Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B10-0143
Separate permits are required for electrical, plumbing, mechanical, fireplace, etc. Project Street Address: ` Office Use: r 0 �UT/ 1 29- W SST 4A - JitN c I Project #: ,4 Q //��,, K� ,, tt (Number) (Street) (Suite #) DRB #: V I ©VO Building /Complex Name: � (f� tZ VIC S 1 A! 14 CZ Building Permit #: 1 0 — 0 ( 4 3 Contractor Information: Company: LA 2If—rL c ` CTIZ ) o 3 Company Address: D (0 TI14 " z lor` 9A00 City: �1 - J State: CO Zip: �b5� Contact Name: Contact Ph e: 4 3 1 1 E -Mail 4 4 44— Town No.: , CD Lot #: Block # Subdivision: Detailed Scope and Location of Work: AAA 1 + t S 5 — Iry 1 ,w. �S llrr � ® 12`�a (use additional sheet if necessary) Work Class: New ( ) Addition (x) Remodel ( ) Repair ( ) Other x Work Type C a t ature (r i Interior ( Exterior ( )Both �) tsfoperty Information Type of Building: Parcel #: Z D 3 2 0� — Single- Family Duplex ( ) Multi - Family ( ) (For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or Commercial( Other( ) visit www.eaglecounty.us /patie) Tenant Name: Does a Fire Alarm Exist? Yes (K) No( ) Owner Name: Monitored Alarm? Yes (Y) No( ) Does a Sprinkler System Exist? Yes (X) No( ) - - r Valuations (Labor &Materials) # & Type of Existing Fireplaces: Gas Appliances '_ Gas Log *_ Wood /Pellet Wood Burning Building: Plumbing: Electrical: Mechanical: (including fireplace) Total: $ 0__ $ b $ 000 ,. b $ 3a 000 # & Type of Proposed Fireplaces: Gas Appliances Gas Log Wood /Pellet Wood Burning. Date Received: JUN 17 2010 TOWS! 0r'vA1L BUILDING PERMIT APPLICATION J��[o '0 1 q - 2;;, Vail Fire Department Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu- lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two - Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including multi - family /condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State - certified and Vail- registered abate- ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: a Will not disturb more than the threshold limits identified above. Q Tested negative, or at 1% or below (1 copies of test results included) Tested positive at more than 1 %, requires abatement (1 copies of test results included) Tips & Facts: Even recent construction projects may include asbestos - containing materials, so buildings of a_y age require testing. • The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos - containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: Fire Prevention Bureau Vail Fire Department 75 S Frontage Rd Fire _ inspectors @vailgov. com 970 - 479 -2252 www.vailgov.com State of Colorado Contact: Colorado Department of Public Health and Environment Asbestos Compliance Assistance Group 303 - 692 -3158 asbestos@state.co.us www. cd phe. state. co. us 15- May -10 Job Reslock and Sullivan, L.L.C. Architectural & Planning Services William F. Reslock, A.I.A. Phone (303) 773 -9578 Debbie A. Sullivan, A.I.C.P. Licensed Architect Fax (303) 670 -8759 Certified Planner Email: rsllc @q.com &O-C) 113 August 12, 2010 David Rhoades Fire Inspector Vail Fire & Emergency Services II�� Vail, CO D IS C C � �'I n (E 2 RE: 1290 Westhaven Circle AUG 12 2010 Vail, CO INSPECTION EXEMPTION REQUEST ITOWN O W,'!' David: Concerning the residence at 1290 Westhaven Circle, the construction took place between 2000 and 2002. No ACM (asbestos containing material) were specified by Reslock and Sullivan, L.L.C. in the construction documents for this residence. In accordance with Colorado Department of Public Health and Environment, Regulation 8, Part B III. A.1.d. we are providing this letter to request exemption from the inspection requirement. Please let me know if you have any questions or require any additional information. Sincerely William Reslock, Architect 04 O CO ' S ILIJAN! F. '0- . - ?ESL , ti COI\ � �ARG�% 1582 Prouty Drive Evergreen, Colorado 80439 RUG -11 -2010 14:45 From:9704792176 UAIL FIRE STATION Pa9e:1 All undMined text in this regulation indicates defined terms. III. ARM RENOVATION AND DEMOLITION PRO.ILC cS iii.A. INSPECTION i,II.A.1. Prior to any renovation or demolition which may disturb greater than the tri�cr levels of material identified as it Suspect .i sbcstos- containing material pursuant to the EPA "GrCen Djuk ", Managing Asbestos in Place, Appendix G (1990), the fac:ilil comVoncnt to be affected by the renov ation or demolition shall be inspected to determine if abatement is required. 111.A.1.a. individuals performing these inspections shall be Building Inspectors certified in accordance with this regulation. II I.A.I.b. The inspection, sampling and a ssessmcnls of the suspect materials must be performed as required in paragraph W.C.I. (inspection), eubwc1ions W.D. (Sampling) and W .F. (Assessment) of this regulation. III.A.I.e. The analysis of samples collected during these inspections mast be performed as required in subsection W.E. (Analysis) of this regulation with one exception: if the asbestos content of a sample of friable asbestos is estimated to be 1% asbestos or less, but greater than 0%, by a method other than point counting ('such as visual estimation), the determination Shall be repeated using the point counting technique with petla light microsc if a result obtained by point count is different from a. result obtained by visual estimation, the point count result must be used. Tar impregnated samples do not have to be point counted. `-� IIi.A.1.d. Buildings, or those portions thereof, that were constructed after Oel.obcr 12, 1988 shall be exempt from this inspection requirement if an archilect or project engineer responsible for the construction of the building, or a state certified Inspector, signs a statement that no ACM. was specified as it building material in any constntction document for the building or no ACM was used as a building material in the building. NOTE: The Division recommends that all buildings be inspected prior to »try re.nova6un or d.c�mo_lition activities, regardless of the (late of construction. 111.A.1.e. To prevent any real or potential conflicts of interest, Building Inspectors identifying AC_M must be independent of the. GAC that will subsequently abate the ACM identified. Inspectors need not be independent of the GAC if both the Inspector and the Iicanscd GAC are employees of the building owner. 111.A.2. Abatement, in accordance with Regulation No. 8, is required if the amount of ACM that will be disturbed in connection with the renovation exceeds the trigger levels III.A.3. Any ;1 <Ile�ltis- cunt,iining ma.tgr_i<il. that is friable or will be made friable during demolition activities in any area of im) i� :_aL�t;ti; ur non- public access area must be. removed prior to demolition. ltetilp.val, in accordance with Rcbulaliun No. 8, is Regulation No. 8 Effective: January 30, 2008 Section Ill Part .13 Page 29