, .i� `�*�
t�-- •� ��E.
r
' ��,►�/j � , 4A': � 4 -.
� �..y, ' , 4t`��� .� � ,, �
s4�i•t_,: � �\ ,. si�r.�a ,. GidS�'.�.3.� _ _ e' *Y �w •":°.��
-, ��,3 s:,
��
��,�'-�:��
+�.� .... s ��-
� `-'`+:a
F�:`^'. "'��
��'' � n
. .. . + '`�=�_'
"'c�'��. ' 4�E�� �,� ",..�Ytpn�ii�r`�� ��' �•.:��apY�" i ��'s. .a;.�nr�--.,� '"•
\; j 4 z s
��}. i•... fiaF l��%1 y� n-.�l,,;�'�.. !'.'t��,Y r, �w:��r c.. .
�a`}� . . . � Exn '_ta,. +. ,'�, ._..`. T� ..Cp --.�.w. �!Y '3' ,_._. � :�
The existing south and west elevations as seen from the hill side above the house
1002_Grothe_letterof-intent_Ob-1 S l0.doc Page 2 of 4
mpp desiqn shop
PO Box 288
095 Willowstone Place
Gypsum, CO 81637
c 970-390-4931
michael@mppdesiqnshop.com
LETTER
mpp desiqn shop
PO Box 288
095 Willowstone Place
Gyps�m, CO 81637
c 970-390-4931
michael@mqpdesiqnshop.com
l • •"" �d�4�
;�,.,�,
I
�.y ._, .�„���,�� ,� �, t
< < �t, � � x°�::,
�w`�� +r�� ; y4��, R '� ,,,�, w�:
� �� . � ,�. ��,#. '4 'a��s� �
1:;;.. . �S '`1 .�, �' �`'�.. �". � q���'
• �. � � �4 '�} 'f
f.�- t i : ���: ` �fh .;!�` .>.�' ., � '�x,.r ���f���. � = �� j��:d
.*� ^� r��r � �����d �j�. � � ti ���
�` �. . � ,
J r,i �.. ,yC ... � � 4 .
�) �IEr 1 •:�'�r a , z �► ��'�,r--��
;r;��ie' � "' �Gi�.4 $ �i i�. \, � .. 1 �+i..�N y� I, d� !i .. ..
-� _ d �1 � }t.•� cC�iV q.\. ` N�% � � �. Z"_�� ri'�'
���� :' �. ae� ���•�1q�r•,.�5� • � ,� :�. ;.Ir� 9��. �'��
'!' y� .. 'h �i�4= � t': � . �-:.�li+w�
�� -�.0 � �` ��� f N �A•� �FJ s
w ° � �F� �°�'� j a�-' . �' � `_`�c •
,g, +-, ,�, ��`;��y1 µ;� "}�s�.''�+'��,� rsf �° g
d Jf..MA���' �9t' T\.''i:yh�,� X1�l�k�'�'�13',.f' .� 1'� ',�,� „�,1�
+Si li:
The existing west elevation as seen from above the neighboring house to the west
� � ��
,
M� } �.1. ` -j'!
a
i � '��q 4
i
4
�x- f%i.
. k:'-, - .�.,
ti. ,
Y.. � ._.... -. _ _.
�:\R• � .'� v � �
�t �a � ` � .. �'i
` ��.:. � � '�.
� ��
� .., �� '�'��`"�,�1��`?� ,�.`�` �; � . �.
The existing west elevation as seen from tf�e neighboring house to the west
1002_Groihe_letTerof-intent_06-1S10.doc Page 3 of 4
LETTER
mpp design shop
PO Box 288
095 Willowstone Place
Gypsum, CO 81637
c 970-390-4931
michael@m desi nsho .com
Thank you for your consideration of this project.
Sincerely,
SIGNED: Michael P Pukas
cc:
1002_Grothe_letter-of-intent_06-1S10.doc Page 4 of 4
(07/02/2010) Rachel Friede - Grothe construction staging plan Page 1
From: "Michael Pukas" <michael@mppdesignshop.com>
To: "Rachel Friede" <rfriede@vailgov.com>
Date: 07/01 /2010 2:44 PM
Subject: Grothe construction staging plan
Attachments: Grothe_07-01-10_A1.1. pdf
Hi Rachel - here is the construction staging plan.
The hot tub colors will be:
Shell: pearl
Cabinet: espresso
Cover: espresso
Please let me know if you need anything else to grant approval for the
project.
Thanks Rachel. mpp
mpp design shop, inc.
custom design
Michael Pukas
President
PO Box 288
095 Willowstone Place
Gypsum, CO 81637
(970) 390-4931
michael@mppdesignshop.com
(07/02/2010) Rachel Friede - Grothe construction staging plan Page 2