Loading...
HomeMy WebLinkAbout01. 20250828_Engage Vail SlidesARRIVE VAIL 39°38’32” N 106°22’25” W TRANSPORTATION CENTER EXPANSION page 2 Considerations: - Future growth should accommodate 18 buses and 400 linear feet for passenger vehicles (current conditions fall significantly short of this need) - The “bus bay” approach offers problems if scaled up, as the second bus in que is trapped. EXISTING CONDITIONS TRANSIT INFORMATION Vail Transit Core Transit Bustang/ Greyhound N TRANSIT/WELCOME CENTER 6 Bus Bays 260 linear feet of Auto/Taxi/Rideshare/Shuttle/Van ARRIVE VAIL 39°38’32” N 106°22’25” W TRANSPORTATION CENTER EXPANSION page 3 Big Ideas: - Solving for buses on existing extended deck - Leaving prime real estate for Arrival Center - Intuitive wayfinding - Visual connections - Creating a “front porch” SHIFTS FRONTAGE RD. REMOVES BUILDINGS/ REINFORCES SLAB N TRANSIT ARRIVAL TRANSIT TEST-FIT STUDIES PHASE 1 CONCLUSION 19 Bus Bays 420 linear feet of Auto/Taxi/Rideshare/Shuttle/Van ARRIVE VAIL 39°38’32” N 106°22’25” W TRANSPORTATION CENTER EXPANSION page 19 ACTIVATOR 1: CULTURAL MUSEUM Rooftop Cafe FOOD & BEVERAGE Lockers, Restrooms, & connection to Elevators Bus Stop shifted West TRANSIT ARRIVAL CENTER ARRIVE VAIL 39°38’32” N 106°22’25” W TRANSPORTATION CENTER EXPANSION page 23 ACTIVATOR 3: CIVIC 2 Council Chambers/Community Space MUNI MUSEUM Rooftop Cafe Municipal Offices FOOD &BEVERAGE Lockers,Restrooms, & connection to Elevators Bus Stop shifted West TRANSIT ARRIVAL CENTER