Loading...
HomeMy WebLinkAboutDRB090420r i s i. i M WN 0x04MNITY DEWADPMENr Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: CEDAR POINT TOWNHOMES DRB Number: DRB090420 Project Description: Participants: DRIVEWAY AND PARKING MPROVEMENTS INCLUDING PAVING CURRENT GRAVEL LOT. OWNER LEWIS, ROBERT N. & AMY E. 09/11/2009 5175 BLACK GORE DR Al VAIL CO 81657 APPLICANT MAURIELLO PLANNING GROUP, LL 09/11/2009 Phone: 970 - 748 -0920 PO BOX 1127 AVON CO 81620 License: C000001697 Project Address: 5175 BLACK GORE DR VAIL 5177 BLACK GORE DRIVE Location: Legal Description: Lot: Block: 15 Subdivision: CEDAR POINT TOWNHOUSES F Parcel Number: 2099 - 182 - 1500 -1 Comments: See conditions BOARD /STAFF ACTION Motion By: Action: STAFFAPP Second By: Vote: Date of Approval: 06/30/2010 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and /or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS. Cond:202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0011496 The applicant shall revegitate all gravel areas not to be paved back to grass within 30 days of the completion of the paving and prior to requesting final planning inspections. Cond: CON0011497 The new shed and trash enclosure are not approved as a part of this aplication. The shed and trash enclosure will be submitted within the next six (6) months as a change to approved plans. Planner: Warren Campbell DRB Fee Paid: $250.00 General Information: This application is required for all proposals involving minor changes to buildings and site im- provements, such as roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town Code sections can be found at www.vailgov.com under Vail Information — Town Code Online. All projects re- quWing design review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and /or the Plan- ning and Environmental Commission. Design review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Fee: $250 for Multi- Family /Commercial $20 for Single Family /Duplex Single Family Duplex ✓ Multi - Family Fax: Description of the Request: Cedar Point driveway improvements, including paving current gravel lot, relocation of existing shed, and new trash enclosure. Physical Address: 5177 Black Gore Drive Parcel Number: 2099- 182 -15 -001 (Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.) Property Owner: Cedar Point TH Association - Amy Lewis Mailing Address: 5175 Black Gore Drive Al Vail, CO 81 657 Owner's Signature: // Primary Contact/ Owner Rep} Mailing Address: PO Box 1127 Avon, CO 81620 E -Mail: aliison @mpgvaii.com For Office Vse Onl : Cash_ Fee Paid: o2 S Phone: 970- 390 -8530 Commercial Ind_ IK Iii i'i • 1 \ • MC Last 4 CC # t�` A th # 0a 38 `1 Ch k # Meeting Date: Planner: W G Zoning: _ RG Phone: 970 -37 -2336 Mauriello Planning G roup - Allison Kent ec Received From: Ail DRB No.: Project No: P -o - o �Q Land Use: Location of the Proposal: Lot: __._ Block: _.__ Subdivision: Application for Design Review Minor Exterior Alteration 0 ,• TOWN OPVATl, JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER This form is applicable to all Design Review applicants that share ownership of the subject property. For exam- ple, the subject property where construction is occurring is a duplex, condominium or multi- tenant building. This form shall be completed by the applicant's neighbor/ joint property owner. In the case of a multiple - family dwell- ing or multi- tenant building, the authority of the association shall complete this form and mail to: Community Development Department, 75 South Frontage Road, Vail, CO 81657 or fax to 970.479.2452. I, (print name) W L . , a joint owner, or authority of the association, of property located at ACV ,provide this letter as written approval of the plans dated which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the ad- dress noted above. I understand that the nronnri-H i m include: Additionally, please check the statement below which is most applicable to you: K � i I understand that minor modifications may be made to the plans over the course of the review process to en- sure compliance with the Town's applicable codes and regulations. (Initial here) D I request that all modifications, minor or otherwise, which are made to the plans over the course of the re- vlew process, be brought to my attention by the applicant for additional approval before undergoing further re- view by the Town. (Initial here) __ _ (Date) ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R090001197 Amount: $250.00 09/11/200901:20 PM Payment Method:Credit Crd Init: SAB Notation: VISA- ALLISON KENT ----------------------------------------------------------------------------- Permit No: DRB090420 Type: DRB -Minor A1t,Comm /Multi Parcel No: 2099 - 182 - 1500 -1 Site Address: 5175 BLACK GORE DR VAIL Location: 5177 BLACK GORE DRIVE Total Fees: $250.00 This Payment: $250.00 Total ALL Pmts: $250.00 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- DR 00100003112200 DESIGN REVIEW FEES 250.00 Page 1 of 2 Warren Campbell - Fwd: Re: FW: Cedar Point From: Tom Kassmel To: Warren Campbell Date: 9/22/2009 3:25 PM Subject: Fwd: Re: FW: Cedar Point Thomas Kassmel, PE Town of Vail Department of Public Works Town Engineer 1309 Elkhorn Drive Vail, CO 81632 Phone 970 - 479 -2235 >>> Tom Kassmel 9/11/2009 4:24 PM >>> looking at it quickly here are comments: 1. Cannot accept the floodplain line as noted. Floodplain line can not be interpolated from Town GIS maps. It also is shown in a location that makes no sense along the bottom of the berm onthe opposite side of the creek and the high side of the parking lot. Seems like it should be on the opposite side of the berm. 2. Parking lot standards require 24' drive aisle for perpendicular parking and 19' stalls, seems like there is room to comply. 3. The entrance to the lot should be narrowed to about 30' and a concrete pan added. Thomas Kassmel, PE Town of Vail Department of Public Works Town Engineer 1309 Elkhorn Drive Vail, CO 81632 Phone 970- 479 -2235 >>> Allison Kent <allison @mpgvail.com> 9/11/2009 10:58 AM >>> Hey Tom - I have a huge huge favor to ask. I'm going to swing by today and drop off the lovely paving job at Cedar Point. Nothing is ever easy. But, with some of the issues on the site, we decided to go ahead and have it engineered. I'm begging Warren to review it prior to it being routed on Tuesday, so that they can hopefully get moving on the paving. Here's our plan that we're submitting today — I am hoping that you can take a look at it and see if you think we're good to go on it. You'll be getting a full set routed to you. Thanks! Sorry to be a pain — not my style to do things piecemeal, but they are trying to fit this in before the snow flies and I'm a little nervous about the whole thing. file://C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \4AB8E... 09/23/2009 From: Allison Kent <allison @mpgvail.com> To: Tom Kassmel <TKassmel @vailgov.com >, Warren Campbell <WCampbell @vailgov.com> Date: 6/8/2010 3:26 PM Subject: Cedar Point Attachments: A -1 Enclosure Floor Plan & Elevations.pdf; Cedar Point Parking 01- 26- 10.pdf DO you guys happen to remember this one? It's the paving project that has taken longer than most homes. Cedar Point it back - and here's the plan. Let me know what you think! Allison Kent, AICP Mauriello Planning Group ph. 970.390.8530 www.mpgvail.com Page 1 of 1 Warren Campbell - Re: Cedar Point From: Tom Kassmel To: Allison Kent; Warren Campbell Date: 6/15/2010 9:43 AM Subject: Re: Cedar Point Looks like they got the floodplain on correct I dont believe we would have any issues. Thomas Kassmel, PE Town of Vail Department of Public Works Town Engineer 1309 Elkhorn Drive Vail, CO 81632 Phone 970 - 479 -2235 >>> Allison Kent <allison @mpgvail.com> 6/8/2010 3:24 PM >>> DO you guys happen to remember this one? It's the paving project that has taken longer than most homes. Cedar Point it back - and here's the plan. Let me know what you think! Allison Kent, AICP Mauriello Planning Group ph. 970.390.8530 www.mpgvaii.com file: / /C: \Documents and Settings \Administrator \Local Settings \Temp \XPgrpwise \4C174B... 06/21 /2010 2 � s , r ;v yr. ��r,M � � - lip IL .• ii 4 t � - — _ `._ — �- - -- - __ �;__._ r _dti� r.;�'"�'ar� _ _ e ,�.: �� �. :.; '� ..�, GRE EK BIGHORN SUBDIVISION FIFTH ADDITION LOT 5 GORE \ ♦ ♦ \ IF / \ MSTNG SHED TO E RELOCATED BY OWNER \ LOT 6 / +oas_as ;\ +. -c,Ae a \ p a Y "w EMSnNC TREES ro unutt gEYAIN EASEMENT ♦ ♦ `\ / INST 12 DIAMETER STRAW �.� /' / THINNED ASPHALT ACTION INSTALL (2) 4 CONDUIT \ \ AT PARKING LOT FLOWLBHE PER AT 24 DEPTH. SWEEP UP. LOT 7 / wATTES PRIpi ro caNSTflucnW. 1a' unutt ,�; \' 1.� \ / EME0�1ri 2 -4' DEEP TttENal AND I // EASEMENT / :- •j., �µ[ irc \ TYPICAL AcnaN BELOW AND CAP EN U�!( STAKE WTIi .1. 1.5 STAKES AT 4 GG (� // w \ IFR.ROr 9 PRDPOSED, ASPHALT PARKING LOT LOT 13 ♦ \`•, \ +noun .656x` /1 o,ssrs ,5y AREA 10,645 SF ♦ \ ''.\ ` ` / ' \ `) ,�% ,' TaTV c J } ` `, \ \L (t'/wj. (SEE cAI. ACTION) GR EEK \\ \ �•, ..... ..� e� •- .- .:L, 1I(� / P [.A A [ ) E1aSTINC TREE RE. TOE REMOVED GO / \� Jt /✓ t �� �; n1 /j7 \ a]. fid Df \ PLACE a2L ERS FROM V IPE R \. ♦ 'Ask a,. // •.•'"" M I6' uTEJTY• [r 14'>° A Ay i4 \ EXISTING ROCK wAU '= �:.�..� ��x... �t;� Y� 'ii.� . /.` ��.. .. .. � T. r '3 Si ..... 1 .wE _ \ ` 1 T y t�yO'! i7s {{+�,�'• i �LUUmwn r r1 ] / I 7 " CONSTRUCT FUELING STORAGE OF FERTILIZERS OR CHEMICALS. ETC THE CONTRACTOR SHALL HAVE 'ML 11Mllo / f ( e ' IIU� �. `, '/ •" 0DRFJNAGE SWALE IDENTIFIED PROCEDURES FOR HANDUNG POTENTIAL POLLUTANTS AND HAVE IDENTIFIED \\� O 2.OT. YIN. ROPE SPILL PREVENTION AND RESPONSE PROCEDURES AN PROCEDURES PRIOR TO Y ACTIVITIES AT THE �`�t�l�r /_.. .... .� ) piAV{2�'• :I .:3o- \ \ .. HIGH, TAT6R. PROJECT SITE. _ PM aNC �./ ♦ ' ,'\ \ •\ \ , .:•e ! \.L DI 9 I mill \ \ mTR CONSTRUED 14'%30' CONCRETE AB IN /. THE CONTRACTOR SHALL NINNIZE ALL OFF SITE SaL 1RACgNG ALL SOIL TRACKED OFF I \ +•. ff /` QUDE FOR OUMPSFEN _ (SEE DETAIL). SITE SHALL BE IMMEDIATELY CLEANED UP TO THE SATISFACTION OF THE OWNER AND THE 'ti• % cONSTRU LE CT ` 1'((f Tm. i yA,, Tl ` • ^. / f ` ' t.�I.,. - PROPERTr ifs ' -CU- io MCF9TECTTUR By OTHER A ,�H . YOM OF vA1L 3 \ \ Tiara Tf; G�TRAINAE SWA \ �: t / \ I�'7Y� �(UNE =� / •\ \\ tr(� � /' \P' YIN. ROPE I +/ + I TTPRCAL .�" MEET EXCAVATING FOR ROADWAY, RETAINING WALLS, DRAINAGE FACILITIES AND OTHER ` TRENCHES SHALL YT GINA REOUnREYENTS \ ♦ ±JP19 ` \ \\ Y "/ +"sw"W '\ 7 .. [a b \ \( 1 /' ���(. LOT S 6, SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR. ENGINEER E ENGINE IS NOT q,. , '`.• \ \ V i : nx6 i& ¢ i 1 \ \� y i `ma i - H ' �\ 1 (f /// ) to UTILITY RESPONSIBLE FOR SAFETY IN, ON CR ABOUT TIE PROJECT STE. NOR FOR COMPLIANCE I ' BY THE APPROPRIATE PARTY NTH Y REGULATIONS RELATING THERETO. SURVEYED HIGH NAIEfl MARK ;\ •.�,\ \ \ \\ i .Inrma. �� / /I� \� z 1`�' rl,' ' f "< ,, TRACT A J - --•-` r r� _ I EASEMENT J AN n ce \ 24 // 7. 08S RVA71ONS OF THE WORK IN PRDGRESS AND ON -SITE N9T5 ARE NOT TO BE \ ♦ : \ \ \ \ \\ f , - .> \ !! \ (TYP.} (TIP) �/CRh CONSTRUED AS A GU OR WARRANTY BY THE ENGINEER OF THE CONTRACTOR'S ♦ \ ) ! ° riRI ' B1 ]• - _.zx _ �p� _ _ m' TRACT C ( CONiRACNAL OBLIGATIONS BON5. LOT 14 \ \'• \• \ \ ♦ PARCEL x� cYaA ) °LY° �rt \ \� IyuS '\•, \... -._ i'1 ] B. THE CONTRACTOR SHALL MAINTAIN TRAFFIC AT ALL TIMES TO THE SATISFACTION OF THE \ ` \�' ,•'. \ +�� \ \. \ • �µ° v t1mJ �Ii t9 /, `y \ R `; r OWNER AND THE TO OF. .' THE CONTRACTOR SHAD, YN'gbZE TRAFFIC a N PBWS t'� (y, \ \ r 1:s• DIP , (TYP) \ / eOe [ ff// AND PROVIDE ADEOUATE SAFETY PRECAUTIONS TO ENSURE PUBLIC SAFETY. "V"� \ \ \ �• \ \'\ + 1 to a LTM) I •l a2 l \ J F '' TT : • . T7 ) , T p� svi Auc rpa �� . THE CONTRACTOR SHALL PROTECT AND PRESERVE ALL TREES. BUSHES, SHRUBS. AND (p -*PARCEL B2 \ g ; \� _ r ' a HS i y- +;,p " A,a�'�nND�TO BOWNER. MANNER ACCEPTABLE TO E O AND AS DEFINED WITHIN NEB WITHIN THE , ' \ \ \ \ .\ sea.. ♦ a;;s\ u H a X \ { ... CaNmacnw �`p' PERMITS �C ' \ ` ' \ \ ♦ J ' rna o O NT (Tan CAI) 10. THE CONTRACTOR SHALL MAINTAIN EMS71NG DRAINAGE CHANNELS. CULVERTS. AND APPURTENANCES DURING CONSTRUCTION AS NECESSARY TO PROTECT ROADS AND ( O � / J L 9c f \ \\ i =NO. PROPPROPERTY. ER � L J ♦\�� � Iii � �\ PARCEL 83 ''•,'�' a` �, PuaaND/o of '; �• n I { / q" \ (�J3a0125 EXISTING EDGE OF It. EMITTING TOPOGRAPHY AND SURVEY DATA PROVIDED RY E VALLEY SURVEwNC. lJ �'f° \ \ �t'Ijlj /•cw ASPHALT (i yff L) XIS c ACIE F GATED 08/17/2009. . \ /fll( +Y i "� / PARCEL 8 SMALL 4 I .1zsA /'�` '' °A `\ � e J /� Y • -� \V l �-' t2. CONTRACTOR ALL OBTAIN ALL NECESSARY PERYtTS. \ •\ \ ��• \� y ar wn 'fir q n LOT 5 13. CONTRACTOR SHALL PROOF ROLL ALL THE SUBGRADE PRIOR TO PLACING GRAVEL AND G (� ♦\ \'•\�/ \ \, \\ �\4/ y1] ", /, n \ \� uI,G / a + HEATHER OF VAIL REPAIR ANY SOFT OR YIELDING AREAS. O D � ��F/ ` /\ \ \\ Y ( �/ I I a5r�il / /s`- !(/ .: f ♦� J 14. IT 15 RECOMMENDED THAT THE OWNER MAINTAIN THE PROPOSED ASPHALT BY CRACK ` Z ' Ww[p �•\ \��i iI I J DO NOT ENCROACH SEALING ALL CRACKS EACH SPRING AND FALL, PLACING AN ASPHALT SEAL COAT FROM IT ✓ `., ON AOJONINC PROPERtt TIME TIME AS NEEDED. AND PATCHING DISTRESSED AREAS AS NEEDED. 1 F S ♦ ♦ \ i / .ng, PARCEL 1 u9TtP. 15. CONTRACTOR SHALL COMPLY NTH THE TERMS AND CONDITIONS USTED IN THE 70M OF GA O / LOT 15 ♦ \ � \\ \ \ I ♦ .1 PARCEL 2 \ e =� n � � ssm `' ^ / VM PUBLIC WAY PERMIT ISSUED FOR THIS PROgECT. V/ +.# �, J CONSTRUCTION SEQUENCE: '' ♦ / /`\ \. \ N. ` 1 I ` \ °= EOCE ASPHwT LU 1. REMOVE AND STOCKPILE DOSING ON-SITE GRAVEL APPROXIMATE LOCATION OF 100 YEAR FLOOD PENN, INTEflP4.ATE0 BY EAGE VALLEY SURVEYING 4, qy PARCEL 3 7Tg? MT2\ - ?7 2. REGRADE SUBGRAE TO PROPOSED ELEVATIONS. / \ IN"ANCE STUDY N0. OB03 CVOOOp GATED DECEMBER 4. IOW /\ \,'•.\ \�� \\ \\ +e ^.Tb f l jg \ \ 3. PROOF ROLL SUBGRADC V / Y /PARCEL 4 ' \, �C n 4, PLACE AND COMPACT GRAVEL BASE COURSE, 5. PLACE ASPHALT PAVING \ » PARCEL 5 `. Y ma ! s.trar \ Pwgm 5y� O \ `• u r n + nr...a SAWI]IT EDGE OF WIDE CO C ASPHALT NNG TO PATCH �W[1V1 LR.S \ ^' r =P \\`��f \.e AND INSTALL 4' VIDE COVCETE PAN (� ( �� - - - - TIMBER WGI .-V WITH CONTRACTION JOINTS AT 10' (.Ati1ES) ;e1� mn�m \ \ TOP OF E%ISBN ��,� owael /-O!, \ •. \ / \ + m r-� RS>1'• INTERVALS (AE DETAIL) -w _�' • P ��•q '` `l , \ / ` ,tl f ! /III' J '.\ �� A Ail I +mlaaa a � °a1c O 1, \ i +�iPti.'t ,� ETDSTINC EDE OF .} j • ; • l • -` s' U=c ASPHALT TYPICAL Th. lnhEr 1 booRer Ra dealgned fo Row mrmce nova not 1. mmetl T Ora fo amoD a m.. dope noue roan P LOT 17 ♦ \ \ \ \ ,: I; ° " /V�aa1a 7 EL? 3:1. Slra. wellim can daa be inafolletl on contour an Bleeper slop" to reduce mrfoM aprend water now and F \ \ \ eoplure sadimant. The f.11a.bg I. a brief doettgtion al the Sbe. Wolllaa, thou ua. and blltaliallon. R. The other h w of 1 Stre. Wollle fa 9 he r l The In , Z hatght made oP po n re st. 5 -7 GL The stantlord length of \ .\ „ ��. , VPJ - OF v4_1'I Strove WoU c IS N., however he r be Zi e un reg.. ltl..ann De lnalailed an contour of dope, with a dig 2. Slrow Wo hl tlomdope angle at the end of each .. to (�(�� "love tar dove drainage during henry preefplla a. They con m.a be ueetl o f the lap a( dopes to erelon ♦ \ ? ���� tt"'flt 1'�I Q �) •1 eh.ld over the edge, antl they er. be used ob the toe of alape% Straw Wotilaa can den be used anon 't� ( 1 _ tdewal In and age and orwnd storm tlrohe and inieta to prevent aetlimanl polut(m. ` � Cl � 051 ®0 3. SNa. wattles eon eo used to replace Oat 1ancm, etrow bole tldm and eantl bag eorrlera, They can also be / \ 7s.a •� Plated h drainage Holm to dove nova and " plum aedl. "they eon De uaetl as level epraotlan to Prevpnl m Iraled na.. and In place at earthen berm. a tlglex 4. Straw W.111 -sh.ld be Ie.1.11 d in shdlo. trenches, 2 - 4 N, tle.P. dill on son type and dope .hope- Dig the deeper Irmch far sal. loamy cog and eteepml dopes tlIII the Mallowar branch far hard rocky sofa and gentler cape°, Uae 'add" and enavel to tltg the Irmd1. throwing .-tell -a to Ue uP hgl a'do to Prevent tun oil ,a m andereatting 0e Wattle. S Lay be W.H.- to the trench antl .lake with _ad .let. of each end and 4 -fool on center. When lmtdnng running lengths. Straw Wollle ends should be battened Brady together to prevent tankage, and N.T.S. e°Prdy obaked together. DO NOT OWRI AP. A STRAW WATTLE IK [apxa QSI «c e01a. \ \ \\ [aslwc rnanO 3' IC PNam16 SiM S N' eaS2 _ r wwt/ata .ibuR YCi01 1 -1 gba_ T..E Kt 3'i'N7ikli>1il 1iG,- Ltd-? l' l- �l'. �'=, ��� , {ji'1lC,.lir�Ir�IFa11 "7ltyN7�y «,rbaa.wa RAtt A.eaaxN. ]' P nc t nr« m r ' P 'lo T i R0 " 4 aar.r nNa�im' ° .p T �'"olr w.�cl . w,r. Pu¢ c �A� °saw .ASE• Ave EowAn m E� watx• stNt rc srnArm ar Pw naoaaE. PPKR TO s+PPPw .w. m.rzw1 velvet �o w P uosule swp+Ax. mA,¢ sou. a .es[cWD er wrzwus n3TrA Pw.R la PEUStntW A PttmaN 6 M PAP«W ".== VISE R U+aWF OMV6 ro PffLArl w or • .ASE WT uWSa]i PW PpaaW WP2 CF he PAY«. tEaen x1K.W -1 GILL «CPEA M PEA01bWIS or M PA,p� Arq M ACanlaxK rAett p' M PNe.xO lm. OeAa A R.SDMw D-D ran IEIPIa ANp A PAWS®r1 .00drS ateaaltroATKrrs ro AS4Aa N.T.S. a[Selm PENboon. e' M PANNNL B TYPICAL PARKING LOT SECTION UNIT WII�III�IIIIIIIIIIIIIIIIIz % 1 Remove 8 Stockpf. Existing Gravel SF mb 2 Pro are Subgrade SF 10,645 3 Place 3" GnxVel• GRAPHIC SCALE A _ f�gl 4 Asphalt PaWng•• (3" + Asphalt Pan) o ,o ro b to nl III q� 5 Straw Wattle LF �I I�IIIII IIIIz 6 4' Wido Concrete Pan F ) g �3m III I 7 PI... 4" Gravel far Dumpster Pad l in h 2 0 (t 8 Reinforced Concrete Dumpster Pad (6 ") GENERAL NOTES: U e 9 Install 4" Conduit APPROXIMATE LOCATICN OF 100 YEAR VA FLOW PWN INTERPOLATED BY EAGLE VALLEY 110 SURVEYING FROM FEW FLOW INjU STUDY NUMBER W027CV000A DATED DECEMBER 4. 2W7. 1. THE CONTRACTOR SHALL CONFORM TO ALL TOWN OF VAIL REGULATIONS AND STIPULATIONS WHILE ACCESSNC THROUGH OR WORKING IN THE MAN. t iv di + •Y EMSTINC ROCK WALL 2. ALPINE ENGINEERING. INC.. ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. IT IS THE CONTRACTOR'S RESPONSI &UTT TO FELD VERITY THE LOCATION VERI L Ott OF ALL y TO E flD10VED, BOULDERS PRIOR TO COMMENCEMENT aF ANY CONST R @ V , ON -SITE. S THE CONTRACTOR SNAIL TAKE ALL APOPRIATE PRECAUTIONS TO SONIFICANILY 'P ®P.Y'r \ ` 1 T y t�yO'! i7s {{+�,�'• i �LUUmwn r r1 ] / I 7 " CONSTRUCT FUELING STORAGE OF FERTILIZERS OR CHEMICALS. ETC THE CONTRACTOR SHALL HAVE 'ML 11Mllo / f ( e ' IIU� �. `, '/ •" 0DRFJNAGE SWALE IDENTIFIED PROCEDURES FOR HANDUNG POTENTIAL POLLUTANTS AND HAVE IDENTIFIED \\� O 2.OT. YIN. ROPE SPILL PREVENTION AND RESPONSE PROCEDURES AN PROCEDURES PRIOR TO Y ACTIVITIES AT THE �`�t�l�r /_.. .... .� ) piAV{2�'• :I .:3o- \ \ .. HIGH, TAT6R. PROJECT SITE. _ PM aNC �./ ♦ ' ,'\ \ •\ \ , .:•e ! \.L DI 9 I mill \ \ mTR CONSTRUED 14'%30' CONCRETE AB IN /. THE CONTRACTOR SHALL NINNIZE ALL OFF SITE SaL 1RACgNG ALL SOIL TRACKED OFF I \ +•. ff /` QUDE FOR OUMPSFEN _ (SEE DETAIL). SITE SHALL BE IMMEDIATELY CLEANED UP TO THE SATISFACTION OF THE OWNER AND THE 'ti• % cONSTRU LE CT ` 1'((f Tm. i yA,, Tl ` • ^. / f ` ' t.�I.,. - PROPERTr ifs ' -CU- io MCF9TECTTUR By OTHER A ,�H . YOM OF vA1L 3 \ \ Tiara Tf; G�TRAINAE SWA \ �: t / \ I�'7Y� �(UNE =� / •\ \\ tr(� � /' \P' YIN. ROPE I +/ + I TTPRCAL .�" MEET EXCAVATING FOR ROADWAY, RETAINING WALLS, DRAINAGE FACILITIES AND OTHER ` TRENCHES SHALL YT GINA REOUnREYENTS \ ♦ ±JP19 ` \ \\ Y "/ +"sw"W '\ 7 .. [a b \ \( 1 /' ���(. LOT S 6, SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR. ENGINEER E ENGINE IS NOT q,. , '`.• \ \ V i : nx6 i& ¢ i 1 \ \� y i `ma i - H ' �\ 1 (f /// ) to UTILITY RESPONSIBLE FOR SAFETY IN, ON CR ABOUT TIE PROJECT STE. NOR FOR COMPLIANCE I ' BY THE APPROPRIATE PARTY NTH Y REGULATIONS RELATING THERETO. SURVEYED HIGH NAIEfl MARK ;\ •.�,\ \ \ \\ i .Inrma. �� / /I� \� z 1`�' rl,' ' f "< ,, TRACT A J - --•-` r r� _ I EASEMENT J AN n ce \ 24 // 7. 08S RVA71ONS OF THE WORK IN PRDGRESS AND ON -SITE N9T5 ARE NOT TO BE \ ♦ : \ \ \ \ \\ f , - .> \ !! \ (TYP.} (TIP) �/CRh CONSTRUED AS A GU OR WARRANTY BY THE ENGINEER OF THE CONTRACTOR'S ♦ \ ) ! ° riRI ' B1 ]• - _.zx _ �p� _ _ m' TRACT C ( CONiRACNAL OBLIGATIONS BON5. LOT 14 \ \'• \• \ \ ♦ PARCEL x� cYaA ) °LY° �rt \ \� IyuS '\•, \... -._ i'1 ] B. THE CONTRACTOR SHALL MAINTAIN TRAFFIC AT ALL TIMES TO THE SATISFACTION OF THE \ ` \�' ,•'. \ +�� \ \. \ • �µ° v t1mJ �Ii t9 /, `y \ R `; r OWNER AND THE TO OF. .' THE CONTRACTOR SHAD, YN'gbZE TRAFFIC a N PBWS t'� (y, \ \ r 1:s• DIP , (TYP) \ / eOe [ ff// AND PROVIDE ADEOUATE SAFETY PRECAUTIONS TO ENSURE PUBLIC SAFETY. "V"� \ \ \ �• \ \'\ + 1 to a LTM) I •l a2 l \ J F '' TT : • . T7 ) , T p� svi Auc rpa �� . THE CONTRACTOR SHALL PROTECT AND PRESERVE ALL TREES. BUSHES, SHRUBS. AND (p -*PARCEL B2 \ g ; \� _ r ' a HS i y- +;,p " A,a�'�nND�TO BOWNER. MANNER ACCEPTABLE TO E O AND AS DEFINED WITHIN NEB WITHIN THE , ' \ \ \ \ .\ sea.. ♦ a;;s\ u H a X \ { ... CaNmacnw �`p' PERMITS �C ' \ ` ' \ \ ♦ J ' rna o O NT (Tan CAI) 10. THE CONTRACTOR SHALL MAINTAIN EMS71NG DRAINAGE CHANNELS. CULVERTS. AND APPURTENANCES DURING CONSTRUCTION AS NECESSARY TO PROTECT ROADS AND ( O � / J L 9c f \ \\ i =NO. PROPPROPERTY. ER � L J ♦\�� � Iii � �\ PARCEL 83 ''•,'�' a` �, PuaaND/o of '; �• n I { / q" \ (�J3a0125 EXISTING EDGE OF It. EMITTING TOPOGRAPHY AND SURVEY DATA PROVIDED RY E VALLEY SURVEwNC. lJ �'f° \ \ �t'Ijlj /•cw ASPHALT (i yff L) XIS c ACIE F GATED 08/17/2009. . \ /fll( +Y i "� / PARCEL 8 SMALL 4 I .1zsA /'�` '' °A `\ � e J /� Y • -� \V l �-' t2. CONTRACTOR ALL OBTAIN ALL NECESSARY PERYtTS. \ •\ \ ��• \� y ar wn 'fir q n LOT 5 13. CONTRACTOR SHALL PROOF ROLL ALL THE SUBGRADE PRIOR TO PLACING GRAVEL AND G (� ♦\ \'•\�/ \ \, \\ �\4/ y1] ", /, n \ \� uI,G / a + HEATHER OF VAIL REPAIR ANY SOFT OR YIELDING AREAS. O D � ��F/ ` /\ \ \\ Y ( �/ I I a5r�il / /s`- !(/ .: f ♦� J 14. IT 15 RECOMMENDED THAT THE OWNER MAINTAIN THE PROPOSED ASPHALT BY CRACK ` Z ' Ww[p �•\ \��i iI I J DO NOT ENCROACH SEALING ALL CRACKS EACH SPRING AND FALL, PLACING AN ASPHALT SEAL COAT FROM IT ✓ `., ON AOJONINC PROPERtt TIME TIME AS NEEDED. AND PATCHING DISTRESSED AREAS AS NEEDED. 1 F S ♦ ♦ \ i / .ng, PARCEL 1 u9TtP. 15. CONTRACTOR SHALL COMPLY NTH THE TERMS AND CONDITIONS USTED IN THE 70M OF GA O / LOT 15 ♦ \ � \\ \ \ I ♦ .1 PARCEL 2 \ e =� n � � ssm `' ^ / VM PUBLIC WAY PERMIT ISSUED FOR THIS PROgECT. V/ +.# �, J CONSTRUCTION SEQUENCE: '' ♦ / /`\ \. \ N. ` 1 I ` \ °= EOCE ASPHwT LU 1. REMOVE AND STOCKPILE DOSING ON-SITE GRAVEL APPROXIMATE LOCATION OF 100 YEAR FLOOD PENN, INTEflP4.ATE0 BY EAGE VALLEY SURVEYING 4, qy PARCEL 3 7Tg? MT2\ - ?7 2. REGRADE SUBGRAE TO PROPOSED ELEVATIONS. / \ IN"ANCE STUDY N0. OB03 CVOOOp GATED DECEMBER 4. IOW /\ \,'•.\ \�� \\ \\ +e ^.Tb f l jg \ \ 3. PROOF ROLL SUBGRADC V / Y /PARCEL 4 ' \, �C n 4, PLACE AND COMPACT GRAVEL BASE COURSE, 5. PLACE ASPHALT PAVING \ » PARCEL 5 `. Y ma ! s.trar \ Pwgm 5y� O \ `• u r n + nr...a SAWI]IT EDGE OF WIDE CO C ASPHALT NNG TO PATCH �W[1V1 LR.S \ ^' r =P \\`��f \.e AND INSTALL 4' VIDE COVCETE PAN (� ( �� - - - - TIMBER WGI .-V WITH CONTRACTION JOINTS AT 10' (.Ati1ES) ;e1� mn�m \ \ TOP OF E%ISBN ��,� owael /-O!, \ •. \ / \ + m r-� RS>1'• INTERVALS (AE DETAIL) -w _�' • P ��•q '` `l , \ / ` ,tl f ! /III' J '.\ �� A Ail I +mlaaa a � °a1c O 1, \ i +�iPti.'t ,� ETDSTINC EDE OF .} j • ; • l • -` s' U=c ASPHALT TYPICAL Th. lnhEr 1 booRer Ra dealgned fo Row mrmce nova not 1. mmetl T Ora fo amoD a m.. dope noue roan P LOT 17 ♦ \ \ \ \ ,: I; ° " /V�aa1a 7 EL? 3:1. Slra. wellim can daa be inafolletl on contour an Bleeper slop" to reduce mrfoM aprend water now and F \ \ \ eoplure sadimant. The f.11a.bg I. a brief doettgtion al the Sbe. Wolllaa, thou ua. and blltaliallon. R. The other h w of 1 Stre. Wollle fa 9 he r l The In , Z hatght made oP po n re st. 5 -7 GL The stantlord length of \ .\ „ ��. , VPJ - OF v4_1'I Strove WoU c IS N., however he r be Zi e un reg.. ltl..ann De lnalailed an contour of dope, with a dig 2. Slrow Wo hl tlomdope angle at the end of each .. to (�(�� "love tar dove drainage during henry preefplla a. They con m.a be ueetl o f the lap a( dopes to erelon ♦ \ ? ���� tt"'flt 1'�I Q �) •1 eh.ld over the edge, antl they er. be used ob the toe of alape% Straw Wotilaa can den be used anon 't� ( 1 _ tdewal In and age and orwnd storm tlrohe and inieta to prevent aetlimanl polut(m. ` � Cl � 051 ®0 3. SNa. wattles eon eo used to replace Oat 1ancm, etrow bole tldm and eantl bag eorrlera, They can also be / \ 7s.a •� Plated h drainage Holm to dove nova and " plum aedl. "they eon De uaetl as level epraotlan to Prevpnl m Iraled na.. and In place at earthen berm. a tlglex 4. Straw W.111 -sh.ld be Ie.1.11 d in shdlo. trenches, 2 - 4 N, tle.P. dill on son type and dope .hope- Dig the deeper Irmch far sal. loamy cog and eteepml dopes tlIII the Mallowar branch far hard rocky sofa and gentler cape°, Uae 'add" and enavel to tltg the Irmd1. throwing .-tell -a to Ue uP hgl a'do to Prevent tun oil ,a m andereatting 0e Wattle. S Lay be W.H.- to the trench antl .lake with _ad .let. of each end and 4 -fool on center. When lmtdnng running lengths. Straw Wollle ends should be battened Brady together to prevent tankage, and N.T.S. e°Prdy obaked together. DO NOT OWRI AP. A STRAW WATTLE IK [apxa QSI «c e01a. \ \ \\ [aslwc rnanO 3' IC PNam16 SiM S N' eaS2 _ r wwt/ata .ibuR YCi01 1 -1 gba_ T..E Kt 3'i'N7ikli>1il 1iG,- Ltd-? l' l- �l'. �'=, ��� , {ji'1lC,.lir�Ir�IFa11 "7ltyN7�y «,rbaa.wa RAtt A.eaaxN. ]' P nc t nr« m r ' P 'lo T i R0 " 4 aar.r nNa�im' ° .p T �'"olr w.�cl . w,r. Pu¢ c �A� °saw .ASE• Ave EowAn m E� watx• stNt rc srnArm ar Pw naoaaE. PPKR TO s+PPPw .w. m.rzw1 velvet �o w P uosule swp+Ax. mA,¢ sou. a .es[cWD er wrzwus n3TrA Pw.R la PEUStntW A PttmaN 6 M PAP«W ".== VISE R U+aWF OMV6 ro PffLArl w or • .ASE WT uWSa]i PW PpaaW WP2 CF he PAY«. tEaen x1K.W -1 GILL «CPEA M PEA01bWIS or M PA,p� Arq M ACanlaxK rAett p' M PNe.xO lm. OeAa A R.SDMw D-D ran IEIPIa ANp A PAWS®r1 .00drS ateaaltroATKrrs ro AS4Aa N.T.S. a[Selm PENboon. e' M PANNNL B TYPICAL PARKING LOT SECTION DESCRIPTION UNIT QUANTI 1 Remove 8 Stockpf. Existing Gravel SF 10,645 2 Pro are Subgrade SF 10,645 3 Place 3" GnxVel• SF 10,941 4 Asphalt PaWng•• (3" + Asphalt Pan) TN 217 5 Straw Wattle LF 50 6 4' Wido Concrete Pan SF 120 7 PI... 4" Gravel far Dumpster Pad SF 420 8 Reinforced Concrete Dumpster Pad (6 ") SF 420 9 Install 4" Conduit LF 110 ie WDE X 25 LONG 6' CONCRETE SXB LANDSCAPE LANDSCAPE (MMES) Ptr« (VARIES) FINISH PARKING LOT GRADE DUMPSTER Y •:fR. ....... ... {.. ,.J P." ENCLOSURE IY OT HERS) No 4 R[6AR EACH WAY SCARaY Sat TO !!' DEPTH ANO COMPACT ..A 0.G SE To 95X STANDARD PROCTOR DENSIY. PLACE s T ON 3' 4' OF GLASS a BASE COURSE -ACTED -, {',:;= Y „ l '/'� 'V S BACKRLL NTH APPROVED T TERIAL V.T.S. TO 95% STANDARD PROCTOR DENSITY COMPACTED TO 9S[ STANDARD PROCTOR C CONCRETE DUMPSTER PAD ' DENSITY O MOISTURE CONTENT WITHIN ZX OF OPTIMUM 3' HBP (I,,) EvHtIng ADph,H (Typ,) / ;' 3/4' SCRENEO ROCK 2' bx. ..t /P a mnc CL OR SCREENED ON-SITE OR 1 -1/2' MINUS MATERI/ ZX or Plan � 2_p' 72" 2 12' AS APPROVED BY ENO. NEER. 4' PVC ^. StE RNV Fm JpNr LA-T SCHEDULE 40 CONCONDUIT N.T.S. CON)T7AGRON JQ'NTS Nam PLACE CDxTItACnON N.T.S. MNTS AT 5' INTERVALS 6 X 6 M.4 X M.4 Wdd Wo dee Fabric PER PLAN D CONTRACTION JOINTS E 1 4 WIDE CONCRETE PAN F CONDUIT DESCRIPTION UNIT QUANTI 1 Remove 8 Stockpf. Existing Gravel SF 10,645 2 Pro are Subgrade SF 10,645 3 Place 3" GnxVel• SF 10,941 4 Asphalt PaWng•• (3" + Asphalt Pan) TN 217 5 Straw Wattle LF 50 6 4' Wido Concrete Pan SF 120 7 PI... 4" Gravel far Dumpster Pad SF 420 8 Reinforced Concrete Dumpster Pad (6 ") SF 420 9 Install 4" Conduit LF 110 FINAL 100% CD January 2010 ISSUED FOR CONSTRUCTION m O N S 0 N LESifJiR r 0, U U Y r7 '- "" INDICATES EVERGREEN TREE AND APPRX. TRUNK OIA. W ° z INDICATES OEaOVOVS TREE AND APPR %. TRUNK 010. ."CH WATER LINE - CENTERLINE CREEK 100 -YEAR ROOD PLAIN BUSHLINE SHEET 1 * I4' -3 3/4" O. RIDG VENT, T7P. FRONT & BACK OF UPPER GABLE SPAC WOOD OVETOIEAD DOOR, WITH ELECTRIC OPERATION KEY PAD TD BE LOCATED BY CONTRACTOR ON SITE FRONT 4" DV STEEL BOLLARD, 8001 SIDES TO HOR. WOOD HAND, TRANSITION ' MATENW, FROM STONE TO WOOD STONE BASE, SIRRDUND (SPEC. T.BD.)- O. I 12 to 12" 7'-70 I 4" L x _ 6" DEEP CONCRETE PAD, REINFORCED MI WITH WINE MESH & REBAR 0.ECTOC GMAGE DOOR MOTOR, WITH ACCESS 14 TO SAFETY PULL CORD / EMERGENCY RELEASE — ' — — — — H1. - NO OVERHANGS ON ENCLOSURE (10) SNOW NARKED POLES UGHT Fl %CORES NWNTED BETWEEN ROOF RAFTERS, ( — , -) , & I WITHIN SUCXET IN CORNER AOJUSiAeIE FINS - ROOF SHINGLES TO MATCH COLOR & GRADE OF EXISTING TOWN HONES. LAS I � II II PLASTIC HOOKS ON WALL TO L J J L° K � UPRIGHT: _ — J 3. "p. I•� (5) SHOVELS UTCHED ODOR NiH LOCNAHLE e _ m'• SP6E `d (1) GARDEN FORK HA90WAAE '< I 4' S I (I) WEED EATER TOWN HOME I - - -- OWNERS' ENTRY o I 13' -41' x5-41" S -4 • c • 3'-41' I 48" WIDE WINDOW, PE: 5 /A -I 4 -8 4 1 _ - 4' -8' I A.I 0 A I 3' -11 1 (6) HOSES, HUNG ON WALL EXFEFOOR UGHRNG, WALL MT. Fl RE WNJONG G 80.0W SUPPLIES SHELVING I I SPACE T :° SPACE SPACE I I•� (2) CENTRAL 4" DIA. BOIWDS, 4' HIGH, FILLED WITH CONCRETE 1 7o I o I ° I I (8) SPRINKLERS / SPRONKIER HEADS, STORED ON MOLIT -LEVEL - I - I 70 3•_71• 6• p• y_i i SUPPLIES SH0.VING, WITH BRACKETS a SUPPORTING (RE: NOTES BELOW) (2) FRONT 4" D0. BOUARDS, 4' HIGH, RUED WITH CONCRETE 7 — •-}- 1 (3) LARGE CUPPERS, HUNG ON WALL BELOW SUPPLIES SHELVING — __- — Q ELECTRIC GAIKE DOOR (12'X7') J I f3 12" 12' -0' CLEAR 12" dry y I I CONCRETE PAD I (SEE CIAL PLAN FOR DIN OF UNOBSTRUCTED APPROACH) I I WO WASTE EMENT VEMCUILAR ENTRY �-� 7 ti, PROPOSED ENCLOSURE FLOOR PLAN „r "ra ROHM TOTAL SQUARE FEET OF ENCLOSURE: 265 SP �I - 110'09ElffOwCTOLPRJ'4Lx09URE: -- - CONCRETE SLAB / APRON / CONCRETE PAD 70 BE 6 DEEP, REINFORCED WITH WIRE MESH & REBAR. - SLOPE OF DROVE T.BD. BY CIVIL ENGINEER. - WAILS TO BE 2X4 CONSTRUCRON, WON TREATED LUMBER. - ALL WOOD STAIN COLORS TO MATCH EXISTING TOWN HONES. - ROOF SHINGLES TO MATCH COLOR & GRADE OF EXISTING TOWN HOMES. - ALL DMENSIONS TO BE SHE VERIFIED BY CONTRACTOR PRIOR TO CONSLUCTION. - STORAGE SHELVING TO BE MULTI-LEVEL ALONG WALL(S). CONTRACTOR TO DETERMINE SPACING ON SHE WITH ALL STORAGE NEEDS PRESENT, TAXING 0r RHEAD DDOR INTO ACCOUNT. �60 ry - to Ma +c�N * I4' -3 3/4" O. RIDG VENT, T7P. FRONT & BACK OF UPPER GABLE SPAC WOOD OVETOIEAD DOOR, WITH ELECTRIC OPERATION KEY PAD TD BE LOCATED BY CONTRACTOR ON SITE FRONT 4" DV STEEL BOLLARD, 8001 SIDES TO HOR. WOOD HAND, TRANSITION ' MATENW, FROM STONE TO WOOD STONE BASE, SIRRDUND (SPEC. T.BD.)- O. I 12 to 12" 7'-70 I 4" L x _ 6" DEEP CONCRETE PAD, REINFORCED A WITH WINE MESH & REBAR HANDLE TO PULL OVERHEAD DOOR UP IF ELECTRIC GARAGE DOOR IS IN POWER RELEASE MODE �•_' A z PROPOSED ENCLOSURE FRONT ELEVATION TOTAL SQUARE FEET OF ENCLOSURE: 238 SF H1. - NO OVERHANGS ON ENCLOSURE - CONCRETE SUB / WHICH / CONCRETE PAD TO BE 6" DEEP, REINFORCED WITH WIRE MESH & RMAR. - SLOPE OF DRIVE T.B.D. BY CIVIL ENGINEER. - WX S TO BE 2X4 CONSTITUCTON, WITH TREATED LUMBER - All WOOD STAIN COLORS TO MATCH EXISTING TOWN HOMES. - ROOF SHINGLES TO MATCH COLOR & GRADE OF EXISTING TOWN HONES. - ALL DIMENSIONS TO BE SHE VEPoFlED BY CONTRACTOR PRIOR TO CONSTRUCTION. 3 /. rs - RiDLE -- VENT. TYP. FRONT & BACK OF UPPER GABLE 5 BATT & BOARD VERTICAL WOOD SIDING- 6' VERT.WOOD CORNER BOARD, P 10" NOR. WOOD BAND, TRANSNOt MATERIAL. FROM STONE TO WND STONE HUE• SURROUND (SPEC. 6" DEEP CONCRETE PAD, REINFORCED WTTH WIRE MESH & REBAR 12 �IO 4 PROPOSED BACK ENCLOSURE ELEVATION t ITOTAL SQUARE FEET OF ENCLOSURE: 238 SF am: - NO OVERHANGS OR ENCLOSURE. - CONCRETE SLAB / APRON / CONCRETE PM TO BE 6' DEEP, REINFORCED YOU WIRE MESH & ROM. - SLOPE OF DRIVE TD.D. BY CIAL ENGNEER. - WALLS 70 BE 2X4 CONSTRUCTION, WITH TREATED LUMBER. - ALL WOOD STAIN COLORS TO MATCH EXISTING TOWN HOMES. - ROOF SHINGLES TO MATCH COLOR & GRADE OF EXISTING TOWN HONES. - ALL DIMENSIONS TO BE SITE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. cs U C �,#L 11ral i O U W O O z U d � � O V V CQ k3 PrImcrI = SNEEFNNEENCLOSURE PM& ELEVATIONS A -1 Q 14' -3 3/4" .T'6 - Rl7C� PROPOSED WEST SIDE ENCLOSURE ELEVATION ITOTAL SQUARE FEET OF ENCLOSURE: 238 SF) NQIE - NO OVERHANGS ON ENCLOSURE. - CONCRETE SLAB / APRON / CONCRETE PAD TO BE 6" DEEP, REINFORCED WITH WIRE MESH & REBAR. - SLOPE OF DRIVE T.B.D. BY CIVIL ENGINEER - WALLS TO BE 2X4 CONSTRUCTION, WITH TREATED LUMBER. - All WOOD STAIN COLORS TO MATCH EKURNG TOWN HONES. - ROOF SHINGLES TO MATCH COLOR & GRACE OF EXISTING TOWN HOMES. ALL DIMENSIONS 70 BE SITE VE DIED BY CONTRACTOR PRIOR TO CONSTRUCTION. 5 PROPOSED EAST SIDE ENCLOSURE ELEVATION ITOTAL SQUARE FEET OF ENCLOSURE: 238 SFE BRIG: - NO OVERHANGS GN ENCLOSURE - CONCRETE SLAB / APRON / CONCRETE PAD TD BE 6 DEEP, REINFORCED WITH WIRE MESH & REBAR. - SLOPE OF DRIVE T.O.D. BY CIVIL ENGINEER. - WALLS TO BE 2X4 CONSTRUCTION, WITH TREATED LUMBER - ALL WOOD STAIN COLORS TO MATCH EXISTING TOWN HONES. - RDOF SHINGLES TO MATCH COLOR & CRADE OF EXISTING TOWN HONES. - ALL DIMENSIONS TO BE SITE VEORED BY CONTRACTOR PRIOR TO CONSTRUCTION.