HomeMy WebLinkAboutB10-0158NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
TOWN OF VAfL '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD/ALT SFR BUILD PERMIT Permit #: B10-0158
Job Address:
Location......:
Parcel No....:
2606 DAVOS TR VAIL
210314204006
OWNER BERNSTEIN, LOIS K. 07/02/2010
10783 E CRESTLINE AVE
ENGLEWOOD
CO 80111
APPLICANT BURKE HARRINGTON CONSTRUCTIO 07/02/2010
PO BOX 2943
VAIL
CO 81658
License: 717-B
Project #:
Phone:970-376-2256,Burke
CONTRACTOR J.B. BUILDERS 07/29/2010 Phone: 970-376-0733 J.B.
P.O. BOX 3233
Avon
CO 81620
License: 656-B
Description:
ADDITION 8� EXTERIOR RENOVATION
Occupancy:
Type Construction:
Valuation:
Total Sq Ft Added:
Status . . :
Applied . . :
Issued . .. :
Expires . ..:
PRJ10-0151
ISSUED
07/02/2010
08/04/2010
01/31/2011
$96,950.00
0
......................................»....,..........,,.,,...._.,....,.,......., FEE SUMMARY .............,,...,,....,...,.....,,..,_.._.......,,,,....,,.x.,,,....._._...,..
Building Permit Fee------>
Plan Check-------------------->
Add'I Plan Check Hours->
I n v e s t i g a t i o n----- ------------>
$972.75 Will Cal Fee--------------------->
$632.29 Use Tax Fee--------------------->
$0.00 Restuarant Plan Review----->
$0.00 Recreation Fee----------------->
Total Calculated Fees-------->
$4.00
$1, 739.00
$0.00
$0.00
$3, 348.04
Total Calculated Fees------------->
Additional Fees----------------------->
TOTAL PERMIT FEES------------->
P a y m e n ts ------------------------------>
BALANCE DUE---------------------->
$3,348.04
$0.00
$3,348.04
$3,348.04
$0.00
.....................................................,,.�,,..,...,,.....,,,..,......,,_,.,..............,.,,.,,........«.........,,....,..,......__._._,,.............,...,........,,,.._
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the informatior
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQ STS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 M - • 0 M.
� Fs' �! v
Signature o Owner or Contractor ate
�� � �
� � 1 • �,r�y
Print Name
b Id_a It_con stru ction_perm it_041908
#f�fl�f44k4RRRftRxxffx�Atfft4Ww�www##fwftwtk�k�R���f�##�1t����4�fft�ff�#flfx}�ff��iftttfi��RM�w�wffy�tftiN�fiNlYfwwfwfwwwRwwrt���ff#�R��x��l�����f�fff*�f#l�A�f�ffitxftlntNxxw/wwwYw*wff
APPROVALS
Permit #: 610-0158 as of 08-04-2010 Status: ISSUED
.................................................................. �.,........,....,,,....,,,,,........................,...,.,.....,...............,..,...,...,...,,,.,...., ......,,.,
Item: 05100 BUILDING DEPARTMENT
07/22/2010 Martin Action: DN See Laser fiche
08/03/2010 Martin Action: AP
Item: 05400 PLANNING DEPARTMENT
07/19/2010 RLF Action: AP
Item: 05600 FIRE DEPARTMENT
07/12/2010 mvaughan Action: DN property contains
asbestos, abatement clearance letter required.
07/20/2010 mvaughan Action: AP asbestos is
contained wall that is to be taken out toward end of
project. Clearance letter will be issued at that time. No
TCO or CO shall be issued until clearance letter is
submitted.
Item: 05500 PUBLIC WORKS
07/21/2010 cdelles Action: AP
................................................:, �.,..........,,,............,,,.........,.. �......,...,,,.......,,.,...,.,.,...,....,.....,.......,,..,,.,..,.....,....., �.,..,,.,.
See the Conditions section of this Document for any that may apply.
b I d_a It_co n st ru ct i o n_pe rm it_041908
Yf�#R�tff4f#ilf�wkwwwfw4f�4xf14�A�x�kwRwwlw���t�#iftwff/�Mwww*www�Nkt�x���ff#�i#4#�ffffff�xR�xwkwiex�ffwrt#w����#f�44Rfx41f�fiftxft��fxxkkkkxtki4kwww#www#wwwwwwX#4f�kkA����iA�ff4fff�
CONDITIONS OF APPROVAL
Permit #: B10-0158 as of 08-04-2010 Status: ISSUED
.................................................................................................................................,,....................,..�..,...,,.,....,»,..,......
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 44
(BLDG 2009): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R314 OF THE 2009 IRC, IF APPLICABLE UNLESS A MONITORED FIRE
ALARM SYSTEM IS REQUIRED.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE
INSTALLED PER 2009 IRC R315
bld_a It_construction_permit_041908
*********************************************************************+**********************
TOWN OF VAIL, COLORADO Statement
*********************************************************�**************************+******+
Statement Number: R100000970 Amount: $3,348.04 08/04/201008:24 AM
Payment Method: Check Init: SAB
Notation: 1004-john
barry/jb builders
-----------------------------------------------------------------------------
Permit No: B10-0158 Type: ADD/ALT SFR BUILD PERMIT
Parcel No: 2103-142-0400-6
Site Address: 2606 DAVOS TR VAIL
Location:
Total Fees: $3,348.04
This Payment: $3,348.04 Total ALL Pmts: $3,348.04
Balance: $0.00
************************************************+******************************************a
ACCOUNT ITEM LIST:
Account Code
--------------------
BP 00100003111100
PF 00100003112300
UT 11000003106000
WC 00100003112800
Description
------------------------------
BUILDING PERMIT FEES
PLAN CHECK FEES
USE TAX 4%
WILL CALL INSPECTION FEE
Current Pmts
972.75
632.29
1,739.00
4.00
BUILDING PERMIT APPLICATION
Separate permits are required for electrical, plumbing, mechanical, fireplace, etc.
Project Street Address: ��� � Office Use: C
�6 � i !J0 ✓0.L/e2 d c_ Project #: '� � J ��" G� 7�
(Number) (Street) (Suite #) DRB #: � � � i Q Q �2 �
Building/Complex Name: Building Permit #: �`�— � ��
�"�� �"�'�`�`"�'. �"`�"����' �"" Lot #: Block # Subdivision:
Contractor Information:
Company: ���.�� ,��/ivlrTtL� ��z/+'lT
�
Company Address: � Detailed Scope and Location of Work:
City: State: Zip: � �'^Si�n�,v� Z��LI�rTiG.✓ /Q� /�d��
Contact Name: � �,v (�TQi`� �
Contact Phone: G% %� ^�;3 7G ��.� s'� �
� (use additional sheet if necessary)
E-Mail �/�GLr7 nt -(.A.NG„c�S T r�/� T ,.�..��.,��.�,�..�».�
Town of Vail Contractor Registration No.:
X
Contractor Signature (required)
Work Class:
New ( ) Addition (✓ ) Remodel (�) Repair ( ) Other ( )
Work Type
Interior (• ) Exterior ( ) Both (✓ )
Property Information Type of Building:
Parcel #: �/D.3 '%�.Z ' � ��� '�o Single-Family (✓f Duplex ( ) Multi-Family ( )
(For parcel #, contact Eagle County Assessors Office at 970-328-8640 or
visit www.eaglecounty.us/patie) Commercial ( ) Other ( )
Tenant Name:
Owner Name: �/.S � �j�,�s � E/�
Valuations (Labor & Materials)
0
Building: $ 7,�' pQD�
�
Plumbing: $ � p00 � �
Electrical: $
� o�e .
Mechanical: (including fireplace) $ %�,� ��M
Total: $ %� O�D � ��
Does a Fire Alarm Exist? Yes () No (✓)
Monitored Alarm? Yes ( ) No (�
Does a Sprinkler System Exist? Yes () No (vY
#& Type of Existing Fireplaces: Gas Appliances �
Gas Log Wood/Pellet Wood Burning l
#& Type of Proposed Fireplaces: Gas Appliances _
Gas Log � Wood/Pellet Wood Burning _
__... .___.__ . __ _. __ _..._._ __._ ____...
Date Received: D � v�� �/ �
JUL O 1 2010
TOWI� OF VAIL
O1-Jan-10
Generated by REScheck Package Generator
Compliance Certificate
Project Title: Bemstein Residence Remodel 8� Addition
Report Date: Os/07/10
Energy Code: 20061RC
�«��� Vail, Colorado
Construdbn Type: Single Family
Glazing Area Peroentage: 15%
Heatln9 �e9nee DaYs: 9248
Climate Zone: g
Construdion Site:
2606 Davos Trail
Vail , CO 81657
Owner/Agent:
Designer/Contractor:
Ron Ki�icham
Ronald D. Kirkham Architect
PO Box 5631
Vail , CO 81658
9703761793
ki�icham.ron�gmail.com
Cumpli:ince� P8SS25 '�
Ceifing: 49.0 __
Wall: 20.0 0.0
Basement: 19.0
Wall height: 8.0'
Depth below grade: 5.0'
Insulation depth: 8.0'
Window:
0.350
Door:
0.350
Compllanae Statemenh The proposed building design desaibed here is consistent with the building plans, specifications, and other
calculadons submitted with the petmit application. The proposed building has been designed to meet the 2006 IRC requiremeMs in the
RESchecR Package Generator and to oomply with the mandatory requirements listed in the REScheck Inspedion Checklist.
Name - Tide
Project Title: Bemstefn Residence Remodel 8� Addidon
Data filename:
Signature Date
� ���o��
JUL O1 20�0
�
TOWN OF VAIL I
Report date: O6/07/10
Page 1 of 3
Date: 06/07/10
Ceilings:
Generated by REScheck Package Generator
Inspection Checklist
❑ Ceiling: R-49.0 cavity insulation
Commerrts:
Note: The ceiling R-values do not assume a raised or oversized truss construcdon. If the insulation achieves the full insulation thiciv�ess
over the plate lines of exterior walls, R-30 insuladon may be substituted for R-38 insulation and R-38 insulation may be su�ted for R-49
insulation. Ceiling R-values represent the sum of cavity insulati�on plus insulating sheathing (ff used).
Above-Grade Walis:
❑ Wall: R-20.0 pvity insulation
Comments:
Note: Wall requiremerKs aPPb to wood-irame wall oonstrucdo�. Metal-frame wall or mass (ooncrete, masonry� �09) wall equivalent
R-values can be found in the Help Users Guide.
Basement Walls:
O Basement: 8.0' ht / 5.0' bg / 8.0' insul, R-19.0 cavity insulation
Comments: Walk out basement
Note: Walls of conditioned basemerrts below uninsulated floors must be insulated from the top of the basement wall to a depth of 10 feet
below ground level or to the level of the basement floor, whichever is less. The endre opaque portion of any individual basement wall with
an average dep�h Iess than 50% below grade must ►neet the same R-value requirement as above-grade walis. Basement doas must meet
tlie door-U-fac�or requirement.
Windows:
❑ wndow: U-factor: 0.350
For windows without labeled U-factors, describe features:
#Panes Frame Type Thermal Breakl
CommeMs:
Door'S:
0 Door. U-facxor: 0.350
Commerrts: Front door exempt
Yes No
Note: Door U-values must be tested and documented by the manufadurer in accorclance with the NFRC test procedure or taken from the
door U-fador table in the Help User's Guide. If a door cvMains glass and an aggregate U-factor ratlng for that door is not avaitable, indude
the glass area of the door with your windows and use the opaque door U-fac;tor to detertnine oomplianoe for the door. One door may be
exduded from this requirement (i.e., may hav a U-fador greater than 0.35).
Air Leakage:
� Jants, penetrations, and all o�her such openings in the building envelope that are sourc�s of air leakage are sealed.
� Recessed lights are either 1) Type IC rated with encbsures sealed/gasketed against leaks to the ceiling, or 2) Type IC rated and ASTM
E283 labeled, or 3) installed inside an air-tight assembly with a 0.5" dearance from combustible materials and a 3' dearance from
insulation.
Vapor Retarder.
� Vapor retarder is installed on the wam►-in-winter side of atl non-vented framed oeilings, walls, and floors; or it has been determined that
moisture or ks freezing will not damage the materials; or other approved means to avoid condensation are provided.
Comments:
Materials Identification:
� Materials and equipment are identified so that oomplia�ce can be determined.
� Manufacturer manuals for all instalied heating and cooling equipment and service water heatlng equipment have been provided.
Project Title: Bemstein Residence Remodel 8 Addidon Report date: 06/07/10
Data filename: Page 2 of 3
� Insulation R-values and glazing U-factors are deariy marked on the building plans or specifiqtions.
0 Insulation is installed according to manufacturer's instructions, in substantlal contact with the surtace being insulated, and in a manner
that achieves the rated R-value wNhout compressing the insulation.
Duct Insulation:
� Ducts in unconditioned spaces or outside the building are insutated to at least R-8.
� Ducts in floor trusses above uncondiiti�oned spaces or above the outdoors are insulated to at least R-6.
Duct Construction:
� Air handlers, filter boxes, and duct connections to flanges of air distribution system equipment or sheet metal fitGngs are sealed and
mechanically fastened.
� All joints, seams, and connec�ions are made substantialiy airtight wkh tapes, gasketing, masdcs (adhesives) or other approved dosure
systems. Tapes and mastics a►e rated UL 181A or UL 1816.
0 Building framing cavities are not used as supply duds.
� Automatic or gravity dampers are installed on all outdoor air intakes and e�diausts.
� Additional requirements for tape sealing and metal duct crimping are inGuded by an inspec�ion for c�ornp�fance with the Intemationai
Mechanical Code.
Temperature ConMols:
� Themwstats exist for each separate HVAC system. A manual or automaUc means to partially restrict or shut off the headng and/or
cooling input to each zone or floor is provided.
Heating and CooUng Equipmerrt Sizing:
� Addibonal requirernents for equipment sizing are induded by an inspecdon for c;ompiiarxx� with the Intemational Mechanical Code.
Circulating Hot Water Systems:
� Circulating hot water pipes are insulated to R-2.
� Circuladng hot water systems indude an automatic or accessible manual switch to tum off the arc;ulating pump when the system is not
in use.
Heating and CooUng Piping Inaulation:
� HVAC piping c�nveying fluids above 105 degrees F or chilled fluids bebw 55 degrees F are insulated to R-2.
Certiflcate:
� A permanent cerdflcate is provided on or in the electrical dishibution panel listing the predominarn insulation R-values; windaw
U-factors� type and efficiency of space-oonditioning and water heatlng equipment.
NOTES TO FIELD: (Building Deparhnent Use Only)
Project Title: Bemstein Residence Remodel 8 Additlon Report date: 06/07/10
Data filename: Page 3 of 3
� ,. .
� � ' 2006 IRC Energy
Efficiency Certificate
Ceiling / Roof .
Wall �.�
20.00
Floor / Foundatfon 19 �
�uctworic (uncondkbnsd spaoss);
�.. .
Window •
0.35 0,40
�O°� 0.35 Nq
.: .. . . .
Headng 8ystem:
Cooling System:
Water Heabar.
Name: Date:
Comrrwnts:
Asbestos Inspection and Sampling Report
2606 Davos Trail in Vail, Colorado 81657
Presen ted to:
Mr. Stan Bernstein
Homeowner
2606 Davos Trail
Vail, CO 81657
Performed by:
Mr. Brandon Sinkbeil
DS Consulting, Inc.
PO Box 6864
Avon, CO 81620
(970) 476-4182
Project Details:
DSC Project #: 2240
Conducted: May 7, 2010
� . Consulting
� � � �
D
JUL Ol ZaiO
�
TOWf� OF VAf� �
EXECUTIVE SUMMARY
On May 7, 2010, Mr. Brandon Sinkbeil of DS Consulting, Inc. (DSC) performed a limited inspection and
asbestos sampling at 2606 Davos Trail in Vail, Colorado, in order to identify potentially hazardous friable
and non-friable asbestos containing materials (ACM) within a portion of the above-referenced residence
scheduled for a remodel. Mr. Sinkbeil performed asbestos bulk-sampling of drywall and ceiling texture
(surfacing materials) in a total of six (6) locations within the residence (see Appendix A for sample
locations). All six (6) bulk-samples were analyzed by Aerobiology and Associates Laboratory, Inc.
(NVLAP # 200860-0) with five (5) laboratory results being positive for ACM between 2% and 3%
Chrysotile (see Appendix C for laboratory results).
i � � . � �t i � �� . � � � � � � _ � � � � � ' � : u
Sample Sample Material Friable or Estimated Material Asbestos
Location Number Classification Non-Friable uantities* Condidon Content
P�pTextureiling pOP-01 Surfacing Material Friable +/- 950 ftz Good 2% Chrysotile
P�pTextureling pOP-02 Surfacing Material Friable +/- 950 ft2 Good 2% Chrysotile
P�pTextureiling pOP-03 Surfacing Material Friable +�- 950 ft2 Good 3% Chrysotile
Wall Drywall DW-02 Surfacing Material Friable +/- 400 ftz Good 3% Chrysotile
Wall Drywall DW-03 Surfacing Material Friable +/- 400 ftz Good 3% Chrysotile
a�uauuuc, ai c q}�F1� UXiuld[IOI1S 8I1Q SUD)@CC LO [IeIU VeI7r1C2t1017.
G
PROJECT OVERVIEW
I. Introduction
A limited inspection and bulk-sampling for ACM was conducted at 2606 Davos Trail in Vail, Colorado, by
Mr. Sinkbeil on May 7, 2010, at the request of Mr. Ron Kirkham. Mr. Sinkbeil is a Colorado State Certified
inspector, and has EPA Accreditation #13442 (see Appendix B for certificate). The purpose of the
inspection was to identify, sample and assess potentially hazardous friable and non-friable ACM within
the areas of the residence scheduled for a remodel.
II. Structural Design
The structure is a three-level, wood-framed, single family residence with an attached garage.
III. Sampling and Analytical Procedures
The inspection, assessment and sampling were conducted by an EPA and AHERA accredited Building
Inspector qualified by experience, education and training in the recognition of potential ACM and
approved bulk-sampling techniques. The asbestos bulk-sampling was conducted on suspect ACM with a
limited number of bulk-samples being collected within the residence.
The inspection, assessment and sampling were performed in accordance with Environmental Protection
Agency/AHERA recommended procedures. These procedures call for the visual inspection of the area of
concern and the collection and analysis of representative bulk-samples of suspect material.
Some minor destructive sampling was conducted. Walls, columns and perimeter pipe chases were not
broken into in order to locate and quantify suspect ACM. It should be noted that additional ACM might be
located in these and other inaccessible areas.
Random bulk-samples, representative of the suspect asbestos-containing building materials (ACBM) of
each homogeneous area (HA), were collected according to the guidelines published as Environmental
Protection Agency (EPA) Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections
2641 through 2654 and in compliance with 40 CFR, Part 763. Representative sampling is based on the
following criteria:
1. The distribution of the suspect material throughout the HA.
2. The suspect material's physical characteristics and application.
3. Random sampling patterns determined for each HA.
Suspect materials sampled and analyzed should be considered to be representative of materials in each
HA if:
1. They exhibit similar physical characteristics; and
2. The application of the sampled material can be correlated to the application of un-sampled
material.
Bulk-samples collected were analyzed utilizing the EPA's Method for the Determination ofAsbestos in Bulk
Building Materials (EPA 600/R/116, July, 1993) and the McCrone Research Institute's The Asbestos
Particle Atlas as methods references.
Analysis of the bulk-samples was performed on the "date reported," as listed in the bulk-sample analysis
report.
IV. Notes on Report Format
Suspect materials alike in appearance and application were sampled as HAs. Suspect materials were
divided into three classifications:
1. Surfacing material: sprayed or troweled onto structural building member.
2. Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation.
3. Miscellaneous: other suspect materials, floor tile, sheet vinyl/linoleum, ceiling tiles, insulation, and
finishing materials.
Condition assessments were performed by the accredited inspector at the time of inspection. Condition
assessments are listed in the following section. Ratings of "good," "damaged," and "significantly
damaged" are meant to indicate the overall condition of the material.
A material in "good" condition has no visible damage or deterioration, or showing only very limited
damage or deterioration.
A material in "damaged" condition has the following characteristics:
■ The surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over less
than one-tenth of the surface if the damage is evenly distributed (one-quarter if the damage is
localized).
Accumulation of powder, dust or debris similar in appearance to the suspect material on surfaces
beneath the material can be used as confirmatory evidence.
A material in "significantly damaged" condition has one or more of the following characteristics:
■ The surface is crumbling or blistered over at least one-tenth of the surface if the damage is evenly
distributed (one-quarter if the damage is localized).
■ One-tenth (one-quarter, if localized) of the material is hanging from the surface, deteriorated, or
showing adhesive failure.
■ Water stains, gouges, or mars are over at least one-tenth of the surface if the damage is evenly
distributed (one-quarter if the damage is localized).
Accumulation of powder, dust or debris similar in appearance to the suspect material on surfaces
beneath the material can be used as confirmatory evidence.
4
Response-action recommendations for asbestos containing HAs are listed in the section VII.
Recommendations may be for more than one HA, if materials are alike. Recommendations are either
"general" or "immediate." An immediate recommendation indicates an imminent hazard exists and
should be addressed as soon as possible. A general recommendation indicates no imminent hazard exists
and no further abatement activities are required for removal of the material.
V. Inspector Comments
ACM was identified during the bulk-sampling conducted at 2606 Davos Trail in Vail, Colorado. A total of
six (6) bulk-samples were collected from the above-referenced address. Five (5) bulk-samples tested
positive (greater than 1%) for asbestos.
■ Asbestos was identified in the popcorn ceiling texture (surfacing material) sample Nos. POP-01,
POP-02, and POP-03 at 2-3% Chrysotile.
Asbestos was identified in the drywall joint compound (miscellaneous material) sample Nos. DW-
02 and DW-03 at 3% Chrysotile
VI. Homogeneous Area Descriptions
The following section contains sampled HA descriptions and sample locations. Percent-asbestos content
for each sample indicated can vary depending on sample locations, homogeneity of the materials, and
type of application. The following samples were collected from the residence at 2606 Davos Trail in Vail,
Colorado, on May 7, 2010. The quantities are approximations and are subject to field verification:
�..�� � *rfi�s� .r,`"'��� � ri ��. �° .r: . ;�::..,,. �, o:�:�p ,� -'-�@t�i'�k ;� x �a ^a-�.';, v. .�;;-- ` u ,�,; �. ._ � �.
�� t
� x � i� ,� -� 4 -
ti � � u� t.. ��' = -a'� � _
v �,� a v
b; �.
Physical Description (layers): White foam ceiling Physical Description (layers): White foam ceili�ng
texture texture
Material Classification: Surfacing Material Material Classification: Surfacing Material
Sample Location: Dining Room Popcorn Ceiling Sample Location: Dining Room Popcorn Ceiling
Texture Texture
Material Condition: Good Material Condition: Good
Material Quantity: +/- 950 ftz Material Quantity: +�- 950 ft2
Sample #: POP-01 Sample #: POP-02
Asbestos Content (layers): 2% Chrysotile Asbestos Content (layers): 2% Chrysotile
Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII
5
Homageneous Are� #U2 ' Hor��geneous Area #02
Physical Description (layers): White tape; White
foamy texture; White joint compound; White physical Description (layers): White paint;
com ound; White tan d all White/tan drywall; White joint compound
Material Classification: Miscellaneous Material Material Classification: Miscellaneous Material
Sample Location: Basement Bathroom Wall
D all Sample Location: Dining Room Wall Drywall
Material Condition: Good Material Condition: Good
Materia/ Quantity: +�- 400 ft2 Material Quantity: +/- 400 ft2
Sample #: DW-02 Sample #: DW-03
Asbestos Content (layers): None-detected; None- Asbestos Content (layers): None-detected; None-
detected; 3% Chrysotile; None-detected; None-
detected detected; 3% Chrysotile
Recommendations: IMMEDIATE - See Section VII Recommendations: IMMEDIATE - See Section VII
VII. Recommendations
IMMEDIATE:
The laboratory results of the potential ACM sampled at 2606 Davos Trail in Vail, Colorado, on May 7,
2010, indicate that five (5) bulk-samples were reported as positive for asbestos between 2% and 3%
Chrysotile. Asbestos was identified in the popcorn ceiling texture and the drywall joint compound.
Since the above-referenced material is to be removed from the residence and the total quantity exceeds
any of the regulatory trigger levels of 50 linear feet on pipes, 32 square feet on other surfaces, or the
volume equivalent of a 55-gallon drum, a Colorado-licensed asbestos abatement contractor is required to
perform the removal, including formal notification to the Colorado Department of Public Health and
Environment prior to the abatement of the ACM.
7
APPENDIX A
SAMPLE LOCATIONS
� f
6
—'_'
._ 'I6'•D V7`
_-____
��.0 im �._m. -- ---------
_�_ �----- ..._.�
_ ---...... _
�-----.. - .—. _- ---�
3 IQ' 3 IR°
0 _ Il__D•_ 9
O
b
__.
�'-m° I'-113/4' •? GA� C-,_AR,�,GE)
y_io m. r-i �ro.. - `c_ �m•-5 v1•
c r.�• b�-m in• -
� _._. ._. - ... � 1 4 /•.j•
_ #
wi.._ � 9 i IR ( 3�. j 3�' �. \ "�.�;�"Z'T':'-.'_..
� �._0.
� _ . _ _ A,�. ' o
I� o � �•MUD �CC>�:J � �
4t s- nv� v1° S 7 �
� ' 4 -O" 9�_p• n
� � � Y
� Q _-s - � � '' _ . _ � EtvT��.-i s ia�
j � � - —
I� �
+ t
� �I ,
. � ..! � uP ;-- Q
p 3 � ^ , `
a - � 8 _.._. 3VI' )
Q M p r� o — i.-A�i�Y r�oc� ,i
�� g
I�^,� •L,4uNDR` � Q � � :. r-s si�•
� .�
�� ' �°��.._ �"� vs• r-�•
�n � ���' ! � �
�
a -�. — � --
� i,.��; 4..a.
� �� � , _ ----
;
� / r-i im .
i j._6' II �^ �POWG '�] a� ;; ;r �
„ g_-� s•-s aro• a _ � _ .._ � o �
: • —
� � 4'-D�/O' 4._�.n i� . j v
_ __ _ .: ._. _. - �
� i...._.. ..- �U� � .� _
1'-� i/4' " 1 �' , .
~ �'-S 3/4, O 9 L II ! Y
_ + � �,.�
' ' _ _.. . . � '
� 9'�H• .... . ]'-1 IR` ..
i._ . ��i �� 3V1' 9V7. ,
�__ 14 -11' � �
_"_ _ � 11•�i•
�' 1 i ---
1
O I ' C - . . . . I ___ '_ . �...
m C�� � i m ��F"ccG. R..O^'1 . R=_= j•iGITGr-!EN I I•=�iNIt�G- ROC`11 ,
, ; / ; � POP-01
�
�•-, �„• i � � � � ,
� �� �
- - � . n � J Q
n �'-m' � � � r � . _ /j� � �� I ^
� � � ,
' � �` (
_ � ��
a
� � I
;
, 1- "_ � -. ; � _ : +o-. r. s ; �- a
_ _.—
a
� s.z aro• , u� a ie• n�-n v4•
O'-5 V4"
Q '_..___ -__.—..__ M'-D V! .___._.._..._ _ b•-l•
-__ _______._-..._____'_.—. 34'-6 IR" *
_'_'__ —_�\
s
� POP-02 DW-03
Y
POP-03
�--- ---- ----- - -- "=m'. --- -
--- _ -- --�
- -- -----�
�J
APPENDIX B
CERTIFICATION
.- - . . .. ... - .. . . . .. . . . .� n . . . , .yY._g"p..�
STATE OF COLORADQ
ASBESTOS
CERTIFICATION*
C'olorado Department c�f Public Health
and Environment
Air Pollution Control Division
This ceriifies thal
`� �" ! Brandon Sinkbeil
,
� ,; :.
�;
, Certification No: I3442
�
� �.
f � has met the requiremenis of 25-7-507, C.R.S. and Air Quxlity Cc�nirol
Commissiun kegulation No. 8, Part B, and is hereby certified by the
�' state of Colorado in the followi►sg diseipiine: �
� Building Inspector*
Issucd: 5/16/2010
`' Expires on: 5/16/2011
" �� `� �.- ,�
./��f.G',�E� :
.�1u ed APCU Represenzaove
• T6is ctr►i/icate is �v/id owly r�ffk fAe psxsession o�o ceitewl DitvsJop-eppioveJ nuininx ruurfe
certifuatiow iw tke disciplisr speeifud abova
:: s_i�s. � _��a:,.r.� x-a� A-�:: �. .. x r...r. ...- .. . .. ��. . . . � . _ � � - ....-.,..-... .. . . . .
E
�
APPENDIX C
LABORATORY ANALYSIS
10
,�,�t,�.�,�..���.��. v�._.n..
� AEROb10�OCjy LAI�ORATORY
�ASSOCIATES, INCORPORATED
CONSULTING LABpRATORY
Certificate of Analysis
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401
303.2323746 •
www.aerobioloav.net
Client Name DS Consulting, Inc. Date Collected: OS/10/10
Street address 5366 Flatrock Ct. ��a�p �k Date Received: OS/10/10
City, State ZIP Morrison, CO 80465 Date Analyzed: OS/12/10
A�� Brandon Sinkbeil #200860-0 Date Reported: OS/13/10
Client Project Name: 2606 Davos Trail, Vail
ProjectID: 102996
Job 1D:
Test Requested: 3002, Asbestos in Bulk Samples
Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993.
Homo- Number Asbestos Detected Non-Asbestos Non-Fibrous Matrix
Sam le Identification Physical Description of Sample; geneous of Fibers Material Material
Client Lab Sam le Number Additional Comments es/no La ers % azea % area % com osition
POPO 1 POSITIVE
102996-1 White Foam Ceiling Texture N 1,100% 2% CHRY 9S C
POP02 102996-2 POSITIVE
White Foam Ceiling Teature N 1,100% 2% CHRY 98 C
POP03 POSITIVE
102996-3 White Foam Ceiling Texture N 1,100% 3% CHRY 97 C
102996-4A White Paint N 3,1% Negative 100 B
DWO1 102996-4B White Compound N 3,19% Negative 100 C
102996-4C 10%
White/Tan Drywall N 3,80% Negative CELL 90 G,M
102996-SA 98%
White Tape N 5,3% Negative CELL 2
102996-SB White Foamy Texture N 5,4% Negative 100 C
DW02
POSITIVE
102996-SC White Joint Compound N 5,4% 3% CHRY 97 C
102996-SD White Compound N 5,16% Negative 100 C
�/ ,/-��i'"�
l , ��� t� � - j-
e c um ce e
Laboratory Analyst
. � _
am ump eys --
Asbestos Laboratory Supervisor
H = fvnos�te
AC = Actinolite
AN = Anthophyllite
CHRY=Chrysotile
CR = Croc�dolite
TR = Tremolite
Trace=Less Than 1 %
Page 1 of 3 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.2323746
CELL = Cellulose
MW = Mineral Wool
FBG = Fiberglass
SYN = Synthetic
WO = Wollastonite
NTR = Non-Asbestiform TR
NAC = Non-Asbestiform AC
FT = Fibrous Talc
AH = Animal Hair
Q = Quartz
C = Carbonates
V = Vermiculite
G = Gypsum
M = Mica
T=Tar
P = Perlite
O = Organic
B = Binder
OP = Opaques
D = Diatoms
� AERO%IO�OC�'y LAbORATORy
�ASSOCWTES, INCORPORATED
CONSULTING LABORATORY
Certificate of Analysis
13949 W. Colfvc Ave
Suite 205
Lakewood, CO 80401
303.2323746
www.aerobioloav.net
Client Name DS Consulting, Inc.
Street address 5366 Flatrock Ct. rn�n n n"' Date Collected: OS/10/10
City, State ZIP Morrison, CO 80465 LN l4�°��J Date Received: OS/10/10
A�� Brandon Sinkbeil �� Date Analyzed: OS/12/10
Client Project Name: 2606 Davos Trail, Vail
#200860-0 Date Reported: OS/13/10
Project ID: 102996
Job ID:
Test Requested: 3002, Asbestos in Bulk Samples
Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993.
Homo- Number Asbestos Detected Non-Asbestos Non-Fibrous Matrix
Sam le Identification Physical Description of Sample; geneous of Fibers Material Material
Client Lab Sam le Number Additional Comments es/no La ers % azea % azea % com osition
DW02 102996-SE 15%
White/Tan Drywall N 5,73% Negative CELL 85 G
102996-6A White Paint N 3,3% Negative 100 B
DW03 102996-6B gp%
White/Tan Drywall N 3,42% Negative CELL 20 G
102996-6C POSITI V E
White Joint Compound N 3,55% 3% CHRY 97 C
� / � 1 r - !�- �: .�
�' ,l/ �i j, / ./�
i e c um ce e
Laboratory Analyst
am ump eys
Asbestos Laboratory Supervisor
r+ — rvnos�te
AC = Actinolite
AN = Anthophyllite
CHRY=Chrysotile
CR = Crocidolite
TR = Tremolite
Trac�Less Than 1%
Page 2 of 3 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303232.3746
C�;LL = Cellulose
MW = Mineral Wool
FBG = Fiberglass
SYN = Synthetic
WO = Wollastonite
NTR = Non-Asbestiform TR
NAC = Non-Asbestiform AC
FT = Fibrous Talc
AH = Animal Hair
Q = Quartz
C = Carbonates
V = Vermiculite
G = Gypsum
M = Mica
T=Taz
P = Perlite
O = Organic
B = Binder
OP = Opaques
D = Diatoms
; � O � �..
a ug�
o v�i �U N
(„) M d
3 � "'
a �
a �
� ..1
.�
W
e
w
O
�
u
�
�
U
�
Q �
C
� O �
� O �
'?T, Z 5�
v � 2
O J
�s�
� O Z
y O V
�/ N
C �
Q
�
0000,�
O O N M a
.--i �-. .--� ,� N
� � � h �
O O O O "
� N � � q
�' �
Ua�'¢ce'o
o� „� �a
p A p O
0
m
�O
N
�, �
�°
�
V�J
LJ
>
F
0
�
O
�
N
V
� o—z
�Uoo�
5''��� �
� �v� �
t0 C
OW.ti� O
n M ° � �
a�n�CGU
A
O
.a.
Y
a
C7
0
0
�
O
�
�
b'p
.T
s
�
A
�
G
0
%
d
0
�
�
�
t�
L
C
�
w
�
�
�
0
�
�
�
�
l7
U
C
v
`o
Y
Fi
N
♦ ♦
O
�
d �
.D
c�d w
O �
L �
� d
O R
C
� o
= E
caa
�+ U
� Yt
A '�
� �
O ^
O
� 'O
� �
� U
d �
C �
�C
07)
N 'Q
L �3
� .�
Y YO
C W
A�
� U
N
i4o
.�.� N
O'
� t
y w
_ O
L �
o �
r >
� E
� y
� �
'C y
� �
�
V
,.�. O
w
g�
� �
� C
= �
- O
y E
r o
s '�
N
" = �
N y
�. �
� o
� E�
� Q' . C
o �d E
N
� = .t..
A � O
v �a �,
� d .�
� a� >
~ � �_ a
Q =n W
�
a� y
C
• E �
� �{,y
..7 F
a�
� �
�
NU �
N �
N �
'O C
� 7
O .�
c E
d
V �
�
� �
�
w-
y �
N �.�.
�
«L. �
� o
� V
E o
RI y
'� �
C �
O�O
U �
E �
� .�
N fp
C �
V U
��
� �
A �
'� �
i0 �
E �
V .�E,
N O
O �
� �
� �
w-p
o a
� X
�
A
C
� �
U ti
� ! f%
� FWC
., .O
� � R
ac :: �
G y
N L �
3 � x
p, � k7
c �, d
w � �
���
� ��% �
R �� �
a��
� �' U
cO
� G N
- y^ ,n
� a i,
� � �
N R
�"' V .�
y 4.
O
• w° �
0
�
�
'O
A
C
�
�
�
^G
a
O
L
C
�
G
�
N
w �
o�
��
o �
V �
� �
V
C �
� �
y❑ 4
C fO
.-d� 'y"
7
� �
� �V
�y S
U =
S�
� ,c
R �
� �Vl
Q �
0 L"
� �p
� a
a E
N
O �
O ti
� �
d
�
O _
G O
� �
��
ay
�
� a
e�
7 �
Nz
�
Vi
H 0
i .y
d �
,, o
% °'
��
�
� O
>,
�
O
�
L
O�p
O
n.
�
E
�
R
W
nq.
N
L'"
w
O
y
^
3
S
v,'
N
�
�
� �
y
o �
O �
w
o �
d '
�
r �
d y
N w
� d
� N
h
� R
0 �
U �
_ 3
a �
�s
y v
y °°
C
� ��
o�
Cpp
�
� ,a
4
��
W a
.�i�i �
�o
d U
c =
r.�. �
�
W
• a
e
�
'
z
a
t
�
.�
u
a
z
NF
G
c7
�
V
u.
.0
O
U
�
�
C
N
O
�
z
d
..7
'z
L
N
y
O
c
O
>
0
a
�
0
�
�
U
�
O
n
0
u
U
�
�
�
�
�
C
7
E
0
d
�
•
�
�
L
lE
U
O
�
y
E
.�-.
s
0
�
O
N
�
A
S
°`'
�
�
O
�ib
v
7
0
a
..�.7
�
z
R
O
�
C
�
�
�
C
_
c
>
C
=
0
d
�
7
N
�
O
0
�
�
U9
3
.�-1
N
�
>
�
w
�..�
�
a
12 Inspect�on Re� uest Re�orting �Q-r��,��� Page 8
Requested Inspect Date: Thursday, April 05, 2012
Inspection Area: CG
Site Address: 2606 DAVOS TR VAIL
A/P/D Information
Activity: 610-0158 Type: A-BUILD Sub Type: ASFR Status: ISSUED
Const Type: Occupancy: Use: Insp Area: CG
Owner: BERNSTEIN, LOIS K.
Contractor: J.B. BUILDERS Phone: 970-376-0733 J.B.
Description: ADDITION & EXTERIOR RENOVATION
Reauested Insqection(s)
Item: 90 BLDG-Final Requested Time: 09:00 AM
Requestor: Phone:
Comments: follow u
Assigned To: SGR E Entered By: JMONDRAGON K
Action: Time Exp:
Comment: EMENTS ARE COI�IPCEI�II'AND APPROVED.
PLAN ING DENIED. A PLANNING INSPECTION IS REQUIRED WHEN COMPLETE.
�I y 1�
�
5
Inspection Historv
Item: 10 BLDG-FOOTING *'` Approved "`
08/17/10 Inspector: mdenney
Comment:
Item: 20 BLDG-Foundation/Steel ** Approved `*
08/24/10 Inspector:. s�remmer
Comment: need special inspection re�ort
Item: 30 BLDG-Framing ** Approved "
08/18/10 Inspector: mdenney
Comment: east side roof framing.
10/01/10 Inspector: Martin
Comment:
Item: 50 BLDG-Insulation "" Approved *"
08/26/10 Inspector: sgremmer
Comment:
10/06/10 Inspector: JRM
Comment:
Item: 60 BLDG-Sheetrock Nail "* Approved `"
10/11/10 Inspector: JRM
Comment:
Item: 70 BLDG-Misc. "" A roved `"
Action: AP APPROVED
Action: PA PARTIAL APPROVAL
Action: PA PARTIAL APPROVAL
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
10/11/10 Insp ector: JRM Action: AP APPROVED
Comment: LATHE APPROVED
10/11/10 Ins� pector: JRM Action: AP APPROVED
Comment: R VALUE ON GLASS APPROVED CONFIRMED
Item: 535 DIA - ;
Item: 536 DIA - ;
Item: 533 PLAN•
Item: 420 Sp 10l
Item: 542 PLAN
02l
Com
REPT131
nal rept "• Approved "`
�ector: JRM Action: AP APPROVED
GEOTECH APPROVED EPDXY OF REBAR DOWELS
Approved "*
�ector: RFD Action: DN DENIED
fhe applicant shall paint below stucco or install landscaping to cover exposed concrete.
fhe applicant shall paint the vent on the west side of the structure.
fhe applicant shall paint the pipe attached to the meter on the west side of the structure.
Run Id: 14314