HomeMy WebLinkAboutJuly 7, 2025 AIPP Agenda1.Call to Order
2.Citizen Participation
3.Main Agenda
3.1 Approval of AIPP Board meeting minutes from June 2 and
June 17.
3.2 Dobson Ice Arena public art project management discussion,
Cortney Stell Black Cube Nomadic Museum. (45 mins)
3.3 Summer AIPP program updates including opening of the Vail
Art Studio and sculpture installations. (45 mins)
4.Coordinator Updates
5.Adjournment
ART IN PUBLIC PLACES MEETING
Agenda
Vail Town Council Chambers
Zoom webinar option: https://vail.zoom.us/j/81026556226
8:30 AM, July 7, 2025
June 2, 2025 Minutes.pdf
June 17, 2025 Minutes.pdf
2025-0203 Art Meeting Update.pdf
Meeting agendas and materials can be accessed prior to meeting day on the Town of Vail website
www.vail.gov. All Town Council meetings will be streamed live by High Five Access Media and available
for public viewing as the meeting is happening. The meeting videos are also posted to High Five Access
Media website the week following meeting day, www.highfivemedia.org.
Please call 970-479-2460 for additional information. Sign language interpretation is available upon
request with 48 hour notification dial 711.
1
Art in Public Places Board Meeting Minutes
Monday, June 2, 2025
AIPP Board members present: Lindsea Stowe, Tracy Gordon, Ramsey Cotter, Kathy Langenwalter
Absent: Susanne Graff
Others present: Molly Eppard - AIPP Coordinator
1. Call to Order
2. Citizen Participation
3. Main Agenda
3.1 Approval of May 5, 2025 AIPP Board meeting minutes.
Kathy motions to approve the minutes, Tracy seconds, all in favor.
May 5, 2025 Minutes.pdf
3.2 AIPP Summer Programming.
• HYBYCOZO – Forest Light scheduled installation is June 19 on the lower bench of Ford
Park.
• Molly is coordinating the installation of the sculptures gifted from Kent and Vick Logan -
Rattlesnake Figure by Thomas Houseago in proximity of the Vail Art Studio in Ford Park and
the Matthew Wedel Flower Tree sited for the Lionshead Welcome Center.
• Studio opening/ribbon cutting/open studio on August 3 will include Donor recognition, gift of
artwork, HYBYCOZO, as well as possible artist discussion.
• Discussion of possible Eagle County Art Challenge at Avanti Food and Beverage to
determine the first artist to work in the Vail Art Studio.
3.3 Update on Town of Vail Capital Projects and Private Development Projects.
• Gore Creek Promenade – DRB approval and it is going out to Bid in June. Will know the
budget better after submittals. Artists have been informed on Board interest in looking at
elements of both artist presentations.
• Dobson Ice Arena – waiting for proposals from art consultants to review at a future meeting.
• Future private developments with public art mitigation: Lot 10, Cornerstone, Apollo (talked
to town planner about a one bedroom/studio as possibility), Lionshead Circle Residences.
4. Coordinator Updates
• Town Council to visit the Art Studio – Tuesday, June 3
• Public art collection cleaning on June 11
• Frank Carfaro sculptures installed with an opening on June 12
• Art on the Block - Third Thursdays – June 19 – funding provided by Cultural Heritage Committee.
• Art Walks July 2-August 27
• July 7 is the next scheduled Board meeting
• Vail Beaver Creek Magazine including AIPP advertisement and articles are now available.
5. Site Visit to Art Studio, Ford Park.
• Board reviews locations for the HYBYCOZO temporary sculpture sites.
• Board reviews and approves location of the Thomas Houseago Rattlesnake Figure sculpture to
be placed north of the existing picnic shelter as that location was identified in the Ford Park
Master Plan for future sculpture locations and recommended by Town Staff.
2
6. Adjournment
3
Art in Public Places Special Board Meeting Minutes
Monday, June 17, 2025
AIPP Board members present: Lindsea Stowe, Tracy Gordon, Ramsey Cotter, Kathy Langenwalter
Absent: Susanne Graff
Others present: Molly Eppard - AIPP Coordinator; Greg Hall, Public Works Director; Russ Forrest, Town Manager
1. Call to Order
2. No citizen Participation
3. Main Agenda
3.1 Discussion of Dobson Ice Arena public art process.
• Greg Hall, Public Works Director reviews the construction timeline, funding, and budget for
the inclusion of public art as a line item in this Town of Vail capital project.
• The Art Board reviews proposal by Nine Dot Arts, Sweeny Co. Art Advisory and Black Cube
Nomadic Art Museum to provide project management and consultation for the public art
integration at Dobson Ice Areana.
• Lindsea motions to enter into a contract with Black Cube Nomadic Art Museum for the public
art management proposal provided for the Dobson Ice Arena remodel. Tracy, Ramsey and
Kathy in favor.
3.2 Vail Art Studio development opportunities discussion with Russ Forrest, Town Manager*
• *Note that this item was added given the Town Manager’s ability to meet with the Board
• The Town Manager outlines a proposed gift to the Town of Vail’s AIPP program and Vail Art
Studio. He discusses potential opportunities for fundraising initiatives around the opening of the
Vail Art Studio and if the Board is supportive of this as a goal.
• Lindsea motions to make fundraising a goal for this Board in providing additional financial
support for the Vail Art Studio and programs. Ramsey and Tracy in favor, Kathy opposes.
4. Adjournment
4
TOWN OF VAILDobson ArenaRenovations
ART OPPORTUNITIES
FEBRUARY 03, 2025
5
W D
DN
LOADING
2149 SF
BOH / LOADING
00.04.01
367 SF
AUX LOCKER 3
00.02.09
366 SF
AUX LOCKER 4
00.02.05
164 SF
TLT/SHOWER -LR 4
00.02.06
172 SF
TLT/SHOWER -LR 3
00.02.10
142 SF
OFFICIAL LOCKER 1
00.03.03 63 SF
TLT/SHOWER -OLR 1
00.03.04
373 SF
AUX LOCKER 5
00.03.02
164 SF
TLT/SHOWER -LR 5
00.03.01
342 SF
AUX LOCKER 6
00.03.07
188 SF
TLT/SHOWER -LR 6
00.03.08
142 SF
OFFICIAL LOCKER 2
00.03.05
63 SF
TLT/SHOWER -OLR 2
00.03.06
433 SF
AUX LOCKER 1
00.02.01
349 SF
AUX LOCKER 2
00.02.04
161 SF
TLT/SHOWER -LR 2
00.02.03
2679 SF
LOBBY
00.06.02
302 SF
ELECTRICAL
00.02.07
241 SF
VESTIBULE
00.06.01
69 SF
PENALTY BOX 1
00.06.06
89 SF
SCORE TABLE
00.06.05
66 SF
PENALTY BOX 2
00.06.04
21 @ 28"21 @ 28"
130 SF
SKATE REPAIR
96 SF
ASSOC. DIRECTOR
435 SF
SKATE RENTAL
248 SF
MEN
523 SF
WOMEN
124 SF
ELEC
154 SF
AV / IT
80 SF
ELECTRICAL
00.04.02
ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF
TLT/SHOWER -LR 1
00.02.02
90 SF
LAUNDRY / JANITOR
00.02.08
20 @ 24"
20 @ 24"
20 @ 24"
20 @ 24"
84 SF
ELEV
00.09.01
250 SF
ZAMBONI
00.09.05
SE LOFTSTORAGE151 SF
MIN. ~6 FT OF CLEARANCE
HOCKEYSTORAGE168 SF
LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF
UNIVERSAL
00.09.02
489 SF
MEP
00.09.03
409 SF
WORKSHOP
00.09.04
205 SF
CORRIDOR
00.10.01
262 SF
BOILER ROOM
00.10.04
974 SF
ICE PLANT
00.10.03
397 SF
ELECTRICAL
00.10.02
142 SF
FLEX SPACE
00.05.02
STAFF LOCKER
00.07.03
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Entry
SOUTH ENTRYEVENT LEVEL - OVERALL PLAN
NOT TO SCALE
6
W D
DN
LOADING
2149 SF
BOH / LOADING
00.04.01
367 SF
AUX LOCKER 3
00.02.09
366 SF
AUX LOCKER 4
00.02.05
164 SF
TLT/SHOWER -LR 4
00.02.06
172 SF
TLT/SHOWER -LR 3
00.02.10
142 SF
OFFICIAL LOCKER 1
00.03.03 63 SF
TLT/SHOWER -OLR 1
00.03.04
373 SF
AUX LOCKER 5
00.03.02
164 SF
TLT/SHOWER -LR 5
00.03.01
342 SF
AUX LOCKER 6
00.03.07
188 SF
TLT/SHOWER -LR 6
00.03.08
142 SF
OFFICIAL LOCKER 2
00.03.05
63 SF
TLT/SHOWER -OLR 2
00.03.06
433 SF
AUX LOCKER 1
00.02.01
349 SF
AUX LOCKER 2
00.02.04
161 SF
TLT/SHOWER -LR 2
00.02.03
2679 SF
LOBBY
00.06.02
302 SF
ELECTRICAL
00.02.07
241 SF
VESTIBULE
00.06.01
69 SF
PENALTY BOX 1
00.06.06
89 SF
SCORE TABLE
00.06.05
66 SF
PENALTY BOX 2
00.06.04
21 @ 28"21 @ 28"
130 SF
SKATE REPAIR
96 SF
ASSOC. DIRECTOR
435 SF
SKATE RENTAL
248 SF
MEN
523 SF
WOMEN
124 SF
ELEC
154 SF
AV / IT
80 SF
ELECTRICAL
00.04.02
ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF
TLT/SHOWER -LR 1
00.02.02
90 SF
LAUNDRY / JANITOR
00.02.08
20 @ 24"
20 @ 24"
20 @ 24"
20 @ 24"
84 SF
ELEV
00.09.01
250 SF
ZAMBONI
00.09.05
SE LOFTSTORAGE151 SF
MIN. ~6 FT OF CLEARANCE
HOCKEYSTORAGE168 SF
LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF
UNIVERSAL
00.09.02
489 SF
MEP
00.09.03
409 SF
WORKSHOP
00.09.04
205 SF
CORRIDOR
00.10.01
262 SF
BOILER ROOM
00.10.04
974 SF
ICE PLANT
00.10.03
397 SF
ELECTRICAL
00.10.02
142 SF
FLEX SPACE
00.05.02
STAFF LOCKER
00.07.03
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Entry
SOUTH ENTRYEVENT LEVEL - OVERALL PLAN
NOT TO SCALE
7
W D
DN
LOADING
2149 SF
BOH / LOADING
00.04.01
367 SF
AUX LOCKER 3
00.02.09
366 SF
AUX LOCKER 4
00.02.05
164 SF
TLT/SHOWER -LR 4
00.02.06
172 SF
TLT/SHOWER -LR 3
00.02.10
142 SF
OFFICIAL LOCKER 1
00.03.03 63 SF
TLT/SHOWER -OLR 1
00.03.04
373 SF
AUX LOCKER 5
00.03.02
164 SF
TLT/SHOWER -LR 5
00.03.01
342 SF
AUX LOCKER 6
00.03.07
188 SF
TLT/SHOWER -LR 6
00.03.08
142 SF
OFFICIAL LOCKER 2
00.03.05
63 SF
TLT/SHOWER -OLR 2
00.03.06
433 SF
AUX LOCKER 1
00.02.01
349 SF
AUX LOCKER 2
00.02.04
161 SF
TLT/SHOWER -LR 2
00.02.03
2679 SF
LOBBY
00.06.02
302 SF
ELECTRICAL
00.02.07
241 SF
VESTIBULE
00.06.01
69 SF
PENALTY BOX 1
00.06.06
89 SF
SCORE TABLE
00.06.05
66 SF
PENALTY BOX 2
00.06.04
21 @ 28"21 @ 28"
130 SF
SKATE REPAIR
96 SF
ASSOC. DIRECTOR
435 SF
SKATE RENTAL
248 SF
MEN
523 SF
WOMEN
124 SF
ELEC
154 SF
AV / IT
80 SF
ELECTRICAL
00.04.02
ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF
TLT/SHOWER -LR 1
00.02.02
90 SF
LAUNDRY / JANITOR
00.02.08
20 @ 24"
20 @ 24"
20 @ 24"
20 @ 24"
84 SF
ELEV
00.09.01
250 SF
ZAMBONI
00.09.05
SE LOFTSTORAGE151 SF
MIN. ~6 FT OF CLEARANCE
HOCKEYSTORAGE168 SF
LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF
UNIVERSAL
00.09.02
489 SF
MEP
00.09.03
409 SF
WORKSHOP
00.09.04
205 SF
CORRIDOR
00.10.01
262 SF
BOILER ROOM
00.10.04
974 SF
ICE PLANT
00.10.03
397 SF
ELECTRICAL
00.10.02
142 SF
FLEX SPACE
00.05.02
STAFF LOCKER
00.07.03
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Entry
SOUTH ENTRYEVENT LEVEL - OVERALL PLAN
NOT TO SCALE
8
W D
DN
LOADING
2149 SF
BOH / LOADING
00.04.01
367 SF
AUX LOCKER 3
00.02.09
366 SF
AUX LOCKER 4
00.02.05
164 SF
TLT/SHOWER -LR 4
00.02.06
172 SF
TLT/SHOWER -LR 3
00.02.10
142 SF
OFFICIAL LOCKER 1
00.03.03 63 SF
TLT/SHOWER -OLR 1
00.03.04
373 SF
AUX LOCKER 5
00.03.02
164 SF
TLT/SHOWER -LR 5
00.03.01
342 SF
AUX LOCKER 6
00.03.07
188 SF
TLT/SHOWER -LR 6
00.03.08
142 SF
OFFICIAL LOCKER 2
00.03.05
63 SF
TLT/SHOWER -OLR 2
00.03.06
433 SF
AUX LOCKER 1
00.02.01
349 SF
AUX LOCKER 2
00.02.04
161 SF
TLT/SHOWER -LR 2
00.02.03
2679 SF
LOBBY
00.06.02
302 SF
ELECTRICAL
00.02.07
241 SF
VESTIBULE
00.06.01
69 SF
PENALTY BOX 1
00.06.06
89 SF
SCORE TABLE
00.06.05
66 SF
PENALTY BOX 2
00.06.04
21 @ 28"21 @ 28"
130 SF
SKATE REPAIR
96 SF
ASSOC. DIRECTOR
435 SF
SKATE RENTAL
248 SF
MEN
523 SF
WOMEN
124 SF
ELEC
154 SF
AV / IT
80 SF
ELECTRICAL
00.04.02
ICE COVERAGESTAGE FLOORSTAGECOMPONENTSSTAGE PARTSICE BORDER159 SF
TLT/SHOWER -LR 1
00.02.02
90 SF
LAUNDRY / JANITOR
00.02.08
20 @ 24"
20 @ 24"
20 @ 24"
20 @ 24"
84 SF
ELEV
00.09.01
250 SF
ZAMBONI
00.09.05
SE LOFTSTORAGE151 SF
MIN. ~6 FT OF CLEARANCE
HOCKEYSTORAGE168 SF
LOW STORAGEUNDER STAIR STORAGELIFT STORAGEFORK LIFT101 SF
UNIVERSAL
00.09.02
489 SF
MEP
00.09.03
409 SF
WORKSHOP
00.09.04
205 SF
CORRIDOR
00.10.01
262 SF
BOILER ROOM
00.10.04
974 SF
ICE PLANT
00.10.03
397 SF
ELECTRICAL
00.10.02
142 SF
FLEX SPACE
00.05.02
STAFF LOCKER
00.07.03
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN-EVENT LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Vomitory
SOUTH VOMITORYEVENT LEVEL - OVERALL PLAN
NOT TO SCALE
9
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Southwest Wall
CONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
SOUTHWEST WALL
10
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Northwest Wall
CONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
NORTHWEST WALL
11
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Northeast Wall
CONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
NORTHEAST WALL
12
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena North Wall
NORTH WALLCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
13
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Lounge
SOUTH LOUNGECONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
14
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena South Lounge Railing
SOUTH LOUNGE RAILINGCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
15
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Arena Duct
ARENA DUCTCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
16
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena West Entry Vestibule
WEST ENTRY VESTIBULECONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
17
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena West Entry Ceiling
WEST ENTRY CEILINGCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
18
24
"
x
3
6
"
FD
J
24" x 48"24" x 48"
24
"
x
4
8
"
FD
FD
FDJV14" x 48"JJ24" x 42"J14" x 48"186 SF
WHEELCHAIR PLATFORM
01.06.02
1171 SF
SOUTH SPECTATOR SEATING
01.05.011061 SF
SOUTH SPECTATOR SEATING01.07.05
65 SF
UNIVERSAL
01.04.01
82 SF
OFFICE
01.04.04
180 SF
CONFERENCE ROOM
01.04.02
735 SF
ADMIN SUITE CIRCULATION
01.04.03
1699 SF
CONCESSIONS
01.09.03
518 SF
NEW ENTRY LOBBY
01.09.02
1284 SF
LOUNGE AREA
01.06.01
1638 SF
WEST CONCOURSE
01.09.01
1111 SF
NORTH CONCOURSE
01.12.01
1091 SF
EAST CONCOURSE
01.03.01
1082 SF
FOOD SERVICE
01.05.03
3868 SF
NORTH SPECTATOR SEATING
01.12.02
40 SF
BEVERAGE CART
01.02.01
3251 SF
MECHANICAL
01.02.01
129 SF
MEP
01.07.03
298 SF
WOMEN
01.07.01278 SF
MEN
01.07.02
Redundant Room
MECHANICAL
01.10.01
1554 SF
CONCOURSE
00.08.04
439 SF
WOMEN
01.12.03
239 SF
MEN
01.12.06
89 SF
CONCESSIONS
01.12.05
18 SF
JAN
01.12.04
RINK DIRECTOR
01.04.05
PROJECT NORTH
Copyright
1/8" = 1'-0"1 PRESENTATION FLOOR PLAN CONCOURSE LEVEL
Town of Vail Dobson Arena Renovations // February 3, 2025
Dobson Arena Arena Duct
WEST ENTRY SCOREBOARD WALLCONCOURSE LEVEL - OVERALL PLAN
NOT TO SCALE
19
Town of Vail Dobson Arena Renovations // February 3, 2025 20