HomeMy WebLinkAboutDRB100240Design Review Board
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.vailgov.com
Project Name: LIONSHEAD TRANSIT CENTER DRB Number: DRB100240
Project Description:
CHANGES TO APPROVED PLANS: MODIFY WALL FOR NEW WEST ENTRANCE TO LINSHEAD
PARKING STRUCTURE TO ACCOMODATE SNOW STORAGE, PEDESTRIANS
Participants:
OWNER VAIL COLORADO MUNICIPAL BLDG 06/23/2010
75 S FRONTAGE RD
VAIL
CO 81657
OWNER TOWN OF VAIL
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL
CO 81657
APPLICANT VAIL COLORADO MUNICIPAL BLDG 06/23/2010
75 S FRONTAGE RD
VAIL
CO 81657
Project Address: 395 S FRONTAGE RD W VAIL
LIONSHEAD PARKING STRUCTUR
Location:
Legal Description: Lot: 1 Block: 2 Subdivision: VAIL LIONSHEAD FIL 1
Parcel Number: 2101 - 064 - 0701 -2
Comments: See conditions
BOARD /STAFF ACTION
Motion By: Gillette Action: APPROVED
Second By: Kjesbo
Vote: 4 -0 -0 Date of Approval: 07/21/2010
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS.
Cond:202
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Planner: Warren Campbell DRB Fee Paid: $0.00
General Information: This application is for all changes to approved plans prior to Certificate of Occupancy. An ap-
plication for Design Review cannot be accepted until all required information is received by the Community Development
Department. Design review approval expires one year from the date of approval, unless a building permit is issued and
construction commences.
Submittal Requirements:
1. Three (3) Copies of all pertinent approved plans with illustrated, labeled changes
2. Joint Property Owner Written Approval Letter, if applicable
Fee: $20
Single Family Duplex Multi- Family ✓ Commercial
Description of the Request Modify approved walls for the new west entrance to the I.H Parting Structure
To safely accommodate the existing snow storage, and provide pedestrian safety.
� 3q✓
Physical Address: - CO,
Frontage Rd., Vail C
Parcel Number: � 1 0 1 0(640 - 1 0 l (Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.)
Property Owner: Town of Vail
Mailing Address. S. Frontage Rd. Vail, CO 81657
Phone:
Owner's Signature:
Primary Contact/ Owner Representative: Tom Kassmel, To E ngineer
Mailing Address:
E -Mail: tkassmel @vailgov.com
Fax:
TOWN OF VAIL
For Office Use nly: Cash_ CC: Visa / MC Last 4 CC # Auth # Check #
Fee Paid: Received From:
Meeting Date* /+ 7 DRB No.: 0
Planner: C Project No: — 0 S
Zoning: Land Use:
Location of the Proposal: Lot: Block Subdivision: `I(P I L
Phone: 970 - 479 -2235
U) e V `o -owl 01- Jan -10
Application for Design Review
Changes to Approved Plans
(06/21/2010) Warren Cam b6i - LHTC DRB change Pag6 1
From: Tom Kassmel
To: Warren Campbell
Date: 6/16/2010 1:39 PM
Subject: LHTC DRB change
Attachments: WESTINOUT.pdf; DRB_ Changes _to_Approved_Plans_010110.pdf
Warren
Feel free to staff approve. SF of total wall actually decreases.
Thomas Kassmel, PE
Town of Vail
Department of Public Works
Town Engineer
1309 Elkhom Drive
Vail, CO 81632
Phone 970 -479 -2235
PLANINER
I
iND 2 SOUTH
816Z-O"
SW AIRLEVEL2
'I'l 0
STONEVENEER
CONCRETERET
NEW OPENING,
RE.* STRUCTURE
NEW CONCRETE
. 1 -SOUTH
8151
SW STAIR LEVEL 1
8,150'- 8
APPRO- - -"
By THE
TOWN VAIL
DESIGN REV, BOARD
DATE: t o
PLANNER
NEW CONCRETE -
WALL WI METAL CAP
FLASHING
CONCRETETOPPING -
SLAB W/ SNOWMELT
r1h SW STAIR LEVEL 3
8,174'-7"
:L- SOLT
� L
8 17 $1-
0 .
NEW CONCRETE STAIR
STRUCTURE
CONCRETE RETAINING I
RECESSED LIGHT FIXrU
SUSPENDED METAL PAP
CEILING
iND 2 SOUTH
816Z-O"
SW AIRLEVEL2
'I'l 0
STONEVENEER
CONCRETERET
NEW OPENING,
RE.* STRUCTURE
NEW CONCRETE
. 1 -SOUTH
8151
SW STAIR LEVEL 1
8,150'- 8
APPRO- - -"
By THE
TOWN VAIL
DESIGN REV, BOARD
DATE: t o
PLANNER
E WALL Wl
SHING
'PING SLAB
E STAIR SW STAIR LEVEL 3 At'%
8,174' -T' \,F
LEVEL 3 - SOUTH Ad
8,174
'AINING WALL
'IT FIXTURE
=rAL PANEL
_LEVEL 2 - (2UT!j�
8,16Z - 0 \,-
SW STAIR LEVEL 2 jK
8,161 - 0"
I ON CONCRETE
LL
RE.- STRUCTURAL
- LEVEL 1 -SOUTH �
8,151' -0'
SW STAIR LEVEL -
8,15U-8' -
ROVE B- Y Tr 4'E-
TOWN OF VAIL
DESIGN REVIEW BOARr
DATE..,7�1.fo
1.
PLANNER C-1-
NEW CONCRETE WILL WI
METALCAPFLASHNG
CONCRETETOPPING SLAB
W/ SNOVAIaT
NEWCONCRETESTAR SWSTAJRL�V�E �3
STRVTURE 8,174 -7' '4v
— - — - — - — - — - — - -- — - — - — —
.. ...... . LEVEI-3-SOUTH A
> . ... ... 8.T74 0 'qr
GRACE SEYMD
. . . . . . . . . . ....
UGHTFUMMM. CONCRET ERETAINNGWALL
..e ... ........... F7XTURE
REOME DUGHT
SITE WALL k
SUSPEM)EDMETAL PANEL
CEIUNG
OUTIINEOFDRSAPPROVFDWALL - r 'i-
LEVEL 2-80plrH
8,16z-(r �
. ............. . Ll - 11 - sw
. . . . . . . . . . . . .
... ..... . . ....... - -STONE VENEER ON CONCRETE
RETAINNG WALL
NEW OPENW. Re STRUCTURAL
:
f=!FM I 1 =1 I I -11 I -
___Lg�V�L I - SOUTH
SW STAIR LEVEL IAN
8.1 - a -F
TOV OF VAIL
ruEs'AGN REVIEW BOARD
DI
PLANNER-
POST LIGHT FLXn)RF-TYP.AT
GLLARDML
METAL STA) RIG UARDRAIL
GRADE RADEBEYOND
PLANTER
OUTLINEOFDRDAPPRMSEDWALL
... .......
—7
. . . . . ....... .... .
. . .. ............ — — — — — — — — — — — — — — — — — — — — —
1 721P
TOWN OF VAL
117JESMI REVMW B0,,,i
ATE
PLAOIN E R.
0
N
LL
U)
a
J
O
0
(D _
LU
C�
a
CD
H
2
J
Z
O
O
U)
w
x
0
a
J_
O
Z
a
0
I
U)
O
U
r
a
a
0
N _O
Q O
Z N
H N
W ~
W
° a
I a
ry
w
H
z
w
U
U)
z
W
2
U)
O
J
O
J