HomeMy WebLinkAboutB08-0131NO?"E,•: 'THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.•
TOWNOF VAiL '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
NEW (SFR,P/S,DUP) PERMIT Permit #: B08-0131
Project #: PRJ07-0529
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location......: 1687 BUFFEHR CREEK RD
Parcel No....: 210312215002
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
CONTRACTOR SCOTT S. TURNIPSEED, AI�
PO BOX 3388
EAGLE
COLORADO 81631
License: 320-A
APPLICANT SCOTT TURNIPSEED, AIA
1143 CAPITOL STREET, SUITE 211
PO BOX 3388
EAGLE
CO 81631
License: C000001848
ARCHITECT SCOTT TURNIPSEED, AIA
1143 CAPITOL STREET, SUITE 211
PO BOX 3388
EAGLE
CO 81631
License: C000001848
Description:
NEW SINGLE FAMILY RESIDENCE
Occupancy Type
Totals...
Number of Dwelling Units:
Occupancy: R3
Type Construction: VB
05/06/2008
05/06/2008 Phone: (970) 328-3900
05/06/2008 Phone:970-328-3900
05/06/2008 Phone:970-328-3900
Factor Sq Feet Valuation
6,261 $1,200,000.00*
Town of Vail Adjusted Valuation
Total Sq Ft Added
Status . . : ISSUED
Applied . . : 05/06/2008
Issued . ., : 01/O6/2010
Expires . ..: 12/03/2009
I,.O � 2
�-�'"'` �� �"'�` ��
$1,200,000.00
6261
...,._..,.......>.,,.,,...> .................�......,.>....,,..,..x.......<..�.«.... FEE SUMMARY .....<>x....<......,...............<......<....<....�.<.....<,........,...>,...
Building Permit Fee------> $6,338.75 Will Call---------------------------> $4.00 Total Calculated Fees-------------> $36,581.24
Plan Check--------------------> $4,120.19 Use Tax Fee---------------------> $23,800.00 Additional Fees-----------------------> $125.00
Add'I Plan Check Hours-> $440.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES--------------> $36,706.24
Investigation-----------------> $0.00 Recreation Fee----------------> $1,878.30
Payments-------------------------------> $36,706.24
Total Calculated Fees------> $36,581.24 BALANCE DUE------------------------> $0.00
..>....,...,� .........................,,��......<...,.xx<x.,.....,....�....�...............................<...,,�...�...�.....�.w....<...........�........�....�.�.............xxxx.....
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION S ALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY ELEPH NE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM.
,� " l �(/ Ii
Signatur of Owner or on a Date
new_construction_perm it_041908
«�.�.wx:���w��x������r��ax.<�.x��..w���.a��ww�ww:e.ww:x::�w��x�x�++����x�x���w������»��:::���w���+�xx�x�t����:<:+�+.x�x���x�+x�xx+����x�+++w��e��:��wwwwwww..wa...www..��+..��f��+�:
� APPROVALS
Permit #: B08-0131 as of 01-06-2010 Status: ISSUED
•# rt:F�krt+�t##*wittr#:Fhh%�f:Ff�k�khrtMkYr�kf ErtYri`i`i�#i(tr1(f i�f f f#iR*irfkl�F***inlw*w#hYef Y'#:tY�hhitYf #YR*Ye#R#*R+tithwf F#%�Yrtr#*##Yrrtf f tr�A'w k�RY�!**irf #f f�kf i�i`f f*#4rt�A'�k�k�k#Yrrtrtrtfrf RY�Y�hYerthYr#Y'rtMhhYr##'xhhYrYe�khXeA"kY�+#f if«*++*# �4f4
Item: 05100 BUILDING DEPARTMENT
05/16/2008 cgunion Action: CR sent applicant
comments
F:\cdev\CH RIS\PERMIT. COMMENTS\608-0131 \B08-0131. DOC
06/12/2008 cgunion Action: AP APPROVED REVISED
PLANS DATED 6-5-08
08/07/2008 cgunion Action: AP APPROVED REVISED
PLANS DATED 7/7/08
01/16/2009 cg Action: AP APPROVED REVISED
STRUCTURALSHEET
10/07/2009 cg Action: CR REVISIONS DENIED.
WAITING FOR INFORMATION ON LISTED SHROUDS, OR SHROUDS TO
BE REMOVED FROM PLANS. LEFT MULTIPLE MESSAGES FOR
BRENNAN. HAVE NOT HEARD BACK
11/20/2009 cg Action: AP APPROVED REVISION
DELETING CHIMNEY SHROUDS
Item: 05400 PLANNING DEPARTMENT
06/19/2008 npeterson Action: CR Need LOC and
Developer agreement for staging on Lot 1 and Rockfall
mitigation implemented on plans.
06/27/2008 npeterson Action: AP Approved plans
dated June 6, 2008. Applicant stated no staging on Lot 1
- no LOC required. (Ref DR608-0045)
08/07/2008 npeterson Action: AP Approved revised
plans date stamped July 31, 2008
08/21/2009 npeterson Action: AP Approved plans
date stamped 08/19/09
Item: 05600 FIRE DEPARTMENT
06/11/2008 McGee Action: AP Plan Review
Notes:
Plan Set 6-5-08
1. Driveway grade is 8- 5%, no staging area.
2. Exterior perimeter measures 290 feet. However,
retaining walls prohibit exterior perimeter access.
3. Cedar siding on south slope exposes portions of the
structure to wildland fire hazards.
4. No fire sprinkler or fire alarm plans are shown.
Submit fire alarm and fire sprinkler plans.
Permit is Approved but Conditions require fire alarm and
fire sprinkler systems.
Item: 05500 PUBLIC WORKS
05/16/2008 cdelles Action: DN Need more detail
for strom water drainage, retainig walls(stamped
drawings), and what is proposed between driveway and
asphalt roadway to make up grade.
06/17/2008 cdelles Action: CR Emailed comments
to architect
07/03/2008 cdelles Action: AP
new_construction_perm it_041908
;.,�,.� .......... ..................»......,,....,......,.,��,,,,,...xx,...,...,.,.,.....,,,,x.....,..,,..,�..�..x.,..,x......,,.,,,x.,.......,..................>.....�....,xx.
CONDITIONS OF APPROVAL
Permit #: B08-0131 as of 01-06-2010 Status: ISSUED
..............�..,..».�..........,....,........,,,..,x,.<x...>,...,..,x,....,.....,>„>,,..,,,���.,»�.......,........,,....,..<....«...,.,.>...........x......x,....,.....>,,.,,...,
Cond: 33
(PLAN) THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT
SURVEY. SUCH SURVEY SHALL BE SUBMITTED AND APPROVED PRIOR
TO REQUEST FOR A FRAME INSPECTION.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R313 OF THE 2003 IRC.
Cond: 18
(BLDG.): STAIRWAYS ARE REQUIRED TO MEET SECTION R311.5 OF
THE 2003 IRC OR SECTION 1009 OF THE 2003 IBC.
Cond: 19
(BLDG.): GUARDS ARE REQUIRED TO MEET SECTION R312 OF THE
2003 IRC OR SECTION 1012 OF THE 2003 IBC.
Cond: 34
(BLDG.): A COPY OF THE SOILS REPORT WILL BE REQUIRED BEFORE
A FOOTING INSPECTION WILL BE CALLED FOR.
Cond: 39
(BLDG): EMERGENCY ESCAPE AND RESCUE OPENINGS ARE REQUIRED
TO MEET SECTION R310 OF THE 2003 IRC OR SECTION 1025 OF THE
2003 IBC.
Cond: CON0010094
NFPA 72 and TOV compliant Fire Alarm system required.
Cond: CON0010095
NFPA 13 R compliant fire sprinkler system required.
new_construction_perm it_041908
*********************�*****************+***************+************************************
TOWN OF VAIL, COLORADO Statement
*�****+*************************************************************************************
Statement Number: R100000008 Amount: $110.00 O1/06/201009:33 AM
Payment Method: Check Init: JLE
Notation: 1424 SCOTT S
TURNIPSEED
-----------------------------------------------------------------------------
Permit No: B08-0131 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location: 1687 BUFFEHR CREEK RD
Total Fees: $36,706.24
This Payment: $110.00 Total ALL Pmts: $36,706.24
Balance: $0.00
**********************************************************************************+*********
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
PF 00100003112300 PLAN CHECK FEES 110.00
-----------------------------------------------------------------------------
� � � � � �.�� � � ,z � ��
� ���'���i" � ��," � � �" `- ,� ��,j �"� �
„� � � . . �
� ��� �a� �� � � � ���� �_ -
� � ,�: � ��� � �:`
� �,� . . � _
.
�� �'� �� '"�. � `���" � _ �"`"� ��".
,,,
. . � �� s� . �
' � " � s� ,.�� , � �,�+ .� `
.. - ��
. � � � ,� _ , e�
��
`$� � �,,�:� �,� ,_ a e ., .�
� �'. �
TRANSMITTAL FORM D
Revision Submittals:
1. "Field SeY' of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are d
P����� �'� 5 2009
is re-issued.
nT s�d� �': F' �v`�� L
�
-____... ._ _ __ _–� -- —� – - � _ _ - --- . .
Permit #(s) information applies to: Attention: �evisions '
� O$� �`� 1 (1�Response to Correction Letter � 8�w.i �)
'�N � MA�'�l N attached copy of correction letter
( ) Deferred Submittal
( ) Other
Project Street Address:
!,1� gv��I/�/ CV't.G �' F�v •
(Number) (Street) (Suite #)
Building/Complex Name:
! Contact Information:
, Company: 5G-o'C� SS Tvr�n�pi�'.t� �► �Ip+
; Company Address: P � • ��� �3 ��
City: ��� � State: � . Zip: 8 «� (
Contact Name: �CNKCh
' Contact Phone: �i O•'3 �i,,0 •� al 0 O X, � � n
i E-Mail b��.rC� �rv� t,� �.,�.r�a �• G�WI,
Valuations (Labor & Material))
Building:
Plumbing:
Electrical:
Mechanical:
Total:
$
$
$
$
$ 0
Description / List of Changes
�f ���rv� o�.e. Gn.1�n v�a.�1
s�,�� aS o��' �, o..s�
5ha ww�.. av� A�S. �—� ��. �7
t� �w�.; � �, vo�c�.w��.► �
v-�q..�c�-s --
� Naw ati�e aF lo � 2G • Q�
(use additional sheet if necessary)
Date Received:
1-Sep-09
SEF:23-2008 11:15 From:HP-�EOTECH 9709458454
�
�
... �..�
7 �
O
C�
O �'�
��
ii
0
H�
t�E�GrI
HEPWORTH-PAWLAK GE�7ECHNICAL
September 22, 2008
Scott S. Turnipseed, AIA
Attn; Mike Guzik
P. O. Box 3388
Eagle, Coiorado 81631
Subject:
Dear Mike:
To:9703283901
�p � 0 I � �
, ,
}�,3;,����1� I'�;,I,�I.I�,,,��,1� ��� �l 1���
5�' .,�. ���r; F: ��:� � �.,
t��l� n�:an�,,� "������n�ir* i�il��� ii�� tilr���l
f'I����,� �,;,: �.�3� ;v,y
�.,,. ,.i;�� y�}, ti.�y-�
lll�i-11� III1�r41�!!II}F'il'l.��i�l�lt�+ll'I
� � � 0 � �
'JAN 06 2010
TOWN OF VAIL
P.2�5
���� �
���
�� Q
Job No. 108 529A
Observation of Garage Area Excavation, Proposed Weiltner Residence,
Lot 2, Filing l, Zneiner Subdivision, 1687 Buffehr Crcek Road, Vail,
Colorado
As requested, a representative of Hepwarth-Pawlak Geotechnical, 1nc. observed the
garage/west wall area excavation at the subject site on September 15, 2008 to evaluate the
soils exposed for foundation suppart. The findings of our observations and
recommendations for the foundation design are presented in this report. The services
were performed in accordance with our agreement for professional engineering services
to Scatt S. Turnipseed, AIA, dated Sepfiember ] 5, 2008. Potential geologic hazard
impacts to the project site is beyond the scope ofour services.
The residence will be a two story woad frame structure aver a walkout basement level
with an attached garage at the walkout ]evel. Ground floors will be primarily slab-on-
grade with some areas structurally supported over erawlspace. The building has been
designed to be supported an spread footings using an allowable soil bearing pressure of
2,SOa psf. The foundation design was based on a preliminary soils investigation for the
subdivision by Koechlein Consulting Engineers dated June 4, 2QQ3, Job No. 03-056.
That report recommended spread footing faundations designed for an allowable soil
bearing pressure in the range of 2,000 to 3,000 psf, We have been provided a copy ofi
their report.
At the time of our visit to the site, the foundation excavation for the garage and west wall
areas of the residence had been cut in numerous levels typically between about 3 to l 5
feet for each level with a total elevation difference of about b5 feet. The west side
excavation cut had been soil nailecl and benehed, The southeast portion of the excavation
1'�31��`I 31�3-�'i'�'�-lj�y •���i�i)�;l��u.���l"IIl}�ti jjl},(l33 lri(�l� • til�\c`if�lulR�' ���ll.}h,� �t)�y
5EP-23-2008 11:15 From:HP-�EOTECH 97�9458454 To:9703283901 P.3�5
. .
Scott S. Turnipseed, AIA
September 22, 2Q08
Page 2
will be dug later. The soils exposed in the bottom of'thc completed portion of the
excavation consisted ofinedium dense, silty sand and gravel with cobbles. The rock
fragments were primarily angular sandstone and shale. The soils were too rocky to obtain
a relatively undisturbed sample for swetl-consolida#ion testing. The results of a gradation
analysis perforrned on a bulk sample af the sandy gravel soils (minus 5 inch fraction)
obtained from the site are presented on Figure ]. Na free water was encountered in the
excavation and the soils were slightly moist to maist.
Considering the conditions exposed in the excavation and the nature of the proposed
construction, spread footings placed on the undisturbed natural soil designed for an
allowable bearing pressure of 2,500 psf can be used for support af the proposed residence
and garage. There could be some differential settlement due to the variable cut depths
and assumed variable foundation taadings. Footings should be a rninimum width of I8
inches far continuous walls and 2 feet for columns. Loose and disturbed soils and
existing fill in faoting areas should be removed and the bearing level extended down to
the undisturbed natural granular soils. The bearing soits should then be moistened and
compacted. The beaxing soils shoulcl be protected a�ainst frost and concrete should not
be placed on frozen soils. Exterior footings should be provided with adequate soil cover
above their bearing elevations for frost protection. Continuous foundation walls should
be well reinforced top and bottom to span an unsupported length of at least 12 feet.
Foundation walls acting as retaining structures should also be designed to resist a lateral
eatth pressure based on an equivalent fluid unit weight of at least 50 pcf For the on-site
soil, excludi�ig topsoil and oversized rocks as backfill. Far retaining walls taller than
abaut 12 feet, a uniform lateral ear�h pressure load of 25H psf where H is the wall height
in feet should be used for the design. A perimeter foundation drain should be provided to
prevent temporary buildup of hydrostatic pressure behind the basement walls and prevent
wetting af the lower level. The underdrain should include at least 4 inches of free draining
gravel below the basement floar slab. Structura] fil1 placed within floor slab areas can
consist ofthe on-site sand and gravel soils compacted to at least 95% of standard Froctor
density at a moisture content near optimum. Backfill placed around the structure should
be well campacted and the surface graded to prevent panding within at least l 0 feet afthe
building. Some settlement of deeper backfill areas should be expected even thaugh the
backfill is adequately compacted which could result in distress ta facilities constructed on
Job No. 108 529A
C-�cP'tech
SEP-23-2�08 11:15 From:HP-GEOTECH 9709458454 To:97�3z839�S P.4�5
Scott S. Turnipseed, AlA
September 22, 2008
Page 3
the backfill. Landscape that requires regular heavy irri�ation, such as sod, and sprinkler
heads shauld not be located within 5 feet of the foundation.
The recommendations submitted in this letter are based on our observation ofthe soils
exposed within the foundation excavation and do not include subsurface exploration to
evaluate the subsurface conditions within the loaded depth of foundation inflnence. This
study is based an the assumption that soils beneath the footings have eq�.�, �r aetter
suppart than those exposed. The risk of foundation movement rnay be greater than
indicated in this report because of possible variations in the subsurface conditions. in
order to reveal the nature and extent of variations in the subsurface conditions below the
excavatian, driliing would be required. It is possible the data obtained by subsurface
exploration could change the recommendations contained in this letter. Our services do
not include determining the presence, prevention or possibility of mold ar other biological
contaminants (MOBC} developing in the future. If the client is cancerned about M�BC,
then a professional in this special field of practice should be consuited.
We should observe the remainder of the excavatian when compiete to evaluate the
bearung soils in those areas. If you have any questions or need further assistance, please
call our office.
Sincerely,
HEPWORTH
David A. Your
Rev. by: SLP
DAY/vain
attachment Figure 1, Gradation Test Results
Job No. l OR 529A
INC.
_-2Cr ���
-
�����
�����
��.....,..
�r..._r..�
_�..�....
�..�.�
-
�...........��
���.��.
� �.... �. r.... r �. ... �
_..�._�,...
- -
�..������.......
- --�....
�..�.......r..�..�
� ww�w
�
�� �
��
�
�� �w
�
��� ��
�� �
�� �
.r,��
�,--
�=--===
--_.....�..��..�.
-.�. �..�•---
....� ---
.:.. ��..
-- - ---
�--�---�......
�......���--
��.���...r......��
...�...........� �....�
----- -...�.......
„_ r....�...---
i�� 11�� ��1 � r ��
� �a � ^� �r� �� w �w�
�r���������r
������
r����������
���w�rrr���w�w
w�w����rrr��w����
r���� ���w�
�� �� �� ��� �� � ��
� � -� _,� �
�� i� � _., � i1 �
�
� � � �`�_� '
, ��,D
. ,
� _ �1�11, .e
� ,� � ,-�, � .
a ���rg S r i ,� .� __ �._ � __�_
" � PR�LIMINARY SOILS INVESTIGATION
� P�ROPOSED RESIDENTIAL DEVELOPMENT
,
� � �i , � �
� � � ZN�EIMER SUBDIVISION � ��
- � � � �� VAIL, COLO.RADO �
.�
a
�
�
�
Koechlein Consulting Engineers, Inc.
Consulting Geotechnical Engineers
12364 W. Alameda Pkwy • Suite °I 15 • Lakewood, CO 80228-2845
LAKEWOOD AVON / SILVERTHORNE
(303) 989-1223 . (970) 949-6009
(303) 989-0204 FAX (970) 949-9223 FAX
KOECHLEIN CONSULTING ENGINEERS, INC.
CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS
PRELIMINARY SOILS INVESTIGATION
PROPOSED RESIDENTIAL DEVELOPMENT
ZNEIMER SUBDNISION
VAIL, COLORADO
flA
, o.,
; �.
� � 33822 ; _
�-
•41�
�,����•� /�/� ; �
CD : y'�:
�,���/ �",.l ^� A� ����`\\``\.
Prepared for:
Larry Scharfenberger
Integrated Resources, L,LC
P.O. Box 639
Minturn, CO 81645
Job No. 03-056
June 4, 2003
DENVER: 12364 West Alameda Prkwy., Suite 11 S, Lakewood, CO 80228 (303) 989-I223
AVON/SILVERTHORNE: (970) 949-6009
June 4, 2003
Job No. 03-056
KOECHLEIN CONS ULTING ENGINEERSj INC.
Consulting Geotechnica! Engineers
TABLE OF CONTENTS
SCOPE
EXECUTNE SUMMARY
SITE CONDITIONS _
PROPOSED DEVELOPMENTS
INVESTIGATION
GEOLOGIC HAZARDS
SUBSURFACE CONDITIONS
RADON
GROUND WATER
CONDITIONS INFLUENCING PROPOSED DEVELOPMENT
SLOPE STABILITY ANALYSIS
FOUNDATIONS
FLOORS
FOUNDATION DRAINAGE
UTILITY CONSTRUCTION
SITE WORK
General
Cut Slopes
Fill Slopes
Retainin�Walls
Compacted FiII
SITE DRAINAGE
FURTHER INVESTIGATION
LIMITATIONS
VICINITY MAP
LOCATIONS OF EXPLORATORY BORINGS AND TEST PITS
LOGS OF EXPLORATORY BORINGS AND TEST PITS
LEGEND OF EXPLORATORY BORINGS AND TEST PITS
GR.ADATION TEST RESULTS
TYPICAL RETAINING WALL DRAIN DETAIL
SUMMARY OF LABORATORY TEST RESULTS
SLOPE STABILITY ANALYSIS RESULTS
1
1
3
3
4
5
5
6
6
'7
8
12
12
13
13
14
14
15
15
16
19
21
21
22
Fig. 1
Fig. 2
Figs. 3 and 4
Fig. 5
Figs. 6 thru 9
Fig. 10
Table I
Appendix A
June 4, 2003
Job I�T�. 03-056
SCOPE
KOECHLEIN CONSULTING ENGINEERS, INC.
Consulting Geotechnical Engineers
This report presents the results of a preliminary geotechnical investigation for the
proposed Zneimer Subdivision a part of Parcel A in Lion's Ridge Subdivision, Filing No.
2 in Vail, Colorado. The approximate site location is shown on the Vicinity Map, Fig. 1.
The purpose of this investigation was to evaluate the subsurface conditions at the site and
to provide preliminary geotechnical recommendations for the proposed development.
This report includes descriptions of subsurface soil and ground water conditions
encountered in the exploratory borings and test pits, the geotechnical conditions
E influencirig the proposed development and recommendations for development of the site.
t
� �
� This reporf presents general subsurface conditions for the proposed development. A site
specific geotechnical investigation should be pefformed for each individual ��esidential
building site as ��ecominended in this report.
� The general recommendations presented in this report are based on the subsurface
conditioz�s encountered within the exploratory borings and test pits, the results of
�v
laboratory testing, and our experience with similar developments. A summary of our
� findings and conclusions is presented below.
�LL
�
�
EXECUTIVE SLT��IMARY
1. The subsurface conditions encountered in the exploratory borings and test
pits were generally similar. The subsurface conditions encountered within
exploratory borings (TH-1 thru TH-3) and test pits (TP-1 and �P-2)
consisted of up to 3.0 feet of topsoil underlain by a loose to medium
June 4, 2003
Job No. 03-056
KOECHLEIN CONS UL.TING ENGINEERS, INC.
Consulti�zg Geotecl:nical Er�gineers
dense, silty sand to sandy, silt and clay with gravel and scattered cobbles
and boulders to the maximum depths explored in the exploratory borings
of 30.0 feet and to varying depths of 6.0 to 9.0 feet in the e�ploratory test
pits. Below the silt and clay in the exploratory test pits TP-1 and TP-2, to
depths of 10.0 to 13.0 feet, the subsurface conditions consisted. of a
medium dense, clayey, silty, gravelly sand. From the gravelly sand, to the
maximum depth explored of 15.0 feet in TP-1, the subsurface conditions
consisted of a soft, weathered sandstone.
2. Topsoil up to 3.0 feef in depth was encountered within the exploratory
borings and test pits. All topsoil should be removed from construction
areas prior to construction. The topsoil may be used in landscaping areas.
3_ At the time of this investigation, no free ground water was encountered in
the exploratory borings and test pits to the maximum depth explored of
30.0 feet.
� 4. Due to the topography and subsurface conditions of the site, deep cuts and
large retaining walis will create unstable slope conditions in areas of the
� proposed development. These areas will require stabilization prior to
construction of the propose access road_ Refer to the SLOPE
�:�; STABILITY ANALYSIS section of this report for additional details.
5. In our opinion, the silty sand, sandy silt and clay, gravelly sand or
__ weathered sandstone will support spread footing foundation systems with
a low risk of movement. Refer to the FOLTNDATIONS section of this
report for rnore information.
' 6. In our opinion, the natural soils encountered throughout the development
� will safely support slab-on-grade floors. Refer to the FLOORS section of
� this report for more information.
�
�-
�_
�
s
7. Based.on the existing plans, we understand that large cuts and fills, and a
system of inedium height retaining wa11s are planned for the construction
of the proposed access road. The natural soils will safely support the
proposed fills and retaining wa11s, after proper stabilization of the access
road cuts has been achieved. Refer to the SLOPE STABILITY
ANALYSIS and SITE WORK sections of �this report for additional cut
slope, fill slope, and retaining wall recommendations:
2
0
June 4, 2003
Job No. 03-056
KOBCHLEINCOn'SULTINGENGINEERS, ING
Co�ssult[ng Geotechnical Engineers
8. Utilities will need to be installed for the proposed development. Because
scat�ered cobbles and boulders and sandstone bedrock were encountered
within the exploratory borings and test pits, it is our opinion that heavy-
duty excavation equiprnent will be required to complete excavations
within the proposed development.
9. The potential for radon gas is a concern in the area. Building designs
wi in the developments should include ventilation systems for below
grade areas such as crawl spaces and basements.
SITE CONDITIONS
The proposed Zneimer Subdivision is part of Parcel A in Lion's Ridge
Subdivision, Filing No. 2 in Vail, Colorado. The site is bordered on the south by Buffehr
Creek Road. At the time of this investigation, the site was undeveloped. The site slopes
steeply down towards the south at an approximate grade of 30 to 50 percent. Vegetation -
ori the site consists of aspen firees, sagebrush, bushes and natural grasses.
PROPOSED DEVELOPMENTS
A site plan was provided by Peak Civil Engineering, Inc. prior to our field
investigation. Based on the site plan, the subject site will be developed into 6 single-
family residential lots with an access drive. Four lots (Lots 1 thru 4) will be located
above the access road to the north while two lots (Lots -5 and 6) will be located below the
access road to the south. The proposed drive will be a cul-de-sac and will be accessed
from Buffehr Creek Road. In order to construct the proposed access drive, large cuts and
fills and a system of inedium height retaining walls will be constructed. In addition,
,�
�
Y ,
R�
�
�
�Y
R
�
n
�
. t.:_:
�
-. �z.�
� �
�=
,;
�;
June 4, 2003 KDECHLEIN CONSULTING ENGJNEEILS, ING
JobNo.03-056 Consultin� Geoteclinical E�:gineers
utilities will also be constructed as part of the development of the subject site. Maximum
column and wall loads for the residences were assumed to be those normally associated
with large residential structures.
INVESTIGATION
0
Subsurface conditions for the proposed development were investigated at this site
on May 13, 2003 by drilling three exploratory borings (TH-1 thru TH-3) with a 4-ineh
diameter continuous flight power auger and by excavating two exploratory test pits (TP-1
and TP-2) with a trackhoe. The locations of the exploratory borings and test pits were
selected based on the proposed access road construction and accessibility of the site. The
approximate locations of the exploratozy borings and test pits are presented on the
Locations of Exploratory Borings and Test Pits, Fig. 2. An engineer from our office was
on the site to observe the drilling and excavating of the exploratory borings and test pits
and visually classify and document the subsurface soil, bedrock, and ground water
conditions. A description of the subsurface soils and bedrock encountered in the
exploratory borings and test pits is shown on the Logs of Exploratory Borings and Test.
Pits, Figs. 3 and 4; and on the Legend of Exploratory Borings and Test Pits, Fig. 5.
Representative soil samples obtained from the exploratory borings and tesf pits
were tested in our laboratory in order to determine their natural moisture content,
gradation properties, and Atterberg Limits. The results of the laboratory tests are
0
�.
�
� _.
��
�
:.�
�
�
-- `�'�
�;
�_•
, �1� �
� �
•� �
•��
�:
:j
June 4, 2003
Job No. 03-056
e
KOBCHLEIN CONSULTINGENGINEERS, INC.
Corrsultirrg Geotechnicaf Ertgineers
presented on the Logs of Exploratory Borings and Test Pits, Figs. 3 and 4; on the
Gradation Test Results, Figs. 6 thru 9; and in the Summary of Laboraiory Tesf Results,
Table I.
GEOLOGIC HAZARDS
A geologic hazards investigation was outside the scope of this investigation. We
recommend that the owner review the Town of Vail and/or Eagle Counry regulations to
determine whether a geologic hazards investigation is necessary. for develop.ment of this
site. If a geologic hazards investigation is required, we recommend that a professional
�eologist be contacted to perform this service. .
SUBSURFACE CONDITIONS
�
The subsurface conditions encountered in the exploratory borings and test pits
were generally similar. The subsurface conditions encountered within exploratory
borings (TH-1 thra TH-3) and test pits (TP-1 and TP-2) consisted of up to 3.0 feet of
topsoil underlain by a reddish brown to brown, dry to wet, loose to medium dense, silty
sand to sandy, silt and clay with gravel and scattered cobbles and boulders to the
marimum depths explored in the exploratory borings to 30.0 feet and to varying depths of
6.0 to 9.0 feet in the exploratory test pits. Below the silt and clay in the exploratory test
pits TP-1 and TP-2, to depths of 10.0 to 13.0 feet, the subsurface conditions consisted of
5
7une 4, 2003
Job No. 03-056
KOECHLEINCONSULTINGENGINEERS, INC.
Consulting Geotechnica[ Engineers
��--
�� a tan to light brown, moist, medium dense, clayey, silty, gravelly sand_ From the gravelIy
� �
� ' sand, to the maximum depth explored of 15.0 feet in TP-1, the subsurface conditions
� 6�
� N`r�SL.�XG% consisted of a tan to light brown, moist, soft, weathered sandstone.
� At the time of this investigation, no free ground water was encountered in the
�- �
� �xploratory borings or test pits to the maximum depth explored of 30.0 feet.
i� 5� � �� � � '
i � �
�
�
��.
�
r
.,-4
��
�
r�.
� �g
E �
h:�
�>
4 '
�_�•
In recent years, radon gas has become a concern. Radon gas is a colorless,
odorless gas that is produced by the decay of minerals in soil and rock. The potential for
radon �as in the subsurface strata of mountain terrain is likely. Structures constructed
within the development with below grade areas should be designed with proper
ventilation for the below grade areas.
GROUND WATER
At the time of this investigation, ground water was not encountered in the
exploratory borings and test pits to the maximum depth explored of 30.0 feet. Based on
the conditions encountered within the borin�s and test pits, we do not anticipate that
ground water will adversely influence the construction of the proposed deyelopment.
However, the upper 6 to 8 feet of natural soil throughout� the development was moist to
wet. Although the natural moistures of the soils did not appear to be high, as determined
�
�
�
�
�
June 4, 2003
Job No. 03-056
KOECHLEIN COI�'SULTING ENGINEERS, INC.
Corzsu[tiitg Geotechnica! Engineers
from the laboratory test results, the characteristics of the soils observed during our field
investigation indicated that the upper soils are at or above their optimum moisture
contents.
CONDITIONS INFLUENCING PROPOSED DEVELOPMENT
Construction of the deveIopment will require excavatiori of the subsurface soils.
These soils consisted of silty sand to sandy, silt and clay with gravel and� scattered
cobbles and boulders, gravelly sand and weathered sandstone bedrock. Because scattered
cobbles and boulders and sandstone were encountered, it is our opinion that heavy duty
construction equipment will be required to complete the necessary excavations.
� Large cuts and fills and a series of inedium height retaining walls will be
V���`�� constructed as part of development of the subject site. Due to the topography and
` subsurface conditions of the subject site, the construction ,of large cuts, fills and retaining
� �S�" � -- — —
--� walls will create unstable slopes in certain areas of the site. Refer to the SLOPE
��
STABILITY ANALYSIS and SITE WORK sections of this report for additional details.
�
.�
' �
� �� .
� �
��
In order to build on the residential lots within the proposed subdivision, either
large cuts or fills will be required for each lot. The upper lots (Lots 1 thru 4) will require.
the use of temporary and probably permanent excavation stabilization in order to
construct the proposed resid� enc_es. The lower lots (Lots 5 and 6) will require large
_-�-------
retaining structures and/or reinforced slopes for development of the individual lots. Slope
7
�''
£
� ,
�
�
`�
�
/��
�
�'
�
�� .;
>�
�
�-
� °
�
t.
t
5
4
June 4, 2003 KOECHLEIN CONSULTING ENGINEERS, INC.
JobNo.03-056 Consu!"ting Geotech�vical Eiageneers
stabiliry analyses of eacli individual residence should be pe�fo7-�ned when final plans for
the ��esidential st��ccctures have been completed,
Final locations and layouts of the residential structures within the development
af�e not Icnow�i at this time.� We recornmend tliat site specific subsu�face i��vestigatio�zs be
pe�fot•med when the location, elevation and size of each structure within the developrn.ent
is kr2ow�c. The site specific investigations may involve the drilling of additional borings
or possibly the excavation of deep test pits. If requested, we can perform the required site
specific investigations.
SLOPE STABILITY ANALYSIS
In order to evaluate the stability of the slopes on t}iis site for conditions before and
after the construction of the access road, cross sections through the site were determined.
The locatioris of the cross-sections (A' - A and B' - B) used in our slope stability analysis
are shown on the Locations of Slope Stability Cross Sections, Fig. A-1. A slope stability
analysis was performed for the existing and proposed slope conditions at each typical
cross section. Each slope condition was analyzed using XSTABL slope stability
software. The soils that will be exposed within the excavation slopes were assumed to
have the following chaxacteristics: ySat of 130.0 pcf, cohesion of 0 pcf, and an �' angle of
30°. In addition, based on the subsurface conditions encountered during our field
r—,
investigation, our analysis assumed that ground water does not readily flow through the
,
`� � �
� 'e ,
�
June 4, 2003 KOECHLEIN CONSULTING ENGINEERS, INC.
JobNo.03-056 Consultirzg Geotech�xica[ Engineers
subsurface soils within the evaluated zone and a phreatic ground water surface does not
exist within the failure surface, and bedrock does not exist within the failure surface. The
presence of �round water could significantly chan�e the stability of the existing and
proposed slopes. If ground water is encountered during construction, vve must be
notified immediately in order to evaluate the exposed site conditions and to review our
slope stability analysis. Graphical representation of each of the four analyses are
presented in Appendix A, Figures A-2 thru A-5
The results of the slope stability analysis indicate that the existing slope on the
east side of the development (section A' - A), where the largest cut and series of retaining
walls will be construeted, has a minimum Bishop Factor of Safety (FOS) of 1.51 as
shown on the Slope Stability Results, Fig. A-2. The term "Factor of Safety" (FOS)
describes the ratio of forces available to resist sliding compared to the forces tending to
cause sliding. An FOS of 1.51 indicates that the ratio of forces available to resist sliding
is 1.51 times the amount of the forces which tend to cause sliding. An FOS of less than
1.0 indicates that the slope will theoretically fail. An FOS equal to or greater than 1.0 �
generally indicates that the slope is theoreticaily stable. However, due to the unknowns
and assumptions made when doing a slope stability analysis an FOS of 1.5 to 2.0 is
generally accepted as the indusiry standard when analyzing slopes. In certain
circumstances and mountain environments, slopes either exist at or can only be improved
to an FOS of approximately 1.3. In these cases, the owner must accept the additional risk
�
June 4, 2003 KDECHLEIN CONSULTING ENGINEERS, I1VC.
JobNo.03-OS6 Consulttng Geotechnical Engineers
of slope failure presented when the accepted industry standard FOS of 1.5 is not
achieved. Because the results of the stability analysis indicated an FOS of 1.51 for the
existing slope conditions, this area has a low risk of slope failure for the existing natural
— =-�-_____ --,
slope.
�--�
The results of the slope stability analysis for the proposed slope (after road and
retaining wall constnzction) on the east side of the development, where the Iaxgest cut and.
series of retaining walls will be consiructed, �has a minimum Bishop Factor of Safety
(FOS) of 1.09 as shown on the Slope Stability Results, Fig. A-3. This indicates that the
proposed slope in this area of the development has a moderate to high risk of slope �
, . �el- �'1 . � �� �l ��°�,�e-
failure. Q
� ��
�.g .
�
� ,2 `�
� poti
/ ��
�� �
�
,
�
i �-
The results of the slope stability analysis for the existing slope on the west side of
the development (Section B` - B) indicated that the existing slope.has a minimum Bishop
FOS of 1.31, as shown on Slope Stability Results, Fig. A-4. Since this FOS is less than
the industry standard of 1.5, it is our opinion that this area has a low to moderate risk of
—y
slope failure prior to development. The results of the slope stability analysis for the
proposed slope (after road and retaining wall construction) on the west side of the site
indicated that the proposed slope has a minimum Bishop FOS of 1.29. This indicates that
the proposed slope also has a low to moderate risk of slope failure. The difference in the
FOS between the existing and proposed slope conditions is small, which indicates the
proposed construction in this area of the development does not significantly influence the
__�–
�_
10
0
June 4, 2003
Job I�TO. 03-OS6
slope stability.
KOECHLBINCONSULTINGENGINEBRS, INC.
Consulting Geo[echnical Engineers
In summary, the existing slope conditions on the site appear to have a low to
inoderate risk of slope failure. However, with the construction of the proposed cuts, fills
and retaining walls, the proposed slope conditions will have a low to high risk of slope
� �--- — —�
� -
failure. The highest risk for slope failure will occur on the eastern portion of the site,
where large cuts.and retaining wall systems are planned. In order to reduce the risk of
� �
o (rt
slope failure during and after development of the site, we recommend that the upper �
slopes and some lower slopes be stabiIized during construction. In our opinion, the upper �`--
S �_
slopes rnay be stabilized by a soil nail system, while the lower proposed slopes may be
stabilized using retaining walls or mechanically stabilized slopes. Locations that we
believe may require stabilization are presented in the Approximate Area Requiring
Stabilization, Fig. A-6. We recommend that a contractor familiar with the use of a soil
nail system, such as Coggins and Sons, Inc. (303) 791-9911, Yenter Companies (303)
279-4458, Schnabel Foundation Company (303) 696-7268, or Denver Crrouting (303)
469-1136 be contacted. Not all are within the aforementioned figure may require
stabilization, we recommend that the contractor selected to perfonn the stabilization
review the current drawings for the development plan and determine where the perrnanent
stabilization will be required. We are available to review the plans with the contractor
and provide information which may be requested, and to assist in developing a suitable
retention system plan.
11
a
June 4, 20Q3
Job No. 03-056
FOUNDATIONS
KOECHLEIN CONSULTING ENGINEERS, ING
Coitsufting Geotechnica! Engineers
The materials at potential foundation elevations for the proposed residences wil]
probably consist of the silty sand, sandy silt and clay, gravelly sand or weathered
sandstone. In our opinion the natural soils and weathered bedrock will support spread
footing foundation systems with a low risk of movement. We anticipate that spread
footing foundation systeins for the residential structures within the proposed development
may be designed with a m�imum allowable bearing pressure varying from 2,000 psf to
3,000 psf. The allowable bearing pressure will depend on the final location and elevation
of the foundation for the proposed residential buildings and the subsurface conditions
beneath those locations. The maximum allowable bearing pressure and specific design
recommendations can be better defined during the site specific investigations.
FLOORS
The materials at potential floor slab eLevations consist of the topsoil, silty sand,
sandy silt and clay, gravelly sand or weathered sandstone. AlI topsoil should be removed
from the buildings prior to construction. After removal of topsoil, it is our opinion that
_ the soils a.nd weathered bedrock will safely support slab-on-grade floors with a low risk
of movement.
� 12
June 4, 2003
Job No. 03-056
FOUNDATION DRAINAGE
KOBCHLEIN CONSULTING ENGINEERS, IA'C.
Consulting Geotechnica! E�tgit:eers
Surface water, especially that originating from rain or snowmelt, tends to flow
through relatively permeable backfill typically found adjacent to foundations. The water
that flows through the fill collects on the surface of relatively impermeable soils
occurring at the foundation elevation. Both this surface water and possible ground water
can cause wet or moist below grade conditions after construction.
Since we anticipate below grade areas will be constructed for the proposed
residential buildings within the development, we recommend the installation of a drain
along the below grade foundation walls. General foundation drain details should be
provided during the site specific investigations.
UTILITY CONSTRUCTION
__ Construction of utilities below grade will require the excavation of the subsurface '
soils. We anticipate these soils will consist of the silty sand; sandy silt anti clay, gravelly
sand or weathered sandstone. Because scattered cobbles and boulders and sandstone
were encountered within the borings and tesf pits, it is our opinion that heavy-duty
construction equipment will be required to complete the necessary excavations for
utilities. The natural soils and weathered sandstone classify as Type B soils in
accordance with OSHA regulations. OSHA regulations should be followed in any
excavation. All utility installation should be performed after the upper slopes have been
13
June 4, 2003
Job No. 03-056
KOECHLEINCONSULTINGENGINEERS, INC.
Consu[tiiro Geotechnica! E�rgineers
properly stabilized. We recommend .that the contractor selected to perform the soil
stabilization include the effect of utility construction on the overall stability analysis and
stabilization of the upper slopes.
SITE WORK
General
Construction of the access road will require large cuts, fills, utility cuts,-and a
series of inedium height retaining walls. Due to the topography of the site and
� subsurface conditions, construction of the proposed access road will reduce the
stability of the existing slopes, as presented in the SLOPE STABILITY SECTION of
this report. After the upper cut slopes have been stabilized, it is our opinion that
utility excavation, fills, and retaining walls rnay be safely constructed as part of the
development of the site. We anticipate that the soils and weathered sandstone may
be used in fill areas for development of the subject site. Proper moisture treating of
the natural soils will be required prior to or during placement and compaction of fill.
Surface drainage should be carefully evaluated during construction of the
proposed development. Slopes above and around retaining walls, cut slopes and fill
slopes should be graded so that positive drainage is maintained away from these
structures.
14
�
�� �� .
�
June 4, 2003
Job No. 03-056
Cut Slopes
KOECHLEIN CONSULTING ENG7NEERS, INC.
Consu![ing Ceotechnical Engineers
As previously discussed, we anticipate that lar�e temporary cut slopes will be ��
,
excavated in order to construct the proposed access road. It is our opinion, that all of �� ,
..�ri�-�
the cut slopes along the alignment of the proposed access road will require �`l
stabilization, as presented in the SLOPE STABILITY ANALYSIS section of this
report. Surface drainage above the temporary cuts should be carefully designed to
divert surface water away from the slopes. We do not anticipate that large permanent
cut slopes will be excavated as part of this development. If plans change, we
recommend that all cut slopes within the development be reviewed for stability prior
to consfxuction.
Fill Slopes
We anticipate that fills over 10 feet may be required for the development of
the vehicle turn around area. Provided that the slopes above the proposed access
road are properly stabilized, we believe that this fill may be safely constructed. We
understand retaining walls will be constructed to contain the fill and do not anticipate
that fill slopes will be constructed. In general, fill slopes of 2:1 (horizontal to
vertical) or flatter up to 5 feet in height should be stable, if properly drained. If
-�
required, fill slopes may be constructed with on-site soils free of deleterious
materials or an approved imported granular fill. Refer to the Compacted Fill section
15
0
June 4, 2003
Job No. 03-056
KOECHLEIN COA'SULTING ENGIATEERS, INC.
Co�rsulting GeotechnicaL Engineers
of this report for specific fill recommendations. However, if plans change we should
be contacted to review the stability of any fill slopes.
Retainin� Walls
Retaining walls are planned above and below the proposed access drive.
Provided that the soils above the proposed access drive are properly stabilized, it is
our opinion that retaining walls could be safely constructed above and below the
proposed access road. We recommend that the contractor selected to design the
permanent stabilization for the upper soils take into consideration the upper and
lower retaining walls when performing their analysis. It may be possible that the
upper retaining walls could be constructed as part of the stabilization system for the
soil's above the access road. The types of walls below the access road could consist
of conventional concrete retaining walls, MSE (mechanically stabilized earth) walls,
timber crib walls and boulder retaining walls. '
Where the retaining walls and/or stabilization systems are to be constructed in
front of access to the proposed lots, special design and construction considerations
will ne.ed to be taken into accouni. The reta.ining walls and/or stabilization systems
in these areas will need to be designed and constructed segmentally, so that the
owner can remove sections required for site access following stabilization of the
building site during construction on the individual lots. These walls and/or
16
June 4, 2003
Job No. 03-056
KOBCHLEIN CONSULTING ENGINEERS, INC.
Co�rsulti�tg Geotechizical E�r�i�ieers
stabilization systems must be designed so that when portions are removed, the
removal of that segment does not reduce the stability of the adjacent slopes. The
walls should be designed so that the individual lot owners are able to blend in the
permanent retaining walls along the access road with retaining walls into their lots.
The contractor selected to stabilize the soils above the access road may have
� experienced similar circumstances and may be able to suggest an appropriate type of
retaining system and layout, possibly including providing site access.
The retaining walls need to be designed to resist lateral earth pressures.
� Lateral earth pressures depend on the type of backfill, slope of ground surface behind
the retaining wall, height of retaining wall, and type of retaining wall. The following
table presents equivalent fluid pressures for the design of retaining walls with a
horizontal backfill condition, no hydrostatic pressure, and no live loads.
Earth Pressure Condition Equivalent Fluid Pressure'
(pc fl
� Active 45
At-rest 60
- Passive - 300
Notes:
1. Equivalent fluid pressures are for a horizontal backfill condition with no
hydrostatic pressures or live loads.
If the desi.gner chooses not to design the retaining walls using equivalent fluid
pressures, the retaining walls may be designed assuming the retained soils have a�'
17
June 4, 2003
Job No. 03-056
KOECHLEIN CO1�'S ULTING ENGINEERS, INC.
Consu/ting Geoteclt�tical Engineers
of 30° and a ysa� of 130 pc£ In addition, we recommend that foundations for the
proposed retaining walls be designed and constructed usin; the following criteria:
l. Footings for the retaining walls should be supported by the natural soils or
properly moisture conditioned and compacted, non-expansive structural fill
as described below in Items 2, 7, and 8. �
2. All existing topsoil in the area of the proposed retaining walls should be
removed. The existing topsoil may be used in landscaping areas. If fill is
required after removal of the existing topsoil, the structural fill should be
properly moisture conditioned and compacted, as recommended in the
Com�acted Fill section of this report.
3. We recommend retaining wall footings be designed for a maximum
allowable soil bearing pressure of 2,500 psf.
4. The retaining wall designer should pezforn� global slope stability analyses
on the proposed retaining walls to verify that the proposed construction
will be stable. '
5. Wall footings and foundation walls should be designed to span an
unsupported distance of at least 10.0 feet in order to account for anomalies
in the soil or filL
6. The base of the footings should be established at a rninimum depth below
tfie final ground surface, as required by the local building code. We believe
that the depth for frost protection in the local building code in this area is
3.5 feet. '
7. Pockets or layers of topsoil or soft or wet soils may be encountered at the
bottom of the proposed footing elevations. These materials should be J
removed to expose firm, undisturbed, natural soils. The foundations should
be constructed on natural soils or structural fill. Refer to the Compacted
Fill section of this report for excavation backfill requirements.
8. Fill should be placed and compacted as �outlined in the Compacted Fil1
section of this report. We recommend that a representative of our office
observe the placement' and test the compaction of structural fill used in
:
June 4, 2003
Job No. 03-056
KOECHLEIN CDNSULTING ENGINEERS, INC
Consulting Geotechnical Enaineers
foundation construction during the placement process_ It has been our
experience that without engineering quality control, inappropriate
construction techniques can occur which result in poor foundation
performance.
9. A representative from our office must observe the completed foundation
excavation. Variatioris from the conditions described in this report, which
were not indicated by the borings or test pits, can occur. The representative
can observe the excavation to evaluate the exposed subsurface conditions
and confirm that all existing topsoil has been removed.
In order to reduce the posaibility of developing hydrostatic pressures behind
retaining walls, a drain should be constructed behind the walls. The drain may
consist of a manufacfured drain system and graveL The gravel should have a
maximum size of 1.5 inches and have a maximum of 3 percent passing the No. 200
sieve. Washed concrete aggregate w�ll be satisfactory for the drainage layer. The
manufactured drain should extend from the bottom of the retaining wall to within 2
feet of subgrade elevation. T'he water can be drained by a perforated pipe with
collection of the water at the bottom of the wall leading to a positive gravity outlet.
A typical detail for a retaining wall drain is presented in the Typical Retaining Wall
Drain Detail, Fig. 10.
Compacted Fill
Stractural fill for this project may consist of t�e on-site silty sand, sandy silt
and clay, gravelly sand, weathered sandstone or approved imported non-expansive
19
June 4, 2003 KOEGHLEINCONSULTIIVGENGINEERS, INC.
JobNo.03-056 Consu[ting Geotechnical Engineers
fill. The imported fill may consist of non-expansive silty or clayey sands or gravels
with up to 35 percent passing the No. 200 sieve and a maximum plasticity index of
10. No cobbles or boulders larger than 10 inches should be placed in fill areas.
Where cobbles are being used as structural fill, care needs to be taken to prevent the
cobbles froin nesting and creating voids within the compacted fill. Fill areas should
be stripped of all vegetation and topsoil, scarified, and then compacted. Topsoil may
be used in landscape areas. Where fiIl will be placed on existing slopes, the existing
slopes should be benched prior to the placement and compaction of fill. Fill should
be placed in thin loose lifts then moisture treated and compacted as shown in the
following table. The recommended compaction varies for the given use of the fill.
Recommended Compaction
Percentage of the Percentage of the Percentage of the
Use of Fill Standard Proctor 1Vlodified Proctor Optimum
Maximum Dry Maximum Dry Moisture Content
Density Density (ASTM D-698
- (ASTM D-698) (ASTM D-1557) - or D-1557)'
Overlot Fill (Inside building envelope) 98 95 -2 to +2
Overlot Fill (Outside building envelope) 95 90 -2 to +2
Access Road 95 -- -2 to +2
Utility Trench Backfill 95 90 -2 to +2
Backfill (Non-Structural/Landscaping) 90 90 -2 to +2
Notes:
1. � For clay soils the moisture content should be 0 to +2 percent of the optimum moisture content.
For granular soils the moisture content should be —2 to +2 of the optimum moisture content.
We recommend that a representative from our office observe and test the
placement and compaction of fill for development of the subject property. Fill
20
June 4, 2003
Job No. 03-056
KOECHLEIN CONSULTING ENGINEERS, INC.
Consu/ling Geotechnical Engineers
placed below building envelopes, retaining walls, and access roads and behind
retaining walls is considered structural. It has been our experience that without
engineering quality control, inappropriate construction techniques can occur which
result in premature failure of roads and fills.
a
SITE DRAINAGE
Because of the sensitivity of the existing and proposed slopes, surface drainage
should be carefully evaluated during design and construction of the development.
Overall drainage of the site is generally down to the south. Construction areas should be
carefully sloped to reduce the possibility of infiltration of surface water into the cut slopes
and fills. In addition, slopes above and around retaining walls, cut slopes and fills should
be graded so that positive drainage is maintained away from these structures at all times.
Tl�e surface drainage of the development should be maintained during the construction of
the proposed development. The surface drainage of the development should be designed
by a Professional Civil Engineer.
FURTHER INVESTIGATION
The subsurface conditions for the subject development were generally similar
throughout the site. However, the futui-e location, elevation and size of the p��oposed
residential sh�uctur-es within the development ar�e not known at this time. We T-eco�nmend
21
June 4, 2003
Job No. 03-056
KOECHLE7N CONSULTING ENGINEERS, INC.
Consulting Geotechnica! Engineers
tlaat site specific investigatioi�s be peijormed wlze�z the locatior�s, elevations and size of
the proposed structures are k�iown. If requested, we can perform the site specific
investigations.
LIMITATIONS
Our exploratory borings and test pits were located to obtain a general
determination of subsurface soil and ground water conditions for the proposed
development. However, variations in the subsurface conditions, which were not indicated
by our borings and test pits are always possible. Any variations that exist beneath the '
developinent generally become evident during construction of stabilization systems,
utilities, andlor the access road. This report was prepared based on the conditions
disclosed by our explaratory borin�s and test pits and laboratory test results. This report
presents the �eneral- subsurface conditions and guidelines for plannin� and design
purposes. Individual site specific i�zvestigatioizs should be perfo��med fo�� the p�roposed
residential structures on the subject site when the location, elevation and size of
structur-es are known.
0
22
June 4, 2003
Job No. 03-056
KOECHLEINCONSULTINGENGINBERS, INC.
Consulti�rg Geoteclznica[ Engineers
We appreciate the opportunity to provide this service. If we can be of further
assistance in discussing the contents of this report or in analyses of the subsurface
conditions, please contact our office.
KOECHLEIN CONSULTING ENGINEERS, INC.
.
6.
; 33822 ;
"Q• i4
�'i� i •
�.c'•. G/y�d3 ,: F �
'�.,��d'��� ...••�� `��
u�u,,,,�;,a u�,,,,a
Scott B. Myers, P.E.
Senior Engineer
Reviewed by:
� i /�
, William N. Houlette, P.E
Senior Engineer
(4 copies sent)
23
KOECHLEIN CONSULTING ENGINEERS, tNC.
Consuiting Geotechnical Engineers
v���..
NOT TO SCALE
VICINITY MAP
JOB NO. Q3-056 FIG. 1
. � KOECHLEiN CONSULTING ENGiNEERS, W<
Consuiting Geotechnical Engineei
� •- -- - = ..� -- -- __- --- ° l --- �, ; � � � --
' - - - - _.. ._ ` --- ._._. ---- -.`�"` _ ._ � -
¢ r ..._ - .� --- ..._- -. - - Y- - ` � - � - ��. :� "_"� -- -- � ~ _ �- � � - - - - -
I �� - _ '�-� f ��__=� -.-�_.-�---.,.�.--__---f � -~" ---` �.�=J�-
�- __ � �.---
� 1„ .�-- ,.._.-.- ""' ----i � _"' ..-- ! _... — `-- — r' � — ----` "�.�.. � _ �
� ..- ..- _ = � J�--`„ r _.-- _-_--� "_ __�" — — � � �.- _„_ �_� _ .� `__..._ � _. �� ---- _ ___-- ��' __ - .�-- - • �' -- � � —"_ '� ��
' �- �.i' r�^'� r.� ��.-i- rr, "�-� _.- �.�� -"r- -�_ r"'' �.� „'"'� �.i' �^ � �_ ' —� � ��' ^ —� , ' �r.. ���, � -
. �,^"�-I `+� �+� /� ..-+ �'._� "� I � �", .�"'- _ __ r .^— ^v �... _.— __' ..-„' . � _. --- —
� � r ^ ��.--'~ r r ",.r �" �"� .-"'�� -„' -.' -.^-- _-.-. _ '._... _.._ _. �. _ --._. _ ,. ..� ____ _.... _..- ---. ' ` �-_' -,._ , - - f ' ,..- __ - � -
,..�' "t�" ! ,---^ ..� �" � ""'" ' f r _
`.r � /'' "3 '' .r' .-" �„ �,_,,,.. ! i ! ..� _- ..."' - ,--. - � � .._._ ,._ „ _.- .- � __._...-._.. N �+ „�. -.--
� Pl�O ROS E D B U i L D! N G E {��E:Lr4P E�,�i�-E':� y _ r � _ _ .� = -�- = � - �- -� - - = _ -= _�.. � _ . � �� �.__- � -.�. -- == = - -- - -� ` � = -- ___"= 1 - --- --;
' _------� �✓ �'" � ''` -� µ.�L � � .l" -� �-„ �- -" � '' ._.-- ..� ` _,r, ... f f � �- - � � _ ._.._ �, - - � `- � -- ` -- '" _' _.:_ _._.. �- "� �" . ''_. .!-_J -'"'- ..�
r "'.� ..... '�.i' � � 'J -"` ' �' �- f r"' ...�. ' .---` y �-- ".� . -^_ �,t, � ' �'" _l. J"�-�^�"" ~ y �� -- ''� ...._ �. _ � _ � ' � _. .� � -.. ._-" '� � ._..- -- - - ^- - ° ` _ __' �•'_r --- Y i _.
. � --- !./.�.._ I ,'"-. = '.-_ . -� _..-- J-� - -t �Z s -�"'"' f .._-. - - ._ - - - - - �._. '^ V- ; � �•- f . _
. .,� ' - -� --- . -'' J.-.- ,..r,. ..-..._ ��•.�,, � ....- �- — _� — �..� --�-- _— ? : ,,.- -�
,� �,. ,,..�y .,..- � , ...J ,-- .,--.•=""' �-- r ------� -_. ._----- � ^,.f _--- -" ....�
,,�-.,.%' ' ..- -� .,,.... r- ;,,_ �'s" `-" �.-- ---- � _ _____-' �--�--- --- �- __._ — — � _ �-- s ', '"
' / /"✓' ` ",- ` � /- / / ,,,r C.`. `�? •�. � ...v � _ ^ .-,-,J.",� '.- � r- ' f,...x, �- � �"�� _._ � _ ._- -'- � �. �..�. _., _. .�- --'- .-'"'" J � � _.- ,. ..-"
, , . /'r `' � J � � " "�" � " ! ..r- I :...r _,�,. "r J.- '+a �-' �. � r ,�-. -"' "' ._--, t�"'� � �'" _.-,- �.-- - _"' -- - -- -.._ � - ' -- - -- " y � ,_ � .---. ._. � � .--._ -- 1 - _ / .s"" �"
' .�- �'" i ,,- "` r ,� ..-- .r ...-- ``� `= - � ' y --- -� _.,. ._ — � — � -- ,,,, .r----- � �.--
� � �J� %' .-= � = � � = ' -- �` f .° � -f - � f - =,� _ _ =�.�-- �= �P.F�O�P�S E i3� F�-�T�4l�i t�G-1�9;L�.-S�T�'�?. � _ _ __ _ -- -- _ f = � -- = = = � ! .: ;, --`�.-'� .- :: = � =_
.r ,/' / A � / �•- �� l'J . -r`" / � ,r J �' .�, z�', f�'� y' .� � -^' � ...- ._.,:..r" ---'� -_-- - „�....--^. _ -y" -�.,W --. _._ _ w. _ .'.-- --` __-- __'_'� ° _.^-_ -- �-�vtJ ..�-- `,.- I
t� / �r � "i' ,,� % '' r - l .- �.� J,,,. ' �,.,. .'",+-,.. s- r--l- �-' r . '"'-„"�- � ..-- ,-"'> ,-"^-. . ...-� �...=r_ ..-- - � - _.,�` -- _ _---__ _..�.� __._ - -' � _ � ._.._ � r' ./ "'� � ..�-' '�- `..--
E r ._. .-- � ,,, .....�Y., ,� _ _..1._ _ -. -.
� i i / ✓ - /` .- �" r l_... J ,- I i ,.,� i r-"�' ,.. - — � ,,,,,,.�--� ..�- --^- � --'�, ;,�;�"""" , -^ .c^ - --.... "`' __ _.._ � ._ � _..- - � '_ .� . �, ^.-- �„ r .s r
, � . � . �� . .-�r O � C ��' _ f� / i ` ' ,..- r .'-- '" 1 /'y / � l. � / J. .- f J ,� ' ` � �,. ' - . � : i-.' ...3"c,`L-�v I = � _ _ ° --.- _- � � _ _. ._--� ---- i __ � , _-- -' �. � ^' .r .i f , y/,. �.
.,,y J/ ..� .�-" ..,--r � ...--- _,.-...__ .3�z'fiTt�'.�L{� �"��:� � "-- /
I ''�,,;,� !'� / ./'� / ./ / r .�' f•" .�" �'^ `'•� �'. `�' / /� . �" � J Y � •---^'' y -"' ,-. r "" "� ' _ ^^- "�, _ ..._ � _ _ __ �` '�. __ ` �. /
.,` -" �~,,. -'!,_ � �`„ �. �� . / r ...- '� _.r'Y . r % -,'` :. : t; ''� .--,. •� _,. l ,,... � _�....- _______�. __..._� -.... ,` _ � _._.. - - - .� .._ -- ` ^.-�-�. -"" � � r� ; a..
`� '.... ...-- ,-f �_.� /� r /^ / r'' �.�' r .-" �,,, ,,..• / ✓ v_�� ' ,.- I r„ w.,,.. ''�._,..J. ' r �,... '� ..-�-� -^'-- ..-- _ _.�. E _ „ `.,.-. _ _ . - �-' �,� ._w..._.... . _�._. n r�"' ,,,..- ! •-=! '
` � ...- "'' _ ^- ' ,r` "r ,,,� , ., ''� •-' ,, ' � -"r ..- yr �= ,,.- :r' / /' ✓ .�-, .^'..,.-•� l �" J -- "'-. � .-j '" ,,,,- � '"_'J_.. ��yK.. _- .� � - �-.` ` .� � �+ --- r-.•- � _ WY`-` L �� �.-- -- -'� � � (
� ,•-- ,,,.. i ! f :/ I .^'"' „'" ,. r'" . ,''� I -..'" .- e --� ••-- J, � � � `^"' -- ---. -.� '� � t �,-�.� '-..�� � _ ..i r, I .�
. � � � L. � Y � r '`� / � � l '� ( � � .I� !�� � �,;,r � J ^^"�r r r/ .i' � ..�-� .,,.r' / .--� - "'J- •-`- ' ^ ��J ..h �,yQ?C ��� , � � ---•• "^- ., . ""'" . _ � ^ � .� � -�. .� _.._ — .....- '"'� µ .- '".-r `
�v �� f3�..�-r !..' ,✓' ,i �" .-' / ' , f � �.-�-_ ,� � � / h ,�..,. �.- � .._.- ..- � ,�, -J�...- � ! r �...--� _ �._.-1r - � _._.. L..... �"";}�,,,� �`' ._ _ F--� ae"- _„_ .�- � � -- _.._ +�_� ..� - .,--'"� ��'''" `''^ .-,
^ � .r � -'' ,,.-- '/�� �,,.�' I „ ..... „_ � .e. / /�,�t',,,.^`J� -.' �,^ `r '"v.- l��Y_ � ^'r --� .._.- ...�- "_-�r '� �F ----� a�--��..,,. ' S �"`�`� � t�'t =5JC'' ,_ _.-- _. -� :' .,.�'�� �„ ""l
. - ,..-� ,r �'' i r-' .r ,;.- r' ,.,.. �,,. �'' 2 .✓.�_✓ ,� "' ,,,,.......- � ! �,'"" ^ '"� - ._._.� 3( �� �p � � i '"'� -"L•ri���?'V= .'�vc�L'�"- - � �-:d" ...-- .-,'
� ^ � --- '� �.r"°� I � � r / ✓ .r �_ Y / `' � .-- ' _ -^` �„''. �i .r'_ � !' l �,�' ��� � ...-�'.-�._�- "' ` �.s- •w r. '�� � � .r- „" � � G _�"`�6�`�� 1^+� �...�. '�'`'�� T`�^- � �-��l�.l'�....•J^`. ��-�. -�_._ �,.-..,.,,., - ya�`:;;;! �~~' �Y� ..! '� i �,.. � .
_ "_ �
_ .. � 1 '`'y .�e,1^.'y'"�, / l ✓� �'r _.•= '.�• �. % �'''`.� " `� "� f ''` �/ `'./• �� l"�. ✓. .:2 � ✓' •^` ,,.-� -,`. ��^-.§�J � tr f - � �,/ ___j_ � �' �- � ...� ."° ��-cs� �-i ._ ,� ''� -`. '�.c'" �� � �_-- -y.:
..-' ,--' r-'".�.• - -.� , ,, -'' .,� ..-" ,,,,- ,-. - � �,�f !'� � I .�,,.� � '' � / /, -- [/ . � � � -�. �p � ' r .-£
� � � ' . ' _ � _ -,'' ,." ,,,..• ...^ y :ca�'C"��. -'� ,�.- -^"��,- � Y� ' -y- � ^ � l-� ' ---y.� � � m-�°^�°- ° --- �� � .
,i /l 'r( � s' �/ '� f /�'r r'r / � ~ � ''� f .�� !�''-' '� ,r .r' `'r '� �-- '"� ..v- �••' / / ,,� f � '_ t " t ....._„� � 1 . � � _,,.,. � �
..� f r �y ,r / "r "" � 1
. 1 Y � , l /'�.,. � . j �: ''J �''J,,. '' � i � / �. ''� ,r . / r. � r'�n J -'-- . � / . . -�+�- - ,,,.... a � ' '',` .'�
✓ f ,r './ ,.. ..r ,✓ r,' . •/ vr �T*�� ~ .-- .� _° ' � ,�,.s ./� ,__,7 v •- "'- ' -- -�- -- . �
. . .^j 4L� f �` .!" / ,, ''�.^'" f�, � / ✓:�� " � � �... yy � ' � � � -� ..-- � � X/ � -�'. ?'W.."' r �" f} � Z0.t't"°P3� "-- .,� ��' �� t �r�. s,�-- i
. . - - �,,, --, � l � y' / � � � r , � / ^, ...,r . ^r � , . -� �,� �ti..�. - -
--' -_..- " r �:x� , ��� �i � E�-2`--...- ' ,,. `..- F• ' �•`` ,.,,-P E3� C.�E�-.�'��� S�-EZ' � t '" . �-�----- �--�`_`" ._=- �-; �-----� =--T_� - -
�C3 , --�,.
� - `l '"• / �' i ; - :is �. -.,r' ..� r~-'' .. � � � r.'".% -�' �..L�-� , �.,.. ..� � � --�' .r i!.. -�^F _..-- „''� � � i �i . 1'"" --._..�,'i ^`- ,L.,_ �':
" --- �� -�' � '/� / ✓ r / ,,,,.<'� v�a, `�,.�-r^-,'" `...,,�, � . ,,,..f o _, `r"''. -„ �'�f - � "`- -� � --- •,-...
^"'' i. � .., ,�'l J /' / Y�. � �'"� � / � � �, � f � � �"� / i r i -''� / -''' I �.�.is �;�� -�" � "'� -�� �'"� ' ° ` .-^ �c '"� � � �_"�---• -
� ;��':' ' / f.. � t-� .^� j � �^ r ''r }E��" � „�~n„ ! -""' � \•x� `g �.,,.-� �.-- „�,,, . � ,,._ � f �t �4 `� \ -� d �,..�`��
� y: ,f ' ; ,,.� ' / /` /� 'r �� /� ' 'i .-.^'�� ' '"J /''' � ^T / _---� ,.�-t�_"� .'� ..�- � f �"" �, .r "w�.�- : � . ' �-'-.-�.._--'� � ' � , � � � ���
�•-' " .,•- �„- �',i .,- i ,r r� te Y � :.r / ;-" %,. �,...-� /� ; � ~ ,r' r" / �„ -� -� �� . ..,-- _ � -�""`ti„�. ' ��� _-�,^�
/ '"- �'� / � / ` � ',.. ✓ I I �aa ,,"�'ir,, `�, �'��" i � - r,� ;- ?... ...- ° „-^ i - 5 ,� �' --- ..-�--y'" -� � ^� � '-�`.
..--- �,,,, -` O .= ,a,. �sp� ' � �r ',- '� .-l'.r'�r; � �" '� ''�- 'r l r ,�,.. � _ 1„�;...1�=* •r,..%,-,' _ .�----�'��_--�- ��^ �� ��-,�''^ �: i ��
� / •-' .� ,r„ / / ^' �„'�' /. 'r - y� ,i' � "' � / J � ,�M ,�... � �.--�"� �- "' ---- ,.,,_, . ` -.� _. w�`-� -. �i"� a-.. _:�- `---_
.\ i/.��lt��' ,! i ,� _ .?�� / =���`.�-�'�% '1`� .a =_' .�- r 'lx�"'--a�+�, .� �.- .�-'��l.. -- . �� -- �. �. ---- ....._ __._ � �. � "_��,= �.�4__---� -,,,',"� � �
_ _ �` � s i F r �/ / ,.'r } '`^' '� -; ,'✓,,�" �,,'' �' -."�� i.�PC G:�' 'P3� 6� �� � � / .�- "'- � ./�. ..._ ,r .�-1 . ,. ____ _" w ,. -.c--�.�__ / `` � �,.....'�_s3' I ..
_�� �- i !s rJ . J,r .s�" =�' � � �- e. ._ � - ._ _.. � _,.._ --s-^"'� � \Y . . _
y "''- �. � r ' /� `` �" � ,i �,Y r r �?:..�'"' .7'f ..� � � 17e .� "� . '� �r�"' �, �,�_ j.�-� .- `. `_',..a - .. t .
� �,�' .�l ' _ / �,.��` ��✓ ./
� � i t,. �/ / '''r /./✓ / i' ��i"�.,.- � :.. �. �, ,7' } �. ss / �/ j' -' ""'. �"� � �/' �.- '"'_ ""_ ! ".l- "". _.,_ _._. ---- �7 �" � `". I
� z�f / ./ �' ' ! '� . � . 9,r i / / � , �,_w ��-{ y sr ..,, �1 y��t, � / / /� � F'"r'"�,,� '. „"" � "'' .�" ,,.....°- .� � --"r � , . .. . .�� . _. . . t .. -.. i .�.�
- .� / ^� _.''"^/ / / .�' . .�c'. .. s �, si � ,. .r . ,� .v-" �.--- . . . i . ._..
f , ,:.. � '' / i �, i ,%% % �~ � � �:--,. --' ., i ! �, is.�is,,, � ,,.-. � ,�. � -� y.-� �...-'- ,,,.. I - �� � _ _ _�__._-__ _.-'-
p ✓ ; � y..- J ✓ / _ ,� �"-� t '1 `z
r r ! .✓ r i .- � s+ „'-- � .I .i' ..,.--' ,., •'' .. � --------"'
__ .r r � rx� � � % i r � /" J� r,l^' ' r ^T' ^?�i'e �E J r.- .,.- -^ /„�, � Y�„ „-^ . � � .-�'�, ._-"- - _ � '
� ,
� �r!/��''�,,5�'`� j ,.' ' -'• r " --' f ,y.. --' �.,, -' J,,�t �<IIa5'�� -'' ,,' f� -'"" ,,,,. "' �,.• _ .r ,�.--"'_"`._�._._.__�-`T�� �'�
,�
, �r % l ,,/��` ' ,/ � � ^/� �%'",r^.,..-. --�' �,.- "'' y.r �. / ='� �„�. -'' �- -" .� -- r„_ J . ` � _..- . t . ,�. . .. _ _ . _ ...
,�� � '" ~ ` � ,�. '✓
/ <
� � i r� , ..,�I"� � .i' � ���i � ,.''' � i i r .,.�^ ,�,�,� �, / / i^ .r .�' .,,,- . . _ � � . ._ � . .. ... . ..
� \ �r
; ,., •- �, �.����' �. / � ,,� 1i/ ✓ = �;-- „� •-� ..- -'' ,.; '1 �..- f / ,.,.�''' /�,. ' „r ,�-- 1. � .. -
�- . _ r!" ,r s� ./ � r'' r . ,�i'=i� � /� �� ,- � � � -'" M,�� .. � :- M i r �- �. � �' r.�- r,. ! J ''� f ..� . � ,,�/����� `-�. �i
,,•� t' , ' f � � / � `' � / ;-' .: r ,,r ..✓" � .-�" �- .-,. ' _ r' ,,- . ,r. ' ,.- / �
--- ,' � 1' , f � e � , �; �-r r- �,,.. _ �- .y- � 1,,.-- ' � i f s _ .r "��,,'� . , .
' ..,.- '! ,;r . " ,, j ,,.. `'� <. r ��
I .. �'�, ` j, � / f. � t�-''� r/ '$; '' ;;'rr� i i' -'� �' f- . — � --- �. .. '� r ,, ,,, .� i ,- i � � . �`� ..�------
� � / f�°-�,.r' ;�;,� '�� �,. i i!� / f -,' � "`r .,-- .-- .,-r' i �,. ! s ,i"` •' ,y/�t�
� / r �� j �� „' � - f ..� Y '`� ./ j` / `( ti.iY
,,; % ' �i / � �' Ur��'�i- £�:� r.. � ./ y' ��� •-� � � � � � '•- /% `, ,�.-�.
j / sn�%3 � �`5aa�� - ,l � .y' . r r r..- � � *^ ����► !•.%
.tr ✓ lf '� : / / / d, .. �/ ,�� ' l' � '"Y .r -- - ....- .�.' .r/''� � �l` ^.. y - . .
� tr f� �� � '" �,/ � �, �// ' f � � ...�.. -� /f /' I J." � � "' � �,,, -""' / f /�, '� . . � � . , - � .
~�,� ,% • � a� '.
7 :
^! � r ' `/ � � r., ,. ./- �'''l'i!?+'`,,. ),.-.y, � . ".. ^.r � J,,,� � I �;� f. .
" .�.,/�, i` ,t '� � j , �/ �./ ./ �-'"' �' -'' _r _ .�- � �'. � �f �
,r �� �' �..� '+ ��'� / / �' / / r i." �°` s r- -" f -� .-° ~ �
�% r' `� '`�.i C� % ,�' '� ' f % �r �,. �,r � � y � y, .--' f� f t: �
�/`�..- �; ' /,% ..�;, �/' / / ,/ / �" � ..-� ''' �„ -°' r � ,� -- /,�°,,,.- "'r//,,lr . 7 �`` � . . �. . . �
''� � f /` r .//. % . • � f f, �. //,?`' ,�' � ..-- '' �,.� ''� J -�` ,'' ''�/ e,�'.
t ,.�� / � f ' i'/ ' % l / ./ / `� /. '.- _„J. ,_.- � _..�---=` � .E � '� ' �� ° �
• `- _--- .� // �
� / ,i -' �/" f / °" °' r`. / .,- — --- ,i.� / -
. . . ` � ; ' ' � `� -1' � _,_, ' f - .
r f ij% f i � i� ,. � �% �'� / /�� ,i''� � � �.- '�/ri j /� �.�,,, �
��1: ,...- � f.. f � � : � � � . ,� i :• r - ._._ � •�^- /
�r ' �f`f,^�'_�-` j � / I / �/ ,'' � --- ''✓ _____� �',i � � �
� J, � ,f, r / 1 / / r �� � ,i�'�. — ,. i -.,�%
�.. j : f ,� % , �� �
�L..� ,i;� 1/ r j s /,;�� ,' .`,�' 'e '�. / %
�y �'"� r � f , � =" �. t " � _... _ —% :'' � �> � _ ;
`� 1 , ? � t��?!i ?Y i ! � ! / �,,� ,,r .r / .. r � � " ��^�'3�r ,. �
� -,-�- � f.a.""f��':Pl�..s2 � f �' % i' ✓ / _ _ . _'__ r,,, .
� . i, � . � 1 ! � . , . _ � ~ . l .
`- LOC/-�TiONS OF EXPLORAT��� Bai�INGS AND iEST PITS
��- � � � � � f -.`" - ' � J ,,..
�_�- �.. ,.-- /
/� -- — -- —
f-� �.._ -.- '"" "l ,o'='_
/ %� -'"
t/_-._„_ -�.�.� ...._ � _.,_ - .."' -�"' ✓''/ � �,.�-..�
%��.: � — --^^-- ^� `1 L: � J/� -f � i _
�-�.. _ _ =/ Y"i = � _ ,
� �„_.�
` 1 - '-�°• --- "" --' � ' . :
�\ 3s ^ � � � ="-.,.- � N � �.s-
-^-'" -y�5.3,'� �" •-^ /
^--- - - '+- R � f ' `�
�.... i "� --- � f . / � �f �N��� .,��
., � e NY \.. .
„y, ��--^�.' ° � ~ �
. W`�'i,' .._.,-- -'--� . . _. �/
.. ��\. \. - . - . .
� _.---�'_"'.
_.-i��
�'.
.�/
�
1"=4Q'
JOB NO. 03-056 -
FIG. 2
�❑
5
10
15
H
w
w
�
� Z
— 20
2
�-
a
w
0
25
� 30
35
.�
TH-1 TH-2
APP.EL.8266 APP.EL.8277
�
,�
::::� 26/12 � 13/12
: WC= 12
—200 = 25
:::�' 16/12 : 50/4
: WC = 1 1
; —200 = 33
: LL=24
: PI=5
: 50/8 � ::: � �
: WC=11
. —200=43 F;::;:
�::::: 50/6 c�::�:
43/ 12
.�::Q
50/7
KOECHLEIN CONSULTING ENGINEERS, fNC.
Consulting Geotechnical Engineers
TH-3
APP.EL.8261
c,�a � 0 —,
10/12
5
50/6
WC=8 10
—200 = 19
50/7
LOGS OF EXPLORATORY BORINGS AND TEST PITS
JOB NO. 03-056
15
�
m
v
--�
S
20
Z
T
m
m
�
25
30
35
.�
FIG. 3
G
�
10
15
H
W
w
u.
, z
— 20
_
I--
a.
w
0
25
30,
35
40
TP-1
APP.EL.8256
� WC=18
� -200 = 52
' WC=16
-200 = 45
� LL = 25'
� PI=4
KOECHLEIN CONSUL7ING ENGINEERS, INC.
Consulting Geotechnical Engineers
TP-2
APP.EL.8286
�-,.�� 0 —�
1:�::�
� WC=7
.. -200 = 23
LOGS OF EXPLORATORY BORINGS AND TEST PITS
JOB NO. 03-056
5
10
15
v
m
�
-�
2
20
Z
'n
m
rn
-�
25
30
35
, �,
FIG. 4
LEGEND:
� TOPSOIL
`�
�SAND, Silty to SILT and CLAY, Sandy, Gravelly, Scattered
cobbles and boulders, Dry to wet, Loose to mediurr� dense,
Reddish brown to brown.
�SAND, Gravelly, Silty, Clayey, Moist, Medium dense, Tan to
light brown.
�SANDSTONE, Weathered, Dry to slightly moist, Soft, Tan to
light brown.
KOECHLEIN CONSULTING ENGINEERS, INC.
Consulting Geotechnical Engineers
' SPLfT SPOON DRIVE SAMPLE. The symbol 26/12 indicates that 26
blows of a 140 pound hammer falling 30 inches were required to
drive a 2.0 inch O.D. sampler 12 inches.
� CALIFORNIA DRIVE SAMPLE. The symbol 13112 indicates that 13
blows of a 140 pound hammer falling 30 inches were required to
drive a 2.5 inch O.D. samp{er 12 inches.
� BULK SAMPLE. Obtained from trackhoe cuttings.
Notes
1. Exploratory borings TH-1 thru TH-3 were drilled on May 13, 2003 using a
4-inch diameter continuous flight power auger. Exploratory test pits
TP-1 and TP-2 were excavated using a trackhoe on May 13, 2003.
2. No free ground water was encountered at the time of d�illing or
excavating.
3. The Boring Logs are subject to the explanations, limitations, and
conclusions as contained in this report.
4. Laboratory Test Results:
WC - Indicates natural moisture (%)
-200 - Indicates percent passing the No. 200 sieve (%)
LL - Indicates liquid limit {%)
PI - Indicates plasticity index (%)
5. Approximate elevations are based on the topographic site plan prepared
by Peak Civii Engineering, inc. and fie(d estimated elevation changes
afer access to the boring locations were constructed. Exploratory
Boring TH-2 was drilled in a 3 foot excavation, created for drilfing
access.
LEGEND OF EXPLORATORY BORINGS AND TEST PITS
JOB NO, 03-056 FIG. 5
�
Z
�
�
a
a
z
w
U
�
w
a
KOECHLEIN CONSULTING ENGINEERS
uIHMt I tK UF NARTICLE IN MM
+3" GRAVEL SAND
Sample of SAND, Siity, Clayey Gravelly
Source TH-1 Sample No. EIev./Depth 9.0 feet
SILT I CLAY
�
z
R
�
c
rr
Z
z
rr
D
Z
m
c
GRAVEL 24 % SAND 43 °i
SILT 8� CLAY 33 % UQUD LIMIT 24 °/
PLASTICITY INDEX $ %
samp�e ot SAND, Silty, Clayey, Some gravel GRAVEL 10 % SAND 47 %
Source TH-1 Sample No. Elev./Depth 14,0 feet SILT 8 CLAY 43 % LIQUID LIMIT %
PLASTICITY INDEX %
,
9ob No.
03-056
GRADATION TEST RESULTS
FIG. 6
�
Z
�
�
¢
d
�
Z
w
U
�
w
n.
a
KOECHLEIN CONSULTING ENGINEERS
�
,
r
�
n
<
7
n
I
�
n
c
DIAMETER OF PARTICLE IN MM
+ 3" GRAVEL SAND SILT CLAY ,
Sample of SAND, Gravelly, Silty Clayey GRAVEL 31 % SAND 44 `
Source TH-Z Sample No. Elev./Depth 4.0 feet 51LT 8� CLAY 25 % LIQUD LIMIT �
PLASTICITY INDEX °
c7
Z
�
�
¢
d
�
z
w
U
�
W
a
DIAMETER OF PARTICLE IN MM
+ 3" GRAVEL SAND SILT CLAY
Sample of _ GRAVEL, Sandy, Silty, Claye GRAVEL 43 % SAND 38
Source TH-3 Sample No. Elev./Depth 9.0 feet SILT 8� CLAY 19 % LIQUID LIMIT
PLASTICITY INDEX
Job No. 03-056
GRADATION TEST RESULTS
FIG. 7
�
�
m
�
n
m
z
�
%
%
%
KOECHLEIN CONSULTING ENGINEERS
6in. ��1- tin.3/din t2in3 i k-0 i10 L2 A30 Xd Y60 Ft00 f140 D
'9� I n I I I� � I
80 � I I
I I I � I I
� 70 I � I
�so I I I � ,�I Ii I 1 f
� So I I I t I I I
� 40 I I! I I I I I
d 30 I I
2p I I I
10 I I I � I
0 � � � � � I
200 100 10 1 . 0.1 D.O1 0.001
UIHMt 1 tK UF- F'AK I IC;Lt IN MM
+ 3" GRAVEL SAND SILT CLAY
Sample of SILT and CLAY, Sandy, Gravelly GRAVEL 13 % SAND 35
Source TP-1 Sample No. Elev.lDepth 7.0 feet SILT & CLAY 52 % LIQUD LIMIT
PLASTICITY INDEX �
C�
Z
N
�
Q
a-
�
z
W
U
�
W
a
1D
?0
30
�o
�o
�o
'0
�0
i0
00
�
I
i �
f
f
t
�
DIAMETER OF PARTICLE IN MM
+ 3" GRAVEL SAND SILT CLAY
Sample of SILT and CLAY, Sandy, Gravelly GRAVEL 27 % SAND 28 '
Source TP-1 Sample No. EIev./Depth 9.0 feet SILT 8� CLAY 45 % LIQUID LIMIT 25 '
PLASTICITY INDEX 4 '
Job No. 03-056
GRADATION TEST RESULTS
FIG. 8
0
KOECHLEIN CONSULTING ENGWEERS
6 in. n. 1 in. 3ld in. 1 in f.d X10 -� �30 id %50 II'10 YldO 00
� 0� I �� �. i . m. � I .
9� I
� II I � '
70 I I I I I I
� 60 I I I I I � � I I I
� So I I I I I I I I
� Qo I �� i l, I I i
� 3D ' I I � I I I
20 I I
10 I I I I �
0 I( I I I I I
20o ioo io � o.i o.oi o oo�
+ 3" I GRAVEL
UTAMt I tK UF NAK� ICLE IN MM
SAND SILT CLAY
Sample of GRAVEL, Sandy Silty, Clayey GRAVEL 47 % SAND 30
Source TP-2 Sample No. EIev./Depth 8.0 feet SlLT & CLAY 23 % LIQUD LIMIT
PLASTlCITY INDEX
)
10
?0
30
40
�o
,o
0
D
0
DO
Sample of GRAVEL % SAND °
Source Sample No. EIev./Depth SILT � CLAY % LIQUID LIMfT °
PLASTICITY INDEX °i
Job No. 03-056
GRADATION TEST RESULTS
FIG. 9
�
CIAYEY BACKFILL
EDGE OF EXCAVATION
(EXCAVATE AS PER
OSHA REGULATIONS)
JOB NO. 03-056
t0
� � — — —
:� �
�.i� COMPACTED BACKFILL
FILTER FAB IC
GR EL�
PERFORATED PIPE
a
KOECHLEIN CONSULTING ENGINEERS, IN
Consulting Geotechnical Enginee
MANUFACTURED
WALL DRAIN
— RETAINING WALL
WATERPROOFfNG
NOTES:
1. DRAIN SHOULD BE SLOPED DOWNWARD TO A POSITIVE GRAVITY
OUTLET OR TO A SUMP WHERE WATER CAN BE REMOVED BY
PUMPING.
2. THE DRAIN SHOULD BE LAID ON A SLOPE RANGING BETWEEN 1/8
INCH AND 1/4 fNCH DROP PER FOOT OF DRAIN.
3. GRAVEL SPECIFICATIONS: WASHED 1.5 INCH TO N0. 4 GRAVEL
WITH LESS THAN 3� PASSING THE N0. 200 SIEVE.
4. THE BELOW GRADE CONCRETE FOUNDATfON WALLS SHOULD BE
PROTECTED FRO�I MOISTURE INFILTRATION BY APPLYING A SPRAYED
ON MASTIC WATERPROOFING OR AN EQUIVALENT PROTECTION METHOD.
TYPICAL RETAINING WALL DRAtN DETAIL
FIG. 10
�
O
W
z
O
0
W
O
C17
�
�
O
m
n
_
r
m
z
n
O
z
�
c
r
�
Z
G�
m
z
�
z
m
m
�
�
z
c�
�7 �; �3 y y � � �
� � � � �, � � r0
N �-• t�.� [.� '
h
d r��-
00 �O �l �O .A ,A �D F�-y rb t\
O O O O O � O "' �y
v�"m
�z
o�
� �� � � ���
�� N �,�
� ��-y
y \
� Z d �
� �--� *� �
�
r � �
N N o ~�Sy �
� � �°.\i j.-i �
�"'3 d �
�
h
ro�
r t...,
��9 �
� �
.� �, o d y �
x� �
y
�C
�
N �i
O C/]
_ O [�
W �-�n. N �O c.Ni� w w ���
v � �
h O
� r, r. 4� tn Y v
� �' �' � z9 e z
�� a h l� � d
� � r n ,� �� c�
a Y � � � � � O
� V-C �-G � t"
� � � � n
� � � � ti
� < n. �' v� Vt � C
� �.� � � o " r
� �
n � � n n � �
�< A C � � � �
`C O. = �t `< < `G
� � �
�
a
r
rn
H
C/�
a�y-
a
r�
�
0
a
�
0
�
�
0
�C
�
m
�
�
�
h
�
�
r
y
�
KDECHLEIN CONSULTII!'G ENCINEERS, INC.
Consul�iiig Geotechnical Engineers
SLOPE STABILITY ANALYSIS RESULTS
APPENDIX A
�
i
� KOECHLEIN CONSULTING ENGINEERS, IN(
Consulting Geotechnical Engineei
f _ __��.�=�` __ __-~-- ---`F:_-.- __f ~ �_-�=-=-
� _ �-� =- = = _ -- --- — --- � — — --- -- — — --- -- — �.- _ __ — — — -- ._ _
.....- _� ____.- --
� .�- -_---,.r � � = - - = - _ `� — - _ = = = = _ � - — _ � .� � ~ — �-.�. ^-_ =---" = -- --- — � =. � � _
� ._-- _ ! "=. f: ="-- �-- — -- ~` = —= — — — — — — — — — — -- _ _ �-- �" — — — — —
� -- =.r _ �- :� — — =� �-� -- = — � = = �= -�" = _ =�_ � = ..� _ � = - _ — � - — -- -- ; � — � __ - � � T....
, ; _
..- ...-- — — _-- — — _ _ _ _ _ -- - _ _
...- �.----
�� � -� - �- r" --� �' �--� .� ' _ - -' .^.r ._-.� _ _ - - - � � r. _. _ - - - - ^, _., .._ - - . -`_ � _ � � - - - J ` _.._ - -- = �
i.,r- `"�€ : -�'= -- �- ..- � � -. -- ;,..--- _.� - _..- � -- � - -_ _. � ._._ _. - _ � � - �. _ - -
� ,� - ...-- sY „-.- ,.- -- � _ = _ ,-- .,_,,. -- ..- -- ,:! -- -' ----- _. -` � ..- - - - - - _ � _ - - - ,. . -- --- --- F --- _ _ . -- -�
a P RO POS E D B U I LD l N G E t_,.y��E: �" --- _ — �.-- — _ �-- --- _ J — _ _ `" _. _ � � - =— _— � � = �= -- — — �= � � � � _ _ � =_
LO:PES'�-T.:��P:� — .— _ .�.— _ --- _
. . . -_�--- �J / %.-.' / �._ ��',,.�.�-; "r� -"'" -- � � � J -"J" � � , _,,. :� '"' '"i ''- ..,-.•.-"'"!, ' _ — � — ! � ` ' — — — — —' - `_ - _._ ._. � _ � � . '`� �--- -"' ...� J I. �
B�'' "' l„� f �„'.-.! % r" ,,,.� f,. � — �-- � — _ ,�,. --r _.,_. ._._� ,�-� �y-'"" � ��-^ �'-- � ...,-r � --� ---..�_` � � -�._,.�-�_ _._.,_� --_,_, � ^. . ...�.�1 � �- �.-� 'l,. -
� . ' .r'' ��'`_ s- '' 1,.. ..-' ' � '~ '� .'�" 1 �./ � �- ..'^" -r .,�' l �--= �Y- '"',`X'� .<_`. -^' f .._ ._.__ _ _ -_-_ --_. � `� — _" _. � `"'" _.. _._. �- _. �_ ___. _,_ _ �fy a^'r � �. '�` ---.. � �
/ '�,,f- �'"_,. f�_ °"'-'"-/ I / �''"�'}, i '"� r' �,,,_= `~- � r- `- "' -"'" ..�-.de`- =-'"�'�."' _ J '` •"" ,,,• "'
_,... I .�' r'i. � .�,,,,',. _ „_._ � � � � — r .�-� � _.--
� � �� J, = ^"� / �' :r r,,. . � -„i ,.-- �,,,, . ��.- . _.-- '� ..-i-s.-'- i ..-- � -._._ .._ _ _ ..� — `� � _ ._- �. �. � � _ � ! � / _ ^�T ,� .^^- ' f �
�•--
/ .' '�I -'� .,,,� .� `� / I '� a- •--- � .---� _". �-- ' . _
E �` � :• , ,;.--� = — _ -- .� -- ,r-f -' -' — `"-...= �, —1 _ `�" — P.t� —O_P��S E Q= �T�[ I�i �G- WAI� S T�'P—. �— -- — -- --- � = _ --- _ _ _ __ -- _ _ � ., _.-` --'`� .- _ _ . _.
` ' j � / � / f � f f' ' I' �, J� *�' � l � .�" MI ��„'"� ..-- _ i'�:" �- —�-- ,�...----_--y-^ � .._,w. �� _ � � ..r-_.--._.... -"'---' _"'— -----`_. -r: ,y l �/ M,,., . ', ."'-...�'
r '.-�,^ "� '�.--�"_ ..-- --_ ' .�..._. �. -�_ � __._ .^�,�V :: f I /' .�
� , r / r^ ..^' .�- �' r �- "' "'�. __ .� .^-- _..- ---- '— — _' -..._ _--- ^..-� �� ~
� � / y...Jl f � � J j / f ' � � J � './' r •-- .'^ r � ..--- _, . �- "'"X^^� -^-� .�"' � . ....._ � _ ._ ..-- r i/ ''�^' � ' J�"
/ J �., � /. / / i �"^� �-, ,✓. /�, �% / �I � � ,�� � ,�.r � �.- �' "_ +�,.. �' � �. ..— _.._ �.' � _- � ../ i
�% i-- �i �'� JJf �' '�''�.- � ,.--- "".-...-- �r � ''/ i- r _-�'"r"i � r `- _ "' ""..r^_ - '��.-�c."�LtEa� f'.°'i � _. � '�„ `,'"'- - � � .-- J J _ � � � f � � �..,• � � 1��.
� '"' ,.-^� ... / . '/ � '' ✓ y�'' '° / .�,,,. -�' i / ./ . h ,,,.- .. "-„ �-- „r.-- ...-� �„ ��,,, .�-�S"""- r , . -- -� --�... ._ � - - . `J, _.._ , �. � � ^ .... .�.,� _. -�' _..-
�..- �� / /'� - /' ,: / ,.: ' . i- i' • /� .✓"" _.-� �,..( ~ -�' r �.- `r .Y- ` ,.-..-- — --�- � --, _ � ...- � � `� .... .:-."-* �r�__ ".f.�.�_.,-
'`^ '` ,,,"" �'r �` / f ''! :/ %,- - ..�- A.-�'. / I _ �f.2 i�.:^,,, f ..i' .�' � ..-" � ..---' "' _.�- . _.-- _.-- _ .� '^^---• ."" - . - ---' _"' � --..�..._. _,__, r.., �.--- � /,--,,,� A Y,..
a.l � --' ~ _ '.� �- ✓„�.- � 1 � � / �./ J j� ^,,,,., ,,, „�" l..• ,r f ,.� � / ,r ...,' -„ ' ! .'"` '�` --"' -" i .�-- ^-"�`�- � ;�iX _ __. _� M '`- •,� M ____�_ -._...- --^,^' `---"` -.i.-� - �3 i�. �" � � � �" / ! �
'�,, ._.-- i y f .�' �' ,�,,, r .-- f / �' -r"' .� I,. I"„ -'' .r' --"' ..,-� '� � _,�... -" �- -""i f' ..-�-'" I � " ^-� _.-- .�--� --r-!"".�. ,„,�,. � �._ - ..� --" ..t .,.� ./ -�"'
,� � / �..^ ..�' / f �, / / / '`!r"� .-" ..-� 'r- I �. y I ` --", _, .-! .�,�. -�' v ° �t,t,..a -� '�:. �. _ _ -7� ,�� � ,..� 11'.�� T � � ._..- -- -'^' � �� -, � ' � i _. .�. -- '_'� "'�.� '^ .i'
�-�-z, .....�-" r i. ''" .�',r. � '! ! ." !_ ..�'� -" ,,,... !.• .,.'" ., ,,.. !,.� � -'' ���" ,� -'^ �,�. 'Y' » °-- _.---�-.' � ...- :..nt^.�`��9P�'=' �..�-= - - - L.. ��`Fi'-� , - - -' ' ~�. } - � � ,.�µ�i_:,_ �^ .�_ _. .�- .�- -;,, .•-- ., ' ,�•
-- 4.t� ,�- .-„ ,r / / r .r' .-- �,,. ✓' /�- � ..-- ..k- """ -� •..'" ...-- ..� -- � _..- ; -.._ n �r � _.,_ ' ' _.. � _ ~ f
/' ..-- s *� � �. ^_ , � �� s� � .-- ` - ,,,
` ^�. - f „" � ,�.^ /' ! -�/ / � j,' �"'"S � �.- ,. -" �� �'' / / s" hv�"✓ f � •�" r -„' —„r�� ...--� ��-„" ��...�-- -_" 'Err . '"s-,- ---' � r .��"�'` �._ $� _ -x.-�- ^�' '� y` E(1ss?'L:SF�'c = ..��i3?�"s"_ '�"' `_ .J-..i.-' l � . .�
� � I �..-' `� ' �, J�, "" ••"5 � / / /•�J-�?�'R,,.r'8� � .,�- _-F' tx �' . � � �..- ^"" � ",� ""'" TR._�:-LrEt ..-.-_ pi� ^°' �" �..- .'''
-..' / " ' / , � f � ✓ �,,,/ � J.-- !,� -'t` �,.- 1' / i,�&�=�t�3E s�30 s --""- �- -'" , , . �.,� ..i""_,� "` . _ �„ ^,� ay .z' z"�e' �;.x.-j�� . �� s, L , .
� "f '� '�J ''` f'e'l� '''rf�/ I -'" `� �' -� „'r '"� ''� � '/ �' �'" „°° -�"� ""r r "� r '"" � -^ '� "'_ f �w�`_�s�". � ��� `_" _3 1.-T- � ""' _-__ ,-.,. — ��".. �, .r^ '.-
` / `r- '",' .'' ' ,:' �/ ,/`�. "r / .r' �, y, m .�'S�a I r'" /,-. ..^'' s .�-^�-^ 3"�"� . � `.�, � .""..-^.//,/ _ � .�s�s t� - ! ^-"' '��.,5" +�a'a._.{ -,� � TyyT��` � --- '- � ,� -�_,_.�`-- � ✓ � •I
`_ --- � ..f -' .,-' ' ,.- .r .--- ^..- �_.a.�'� , • ..-- �' ,...�,�. -- � "'. � '_ . -�- .�,, 3I � �' T -s;�- _- -� �- `! "�
--_•. s-?��J Jf �~ `,r- ..' s^ / _ .r ���- Jl ..'r^.' � .'' o ,.- ;i' �-� k _ -a sa: � e !
.._._ try _..-- --' r f / ' ' --" 1 � � � ✓',�- � -' f ..-� �r' ..� "r ���; x �''"✓ .,� "�� �� � ~ -� � j '.� � ~ " ..-��� -�r-�- �' . ��'' ."` ^ -� j�j � _ �� �-- - -- '."' — .— J . J ,-."" r�
� ! �" /". .r' s � � � ..- � � � �.. ..,,,,,_,,, 7,..� --� ' � M � �
.-- ..,-- -'' � � ,. �'�` � , �' � .- •- ,,•� ,/ . '"� ...-°_'� '`'' �` �'•. �" r- �. '�^- �...-,-- _ ~ . _.i� ' ".� _, - �--' _" '` �-r-
. .-�_""'` � ' ..-� � �''��,,. i' ..�'� �'1 � / `."8"-,.' i' � � i � � � `.' ''- "..- . 'r � 1 "'r . -�'— '°' - -� _ -.' —� ;✓�. �== �-'` ' .�,.� � -,'=-'1�� �' �-' !.✓ i
F� '' / ,,•- ,,r ,i` ,,r' 'a' a+� . .r � _,_,,, jp6' ' f -„' : �.. -�- $.,... ^�-.. � �r i" -�'
_ '..-� �' `J! � _ � / J � ' �. �- r'' f-r„ ' � .... �,,, J,% . %',.^- � �-`" � y. "~�. �u � f �-' '�-- „� '.,-^ '$" - �' � �tr.��^.m3� --.._ 7"' -�. �"'._...._ �� J_ �* _ , '� _. '..- _ _ - °'s -�'�-" ��.. '"i.. ''
✓ Jf•� �~ / ��' .r ,/ �.E4,''�5'' / �' / � `�G �� -"'" + , ' ' '�J! �� —P�RQ-PCC��� ` -E'�S�-D�.tV�--���.,.-- � _ -j_� "'=•,� _ � �wo �� - _ ° �-�,.� ,�. � � _.•-� "', J r
.�
/ � _-�•^ / /� £?ii!E! a""`. f' 3a{�'"�"r/ � � /`" ��` � � / �- --�./ � /�a° _ ...-„ $ ���� J, r ..-;` -i "7 ....._ _..�_"'.. 1 '3� '� ~ + ~`�'�°' _..\..... °. o � A,.� � r- 'f � ��"�� :
.' � .-' ,r•� i � ��..� j -:./' . j ,�--�� .r- .�s-1`_. .-�'„ia i..�.�- „�_ - . t -..,_ ` -�-�... ...,_ ., `.- ._--�--'� .
,.�- �. _- f ^/ ,,�� � / ,.` .. � i� g� �,. `„ `r- 1"'_ N,, '4 j7 .�,r-n'�� il J -.... �,,.� , � .-�i �.•. -'~` L. , j � .es"'"�� .-^ _� �..- � -^- � �,� ' t ;� "�-...._ � ( �� � '� � �l � � .--�, .� ° r L,
r .r / / .r f,,. m'' S�' v y�r,.J.-T�l,• � N '-r'_.,. i ��.� ` �- -,._ � f \ _ ...r _.-. ,
..,, S,i� ��/ f �/ / �'1. �ta .�, J'eay°r�.%' � .�" .' 3 � � .i /� / y^ 1-' � .�,•. . � ..�- '' � -^'� «G- � .,,.� t "'c"",,....��� _ _ t� ``�_ �'�-_. ��-..�. �- ._ �-' "'�-..�- '" ` % _ ' f, �
; ;�' ���' .r'" �•- / -� _.�-- �-=��-
/ i r^ /�/�'r ''r i / �' ,� '^�� / / �'���"`" --'r'" � ir r�/' � �'`:�c � "' '�"�^' �" � "�'T.r �4s s �� '-' ^�'_� '"'� ��� �� _ � � � j �s. t ,,,--'f
"l ",.���' �' - '� �" --',IR � ✓O,; .. ./ S � ,/: r i_ r' -'�"�' �3Y33._?-„"- � r ��^^-- `= --' '. � � n r'"
f -r' � '�!�/ / '� `�'`' � / r�� '"' z`i K ,,,.- . '"' �`�',r ,''' '`� � a�'".�;:w��..��-"-s�' �� "�' -_ ,_ '�-..""= -1- '�"'c-_,��..-'"-�� rs r. '�^� �� =.- � . - Y,,/. :, .
� .r I ^SE � i / �,,."�i`,�^f �,,.• � / I _" / ..... � . � �--r,.7��"�.r..-^ �..-'x,'� �����'�j""'4'_._._'. . %- " y .
� �
�
/ ..� � �� �. � �, J-- — � ' ' ,�..,� ' —'C.w — .�.e�'�^.-.-- �. ,.,/�....
�� �''� '' / / � l /� �',�` ,� ,J a ,f ' � "•- f',''�1 ,�' ��? ''� /, r` �' *-- ''� r'��'` �- '✓'''_"" -' ° i - -"" `.� ` -- _` -" = '"� '�''���— ^ 7 �.-� e L /. ..-� �\ -, . �
�•�" ` � / ,/ %" r� I �"� '' r1. � /, ..r � � . �i�aL..�r ,}r�'�y ��r,!'�� � � ,�-Y' .,,� ,'''- -- I ,,,�..� ..-- .�.V ...... � -- . riax''-�~'"'-�+-' :.. . _. �$ = rx1� ,. � � _
""' � ,/ .r / ''r /� / 1. �/ '° / -�'`� P .:���� .^'�� tI .,"/� _,�. .-�.' _ �,,.'"'- `.°r-.-� _"..._._ _,.._-• /-� � • ; -."��
:�,,P �; �. r, �'' /'Ji -. . o' ,sai / / i'�r- i •'�^�� �''.,-- 'i ° �,�,�,.3 r / ,r 'J' ?�J .� - I i'' t�� '' / �•- �,_ - --- .. .. ,/- � _. . .-� .C� -.� __ � ' . _._ ....._�---"""" �'<i.\ �._.. /�
' ✓' "'' � „'� /� ''`� / .-'' .r -'' � ..-'-'� / f � �/" $-q� ,.- r 1,., fr �-- ,.-1� -' ^„� -'' ,.` � - i i �.. -------- � � f' .._._ - ,
' �O ^t � /i . '!: /'' .,//%� ll � f / / r" ;i .� ' �,,.. ! ^,,• � S =ii' �--' l,,. . .-•-� �,,,,,.._- � .i' � � � � . �------�'_` � . -
.> ,,,}. � .. : . .,1) �_.-.,.
�
ys : r'
� 'p " 7w : f � '/ `� .�f '� '/r '�\� ! '"� /� , s ,...' � / � �:,F�; e �di3��� � � -`'� � ":`�� ,,.-- ./ �"� � . -' S �'"'�'�
' j!�� r .. .✓`�/,/�/ % � � � / " ` 1 ` -" � ,/ "� --' r,r / r ' / 1 / '� -'° .'' �? .--" �...__..�..__.- `% � L
,�,�%) / � '�/ /�' � •/ ;y,_-�;�t/ \ � � ,�„ f ,.�• � r- ,� . ,/ l,,, �/• �„^ -"` ,,, f ..,,,,. -'"l,,, •'� � �+�... \. .� ... . . . .... . .. . .. . U : .. ..
/ . / e 'r . / � / �/ �" �. �,.-�' `.� r . '.- .. ,,,.-. � , . ' �. °� `� ..
/ � � � / f J ,r / � r-� l ,-- ..-- "' 4 .r 1 ,� `" �,. ".
_ t" � ��, ,r � - � ,-r ir4,� er� � � �- ,,- -�- � i4 � ..r� �- � ,y �,''" ,,- r '�.r'_ r . � � ..-�;,� _ .� . - � � �� .
ri r�
r� '� f / f % /' �� � ,/� „_i`/ .- !� �`` ^� � s '„r! . �'" � ---' . �, /` y„ -'' �,,, ,•-' ,,, -' •�,.ql�, • , _
r � r r ,r t w�-% ! � � - -- � ,,,- -�' _,,, / / t ''" �_ �
0_� .. .... -
A'
J � � �,c��.'� � r .f � r / , � rr, � �� /� ', J �,�' ,,,, � � ,.� � �, � .. ' r '' /` ! / .`` ,� . . - . . . . . _ --�._
' ¢y- , /�, � _. '/ + �' J'' /, f !/'- '�' r " r �,,, � ' .,.'"�� f. � / rr �'�/ t �� _._--`- .
,.'t' ,/ � % ' ,/ r y?� / �� �/' ./ i / '"� J �" -r' ,,.�.-. ,,.� �r / / � � ,q� �`�--
/� ��J 1 l' ii �� r', � / .✓ / �„ �,; ! � �,... �` � �.�,,.... � / .,�" � �'' f j �� "`" /i
� , r � , - s�sfl�• ".i . r � �� ..- % � �', ' �'`�
/ i ` ,� �'"� �j ,j l �' s� ��fj �- / � -'" r, , r '� �' 1- . � e ,.--, .� � r �; �� �
,- �
- ,,.- � Y� ,,- / / /��,,-,-. _� r / .�" ` —' `..- -r "`- -' ,• /�. '� f . 2`
-'" /��/ f. �/ �/'; / i'/ r/�� ��;:�.--� ''��J �-^ " ..-� '` ,� r� �i`� f �s'�e�''��.4�"�'.� �
'~ y, � --'` i{ � �/', �� , `�' j / .� ��"'" „r '' „_- _ �" �, ..- -' ! r.,. � r'i- r, �I"�' /
-`'� ''/-r 1�,�' / f' � '/ r" f / / i!.l'�; 1'" f -'' — r..- ? ,,.''/ f �' /
`' � i'' �..:.. ,� � � ,, ../ ,f' .i^ ,.- „^ ''"" -- - _,_ ...-- ° . � r -�'� � � �pl � f -
s .- • r ! > % i ,;' ,r�: ..-- � --- �, f-. !.f ��
� '� / r j '` �: ,'� ' . ' ��/ /� / ! ,: � ./ �.-- .- � -, : .. � �,. � �
i `7, % % l �� ' � ' ,,'�• l,, �,. ....- ..-Y f �-_ _ :�.=u � f- %,r f � �� .,,,, %�
, ° � r � ' ( � / / '� i 'f i} / ...- -- -- `` ''.�.r �' '�'� /
�' ' f ; / / ,r ,� ' j � � '� /,,,' 1 r �-
� . ' .l tl /, 1 " � i % � /� r `` J __ �. .. � f � j '�... . � . �
� ✓/' J i J^./( ' 'I ,/ ! � � .r��_� s r "_- — -y' / ,�/ . � . � _ . ' '
� , �� , � r _ ,,- . r j
1.� 1 , �r;�: ; ff f � f / / f, � .l! "_! � '_ / „ �e' �
� �l '�t ! `/ i ,, � I /� ,: � / / F'�,� .� .__._-._ - / .: .f, ' , � . .
� f 70th.�`.ST '" r � � / / '_" - f ,,,/�. ��.- �v� / . .
�'� ��� w� � ��,-Y/: �` f , f °/jf , ' ;' f �' � ^ '.._ /1,.� -`` � , ;,.r�n'
. ., _ � =, , �
. LOCATIONS �F SLOPE SiABILiTY CR��S SECTi�NS
JOB NO. 03-056
� \ \ �
�_ _,__� ._--�'
.l------=-
'�
�
1 " = 40'
FiC. A-'f
KOECHLEIN CONSULTING ENGINEERS, INC
_ � Consulting Geatechnical Engineer
� _ �. �_. . __
. 1 -__._.._=- -- _. �=.=--� _ -- _, - m..� =�-�; _
_.J._- ,,_�__---_-- -- �_ ---- _- � ______
__ -�-_ -_ - --- - __._. �. ,�- -- __ _ -- - � __ - -- - - - - -
--� =-%,� - --� - =- - - _ - = _ = _ _ � � � _ - "� . � ` _ _ �- - � _-" __ -- °. ' - � = � =
� - � � � - J,,. _ -: = - - - - _ _ -- _ _ __ _ -- � - _ -- --- �- _�. - -- -- _ _ _ _ _ -
� -- �.. _,� � - =.�-- _. `~ --- --- — — — --- — — — -- — -.` �_._ -- "`- - — -- — - _ — � _ _ ` _-- —
! ' -- .
�- °.� ---~_. � - �-..- - .1 � �. - ,-- -- -- � _ --." ..._`--�. --____ _ � � "`"` "_ -- _ _ Y. _ .. — — — � — _ _ _ — _ - — — � �
_ � :..- ,� � _.-- - -- — .� -- '- — — — _.._ — — _. — ,_ _ - —
� ...;-F , = r r-- �-" ...-- _.--� '"'._ .,�- '"�. �. -..'" — — — . __._ . -_ � � � � r � _ .._ — -_"' _._. ' � ,-- --- ' _,_. � v.
v:.��- f� �-- '� ~ ° � � �` �.. -" �..,.�-- � � — � �
} ,.�- '� � -' ` � .r _ � r-. _„ �. � '� � �..-, .,._ _� _.. .� _ ` � _ _ _.. _ _ � � — _.._ _ �_ _ __. �-- _ � _ � �
� PROPOSED BU(LDlNG E ` � ��:(- �� =°f _-�===.= -�-__�_� _�=-"=._..._T _=�_�._ � �=�---=�=~--�����-���- `- - - - _--- _�
-' - ° -- .- _ _ . =.._- -_ -- _ _ �-
I� V E:L Q=P E-� �'P -__ -- _--- -- f-
�� , : _ - . _ --- �- _ _ _ -�-
. �+'r�. .�" .� —,/ � fi i.i.t '�.. `_ I �.� _ a-- �� �� �..r'��-^ � � �� ' �-- — �� �. ..�,. �� �- `� .� _� __ � .....� �� `..+ -'� ..-...^ �^ .
f Y,.i ..�� '�` �.... I- ~� f•� �- "`. ^-- . �- '� _r
-^'^' ,.-, r � � 'r� y...- �% I j. ..-' r. � ," � _ r-- �.` ` __,__ j s.'."'� .`� Y-^,_,,,,. . ✓ _. � , � _.�. � - �. _ . ,�.. _� ,_, `"� " r _
. / ""!- -�' .- -i' � / ' ,,,.- / J.r' .�--•:- ..-- J �"" ,� �. �- . : _�.,^�. N�„ .�---^"� ,,,;,_..-i � --- � � _.._. -_.. --� -� � — _ _ — _ '^' ". — ' ..-V_— - ._— =: ^ j'v — -"" f "�.r_ ....^ _-.
. � s` "�y,,. ..�- � � ' � � � -'".. ,r ,� ✓` i l ^ -"'" .r-" =- ��'"'"" . y `.-.� r ...-^ ""'•,�..,.�— � _ .r..., � �'�� ^-_....._ -�..� � - r " J � Y ._.._ _ — _...., .� ' �.- '� � — � „'". r^"..
. � '//'.,- '�-' f„-^^ '� "� / ,�•- � � � "' ..��" ..-- " --� "' r� � � .`-- ,�-- ..-+^'- _ _ � � l J r
' . .+ i.I`' ''r-�, r' '"rf- ` r = / � "'�.r' f �,,..r �/� "' � ..--��,,,- � --.^ "� �''•.�- ._,...-e.� '.._.�.�-.�acF'Ip J �� i'^� i` .� --... -� -.._ -..... ' � '._. _ ._ ' `< < �� ._. — ..- _.. ` r . / ./`�r I � .i
� � . � r'' !�'`' I' `.r.l;" l Y '� � � _"''i'' � / '' � � �� '.- "� � ��V���V � L/� � i� .4T"�� � ,�i"V ` � � ����� -'1 � . � .._ ._._. _, � ' ..-- --�-� -�' "' ° "' _-- ,._. � _ _ ^ ----� l ✓ ' �� / � �... '` _
' � .�` �,. ,•- s r •/'- ,,.1 .I ��"„ � .."'_ ,..- ...r'-^' r : '.-.. '..-, f __ , " ^� --^'" J;,.� "' J~ �^'
l„' % �r �•� r,..., i � �,,,,r-`• „r J.� �. .i,•.., ,f � - .i- r .-r' r,�.. + �--v_.✓ _„ f -�' � � +•--� _. ,_.,,�. �--�� _,.,.�_ .�-�""_ y — � ..._ � �.___ _..-.�.. --- . .- _._,,,,�__ ....__ yj;..;�,.: �,. ..^ `,. -.-.'" .r^
� ,.-- '�r / _ / .= �- , . _ ,.- ; ,. o ;,�:: � -� --" ,,,�, r � � _ .:�*"._.-. �- � -- � ._... _____ —..... � _ � � � � _ _ � ..�- �. � � e r...
�✓ / ..-- ya - ✓ I _ -t- .,:m---^"'� f. -T. --.... ,_.... ._ _._ -_.'" ...-.- 'v" r' ,.w" ,.-/
. .-� �' ' -'' ! 1 '�� ° / ./ � J r � r-.. � .,--^ � "�.S 1��, •r'",,,,. � � � � ..--- � . -" 1 f � _✓:Vi±t*'..:��� � -_._ � `"� _ A _ � � __ .�- "_ '_ -- �,- .�. "�/ .' r ..
i -.'' r' ,.' - ,. y ,- �. ,.-,_ ..-� i � ,.-� - ..' ,.- � �,�- f �"~ y �� � ...�-.^'. � ''x�..-ERS�'�� � : 4?. _,.. _. �_.... ` � — — !�. - �-"� "' _ r " — — -- � .l- . ,.�- r,..'' = . �- �.
�+ / / J " ' __.- -^" ,...- --- ..,. -�._
� � E �— � � �� ,✓ M,l // ,/,f /, �,�.r / / "'�� � f ''r' % �`/�^���� "� ..+� / / ~ �Y ~s�^ r �~l r• ^�.,_ �t..��.• __._^+,: � 1 »_.�: r- ��._ ^�_�_ `_ _ __ ` l...�-,^"' �.. i'`r'="..f.`P-.1�,"J,l
r.1 � � �,..- „✓ .� � '�� � �/ . . ".r. /' , � . r'- ✓ "� "i , .� �. �e ./ "� f �" ...,-�" r'" .r- '~ � � � L�!'C �Q�Rtt��C- P�ER��1=�► N L�tT - AK T -- w `� � � / ..�'
.�,. {f.-- .-- �.- ✓ •-'^' •�^� .f .% f /� / ,�+' ..^ .- .w,., ,i � ` .rr .-, • `' "� '. `�' / ~-."'".�- s �-- 'l'. ...r '' �� '` .^--'^" �' J.- ' , ---. -�� ti�k� A.LJ ���...� �-O � --- _ � _..._ � ` _,,, .�-- � � ..d' f � �,,. •-j •'
`^.. i _ _._.- -- "�.,-"�-"..r ' y'�' -''� �, �-/��- ` '/ `•�`i '�"J,✓'� ..-` ~ ! ° -'` ''^O .,-�� r-" i r �../` -'" �~ -"- "' --' .,.-„ .•� .- `�-�-" — �-�_�.'Ya� -="� _._. ' ^." 'se av -�.'� � '_. � � � '. r -� . � . — -^' ..-� �M �„ �- _� _ l„ ,.,.
,- f - �.i °.. -,' �. .r r.! '� / j � .�' J,,. -" � `. ! / .� � _,,,- "' s "" `-- zaw-�= �u..-.=-'r- — �.. -� � �:'_ �� �'a� � ! -.-- �= r �-`
' ic ; � ✓ �, .�" f `% .% / f i" r` ,.- -'`� � .,.-^ � � ,r- / �r Z ' � � ...- ' �.. �- . J _,. ° �_...- ��..-. -- W ' °� ,-,... ` `s -- -- '"_ ffi --. � � < < � ...-" q ,✓' - ✓
�. "' r� � �'' ..^ � / ./ ✓ "�" !' ,.r' � = .-' -�,- '"` '� ,.. -� J �'^''=t""-'` .i- '� "'� ° -- , � ..-- ��„ �-- '" '� � � ,.-,� ._._a -^• ,�� . — �u � ^ � ��El,:h=c = �t�."`�'_ � {�.. '"'_ '- .,i«' . - '- ,, , _
r � � � � =�-- � �S.z"CSr _
_• J._- -" s' f '^'' / °� / !'' / • r" �.I � �Y y„ ' J.r' � � / J,� � ��tt�' �y"�=T'�.� r- "'.�- "' �.. � .. J� Tu / .�.-,. s� � as„ 3 i �.p � - `" --�._ — ca :a � .�L ...- �'`- --"- -- ..... 4 � ,�"vs � � � --' t '� � "'�
�- _
� _ _
�- -""
�.. ' y _ J... \
N ..-- �,, ,�,. .- ,r ,r' - �.- ` � _,. .�- �, � -r �- f ;� � � � �- „�.--s-"s�� r- ' � : \ � , ..-- �� --' ..�
- �- � ���-- � _
r,, ,.�� .i" �-�,,, .l^,/' .. � � f ..r .,-� _,,•• •�'' �-' ..r r„� . .r / �.--7 e` " � _ - — — f r,l, — — �..r .�,, ::._...�..,-. _,,, ..�
- �,. I �'' /"- /,,. �I �/ ,, '' .-� .� ` �''' '" ns Ii+r ...- ,,,,. ''�,.� "' � �� / - �-�y � ; �"^--- "'��� __ --�d = — � -��-- .,.'" "'r /'
i .r'� ,r-�/ "� ,/ I y/ ,� r`: � ` t` � — �^— � ..--' „r `�! i
'---� Y t'�" ✓ .�' �^'� y�/ / .,r � � / J/ /�- /,..r.: . " j. -' f _. ..-. . ��- �"" 7� --. /
- f .� / !,� ° '�✓-' �'''�,,r ' f � ••' i '�„•°''�. -'� ,,.- 7h . �'� Y �l � , � r t � ,r' � � � ,._- — — jf� _ � A � �� ,., /_/,.,, r
--- � � "`'� / ''� % ./� "'r '�� ,..I'� I '`` l "/ l' . _ . ^ ; 3� . .-v'°'� --� �. - _ _. _.. �-- f
� �✓ fr' "'� '"r / ".^ i.�' ,� , /"`rr ''� "`� , . ��°4"'`�' _- '� � ' "� -,-''I
� i r" ,,� ` l -, .! ./� . . �-�-•-.. I.
f
f . / . / • . � ".-,_�.
•+ --•. ✓' �' r .�
.
' � � � , /1,. � / s'�/ /J, / ,,.- ��'""r/ �^'� � ( �. i - - -- '�-:.a .._ ____�,^`,,--- i �, -•T� •�' �
� ���.'L�..t '�/ / i'" / - /�,%/ / �� .� „�.. � <. � s,,.,: � � .� ,,,� ;� � ' �°� a= � . F � �w� _.._ .._ �... — � _.__ -- r-" ^,,.- s ,'`�.- "r
� � _
'"' � ""' "^ / / �'s' � �`�p��'-05_°� �/ / r � ,� �� Y B�. '���':,...__--'�--m.,� �-,.-._a^--.-Y---�`'-°- �' �.._ �� . ��� � !_ � ..-^ ,.
-"� r i" : `'�� `�=sf1 �i?�4 E �5c'v�3''�'/ - ,,.�. r •..!`,,, �,,-� - y` _ � is..� ._af ; � ..,_�--� �"'�'',� . ..� ^ '._. ._ � .r-- :.� '',.,r��'
i- / r: .-" .-J , . . � ..-" � —� ""� . 3 ° --..
. r ..�• ,,• .! � r s. , i� p _ `. ,'.^_ � f ^�-,.�„�f f-- ^ i.. . J ,..-� J
�' J`. -^r, !'i /� ,!` .� ,� '� � -'h * `J �,,.., _ ' ^� _'_,_ _"' " " ,
+" � `/ .+� � ' � r'r " /�� .. ' : . a,.{ "'� f mi \.� ir � ""� � �� � — �1 _ "�,.� =.� = _ - - / ,� V`
� � � .. � . ' ' �' �� � . � T 7 �.. �' ...
y f '
�.,� � �,,, �/ / �� � .�`r�.0 -� ' �,e' I _ i' _ �,,,. --" �.,,. ''� L f _"_'''°,-,�.,,,,,��-�,_„n_:-�.-. � �' — M � \ � � ____ .�_�! ,_- `� �
,_ ,, j -r. ' _ f,. ,._ , „ � '-= - .r-
f `� ✓ � / .� ,j J.. �4 ^�.� . . ', "°r Ii•'%�'�,.} � / - . _ �,,,, f � �....- � .�,,, ---,.,.r'" --_f -� .'�_,..-�'-..,�; �i -.v _e_.__ _�_ _ ' ... �.�y-. _,_, � � _,,. { . � j
_-^'� ..-` l. � ,/ �a- /` �' ,�'r i � : ,. � _ ,,�- .�.....,.w ,�...� - --� f ' . �... � r.-.. ~ _ _.. � . ,.. �
..-.^ r `/. � r, .�J� / . ` l..'I_ *.�' f�� � �,`, x�� c�"-. `, �.��'c...,�_ ^--
/ ,.-^ � / r'.�'�/ / ,� �, / ..l,... � l f, _ " -"'''„i � �. ✓ � �,. �,,, `a . s;�. R � � M. �y "^--..' ��_.�--�-�...""��- _� J,?•.�`'�"' ,"''`"y___� � , 1_., "'_--�._ ..� _.. r-' ' / =�,.,.� , `
/`° •%..,,.1' ✓ ✓ �! , �'`� / .,- ��. r" �..� saM1 ��.r^ ".^ . ._-- ._-- — — - � � '_" `'-- �°s� - ! V='� — ;r�.,"'-- _...__, f`.
��[ /y"1` ' /r � ,.^' ` r'i. "r . f � � "t' ,.33 s; -/ l� ". ' ' 'i `� .�- `� � `-- -._. � — -° �._ �j.Ts-�.i.... � i �'`� ; ��- .�.-�'� f , . E J .�'� .
- i 'a" � �'� �/' f � J' � � � �r r"' %: _'"� C� _ '8,9�SA;'i ` ', it� � ..i:�� � � �`""" � ` .�'" � ^- .r � _" . - -'�� --�\� � J o ,`_ . i � -" t! ..
e° / ✓ t 'r' �t°�T r ' . _ig - ' y_�
�1�j .l ,.� `� �' � / / / �.1 �,,�"'�,�. "� � �" �,. ,,,- "Y .�"" � ,r' r " , . '�" - t�.. � ..._ .-^'.,�„�.— .�.--" w...w ---- � �� �- - ". - � ' : ,fs r,�,.,�--�-r `�
- �� r' f f �/ / ✓ � „'?�r ,,� / / �r'"' r�-� ^'v �,.-� "' � ..i' �'y? Y,�'� /,J. '/'^ . � '' � "r' ,,,� '� � N''� '.?' � � � ° ".e„�_ _.._ ..J.- -/- . , - . .. . !'.. ., -� � . i �_ �-".,--... �J � - f
l�
' ' "� ,r' -i �y;' .�'r �l ` f! r./' ..-� ' s �. ''" �;--'"' �-' r' �, -''tf� -`'?e�xc "f ..,�- °T�- i.y'"" ..---'' -- r ... - ty , � � � -
.- / r. f � ,// �l �,, / I .i ) ,,..-- �- J,,,. . t /� ,,,, �-�J sJ,. '^' = r "'- _ -'" .,'"/ ..-� '" � ' �.- �'i' �: " �- _,, .._. 0
„ �{�w �rr �e . .+� ��, /� . / '� "'f ..,-� %'~ ^.- ° .�-' ./ ,,,,.. , ... y,,.,--' '� . ' ._-.------
J �, ^t-' � • sC-0�' / ^ f „"' r . �...�^� ..-.-.
,,
�,,. _ s t�
f �� r� /r �,d7` ii' � �. � �^' I" y; .i" "''A,,, ..--� � ,J,.� � �,r �l,,r f ��'� /' J,. N'` / r � ./' ,"� � _ „' ,.� � - .. rO, ' _,.---- `l._..�__._---�_ . S?'% � .�� . . ,. .. .. '.Z
i'
-_ �...- � ,t�� /� • _ ' ,,.,.-� .,..-� �^. �/ -'� ` .�-' . ' , ..
_
; � r � . r J .. � J � � . .. . .
, � % � .r' ��^� / l � n, ..--�` J r ; . ' � ,;�.-^': ~ � . � '
� � . .f j i/ � . .% �,' f �,.s �,,. • ,.� t ,,� �� ,. � J/ .,•� � •"' �
� ^� `�// � = J ?-'...�� '�- -" � .�•--" �, Z� -� ✓ �- � f J,.,� �,, i ..r �� �./ r
-�� ''' ' f / / /� i , � . �r � /' .s� r � ..- .. „s f `� i f 'j -�-� •
. 'rr �// 1 /- /. / 3'�� ��, � ; f1 1 % �- j\.. 'r, .^.-, _..-� �"" f. r `� ,1.,, �'` � �'" J,,-' �, � r,,. � l l,, '� �� . - / `�. .�.t . .. . .
- ~ ,i' •; u� /' �. � " �! � /,� � / ,/� ` i ^� i" `'' r /� -- r �- '` � / ..` / � r' �, ''J '' - '� �^4 �'~ ..,: - � - . . �__,--'- � -`~
� ' ` ��"�/ ./ /it� f+ �. / /Y'� � ,� /l !~(,� f, �"' `�-' ~ J -''" --. . '"- / / _ / � �' � c �'°' .. . .
� � / % � ✓ / r / . � " �„- '' .s-''� -/ �.' % r'` �%j � F \ Ii� . � . ` .
. . ''� / °%°/ �� .� /� � / !r� r/ ,,,,, f,r. "' � r-- ` �. .,,�..-^. � I /' / I � /��'�_ . J, ✓ , .
% /�f / c-� s�€_.+.4-�,E ,,.. ,,. . ' - r / �.-'` % �� `�-= /��
' � %l / /. / � � r JJ f r' ����' # � sdts" =i "�f � _ �,1 �" . � ", � � � '
F / / � y� �` � �^�' ✓ i-.,� � / � �,. ' , �' � ....- r � .,. '' Jf / � �, r-` .s i('�
� ��'' � ,, �-. � .i r ,.-- .. � -- �,� r` ` `�
�',�.,' f �. �✓ ,. ;,�,.%, i�, ,r i �r"y,�.;,�,.,,.� ....--' _,,_ _- �, ...- f .� � - _,..
� � f /. ,- .,- . �..-- �.-. ._ _-- �- .-,�` �'" � �,
� �� /.,i 1,�� l� ,.� � j �� f./� ,i' / � /i � i � '",- f. �. _ � Y � f- "" ""r � �,. f, ,� rt , ` �' �.
� �
`'` ...�``,� � � l r' / '' �.,,, -' � / �" I �.
� �i �� �J.. '�%" / -'' / / i",,,'`'� --' � i '✓ ,�. ._- _— --- �/,,� /, fr �S�� -
� .,�` ,/ 'j/ / J�f / -'' l / ..,.� `� f -'' � ,,''� � z r; - . . �'' ''f�-� . �f'�d � /
� � '� f f �f � � e �r 'i•- <� � - ' J �-- f-' �_.- °` �~ -' ` � � �J ��� ��r^ 1'�` � f/
, � / ' /� � f / �� � % '`'� f r 'r f %_ /. _ ^-- "� ,_,_ � J-. ---' _._- / f f, .,jl - t� � / � � .
� � � > , � .� ✓ � ..-- r
�,i / � r ; 1J % � � j � � / r`,i�' � �_ _ .�/ � . j�' -�
i f f _r J / %' \.
` �-�' 1 � '' j fr , j � j�' � �i : �i /,`_'LL ..-- �' � _____ _ �"�'"i• � ,y�,•'� �
��1 `� l L;',��f < < // �' l' f �_ — - � � =' : / � � _
�.y = �.� „� � f ; � %,s C',,�' � J f `�` _ _ � ._.-. — r -r �'; `` i �
. -. �k i , y 7 �ii��-n ?! s. �'" ! � j � f .r � .: /i �? - . �,r r ~�c�� , . . � � -
' Ai'��'Y�:.�� t � l - .i F � . '; -_._.— _._. �,,j `' d �' c1- . / . .
� i i -""�� , , / . , � , , ..,. .. � . . � :� .
APPROX�MATE AREA R�C,�UfRING STABfLIZATlON
� ~. _- .. . . Y; `--, � � -_ -_-- �- _ - .�
..._ . ..' .. � � ..
��
—"__.--� � .
��
�
1"=40'
_ JOB NO. 03-Q56 �
FlG. A-6
83�+7
831��
�
�
N F3?8�?
4�
w
•,,,�
tn
� 8: ;0
I --
��
BuwQ
819�3
0
KOECHLEIN CONSULTWG ENGINEERS, INC.
Consulting Geotechnical Engineers
SLOPE STABILITY ANALYSiS
EXISTING SLOPE
SECTION A' - A
1� rsiost critice�l suriACe�, �iIhIIMT�� BISHC�P Ft��; = 1.�Ci�
3Q �sQ 9Q 12� 16� 1B0 .,10 ':',�0
:�—�YI� (feet)
SLOPE STABlLITY RESULTS
JOB NO. 03-056 FIG. A-2
J33��
8310
�
�
�v 8�84
a�
w
�-
�
' � 825�
I
�
8 2::0
8190
KOECHLEIN CONSULTING ENGINEERS, INC.
Consulting Geotechnical Engineers
SLOPE STABILITY ANALYSIS
PROPOSED SLOPE
SECTION A' - A
1� �lost crit:ic�il surP�aces, D�iINlMtn�f BI�HOF FOS = 1,�8�
0 SQ 8Q f�Q 1ti� 1�Ci 1EtU 210 N4�
" �—A�IS (fe?tj
SLOPE STABILITY RESULTS
JOB NO. 03-056 FIG. A-3
83fi0
83��}
,-�
�
- ai 8?80
a�
w
�
,�
� 8�4�J
I
��
82t>0
- _ 81�0
KOECHLEIN CONSULTING ENGINEERS, INC.
Consulting Geotechnical Engineer�
SLQPE STABILITY ANALYSIS
EXISTING SLOPE
SECTION B' - B
l�? most criticril �ur�rice�, biII1II+�iLl��i BISH�P F�S = 1.3i�-
U 4a BQ 1N� 1Ei� �QO 2�1-G 2BU �20
:�—A.��IS �feet�
SLOPE STABILITY RESULTS
JOB NO. 03-056 FIG. A-4
838�7
832��
,-�
�
v 8�8�?
a�
w
�
i1?
� ����
i
��
�
U HI��J
81 f3U
U
JOB NO. 03-056
KOECHLEIN CONSULTING ENGINEERS, INC
� Consulting Geofechnical Engineer
SLOPE STABILITY ANALYSIS
PROPOSED SLOPE
SECTION B' - B
i� mnst critical �urfaees, MIIaIMUI,� BI�HOP F�S = 1,;392
�a �a 1ti� 160 ��o ti4c� :��C� ��p
�—��I� (feet)
SLOPE STABILITY RESULTS
FIG. A-5
NOTE: TH/S P�RMIT MUST BE POSTED OE11 JOBS/TE AT ALL T/MES
.�
TbWNOFVAlI, '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
NEW (SFR,P/S,DUP) PERMIT Permit #: B08-0131
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location......: 1687 BUFFEHR CREEK RD
Parcel No....: 210312215002
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
CONTRACTOR SCOTT S. TURNIPSEED, Ali
PO BOX 3388
EAGLE
COLORADO 81631
License: 320-A
APPLICANT SCOTT TURNIPSEED, AIA
1143 CAPITOL STREET, SUITE 211
PO BOX 3388
EAGLE
CO 81631
License: C000001848
ARCHITECT SCOTT TURNIPSEED, AIA
1143 CAPITOL STREET, SUITE 211
PO BOX 3388
EAGLE
CO 81631
License: C000001848
Description
NEW SFR
Occupancy Type
Totals...
Number of Dwelling Units:
Occupancy: R3
Type Construction: VB
05l06/2008
05/06/2008 Phone:(970)328-3900
05/06/2008 Phone:970-328-3900
05/06/2008 Phone:970-328-3900
Factor Sq Feet Valuation
6,261 $1,200,000.00*
Project #:
Town of Vail Adjusted Valuation
Total Sq Ft Added
Status . . :
Applied . . :
Issued . .. :
Expires . ..:
PRJ07-0529
ISSUED
05/06/2008
07/08/2008
01 /04/2009
$1,200,000.00
6261
....,. ...............>,,...........»,,,.........«....,......<,,.>...,........,...... FEE S ..x....,....,...,......».....>..«.................,............................
Building Permit Fee------>
Plan Check-------------------->
Add'I Plan Check Hours->
I nvestigation----------------->
UMMARY
$6,338.75 Will Call---------------------------> $4.00 Total Calculated Fees-------------> $36,141.24
$4,120.19 Use Tax Fee---------------------> $23,800.00 Additional Fees-----------------------> $125.00
$0.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES--------------> $36,266.24
$0.00 Recreation Fee----------------> $1,878.30
Payments-------------------------------> $36,266.24
Total Calculated Fees------> $36,141.24 BALANCE DUE------------------------> $0.00
...,,.._........,......,,......,....,,.......,,.�...........�.�.,.....,�....�.....................xx..tx> ..................,..�..,,......��..................�..........x......x.xx............
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTiON..SH�i.�E MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM. , ,-\" ;�.. ...._.,�
r .
_ _ _� � � . G '�
Signature of " .t�antr r Date
new_construction_perm it_041908
xxf��fA�x��flf#*#�#*/k*wfhww*4##wwwYfwwwfwfwwwwwffwwfwfwwwXfwYffwwwwwwww��wwwwwwwffwfwwwfw#kYk+flwX*4�*f#wwwwwwrt**w#wwkkk*R#*Rtf�*ffkiftf+***��wR�fkwwNYYew/�w*xf***#f*!�**#wwwwwwfN•
APPROVALS
Permit #: 608-0131 as of 07-08-2008 Status: ISSUED
..............................................................................�.......,............,..<,.,..............�,...........�,...........,............,.......,..,,.,,,....,
Item: 05100 BUILDING DEPARTMENT
05/16/2008 cgunion Action: CR sent applicant
comments
F:\cdev\CH RIS\PERMIT.COMMENTS\B08-0131 \B08-0131. DOC
06/12/2008 cgunion Action: AP APPROVED REVISED
PLANS DATED 6-5-08
Item: 05400 PLANNING DEPARTMENT
06/19/2008 npeterson Action: CR Need LOC and
Developer agreement for staging on Lot 1 and Rockfall
mitigation implemented on plans.
06/27/2008 npeterson Action: AP Approved plans
dated June 6, 2008. Applicant stated no staging on Lot 1
- no LOC required. (Ref DRB08-0045)
Item: 05600 FIRE DEPARTMENT
06/11/2008 McGee Action: AP Plan Review
Notes:
Plan Set 6-5-08
1. Driveway grade is 8- 5%, no staging area.
2. Exterior perimeter measures 290 feet. However,
retaining walls prohibit exterior perimeter access.
3. Cedar siding on south slope exposes portions of the
structure to wildland fire hazards.
4. No fire sprinkler or fire alarm plans are shown.
Submit fire alarm and fire sprinkler plans.
Permit is Approved but Conditions require fire alarm and
fire sprinkler systems.
Item: 05500 PUBLIC WORKS
05/16/2008 cdelles Action: DN Need more detail
for strom water drainage, retainig walls(stamped
drawings), and what is proposed between driveway and
asphalt roadway to make up grade.
06/17/2008 cdelles Action: CR Emailed comments
to architect
07/03/2008 cdelles Action: AP
....................................................................................�..,,.,»..,....,,.,........,,,..,,,...,........,..........,,.,,.....,........,......�......,.,..
See the Conditions section of this Document for any that may apply.
new_construction_perm it_041908
wwwa#wwwwkfwwwwwwwwwfwwfwffYw��Y#ww�fYwY�tff��fY�k�w�f*k�iwwww*wfrtw#xfwwMwwwfYff�fwrtwfffw##rtffw#wwW4w#N?wwww+RWwtwwwfwwwwtkw�**f*���**�*1f�lwfwwtw*ffwXwwl#kkfk�e����f#**t*�fwwwwwwww
CONDITIONS OF APPROVAL
Permit #: B08-0131 as of 07-08-2008 Status: ISSUED
..........................�.............,...,.,....,.,.....,....,..,...,.....,,......,..<..,,,..,.,.........,,,.<...,,.................,..................,,,,..,....,........,......
Cond: 33
(PLAN) THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT
SURVEY. SUCH SURVEY SHALL BE SUBMITTED AND APPROVED PRIOR
TO REQUEST FOR A FRAME INSPECTION.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R313 OF THE 2003 IRC.
Cond: 18
(BLDG.): STAIRWAYS ARE REQUIRED TO MEET SECTION R311.5 OF
THE 2003 IRC OR SECTION 1009 OF THE 2003 IBC.
Cond: 19
(BLDG.): GUARDS ARE REQUIRED TO MEET SECTION R312 OF THE
2003 IRC OR SECTION 1012 OF THE 2003 IBC.
Cond: 34
(BLDG.): A COPY OF THE SOILS REPORT WILL BE REQUIRED BEFORE
A FOOTING INSPECTION WILL BE CALLED FOR.
Cond: 39
(BLDG): EMERGENCY ESCAPE AND RESCUE OPENINGS ARE REQUIRED
TO MEET SECTION R310 OF THE 2003 IRC OR SECTION 1025 OF THE
2003 IBC.
Cond: CON0010094
NFPA 72 and TOV compliant Fire Alarm system required.
Cond: CON0010095
NFPA 13 R compliant fire sprinkler system required.
new_construction_perm it_041908
************+**************************************�*******************************�***+***+
TOWN OF VAIL, COLORADO Statement
*******************************************+******+******++*****************+*****+******+**
Statement Number: R080001107 Amount: $31,941.2407/08/200801:38 PM
Payment Method: Check Init: DDG
Notation: Scott
Turnipseed 1013
-----------------------------------------------------------------------------
Permit No: BOS-0131 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location: 1687 BUFFEHR CREEK RD
Total Fees: $36,266.24
This Payment: $31,941.24 Total ALL Pmts: $36,266.24
Balance: $0.00
******************************************************************+*********+**+*+**********
ACCOUNT ITEM LIST:
Account Code
--------------------
BP 00100003111100
RF 11100003112700
UT 11000003106000
WC 00100003112800
Description Current Pmts
------------------------------ ------------
BUILDING PERMIT FEES 6,258.94
RECREATION FEES 1,878.30
USE TAX 4% 23,800.00
WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
.
, u
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG Q
Project #: ���052-!
Buildin Permit #: -dl
- i � _ . . . x . _. _.
����� � � �
75 S. Frontage Rd.
Vail, Colorado 81657
TOWN OF VAIL BUILDING PERMIT APPLICATION
Separate Permits are required for electrical, plumbing, mechanical, etc.!
CONTRACTOR INFORMATION
' General Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s:(q-I o 32$-;yoo
� o S. Uf �i � 3��� �rG- �e ��ef L�110 �1��-11 S b
Email address: � Rr�/ � �,rn►�ph a.�ct,. c,oM Fax#: t�—�,o `32,�-3�1� �
�-' COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials
BUILDING: $' � Z,OO.�OOO�' ELECTRICAL: $ OTHER: $
PLUMBING: $ MECHANICAL: $ TOTAL: $ � _7�r
For Parcel # Contact Ea le Coun Assessors Office at 970-328-8640 or visit www.e
�' ,.� h Z,10 � 1.2Z. o o Z,
Job Name: `(,� s�ow• v�, �`jZeS�ae„r�C.�� Job Address: ���� �v�c
Legal Description Lot: 2. Block: --� Filing: �
ner:
r�G �,., e� �
`L� Address.
_ Address:
Address:
��s
C,re,�e,� � a�d.
Subdivision: F.�eY1��YlC.� MP—�/
L� 8�b��
a'to� 328�390�
'�� ci �t 55 - � t b
coh ��+-�oh o h� s►�. I�-f��, l�s� d�.n�.
Work Class: New Addition ( ) Remodel ( ) Repair ( ) Demo ( ) Other ( )
Work Type: Interior () Exterior () Both Does an EHU exist at this location: Yes () No (�
Type of Bldg.: Single-family (� Two-family ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: � No. of Accommodation Units in this building: � bec�roo
No/T e of Fire laces Existin : Gas A liances G�s C�` s� i Wood/Pellet Wood Burnin
No/T e of Fire laces Pro osed: Gas A liances G s Ld s Wood/Pellet Wood Burnin NOT ALLOWED
Does a Fire Alarm Exist: Yes () No Does a Fire Sprinkler System Exist: Yes () No Q�
� FOR OFFICE USE ONLY � �� �, ,. ��, � � � ;
_ , � � � �,
Dat� ecei d
Rece ved By: I I i
� !� -
http://www.vailgov. com/docs/dl_forms/building�ermit_4-17-2007. DOC
� �1�g�� a,. - ":` �:: �.
Page 1 of 7 04/17/2007
u
�
TOWN(�VAIL �
BUILDING PERMIT APPLICATION CHECKLIST
SINGLE FAMILY/DUPLEX CHECKLIST
This checklist is to be used with any single family/duplex permit (new construction , addition, or remodel application.)
� Town of Vail Design Review Board approval must first be obtained (may not apply to interior remodels)
�C. Plan Check Fee must be paid at the time of application for projects over $100,000 valuation (see attached
schedule)
The following information must be shown on all 4 sets of plans:
Architectural Plans
� Site Plans. Provide all site plan information as required for the Design Review Application for your project.
Refer to the DRB application checklist for complete details.
� Construction staging plans. Provide construction staging and materials storage site plans.
� Floor plans. Complete floor plans provided for each level. Complete dimensions, drawing scale noted, use of
each room shown on the plans. Location of inechanical equipment clearly shown
� Building Elevations N,W,S,E elevations. Show all proposed exterior finish materials, guardrails, windows,
doors, and finish grades.
�. Window sizes and operation types. Specified on the floor plans or elevations.
�C Stairways, guards, and handrails Show all stairway details with rise/run, handrail and guard details
�C Roof plan. Show all roof covering materials (Class A covering required) and underlayment, roof pitch
,� Building cross sections. Show roof, wall, floor construction assemblies and insulation R values. Show roof
and crawl space ventilation. Show ceiling heights in rooms and crawl spaces.
� Rescheck compliance certificate and inspection checklist (new construction and additions only).
Provide a complete signed compliance certificate and inspection checklist. Verify all exterior building is detailed
on the building plans as required on the Rescheck compliance report. (www.energycodes.gov)
� Fireplaces. All fireplace types shown on the floor plans. Specify gas log set, or gas appliance at each fireplace.
Structural Plans
Soils Report. Include 2 copies of the soils report for your lot.
� All sheets of the structural plans stamped and signed by a Colorado State Licensed Engineer.
�, Design specifications sheet. Roof live load, Deck live load, Floor live load, Wind Speed/Exposure, Soils report
number and soil bearing capacity referenced per the soils report.
� Foundation plan. Provide a complete foundation plan with all footing/foundation section details
� Framing plans. Provide complete framing plans for floors, decks, roofs. All beams, joists, rafters or trusses
clearly shown. Include framing construction details and connection schedules.
Ot er items
Asbestos form completed. Asbestos test and report provided if any existing construction is proposed to be
disturbed. See Town of Vail asbestos testing requirement form.
❑ Plan check fees. Plan check fees must be paid with your application. The building permit and recreation fees
will be paid upon issuance of a building permit.
I have read and unde tand the requirements of this checklist. If any required information is missing from the
application, I under�wd-l� application will not be accepted.
Applicant's Sig
�', • Co • a B
Date
http://www.vailgov.com/docs/dl_forms/building_permit_4-17-2007.DOC Page 2 of 7 04/17/2007
.
.
��►�n� .
ASBESTOS TESTING REQUIREMENTS
u
THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS
TESTING ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT
APPLICATION FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR
REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER
OCTOBER 12, 1988 THAT HAVE NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT.
A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
• I have included the asbestos test and report with my building permit application
applicant signature
OR
date
• I certify my project will not disturb or remove more than 160 s.f. of building material. The construction
plans submitted with my application clearly indicate this information. (This will be verified during plan
review, and will delay your project if found to be inaccurate)
applicant signature
OR
date
• The building was constructed after October 12, 1988. The date of construction was
applicant signature
N�
date
� Q�,J � ►� � `� �- � �r� ✓�
original construction date
http://www.vailgov.com/docs/dl_forms/building�ermit_4-17-2007.DOC Page 5 of 7 04/17/2007
:
�nwxo�yn� .
WHEN A"PUBLIC WAY PERMIT" IS REQUIRED
u
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT":
o Is this a new residence? YES NO
o Does demolition work being performed require the u e the Right-of-Way, easements or
public property? YES NO
o Is any utility work needed? YES�_NO
o Are there any improvements being done to the driveway? YES _�NO
o Is a different access needed to the site other than the existing driveway? YES. NO
o Is any dra' a work being done that affects the Right-of-Way, easements, or public property?
YES NO
o Is a"Revocable Right-of-Way Permit" required? YES NO�
o Is the Right-of-Way, easem t or public property to be used for staging, parking or fencing?
YES NO�_
If answer ' , is a parking, staging or fencing plan required by Public Works?
YES NO
If you have answered YES to any of these questions, a"Public Way PermiY' must be obtained.
"Public Way PermiY' applications may be obtained at the Public Works office or at Community Development.
If you have any questions please call Leonard Sandoval in Public Works at 970-479-2198.
I H AD AND W RED ALL THE ABOVE QUESTIONS.
�, c.oT� "�� �� v h i� 5� I�t����i1C.
Co tracto S nature Company Name
Job or Project Name: � �J S'N Y%1, V�� � R� ��'e�_e- �m T Z
Date Signed: � /���
http://www.vailgov.com/docs/dl_forms/building_permit_4-17-2007.DOC Page 6 of 7 04/17/2007
.�
.
.
����� �
Town of Vail Survey
Community Development Department, Director
(970) 479-2139
Check all tha appI
Date: J`r�Z / �
Which Department(s) did you contact? Building_� Environmental Housing
Admin Planning DRB PEC
2. Was your initial contact with our staff immediate� slow or no one available ?
3. If you were required to wait, how long was it before you were helped?
4. Was your project reviewed on a timely basis? Yes/No
If no, why not?
u
5. Was this your first time to file a DRB app PEC app Bldg Permit N/A �
6. PI ase rate the performance of the �aff person who assisted you:
5 4� 2 1(5 is high) Name: (knowledge,
responsiveness, availability)
7. Overall effectiveness of the Front Service Counter. 5�3 2 1(5 is high)
8. What is the best time of day for you to use the Front Service Counter?
8. What comments do you have which would allow us to better serve you next time?
Thank you for taking the time to complete this survey. We are committed to improving our service.
http://www.vailgov.com/docs/dl_forms/building_permit_4-17-2007.DOC Page 7 of 7 04/17/2007
Scott S. Turnipseed, AIA
arehihech�re � corsVucbon � ir�terior design
MEMO:
Q��
Mr. Warren Campbell
Town of Vail Planning Department &
The Town of Vail
Building Department
RE:
�og -o i 3 �
i �;: � t � r. i� i; �.
i
i , i �,+ I r" I 1
I -, ��' �� -� ' � i
D ''
i+ i�
I,
�;
� �! :i
i '���
! �u' � 1
TOVV fl�',��a��l L.
Combined Construction Management Plan for Lots 1& 2 in the Eleni Zneimer
Subdivision, Town of Vail. (Please see attached sheet A1.2)
Warren and Town of Vail Building Department,
I am writing a quick memo to all needed parties to try and get approval for the
attached "Construction Management Plan". We wanted to illustrate and verbalize our
intent to combine the two Lots (1 & 2) for "Construction Ease" purposes.
We believe that if we could come to an agreement, the neighborhood would
greatly benefit from this plan. It would have much less construction impact on the
small spur road that serves all the other neighbors on lots 3-6. Our intent is to put in
the subgrade or gravel drive onto Lot 1 with required retaining walls first, so that we
could use the building envelope of Lot 1 as a staging and parking area to serve during
the construction of Lot 2. The timeline of this request is from the beginning of
construction in June of '08 thru the bulk of a 14 month construction schedule.
In earlier discussions with the DRB, we felt this was a viable approach and would
explore the options of providing a Bond to the Town of Vail to accomplish any work
needed to after the project was complete, ie, re-vegetation, landscape, etc..
Please let me know what you all feel the processes would be to come to a
workable solution to this proposal.
Thanks Again,
__-----
Brennen S. Fitrgerald
1143 Capitol Street, Suite 211 PO Box 3388 Eagle CO 81631 t: 970 328 3900 f: 970 328 3901 www.turnipheadaia.com
�
Generated by REScheck-Web Software
Compliance Certificate
Project Title: Custom Vail Residence-Weltner
Report Date: 05/02/08
Energy Code: 20031ECC
Location: Vail, Colorado
Construction Type: Single Family
Glazing Area Percentage: 15%
Heating Degree Days: 9248
Construction Site: Owner/Agent:
1687 Buffehr Creek Road KC Buffehr Creek, LLC
Vail, Colorado 81657 4520 Main Street, Suite 100
Kansas City, Missouri 84111
Compliance: 15.9% Better Than Code Maximum UA: 1063 Your UA: 894
"'�..c
Ceiling 1: Flat or Scissor Truss.
Ceiling 2: Cathedral
Wood Frame, 16in. o.c.-Front Elevation: Wood Frame, 16in. o.c.
Wood Frame, 2 Pane w/ Low-E-Front Elevation: Wood Frame, 2
Pane w/Low-E
Glass-Front Elevation: Glass
Solid-Front Elevation: Solid
Solid Concrete-Front Elevation: Solid Concrete or Masonry
Wall height: 10.0'
Depth below grade: 10.0'
Insulation depth: 10.0'
Wood Frame, 16in. o.c.-Right Elevation: Wood Frame, 16in. o.c.
Wood Frame, 2 Pane w/ Low-E-Right Elevation: Wood Frame, 2
Pane w/ Low-E
Solid-Right Elevation: Solid
Solid Concrete-Right Elevation: Solid Concrete or Masonry
Wall height: 10.0'
Depth below grade: 10.0'
Insulation depth: 10.0'
Wood Frame, 16in. o.c.-Back Elevation: Wood Frame, 16in. o.c.
Solid-Back Elevation: Solid
Solid Concrete-Back Elevation (LLvI.): Solid Concrete or Masonry
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
Solid Concrete-Back Elevation (MLvI.): Solid Concrete or Masonry
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
Wood Frame, 16in. o.c.-Left Elevation: Wood Frame, 16in. o.c.
Wood Frame, 2 Pane w/ Low-E-Left Elevation: Wood Frame, 2
Pane w/ Low-E
Solid Concrete-Left Elevation (LLvI.): Solid Concrete or Masonry
Wall height: 10.0'
Depth below grade: 10.0'
Project Title: Custom Vail Residence-Weltner
Data filename:
�;��� r � �� -��7 ��-� 9
n � i � �_, � i - ; � \��! ��' ��
II ' i
,I,_,I i
ii" r i
I \ j
'.,, �I �„\' . .
hlj � �
i�i iii I�
i � �' I
� � �' ��`�� �.; �; ; _ 5:t"� � �..,.
� _ _.__._.__��_.__d��__....�.._...,
Desig ner/Contractor:
Scott S. Turnipsee, AIA, Inc.
PO Box 3388
Eagle, Colorado 81631
(970)328-3900
1332 49.0 0.0 35
998 49.0 0.0 22
1641 23.0 0.0 60
384 0.350 134
138 0.350 48
28 0.560 16
250 19.0 0.0 10
1404 23.0
145
165
200 19.0
808 23.0
21
1080 19.0
1080 19.0
583 23.0
12
520 19.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
60
0.350 51
0.560 92
8
43
0.560 12
40
40
0.350
31
4
20
Report date: 05/02/08
Page 1 of 6
Insulation depth: 10.0'
Solid Concrete-Left Elevation (MLvI.): Solid Concrete or Masonry 440 19.0 0.0 17
Wall height: 10.0'
Depth below grade: 10.0'
Insulation depth: 10.0'
Floorl: Heated Slab-On-Grade 38 6.0 28
Insulation depth: 6.0'
Crawll: Soiid Concrete or Masonry 1812 11.0 0.0 123
Wall height: 7.0'
Depth below grade: 7.0'
Insulation depth: 5.0'
Inside below-grade depth: 5.0'
Boiler 1: Other (Except Gas-Fired Steam)90 AFUE
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2003 IECC requirements in
REScheck-Web and to comply with the mandatory requirements listed in the EScheck Insp ction Checklist.
K� '� — V�� e �nc �
Name - Ti gnatur Date
Project Title: Custom Vail Residence-Weltner Report date: 05/02/08
Data filename: Page 2 of 6
Date: 05/02/08
Generated by REScheck-Web Software
Inspection Checklist
Ceilings:
❑ Ceiling 1: Flat or Scissor Truss, R-49.0 cavity insulation
Comments:
❑ Ceiling 2: Cathedral, R-49.0 cavity insulation
Comments:
Above-Grade Walls:
❑ Wood Frame, 16in. o.c.-Front Elevation: Wood Frame, 16in. o.c., R-23.0 cavity insulation
Comments:
❑ Wood Frame, 16in. o.c.-Right Elevation: Wood Frame, 16in. o.c., R-23.0 cavity insulation
Comments:
❑ Wood Frame, 16in. o.c.-Back Elevation: Wood Frame, 16in. o.c., R-23.0 cavity insulation
Comments:
❑ Wood Frame, 16in. o.c.-Left Elevation: Wood Frame, 16in. o.c., R-23.0 cavity insulation
Comments:
Basement Walls:
❑ Solid Concrete-Front Elevation: Solid Concrete or Masonry, 10.0' ht / 10.0' bg / 10.0' insul, R-19.0 cavity insulation
Comments:
❑ Solid Concrete-Right Elevation: Solid Concrete or Masonry, 10.0' ht / 10.0' bg / 10.0' insul, R-19.0 cavity insulation
Comments:
❑ Solid Concrete-Back Elevation (LLvI.): Solid Concrete or Masonry, 12.0' ht / 12.0' bg / 12.0' insul, R-19.0 cavity insulation
Comments:
❑ Solid Concrete-Back Elevation (MLvI.): Solid Concrete or Masonry, 12.0' ht / 12.0' bg / 12.0' insul, R-19.0 cavity insulation
Comments:
❑ Solid Concrete-Left Elevation (LLvI.): Solid Concrete or Masonry, 10.0' ht / 10.0' bg / 10.0' insul, R-19.0 cavity insulation
Comments:
❑ Solid Concrete-Left Elevation (MLvI.): Solid Concrete or Masonry, 10.0' ht / 10.0' bg / 10.0' insul, R-19.0 cavity insulation
Comments:
Windows:
❑ Wood Frame, 2 Pane w/ Low-E-Front Elevation: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.350
For windows without labeled U-factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
❑ Wood Frame, 2 Pane w/ Low-E-Right Elevation: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.350
For windows without labeled U-factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
❑ Wood Frame, 2 Pane w/ Low-E-Left Elevation: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.350
For windows without labeled U-factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
Project Title: Custom Vail Residence-Weltner Report date: 05/02/08
Data filename: Page 3 of 6
Doors:
�❑ Glass-Front Elevation: Glass, U-factor: 0.350
Comments:
❑ Solid-Front Elevation: Solid, U-factor: 0.560
Comments:
❑ Solid-Right Elevation: Solid, U-factor: 0.560
Comments:
❑ Solid-Back Elevation: Solid, U-factor: 0.560
Comments:
Floors:
❑ Floor1: Heated Slab-On-Grade, 6.0' insulation depth, R-6.0 continuous insulation
Comments:
Slab insulation extends down from the top of the slab to at least 6.0 ft. OR down to at least the bottom of the slab then horizontally for a
total distance of 6.0 ft.
Exterior insulation has a rigid, opaque, weather-resistant protective covering that covers the exposed (above-grade) insulation and extends
at least 6 in. below grade.
Crawl Space Walls:
❑ Crawl1: Solid Concrete or Masonry, 7.0' ht / 7.0' bg / 5.0' ext. insul / 5.0' inside bg depth, R-11.0 cavity insulation
Comments:
Applies to walls of unventilated crawl spaces.
Heating and Cooling Equipment:
❑ Boiler 1: Other (Except Gas-Fired Steam): 90 AFUE or higher
Make and Model Number:
Air Leakage:
� Joints, penetrations, and all other such openings in the building envelope that are sources of air leakage are sealed.
� Recessed lights are 1) Type IC rated, or 2) installed inside an appropriate air-tight assembly with a 0.5" clearance from combustible
materials. If non-IC rated, fixtures are installed with a 3" clearance from insulation.
Skylights:
� Minimum insulation requirement for skylight shafts equal to or greater than 12 inches is R-19.
Vapor Retarder:
� Installed on the warm-in-winter side of all non-vented framed ceilings, walls, and floors.
Materials Identification:
� Materials and equipment are installed in accordance with the manufacturer's installation instructions.
� Materials and equipment are identified so that compliance can be determined.
� Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided.
� Insulation R-values, glazing U-factors, and heating equipment efficiency are clearly marked on the building plans or specifications.
� Insulation is installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner
that achieves the rated R-value without compressing the insulation.
Duct Insulation:
� Supply ducts in unconditioned attics or outside the building are insulated to at least R-11.
� Return ducts in unconditioned attics or outside the building are insulated to at least R-6.
� Supply ducts in unconditioned spaces are insulated to at least R-11.
� Return ducts in unconditioned spaces (except basements) are insulated to R-2. Insulation is not required on return ducts in basements.
� Where exterior walis are used as plenums, the wall is insulated to at least R-11.
Duct Construction:
� Duct connections to flanges of air distribution system equipment are sealed and mechanically fastened.
� All joints, seams, and connections are securely fastened with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric, or
tapes. Tapes and mastics are rated UL 181A or UL 181 B.
Exceptions:
Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa).
Project Title: Custom Vail Residence-Weltner Report date: 05/02/08
Data filename: Page 4 of 6
� The HVAC system provides a means for balancing air and water systems.
Temperature Controls:
� Thermostats exist for each separate HVAC system. A manual or automatic means to partially restrict or shut off the heating and/or
cooling input to each zone or floor is provided.
Service Water Heating:
� Water heaters with vertical pipe risers have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or
is part of a circulating system.
� Circulating hot water pipes are insulated to the levels in Table 1.
Circulating Hot Water Systems:
� Circulating hot water pipes are insulated to the levels in Table 1.
Swimming Pools:
� All heated swimming pools have an on/off heater switch and a cover unless over 20% of the heating energy is from non-depletable
sources. Pool pumps have a time clock.
Heating and Cooling Piping Insulation:
� HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to the levels in Table 2.
Project Title: Custom Vail Residence-Weltner Report date: 05/02/08
Data filename: Page 5 of 6
Table 1: Minimum Insu/ation Thickness for Circulating Hot Water Pipes
� , Insulation Thickness in Inches by Pipe Sizes
Non-Circulating Runouts Circulating Mains and Runouts
Heated Water Up to 1" Up to 1.25" 1.5" to 2.0" Over 2"
Temperature (°F)
170-180 0.5 1.0 1.5 2.0
140-169 0.5 0.5 1.0 1.5
100-139 0.5 0.5 0.5 1.0
Table 2: Minimum Insulation Thickness for HVAC Pipes
Insulation Thickness in Inches by Pipe Sizes
Fluid Temp.
Piping System Types o.,..,.,.���, 2" Runouts 1" and Less 1.25" to 2.0" 2.5" to 4"
Heating Systems
Low Pressure/Temperature
Low Temperature
Steam Condensate (for feed water)
Cooling Systems
Chil�ed Water, Refrigerant and
Brine
201-250 1.0
106-200 0.5
Any 1.0
40-55 0.5
Below 40 1.0
NOTES TO FIELD: (Building Department Use Only)
Project Title: Custom Vail Residence-Weltner
Data filename:
1.5 1.5 2.0
1.0 1.0 1.5
1.0 1.5 2.0
0.5 0.75 1.0
1.0 1.5 1.5
Report date: 05/02/08
Page 6 of 6
*�******************************************************************************************
TOWN OF VAIL, COLORADOCopy Reprinted on 05-06-2008 at 15:32:46 OS/06/2008
Statement
*************************************************�******************************************
Statement Number: R080000628 Amount: $4,200.00 05/06/200803:29 PM
Payment Method: Check Init: SAB
Notation: 1007 SCOTT
TURNIPSEED
-----------------------------------------------------------------------------
Permit No: B08-0131 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location: 1687 BUFFEHR CREEK RD
Total Fees: $34,387.94
This Payment: $4,200.00 Total ALL Pmts: $4,325.00
Balance: $30,062.94
********************************************************************************************
ACCOUNT ITEM LIST:
Account Code
BP 00100003111100
PF 00100003112300
Description
BUILDING PERMIT FEES
PI,AN CHECK FEES
Current Pmts
79.81
4,120.19
-----------------------------------------------------------------------------
Development Review Coordin<
75 South Frontage R�
Vail, CO '81+
��i�� �'�' v'��� Phone: `97Q-479-2
� Fax; �970-479 2��
Inspections: 97�-479-2
� � '..� �
Revision/lnformation Transmittal
All Revision submittals must include the Field Set of approved plans and a copy of the correction letter.
No further inspections will be performed until the revisions are approved and the permit is re-issued.
Permit #(s) information applies to:
�-,e;�� --v 1''�1
Contact Information
Attention:
Cl/ti�`� �-P�1�i,��
,� �
Company: � '� �
���),�� �� �
Company Ph: , ax: � c - b��
Contact Name:-����"14'� �`'1 �����J�( i �.d'�#
�'�� � ` �'-����.,��,.�,� �
Contact Ph: ._ •7J1 ���'T,% ���%ell:
E-Mail: ��I�n�2"? � ' (i t i� %1�'..�� �-t� - COI'1-�
Town of Vai�Contractor Registration No:
. �
SIgllatuCe (required)
Revised ADDITIONAL Valuations (Labor 8� Materials)
(DO NOT include original valuation)
Building $
Plumbing $
Electrical $
Mechanical $
Total $
( ) Revisions
( ) Response to Correction Letter
( ) Deferred Submittal
Reason for Revisions (include a list of all changes that
have been made from original approval):
`�-o �- k—�u. �l v� -�' °� �-�—�
(Use additional sheet if necessary)
Date Received:
'I
L «��M(�
.1UN 2 6 2008
T01N�1 C3� `����� �. `
._.__, __ _ �., _ �.__� _ �
Transmittal Sheet
Send to:
Chris Delles,
Community
Development
Company:
Town of Vail
Fax Number:
Phone Number:
� URGENT
Comments:
Hi Chris,
REPLY ASAP
Scott S. Turnipseed, AIA
ar�hiteclure � cor�struc6on � irrte�ior design
From:
Brennen Fitzgerald
Date: 6-26-08
Total Pages with
Cover:
Regarding:
Building Permit #
B08-0131
PLEASE COMMENT /I�PLEASE REVIEW
/ `
I FOR YOUR INFORMATION
Here is some more information that you guys have requested on our Lot 2 Buffehr Creek Project. Building Permit #
B08-0131
I Included are 3 copies of the following : Structural Engineer Letter, Engineered Drawings of Site Retaining Walls
! Please let me know if you need any further information.
Thanks so much,
Brennen
D 's��I�IIp�, ��_��;
I
JUN 2 6 1008 �
I'
TO �p,g
�._.�, �
�� �� �i \�1 4
�_'�^..+*+....I.,�....,.. '
. ,_._Fh
1143 Capitol Street, Suite 211 PO Box 3388 Eagle CO 81631 t: 970 328 3900 f: 970 328 3901 www.turnipheadaia.com
JUN-26-2008 11:0$ AM NEWKIRK.ENGINEERING 830 249 0925 P.@1
4
xune 26, 20p�
Mr, Hrennen Fitzgerald, Araject Manager
Saott S. Turnipeeed, AIA
1143 ��pitol St., Suite � ] 1
�aglo, CQ 81631
Re: �V'ew R.��idence
1b8� But�ehr Creek
Vail, Colorado 81657
Llear Brenner�:
N�WKIRK �NGINEEI�ING
Caneulting Struotur�l �ngir�oeri�ng
ao7 r�u �,��y
:�oem�, mx ��a�s
�h.ff�c 8�0�755»81b4
I have ro�+io�x+ed the "Rockfall Mitigation" requir�m��tts for the referenced praject ae p��orrtad in tho
repnrt prepared by Arthrxr I, Mea�r�, p,B., Zn�. Thc c�ncrato fbundation wa11e indicated an eho�t S 1. �
and detailed an �ubsequent detail aheets in the Conatruction Document dr�wi�g set that I h�ve
pr�parod m+�et the requirement nnted in the Meare� r�port,
Flease let me know if you have any questione or ifI m�y be c�f further asai�tancc,
Sir�cerely;
NEWKIRK �NGINEERING
�aul H, Newkirk,
�rinaipal
r
—__— -- -- - - - ---
_ _ --- - ----
_ . _ _ _ ._ __ ___
_ ._ _ _ _ __
_ - _. _ _ _ _
I
I
�
:
i
I
I
ii
LOT Z EL!'�N/ ZNE'IMER SUB
'
D/Vl �l t'�N
1687 Buffehr Creek I�oad
Town of Vail, E�gle County, Co�orado
Soil Nail �nd Shotcrete Retaining Walls
RW-1.
f�W-2.
RW-3.
RW-4.
RW-5.
RW-6.
RW-7.
Cover Sheet
Generai Notes
Plan View
Elevation Views
Elevation Views
C1"OSS St�CtiOC1S
iypical De#ails
Town of Vail
FI 0
�
J
�
>Q
Z ?
� �
f� � Z
> o z ;
� m � � �
�
� W �
i � � � � i
' W U
I �
� � � '
� ' � 2 U �
� i N � O i
� � i
m '
U �i � � Z I
; c�i � � �
i � � J ;
oz
�
0
���
�
U�
z�
°� g� �
a p M O
� L � � V
�°On
�r>
O �y
V � m � r°�
v
�in a r m
x.-c9a�
z
0
� �
o �
LL �
�
W �
a :
w o
d�
,_ -
j p�`��� E�lST�
i �°v� oQ� �'o� �o i
� .o ;� 3$549 ,�-r: �, ,
J - � .�. ti
� o
�
�,
� O '7
� � r
c ��°'
,a'��M
y o
o O��U�
ui
y V � � c
�
Q o
nY. � `�' c7 a
---__ �
. . REVIS�ONS ,
� � .-PROJECTNUM.RER� OB-012�� .�-��'
PlOT DATE 624108
ORAWtiBY: WDL i
CHECK BY: CLT
SG4LE: NIA
__ ---__ R�� 1 _ _ __
�
,
.
1.0 Soil Nail Wali Maferials
1.1
� 1.2
' 1.3
1.4
�
1.5
�
i
I
j
�
Ground nails - Grade 75 epoxy coated or bare threadbar in accordance with ASTM A615.
fy = 75,000 psi
Grouf - Grout may be neat-cement or with sand, with Type I/ll or lll cement in accordance with
ASTM C150. Water-�ement ratio should be b�tween 0.4 and 0.6.
fc = 3,000 psi minimum
End hardware - Nuts and washers shall be i� accordance with soil nail manufacturer's
recommendations. Bearing plate shall be in accordance with ASTM A36, Grade 36,
Shotcrete - Sho#crete mix shall consist of Type II cement in accordance with ASTM C150,
potable water and normal weight aggregate in accordance with ASTM C33. Air entrainment is
not required. Admixtures, if used, should be non-corrosive to steel.
fc = 4,000 psi (28-day strength)
Welded wire mesh shall be in accordance with ASTM A185.
1.6 Walers and vertical bearing bars (if required) shall be in accordance with ASTM A615
fy = 60,OD0 psi
1.7 Centralizers should be plastic and attached t� the nails in accordance with the manufacturer's
recommendations and should be spaced no farther apart than 10 ft with one centralizer within 3
ft of the nail head and one within 3 ff of the nail bottom.
2.0 Soil Nail Wall Construction Sequence
2.1
2.2
2.3
2.4
Excavate one 5' lift. Ground nails may be drilled and installed through a temporary stabitizing
berm if necessary.
Install ground nails at the approximate locations and to the lengths shown on the plans.
Ground nail locations may vary from the specified spacing by up to 6".
Install drainage system as shown on the drawings.
Install welded wire mesh and walers as shown on the drawings.
2.5 Install shotcrete to cover welded wire mesh and walers. Give special attention to filling the void
in the borehole above the grout line. Cold weather protection measures may be necessary.
2.6 Install the grour�d nail end hardware while the shotcrete is still wet. Embed into the shoicrete
surFace until there is no void behind the plate. Wand tighten the nut.
2.%
2.�
II� -- -----�
Once the grout and shotcrete have attained 50% of their specified strengths, repeat 2.1s2.6 to
the bottom of the wall.
Shotcrete over the ground nail end harduvare for permanent portions of shoring to attain
minimum coverage requirements. Do not shotcrete over nelson stud plates.
3.0 Soii Nail Wall Design Parameters
3.1 ihe ground nail wall has been designed in general accordance with procedures
contained in the FWHA "Manual for Design and Construction Monitoring of Ground
Nail Walls", Repo�t Number FNWA-SA-96-069R.
3.2 ihe follewing values have been used for th� design parameters:
$ � r q�n
Material Description (deg) (psf} (pcf) (psi)
Silty Sand and Cobbles 30 0 130 �0
3.3 The required allowable force for the ground nails is 1.5 kips/If.
3.4 The groundwater table was assumed to be below the retaining wall.
3.5 Factors of safety:
Bearing capacity - FS = 1.5
Overturning - Eccentricity <= B!6
Global - FS = 1.5
Pullout - FS = 2.4
Yield reduction fact�r - at = 0.55
Facing flexure factar - a� = 0.67
Facing punching factor - af = Q.67
4.0 Special Provisions
4.1
4.2
Wall geometry used in design will need to be field verified. ihe actual horizontal
layout may be modifieti if necessary. The wall was designed for maximum heights
as shown in the plans.
At least one preproduction verification tests shall be pertormed on sacrificial test
nails to verify the ins#atlairon method and nail pull-out resistance in accordance with
FHWA-SA-96-069R.
4.3 Proof testing of the ground nails shall be performed on 5% of the nails or as
directed by the engineer. A passing verification test can be counted towards the
proof testing requirement.
4.4 This design is valid only for this site and is to be constructed by HiM Construction
only.
4.5
4.6
The ground nail walls may be redesigned based on verification test results.
�lan View drawings Taken from drawings by LKP Engineers, ►nc.
Q
O � ;
� � Z !
� > � Z
� � o � ¢ `
;; W i� Y w j
� ; �. � vs W � �
�
' i z ! w V W j
' ! � g � � �
;� w
� � w �
� � Z N LL o �
i � W � N z
m �
� � o
i� W � z i
i ' nj cD �L �
E ` � � � J I
' ' � Z i
'I
_ .. .... _..___ _. _. ... _. -- --__ ..___--___..�
I�
U �o
_
0
o� �
���g�
U�o�7o
�c��tiM
�m�r
Z=°o�
o����
� u� m
c
�Fa' o t m
x�c9aLL
0
h
� u
o �
o`
w �
� w
a s
� _
a
i
; OPppo RE{;�ST
� �
� :�
U t OQ � ��, 90
j �: a 38549 �-r: w
' �. ti o.
� . c�`�'�.----. �::c��.2
m
0
W
a
�a
a
��
� 6
�
°
o� �
�7���
��o�
�0
c�o..
�viv�
t��ms
4�oL
��c�a
REVISIONS
PROJECTNUN�ER: OB-012 i
� PLOT DA1E: 6J24/pB
DRAWNBY: WDL �
CHECK BY: ClT �
SCALE: WA '
�.__.____ _._ ..__�...'.._.___J
__ _. ___... __p__._._ ___"_._-1
RW�2 i
. �
I
I''
I
�
834
8�
B34
8�
B:A�
i 833�
g33f
' 833�
� g33a
! g33C
, as2e
' 8326
8324
8322
8320
83�g
g316
8314
g3�5
831
83�
i B3
8'
I
i f
I:
i
li
��
I
i
I
i
�,
�'
�
�I
�
iI
I'
II
�'
r
�I
�;
i' INDICATESA
� SEW£R
! ! SERVICE STU.B °��CO
�,
��
i'',
I'
i
I
�
�
J
Q
2 �
o (� :
(� 0 Z
I i y Q Z i
' i Q
I' i m Y W i,.
i � � W � �
W
UJ � F' �
W �
i � � g � � i
Z
i g ! Z W H �
i� I N = O �
Z � �
ltJ ,
� J m � i
i W � Z 1
i I c.i co a 1
'� � � � I
" Q i
� � � I
0
� �
V�
yo
O � o
F- �
o r
�o°�v°o
d' C� � M
� �
��O<n� I
; Ot° v'�'� �
i c�^ m ��.°>
� �
F � o r m
Sr(9aLL I
� I
o i
" �I
r
� u
O �
0
W f
¢
¢
a :
w o
� u
a
I OQ'P�'� ���SrF,�
i ' U � `�e� ��.e' � �� I
� ; � i,a 38549 0-�? �
� ' Ot�� . .. 0� . 4 I
� dNA. '
; i_ _ l� - — --��'� �
�
�I V �� ow
0
°o �
' c� � �
; � �oe��
� � `"+ M
m N O 0
' °w Q � U �
� V � c m
a
' a ����
.����,. ' REl9SIONS . ___ ._ i
� � PROJEGTNUMBER: 0&O12 ��
I PLOT DATE: 82/1pg �
��, DRAWN BY: WDL �
CHECK BY� CL7
� SCALE- 1116' = T _)
. .._ _.. ._ .. : �r._ �.__ _ _-_...�
' RW-3
1
0
.
SNL = 15'
Sh = 5' SV = 4'
8280 .-°°-° ------ ----; 8280 8290 •--•-----------°__e,e_a_eee°-°-----°----°°--e_�_�, 829� 8300 �----•---------°---•------------•-•-•°-----°-°-�-- 8300 8310 ----------•-----si�=is'
SNL • 15' SNL = 15 Sh � 5 Sv = 4
ShaS' Sv�4' Sh=S' Sv=4'—�
� � i
� � i
: � ' TW 0 �
� �
�
� ; � �
i
__� � ��
82i0 ' " � - � 8270 8280 ' ----�--- ----�� °---� 828� 8290 � ----- -° --- --r ---- �--------° --- - 8290 8300 - - ------°- ° ° -�
•---° -°ee. .--°-- --°____°- ----°---,-- _
j
FG �- ' .
', BW Soil Nad Sal Nail �
FG FG
� � . ' � i
1 � � g,r� 1 � � � e W
6260 �--------------------- 8260 6270 �-°----------------------------------------°-°-°-°' 827i 8280 �-_°------- eW ----°-°----•-°°-----------------°' 8280 8290 '-----°----°----------------
� � � � � � � �
STA. 0+00 � STA. O+OD STA. 0+16 STA. 0+29.5 STA. 0+00 STA. 0+13 STA. 0+30 STA. �+00
V f� �1 tD M
� n p S 7 A. O+ O S �� �� �� �� N N N N N N
ro� c�o aNOm oNOaNO roNm o�oro �eo mm aoro
� II 11 11 II II il II II 11 II �� 11 11 II 11 �I
�m �� �m �m �m �� �m �a�0 �m
� m WALL B WALL C
WALL A
8320 ----------------- -•-------------------------------------------------------------°--------------------------------------------•-°°-°•---•-•---°°--
.
SNL = 15' SNt = 24' SNL = 20'
� Sh�S' Sv•4' Sh=5' Sv=d'
� �Sh-5'Sv=4' "
i
8310 � y '
6__ve� ��.��... :'�.esaee�`�.. 7 ��__�_����_..�_ �����__ev__��������_____�_�_�____�____�����_�___�_______�__ _�______�_____��.�__���.���_�___�����_
� '" rn
� y � �sn-�
,
, �
; a,. sv �,
, _
8300 � � � '
----� ----------^'•--- ----•°-------°--------------°°----
; --------•----Bw - ---°-------- - - -------- -a---° r- <
FG r Y 3 e'
m
. � ��
8290
I
STA.0+00
o�
��
II �1
� �
m
�
STA. 0+20
a o
m�
II 19
� �
m
( �
5TA.0+38.5 STA.0+61.6
� � � �
II �I >11 11
� m F m
WALL E
STA. 1I+0125 I
STA 1+10.25
cpp� �
� � N N
II 11 � �
2 � II 1!
Fm ��
m
SNL = 75'
""� Sh=5 Sv=4'
8320 832Q �
5
8310 8310 ' --------
�
8300 8300 �--------------------
8290 8290 ' ---•----------------
STAI0+00
� �
��
II M
� �
m
°-------------------°°------------------------°°-°------------------_------------•---°-_..-------°------------, 8310
SNL � 20' Sfdl � 2;' �
'�Sh:S' Sv=4'� `Sh'S Sv�4' �
� `
� ;G �
�
_°___-�__---�;_---g---- �-sn a sd-- -°°-°�------'----- ------------------- ' 8300
- " - �
Shc Nal ,
FG � � °�Q
---------------•---------------------------°---ee_e,_�_--°°----°------�— -----"� --•---' 8290
� � � � �
STA. 0+25 STA. 0+48.5 STA. 0+68.5 STA. U*80.5 STA. 0+97.5
OOr1 00�1 �� �� N a�0
"�m� o"�oa�o m�m mNm �o�o
II II II II 11 �� U N 11 II
� m F m � m � m � m
WALL D
SNL=2lY SNL=1Y
Sh=5' Sv=4' Sh=5' Sv=s' �
� . 1W
� y.� �
4- Sh -I `'
,
_______ __ _�?_�__F_�_______�y____�� -____ ______���____�___________�___'
f � �
ew � :.
"""°""""°""""""___""'F_[`'_"""_"_ __'__"""'__""""""""•"' �
sai rrmi
___ __ _ __ _ ____- _
STAI0+27
�D o
ro�
II II
� m
I
STA.0+50
��
O
��
II II
� m
WALL F
8320
8310
8300
-------------------------------°----' 8290
I
STA. 0+77.7
STA. 0+$7.5
`O o
�aCOO o°rn
q N � �
� �j M fl
m � �
m
�
�z � �
' o ! I
� ; �n o z ��
; , � Q Z ,
j i p � Q !.
i w i� w W i
� � '
i I > � a� w �
�
' � O I � � � i
' f' ! W � U
' d i Z W I— '
W � N ��j., � i
—� Z � �
� I W m Q
� �
GO Q
� � g
; J Z
� J
i �
O .o
v�
O� �
F=d�$�
O
�c°���$
Z��orn
p°Umr�
�
��mmM
�x
�� � L lC
s�c9au
_
0
M
� u
O �
■
W ►
� �
a z
W p
K �
�..�. r a _'—' __ _ _ _ . . .
p0 RF'�
OQ PP �... �S'�.�`
c�iv ;O �O� �9v
; � .��N 38549
, -� E �
' ' �'�ati o�.'��
i i � '' .`7 O f
s ' ....
`: ; S � � AL '
; i _ � :
1
�
i
�� o
`�^ � M
V a'.—^
o�
�,mgo
���
o m'° �
W oN �
m
� � � o e
a � .- U' d
� - . . . .REVISfONS � - - � -
_._._ ... - r--..
. . ._'_--____ . _ ..._._ ...--:
i PROJECT NUMf3ER: OB-012 j
PLOT DATE: 82MC8 i
DRANM BY: WDl !
CHECK 6Y: CLT
scn�: t• = za
_-- --- RW-4--° --;
�
�330
8320
8310
$300
--°---__ea__e_-------------------•-•---------•--� -------•-------.,,...e_�._�..�ve----;
; SNl = 15 __ _
� .�_�._.�Sh-5 Svzq _.� .
I �_z�
�
�
o '
� r. Q o , �
;----- ---°----•_.ee�.,.eeve�_V _ee_.e. :_�_.ay- e°---- -°--------�_._ ee_.e,
5 '—Sh—i m `�
� . �
, � ,
; a �
' ew fG I
� �
� �
%----•-°--------
------___-_�--------------------- s«�------------- - -----,
�------------ •--------------------••--°-------------°-°°----------------------------•
I I I I I I
STA.O+pp STA.0+11 STA.0+2g STA.0+41 STA.0+55
STA. 0+46.7
N Q> M I� N N O c`� O O�
N N � �p .— m m
M M aMO� oM0 � �� �� Nc0
W �
u u a u n u u u co co u u
�m �m Fm �m2m �m
F
WALL G
8330
8320 B290 �----------- ---°------------�
5NL = i5'
r5h-$.5�-4
� �
; v i
8310 82�0 ' -••-- -- -----�
FG BW Soil Neil
8300 8270 �------------°--•-----°------�
I I
STA.0+00 STA.0+13
� Cap � W
N N � �
W W
u n n u
�m �m
WALL H
"'-'__'-"-- SNL = ib'
s27osr_=k_sr°e--------------------•---•--------------- --•---�
', k -0 �; n„
,
, 1
� � �
� a ;.
, � .
, '
, � .
8260 ' '
; ---------- -- -----�6---- a---°--- S"-----s� ---°------•--s ---- =-----c--- ---•-�
`b � � a
gW FG
� �
; Shc Nail �
8250 �--------------------------------------------------------- ---------------------------------'
� � � � � �
STA.0+00 STA.0+16 STA.0+29 STA.0+52 STA.0+66
STA.0+22
O1 O c0 'W V ti N tn t0 ut�7
NN m� N N C11 �j �n1
� O�D GD CO N N OD W W N c0
11 11 II 11 �� 11 II I� � �� 11
�m �� �m �P�A � m �m
WALL J
8290 828D �---_�__.e_s_._e_ae._ee_a_____.e._____._.__. a._m_e._�___,��e,e.vv__e.�e_aa..__., 82gp
SFiI =1$."""" �
Sh=S Sv=4'
� V Tw i
; , ;
8280 8270 ' ° ° ' 627�
----° ``-----^---°------- ------------- -----�eeee .e.__q
�,~ � --v�
ew �
FG
soa r+�
8270 8260 �------•---------°----------------------------------------------------------°°----------°--°' 8260
I I I I I I
STA.0+00 STA.0+22 STA.0+40 STA.0+62
STA. 0+29 STA. D+4&
� m N� O �f) N�
� N N N �f7 f� (~�f N � � � �
��p W GO CU q� OD (p
� u u u r� m x r� aNO u u
n � � 3 � n � � �w n � �
z� m m n� m n�? �- tt1
� m � m
WALL I
8270 8280 ; -------°----- ���7i = i6� --------------• $280
�Sh 6 Sv�1 �
s2so s2�o ; � ° ` s27o
,
; � & ,
BW FG
i Sal NaA :
8250 8260 �---------------------°------°-----------' 8260
� �
STA.O+pp STA.0+22
N N
� � � �
11 II >II II
� m r �
WALL K
�
J
�
Q
Z �
O (� ;
I � � � �
i j Q � i
O
� j
W ! � W � �
; cn
i > ' � � � j
� i � '�� � � w i
� �
� > ; r�v � ~ �
O
� � {
I � �,w°�°° `
z
' N � Q I
, I � � � ,
I '
; ° Z I
I i � i
I � '
,
�, :
---_ _'�-- --- -- '
c.i o
O � �—
c'�°°$$
'��g��
H�Oc%��
����o
� C
� � � O X
=`r'c�a�i
:
0
h
¢ �
o ,
.
wr
� .
a z
w o
� u
a
�--------- - -- - -- -
� � p0 RcG� ,
o�,�... sr� i
I c.di�`,OQ`?� "r0� 90 ;
( '• � 38549 -i � ;
�o�a'yJ oo°' �� .
i `S A1- � '
i
, !_ . ---� �s�a
�j o
0
����
�
o�
ai.00roM
m
� � � O W
� 0 Vj C LL
Q U ^�p m �
a Q Of o O
d � � � �
. .. � � REVISK)NS .. _ . . i
i
iPitOJECT NUMBER: OB-012
PL07DAiE: 824h18 �
oRa,Haa ev w�� 1
cr�uc ev; ar �
scn,tE r = zn
� ,
, --'__—�:- _--- --. �
RW-5 ;
.
�..�.�.q,��
....�...�..w
( (/
i�
� (/
;
!.
�
` 3
i
; RW-6
rb e. o.a n.�r�a
n..mr a..Qr.�.t
�
�T
��
��
���
i
�
w e. ca.a n �n �u
w..m.>.v�n.e
�..�.�...�r,�
�
i���
la
�on:�oosa
w.e unn
Ilv M �nd!'v!'e1PP
t�1PYY
--- -�
�
i
J
�
; Q
� z �
o c�
v, o z
> a z
� Z j Y W
i O ; � W �
! � w
U ; W V �
� ' w 2 U
N
' Z
O ; N � p
� ' Z � f�
c U ,wmZ
j � N � J
H
o Z
J
Q
�
��
� ��
A
��O�A
a����
� A
�
��j V �`�i c%f
�
V n m c c°+�
�� O � �
i i)dLL
z
0
M
� �
� �
p s
K F
6 w
a z
� e
a �
i
i
, � �O Q�� �P Tc�`,Q(�
U r,0 0,�: v
' f ;•� 3 549 � :
[ I �..,y DO.: �,t�
� � ••. ��' 2
s ' �`
; � _ so.a..
� � �- ti5��.
i °� $
c���,
; �
mmg�
� �
; W � ��
�;
; a C����
a ��C7a
� REV1510N5
1
� i
( PROJECTNUMBER- 06p12
PLOT M7E: !2i/pE
j ow,ww ev: wo�
CHEpCBV' CLT
SGLE: NTS
RW-6 .
i
, �
.
min.
Bare 4'x4'
' W4.OxW4.0 Mesh�
Shotnete�
i
Hex Nut and Wa�er
; 6"x6"x7/2• Steel Plat%
i %
i
No. 8, Epoxy Coated
Grade 75 threadbar
Neat Cament Geout -" '
\\ G
N� °e�Fl@�ab� l
Ground Nail Det;
Temporary Shori
��
° � Typicad S�ofcrete Reinforoement
N C
� E
No. 8, Grade 75 epoxy-coated
threadbar or equivaleni
�8� I
�
Ground nail hWeLJ �
diameter = bar diameler+ 7/4"
Bearing Plate Detail
NTS
_
atnp urdms iu' u.c. � �
'� E
Wire Mesh > o�
botbm ot hde. Max i0' apart.
Typical Section Details
Top of Shotcrete
10' O.C.
0
�Ground Nail
a a
Exte�d drainboard ro ��_
bottom of excavation Final grade
and daylight through faca
Geocomposite Drain Strip Detail
Permanent Shoring Oniy
Drain strips shall not
extead to wifhin 24" of
top of shotcrete
�
t�l
z �
o �
tn p Z '
' > Q Z �
O c
I � �� m � F¢.. �
`.L W
� i Q i� W R' i
W � � F I
� + � � V W �
fi ��;
°r W
� U N � O �
T
� � ' � m Q !
� � W � Z
i (y tD Q
� `— J
� ¢ '
� Z i
' � !
� �
, _ . . _ .. _ . . _ _ �
� O
C) �
2
�� o
� � II � � �
i �t���$
t- L m v
� y � � � m
i 0 � U � �
' Vr, m mr�i
� � � O L t4
; x�c�a�
� _
I°
i �
' � u
i O o
� o `
w r
I ¢
i a s
j a �
I
I
I
"t1 ;a„ „O�: �' I
o'.'yj p�� w
S • Al- � ��
i
� o
�
����0
�o�o
> �
i � � � � m
w � 11
V��c
m
Q o
a Vi`rC9nt.
� � �. ..REVISIONS _ � . _ _ I
�
' �
'. PROJECTNUMBER 0&-0i2� I
PLOT DATE�. 8I1Mp0 I
ORAWN BY: WpL
ChIECK BY. CLT �
SCALE: NiS I
�. �� . . ..__ .. . . ...._ __._ ... ___.l
-- _ -RW 7 __J
.
I DEC/03/2009/THU 10:08 AM
N��COG
�� FAX No.970-468-1208
: ��� , . . . � : a.., �� ' ? �
�'�OU#V�GII O�F,s�+OY��NM�+NT9'^ r > '• ''�` � b > x � �'C .
• "<: . i Z
' :�''' �'r •' ,••s ' < ,�w ` ; ' • f_ ' i i� � i � �
.:•y:.o•,:r . r``r, a.��,•.gicx.•,.. .�; > S i a � >' x y
7{ ,6 Y v t
i��iJ',�}��+tiit I i e 'S Z . d � � 4 . . ... � � t
!.,�;...�.. .
j,
1
To Martin Haeberle Town of V�1�, Co. Building Official
From: Gene Morse, Eleva�bor Inspet�or
970-468-0295 ext. 108 or elevator�nwc.co�.co.us
Da�e: 12/3/Z009
Project Name: 1687 Bufehr Creek Rd. Vai�Co. B-OS-0131
�
�
���
u
��
Conveyance Plan Review
Conveyance Test and Inspection �
Location: 1687 Bufehr Creek Rd��Vail Cp.
Permit Number: NWCCOG 09- ��.
Conveyance Type: Residential . enger
P, 001/001
%wn of Vail
F�
Y
�08 - nt 3 c
The plans; have been revfewed and fot�t�d to conform to alI applicable ASME 17.1 and
IBC codes
The rafied speed of the conveyance me�ts ASME A17.1 requirements, speed in up
directiion 43 �PM, speed in down direction 43 FPM
� The Conveyance at d'�e above location was inspect,cd and tested on 12/2/2009 and a:
❑ TEMPORARY Certificabe; nas been issued.
� FINAL Inspection Certificate; has been issued.
❑. NO certificate; is being issued.
❑ FOR CONSTRUCTION USE ONLY
Comments: ' �''
€'�
�
�
,
Signature
:
,;
`�
� ��� � L ' � ����` ��
D�J
�'���> � 3 ��09
�
�
' TOVV{� �F �i�iL
Northwest Colorado Council of Gavernmer�ts i,;�P'O Box 2308 • Silverthorne ♦ CO ♦ 80498
970-468-0285 i Fax 970-�1208 ♦ www.nwc_cog.co.us
.�
�?;'
May 20, 2009
�VIr. Brennen Fitzgerald, Project Manager
Scott S. Turnipseed, AIA
1143 Capitol St., Suite 211
Eagle, CO 81631
Re: New Residence, Lot 2
1687 Buffehr Creek
Vail, Colorado 81657
Dear Brennen:
NEWKIRK ENGINEERING
Consulting Structural Engineering
407 Kendall Parkway
Boerne, TX 780]S
ph./ 830-755-8164
_�� �.y`' ��
�� � �
� � ��
��
�
During our visit to the referenced site today the following items were noted as requiring correction:
Item # 1
Item #2
In the Lower Level in the southwest corner of Bedroom #1 along the south wall the
wall double top plate has been cut directly under a floor joist bearing. It will be
necessary to install a 2x6 stud directly under this joist bearing down to the wall bottom
plate.
ln the west wall of the Gazage in the Lower Level the stud pack indicated by keynote
#11 needs to have one 2x4 added to the south face of the stud pack to provide the
required 4-2x4's.
Please forward this letter to the contractor after your review.
Sincerely:
NEWKIRK ENGINEERING
,.
��,
P'aul H. Newkirk, . .
Principal
TOWN OF VAIL FIRE DEPARTMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2135
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ALARM PERMIT
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location.....: 1687 BUFFEHR CREEK RD
Parcel No...: 210312215002
ProjectNo : �''�,.--���-4 ��r� � �-�
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
APPLICANT VAIL ELECTRONICS, LTD.
PO BOX 3940
AVON
CO 81620
License: 198-5
CONTRACTOR VAIL ELECTRONICS, LTD.
PO BOX 3940
AVON
CO 81620
License: 198-5
05/12/2009
Permit #: A09-0027
Status . . . : ISSUED
Applied . . : OS/12/2009
Issued . . . OS/14/2009
Expires . .: 11/10/2009
05/12/2009 Phone: 970-827-9120
05/12/2009 Phone: 970-827-9120
Desciption: NEW SFR- NEW FIRE ALARM SYSTEM
Valuation: $1,800.00
*+��+***+******+*�*�*�*ss�++++*****►�**s�*:r*�r+*r*r*r*�+r***+*+►�►x+ FEE SUM MAR Y ***s****r+�**r*r+�r��******+��***�*****r**rrr►*r*+**+*******
Electrical---------> $0. 00 Total Calculated fees--> $299.50
DRB Fee---------> $0.00 Additional Fees----------> $0.00
Investigation----> $0 . 00 Total Permit Fee--------> $299. 50
W ill Call---------> $ 0. 0 0 Payments------------------> $ 2 9 9. 5 0
TOTAL FEES--> $299. 50 BALANCE DUE--------> $0 . 00
v*s****.�***:***.+****��:�******►*►�**t*►*t:*****�s****«*�*r*�r***�*****s*+**+***r�*****r*t**��■*r**►r****+***:*�*�****t*v+**+*r*ss�*«�►�.►+rt**»*
Approvals:
Item: 05600 FIRE DEPARTMENT
05/14/2009 drhoades Action: AP Approved as noted on plans.
r:**�****�►*�*�*�*M***r*s*.xra.►****�******,*.**�:�,*.*�**r�*►*:wr*r.»:�sr**.**+*«��*«��a*sr*r***r****r**�++�**�+**�*�***»�+*s*v��.�+r**+*+++**�**
CONDITIONS OF APPROVAL
�**����*.�*�..�...�.���.*.*+.�**.*.*.,***,*.*.*.�*.*«**.*.**.*.*.«*.**.**�*.��..��«�*.*.....*�**�...�..*.�.*.*...�..����«�.*...�*�*.*.��.�...*...
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
RF.QUESTS FOR INSPECTION SHALL BE MADE SEVENTY-TWO HOLIRS IN Alj�f�ANCF��TELEPHOIY� AT 970-479-2252 FROM 8:00 AM - 5 PM.
CONTRACTOR FOR HIMSELF AND OWNER
**************************+***************�*******************�+*+**************************
TOWN OF VAIL, COLORADO Statement
***********************************************************************�*******�************
Statement Number: R090000477 Amount: $299.50 05/14/200901:05 PM
Payment Method: Check Init: SAB
Notation: 3089 VAIL ALARM
Permit No: A09-0027 Type: ALARM PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location: 1687 BUFFEHR CREEK RD
Total Fees: $299.50
This Payment: $299.50 Total ALL Pmts: $299.50
Balance: $0.00
**********************************************************************�*******************+*
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 FIRE ALARM PERMIT FEES 67.50
PF 00100003112300 PLAN CHECK FEES 232.00
/'
�
� FIRE ALARM PERMIT
Commercial & Residential Fire Alarm shop drawings are required at the time of
application submittal and must include information listed on the 2"d page of this
form. Application will not be accepted without this information.
_. _ ...... .... .. .. _.._ _.._.. .. _ . -._. __.... -__._ .._ .... _.._ - __ __. . ._ -._._ .._. ....... . . _... .. .. ..... . .... _ -
ProjecUStreet Address � � � "�. _. � t�� �
Project #: � � �
1687 Buffehr Creek, Vail, Colorado
_ _ ..................................................................................... _............................:
i Contractor Information: Building Permit #: 608-0131
i company: Vail Electronics A�arm Permit#:
/� t� �t - � v ��. �-
; ;. .. .............. . ..... ............ ............ .. ......... . . ... . . . ;
' Company Address: PO Box 3940
� �etai�ea Description ofwork: New fire alarm system
City: r`��" state: CO Zip:81,620
: for new sinqle family home.
Contact Name: Don Anderson
Contact Ph: (970) 827-9120 Cell: (970) 376-3922
E-Mail dOfl �121eCtf ICS.COfTI (use additional sheet if necessary)
Town of Vail Cont ctor Re i tratan No.: `� LL' "�
', �( `� Value of Fire Atarm: $ $1.800.00
! Contracto �gnatur ( qu red) (Labor & Matenals)
......................................
' Property Informatio�
' Parcel #: 2103-122-15-002
Legal Description: Lot #: 2 Block #:
' SUbdIVISI0f1: CLGIVI LIVGIVICK JVdUIVIJIVIV
Building/Complex Name:
owner Name: K C BUFFEHR CREEK PARTNERS LLC
!(For parcel #, contact Eagle County Assessms O(fice at 970-328-8640 or visil
www.eaglecouty.us/patie)
......................................................
' Does a Fire Alarm Exist? Yes O No (�)
Does a Sprinkler System Exist? Yes (�) No ()
!.........__ ...................._... ...................... ,...._...................._._......._......................._ ....,
� � � �♦ �
� • � :.- � • . � •
� ,. . -. . .� _. ,.
� l' ...� �ir��.i•
t _ • i., �� .'
� :. : r � •
: Work Class:
New ( � ) Addftion ( ) Remodel ( ) Retro-Fit ( )
Repair ( ) Other ( )
Work Type:
` tnterior (, ) Exterior ( ) Both { )
; .............................................................................................
: Type of Building:
Single-Family ( �) Duplex ( ) Multi-Family ( )
Commeraal ( } Restaurant ( ) Other ( )
_ _ __ .. . .... __ ____. _
Date Received:
�� i
''_�,
� �;,
,� �
.a ._
a � `_ ... �,_._
_ _,�
- , � �..
�I
'i,
MAY 1 �' 2009 � �����
� �_ ,
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
1�WNOFVAII, '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
NEW (SFR,P/S,DUP) PERMIT Permit #: 608-0131
Project #: PRJ07-0529
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location......: 1687 BUFFEHR CREEK RD
Parcel No....: 210312215002
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
CONTRACTOR SCOTT S. TURNIPSEED, AU
PO BOX 3388
EAGLE
COLORADO 81631
License: 320-A
APPLICANT SCOTT TURNIPSEED, AIA
1143 CAPITOL STREET, SUITE 211
PO BOX 3388
EAGLE
CO 81631
License: C000001848
ARCHITECT SCOTT TURNIPSEED, AIA
1143 CAPITOL STREET, SUITE 211
PO BOX 3388
EAGLE
CO 81631
License:C000001848
Description:
NEW SFR
Occupancy Type
Totals...
Number of Dwelling Units:
Occupancy: R3
Type Construction: VB
05/O6/2008
05/06l2008 Phone:(970)328-3900
05/O6/2008 Phone: 970-328-3900
05/06/2008 Phone: 970-328-3900
Factor Sq Feet Valuation
6,261 $1,200,000.00'
Status . . : ISSUED
Applied . . : 05/06/2008
Issued . .. : 01/20/2009
Expires . ..: 01/04/2009
Town of Vail Adjusted Valuation: $1,200,000.00
Total Sq Ft Added: 6261
..,.,.,,,x,.,.........,......,,.....,,...,....,,.,...,, .....................,,....,,....�« FEE SUMMARY .......,........................,..,,*,.................,,.........,,....,,.......
Building Permit Fee------> $6,338.75 Will Call---------------------------> $4.00 Total Calculated Fees-------------> $36,471.24
Plan Check--------------------> $4,120.19 Use Tax Fee---------------------> $23,800.00 Additional Fees-----------------------> $125.00
Add'I Plan Check Hours-> $330.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES--------------> $36,596.24
Investigation-----------------> $0.00 Recreation Fee----------------> $1,878.30
Payments-------------------------------> $36,596.24
Total Calculated Fees------> $36,471.24 BALANCE DUE------------------------> $0.00
.. x.,, x...... x. �.... � ......................... �.,, «�...........,.... .........,. «�....,..........., «................,....... �........,....»..,,. �.............,.,.,.,......,... «..,.,......
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INS
8:00 AM - 4:00 PM.
Signature qjt�wner or
new_con stru ct io n_pe rm it_041908
MADE TY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
. � �' �
ate
> ................�.,,..........,..,,��........,,,,,.....�,..........................,,.,..........,.........,.,..,.........,...,�,...,,.......�.....,,,,.....,...�.,.,...,............
APPROVALS
Permit #: 608-0131 as of 01-20-2009 Status: ISSUED
.. � ................. ... �.........,.............,......, �,,...... �.,,........,....,........... �......,....,.......,.............,...,... �............,.,.........,.....,.,..,..,,......
Item: 05100 BUILDING DEPARTMENT
05/16/2008 cgunion Action: CR sent applicant
comments
F:\cdev\CH RIS\PERMIT.COMMENTS\608-0131 \608-0131. DOC
06/12/2008 cgunion Action: AP APPROVED REVISED
PLANS DATED 6-5-08
08/07/2008 cgunion Action; AP APPROVED REVISED
PLANS DATED 7/7/08
01/16/2009 cg Action: AP APPROVED REVISED
STRUCTURALSHEET
Item: 05400 PLANNING DEPARTMENT
06/19/2008 npeterson Action: CR Need LOC and
Developer agreement for staging on Lot 1 and Rockfall
mitigation implemented on plans.
06/27/2008 npeterson Action: AP Approved plans
dated June 6, 2008. Applicant stated no staging on Lot 1
- no LOC required. (Ref DR608-0045)
08/07/2008 npeterson Action: AP Approved revised
plans date stamped July 31, 2008
Item: 05600 FIRE DEPARTMENT
06/11/2008 McGee Action: AP Plan Review
Notes:
Plan Set 6-5-08
1. Driveway grade is 8- 5%, no staging area.
2. Exterior perimeter measures 290 feet. However,
retaining walls prohibit exterior perimeter access.
3. Cedar siding on south slope exposes portions of the
structure to wildland fire hazards.
4. No fire sprinkler or fire alarm plans are shown.
Submit fire alarm and fire sprinkler plans.
Permit is Approved but Conditions require fire alarm and
fire sprinkler systems.
Item: 05500 PUBLIC WORKS
05/16/2008 cdelles Action: DN Need more detail
for strom water drainage, retainig walls(stamped
drawings), and what is proposed between driveway and
asphalt roadway to make up grade.
06/17/2008 cdelles Action: CR Emailed comments
to architect
07/03/2008 cdelles Action: AP
,...»..,,.>..,,.>,,,> ......................................................�..,.�.....,....,,>,.,.....<.....�.,�................,.�.�..,.,,.,......,..,....�....,...................
See the Conditions section of this Document for any that may apply.
new_construction_perm it_041908
+�aa�x>�����xwwx«++w+wwwrrxwww����>�x:w:+++++++t�+�+txxxxx�w�rwx���x+ww�«�w�ww+ww+e�www�w«ww++wwww�w»++xwe����+��������x�f�x�++a�x���+���������xxxxx��+x�x+����x����+w�w+we++++ww��w•
CONDITIONS OF APPROVAL
Permit #: 608-0131 as of 01-20-2009 Status: ISSUED
...�......� ....................................................,,.,,.,.......,,,.�........,,,.�...................x,...,.,,..,�....�,....,.�„x...........................,........,.,
Cond: 33
(PLAN) THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT
SURVEY. SUCH SURVEY SHALL BE SUBMITTED AND APPROVED PRIOR
TO REQUEST FOR A FRAME INSPECTION.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R313 OF THE 2003 IRC.
Cond: 18
(BLDG.): STAIRWAYS ARE REQUIRED TO MEET SECTION R311.5 OF
THE 2003 IRC OR SECTION 1009 OF THE 2003 IBC.
Cond: 19
(BLDG.): GUARDS ARE REQUIRED TO MEET SECTION R312 OF THE
2003 IRC OR SECTION 1012 OF THE 2003 IBC.
Cond: 34
(BLDG.): A COPY OF THE SOILS REPORT WILL BE REQUIRED BEFORE
A FOOTING INSPECTION WILL BE CALLED FOR.
Cond: 39
(BLDG): EMERGENCY ESCAPE AND RESCUE OPENINGS ARE REQUIRED
TO MEET SECTION R310 OF THE 2003 IRC OR SECTION 1025 OF THE
2003 IBC.
Cond: CON0010094
NFPA 72 and TOV compliant Fire Alarm system required.
Cond: CON0010095
NFPA 13 R compliant fire sprinkler system required.
new_construction_perm it_041908
*********************************************************+**********************************
TOWN OF VAIL, COLORADO Statement
********************************************************************+***********************
Statement Number: R090000045 Amount: $110.00 O1/15/200911:20 AM
Payment Method: Check Init: JLE
Notation: 1092 SCOTT
TURNIPSEED
-----------------------------------------------------------------------------
Permit No: B08-0131 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location: 1687 BUFFEHR CREEK RD
Total Fees: $36,596.24
This Payment: $110.00 Total ALL Pmts: $36,596.24
Balance: $0.00
************************+*****+*****************+*******************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
PF 00100003112300 PLAN CHECK FEES 110.00
�
Transmittal Form
`Development Review Coordinator
' 75 South Frontage F,toadrv �
Vail, C� �i�6"7 ;:
,Phan�� 97�-4�'9-2]'7�$`
����'��@w47��1� :,
Ins�it��~��,�47�3 �1 �
� - �.z�^•,. -,,,s+n�vs��'a�F� .�..�"�. �'. , wrr ia°Ma�
Revision Submittals:
1. "Field SeY' of approved plans MUST accompany revisions
2. No further inspections will be performed until the revisions are approved & the permit is re-issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
( ) Revisions
Parmit #(s) information applies to: Attention: () Response to Correction Letter
��N .� v 1/ n attached copy of correction letter
� g b�"� � 3 � J �- � �" ��; () Deferred Submittal
� / ( ) Other
� v �•
Project Address: Description / List of Changes:
� b R�"� 'P�v�'r��1r. ✓ �-Y-e.a �� �.
Contact Information
Company: SG�%�t" S•'�'`rv``��� � A t►`�
Company Ph: �-i2 � ' �i �1.. � Fax: Zi2� ' 3�j,0 (
Contact Name: w� ��G c b�'�-� t�
Contact Ph: Ce�l: �� �i � �Z � 3
E-Mail:
Town of Vail Contractor Registration No:
X
Signature (r�quired)
Revised ADDITIONAL Valuations (Labor 8� Materials)
(DO NOT include original valuation)
Building $
Plumbing $
Electrical $
Mechanical $
Fire Sprinkler/Alarm $
Total $
o.00
�� �o �� ��D
�
'��-�y.a«,�* :;�r- .�v �� � -
� � r s�o�
a�� �.�.� s fi�� �-�-�-�- (
�,�. �,,,,,�. �,.r-... � s 1� �-
� � S l . l � � ... �� Pl�,-�-. , ,
� C�v; �cti � � e.� �,, S �..�V
� c�.G,v� (^ co�. �� � wt►.,yl ►�`-� �'�
� d (' G�GPNt � 'f"' C7w✓G`� �
� v�'"�- �^'�"1
(Use additional sheet if necessary)
Date Received:
,
,- / r i t�
��C�f� '`� - �
�
JAN 1 �' �009 ! I
!�
-!���� d�� �;���,.._
+***********************************************+*+**********************+****++*******++***
TOWN OF VAIL, COLORADOCopy Reprinted on 01-20-2009 at 10:58:42 O1/20/2009
Statement
*****************************************************+**************************************
Statement Number: R090000045 Amount: $110.00 O1/15/200911:20 AM
Payment Method: Check Init: JLE
Notation: 1092 SCOTT
TURNIPSEED
-----------------------------------------------------------------------------
Permit No: B08-0131 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location: 1687 BUFFEHR CREEK RD
Total Fees: $36,596.24
This Payment: $110.00 Total ALL Pmts: $36,596.24
Balance: $0.00
******************************************+*+*********************************��************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
PF 00100003112300 PLAN CHECK FEES 110.00
-----------------------------------------------------------------------------
SEP-23-2008 11:15 From:HP-GEOTECH 97�9458454 To:97032839�1 P.2�5
i
�P
t�°��'1
HEPWORTH-PAWLAK GE07ECHNICAL
September 22, 2008
Scott S. Turnipseed, AIA
Attn: Mike Guzik
P. O. Box 3388
Eagle, Colorado S l 631
Subject
Dear Mike:
)I�E�;����tl� I'�u1,�3.1��,���,1�����.��1 I���
;�-'�,,,. ii�ir. �' �i:,,.,�
[���i n:4���,,� ��� in��u* i ,�I,n i,i„ ��lt���il
I''li��n��� 'r���'-��{ti ;�r�5
i", i �. '-� i l' `�-F `
c nt ul li�,��t�
FILE COPY
� � � � V �
�i,:, I, <<�u,
t._,._..��� , ., r..���
TOWN OF VAfL
�30�-o/3I
Job No. 10$ 529A
observation ofGarage Area Excavatian, Propo�ed Weiltner Residence,
Lot 2, Filing l, Zneiner Subdivision, 1687 Buffehr Creek Road, Vail,
Colorado
As requested, a representative of Hepworth-Fawlak Geotechnical, inc. observed the
garage/west wall area excavaCion at the subject site an September 15, 2008 to evatuate the
sails exposed for %undation support. The findings of our observations and
recommendations for the foundation design are presented in this report. The services
were perforrned in accordance with our agreement for professional engineering services
to Scott S. Turnipseed, AIA, dated Sex�tember l5, 2008. .Potential geologic hazard
impacts to the project site is beyond the scope of our services.
The residence will be a two story wood frame structure aver a walkout basement level
with an attached garage at the walkout level. Ground floors will be primarily slab-on-
grade with some areas structurally supported over crawlspace. The building has been
designed to be supported on spread fQOtings using an allawable soil bearing pressure of
2,SOb ps£ The foundation design was based on a preliminary soils investigation for the
subdivision by Koechlein Consulting Engineers dated June 4, 2003, Job No. 03-056.
Tliat report recommended spread footing foundations designed for an allowable soil
bearing pressure in the range of 2,000 tc� 3,000 psf, We have been provided a copy of
their report.
At the time of our visit to the site, the foundation excavation far the �arage and west wall
areas of the residence had been cut in numerous levels typically between about 3 to l 5
feet for each level with a total elevation difference of about SS feet. The west side
excavation cut had been soil nailed and benched. The southeast portion of the excavation
���ll�k�`I jl� i-��`� � � l � � � • ( �ti�i�I��l��u `i�i�..111}��, � � �� �il i i � �(1 � • til �\ c`1 I �1� il llc �) r (i �}h� � tl�'��l
SEP-23-2008 11:55 From:HP-�EOTECH 9709458454 To:9703283901 P.3�5
Scott S. Turnipseed, AIA
Septe�nber 22, 2008
Page 2
wiil be dug later. The soils expased in the hottom of the completed portion of the
excavatian consisted ofinedium dense, silty sand and gravel with cobbles. The rock
fragments were primarily angular sandstone and shale. The soils were tao rocky to obtain
a relatively undisturbed sample for sweU-consolida#ion testing. The results of a gradation
analysis performed on a bulk sample �fthe sandy gravel soils (rninus 5 inch fraction)
obtained from the site are presented on Figure 1. No free water was encountered in the
excavation and the sails were slightly moist to moist,
Considering the conditions exposed in the excavation and the nature of the proposed
canstruction, spread footings placed on the undisturbed natural soil designed for an
allowable bearing pressure of 2,500 psf can be used for support af the proposed residence
and garage. There could be same differential settlement due to the variable cut depths
and assumed variable foundation laadings. Footings should be a minimum width of 18
inches far continuous walls and 2 feet for columns. Loose and disturbed soils and
existing fill in footing areas should be removed and the bearing level extended down to
the undisturbed natural granular soils. The 6earing soils should then be moistened and
compacted. The bearing soils should be protected asainst frost and concrete should not
be placed on frozen soils. Exterior fc>otings should be provided with adequate soil cover
above their bearing elevations for frast protection. Continuous faundation walls should
be well reinforced top and bottom to span an unsupported length of at least 12 feet.
Foundation walls acting as retaining structures should alsa be designed to resist a lateral
earth pressure based on an equivalent fluid unit weighfi of at least 50 pcf far the on-site
soil, excluding topsoil anci oversized rocks as back�ll. For retaining walls taller than
a�out 12 feet, a uniform lakeral earth pressure load of 25H psf where H is the wall height
in feet should be used for the design. A perimeter foundation drain should be provided to
prevent temporary buildup of hydrostat'rc pressure behind the basement walis and prevent
wetting ofthe lower level. The underdrain should include at least 4 inches of free draining
gravel below the basement floor slab. Str�cEural fill placed within floor slab areas caJ�
consist of the on-site sand and gravel sails compacted to at leasfi 95% of standard Proctor
density at a moisture cantent near optimum. Backfill placed around the structure should
be well compacted and the surface graded to prevent ponding within at least 10 feet of the
building. Some settlement ofdeeper backfill areas should be expected even though the
backfill is adequately campacted which could result in distress to facilities cansCructed on
Job Na. 108 529A
- _ _ - ---
c�C�teC�"1
�EP-z3-2008 11:15 From:HP-GEOTECH 97�9458454 To:97�32839�1 P.4�5
.
Scott S. Turnipseed, AIA
September 22, 200$
Page 3
the backfill. Landscape that requires regular heavy irrigation, such as sod, and sprinkler
heads should not be located within 5 feet of the foundation.
The recommendations submitted in this letter are based on our observation of ihe soils
exposed within the foundation excavation and do not include subsurface exploration to
evaluate the subsurface conditions within the loaded depth of foundation irfl»ence. This
study is based on the assumption that soils beneath the footings have eq��,, �r better
support than Chose exposed. The risk of foundation mavement tnay be greater than
indicated in this report b�cause of possible variations in the subsurface conditions. in
order ta reveal the nature and extent of variations in thc subsurface conditions below the
excavatian, drilling would be required. It is possible the data obtained by subsurface
exploration could change the recommendations contained in this letter. Our services do
not include determining the presence, prevention or possibility ofmold ar other biological
contaminants (MOBC) developing in the future. If the client is concerned about MOBC,
then a professional in this special field of practice should be consulted.
We should observe the remainder of the excavatian when corrsplete to evaluate the
bearing soils in those areas. If you h<ve any questions ar need further assistance, please
call our office.
Sincerely,
H�FWORTH -- PAj�$�AK G����IICAL, INC.
-- s :.
David A. Ypung, P.E. • � 3 2.1�� �
i�.�►ti.g� �-W.� �.
�I � .��'•a�....••. ���
Rev. by: SLP �'�������N����M���
DAY/vam
attachxrtent Figure 1, Gradation Test Results
Jo6 No. ]08 529A
`�
- -.r.��.....�....� -_�....�_s..
�..+..�...�..�......,...���� �..��� --
. � � �.. � �.. �... � � � � �. �.. �.........,. �. � - �.
� � � ��.......,..�.�.��...�..�� � •�
.._ .�....rW...�...�,.��_._�..�.�.���
�.�..�����-� ������.....,�
� - - - _...� �..r.� �.� �...,� ��. �..� , �
���,.�----�...��.l._
....,�.�.�.,.�.�...�.,� --•-----
---�-----
r+r� rr�
=�������A�r�IY�
��W �� r���111���^�
WA��
r�� �YY�� �IIW WY � � �III�IwI�I I�II�S �
��- �� ���
�-r� �I�IY���III��-
����� ���r����
������--���
��-������r
��-������
����������
■� �� YY��IIIYI�IY Iln�l� �� �� /r�
--
�.�..,......--
� � w�w r �.rr
� w�w.n � r rr.r
r �rirr � � �
�����
� ��
�����
�r r
����
www�w � r
�1111^ Irl�llw �
II�IIIIr�=�
�III
���� �YY�����IIIIIAI� i��
������/��-���
�����������r����������
��������������������
� �����'��w���r���
r�������� ��rrr��w��^
����w�w��� rr�r���ww���
w��� �w� ���� �^ �. � rr� �� �. � � �
��� ��,.w�wr.rr �W�wr�
ww�.� �� �a�w�r��r���
� �r�rrrr��w��^�����
rr� �����w���r�����
� �������urrrr��������
��rr�r�����www� �r��r��
�rrrr ... r�rr���w�w��� ��rr�wi�w�
�..� ��.�r �rr� r��r, w�� � �rr �wu � � �
� �� .rrr� r��� �� � r.rrr
� r� � �r ��iir r�� � ^� ��...rrr � � ��w
.�� ���.nrr�rw������
���rrwrr��rr.�r�%r �������
w�w�w w�� ��i: �rr r� i� �� �r� �� r���
�� � �r�r rrr� ��w �� rrr� � � �w
�� ����������
����������rr������
���������������r��
rIW�1�lOOl�r �� � 1�� II�III� � � �� Irl�� � � �
�w�w� � �� ��� ww�� �� rrrr� �� � � w ��
r��. �� �r�s��w� �r��r�i�
rrrw� r�w�� rwr�� � �� � � � � w� � � �
�.��ww�w�ww� ��.�r�����
°� �������wir�����
����r�����������r���
���^�^� �������������
�� ������r������������
���� rrr� �� � � �w �r� �� rrr�� ��
�� � �r� �� ��� �� �� ww��s�
rwra�wrr�rrrrr���rrr�r���eww��^� r�r+�rr
����� �r�������
�� ���� ��rrrr�
9
1
f
� DEC-22-2008 e4:40 PM NEWKIRK.ENGINEERING 830 755 $164 P.01
�o�t� az, �oas
�Il', ArAril�etl Fitx�C!'�lc�i P3bj�Ct M�a�eC
Soott �. Turnipe�eci, AIA
1143 �apitol St., Suite 211
��la� C� � 163 I
Ae. Now Raeides�tcc, Lot �
16$7 �u�hr Cr�k
Vail, Colorado 81657
ria�r �rennen.
n��wKi��c �N������iN�
Can�ulting 9tructur�l F�eerin�
407 Ka�ll �y
Boorno, TX y80Y�
ph./�x 830-'i��•�164
�s - o �� r
�����%�
D
DEC 2 3 1008
TOWN OF VAIL
Attach�l ara 2 partiat pl�n�► and 3 dotails for rovi�iang xo tha exterior i�ont en#�y etatr s�d drivaw�y
f�x'tho raRerbnc�dd pr�j�ct.
Pl�a�o le� me know ii yau h�ve �ny queetion� ar if � may b� � tLr�th,er �e�iet�nnce.
Sino�roly:
N�WKIRK ENGiNEEf�I G
�uf H. �Iewkirk, P, .
�rir�aipa�
'DEC-22-2008 04:41 PM NEWKIRK.ENGINEERING 830 755 8164 P.02
, � �
�'�i� 0 I I .
� I -e � - " � . '" �
.
�� �
, � s.w I � � �. ,... _ � .�.,. f i
�s.r� _ .�.. � � .... _ .� J i� � _ -� �. ... _ _ -.� I
s,w.
,,.,..,_. ........ _ _ � .� _ ...r J s r� { � i '��',"
, �' � � � � �-
'"� � " ' 9�" �
� � _�l r"� �
� I I
�'�a" �' � � I I 1 _ �
,�,,� 2�-1 " � � �
� �� � � � �r� � �.
� � ��8» ' � �
I
„ ► q�
�� f , �� � � I Y�� � �w
/ �„
r/'f ,r�f N2' � � '��MCN'� ��
� t'� / � '� � �
�
� � / /'� �
/ � � � . �� /' � s• � SET �'I: d� FTGQ. 1!Y
/ � r .
< /� �/' �,.-' �N�i d� irP. �i
C "�
\ ` ey� ,,,'/ �,/ /� `�,�,1111't1�►'ifq►I��M��i,
`\ ` � � �,'��t`����"a a��.�� �✓a
\ ,.'� I, � \ :�.' ,�� � y4 � d, �
� ` � � S ^ `��,��„�;�'ty� � r. �
``� `� /'� '' � � �L c:. � ,K'
` • � � ����� ' �
\ ,,,.'' ,. ���;,L� /� y�, � � �
\ � � r �. .�,..�"� � _. ±�., .,
. �, � � ff ��,
.�'� � ,� �' f ���''�
� �,� �
��,, •'' � �,,� �,� r� (�V19�ED 6/13/�
i
�
♦�
���
���
,!� �
DEC-22-2@08 04:41 PM NEWKIRK.ENGINEERING 830 755 8164 P.93
. ���, .
�I�'� �
` DEC-22-2008 04:�2 PM NEWKIRK.ENGINEERING
�
�
�
�
2�8 OdNT
ORIU, dc E�OXY
GRp1JT �A�
RdN�, 8` INTO
F'�N. WALL
�a�x�t
i d. w�u.
EXL �IN. �
�RAbE
N
83@ �55 8164
� ! � � 1�� ��
eaow st�E c�,
COORp, W/ A�CH.
SF� pLAN F4R
�I.A9
��
� ��
� a w �r.
,��rw�o�ua
�
� r
��
�_����
3�4' ■ 1'—p" ACpEO 8/13 f b� .
P.04
DEC-22-2008 04:42 PM NEWKIRK.ENGINEERING 830 755 8164 P.05
� ..� ��...
� DEC-22-2008 04:4� PM NEWKIRK.ENGINEERING 830 755 8164 P.06
��� w/ ��. �
NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
10WNOF VNL '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
NEW (SFR,P/S,DUP) PERMIT Permit #: B08-0131
Project #: PRJ07-0529
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location......: 1687 BUFFEHR CREEK RD
Parcel No....: 210312215002
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
CONTRACTOR SCOTT S. TURNIPSEED, AI�
PO BOX 3388
EAGLE
COLORADO 81631
License: 320-A
APPLICANT SCOTT TURNIPSEED, AIA
1143 CAPITOL STREET, SUITE 211
PO BOX 3388
EAGLE
CO 81631
License: C000001848
ARCHITECT SCOTT TURNIPSEED, AIA
1143 CAPITOL STREET, SUITE 211
PO BOX 3388
EAGLE
CO 81631
License: C000001848
Description:
NEW SFR
Occupancy Type
Totals...
Number of Dwelling Units:
Occupancy: R3
Type Construction: VB
05/O6/2008
05l06/2008 Phone: (970) 328-3900
05/06/2008 Phone:970-328-3900
05/O6/2008 Phone:970-328-3900
Factor Sq Feet Valuation
6,261 $1,200,000.00'
Status . . : ISSUED
Applied . . : 05/06/2008
Issued . .. : 07/0812008
Expires . ..: 01/04/2009
Town of Vail Adjusted Valuation: $1,200,000.00
Total Sq Ft Added: 6261
........................................................«..............�......... FEE SUMMARY .....x.........._.........,....R..,.....,...__.....,.._.............,....,....,
Building Permit Fee------> $6,338.75 Will Call---------------------------> $4.00 Total Calculated Fees-------------> $36,361.24
Plan Check--------------------> $4,120.19 Use Tax Fee---------------------> $23,800.00 Additional Fees-----------------------> $125.00
Add'I Plan Check Hours-> $220.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES--------------> $36,486.24
Investigation-----------------> $0.00 Recreation Fee----------------> $1,878.30
Payments-------------------------------> $36,486.24
Total Calculated Fees------> $36,361.24 BALANCE DUE------------------------> a0.00
.,. .............................�................................�..�..........�.�.,.._,....,.,,...,..................�,..�..,..__........,,..+=...x.,..........,,.,....,.._....,.,,,.....
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto. „ �
REQUESTS FOR INS
8:00 AM - 4:00 PM.
Signature of Owner or
new_construction_perm it_041908
MADE TWENTY-FOUR HOURS IN ADVANCE B TEL P ONE 70.479.2149 OR AT OUR OFFICE FROM
� �
r Dat
.,� ............................................>....,.....,,,.,....................,,,,.,..................,.,,..,........,.,,,..,....,..,,...,.,..............,.......,..,,,.........
APPROVALS
Permit #: 608-0131 as of 08-14-2008 Status: ISSUED
.............................�....,,,,,....,..,.....,,,.,.........,..,....,........,,....,...,...�.............,......,....,......,.,.,.,.,,:,....,......,.,.,,...,.....,,....,......
Item: 05100 BUILDING DEPARTMENT
05/16/2008 cgunion Action: CR sent applicant
comments
F:\cdev\CHRIS\PERMIT.COMMENTS\B08-0131 \B08-0131. DOC
06/12/2008 cgunion Action: AP APPROVED REVISED
PLANS DATED 6-5-08
08/07/2008 cgunion Action: AP APPROVED REVISED
PLANS DATED 7/7/08
Item: 05400 PLANNING DEPARTMENT
06/19/2008 npeterson Action: CR Need LOC and
Developer agreement for staging on Lot 1 and Rockfall
mitigation implemented on plans.
06/27/2008 npeterson Action: AP Approved plans
dated June 6, 2008. Applicant stated no staging on Lot 1
- no LOC required. (Ref DR608-0045)
08/07/2008 npeterson Action: AP Approved revised
plans date stamped July 31, 2008
Item: 05600 FIRE DEPARTMENT
06/11/2008 McGee Action: AP Plan Review
Notes:
Plan Set 6-5-08
1. Driveway grade is 8- 5%, no staging area.
2. Exterior perimeter measures 290 feet. However,
retaining walls prohibit exterior perimeter access.
3. Cedar siding on south slope exposes portions of the
structure to wildland fire hazards.
4. No fire sprinkler or fire alarm plans are shown.
Submit fire alarm and fire sprinkler plans.
Permit is Approved but Conditions require fire alarm and
fire sprinkler systems.
Item: 05500 PUBLIC WORKS
05/16/2008 cdelles Action: DN Need more detail
for strom water drainage, retainig walls(stamped
drawings), and what is proposed between driveway and
asphalt roadway to make up grade.
06/17/2008 cdelles Action: CR Emailed comments
to architect
07/03/2008 cdelles Action: AP
.....................................................................................�.,.,....,...,,..........,.........................................................,..,......�..
See the Conditions section of this Document for any that may apply.
new_construction_perm it_041908
..................................................................................................................................�..................�,,,,.,.,.......................
CONDITIONS OF APPROVAL
Permit #: 608-0131 as of 08-14-2008 Status: ISSUED
.. x ...........................................................................,...,.......,.,...,,,,,,...,..,.......................,..,.,.,,...........,....,..,.,.,,.......»......,..
Cond: 33
(PLAN) THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT
SURVEY. SUCH SURVEY SHALL BE SUBMITTED AND APPROVED PRIOR
TO REQUEST FOR A FRAME INSPECTION.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R313 OF THE 2003 IRC.
Cond: 18
(BLDG.): STAIRWAYS ARE REQUIRED TO MEET SECTION R311.5 OF
THE 2003 IRC OR SECTION 1009 OF THE 2003 IBC.
Cond: 19
(BLDG.): GUARDS ARE REQUIRED TO MEET SECTION R312 OF THE
2003 IRC OR SECTION 1012 OF THE 2003 IBC.
Cond: 34
(BLDG.): A COPY OF THE SOILS REPORT WILL BE REQUIRED BEFORE
A FOOTING INSPECTION WILL BE CALLED FOR.
Cond: 39
(BLDG): EMERGENCY ESCAPE AND RESCUE OPENINGS ARE REQUIRED
TO MEET SECTION R310 OF THE 2003 IRC OR SECTION 1025 OF THE
2003 IBC.
Cond: CON0010094
NFPA 72 and TOV compliant Fire Alarm system required.
Cond: CON0010095
NFPA 13 R compliant fire sprinkler system required.
new_construction_perm it_041908
******************************�*************************************+***********************
TOWN OF VAIL, COLORADO Statement
*****************�**************�*�********«*******�****************************************
Statement Number: R080001396 Amount: $220.00 08/14/200812:00 PM
Payment Method: Check Init: DDG
Notation: Scott
Turnipseed 1014
Permit No: B08-0131 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location: 1687 BUFFEHR CREEK RD
Total Fees: $36,486.24
This Payment: $220.00 Total ALL Pmts: $36,486.24
Balance: $o.00
************************+*************************+************+*****************+*+***�****
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
PF 00100003112300 PLAN CHECK FEES 220.00
.. ae.�„+ �.a ry��:� � a . _� � K,'r ' "� aW,�,+`N;�^n�tfi� N�d, �r.�.,, ' '. .'. .
,R ��t; , °•x , . } � ' ° 1?evelopment Revfew Coordindtor
,
� -..,� ���� � . .�r '" �; �,�• 7� Saut�r ��ron � �� �
. q
+_�, ��.� . '` ` °��a .� . ' � �,�� ��:'*'"` �at �
, ., , .
� � �
, ' � t.,, � � t � `°���
`y. � , w
' i' yp," � 4 et.:� �• "y�� �* • ��
'� � . "�,., � �iro ;, 4� �. �
. ��� �
-.
� , .
'�4i,, . ,� ,� . . , �,�
,; , � . :
.._� $ � � A�jc, __ �,, ��'�''A l m ,�r•, , $ i
Revision/lnformation Transmittal ',
All Revision submittals must include the Field Set of approved plans and a copy oi the correctiou letter.
No fiirther inspections will be performed until the revisions are�proved an the ernlit is re-issued.
_ _. _ _ _
_ _... _ _
� Permit #(s) information appiies to: Attention: �'�, Revisians '
, �j b'Q� - 0 13 ( S� n�� i� I�- ___ ( j ReSponse to Correction Letter
- attached copy of correction letter
{ ) Def'erred Submitial
; __ . ,
Project Address: Reason for Revisions (include a list of a!l changes that
have been made from originai approval):
`Ce�1 p����ekr �r�-e� iZd . � _Fa..�.d.�.k�� __`�a`-^^��k-_d.� �
Contact In#ormation — —�
�' '^ 1,1 �1 ' kU S c k�a� r� d✓-� � ht,w d t�l-�� �
Company:_.>ca��. 1,Wn�yS'ua � --- ----�—�.----------------------
company Pn: �ll t3 •�iq. G o Fax: '�2 Y� • 3�i o( ___� 5 a c v►o�►{j� __ wc. l� �c I�^�.� _
Contact Name:_^ T''� 1 iG �G G v�l JF — ,�„v, ,�a -�`,�.t .� l, i S'Z .S
Contact Pn: �1'�0 -a 04 • b2(i 3 Cell: S A rY► E _ ---..-_.._--___�__ _.�_.�__�-�—�--- -
,
E-Mail:_,+M��� TN1r����0.dOU0�..LOW! ia l7ied�rq�a�e�+ ^�r'� A.L�d�tJ SY�'+A��� �•��ndaw
Towr� of Vail C�ntractor Registration No: �rt ,r�
-- ----- ; ----•— _ _------
X ' �__,,,,:d�� En a�.. �Z,-� ,
_._____
______�_______------_.____ __
Signature (required) '� /a r��t d Goo�.� GlPu� �_�� �,�,,r '
Revised ADDITIONAL Valuations (Labor & Materials) ,! ��tt�� �,lF �
� (DO NQT include original valuation) —� - "
--�--- -- -----____—____ __-- --
�
' � C{n,r,,�,�� d �A.h•b %• l? __ _�'° c._ _ d o �bLe -,- �•� �1
i Building $ � �
Plumbing $ __ tivr � �" . lQ� �'� ____^..___-------
(Use additional sheet if npcessary}
; Electrical $
; _. .
Mechanica! $ �
' Date Received:
Fire Sprinkler/Alarm $ _
Total $ $�.��
� �r�wr� o� va,��. �
NOTE: THIS PERM/T MUST BE POSTED ON JOBSITE AT ALL TIMES
:
TOWNOFVAQ. '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149
ELECTRICAL PERMIT Permit #: E09-0018
NSFR
Job Address:
Location.....:
Parcel No...:
1687 BUFFEHR CREEK RD VAIL
210312215002
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
APPLICANT MOUNTAIN ELECTRIC
P. O. BOX 131
GYPSUM
CO 81637
License: 105-E
CONTRACTOR MOUNTAIN ELECTRIC
P. O. BOX 131
GYPSUM
CO 81637
License: 105-E
Desciption:
POWER
Valuation:
02/11 /2009
02/11/2009 Phone:970-524-7115
02/11/2009 Phone:970-524-7115
Project #:
Status . . . :
Applied . . :
Issued . . .
Expires . .:
WIRING FOR NEW SINGLE FAMILY RESIDENCE, INCLUDING TEMPORARY
$21,000.00
Square feet: 4100
PRJ07-0529
ISSUED
02/11 /2009
02/11 /2009
08/10/2009
�„��,..�����,,...*„*�.�,..,,<*.*�„�..��.<*.***«�.�..*.,.,,«���.*�***«*«�� FEE SUMMARY *..*«*****��.�,.*,.*«*«,,.*«**.,«««��.***.,*.*.,.,..***...�.***.,«...�.�.*.**��,..
Electrical Permit Fee---------> $182.85 Total Calculated Fees--> $186.85
Investigation Fee--------------> $0.00 Additional Fees----------> $0.00
Will Call Fee--------------------> $4.00
Use Tax Fee-------------------> $0.00 TOTAL PERMIT FEE---> $186.85
Total Calculated Fees-------> $186.85 Payments-----------------> $186.85
BALANCE DUE----------> $0.00
�„��,.,,,,. �,,.,,�.,.*..,**,,,,.,<,,,.***��„�..,***.*,,,.�,..,..**�„«.,�.,.,,..*.,�,..,�„*.*..*�„�..,..*.*..«��,«.,****.,.,*��«��..***«�«„�„«**.,*«.�.*..***�.,,..,*.,,«„�.�,,,.***..�..,,�.,,...�«�„
APPROVALS
Item: 06000 ELECTRICAL DEPARTMENT
02/11/2009 JLE Action: AP
.,�.,��....����,�.,,..�.,,,��,,,....,.�„����«..***�«„«�..�.***..��.«.*,.*«*..�.*.««*,..*.,..,*«**�.�,,.**.,**«**«�.*.**.****,.�«„**.«*«��.�«**«„*«„��*«**««*.�.�..**„���.��..**.,�.,
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
„���«.,......��.,�.*.,.«.,,,�„�.,�..*.�«��«„�....,*«�.,�,.�..**..«.,�..,.*.*«�,,,.,,***«��.�*.,,,.«*,,,,.«.�.�.«*.,..«*«�,.�.,....**,,,.��.,..,�.*,.«�«�«.,,�.***.,��,.,,..*�.��«.,«�,�..*.,,,..,�.,��
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that
all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state
laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and
Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE
OFFICE FROM 8:00 AM - 4 P�VI. �.
TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR
:� .
gnature of Owner or��uFitractor
V r ` � �� �
Print Name
elec_prm_041908
:a �--�1 `�-- fl `�
Date
De�elopment Review Coordinator
75 South Frontage Road
Vait, CO 81657
Phone:970-479'-2128 ',
' �, Eax. 970=479=2 � 72 '
! � Inspections: 97U-479-2149
� �� ��
TOWN OF VAIL ELECTRICAL PERMIT APPLICATION
Project Address � �� t l-- �p� � � _ � ��
' Project #: �
I Co �-7 � UFFC-�Z_, C�'-C� K �6 �-- o f 3 I
„ .�...... .,. ,�,..,,,. ,,,.r.... �»„ ,_.... Building Permit #:
Contractor Information �/� � /V'� ��
's Electrical Permit #: �"1 U"
Company: �� t)�t�'f� t� �� �C�`T�i(�.lC ZlJ C
Company Address: 6��'� � � �
City: �� PS � � State: �_Fax: �c�7'��7 � �
Contact Name: � l �� ��''E��Iv
Contact Ph: �1 � � � � � 5 Cell: .SI� �
E-Mail: �������� � C�l--���� � /V�T
Town of Vail Contractor Registra ' n No: %��� �
X`'y� e-e�.e,�--
Contractor Signature (required)
Property Information
Parcel #:
Legal Description: Lot # c% Blk #,
Subdivision: � ✓���I� ����1`
�--.
Job Name: �JCC=��"i" � 4W �{�SE1� (�s 95'�UMe- �'�-
Owner Name: 5�' �� � i�N� � �'C�IJ
`g�x 33 � ��61�
Mailing Address:
(For Parcel # Contact Eagle County assessors Office at 970-328-8640 or visit
www.eaglecounty.us/patie) -
Architect.(� Designer (� Engineer�
Name: S c.o�t't' T� 2-IJ G� S C=�
Phone: �i'r�`� " 3� ��
Fax: "3 �, � .- `�q�P� �
E-MaiL _
i ��.o -��
Detailed Description of Work: � �l'v �L�
�Qi,�'vl i � +� �'� S' <<���-�—
j✓�L �"�',.;�_� �Pa�1� �
(Use additional sheet if necessary)
COMPLETE SQ. FOOTAGE FOR AREA OF WORK AND
VALUATION OF WORK (Labor & Material)
Amount of SQ Ft ��� ��
Electrical $ � c3- �� �� a
Work Class:
New (v�Addition ( ) Remodel ( ) Repair ( ) Other ( )
Building Type:
Single-Family ( i�Two-Family ( ) Multi-Family ( )
Commercial ( ) Townhome ( ) Other ( )
Date Received:
_-
I__ „�; 1I�,
n� ;; ��
� i� ��9
,�
;;
{� ��� �. � ���� L.,����
',L�
�
� L '� � �
�
� ���d���, k ; "' ° �� m � -._...._ �
6 . ... . :... . .
********************�************************************************************+**********
TOWN OF VAIL, COLORADO Statement
**************************************************************************+*********+*******
Statement Number: R090000145 Amount: $186.85 02/11/200901:56 PM
Payment Method: Check Init: JLE
Notation: 4164 MOUNTAIN
ELECTRIC
-----------------------------------------------------------------------------
Permit No:
Parcel No:
Site Address:
Location:
E09-0018 Type: ELECTRICAL PERMIT
2103-122-1500-2
1687 BUFFEHR CREEK RD VAIL
Total Fees: $186.85
This Payment: $186.85 Total ALL Pmts: $186.85
Balance: $0.00
*************************************+********************��*************++****************�
ACCOUNT ITEM LIST:
Account Code
--------------------
EP 00100003111100
WC 00100003112800
Description Current Pmts
------------------------------ ------------
ELECTRICAL PERMIT FEES 182.85
WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
TOWN OF VAIL FIRE DEPARTMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
97('�-47�-2135
Job Address:
Location.....:
Parcel No...:
Project No :
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
SPRINKLER PERMIT
fC'F I�: iT���Z��.����.� ��l.lL1
210312215002
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
APPLICANT 4VESTERN STATES FIRE PROTECTI
7026 SOUTH TUCSON WAY
ENGLEWOOD
CO 80112
License: 338-5
CONTRACTOR WESTERN STATES FIRE PROTECTI
7026 SOUTH TUCSON WAY
ENGLEWOOD
CO 80112
License: 338-5
Desciption: INSTALL FIRE SPRINKLER SYSTEM
Valuation: $31,450.00
03/24/2009
Permit #
Status . . . :
Applied . . :
Issued . . .
Expires . .:
F09-0010
ISSUED
03/24/2009
04/21 /2009
03/24/2009 Phone: 303-792-0022
03/24/2009 Phone: 303-792-0022
**r**►*****�*+r+*���++*�**s*****��***+****�***�*********�+*�******+s FEE SUMMARY «*��+�****�*+s*+**++**��r*+��+*****t*r*r*r***++***+a�+***++*
Mechanical---> $ o. o o Restuarant Plan Review--> $ o. o o Total Calculated Fees---> $1, 6 86 . 63
Plan Check---> $ 3 5 0. 0 0 DRB Fee---------------------> $ o. 0 0 Additional Fees-----------> $ 0. 0 0
Investigation-> $0. 00 TOTAL FEES--------------> $1, 686.63 Total Permit Fee----------> $1, 686.63
W ill Call-----> $ 0. 0 0 Payments-------------------> $1, 6 8 6. 6 3
BALANCE DUE---------> $0 . 00
*�+.**r►*�***++*****+***r***��******r*r***r*�***********r*s�*r��*�++*�*r**r*s****r****s*rrr**r�*rrrs*:***�:****r+r***r**r*+�*�***�►++r++«+��*►�*+
Item: 05100 BUILDING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
04/14/2009 drhoades Action: AP Approved as noted on plans.
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
**�.***�.*+.��*��*.*+*,**►�...*.*****�****���*�*�+***«�*+�:**�*.�*�*.*.*,».�..*.**.*�+�*+**�.+�++****�*�+�*.+#�+.��+�**.�+�.+�+:*.**..***+***►+�*
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE SEVENTY-TWO HOURS IN ADVANCE BdY TELEPHONE AT 970-479-2252
FRONi 8:00 AM - 5 PM. " - :�f � �'�
. ,. �
;
�
SIGNATURE OF OWNER OR
FOR HIMSELF AND OWNER
***************�****************************************************************************
TOWN OF VAIL, COLORADO Statement
***+*+***********************++******+**+*****************�+*+*++***************************
Statement Number: R090000337 Amount: $1,686.63 04/21/200909:52 AM
Payment Method: Check Init: JLE
Notation: 420107878
WESTERN STATES FIRE
-----------------------------------------------------------------------------
Permit No: F09-0010 Type: SPRINKLER PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location:
Total Fees: 51,686.63
This Payment: $1,686.63 Total ALL Pmts: $1,686.63
Balance: $0.00
+***+*+********************************************************+***********+****************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 SPRINKLER PERMIT FEES 1,336.63
PF 00100003112300 PLAN CHECK FEES 350.00
FIRE SPRINKLER PERMIT
Commercial & Residential Fire Alarm shop drawings are required at the time of
application submittal and must include the following information:
1. A Colorado Registered Engineer's stamp or N.I.C.E.T level III (min) stamp
2. Equipment cut sheets of materials
3. Hydraulic calculations
4. A State of Colorado Plan Registration form
5. Plans must be submitted by a Registered Fire Protection Contractor
! Project Street Address:
' 16�7 ��c�'��tr C✓�e�
', (Number) (Street)
Building/Complex Name:
C�s-�� �, �n; ( 2�, < <.�.�.
_ _.
(Suite #)
; Contractor Information: ,1
Company: W2St,PX✓l S'"�� 1'�' /L' �r'O�fl��l
! Company Address: �e�� S T�'`��c',? �%u�
' City: [;e�s�u�� State: �� v Zip: �v�/2
', Contact Name: L� ` T�
' . ,,Y� .y 2
' Contact Phone: 3� a 11�2
i E-Mail ��-' �•�� tt/��T j� � G'S'
,�-r
' Town of Vail Contractor Registration No.: 7j�—S
'; X �'
Contractor Signature (required)
Property Information
Parcel #: �'%�3 / 22l��v�•=
', (For parcel #, contact Eagle County Assessors Office at 970-328-8640 or
' visit www.eaglecouty.us/patie)
, Tenant Name: � ���`� "' C�` / "�ZtSf �LC.
Owner Name:
Complete Valuation for Fire Sprinkler Permit:
Fire Sprinkler $: � 3/� ��U
��,. -�. � t, .
� � • � • • . • � • _�
= . i,. .. ��I.:.ii ! ►
'� = . � �c
� ••
Office Use:
Project #: �1 V � � � �� 1
Building Permit #: � V�O ( v 1
Sprinkler Permit #: �� 1 �Ov � LJ
Lot #:� Block # Subdivision: �'Aw• 1 Z.i�lilt (�
_ --r�
Detailed Description of Work: '
1�f S�c�.�'� �,� �Y2��"
(use additional sheet if necessary)
....��.., . .... .,: , .,
Detailed Location of Work �cL! /
_... .
Does a Fire Alarm Exist? Yes (� No (�)
Does a Sprinkler System Exist? Yes O No (�) ,
Work Class:
New (�) Addition ( ) Remodel ( ) Repair ( )
Retro-Fit ( ) Other ( )
Type of Building:
Single-Family (�O Duplex ( ) Multi-Family ( )
Commercial ( ) Restaurant ( ) Other ( ) ,
__.... _ __
Date Received:
� ��[� oMC�
� MAR 2 � 1009
� � �����J C3F VA�L
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT
.�
TOWNOFYAd, '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970-479-2139 f. 970.479.2452 inspections. 970.479.2149
MECHANICAL PERMIT
NSFR
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location.....:
Parcel No...: 210312215002
OWNER BUFFEHR CREEK PARTNERS 04/30/2009
PO BOX 305
MINTURN
CO 81645
APPLICANT WIEMER'S HEATING & SHEETMETA 04/30/2009 Phone: 970-328-9315
PO BOX 22
EAGLE
CO 81631
License: 418-M
CONTRACTOR WIEMER'S HEATING & SHEETMETA 04/30/2009
PO BOX 22
EAGLE
CO 81631
License: 418-M
Phone: 970-328-9315
Desciption: INSTALL BATHROOM FANS, CLOTHES DRYER AND KITCHEN RANGE
VENTING, ROUGH-IN AIR CONDITIONER
Valuation: $8,000.00
ALL TIMES
Permit #: M09-0052
Project #:
Status . . . :
Applied . . :
Issued . . .
Expires . .:
PRJ07-0529
ISSUED
04/30/2009
05/11 /2009
11 /07/2009
.�....,�.�.�....+......*......«..��...........,�,...**�.....>,�......�...�..,....*.FEE SUMMARY.,�*..�..,.........,.......�.�.�.�...+�....,..��...«.����..,..��...........«�� .............
Mechanical Permit Fee---> $160.00 Will Call------------> $4.00 Total Calculated Fees---> $204.00
Plan Check-------------------> $40.00 Use Tax Fee------> $0.00 Additional Fees-----------> $0.00
Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $204.00
Total Calculated Fees--> $204.00 Payments-----------------> $204.00
BALANCE DUE---------> $0.00
»*����...,,.*..*���..*...*.*:+,.....��...**.*.....��«.:......,�**�::....*...........>.*.�..�..�»**......««<.�.»*�*�<..«..��..�*.....<�...,,�,.,�......��».�*��««..�.,...�.,.,�.�..,,,,,....
APPROVALS
Item: 05100 Bl11LDING DEPARTMENT
04/30/2009 JLE Action: AP
........,.x<�.......�...x«»»»...,........«..,.....,.�.....,.�.,.�..,...,t.....�..�...�,..�.�.......�..�<:,......*.�......�......,..,.�*..........*�...�.....�......<...�.�..,.� ...................
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
..�.,.............�,�.........��.........�...*��....,....���.....».....*.�,.......,�.� ...................>.....�.��.,,<...�..��...,�.........�.�.....,..«+..�.,.,...x......»........,�....,......
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
AM - 4 PM. /I
�
of Owner or
STf��'� // Gt% �>�''"', .? /� —
Print Name
mechcan ical_permit_041908
� //�7
Date
*******+**********+*********************************************************************�***
TOWN OF VAIL, COLORADO Statement
*********+***************+**************++************+********+******+***�*+***************
Statement Number: R090000437 Amount: $204.00 05/11/200910:37 AM
Payment Method: Check Init: LC
Notation: #7346/Wiemers
Heating and Sheetmetal Inc.
-----------------------------------------------------------------------------
Permit No: M09-0052 Type: MECHANICAL PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location:
Total Fees: $204.00
This Payment: $204.00 Total ALL Pmts: $204.00
Balance: $0.00
********************************************************************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 160.00
PF 00100003112300 PLAN CHECK FEES 40.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
04/30/2�009 10:02 FAX 970 �28 9316 WIEMERS HEATING
I
[� 002
MECHANICAL PERMIT
BQiLer/Furnace A.p�lications MUST include:
a Mechanical Room Layout/Plan wlth Dimensions
❑ Comb�stion AIr�Duct Size and Location
� Flue o� Vent Size
❑ Gas Piping P�an� (if applicable)
❑ Heat Loss Caleulations*
o Equlpment Cut Sheets for Boller/Furnace
� Not requ/rad h�r same slze (67tJ) boller replaremont wlth �o system
changes, or snow melt
Prvjact Street Address:
r o
1l�..���y"��-e�.r ��r,���. �. �
' (Number) (Street) (Sulte #)
�uildinglComplex ,Name:
FireQlace Applications (�IUST i de:
o Equipment Cut Sheets for Flreplaces/Log Sets
(Manufacturer's info showing make� mvdel & approval Ilsting)
o�ce use: � � `Q � ^ �s��
P�o���� #: �
Bullding Permit �k: ��(J O �V ��
Mechenicel Permit #: � '— S
,. W..., ,... .. . .,� ... :.. . ...... . : .. .... . .. . . ... ..... . .. . . ... . . .. . . .
Contractor Inform�tion: lot #:� Block # Subdivislon: P.✓� i�nQ�i N_��
Company: � � � :
Detailed Description of Work; � evt'����rm��� ,
Company Addrass: ofC a� �i Q�Q � S J� �
� � �b �
City: ' Slate;��,,�_ Zip:
. .
Contact Name: y��yo -�► � e�cY� C� _ -
ICantect Pho�e: ���n ^�o� �` '(use additional sheet iF necessary)
(E-Mail V.�t 2v�r�S1w C�1 CQ+c��ur� 2\.+nPT ;❑ Ges Piping Included
Towh of Vail Cor�tractor Regisiration No.: � ` e�Gas Plping by Others ,
� . o Wood to Gas Fireplace Conversion
X I Boiler Locetion:
Contracter S gneture qu red) r Interior () Exterfor () Other () �
Property Information �
� 2 ��?� �Z2 � S� �' Number of Existing Fireplaces: .
Parcel #: —
(For parcel #, contact Eagle County Assessors Office at 970-328•8640 or Ges AppllBnCes Gas Logs Wood/Pellet
vlsltwww.eaglecouty.us/patle) • ' .
� � Number of Proposed Fireplaces: ;
Tenant Name: .,,, ' �
(Commerclal Propertles) ` Gas ApplianCes Gas Logs Wood/Pellet :
�
.....,.. . . . . .... .. .,
. ;
Owner Name� �1�1C1 ZG�f ���-- �� '' Type of 8ullding: �
. i i � � � •• • � Singie-Family �Dupiex ( ) Multf-Famlly ( ) Commercial ( )
Compiete Valu�a�iort�OOhanical Permil: Restaurant ( ) �lher ( ) � � � a �n �
Mechanical �: V ' � � D v
, Date Received:
i
, • ��� '� i� ��Q�
' ��/Q `"� � � TOWN OF VAIL
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT
.�
TOWNOFVAQ. '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970-479-2139 f. 970.479.2452 inspections. 970.479.2149
MECHANICAL PERMIT
NSFR
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location.....:
Parcel No...: 210312215002
OWNER BUFFEHR CREEK PARTNERS 04/24/2009
PO BOX 305
MINTURN
CO 81645
APPLICANT WESTERN FIREPLACE SUPPLY, IN 04/24/2009 Phone: 668-3760
1685 PAONIA
COLO SPRINGS, CO 80915
PO BOX 670
MINTURN, CO 81645
License: 323-M
CONTRACTOR WESTERN FIREPLACE SUPPLY, IN 04/24/2009 Phone: 668-3760
1685 PAONIA
COLO SPRINGS, CO 80915
PO BOX 670
MINTURN, CO 81645
License: 323-M
Desciption: INSTALL ONE PRE-FAB FIREPLACE WITH GAS LOGS, AND ONE
OUTDOOR MASONRY FIREPLACE WITH GAS LOGS (GAS PIPING BY
OTHERS)
Valuation: $11,455.00
ALL TIMES
Permit #: M09-0046
Project #:
Status . . . :
Applied . . :
Issued . . .
Expires . .:
PRJ07-0529
ISSUED
04/24l2009
04/28/2009
10/25/2009
.......<....��,��.....,.....,«.....««..........,..>..�.......,....>*......,.,.....*...FEE SUMMARY..«......«<.....�..........��**.�.�«�.�.........�.,�..<..�.�.....<..........,........
Mechanical Permit Fee---> $240.00 Will Call------------> $4.00 Total Calculated Fees---> $304.00
Plan Check-------------------> $60.00 Use Tax Fee------> $0.00 Additional Fees-----------> $0.00
Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $304.00
Total Calculated Fees--> $304.00 Payments-----------------> $304.00
BALANCE DUE---------> $0.00
.,.,....>......,.,�.......,...,..,.:.�.»..........,..,�..:,�::,��,.,. .............»�......�.�...,.,...,.......�+.>..�.....���..«�.,,......+«+......,.......���.�,.......���.,,....���......................
APPROVALS
Item: 05100 BUILDING DEPARTMENT
04/24/2009 JLE Action: AP
.<.....�.�:.«........�,..,�......�.,.,.:....«..........>.........�.....t.....,.,..........x..<�......*..a...,t<..�.��.*�<..+>.«........«.<..,,....< ...............««..........�....,,.,..........
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: CON0010648
SEPARATE PERMIT REQUIRED FOR GAS PIPING BY OTHERS
.,,,.<..,..,..».,�...,.....,........>.,..........�.........�.........,.�.......�....x�.�,.,+.�.�..��...�............,.«,�<.«,.�..�......«..�............�.�........».........« ...................
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdiv' ion codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FORJNS��ECTION SJ'��Ci6 ADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
AM - 4 PM. �-''J �
Date
Signature of Owner or Contractor
Print Name
mechcanical_perm it_041908
**********************************************************++**********+********************+
TOWN OF VAIL, COLORADO Statement
**************************************************************************+*****************
Statement Number: R090000371 Amount: $304.00 04/28/200911:39 AM
Payment Method: Check Init: SAB
Notation: 2320 WESTERN
FIREPLACE
-----------------------------------------------------------------------------
Permit No: M09-0046 Type: MECHANICAL PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location:
Total Fees: $304.00
This Payment: $304.00 Total ALL Pmts: $304.00
Balance: $0.00
**********************************+************************************�********************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 240.00
PF 00100003112300 PLAN CHECK FEES 60.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
04/2312009 '12:03 FA� 9708279222
� � : . �,: '
wESTERN FIREPLACE
�. �1, �
��, { :�Y �, q Y �� ��
i+ ' ! ,�:' , � .� a
, �!• � ,.� . ,. ; � � a �.. �„ •.
. „ � � • � " '� ;�1 � "�� � � ' �'''
,
��.1 �M � �;���r '� M1r�Y�{.�,
. . . �7'1�' A 7i� �.�I. �.
••r/ 'Y/h` �• ,�.a
.: • ��,� ,•..... ,: �� .�,.r.r�li
r�oo7�oos
_. _. �.__......—,..Y�.,�u. .. '
. � • ,' �.':, .
� ME.CHANICAL PERMIT �
i �
�Irenlace AA011cations MUST Include:
o Mecha ical Roam Leyout/Plen with Dlmenslons ❑ Equlpment Cut Shests for Fl�epleces/Lvg Sets
o Cpmbu on AIr Duct 51ze �nd Locatlon � (Menufacture�`s Info showl a �
❑ �lua ,o� Vdnt�5lze D - " `� ��
o Gas PI ng Plan (If appllc�ble)
a Heat as Calculatlona* APR 2� 2009
❑ Equlp , ent CuC Sheets far eollor/Furnace .
*Not rr,�qW .,.lai same,'s/ze (9TU) ba/ar rop/aoemenc w/c� no sys�rm
ct�'air�,��a . wr�e/c �� � TOV�,/N OF �
ProJact 6�! Addn�s: ����.�w��.� Offlco Uiea: �
8 7 guFF�t-� � GLL�� IG. Project i�:
(Numbo�) (8trv�a!) ($��� *� 6ulldi�Q �Permlt #: �Q � �,�
Bu11dInQ/C mp16x Name: � Mechenl�el Pertnit #:
�_„��,,,�_ ,�..,M�.,�M, � Lot �: � Blook # 3ubdlvialon: F_�C.K i%riP.i �e,c_
Ci1y: I _
Cont�ct
Conteot
E-Meil _
Town of
#:
Tena
f (, V :
, dress: Ib$S ?�AQ�t rp S?�. Deteiled Descriptlon ofWork: ��A�!� �.� ��D �� �
�pu� ►�+opEt ��w�M e�o' w%�as ca ss-t �4 •I�o�
S State• Ga zip: 09' 1 �vRN�'.
.�..< .,.,�ee�o t�ASnu��I woeD � F��U�
la e: '�C� A'1�4f�tS ' e� ..r � -- 3� T
'hlo�� , 51'� �or�oP.�,r('i Z�f� �/� S do�S �'f �Ci A Iv5 �
'h ne: , ' 4S'�(o 'f'�S"7� t3 (uee eddltlonal sheet H neceeaary� .„ j
• ;
O V'i � T� it'E PL+'K-� . GAM ❑ Ges Pipin,g Included �
�a Contreator Reylstretlon No.: 323 � IH Gae� PIpInQ by Othere , i
o UVovd to Gas Flreplace Conversion
9oller L �catlon: ��
� .., _,,,_,,,.„�,w.M�.„„�,�.,.,,�.„....�,.,�._, Interlor �1Qy Exterivr ( ) OtherY( ) � �
tnormatlon ....�,.,�4.�...�.,.,,.�, .��.,�..��.._.. .._....�
'� � Z � Number!oP Faclvting F�r�placae: '
# oonteot Eeple Counq� Asaqeeors OfFWa at 870-328•8640 or Ga9 Apqliences (� j Oas Logs ( j Wood/PAllet ( j _N�
iA lecouty.uelpetle) M....,.- --- -_w�,»��.,.,..«...�,,�,..�.y�..,..,,..�..w__.�.�._ .
, Number of P�oposed Flroplacea: �
� a� Ges Apqliencea ( j Oes Logs ()1Nood/Pellet (2J �
(Gommer�lal Propertiea) � ,,.�„�,�,M,,.�,,�.�M�,�,,,�, - ------�
� e; KG $C�FFiK1� C.i��K Typ� of Bullding: I
w-����°�-�•�-- Single-Femily � Duplex () Multl-Famlly () Commercial () �
� luetion for Mechenlcei Permit
. � � � Reatourant (+_) Other (w )� I
'�� ' Dets Rscol�vd: . � � � �� ��
.
� D
��ar� .o°
i _ . __ �
APR � � 200�
TOWN OF VAIL
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT
:
�wxo�unII. '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970-479-2139 f. 970.479.2452 inspections. 970.4792149
MECHANICAL PERMIT
NSFR
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location.....: 1687 BUFFEHR CREEK RD
Parcel No...: 210312215002
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
APPLICANT K.W.'S PIPE FIXATION, INC.
PO BOX 677
GYPSUM
COLORADO 81637
License: 348-M
CONTRACTOR K.W.'S PIPE FIXATION, IN(
PO BOX 677
GYPSUM
COLORADO 81637
License: 348-M
02/23/2009
02/23/2009 Phone:970-401-3688
02/23/2009 Phone:970-401-3688
Desciption: NEW SFR- INSTALLATION OF INFLOOR RADIANT HEAT AND BOILER
INSTA�LATION
Valuation: $36,500.00
ALL TIMES
Permit #: M09-0027
Project #: PRJ07-0529
Status . . . : ISSUED
Applied . . : 02/23/2009
Issued . . : 02/23/2009
Expires . .: 08/22/2009
*....+.<.******.**.��...,..�,�......***...,�*.�....�«<..*...,.*,.,�............**...FEE SUMMARY#.**..*...*,+..,�<..>..�..�***....*.�,�*.<...�...*<*..,.*..........�� ....................
Mechanical Permit Fee---> $740.00 Will Call------------> $4.00 Total Calculated Fees---> $929.00
Plan Check-------------------> $185.00 Use Tax Fee------> $0.00 Additional Fees-----------> $0.00
Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $929.00
Total Calculated Fees--> $929.00 Payments-----------------> $929.00
BALANCE DUE---------> $0.00
.,����..,�........�*..�....����.,+.+.....».>*.,........<, .�.>..�.......�<.,��,......�..�...�.,�,�* ..............,.«.�..����.,......,...,...«.�..>.�..�:...<..,,.�.....,..�..�...............,..�...,...
APPROVALS
Item: 05100 BUILDING DEPARTMENT
02/23/2009 RLF Action: AP
Item: 05600 FIRE DEPARTMENT
.��,.,�..,..,w...«t«�.....,�,...........«,.���� .............*.....,�,�..�...>.�.,.......«.,....��.�.*...........�...........�.�...,......,�,�.�...>.�«.......,�.�<,�............,.*�..,......�.......�.
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION
304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND
CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.
Cond: 29
(BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND CHAPTER 3 OF THE 2003 IFGC..
Cond: 31
(BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
mechcanical_perm it_041908
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6.
�..........,«.>.,.«.......,.**3...,�,�,..�...+........�::,.x�..,.....:..*.......,.,.�.....�...�*�......,�......�<.�.���.���....>.�............,t<«,...�..........<.,..��....,�...�..........«+..�....
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL B MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
AM -�-12N1� _ � ,/I� (i
Signature of Owner or Contractor
rN, erJ•'IG 1��► ,n� . t�[ ' `�-5
f.,�, / �
Print Name
mechcan ical_perm it_041908
a' ��� °�
Date
*****************+****************************************************�*********+***********
TOWN OF VAIL, COLORADO Statement
**************************+*�++***********++*********************************�**�********�**
Statement Number: R090000185 Amount: $929.00 02/23/200901:23 PM
Payment Method: Check Init: RLF
Notation: 4575 K.W.'S
PIPE FIXATION, INC
-----------------------------------------------------------------------------
Permit No: M09-0027 Type: MECHANICAL PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location: 1687 BUFFEHR CREEK RD
Total Fees: $929.00
This Payment: $929.00 Total ALL Pmts: $929.00
Balance: $0.00
***********+*****************************************�*�**************�**********�**********
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 740.00
PF 00100003112300 PLAN CHECK FEES 185.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
MECHANICAL PERMIT
Boiler/Furnace Applications MUST include:
❑ Mechanical Room Layout/Plan with Dimensions
o Combustion Air Duct Size and Location
o Flue or Vent Size
❑ Gas Piping Plan (if applicable)
❑ Heat Loss Calculations*
❑ Equipment Cut Sheets for Boiler/Furnace
* Not required for same size (BTU) boile� �eplacement with no system
changes, o� snow melt
Project Street Address: n�
1� � U �''�� �� � � l�C�� f�
(Number) (Street) (Suite #)
Building/Complex Name:
Contractor I�rmation:
Company: � /�, .s ��PC� F��u���0✓l �- �L�,
Company Address: � [�� � �
City: ��� State: �_ Zip: � 6-3 �
Contact Name: /5 �%� G� �?��id `'�
Contact Phone: / /� `" yb�� `�0 ��
Fire�lace Applications MUST include:
❑ Equipment Cut Sheets for Fireplaces/Log Sets
(Manufacturer's info showing make, model & approval listing)
Office Use: _ d � �
Project #: �� �� � �
Building Permit #: � l� �'� l 2�
Mechanical Permit #: M D� �� o��
Lot #: Block # Subdivision:
Detailed Description of Work: �n��f��'�� � �
r/1 Sr�Dei� �u-G�rca.>� l�CaT � {JC�1/C%' rikS�i�t�"�yl..,�
(use additional sheet if necessary)
E-Mail ❑
Town o�• i ontr ctor Registration No.: _ .*� � �
b/� �� _\ � �•, � ...❑
t/
iC � �`L � ' +G� l� B
Contractor Signature (required) �
Property Information
Parcel #: v?/Cl� I �"� r'� �O�
(For parcel #, contact Eagle County Assessors Office at 970-328-8640 or
visit www.eaglecouty.us/patie)
Gas Piping Included
Gas Piping by Others
Wood to Gas Fireplace Conversion
oiler Location:
nterior ( ) Exterior ( ) Other ( )
Number of Existing Fireptaces:
Gas Appliances Gas Logs _
; Number of Proposed Fireplaces.
Wood/Pellet
Tenant Name: Gas Appliances Gas Logs Wood/Pellet
(Commercial Properties)
Owner Name: �U %l-T P/� Gr�d� 1"c�r'����' Type of Building:
•� —' ' Single-Family �) Dupl u- a y o a( )
Complete Valuation for Mechanical Perm���s� Restaurant O Other ( ���,� �
�
Mechanical $:
Date Received: FEB 2 3 2��9
TOWN OF VAIL
FEB-19-2009 14:05 HVAC SUPPLY P.O1
l.iU , I � t cu.�
Mr PE�SYSTEMS Heat Loss Detail
Project Summary
Project #:
Project Name;
Total Floor Area:
Total Heat Loss:
Total Radiant Into Room;
Total Other Heat Supplied:
Downward to Ground:
Total Infiltratian Loss:
Buffehr Creek Rd.
Buffehr Creek rd
Detailed Heat Loss Data
GREATROQM (Upper Level)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
Floor
Total Area:
Heated Area:
Construction:
Cover Rv;
Structure Rv:
Space Below Heated
Surface Temperature
Ceiling
Total Area:
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated:
4,735 ft2
330,821 Btu/hr
107,418 Btu/hr
21,860 Btu/hr
1,542 Btu/hr
76,423 Btu/hr
Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
Design Fluid Temp, Drop
Fluid Type:
Total Flowrate:
Maximum Head Loss:
Total Loops:
Total Manifolds:
Total Zones;
456 ft2 Total Heat Loss:
15 ft Total Radiant Into Room
6,84o ft' Total Other Heat
42 ft Supplied:
0.94 /hr Total Downward Loss:
70 °F iotal Infiltration Loss:
Floor Unit Load To
Room:
456 ftz
456 ft2
Joist 16"
1.08 °F�ft2•hr/Btu
20 °F�ft�•hdBtu
From Same Source
�F
83.2
Other Components
456 ft2
0 ft2
Gypsum Board
0.77 °F•ft2•hr/Btu
49 °F•ft2•hr/Btu
No
Downward Loss:
Floor Unit Load To Room
Heat Loss:
20 °F
0 % glycol
9.1 USGPM
6 ft(H20)
31
5
10
19,066 8tu/hr
11,167 Btu/hr
7,039 Btulhr
860 Btu/hr
9, 659 Btu/h r
24.5 Btu/hr/ft2
860 Btu/hr
24.5 Btu/hdft2
754 Btu/hr
Component Length Width/Height Area Rv Heat Loss
Wail-1 42 15 630 24 1,51 �
Door-1 2.8 S 22.4 2.15 875
Units: Heat Loss = Btulhr, Length = k, Area = k', Rv =°F•ft'�hrB1u
Created using Mr PEX Radiant -1.8.0 Page 1 of 16
FEB-19-2009 14:05 HVAC SUPPLY
Ll
P.02
m
SYSTEMS Heat Loss Detail
� Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
Detailed Heat Loss Data
Door-2 2.8
Window-1 -
Window-2 -
Window-3 -
Window-4 -
�
�
�
�
A
DINlNG (Upper Level)
Total Area: 266 ft2
Average Height: 12 ft
Volume: 3,192 ft'
Exposed Wall Length: 32 ft
Air Changes: 0.94 /hr
Room 7emperature; 70 °F
Floor
Total Area: 266 ft2
Heated Area: 266 ft'
Construction: Joist 16"
Cover Rv: 1.08 °F•ft2•hrBtu
Structure Rv: 20 °F•ftz•hr/Btu
Space Below Heated: From Same Source
°F
Surface Temperature: 85.1
Ceiling
Total Area: 266 ft2
Heated Area: 0 ftz
Construction; Gypsum Board
Covering Rv: 0.77 °F•ftZ•hr/Btu
Insulation Rv: 49 °F•ft'•hr/Btu
Space Above Heated: No
Other Components
Component Length Width/Height
Wall-1 32 12
Window-1 - _
Units: Heat Loss s Btu/hr, Length = ft, Area = ftz. Rv =°F•ft'�hdBtu
Created using Mr PEX Radiant - 1.8.0
22.4
38
25
72
19
2.15
2.85
2.85
2.85
2.85
Tofal Heat Loss:
Total Radiant Into Room:
Total Downward Loss:
Total Infiltration Loss:
Floor Unit Load To
Room:
Downward Loss;
Floor Unit Load To Room:
Hea# Loss:
Area
384
48
Rv
24
2.85
875
1,132
726
2,122
552
8,118 Btu/hr
7,539 Btu/hr
579 Btu/hr
4,508 Btu/h�
28.3 Btu/hr/ftz
579 Btu/hr
28.3 Btu/hr/ft=
440 Btu/hr
Heat Loss
1,176
1,415
Page 2 of 16
FEB-19-2009 14:05 HVAC SUPPLY P.03
SYSTEMS
r PEX Heat Loss Detail
Detailed Heat Loss Data
KITCHEN (Upper Level)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
Floor
Total Area:
Heated Area:
Construction:
Cover Rv:
Structure Rv:
Space Below Heated:
Surface Temperature:
Ceiling
Total Area:
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated:
288 ft' Total Heat Loss:
13 ft Total Radiant Into Room
3,744 R' Total Other Heat
40 ft Supplied:
0.94 /hr Total Downward Loss:
70 °F Total Infiltration Loss:
Floor Unit Load To
Room:
288 ft2
288 ft2
Joist 16"
1.08 °F•ftz•hr/Btu
20 °F•fi'•hr/Btu
From Same Source
°F
83.2
Other Compvnents
288 ft2
0 ft�
Gypsum Board
0.77 °F•ftZ�hrBtu
49 °Fft2•hdBtu
No
Project Number: Buffehr Creek Rd.
Project Name: BufFehr Creek rd
Date: February 19, 2009
Downward Loss:
Floor Unit Load To Raom
Heat Loss:
9,928 Btu/hr
7,053 Btu/hr
2,332 Btu/hr
543 Btu/hr
5,287 Btu/hr
24.5 Btu/hr/ftz
543 Btu/hr
24.5 Btu/hr/ftz
477 Btu/hr
Component Length WidthlHeight Area Rv Heat Loss
Wall-1 40 13 520 24 1,577
Window-1 - - 60 2.85 1,768
Window-2 - - 9 2.85 276
STUDY (Upper Levei)
Total Area:
Average Height:
Volume:
Exposed Wail Length:
Air Changes:
Room Temperature:
169 ft2 Total Heat Loss:
14 ft Total Radiant Into Room:
2,366 fN Total Other Heat
72 ft Supplied:
0.94 /hr Total Downward Loss:
70 °F Total Infiltration Loss:
Floor Unit Load To
Room:
Units: Heat Loss = Btu/hr, Length = ft, Area = ftz, Rv =°F-ft'•hr/Btu
Created using Mr PEX Radiant - 1.8.0
11,227 Btu/hr
4,139 Btu/hr
6,769 Btu/hr
319 Btu/hr
3,341 Btu/hr
24.5 Btu/hr/ft�
Page 3 of 16
FEB-19-2009 14:05 HVAC SUPPLY
P.04
�
SYSTEMS Heat Loss Detail
� Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
Detailed Heat Loss Data
Floor
Total Area: 169 ft2
Heated Area: 169 ft=
Construction: Joist 16"
Cover Rv: 1.08 °F•ft2•hrlBtu
Structure Rv: 2Q °F•ft'�hr/Btu
Space Below Heated: From Same Source
°F
Surface Temperature; 83.2
Downward Loss:
Floor Unit Load To Room
Ceiling
Total Area: 169 ftZ Heat Loss:
Heated Area: 0 ftZ
Construction: Gypsum Board
Covering Rv: 0.77 °F•ft2•hr/Btu
Insulation Rv; 49 °F•ft=•hr/Btu
Space Above Heated: No
Other Components
399 Btu/hr
24.5 Btu/hr/ft2
28D Btu/hr
Component Length Width/Height Area Rv Heat Loss
Wall-1 72 14 1,008 24 3,021
Window-1 - - 126 2.85 3,714
Window-2 - - 19 2.85 552
POWDER (Upper Level)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
54 ft'
9ft
486 ft'
Oft
0.94 /hr
70 °F
Floor
Total Area: 54 ft'
Heated Area: 54 ftZ
Construction: Joist 16"
Cover Rv: 0.94 °F•ftz•hr/Btu
Structure Rv: 20 °F•ftz•hr/Btu
Space Below Heated: From Same Source
�F
Surtace Temperature: 77.9
Unils: Heat Loss = Btu/hr, Length = R, Area = ft�, Rv =°F•ft'•hr/Btu
Created using Mr PEX Radiant - 1.8.0
Total Heat loss:
Total Radiant Into Room:
Tota! Downward L.oss:
Total Infiltration Loss:
Floor Unit Load To
Room:
Downward Loss:
Floor Unit Load To Room
831 Btu/hr
776 Btu/hr
55 Btu/hr
686 Btu/hr
14,4 Btu/hr/ft�
55 Btu/hr
14.4 Btu/hr/ft2
Page 4 of 16
FEB-19-2009 14:05 HVAC SUPPLY
P.05
�
SYSTEMS Heat Loss Detail
� Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
Defiailed Heat Loss Data
Ceiling
Total Area: 54 ftZ
Heated Area: 0 ftz
Construction: Gypsum Boa�d
Covering Rv: 0.77 °F•ftZ•hd6tu
Insulation Rv: 49 °F•ft2•hr/Btu
Space Above Heated: No
Other Components
Component Length Width/Height
Wall-1 1 9
LANDING (Upper �evel)
Total Area: 250 ft2
Average Height: 12 ft
Volume: 3,0�0 ft'
Exposed Wall Length: 25 ft
Air Changes: 0.94 /hr
Room Temperature: 70 °F
Floor
Total Area: 250 ftZ
Heated Area: 250 ft�
Construction: Joist 16"
Cover Rv: �.08 °F�ftz•hr/Btu
Structure Rv: 20 °F•ftz•hr/Btu
Space Below Heated: From 5ame Source
�F
Surface Temperature: 84
Heat Loss:
Area
9
Total Heat Loss:
Total Radiant Into Room
Total Downward Loss:
Total Infiftration Loss:
Floor Unit Load To
Room:
Rv
24
Downward Loss:
Floor Unit Load To Room
Ceiling
Total Area: 250 ftz Heat Loss:
Heated Area: 0 ft�
Construction: Gypsum Board
Covering Rv: 0.77 °F•ft2•hr/Btu
Insulation Rv: 49 °F•ft2•hr/Btu
Space Above Heated: No
Other Components
Component Length Width/Height
Wall-1 25 12
Door-1 3 g
Units: Heat Loss = Biu/hr, tengih = ft, Area = ft�, Rv =°F fN•hr/Btu
Created using Mr PEX Radiant -1.8,0
Area
300
24
Rv
24
2.15
89 Btu/hr
Heat Loss
0
7,058 Btu/hr
6,554 Btu/hr
504 Btu/hr
4,237 Btu/hr
26.2 Btu/hr/ft2
504 Btu/h r
26,2 Btulhr/ft'
414 Btu/hr
Heat Loss
966
938
Page 5 of 16
FEB-19-2009 14:06 HVAC SUPPLY P.�6
Mr PEXSYSTEMS Hea# Loss Detail
Detailed Heat Loss Data
MASTER SUITE/CLST (Upper Level)
Total Area: 468 ft2
Average Height: 10.6 ft
Volume: 4,960.8 ft'
Exposed Wall Length; 53 ft
Air Changes: 0.94 /hr
Room Temperature: 70 °F
Floor
Total Area:
Heated Area:
Construction:
Cover Rv:
Structure Rv;
Space Be1ow Heated:
Surtace Temperature:
Ceiling
Totai Area:
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated:
468 ft'
468 ft2
Joist 16"
1.91 °F•ft2•hr/Btu
20 °F�ft�•hr/Btu
From Same Source
°F
81
Other Components
468 ft'
0 ftz
Gypsum Board
0,77 °F•ftz�hr/Btu
49 °F•ftZ•hr/Btu
No
Project Number, Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Total Heat l.oss:
Total Radiant Into Room:
Total Other Heat
Supplied:
Total Downward Loss:
Total Inflltration Loss:
Floor Unit Load To
Room:
Downward Loss:
Floor Unit Load To Room:
Heat Loss:
Date: February 19, 2009
13,554 Btu/hr
9,473 Btu/hr
2,974 Btu/hr
1,107 Bfu/hr
7,006 Btu/hr
202 Btu/hr/ftZ
1,107 Btu/hr
20.2 Btu/hr/ftZ
774 Btu/hr
Component Length Wldth/Fieight Area Rv Heat Loss
Wall-1 53 10.6 561.8 24 1,6�2
Window-1 - - 104 2.85 3,065
MASTER BATH (Upper Level}
Total Area: 208 ft2
Average Height: 10 ft
Volume: 2,080 ft'
Exposed Wall Length: 42 ft
Air Changes: 0.94 /hr
Room Temperature: 70 °F
Units: Heat Loss = Btu/hr, Length = ft, Area = ft', Rv =°F•ft�-hr/Btu
Created using Mr PEX Radiant - 1.8.0
Total Heat Loss:
Total Radia�t lnto Room:
Total Downward Loss:
Total Infiltration Loss:
Floor Unit Load To
Room:
6,171 Btulhr
5,764 Btu/hr
407 Btu/hr
2,937 Btu/hr
27.7 Btu/hr/ft2
Page 6 of 16
FEB-19-2D09 14:06 HVAC SUPPLY
P.07
�
SYSTEMS Heat Loss Detail
� Project Number: Buffehr Creek Rd.
Project Name: BufFehr Creek �d
Date: February 19, 2009
Detailed Heat Loss Data
Floor
Total Area: 208 ftZ
Heated Area: 208 ft2
Construction: Joist 16"
Cover Rv: 0.95 °F•ft=•hr/Btu
Structure Rv: 20 °F•ft2�hr/Btu
SpacQ Below Heated: From Same Source
°F
Surface Temperature: 84.8
Ceiling
Total Area:
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated:
Other Components
208 ftz
D ftZ
Gypsum Board
0.77 °F•ftz•hr/Btu
49 °F•ft�•hr/Btu
No
Downward Loss:
Floor Unit l�oad To Room
Heat l.oss:
407 Btu/hr
27.7 Btulhr/ft�
344 Btu/hr
Component Length Width/Height Area Rv Heat Loss
Wall-1 42 10 420 24 1, 334
Window-1 - - 39 2.85 1,149
FAMILY ROOM (Main Level)
Total Area: 483 ftZ
Average Height: 10 ft
Volume: 4,830 R'
Exposed Wall Length: 46 ft
Air Changes: 0.94 /hr
Room Temperature: 7� °F
Floor
Total Area:
Heated Area:
Construction:
Cover Rv:
Structure Rv:
Space Belaw Heated:
Surface Temperature:
483 ft�
483 ft'
Joist 16"
1.08 °F•ft'•hr/Btu
20 °F�ft2•hr/Btu
From Same Source
°F
81.2
Units: Heat Loss = Btu/hr, Length = fl, Area = fl', Rv =°F•ft�•hr/Btu
Created using Mr PEX Radiant -1.8.0
Tota1 Heat Loss:
Total Radiant Into Room:
Total Downward Loss:
Total Infiltration Loss:
Floor Unit �oaci To
Room:
Downward Loss;
Floor Unit Load To Room:
10,744 Btu/hr
9,973 Btu/hr
771 Btu/hr
6,821 Btu/hr
20.6 Btu/hr/ft�
771 Btu/hr
20.6 Btu/hr/ft'
Page 7 of 16
FEB-19-2009 14:06 HVAC SUPPLY P.08
Mr PEXSYSTEMS Heat Loss Detail
Detailed Heat Loss Data
Ceiling
Total Area:
Heated Area:
Constructlon:
Covering Rv:
Insulation Rv:
Space Above Heated:
483 ftz Heat Loss:
0 ft2
Gypsum Board
0.77 °F�ftZ•hr/Btu
49 °F•ft2•hr/Btu
From Same Source
Other Components
Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
0 Btu/hr
Component Length Width/Height Area Rv Heat Loss
Wall-1 46 10 460 24 1,402
Window-1 - - 50 2.85 1,474
Window-2 - - 9 2.85 276
POWDER/LN (Main Level)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
Floor
Total Area:
Heated Area:
Construction:
Cover Rv:
5tructure Rv:
Space Below Heated
SurFace Temperature:
Ceiling
Total Area:
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated:
84 ftZ
9ft
756 ft3
10 ft
0.94 /hr
70 °F
84 ftZ
84 ft'
Joist 16"
0,95 °F•ft2•hr/Btu
23 °F•ft�•hr/Btu
From Same Source
�F
79.3
84 ft2
0 ft2
Gypsum Board
0 °F•ftz•hdBtu
49 °F•ft2•hr/Btu
From Same Source
Units: Heat Loss = Btulhr, Length = ft, Area = ftz, Rv =°F•ft=•hdBtu
Created using Mr PEX Radiant - 1.8.�
7otal Heat �oss;
Total Radiant Into Room
Total Downward Loss:
Total knfiltration Loss:
Floor Unit Load To
Room:
Downward Loss:
Floor Unit Load To Room:
HeatLoss:
9,51 7 Btu/hr
1,428 Btulhr
89 Btu/hr
1,068 Btu/hr
17 Btu/hr/ft2
89 Btulhr
97 Btu/hr/#tZ
0 Btu/hr
Page 8 of 16
FEB-19-2009 14:06 HVAC SUPPLY
r
P.09
m
SYSTEMS Heat Loss Detail
� Project Number; Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
Detailed Heat Loss Data
Other Components
Component l.ength Width/Height Area Rv Heat Loss
Wall-1 10 9 90 21 360
BEDROOM 4 (Main Level)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
Floor
Total Area:
Heated Area:
Construction:
Cover Rv:
Structure Rv:
Space 8elow Heated
Surface Temperature:
Ceiling
Total Area:
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated:
273 ft'
9.6p ftp
2i62�.V Il3
10 ft
�.94 /hr
70 °F
273 ft'
273 ft2
Joist 16"
1.91 °F•ftZ•hr/Btu
20 °Fft2•hr/Btu
From Same Source
�F
78.2
273 ftz
0 ft2
Gypsum Board
0 °F•ffz•hr/Btu
49 °F•ftz•hr/Btu
From Same Source
Other Components
Total Heat Loss:
Total Radiant Into Room:
Total Downward Loss:
Total Infiltration Loss:
Floor Unit Load To
Room;
Downward Loss:
Floor Unit Load To Room:
Heat Loss:
4,563 Btu/hr
4,085 Btu/hr
478 Btu/hr
3,701 Btu/hr
15 Btu/hr/ft2
478 Btu/hr
15 Btu/hr/ft2
0 Btu/hr
Component Length Width/Height Area Rv Heat Loss
Wall-1 10 9.6 96 21 384
BATH 4 (Main Level)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
84 ftz
9ft
756 ft'
10 ft
0.94 /hr
70 °F
Total Heat Loss:
Total Radiant Into Room:
Total Downward Loss:
Total Infiltration Loss:
Floor Unit Load To
Room:
1,530 Btu/hr
1,428 Btu/hr
102 Btu/hr
i,068 Btu/hr
17 Btu/hr/ft2
Units: Heat Loss = Btulhr, Length = ft, Area = ft2, Rv =°F•ft2•hrlBtu
Created using Mr PEX Radlant - 1.8.0 Page 9 of 16
FEB-19-2009 14:06 HVAC SUPPLY
Mr PEXW _ -
SYSTEMS
Detailed Heat Loss Data
Floor
Total Area: 84 ftz
Heated Area: 84 ft2
Construction: Joist 16"
Cover Rv: 0.95 °F•ftZ�hr/Btu
Structure Rv: 20 °F•ft'•hr/Btu
Space Below Heated: From Same Source
�F
Surface Temperature: 79.3
Ceiling
Total Area: 84 ft2
Heated Area: � ft'
Construction: Gypsum Board
Covering Rv: 0 °F•ft'•hdBtu
Insulation Rv: 49 °F•ftz•hr/Btu
Space Above Heated: From Same Source
Other Components
P.10
Heat Loss Detail
Project Number: Buffehr Creek Rd.
Project Name: Buffehr C�eek rd
Date: February 19, 2009
Downward Loss:
Floor Unit Load To Room
Heat Loss:
102 Btu/hr
17 Btu/hr/ft2
0 Btu/hr
Component Length Width/Height Area Rv Heat Loss
Wall-1 10 9 90 21 360
FOYER (Main Level)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
3�8 ft'
17 ft
5.236 ft'
17 ft
0.94 /hr
70 °F
Ffoor
Total Area: 308 ft=
Heated Area: 308 ftZ
Construction: Joist 16"
Cover Rv: 0,94 °F•ftz•hr/Btu
Structure Rv: 20 °F•ft'•hr/Btu
Space Bekow Heated: From Same Source
°F
Surface Temperature: 85
Units: Heat Loss = Btu/hr, Length = ft, Area = ft', Rv =°F-ftz�hr/Btu
Created using Mr PEX Radiant - 1.8.0
Total Heat Loss:
Tofal Radiant Into Room:
Total Other Heat
Supplied:
Total Downward Loss:
Total Infiltration Loss:
Floor Unit Load To
Room:
Downward Loss:
Floor Unit Load To Room
10,562 Btu/hr
8,651 Btu/hr
1,304 Btu/hr
607 Btu/hr
7,394 Btulhr
28.1 Btu/hrlftz
607 Btu/hr
28.1 Btu/hr/ft2
Page 10 of 16
FEB-19-2009 14:06 HVAC SUPPLY
Mr PE��YSTEMS
`�
Detailed Heat Loss Data
Ceiling
Total Area:
Heated Area;
Construction:
Covering Rv:
Insulation Rv,
Space Above Heated:
308 ftz
0 ft2
Gypsum Board
0.77 °F•ft2•hr/Btu
49 °F•ftZ•hr/Btu
From Same Source
Other Components
Heat Loss:
P.11
Heat Loss Detail
Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
0 Btu/hr
Component Length Width/Height Area Rv Heat Loss
Wall-1 17 17 289 24 840
Door-1 3.6 8 28.8 2.15 1,125
Window-1 - - 7 2.85 212
Window-2 - - 13 2.85 383
BEDROOM 3 (Main Level)
Total Area:
Average Meight:
Volume:
Exposed Wall Length;
Air Changes:
Room Temperature:
Floor
Total Area:
Heated Area:
Construction:
Cover Rv:
Structure Rv:
Space Below Heated:
Surface Temperature:
Ceiling
Total Area:
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated
221 ftZ
9.6 ft
2,121.6 ft'
23 ft
0.94 /hr
70 °F
22'i ft2
221 Rz
Joist 16"
1.91 °F•ft2•hdBtu
20 °F•ftZ�hr/Btu
From Same Source
�F
81.8
221 ft2
0 ft2
Gypsum Board
�.77 °F•ft2•hr/Btu
49 °F•ft2•hr/Btu
From Same Source
Total Heat Loss:
Totai Radiant Into Room
Total Downward Loss:
Total Infiltration l.oss:
Floor Unit Load To
Room:
Downward Loss:
Floor Unit Load To Room:
Heat Loss:
5,369 Btu/hr
4,808 Btu/hr
561 Btu/hr
2,996 Btu/hr
21.8 Btu/hr/ft�
561 Btu/hr
21.8 Btu/hr/ftz
0 Btu/hr
Units: Heat Loss = Btu/hr, Lenglh = ft, Area = ftZ, Rv =°F•ft'•hr(Btu
Created using Mr PEX Radiant - 1.8.0 Page 11 of 16
FEB-19-2009 14:06 HVAC SUPPLY
P.12
,m
SYSTEMS Heat Loss Detail
� Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
Detailed Heat Loss Data
Other Components
Component Length WldthlHeight Area Rv Heat Loss
Wall-1 23 9.6 220.8 24 633
Window-1 - - 40 2.85 1,179
BATH 3 (Main Level)
Totai Area:
Average Height:
Volume:
Exposed WaEI Lengih;
Air Changes:
Room Temperature:
78 ft2
9ft
702 ft'
5ft
0.94 /hr
70 °F
Floor
Tota! Area: 78 ft2
Heated Area: 78 ft�
Construction: Joist 16"
Cover Rv: 0.95 °F•ftz•hr/Btu
Structure Rv: 20 °F•ft'•hr/Btu
Space Below Heated: From Same Source
�F
Surtace Temperature: 78.1
Total Heat Loss:
Total Radiant Into Room
Total Downward Loss:
Total Infiltration Loss:
Floor Unit Load To
Room:
Downward Loss:
Floor Unit Load To Room:
Ceiling
Total Area: 78 ft2 Heat Loss:
Heated Area: 0 ftz
Construction: Gypsum Board
Covering Rv: 0.77 °F•ftZ•hr/Btu
Insulation Rv: 49 °F•ftz•hrBtu
Space Above Heated: From Same Source
Other Components
Component Length Width/Height
Wall-1 5 9
Units: Heat Loss = Btu/hr, Length = fl, Area = ftz, Rv =°F ft� hr/Btu
Created using Mr PEX Radiant -1.8,0
Area Rv
45 24
1,231 Btu/hr
1,149 Btu/h r
82 Btu/hr
991 Btu/hr
14.7 Btu/hr/ftZ
82 Btu/hr
14.7 Btu/hr/ft'
Q Btu/hr
Heat Loss
158
Page 12 of 16
FEB-19-2009 14:07 HVAC SUPPLY
Mr PE)C _ -
SYSTEMS
Detailed Heat Loss Data
BEDROOM 2 (Main Level)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
F��OI"
Total Area:
Heated Area:
Construction:
Cover Rv:
Structure Rv:
Space Below Meated
Surface Temperature:
Ceiling
Total Area�
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated:
P.13
Heat Loss Detail
Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
315 ft2 Total Heat Loss:
9.6 ft Total Radiant Into Room:
3,024 ft' 7'otal Other Heat
36 ft Supplied:
0.94 /hr Total Downward Loss:
70 °F Total Infiltration Loss:
Floor Unit Load To
Room:
315 ft2
315 ftz
Joist 16"
1.91 °F•ft2•hr/Btu
20 °F•ftZ•hr/Btu
From Same Source
�F
81
315 ftz
0 ftz
Gypsum Board
0.77 °F�ftZ•hr/Btu
49 °F•ft'•hr/Btu
From Same Source
Other Components
Downward Loss:
Floor Unit Load To Room:
Heat Loss:
8,563 Btu/hr
6,376 Btu/hr
1,442 Btu/hr
745 Btu/hr
4,270 Btu/hr
20.2 Btu/hNftz
745 Btulhr
20.2 Btulhr/ft2
0 Btu/hr
Component Length WidthlHeight Area Rv Heat Loss
Wall-1 36 9.6 345.6 24 895
Window-1 - - 90 2.85 2,653
BATH 2 (Main Level)
Total Area:
Average Height:
Volume:
Exposed Wall E.ength:
Air Changes:
Room Temperature:
78 ft2
9ft
702 ft'
28 ft
0.94 /hr
70 °F
Total Heat Loss:
Total Radiant Into Room:
Total Downward Loss:
Total Infiltration Loss:
Floor Unit Load To
Room:
2,005 Btu/hr
1,873 Btu/hr
132 Btu/hr
991 Btu/hr
24 Btu/hr/ftz
Units: Heat Loss = Btu/hr, Length = ft, Area = ftz, Rv =°F•ftz•hrlBtu
Created using Mr PEX Radiant - 1.8.0 Page 13 of 16
FEB-19-2009 14:07 HVAC SUPPLY P.14
Mr PEASYSTEMS Heat Loss Detail
� Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
Detai led Heat Loss Data
Floor
Total Area:
Heated Area:
Construction:
Cover Rv:
Structure Rv:
Space Below Heated
Surface Temperature:
Ceiling
Total Area:
Heated Area:
Construction:
Covering Rv:
Insulation Rv:
Space Above Heated:
78 ftz
78 ft2
Joist 16"
0.94 °F�ftz•hr/Btu
20 °F�ft2•hr/Btu
From Same Source
°F
82.9
78 ft2
0 ft�
Gypsum Board
0.77 °F•ft'•hr/Btu
49 °F�ft'•hr/Btu
From Same Source
Other Components
Downward Loss:
Floor Unit Load To Room:
Heat Loss:
132 Btu/hr
24 Btu/hr/ft2
0 Btu/hr
Component Length WidthlHeight Area Rv Heat Loss
Wall-1 28 9 252 24 882
bed 1 (Basement)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
Floor
Total Area:
Heated A�ea:
Construction:
Slab Depth:
Cover Rv;
Structure Rv:
Edge Rv:
Surface 7emperature:
192 ft�
10 ft
1,920 ft3
30 ft
0.94 /hr
70 °F
192 ftz
192 ft2
Concrete
4 in
0.98 °F•ft2•hrlBtu
5 °F�ft2�hr/Btu
5 °F•ft=•hr/Btu
o�
83.4
Units: Heat Loss = Btulhr, Length = ft, Area = ftz, Rv =°F•ft2•hdBtu
Created using Mr PEX Radiant -1.8.0
Total Heat Loss:
Total Radiant Into Room
Total Downward Loss:
Total Infiltration Loss:
Floor Unit l.oad To
Room:
Downward Loss:
Floor Unit Load To Room:
5,309 Btu/hr
4,781 Btu/hr
528 Btulhr
2,711 Btu/hr
24.9 Btulhr/ft2
528 Btu/hr
24.9 Btu/hrlft2
Page 14 of 16
FEB-19-2009 14:07 HVAC SUPPLY P.15
Mr PE�SYSTEMS Heat Loss Detail
Detailed Heat Loss Data
Ceiling
Total Area:
Heated Area:
Constn�ction:
Covering Rv:
Insulation Rv:
Space Above Heated:
192 ft2 Heat Loss:
0 ftz
Gypsum Board
0.77 °F•ftz•hr/Btu
49 °F•ft2•hr/Btu
From Sarne Source
Other Components
Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2�09
0 Btu/hr
Component Length Width/Height Area Rv Heat Loss
Wall-1 30 10 300 21 890
Window-1 - - 40 2.85 1,179
bath 1 (Basement)
Total Area:
Average Height:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
Floor
Total Area:
Heated Area:
Construction:
Slab Depth:
Cover Rv:
Structure Rv:
Edge Rv:
Surtace Temperature
Ceiling
Total Area:
Heated Area:
Construction;
Covering Rv:
Insulation Rv:
Space Above Heated
6D ft2
9ft
540 ft'
19 ft
0.94 /hr
70 °F
60 ftz
60 ft2
Concrete
4 in
0.02 °F•ft�•hdBtu
5 °F-ft2•hr/Btu
5 °F�ft2•hr/Btu
oF
81.9
60 ftZ
0 ft2
Gypsum Board
0.77 °F•ftZ•hr/Btu
49 °F•ft��hr/Stu
From Same Source
Unlis: Heat Loss = Btu/hr, Length = ft, Area = ft', Rv =°F•ft2•hd81u
Created using Mr PEX Radiant - 1.8.0
Total Heat l.oss:
Total Radiant Info Room:
Total Downward l.oss:
Total Infiltration Loss:
Floor Unit Load To
Room:
Downward Loss:
Floor Unit Load To Room
Heat Loss:
1,454 Btu/hr
1,322 Btu/hr
132 Btu/hr
763 Btu/hr
22 Btu/hr/ftZ
132 Btu/hr
22 Btu/hr/ftz
0 Btu/hr
Page 15 of 16
FEB-19-2009 14:07 HVAC SUPPLY
Mr PE�SYSTEMS
� 7
Detailed Heat Loss Data
Other Components
Component Length WidthlHeight
Wall-1 19 g
MUD / SKI CHANGE (Basement)
Total Area: 400 ft2
Average Height: 10.6 ft
Volume: 4,240 ft'
Exposed Wall Length: 42 ft
Air Changes: 0.94 /hr
Room Temperature: 70 °F
Floor
Totai Area:
Heated Area:
Construction:
Sleb Depth:
Cover Rv:
Structure Rv:
Edge Rv:
5urface Temperature;
400 ftz
400 ft'
Concrete
4 in
0.02 °F•ft2•hr/Btu
5 °F•ftZ•hrBtu
5 °F•ft2•hr/Btu
�F
82.3
P.16
Heat Loss Detail
Project Number: Buffehr Creek Rd.
Project Name: Buffehr Creek rd
Date: February 19, 2009
Area
171
Total Heat Loss:
Total Radiant Into Room:
Tota! Downward Loss:
Total lnfiitration Loss:
Floor Unit toad To
Room:
Rv
24
Downward Loss:
Floor Unit Load To Room
C@1�1119
Total Area: 400 ft' Fleat Loss:
Heated Arsa: 0 ftz
Construction: Gypsum Board
Covering Rv: 0.77 °F•ft2•hr/Btu
Insulation Rv: 49 °F•ft2•hr/Btu
5pace Above Heated: From Same Source
Other Components
Component Length Width/Height
Wall-1 42 10.6
Door-1 6 g
Units: Heat Loss = 6tu/hr, Length = ft. Area = ft�, Rv =°F•ft2�hr/Btu
Geated using Mr PEX Radiant - 1.8.0
Area
445.2
48
Rv
24
2.15
Heat Loss
560
9,964 Btu/hr
9,082 Btu/hr
882 Btu/hr
5,988 Btu/hr
22.7 Btu/hr/ft=
882 Btu/hr
22.7 Btu/hr/ft2
0 Btu/hr
Heat Loss
1,219
1,875
Page 16 of 16
TOTAL P.16
05f1212009 16:34 FA}t 9708279222 wESTERN FIREPLACE
r�ooiEOO7
T�an�mittal Form
Revision 3ubmlttals:
1. "Field Set" of approv�ed plans MUST aoCOmpahy fevisiene
2. No turther Inspectlons� wlll be perFormed until tha reviaione are approved & the permit Is re-Issued.
3. Fees bt Peviewing r�visiorn aro $55.�0 per hvur (2 hour minlmum), and are due upon isau0nce.
�...,...m,,,.....,.�.�__.._,....._._.._._ .............._...... . ., .. .. ........ ._.._..._.._.__._..„.._,...,,,:........,..-...,.,..,._.._........_.__....._._.._....._...._. .........,..........._....._. ,_.
� Revi8i0ns
� Psrmit #(e) Iniormatlon applles to: Attantlon; �j Response to Correction Letter
i M o`l - oo�' (o s'���LnG l �£ � () Defecrred Subml�aicvrrs�t�on lettsr
i ( ) o�er
i
� ~Pro�oct adars,s:_ .�..�....�...�w..,., �...._.....,.,___.. .. �.�...,.,,�.�.,�,�......._._.E Deecrlptlon / Llet of Changes: .._......_...,...___.._...... ....�. . , . . ..... .
, „
�
I
�_.1.�.�7. 13��FF�,��._. �.R��..�..,...�..,,.,...,..�.:........___.._......._.�' �t,� r� �,.�r�1�. so� oP-�4nE #2
; Cv ct �rnormatlon -�' ,('�, 03 O L�4 S Ei�
; Co any: �§'C�RI� ' � I, � PLl°tG� Sv ��� ' o D / -- 2
�I Co ny Ph: � �S�I �o Fau g?i ( Q �ZZ � � •L`�rr �"14� ��/ �J �/�b �/�r� u �ip
I
' contaot N�ema: `'SO'E M fi �-� S ��O. ��1- � 04,5 � T
� Contaot Ph: �� � "� � �O Call: �'TV 7l Z � y
� �. G�A �+i7 � L S�
; e-nnau. Sa�-� v� �s TFR.,hI� i R£Q4�tGF _ Gcv`1
� Town nf Vell Cantrsc3or Replet�e�tlon No: � 23' M I
,
i
;
j j
;
j 91A
�
u..,�..x�.�w�.aw,,.,�w.,�..:2<::�,�,�...__-_._.__._.._.._. .. _._...,..,,�.: w.......,... _: �...,.._�..;�
; Rovisrd ADdITlONAI. Valuatlons (L.Abor 8 MaE�Nals)
(DO NOT In�lude origlnal valuotlon)
! Bulldlep $
j Pwmo�no $
�
j �A�;�t $
I Meohanical � r7 �
i
) F�r� SprinkleNAlerm $
� roai: a.00 �
�-�.-�--....._. _ .., _,....,�. ,..... __.___. _. _.__ ...._.._ .._. . ... .. _. .
x I �•l .. .. . . .�...—L_
?o R-Er1�411� uhLCJ`{�4h[�FL�
,... i
, .... . ...._...
. i
I
i
1 -- �
; (Use addiGonei aheet If nece�saryj .
� ;
:
� �
; �
i
f-__.._ _. �..___...__. _._.... . ..... _. ...._.. � .... ... . . . . . .. . ....... . ...... .......... .__._.__ �
� Date Reoeirred�
;
� � �c��a��
;
� .
MAY 1:? 2009
TOWN OF VAIL
:.
l�s�`i��a s
,���ssta
/nsuNail, «c
Turnipseed Construction
PO Box 3388
Eagle, CO 81631
PROJECT: 1b87 Buffehr Creek Road
Vail, CO
Post Office Box 2888
Vail, Colorado 81658
970-�24-3000
Fax 970-524-3fl0i
i3� c�P.. Pw�
� � �� 3 �
June 1, 2009
SPECIFICATIONS:
R-12.8 2" polyurethane spray foam & R-38 BIBS to 2x12
exterior ceiling total R-51
R-23 BIBS to 2x6 elcterior walis
R-23 BIBS to 2x6 garage exterior wa11s
R-23 BIBS to 2x6 garage common walls
R-15 BIBS to 2x4 fiured concrete exterior walls
R-23 BIBS to 2x6 furred concrete exterior wa11s
f-mil gaty air/vapor bazrier ta earterior walls, garage exterior wa11s
and garage common walls
Membrain Smart Vapor Retarder to exterior ceilings and furred
concrete exterior walls
R-30 FSK to 14" garage ceiling
R-19 foil faced fiberglass insulation to 11 7/8" mid floor
R-30 foil faced fiberglass insulation to 11 7/8" crawl ceiling with strapping
R-23 BIBS to 2x6 cra.wl common walls
R-19 foil to 11 7/8" rim joist
1Z-11 sound batts to 2x4 interior wa11s
R-19 sound batts to 2x6 interior walls
Foam a11 windows, doors and penetrations
CertainTeed�-1
Builders Statement
«�� ���������� ���
�,"�� �� � , � r4�� ��. u 1�1�1 '� Qv�c...
.. i� � ,� li ,����� �M ?ol��..,R.�'� �«M... R - /o? �
* '�'�r `(3 c K S�. R- 3 8
[�!'��;f�'rr CU,!i��55 �i��;�1���G�Q�€� ����aEu� �r,� !1�i°1EL t�i��`�n�-���' i�i;i�l�`'�!;C�'i��t ����:;,t ���a -}�,-{�.� 'jZ � ��8
The OPTIMA System has been installed using OPTIMA Insulation to provide a R-value of R_3S _ using __ bags of
� - --
insulation to cover�0 $_ square feet of area at a thickness ofgL� inches. 01�t G�TGR�pf� G� 11..�KG�
Installcr Contrador (sign) 0, (`J (�C�O Company Name � S�} L�A l L �..�.. G- / D.iic /(p" p`�-Oq
l3uilder (sicn)
Comi�inv N�ime
/ f7,�le /
iri� ��!��v��IA��L ��:i�fr2��i'�.(�!!�1i'�i,; !�
OPTIMA�^^ Loose Fill Insulation is m�nufact�n�ed for closed cavity application installed behind OPTIMA Fabric ar
cquivalent. It should not be usecl for o��en blow applications. In accorclance with the charts I�elo�v, you must install
the minin�um numl:�er af bags per 1,000 sq. ft. of net area for e�ch R-value/cavity thicl<ness listed. Cover��;e is
based on � nominal 28 Ib. bag. The maximum net coverage must not exceed that specified for each R-value.
Failure to install the required minimum weight per sq. ft. of insulation �Nill result in a reduced R-value. This product
should not I�e mixed witl� other l:�lown insulations or the thermal clairris will become inv�lid.
Sidewalls, Cathedral
7hirknecs
huhes
�t'b" i2xd)
, y,�� I? x( )
7�/�° l2xHl
9'/i" (2x10}
11'A"l_�x12)
1 >'/.�" (2x1 �11
R-value
15
23
i0
q
ai
;6
and other closed cavities tliat are compression filled.
Density Minimum Weight Bags Per
Lbs. Per Cu. Ft. Ll�s. Per Sq. fL 1,000 Sq. Ft
1.II 0.525 1 R.9
1.i3 U.C;25 �g.4
1.Pi 1 .Oti(i
1.i3 I . ;II8 50.0
I.t3 1 .6EiU �S.S
1 .(f 1 .9o7i 71 .<l
Maximwu Sc�. Ft.
Cuvcragr Per 6ag"
�� �
�:� --
? (,
�Il
i�
ld
Floored Attics-Closed Cavities that are not compression fill�d.
Thidmess Density Minimurn Weighl [3ags Per Maximum Sy. Ft.
Indiec R-value Lbs. Per Cu. FL Lbs. Per Sy. Fi. I,000 Sy. FL CoveraFe Prr 13a��
i�/��� �1s4) 12 1.0 0.292 I(1.�� <)6
S'/," i2x4) L� 1.2 0.;50 12..5 RO �-
;'/." (��R) 14 1.4 O.dO£S 14.5 6�)
s�i,�� �z,;41 i a t.C, o.�G� t 6.� ��o
5'L��� (2�6) 15l 1.0 0.458 16.4 61
;'/:" 12x6) 21 1 2 0.550 19.6 i I
;'/," (2x(,) -- - �2 �1.4 O.G42 2ZJ 44
S�/,�� (?s(�) 22 1.(, 0.733 26. i Stt
7'/�" (2�FS) 76 I.0 QfiO4 21 J -J6
�7'/�" (2x±S) 27 1.2 OJ25 25J 39
7'l.�° 12x81 '29 1.4 Qt34G 30. ;
7'/�" f2x8) 30 I.G 0.967 34.5 ?9
9'/,�" (?x10) 33 �I.O OJ71 27.� ih
<1'/," 2x 10) 35 1.2 0.�115 3_'>. I SU
�)'/��" (2 x I 0) ;6 1.4 1.079 1H. S ? 4
)'lP (2x10) 3II 1.G 1.233 43.5 L S
R-values are cletermined in accordance with ASTM C GII7. Coin�lies with ASTM C 7G4 as Type 'I intiulafion. "R" means resistance lo heal Ilow. lhc hi,qher lhe R-v;diie,
thc greatcr Ihc insul.ating �'iower. To get Chc marked R-value, it Is ecsential thal thc iniidation is installed properly (ollowinZ; the recommcnd�rtions o� Ccrt,�inTecd Corpnr,iiion_
,������/[EiF� li u��+ QJ�� @I�J ��i1!L �^1_�'�J-IPJ••`L�2v11;1i��i�, �^!5�TE1�1
61o�v-In-Blanl:et' S��stem is a registered Vndemarlc of Arl<-Seal International, Inc., Dem�er CO F30223 • OPTIMA' � is a h'�tden'iark ot Ceri.iinTecd Curpur,�llon
CERTAINTEED CORPORATION, P.O. BOX 860, VALLEY FORGE, PA 194II2
c,d�: ,u-1a-?ir 1999 Certaineed Corporation 5/99
.
C r '
e ta�nTeed��
Builders Statement
- I (o ��- �r� � �¢.c-,�K ¢.v
s
� �. r.. ;-I,�1
�
... � -:� � �. ��`�������\
���r'�c�'�' �r,fl��'��� �i!?��E'���it�N��31 f1��(�(�j ���� fifl"1E"' G�i�Z➢���/���ir' �l�'1ii`���C`P`1�a .�J�;�,i;;k'';�ir
The OPTIMA Sysfem has been installed using OPTIMA Insulation to provide a R-value of R�.3 using __ bags of
insulation to cover� square feet of area at a thickness of 5`�t inches. p�y �,XTBR,uDQ. �/�.�,�„s
Instciller Contrac(or (sign) p��G��,p C��mpany Name (l�(Sti�-�LA(%l_ l..(.. G. / D,�le /(p''��"0a1
l3uilder (si�nl
CnmpanyName
/ I"),� t e /
irG�,;t�i�f�l/�?L �':� i���t��;�l�!!n� �ir;: ?c
OPTIMAT"^ Loose Fill Insulation is manufactured for closecl cavity applic�tion installed behind ONTIMA f=abric or
equivalent. It should not be used for open blow applic�tions. In accordance with the charts below, }�ou must install
the minimum number of bags per 1,000 sq. ft. of net area for each R-value/cavity thid<ness listed. Co��era�;e is
based an � norr�inal 28 Ib. bag. The maximum net coverage must not exceed that specified for eacli R-vil�ie.
Failure to install the requirecl minimum �veight per sq. ft. of insulation will result in � reduced R-value. Tliis ��roduct
slu�ulcl not I�e mixed with other blown insulations or the thermal claims will become invalid.
Siclewalls, Cathedral C
Thicknccs
Inches
3y��� ��>x4)
i��,�� 1')xbl
7�h�� (lzHl
9'/:" (? � 10)
7 1'/�° f2v121
1 ;'/," ('al-�)
R-value
15
2i
;(1
39
ai
SL
and other closed cavities that are compression filled.
Density
Lbs. Per Cu. Ft.
I.II
1. ii
1.�
l . ii --
I .ti
I .IS
Minimum Weight
Lbs. Per Sy. Ft.
0.52 i
(1.7i2 i
1 .OtiII
1.3uti
1 . (iti t1
I .9t3t{
6ags Per
7,000 Sq. Ft.
I ti.�)
?N 4
iU.O
S�i.B
71 .�1
Maximum Sq. Ft.
Coverage Per Qag'"
5i
f -J
-- ? (,
ZII
17
- �,{
Flooe�ed Attics-Closed Cavities that are not compression filled.
Thid<ness Density Minimum Wei�ht 6ags Per Maxirnum Sq. Fl.
Inchec R•value Lbs. Per Cu. FL Lbs. Per Sy. FL 1,000 Sq. Ft. Coverage Pir l3ag"
3'L��� (2xdl 12 1.0 R292 10.4 9G
3'L�" 12a4) 13 I.2 0.350 12.,5 730
;��,�� (�x41 __ 14 1.4 0.4UtS 1d.5 6')
.5��,�� (1x41 1d 1.6 0.%16i 16J 60
S��,�� (�xG) I g 1.0 0.458 I(�.4 G I
;'/," Qx6) Z1 1.2 0.550 19.G ti I
5��,�� 12xb1 22 1.4 Q642 22J 44
S'1,�� 12�(�I 22 1.G OJ33 2p.3 ;tS
7'/�° (2x8) 2G �I.O 0.604 21 J A(,
7'A" ('xEi) 27 1.2 Q725 25J i9
7'/��° l�'x8) 29 1.�1 O.i34G 30.3
7'/i" (2xtil 30 I.G 0.9(i7 34.5 Jq
9'/.�" 12x'10) 33 1.0 0.771 27.5 36
!�'/�i" lZx 10) 3 i 1.2 O.y25 3�.3 3U
�)'/�° (2;:1(1) 3G 1.4 1.079 i3.S 26
9'/�" (2x10) 3t3 l.fi 1.233 43.5 Z3
�:-vz��ues a�e oc�erm�nea �n accornance with RS i nn C, 687. C.omplies w�ith ASTM C 7G4 as Type 1 intiularion. R" means resistance lo he�il Ilo�v The hi�tier Ihe I�-value,
Lhe �,res�cr the insulating ��o�ver. To get the nt�rked R-v�lue, it is essential that the insulation is instailled ��ruperly followin� the iecommendalion� uf Ccrtolnlccd Cor��or.i�i� rn.
,4�Y'�'���/I�� fr=�F� �J`�� �f`�J �N-��E �'�_�'�/F/-;1i�J-�`L/�i�liC�'f ° 5`Y�if�laJl
131ow-In•Blanl:et' System Is a registered trademarl: of Arl:-Seal InCernational, Inc., Denver CO 60223 • OPTIMA" is a trademarl< of Ccrt.iinTc�ed Corpr�ration
CERTAINTEED CORPORATION, P.O. BOX 860, VALLEY FORGE, PA 194II2
�"'i" t0 1J-1��� 1999 Certaineed Corporation 5/99
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
:
�owxo�yn¢ '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p.970.479.2139 f.970.479.2452 inspections 970.479.2149
PLUMBING PERMIT
NSFR
Job Address: 1687 BUFFEHR CREEK RD VAIL
Location.....:
Parcel No...: 210312215002
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305
MINTURN
CO 81645
APPLICANT K.W.'S PIPE FIXATION, INC.
PO BOX 677
GYPSUM
COLORADO 81637
License: 355-P
CONTRACTOR K.W.'S PIPE FIXATION, INC
PO BOX 677
GYPSUM
COLORADO 81637
License: 355-P
Desciption:
PIPING
Valuation:
02/18/2009
02l18/2009 Phone: (970) 401-3688
02/18/2009 Phone: (970) 401-3688
PLUMBING FOR NEW SINGLE FAMILY RESIDENCE INCLUDING GAS
$50,000.00
Permit #:
Project #:
Status . . . :
Applied . . :
Issued . . .
Expires . .:
P09-0015
PRJ07-0529
ISSUED
02/18/2009
02/18/2009
08/17/2009
......,�«..�.,..� ..................#«....�...«��..�............+.��....«..�...... FEE SUMMARY .,...*.�,.*�.+...�...�..............������........*...���..�.....�.�....*.��.,,.......
Plumbing Permit Fee---> $750.00 Will Call------------------> $4.00 Total Calculated Fees---> $941.50
Plan Check----------------> $187.50 Use Tax Fee------------> $0.00 Additional Fees------------> $0.00
Investigation--------------> $0.00 TOTAL PERMIT FEES--> $941.50
Total Calculated Fees--> $941.50 Payments-------------------> $941.50
BALANCE DUE-----------> $0.00
...�...«�.,.,,..,..,�...�..,,...,.....«:..,.�.........�............��......�.....�.....*.....�....«......».......,......��«,.....�........*�.��..:...........«..,.......� .........................
APPROVALS
Item: 05100 BUILDING DEPARTMENT
02/18/2009 JLE Action: AP
.................,..,..<.....,.,,...�,.�.,..�,�............,....,,,,.....�...«.,.,.,..,��.,,..��.........,...����..,,�..:�..,........,.,....,,,.,,.......,,.....,�..�..,,,.,.,..,,,.,�......,...,......,...<.
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
,�....�,,,,..� .................�,.�.,,,...........................,....�.,..........»......«�....�........«........�..,�.�.�.,..........»...,....�...............«.«.,:..�:..................,,.,.,�
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR IN ECTION SHALL BE M DE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
AM - 4.RM. % /I� . �%"� �I
" Signature of Owner or Contractor
����ef! � , �i� /%-� � S
� Print Name
plmbpermt1_041908
�- /�- o�'
Date
TOWN OF VAIL PLUMBING PERMIT APPLICATION
Project Address: /% Q � �U�[� � � G1�►��� ��% `
FJ fJ f
Contractor Information
Company: u laJ. ��7 f �Y"�.--%���1l6c l'i%p�� ,�'�'�i.
Company Address: i-�'� � � 0'X !� ��
/� C p: 8 /63 �
City:Ty�+�`� State: Q Zi
Contact Name: /S�i�� T�'1 L�J. ��/ G�''%�
Contact Ph: %i�d-- �!o/- �6�� ceu: 1�o ��/o/ �d�
E-Mail:
Town ail ontrac Registration No� � �!�
iC `� �
Contractor Signature (required)
Plumbing Valuation (Labor 8� Material)
Plumbing $ SP!f ��� �__
Properly Information
Parcel #:
Legal Description: Lot # � Blk #
Subdivision:
Job Name:
Owner Name:
Mailing Address:
(For Parcel # Contact Eagle County assessors Office at 970-328-8640 or visit
www.eaglecounty. us/patie)
��v,�.��
G��.GO
2�.�,�
�I I n r? 1 r r)!1
Project#: C �v ��
Building Permit #: /�) D�II '" ����
Plumbing Permit #: �� ! "'� Uv � �
Architect (✓j Designer ( ) Engineer ( )
Name: �GOtf �'J/'�'i��f �eca�
Phone: �l � � 3 a8 '" � ye�
Fax:
E-Mail:
Detailed Description of Work: .��i%� ��
�- � �1 U . �b���;
� � Q�:s�r%(�v���
(Use additional sheet if necessary)
Work Class:
New �) Addition ( ) Remodel ( ) Repair ( ) Other ( )
Building Type:
Single-Family (�) Two-Family ( ) Multi-Family ( )
Commercial ( ) Townhome ( ) Other ( )
Date Received:
�; �' �� t C� � ��, _� ��% i�
��
� 1�I �•�+� �"r� i:ii*�d
3 i�
���_�
TOWN OF VAIL
******************************+*****************�*******************************************
TOWN OF VAIL, COLORADO Statement
**********************************************+********************+*********+********�*****
Statement Number: R090000160 Amount: $941.50 02/18/200902:05 PM
Payment Method: Check Init: JLE
Notation: 4574 KW'S PIPE
FIXATION
-----------------------------------------------------------------------------
Permit No: P09-0015 Type: PLUMBING PERMIT
Parcel No: 2103-122-1500-2
Site Address: 1687 BUFFEHR CREEK RD VAIL
Location:
Total Fees: $941.50
This Payment: $941.50 Total ALL Pmts: $941.50
Balance: $0.00
***********************+**********+*********+**************************************a****+***
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
PF 00100003112300 PLAN CHECK FEES 187.50
PP 00100003111100 PLUMBING PERMIT FEES 750.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
0
0
02-02-2010
.'� Inspection Request Re�orting
Vail C[) _ Citv n
Requested Inspect Date: Wednesday, February 03, 2010
Site Address: 1687 BUFFEHR CREEK RD VAIL
1687 BUFFEHR CREEK RD
A/P/D Information
Activity: B08-0131 Type: B-BLD
Const Type: 101 Occu ancy:
Owner: BUFFEHR CREEK PARTN�RS
Contractor: SCOTT S. TURNIPSEED, AIA
Architect: SCOTT TURNIPSEED, AIA
Description: NEW SINGLE FAMILY RESIDENCE
R�d Inspection(s)
� Item: 534 PLAN - FINAL C/O
Requestor: SCOTT S. TURNIPSEED, AIA / Mike
Comments: will call Mike
Assigned To: BGIBSON
Action: Time Exp:
Item: 25 PW-Rough grade
Requestor: SCOTT S. TURNIPSEED, AIA / Mike
Comments: will call Mike
Assigned To: JMONDRAGON
Action: Time Exp:
u
Com
Sub Type: NSFR
Use: VB
Phone: (970) 328-3900
Phone: 970-328-3900
Page 1
Status: ISSUED
Insp Area:
Requested Time: 08:00 AM
Phone: 970-904-0263, Mike
Entered By: LCAMPBELL K
Requested Time: 08:30 AM
Phone: 970-904-0263, Mike
Entered By: LCAMPBELL K
540 B DG-Final C/ quested Time: 08:45 AM
SCOT S. TURNIPSE AIA /'k Phone: 970-904-0263, Mike
will call ike
JMONDRAGON Entered By: LCAMPBELL K
i e
L APP O R
���i��c`� �> ��
� ��
,
��
Inspection History
Item: 30 BLD 5/2r1/09 91nspector SHAHNroved "` Action: AP APPROVED
Comment: LETTER ON FILE FROM STRUCTURAL ENGINEER FIELD INSPECTION. INSPECTION
APPROVED.
Item: 50 BLDG-Insulation `" Ap� proved "`"
05/21/09 Inspector: SHAHN Action: NO NOTIFIED
Comment: PROVIDE 3"RIGID BOARD ABOVE RECESSED FIXTURES IN ENVELOPE.
05/28/09 Inspector: SHAHN Action: PI PARTIAL INSPECTION
Comment: CEILING PREINSULATION OK.
06/04/09 Insp ector: JRM Action: AP APPROVED
Comment: INSULATION COMPLETE... R VALUE CERT ADDED TO FILE
Item: 60 BLDG-Sheetrock Nail "* Approved *"
06/11/09 Inspector: JRM Action: PA PARTIAL APPROVAL
Comment: ALL COMPLETE EXCEPT FOR GARAGE
06/16/09 Inspector: JRM Action: AP APPROVED
Comment: complete
07/31/09 Inspector: shahn Action: AP APPROVED
Comment: both fireplace gyp ok.
REPT131 Run Id: 10983
r '
11-18-2009 (nspection Request Reporting Page 22
4:28 pm Vail, CC� - Gitv Of
Requested Inspect Date: Thursday, November 19, 2009
Inspection Area: SH
Site Address: 1687 BUFFEHR CREEK RD VAIL
A/P/D Information
Activity: E09-0018 Type: B-ELEC Sub Type: NSFR Status: ISSUED
Const Type: Occu ancy: Use: Insp Area: SH
Owner: BUFFEHR CREEK PART�RS
Contractor: MOUNTAIN ELECTRIC Phone: 970-524-7115
Description: WIRING FOR NEW SINGLE FAMILY RESIDENCE, INCLUDING TEMPORARY POWER
Requested Inspection(s)
Item: 190 ELEC-Final
Requestor: MOUNTAIN ELECTRIC
Comments:
Assigned To:
Action:
Comment:
471.6155
Requested Time: 10:30 AM
Phone: 970-524-7115 -or- 471-
6155
MDENNEY Entered By: CGUNION K
Time Exp:
TALLIC PARTS WITFfTl�3-FEET OF HOT TUB. 2) PROVIDE WEATHERPROOF
�O KOIOS I�N OUTDOOR PA OV 6�FACCES� FOR U ER ROU DN 7)CB NDICSS NGAS CURE
PIPING.
��,� �2- c� � - ��—.---��....-�.,
�� � �
�
Insaection Historv
Item: 110 ELEC-Service "* Approved "*
02/20/09 Inspector: MDENNEY Action: APCR APPROVED/CORRECTION REQD
Comment: 1) GROUNDING CLAMP USED FOR UFER CONNECTION IS NOT LISTED FOR USE WHITH
FZEBAR.
Item: 120 ELEC-Rough "" A� pproved *'
05/21/09 Inspector: SHAHN Action: AP APPROVED
Comment: FEEDERS NOT PULLED AND LOAD CENTERS NOT INSPECTED.
BOND CSST #6CU SOLID AT FINAL.
Item: 130 ELEC-Conduit
02/18/09 Inspector: JRM Action: NO NOTIFIED
Comment: CANCEL BY CONTRACTOR
Item: 140 ELEC-Misc.
Item: 190 ELEC-Final
11/17/09 Inspector: MDENNEY Action: CR CORRECTION REQUIRED
Comment: 1)_ BOND ALL METALLIC PARTS WITHIN 5 FEET OF HOT TU)B. 2� PROVIDE
WEATHERPROOF SWITCH COVERS �2) a�. PAT O A4 I PROVIDE COVER OR J-BOX ABOVE
BRANCH CIRCUITS AND SECURE Ac�K )
BAR AREA. 5) COVER OPEN KNO�KOUTS IN OUTf300R PANEL. 6) ACCESS FOR UFER
GROUND. 7) BOND CSST GAS PIPING.
REPT131 Run Id: 10663
M09-0027: Entries for Item:390 - MECH-Final 14:14 02/01/2013
Action Comments By Date Unique_
Ke
AP martin 12/01/2009 A000130
145
Total Rows: 1
Page 1
M09-0052: Entries for Item:390 - MECH-Final 14:14 02/01/2013
Action Comments By Date Unique_
Ke
AP BW 11/20/2009 A000129
920
Total Rows: 1
Page 1
P09-0015: Entries for Item:290 - PLMB-Final 14:14 02/01/2013
Action Comments By Date Unique_
Ke
NR CANCELLED BY CONTRACTOR cg 11/24/2009 A000130
004
AP martin 12/01/2009 A000130
146
Total Rows: 2
Page 1
_ _ _ _---- ----_-
02-02-2010 Inspection Request Re orting Page 13
4:07 pm Vail, Cp - Citv O� _
A/P/D Information
Activity: M09-0046
Const Type:
Owner: BUFFEHF
Contractor:
Description:
Item:
Requestor:
Comments:
Assigned To:
Action:
Comment:
2)
Requested Inspect Date: Wednesday, February 03, 2010
Inspection Area: JRM
Site Address: 1687 BUFFEHR CREEK RD VAIL
Type: B-MECH Sub Type: NSFR Status: ISSUED
Occupancy: Use: Insp Area: JRM
CREEK PARTNERS
�ZEPLACE SUPPLY, INC. Phone: 668-3760
NE RE-FAB FIREPLACE WITH GAS LOGS, AND ONE OUTDOOR MASONRY FIREPLACE
LOG� (GAS PIPING BY OTHERS)
MECH-Fina
- Srntt Ti irn
MANUAL
GAS KEY
TERm NATIOf�TT
iR SH OFF AT
�
(
`� �
^ \ �
Requested Time: 08:00 AM
Phone: 970-904-0263, Mike
Entered By: LCAMPBELL K
ELOW CHIMNEY ON OUTDOOR SONORAN PER
N OUTDOOR FIREPLACE
Inspection Historv �J
Item: 200 MECH-Rough ** Approved *'
06/04/09 Ins��pector: JRM Action: AP APPROVED
Comment: 2 FIRE PLACE ROUGHS APPROVED
Item: 340 MECH-Misc.
Item: 390 MECH-Final
12/08/09 Inspector: _cg Action: CR CORRECTION REQUIRED
Comment: 1) COMBUSTTON AIR TERMINATION TO BE 3' BELOW CHIMNEY ON OUTDOOR SONORAN
P"ER INSTALL MANUAL
2) NEED GAS KEY FOR SHUT OFF AT SONORAN OUTDOOR FIREPLACE
REPT131 Run Id: 10983
���1��°a�s
.�Ng�sS�
�
InsuNa�l, «c
T►�rnipseea consmiction
P4 Box 338$
Eagie, CO 81631
PRUJECf: 15$7 Buffehr Creek Road
Vail, C�
�osr of�ice Box 2i38s
Vai[, Colorado 81558
97U-524-3�D{i
Fax 970-524-3fl0!
�� �-��' �i- ��
� � �� 3 �
�une 1, 20a9
SPECIFICATIUNS:
R-12.$ 2" polyuretharze spray foam & R-38 BIBS to 2x12
exterior ce��ing total R-S l
R-23 BLBS to 2xfi exterivr walis
R-23 BIBS to 2x6 garage exterior walls
R-23 BIBS ta 2x6 garage comnaon walls
R-15 BI.SS ta 2x4 funred concrete exterior walls
R-�3 BIBS to 2x6 furred cvncrete exterior walis
G-aai,l go�y airt�apar bar�i�r bo exterior walls, garage exteriar waiis
and garage com�nQOn wa�ls
Mem.bratn Smart Vapor Retarder to exterior ceilings and �rred
con�rete exter�ior walls
R-30 �SK to 14" garage cei]ing
R-19 foil faced fibexglass insr.ila�ion w 11 718" mid floor
R-30 foil faced fiberglass insulativn to 1 l 71$" crawl r.ei�xng with strapping
R-23 BIBS tv 2xb craw� common wa1Is
R-19 foil to � 1 718" rim jvist
R-1 t sountd baris to �x4 interior walls
R-19 sou�d batts tv 2x6 interic�r walls
�'oam a11 windows, doars and penetrations
��rtairT�ed ��
Bu�lders Stat�ment
«�� ������ ���� ���
� ��j i�– _ � � _...,, � 'n_ `,� (�'r''Cati
��,�: �•:.] a� �. ��..
Fq�
�' �, ;�, j„ , � � � ; .. '�+�� f� ' b'
�_.�=� ��� l:] � �� `•�E-�� ��:� � Pol���. •�-�,_ R ��
g�,r'` [3[Q� R 3�
h ' ��'•t"' [t.�!�,:....� �! � '� `1f �' (7 1i ���,rn { i�....ti� !, r.,, Z'' - ,i�,.,,.i K -,. �. •': :-, S "1'�"� i R ^ + �' �
'������ ���;fi .�� _�:.i '!�i�i � _ I�':t;• �� ,. ���. . .. _ . .'r.,
y�,
The OPTIMA 5ystem has been installed usin� QP71MA Insulation to pro►+ide a R-�alue of R�� iisin� bags of
� �i .
insu�ation to co�er�,_ square fee� oF area at a tfiickness of�_ inches. pK Gy�-��,0.�0� e���.��4
1»s?all�r C�nlra�Ear isignl � �.�,] [�Gi�� CUmp3��y N�me ��C,�� Lr,lPti l` ��� C--- _ 1 F).�ic� 1(� _p�–D9
Buii�lcr isi�;nl
Cnn,�7�ny ll�,mr
1 �)•�lr 1
��,:.ir'r.l�/:�r�.. . =�1�%-�, .j:•.�/`�i'i': r_.
QI�71MA�^� Laase Fill Insulation is nianufictured Fnr ciosed ca��ity apjalicali�n ii�siallerl i.�el�ind Q�'Tlrvtirl F�br+� or
er�ui�alr-.rit Ir shnulcl nnr he used for open bfow ap��lications. In �accordince w�th the charis helow, you n�ust in�rali
lf�e m�nimum numF�er of bags per i,fl0� sq, f�. of ne[ area for eac:li f2-�aluelca�ity tli�cicness 4isted. C����ra�;e �s
I�asecl [�n i ��on�u��l ?S Ib. Uag. 7ht maximum net cnverage must not exceec� that s�ecifiecl tor e��ci� f�-vilt�e.
�atl��re lo ii�slall lhe reyuired miriimum wei�ht per sc;. ft. of insul�i�ion ��ili result in � reclucerl 12-�aiut. Tj}is procluct
sfioulel nat !�e niixed witl� nfl�er f�lnwn ins�al�lions nr tl7e tl�ermal claims wili >?erome ii���alic.l.
5idewalfs, Caif�edral Ce�lings anti otlier �Insed ca►+ities tEiat are coinpressivn filled.
ih�rknccs
i��i��,
; ' ' ? � ]
, .r,i
, �,,�� , �..ru
�����°S?���5 "—_' _
] 1',.� i!v 1:!.
i :��1•tiy ..
�•ViII��L'
15
1t
?��
� `J
�i 7
��1�
Qensi�y
Lbs. Per Cu. Fl,
f . �i
t.r,
7�
1.��
V3
iu
Mi��imum We�F61
Lhs. Per Sq. FI.
!7. S � —
— n.r��yY–
;rs
I
I r;;;i�
I .n�is
�a •S PCr
i,ucr� s�. F�.
1;} n
i�; nT
;lF.S
3(l.11
�:i ��
I •i
hlacin�uro Sc� FI
c�vi•r.,�;� ��i. e.,�=
;s
;1
� ��
._ II
Ir
f-Ibared Attfcs—C.IVSeci La��ties tt�aF are npt Com �r�SS�on ti�leq.
Thickness Densily Minimum Weigh[ f3ags Per ��hasimum Sy. Fi.
InC{u•� R•value Lhs. Per Cu. Fl. Lbs. Pcr Sry. FI. I,OOU Sq. Ft. C��vcr��;c I'rr 11��•'
t'. i� �.1, l2 y.[1 �.i.2'a2 i t�.�� ��r..
S'. ILxAi li ~� > > ------ U.SSU . . 1?.S _ �'�il -
�' i�'341 - l-t— --- l.d C'.•1f'fS !,1 ; r'. — - . ._.
'•"Ilx�3s Id i G f73G7� 1F,: [,U
�>>��S IQ i.[1 If.95° I1�� •!
1';`•�' I�rE�1 1! 1.2 [].�,SU !'7.fj �I
�'�,'.{1xL! 22 1.4 �.(,t' 22 7 �+-� --
� ',r,�
12 1 G U.73Z 31�.5 u� �
7�;�' 1=.ii; �f•. 1.f1 U.�i!]d ?1 ? dC�
--:� li" I'.vif'r �..1� -- - �- � 1.2 --- U 175 --�� -- � ;�I
��i,� t�xni 29 t� n rs��G 3n s :s
7'1," r?x�il SU i f� Is.')i�? 3�l y �`�
y�1,�� r?r1Dl 33 T.0 [} 771 27 u �f,
.�;�'�.' il�Iill — ......--, 1.1 �I �!'�5 ii 3 -- � �4i - . .. .._
���1�" (2r I(11 ;i� I •4 1 :17'1 :tA, S _ !!,
y'1�" 4?x1fli Si{ }.� �....33 ,1:; '� L �
I:-vrlue5 ��rc rl�•iuriioni�ci in d�Cni�I�u+C[ wiifi AS7M C G87. Coni�liPS u�dli,�S7M C 7frl ,iti fj•��C 1 �ntul,innn "R'" m�•.i+�� �c'�is��i�cc 1n h�•.>> ilnu• flir iu�lu�� Elu• 1i.��.ilur�,
thr ��carcr 11�� insul.�pin� pu�ver. �f� �,cr �he m, rked R-v�ltic, d�s rssenh.iP rha� Ilv• in�ulalwn i. in��.ilic�l �nu�x�r±�• in;!o�vin� dn� ir•i�inmc•n(I,ihoi�c �.�� [.�•rrrinlrrrl [��u�,nr,vinn
�a�rn�':��'J�.C�'P � �•'3, ii'�].. :I��q� �1:Y'::�� ��.�'.? � `I`:�-:I��. •i`'���iy,l°.';� .. 3 ��.. �f�i�.
lilow-ln-Planke� SySti'm is a re�q�slered iraclem.�ek, uf Ark-Se�l lnlcrii�tum,�1. Int.. L�e�z���� CC1 8(1J7i • C1P76�1h is a ��aden�ark ��i (-en.unTt�i•tl Cur�nv.iliOn
CERTAIiVTEED CORPQRATIOI�', n.0. Bp;C 8G0, VALtEY F�RGE, PA 19482
c, ��i.• +�i-ta.� rn � 999 Cerla�need Corporat�an 5l99
�erta irTee� C-I
Bui Iders Statement
� � � � � �� � � eFeK �.v .
�f ti�, �� � � � � - , ��.
f ` J•3�:1 I•� �1 �i'j '��;
� �'> ;�'�1�r , �'t.
��.. `y �� �� �. �.��� I1
�'�ii � q - I� r I ,� 'I, .ex '-• -
� :.t>>�''.r ����,��:rJ:... ���I�'i���aiha.��.0.i��.i�"� I+.li.� _�� .il� li��j�tr' �� ti"u;i�. �. ��iL'�. �� i.r.�i�'. �yr �
. `•���� .i!'� ��Zi� � �1 n ;.'.l'� ..;� . . � �I �
!
The �PT1MA 5yslem has 6een instakled using QP71MA Insulation to pro►+ide a R-�alue of R�� _ iisin� Uags af
insulation to co�er� sq�care fee! of area at a�hickness of 5�L in�hes. p� �}�j���� ���r
Insfaller C��riirac.[�n iSi�nY � � �..�,)C.{��j Com�any f�ame � (�,[ �U[,.�p,rj.�,,, L.L � ---- - ! Cl.it�• ! �o'��p�
Builrler (si�;nl CnmF�,�ny Nzme 1 f7.7�i� 1
� i-i: ti. ':�.��� ;_ f.��i�'l.' i �;���•,1 ;'f _
QI�TINlA7"� Loose Fill Insulition is manuFacturecl fnr closec! c�i�ity ����31ic�itioi} inslal�er! Uel�ii�d ❑P'flivlA F�f�ri� csr
cr�ui�alent. �t shrn_�Icl no� I�e useci fnr of�en I�lo�� ap��lic�tions. in �iccardance witli Il�e �I�arts 4�elnw, you mifst in�t�il�
the m�nimurri numher af ba�s per 1,a00 sq. ft. of net area far each R-valuelca�ily thicl�ness lisiecl. Co��r���e �s
Uaseci on � nomi�i�i 28 Ib. L��g. ihe m�ximum nel r��erage mirst not ex�eed �i��t� s�e�ifiec! fnr e�a�h R-���is��e.
F�ilUre li� ins#�I! th� required mii�imum ��eight per s��. ft. of insulahon will resuit +n a reduced R-��luc. This ��roducl
sl�nutcf i�ol 17e mixed with �1hei l�lr�wn insulltions or Ihe th�rmal �laims will become ir�valid.
Siclewal�s, Cat�ieclraf Ceilings and other rlosed sa�ities that are compr�
lhirknrsc ❑ensity Minirnum Weight
liiriies R-value Lbs. Per Cu. FZ. LUs. Per Sq. FI.
R'1";?�d} 1 S E.FS {!.���"�
-- .,t[,) �� I l !V ��.Ii�S
�",.� i�,��; 1n � it I.1]°s!i
'�1'::' I'.�]U� -�J�l . _... �.fV f.:�41i
I I'•�� i!el ��l �i7 il i.hi'�ii
1 a'1�" tl. t�1 i�, 4 S.0 I.7(S!3 �-
sion filfed.
F3a�s Per
1,fIf1l15q. F[.
1iS`f
—.=,;� __
;;[ S
'��!.f!
71 -�
h4�xu»um Sy. FI.
Cavcra�;r F'er Ba�'
;•I
!ii
—��,
.. _ .��.-_-_ .._
I •I
Ffov��ed Attirs—Close�! Ca�ities tliat are not com ressian filled.
7hideness pCnSily Nfinimum Weish[ f3ags Per �4taxim�+m Sq. FI.
InChrS R.�alue Lh3. Per Cu. FI. LI». Per Sq. FI, S,[1[lU 5q. FI. C��vrrage Prr 0��,'
3��, �� l•+'�• V 1 !? 1. t 1 i7.2'72 i r a.1 ��� �
i'; ' i2x4] ----1 i 1 J U 35U 3? ; �;il -
---�-i �ti4� 1� I.a �.•I.f±�1 1�I� S r��;
---t'.: i: t•11 1e 1 G D sG� --- �� 7 � r,n _.. ._.-----
��'1' i?iG� 1R 1[1 Il .1�^ 1t� 4 F�1
� : •' 12 xl�1 � 1 ---��--Y'VF 1 .2 I! �+SU ] �l (i �� I
; ��,• i:�xl,Y ^ � �? I •i i!.!,•IL ----� � - — --�----- ,l 1
S','•' :!.��. _.�.._..__�. 1.�� f].��i' .'��.i 414
'�:�' I?r�l� 76 I[1 O.U04 ?1 - If,
. . � i_.:i; -- � ;��l--- -- - 1 1 U.725 zS 7 �`�
.'1.�" ix�,i� �'J � a 0.3•�G T03 sS
���,�� lZxfii SU 1.G 0.9G7 34.5 �_. `._..--.--
9'%�" !2.1 ��i 33 I.D n.771 27.�; �F�
- ,��•��� �.: �;I lil JS 1 2 Ci �fZi -- � � _ -
ti'�;'::'�;iC�! 1(, F.h i.U"? ^ S '!�
�i'.," �?x14� 3B i G 1.?�3 � as.5 't
I:-valn�•, ,vr rlck•m�ini•J in .iccurdancc wuh AST�4l C b87 Comf�lies witi� A5TR1 C 7r,4 ds Ty��� I ii�sul,in�ri, `R" mc•anti r�si�l:in[c in ht�.�l Ilrnv. fiu• li.•�hr? R:r I.-�al�ii•,
�hc ��ra�rr �I�r incul,�t�n�; �-iotive� 7� ger �lir m,��keci R-�•alua, �t �s esse�ili�il rhal 1h�• insul.���� ��� n u»tall�Kl j�rupei ly fnA�nv�nf� III�• f�Y'V�nniE'�ui,il���nc ni [c��.�ii�1�•� d �� �i �u�i.ii".vn
�� r* "�,� • ,'�1a '�,j :7•,s b -sl!��>-� �^�<-- °
A?����? !�•.p r�'� :J�� �i . � y-;':� 45a.s PJ-a �-{: F-. i,� _ `_. ��;'r'
131ow-1n-131ankei Sys[�m �� � rcglsrered tr.�demark� oFAr4:-Scal inrerna�ionaS, lnc., l7em•�r C� (3�223 • Qf TInhA' �s a[r,id�nr.irl. r�l [ ��n.iinTi•���I Cur��nr,ili��n
CERTAIiVTEED CORPQRATIDiV, f!O. Bpx 8G0, VALLEY FORGE, PA 19482
i�����• u� 1s z�+� 1393 Certainsed Corporauon 5199
�4TE: TH1S PERMlT NlUSf BE P�ST'ED �11� JDBSlTE A T
��
�nw�a�v�, •
Town oi Vail, Community Development, 75 5outh Frontage Road, Vail, Colorado 81fi57
p. 874-479-2139 f. 970.479.2452 inspections. 970.479.2149
MECHANICAL PER�VIIT
NSFR
Job Address: i687 BUFFENR CREEK R� VAIL
�ocatian.....:
Parce! Nn...: 2'1�3722150a2
aWNER BUFFEHR CREEK PARTiJERS q�124l2009
Pa 8aX 345
MINTl1RN
C� 81645
APPtICAIJT W�STERN FIREPLACE SLIPPLY, IN D412412p09 Pnone: 668-3760
1685 PA�NIA
COLO SPRII�GS, C� 8D915
P� BD7C 670
MINTLIRN, C� 81645
License: 323-M
CONTRP,CTOR WE57ERN FIREPLACE SLIPPLY, IN 04124l2pp9 Phane: 668-3760
'ffi85 PA4NIA
C�LD SPRINGS, C� 84915
P4 BO}C 67p
MIM'URN, Ca 81645
License' 323-M
�esClptlon; I�1S7ALL �NE P�E-FAB FIREPLACE WITH GA5 L��S, AN� �NE
�U70�dR MAS�NF2Y FIREPLFICE WITH GAS LdGS (GAS PIPING 6Y
�l'FiERS]
VafuaUon: $11,455.00
Q L L TrN1ES
Permit #: MU9-404fi
Project #: PRJD7-0529
Status . . . : ISSLIEa
Applied . . . 04/24/2069
Issued . . : 04J28l2009
Expirss . .: 'fa12512009
,,.,..,,,�,.x,.x.....,r�........,,�.........,�+.........,.�..+,..�.,.,.t,...,' .............FEE SUMMARY............_,...�.,,.,,.,+,.....,....,t.'=..,�.x.........-.,t,.........,.,....,............�.
Mechani�al Permit Fee--� $24Q,00 Will Call-----� $4.0p Total Calculated Fees--� $304,00
Plan Check---- ----� $60.00 Use 7ax Fee---�-� $�.04 Additional Fees-----------� $Q 66
Investigation-------� $0.00 i�7AL PERMIT FEE--� $344.00
Total Calculated Fees--� $30a,p0 Paymenfs----a $3Da.00
BALANCE �UE � $�.00
s+���+�r�+x�xw/rrrH�waxt�w�kirwww�rwww�nr�wN �e ��et�e�e� Ra i-a�H�-i++#/+�xR*4�/-#�tw�wk�#�# nM-krkMF �* rxMl-wiw �e wf w�tM�t►t R� /+F'+� � sii-t�r�+-'#Yr+-'-M-�ti r��w*w��r� �y-Rw-krH �nw-wrwr r xrxwew�N� ���tw�wawww.� R�f� ww.e
APPR�VALS
Item: 651D6 BUIL�ING DEPARTMEh1T
DaI2a12009 JLE Action: AP
-- ...,�...............+,�........w......,,.,'...�........,.._.......,.+..�.,.,.,,,n.,,,.,.,�,._....,.,,�...,�..�,�„� .......................'.,�.,,..,w„".,.�,..,..,�„+,.,...,'.,�.,.�,.,...,'..,..�...
COMDITI�N bF APPRDVAL
Cond: 12
{BLQG.j: F;EL� INSPECTIONS ARE REQUIRE{] Tp CHE�K FOR CO�E C�MPLIANCE. ,
Cand: CO�J601�fi4$
SEPAi�ATE PERMIT REQiJIRED FOR GA5 PIPING BY pTHERS
wrtxw� Rw*xrtx�wr�nrRVw� wt►e��k� ��avM�+-� ��rrx�1+R+A M##mwH Rw*wMkwxin *xxwkxtw * �x w�twx� � � k nHxw � � t ��� t� h x� R �s+: �a f a-� ��a-i+� �� �+tkrR�+r��+wr�#f r+tf-ffra�++Mr+rw`+ Nrrtxir+w � K��rrtxrww+t M t r�
D£CLARATIQIVS
I hereby acknpwiedge that I ha�e read this appiication, f�lled put in Tull the infprmativn required, completed an accurate plot plan, and s[ate th�t all the informativn
as required is carre�t. I agree to camply with the information anci plot plan, to comply with all Town ordinances and s[ate laws, and to build this strUCture
according to the towns aoning and su6div' ion codes, deslgn re�iew appra�ed, International Building and Residential Codes and other ordinances oF the 7own
applicable thereto.
F2EQl1E5T5 Fag.lM5�ECTI�� B A�E 7WEM7Y-FDUR HOURS IN ADVANCE BY TELEPHdNE AT 970.478.2148 OR AT DiJR OFFICE FROM 8:0[
AM - 4 F�lYI..•�
Signature of Owne� or Contractor
Print Name
m echca n ica I�e rm it�,D419p8
Date
*.**���***���*�*�*��**�**�**�*��***�***.*�**�****�*����*�*���*������*��*����**����*�**������
T�WN dF VAIZ, C��.�RADO Statement
**«��.**�*��*�**���***��a�*���***�*.*****�*»»**����#****�****�*��.***���*�***���**.���*.*��**
Statement Number: R�9QQa0371 Amount: $304.fl4 44�28�20�911:39 AlK
Payment Methvd.: Check Init: SAB
Notation: 2320 WESTERN
FIREPLACS
-----------------------------------------------------------------------------
Permit No:
Parcel No:
Site Address:
Lacation;
i+�i09-0046 T'ype: MECHANIC�IL PERMIT
�].D3-122-150p-2
1687 $UF'FEI-IR CREEK FtCl VAIL
xoraz ���s: $�aa.oa
This Payment: $3D4.Q0 Total ALL Pmts: $304.fl�
Balance: $o.a�
�x�» * r. *. *�x��*.*� r v� *�*�k*�t�#**�*x��x�** � r r * *. ■ z� �*��**�** r *. �h � �a�*�*��� �. * �*��kx��r» �+*�**��»**�� *. *
accouivr �rEM �.rsr:
ACCOUnt C�C�E
m� ❑ozooao3ia,z�.ao
PF d01004Q3112340
WC D0100d03112840
�escription
[�'FECHA3VICAL PERMZT FEES
PLAN CHECfC FEES
WTLL CALL INSPECTIQN FEE
Current Pmts
z�o.oa
6Q.OQ
4.00
04/23/2069 ]2:03 FAH 97482i3222
,. .�..�.
o Mectia
a D�m��
a pua �w
o G�s PI1
4 FE�t L
�
a �u�pn
*� ��
ProJvct B�
�
�Num6ar�
0
�ESTERN FIREPLACE
�
.; �:;;; , � ... • . ,�.,�:: ,
;-�.i .. . „ ' ,�:. ��;:
,� ��_:. � , ,
�_� � ��yr. . .
��f
�A t:
, ' '��. . i+
. ��. _ _•e aN:.,,• .. y '� � _�
1.�r.ss•-
� ��
� .
� �� �,
^r x ,.
r�� u7i. ,ir'■ ..
ii
�0ol�oos
-. r �.
M��HA�IGAL PERMIT
maCe nd� �atloRS UST incl� �: Flra�aca A�ol �stiotl� UST In I de:
lcal Rnorr� 1,8yout/Plan wld� �Imen510n5 o Equlpment CuG Sha�ts for Fh-e�laces/Lap 5�ts
�an AEr Quct �a and Lvc�ttor� " {ManuFa�+re�s �n�v 5howl a
[}�j �
V�It �iZE r�' `.• I�, J 1'!I ��
In� Piap {If app[�caalej I� a
�a �a�+�ado�s� �� ►4P� � � 20�9
ent L1�C Sheeks Far SallrrjFurnace ��
`.liarr sarrn�'slre (B7Uj LoaAcr rapl�aament wlGh rra sys[errt
1 rn�
�W "�r �� , Tnll�lN, � F . .
_-.-.r.�.
r�t Addnss: afflc� l�as �.7�
. SJFF'�k i� GC�� wc �� Pmtect #: � �c� � � � !-'" I
���� {'�u� �] Bufldfn �ennit #: �� � �
A�
impxex Nama: � Mschanlr.el Permlt #;
�rr�qrmauon� � �ot #: � 8400k # Subdlvlslon: F.t�M � �%ylP.i ��r
Com I ny dnass: �68 ?y4o� �R ST. Detalled Dssarlp�on oi Work: 1 ne ct. o�f Swroafl QaP.l�l
c�ty:� . S stete; c.a �ip, oq +F/�_e� rtav8z ��I��t �o� wl�aB�R�ra�s�r�r
. �. �� o�tD� HASo�RY 1�Caa0 � �
Conta�t Na e: "CO�. l�'1 r4�rS
F��,,ST�Sa1�Ld •f� �ulr ��5 Lr.��Ft �CBfi'.�
Canta�t Ph ne: G�' 4�1(� '1�S'71.73 � addl�anal eheat tt ner.eaaaryy .
i
�-Mail A �� T� Q� ��� � G� o G0� Pipir� kndudad �
,
Tawn of Ve Cvrr7aotor Reylstratlon No.: ��3 � I� Ga� PIpInQ by Dtherg I
t7 Wa�d Co Gas Flrspfsve Con�erslprs j
�y . � .
#:
Tenarlt N
lI�IeCtl
B6IIEC LqC��IOn� �
� __._.-..._.......,�..�......_.,....,,..�..� Illtbi�Qf �] Exteriar { � �}1@f i � I .
Cfllfltl811 ..._,...�.,.,,._....,...-..,.-._....��.....,. �.—�
f� � 2 c��. � aQ � Numt7el?pF Exbting Flreplao�:
inEeot Esyla Coun� AseQesD� O�pe at A�0-328- BdC ar C3A9 Ap�iion+oe� I 5 aas Logs �} WoodlPellet ( a
:vu�.ualpe�e} - __ .�.�._...__...,...-., ............._ ,
. Numbsr of Pr�posecf Flreplar.es: �
[Commv�a ProperGasj �QS Rp�lf�noes ( j Das LOqB �] WofldlPeslet �j `
1cC 8 V�FrE►K� C.{�EI� 7� v� Buud�ne; �
r�bon f�r Machanlcsl Penm�it 8in�l�Femily � DuRiex {] Multt-Famlly (} Cvmmerclal ( y'
. � �� Reotnurant { y Dther ( ) �
---_.w........,..,..M.,.._.. _....... ._••••�_....,._..._._........ Datn liacil�d: • jj � LS LJ ....r
U �
d , ap APR ��3 20�9 ��
�� � ---- - - ---
� TawNOF�a��
� .� . �__
�
04I23/2p09 ]2:64 FAx 370$273222 �E3TERN FIREPLACE f�0021408
W �Io1T�G L�M �
No ano bu;lal� a be�ker fire
Mod�ls�
.
EXCLAJNI�SQ
Wood Burning Firepiaca
Own�r'$ IVlanual
instalkativn �nd �peretion
�
I.I�TED
�ror�c� .�
t� NGT �I'S�ARD THIS #AANUAL ��'
� Impartent oparatEng • Read, Understand � Le��e th}s manual wtth
and m�lntenenee and fallow thase party respons«le far
In�trucdona inciuded, instrudk�ns far �nfa ua� srWd oper�[d4n,
Install0tlan sn�
. aperetlon.
� WARNING
Ii tha Infamna#l�n in these Inatru�
tivn5 iS no! fOflaW�tl a]atCtxy, a
flr� may rv�wlt �ausing property,
dgmage, psroonal InJury, ar daatt�
�r...
•❑a no# stare ar use gasallne ar ather Bam-
mabl� vapors and 1lquids in the vicinity af
this or �ny vther applian�e.
�❑o nat over�rs. 4Verl9ring wiil void yflur
warr�nty.
Comp�y wlth a[[ minlmum cle�rences #o
comhustibles �s spectfled. Fallur� ta
camp{y may cause hous� f�re.
Inatauatian and service af this flreplace
shvufd be perForm� by qualif�ed personrraf,
Henrth & Home Techrtvl�ies su�flests NFI
certlflecf or factory-trnfnecf professlan�ls, or
tachniclans aupervl9ed by �n
NFl cerfified prvfesalana�. �.�"'.�.-.
�WARNiNG
F��T SURFACE8!
SoreeNmesh, fli�ss daors
end athBr auriaoas �r* hot
�uring aperatian Af�l� aoal
dawn,
Hot scr�nlrnash �d $tpas d�ora nrlN causa burns.
■ �Q NDT tau�h screanlmesh ar g�9s dcars unt�l
can�ed
�� NEVER �ll�►rv [��Idren f�touch a�resNmash ar giass
daor,a
� Keep cnlidren away
•�AREFLJLLY SllPERVISE ahltdren Ir� sam� room es
ilreplac�.
• Alert chlldren and adults tv hatard� af high
tem�+aera#ur�.
Nlgh temperat�re� may Igr��ta �IathlnA or �tha�
tlamms�lv matv��.
• f{aep ciothing, turnituhe, draperies and athar
�ammabfe materiala aw�y.
OWARNEN�
Flre Rlsk
• Far uae with �oiid wnad f�el ar d�nr�tive
g�a appilanae anlY-
� DO HOT inatal{ unv��ted gna loga,
Neet & Ola -�xc�u�-�o • 40'15-D41 � Rev V• 03/Q8
04/23/2009 ]2'04 FAK 9i08279222 wESTERH FIREPLACE f�003/048
���� �� ��
� � Acc�asorias �
A. Gas LaglLiAhter Prori�ion
WdRN1NG1 Fl►g andlbrAsphyxl�Llpp RIsk1 Use with
so!►id w�odl�►s! arde�watNa g�s eppli�rtpa anly. Gas �
ger�srar�s �.rmes.
• DO Nai rnst,aN urrvel�ted �'as log8
• �amper must b� locked fully open whsn gas lags ere
IRS��Ied �
A certi aa io8 itghter vr deoora�►re g�a
in in thke flrepl�ce.
s Maxlmum Ir�put is i �ti3O�� B7�JIi�r. 1
� DecoratJve gas applf�ncs must b� oerti�ed fo AN�i
�1.9� 'Standprd fo� �ecora�ve Ges Appliance6 fpr
InBtaflatfon in Ver�ted Firepfacea°.
• Mu�t be instailed in a�cor�nce with the N�t�an�l fu�l
Gaa Code, ANSf Z223.7.
• A qaa !o� scf must incorpa�ate a gae af�utolt�
• G� Eag aet requi�es the damper tn bs I ful[y
� A li wlth nafefy Interiack
may he used In tt�ls �irepla�e wit� only cam�atib�e,
Ifsted gea fog aets. Sse dampar system manu#a�turer's
inBtUlCtionB.
► E(nackouts are pravidsd on bath aldea of the firoplace
and in reiractori�a for TI� in. (9 3 mm] iran pl�g.
• Sael ra�fradary araund plpe wltt� �r�p�gce m�rtar or a
nan-c�mbustible s�a�ant
R+aT�actory
Seal with
firaRlace tnoR�r
or nvn-oombuat
bk oe�laM
Rapa�k
tnaulattlon
lmockout
dutar aF�eli
of Rrei7�80a
�
�
�
�
�
�
�
�
�
�
�
'I 4 �. f"
{1fl2 mmj
lidu� 1Z7 Gn ilnf Ir�sbllaHo�
Mekrdafn alr cJearsnoe
ta combustlble�.
Combuedbie
malerlal�
1 1l� f�. (38 mmj
air ap�as er�und
ptpa
Combust�bie matarljUa
msy bs lacaded at saro
dearance ta ge� Ilnb
bqyand 4 in. (tQ2 mm]
frDIR'ArsAkace Bid6.
B. Wvad Burning inserts
w�tH�nrvr �Sk �� �r►�� ►�.op�r �,sre�r�c� ar wovd rr�-
ssrts may ceuse fNaplave or crik+�+r+ey system b�ve�i�eet
Is a wppd hu�r�fng inaerf ia bc}r�g Instalisti In [h�s f�repiaos,
Nearth & Hvme Technalv�iss racommer�da �uu rellne vf
the ehlmn�y. '
■ Covlin� air cpeninga at tha tap of !�e ch�mn9y mu�t not
be obstructed in any mar►nar.
• Hearth & HameTect»olo0les reaammend8 seCUrlrt� the
rellne at tne top oTthe flu� and �eing tha ca� oertified fvr
use wlth th�a �Ireplpoe ay�lem.
Nest & Glg • EXCLAIM-50 • 40T3-U4Z � ReV V+�3/09
45
64/23/2009 T2:05 FRX 97�827922� �ESTERH FTREPLACE f�0441008
�.� �� ����� �.a�S�'� .
� Instaliat��n
H E A R T H�-H Q`MiE, InstructEOns
Modefe:
Ci074BP-Ha dr LP, GD3�SP-MG ar LP
GQ�4SP-lt�IN-NG vr LP, 00�8d8P-��EM-NO v� �P
G03�SP-REM�1►I� or LP,aO+IQ8P-RE�IA-ng ar �P ��
G0�4•IPI-H�i or Lp, OC3Q-lPI-NG vr I.P a
�3035aP1-NG o� LP, G�4G-IPl�IG nr lP «W„�.,�.,..,�
Gr�nd �ak �as Loa S�a
ln�tallat4an and sarviae af thla
applianGe sh�uld be performed by
qual�ied persannel. Hesrth 8 Hcme
Techr+aingi�s augga�s NFI cerpfed
ar f�ctory-tralned prof�saianals,
� or fac�tnlGlana
suparvfsed by �
an NFi c�r't�fled �+
�rofesslon�l.
Check wlth yvur loca! buildin� �!e ag8ncy befa�e ynu nsgfn inataflabvn ta enaure campliar�r.e wfth local codes, inc4uding
the r�eed for �rccrmlts snd Toliow-�p map��ons. If you a�rcounter �ny prablems regarding code ��prova�s, ar i� ya� need
a�cstlo� ef �ny oi the inatrudJons wnksfned hera, �ant�ct th� Tedir�kcal 8ervic� Dapt�, Hearth 8 Ham� TecF4nolvQies
inc., �8n� �ensington �Ivd., Lake�ille, MN �6044, www hearthnhom�.com,
cAUT�aN ��
D� N�T �IS�AI� THIB MANUAL
Emportant apere#ing �• Rs�d, u�deraiand • Lasve thls menual wf�h ���
and m�l�tenanca �nd fallcw thase party r�aspanslble far �� �' �
instructia�e� EnGudsd, InstruLtl�tlp t�r eAf+9 use and operartion.
�� :
En�tallation and � �
� WARNlN[3
tf �he In�vrmatlon in these �natru�-
tlons is not fallowsd axact�y� a
firm may res�lt +�auaing property
�--�. damsge� per��na! inJury, or death.
• t]o not stvre vr use gasaline or othsr flam-
mable vapors and liq�fds in thQ viq��ty vf
thi� or any �ther applian�.
• Y�Fhat to da i� yau �me�l gas:
- Do nat try tv Ifght any appllar�ae.
- Do nat tvuch any e4ectricai switch. Dv nat
use a�y phone in yvur building.
- Imm�di�tely cali yaur gas suppller iram
a neigh�cr's pl�one. F�Ilow the gas
. suppfief's instruc#ions.
- ff yvu�canRVt reaah yourgas s�ppller, call
the �re dspartment
�nstal4at4�n and servi�e must be perFvrmed
hy a q�is!l�ed Inst�lier, �en►ice agancy, ar
the ges suppl�er.
�lote: An ar�aw ��y �amd in the text slgn�ife� change.ln
� WARNING
Mor� �o No7 �a�cti,
s�R� ��r�a M�r �su�T
C�GTH11�fl Ii3NfTI0N MAY R�BLILT.
GlaB� and other aurt�aea are haC durfng
apr.rativn and �aol �own.
� Keep children r�y.
• CAR�FIlL�Y &UPERVIS� c��ldren In sama room as
�p�lianr.a.
• Aiert ahlldran and adulta to haaards of high
temperstures.
• p� NDT ope�ete wlth protedive be�rriers r�movOd.
� Kecp alathing, furn[tvre, draperles and other
comb�stlbles aw�y.
In the Commonwealth of M�saachusetts:
Th�s sppl3ance must be instefied hy a Iloensed plumber
or gas ttter.
Th� chimney i{ue damper, when uead vYlth gas logs, will
be weldscf opan nr r�mpl�ly removerJ.
A GD date�tar shall he in�ta�led In ths room where the
appli�nne � Ins�led,
conten�
Hearth & Home 7'echnolaQies • Griancl0ek Geg l,.og S�ts � 4004-299 Rev H� 05108
0�/23/2409 12:05 FRX 97082�9222 wESTERN FIREPLACE
�� ���
Thfs �p�;lance must hsva a�creen !n pface while She
appllsnca Is In operation and, ur�leas other provieio�a ior
epmDuation air are pravided, tha acreen shsll have an
openinfl Far it�7oductlon c� camburtlan air.
5olid tueia aha�l n4t �e �umed In m flreplace whare e
deccretive appll�rrc� is installed.
If glass dnors are preseM, tha Rlaea �ao�a mu�tt be fu�hr
� wht3� apRlfance ls in aparatEcn.
� WARNINC�
Do lVQT ue$ �is appliance If.any part h�a baen under
W�ter. IrrtrnedlRt9ly, Dap a qusllnAd S�Vice taGtlnlpan
to insp�ct the a�pilan�e 8r1d tv repbGe arry part of tl1e
�antrol 6y6tem and srn o�s r.ari#ral whic.� has �esn
u�dCr v+�r.—r ' _—`�
D. Appli�nc� Cer�lflcatlan
`iitiie appllartca la de�lgn certlfled by �mnl Intemetlonal ur�-
der tl�e ANSI �1.�{l�R�04 n� �8A �.g�h-�G4, DaCOra-
t�e Appl��nc� tor Insta[la�lan fn $olld-fue! Burn�r��
Flre�facas. Inetaklat4on ar�d the pravi�ians br car�buation
end v9n�{ada� air must oan�rm ta the Natlanal Fuvi G�e
Code� AN�i Z27,�.1rnIFPA 64, ar tt�e aSA 9�14�.7 � Natural
Gas and f�rop�n� I�tal�atlon Coda
upply Conne�tlan
A 318 in. on t�e gas vnlve
1�1iet ett fhe factory. �nsune fti#Ings �re aT th� epproprl�t8 81ze
shd type fln the g� uno cannar.klo�. if the 6uh�ng tiaa ta be
aat ro. iength be aure to uae tho proper cutdn� and flsnn�
taol. Alsa, ba c�refui no# tv c�imp the tLibir�� whlla bend�ng. 11
th�e tu�in� br,�amas crlmpad, dQ nat �se for In�tallation.
G�s resistant pipe aompaund must he uaed an al! threadad
m�le con�e�tlorta to er�aure a�ght seal. ,
F. G�� Prsssurs
Praper input preesurea ara r�q�lred for ap�mum applianoe
perfnrmance, Gaa Ilne sizin� requirementa naad t� ba ma�ds
iallvwing NFPA61.
� WARNINC3
�Fli� Rfsk
�xp�oalvn R�k
Hign pr�ure wi�t damage valvs,
• Dlsoonnsct �� vuppfy piping BEFORE
preeaufe teatin9 9�e llrte at test pr�ss[u�s
$bove 1l� psfg, �
• Clase thc manual �hutaffr►sl�►e SEF�3RE
pr�essure i�s#Ing �s Nna at te�t pres�ure�
�quai to ot less fhari 117 psE�,
�oo��oos
A WARNlN�
Flrv Rl�k
Explaalon Wak
Verliy� wet pressures.
■ Hkg� pres8i�re may caus� overflre
ovnditivn,
• �flv+r pressure may c8uge explaslfln.
EnateH r�gulatar upstream of val�e if 11ne
� pr�suro ia �reater trsgn 11� psig.
� Gas 8uppiy Pr�eaure: Mlnimum iNaf gaa;upp�y p�s�ure
muBt 179 l.4 in. W.G. �r natu►gl gas vr ii I�. W.C. for Lf'
gaa Tar thv purpvsa of �np�t adjustms� Maa�mum inlet
gaa presaure mwat n4t ex�aed 40.5 in. W.C, far natural
9aa ar 13 in. W.C. for �P gas. `rne eas une supplying the
�spp�isrtoe must be eufficE�r�t slz� to iumish the spprop�iafe
P�v R�essure to tfie applrance vu�,ile o�eratlnQ �n t�e
"H • setting.
• Prass tap screws must be doaad b�frsro tumin� gas
an t�a th applisnce.
� t3sa Lln Pr�es�tra T�e� Perform preasure tast �v�rding
to 9tats nd Ivcal r,ade (if pro�sure ex�aeds 1�1 In. ps! (9.�
ki°al) f��e appilanca Is connected. B� sure to r�iea�
a�r p roa irom the go� ling �efvna carmectian [s made
to op�'�anve.
� Ca9 I..aak T�at: Make aure the gas cann�udrrm �r� #ght,
Tum on the �a� anc� ccat eacts jolrEt wlth a nan-carrasive
$as {�rak check anlutlar�, Alr bubbles wi�! farm indica�n�
any ls&ks, �O NOT U�E A FEAME OR ANY `f''YP� 0�
1�N1TlDN �OURCE TO CH�CK FOR �, Ali leaks
mu6t be carracted befar� pr�cee�in� wlth In9teli�tlon. .
• The appRianca muat only be instslle� Ir� a salfd�ei bum�ng
tireplsce
t� TahEes � ana 2, 7ne firreplace must ba oonatruasd of
non-Ctim�us�ele mafie�iaf.
• The minlmvm permmnent fiee oponinp {'in a�uare ir�chea}
that must be provided hyth8 flra�let�e chimney or damper
ta vent the flue gasea €a prvvidad in Tablea 1.and �. If tns
Tree openin9 ia smsllerthan the spactfl�d areg, do h�t use
m�� ��u�ue.
•�he d�mper mu� h� rem�¢ved Dr ftxeci In a mahner ln
whlch wlll secure at opan. 5nme Jurlsdlotlons +equlre tl'�e
damper t� be remov�d or permaner�t4y ws4dad fu11y open.
Ch�dc wittt afata ar�d 1vcAI oodas.
• 9� sura 4t1at ttla chimney le Conlpl��y ur�obetructsd tv
ensure propar ►�antllstian of flue 9asea inr�udinQ carban
mo�oxfds �CO). G� �� palsonoua gasy is t�a�te�e:a,
odarlesa, colorl�sa and und�t�cta�le witi�QUt proper
aqWpm�rrt,
• Refer to Table 3 tn d�term+ne mlr�lrrtum i�replaca opening
r'eqUlrem�nta bafvse procseding.
4 Flaarih & Nama'Fe�hnofagies ■ Grand D�k Gss �.ng Seta � 40D4-266 Rev N•�61D8
04/24/2049 OZ'36 �Ax 9748279222 �ESTE�� FIREPLACE
� � '�������
��
�
�. Negathre Pressure
AE�g�dve preesure tesultS from tF+a impa[�nr,e of a!r avaEl-
a�l� far ihe ilrep[ars to apardte proparly. Causes for thfa
Imt�lance inGude:
• �xhaust �ane �lotchcn, I�, etc.j.
• RenE}sa �oods.
• CQrr�qu�ttan afr requ�rementa i❑r fumacea, wafer hsatera
�nd othsr Cam6�ation applE�n�es,
• Cioftres dryare.
■ LocAtfon af re4urn-alr ►►ent$ to furnaCe vr air
Condltlanin$.
� lmbalst�ces o4 the HVAC alr handlEng 6ystgm,
• Uppar levet air leaks: re�asssd lfght[ng, attic hatoh
openfreg, d�ct ieaits.
t I
wARNING
�oo7�oa7
A�p�tyx�atton R1:k . .
��� This appllance produoes carbon m�noodde
t�ol .
� • i7je free opening ar�e$s (in aquare inchas]
of the dilmney dempdr �e ehown !n the
fallawing tables must be met,
• User muat mske sura ds�mpar Is Iccked
o�m.
� • Th� Inataller Es reaponsfble tp enaure
praper ven�fa#kon pf flue �ases aefore
appuanr� ia uacd.
Flre need� tn drsit prpperly for safe
op�ration.
Tablo �l fpf Fact,ary �ulit F[npl���s
Free Qpen�ng Arca [in sQt
Prodac� from �emretive A
nimr�ey 0v xa a ae
(IRs�q* LP Gas
10 88.8
9'J i6.�
�0 22,1
2'� 18.1
S4 17,$
36 ' 16.g
40 T 6.2
inch��] af Chimnay Damper �o► Ventlng aambusllCn
�naea far Insteflatlan in 6did PuN 6uminp Flroplaaai
�o a� a sa ao a� a�o t�o aa a.�
kat„rai vas �� a.. H.tur.� aea
nat n u�i �4,F nM eppro�ed
58.5 3�.� 48.4
31.2 xB.d 37,4
27.8 73.4 31.2
24.6 20.{ �8.3
7�.1 T8.9 .'�
�0.� T8.1 P�.B
Tabis 2 far Il�onary Bu�lt Flreplacae
�
Free Opanlne A►sa [In squ�ra Ir�ea] of CFdmrwy Dsmpef fa► V�r►pn0
COmbuai'iar� Product� from �er+a►ethre Appll�naee Mr t�+stsNadon 1R 8of� Fu+i
�mir�Q Flreplecea.
himnay 4o s4 � aa av 7A a a6 Ga 3� a�D [�10 sa �a
�F��tj• LP Ws NBiural Ci�s �� t3w Natur�� i�ae
6 4➢.Z 84 d8.6 T7 aF
8 48.6 58,7 �2.4 8B.$
1fl 4'#.7 '34.3 4$.2 Ba.2
t E 37.7 dB.B 43.2 54.7
2U 34.3 #4.4 39.9 48.7
3D 31.Z 44.5 85.� aa.6
" t{elght Is meaaured irom th� hearm m the top aT tha ct►Imney.
Mlnirnum helpht la 9 R.
Tabla S tor Minfm�m Flreplace Dimanslans
' C3Q40 qfl ln. Z31n. 221n, �B In. g2,OQ� $2,�l1
� G���
�� �� �� ����
Hearth 3� Home TechnvfoQles • Grand C}ak G�s �.ag 5eta ��10�4-29� Rvv H� Q5106 5
04/23/2003 12:06 FAH 9708273222 'NESTERN FIREPLACE
I
S�Ll�HIl�EST FIREBIR
Th
m�
Yo'
nt+
aa•
a�nvr�n T"" �Il��e� 3G , 4�ST
5epiemb�r 2408 INST�
p���►��arr.�r�d
idOfll3tAR YA�I�iY- W�O[]-Blf1�f�ItHG �1�IEPL4CE
r� aosioos
a4�2312009 12:OE FAx 9i08273222 WESTERH FIREPLACE
. . �S'� � � �Q 1� � '7�
INSTALLERY PLEASE LEAV� WITH HQINIEDWN�R
r�aoz�ooe
�NSTALLATI�N AND flPE�tATING INSTRUCTIDN3
"BiG TEX" VEN�ED [�AS L�GS
f �
� i �
� ��
+ � � � �
Plea�se Note; It is �impnrtant th�i you read �tructions heforc instellin� or operating Sas lag�
C�N�RAL TNFURMA'i'E�N .
Ga� logs aze ro be krus'»ed only in appxovCd woodbuTil�llg Fyreplg�e wilh �c3�eyu�tte Chimti�}+ dxaf[. When hLrntn�. the � imneT
d�r per ►tst bc FC]LLY OPFi+i, Lc�g set ma�st bd i.�staIl�tl �u areplace w�ich operates properly.when wvad firas eirc burned.
■ F�or Uest reaultg, nat�tal gaa p�easure me�st be 7" to lU-ll2" wat�
enlurlln.
■. To slmulaur� r�] waod huiaiag, chc gas hur�er is des.igned W burn a
yellow 9amc. It i� nonmal for citic �nga w sooc-�p. Tha �oa� can e�ily be
ae;mvved v�+ith a v�.'utxtu c�ner rrr a goft �ush.
• A�repiace sczeetl x�usi be in fllacc whcr� tha appliance is ope�ating
und unless ot�e� pmvis�ans for com6s►ssl�an air are prooidad, tha scroen
she� ha►re aa gpestiirig (�} fvr lute�oducdon vf Gombustion air.
� If used with glass fireplcce daora, bum wilh daozs in opan posidnrs.
■ Dci avt bura wood or achcr ft�ema wI� Io� �at. •
FaR' Y�UR SAFETP
if yau smell gaa:
I. Q�en Windaw�, .
2. Uvn`t'Ibuch etactricat �wit�ohea.
3. �3xdx�uish aTry 8pen flannc.
4, Tmmadiat�lr calF yaur g[ts Suppl�er.
FvR rav� �E�r
Do not acore or usc �,n�av�ine ar ot�es Ha.pnmable
►rq�y �d liquids in the vicinity of tbda or auy
o�her apg�lia�nce.
, IIVtPaRTANT INF�RMATION
� C�IEGS'I'a BT S[iRT LOG 8LT I3 F[]R PRi]PER GAS TYPE
Lag aets es�e des}gned f�rr use wlth Natural Cms, artless clear�y �tttieled for Propane fLP). Nevar uRe Pm�an� C'r�n in a log set
designed fc►r �+Iatuz�l C}�s, a� Natural Cr�s in a Iog set designed fctx ube with Propane C�as.
The msta3latia�, inc] udnsb pm►+isions for �o�mbustion ond venrila-
tio11 aii. must�CflAform wi[h ]c)ctsl eodes or, in the ahsenee rr! ]or�il
co�es, wirh ttie na�ia�al fu�1 G�x Code, AN5I Z?23. l-1 �$8 nnd
NFPA5d- � 5�8g,
The app]iance and irs zncli►�iduaZ sbutgff ►ra]� mu.ac Y� d�sconne�t-
ed fro�u the g�s supply p�ipi�g system whaa tc,ating st t�st preseures
irt e�sceas vF 1/'� �ig. � .
Th� �ppli�nce must be ssolated lYam the gas suPPtY FXP+A$ ayatem
by c3�siug�its indir�i�i n�nnuat Ri�ulnff v�l�e during an}' Fres�ura
testing vf gas-suppiy sysum at te�t presr�r�s eg,ual tv
nr Iesa t�n 1!2 ps�g. Tt�a i.a accompli�ed hy cla�ing tlac gas sup-
pJy liue �ve, which is reqttired hy NF�A Sd, seetiam 5.54,
Th� rninimum iniet gaa �pP3Y P�gure for �h� purper�e
af input ad�ustment is 7" WC inr �I�tur�I C}as and 11"
WG fcu P'rvpaae Cas.
Th� msxiffium inlei gaa sugpiy preeet�ra fi� thi� b�rrser
ia 10.5" for N�turul Gaa a�d l�" #'ar Propane Qas.
IMP�RTANT: MINIMUM SPECIFf�ATI�NS
L1STE4 li� T}�1� CHART �1� PAGE 2 pF 7NES�
iusr��crio�us ��sr eE M�-r ro sA���v
IlVSTALL AN� OPERAl'E THIS �RS L�G SET.
04/23��009 12:Oi FAH 9708279�22 �ESTERM FIREPLA�E � Q�g��a$
' + �
MpO�L # MlNIMLiM Ml'N�MUM SE�-THRU pV�RA11 MINIMGM �II{INIMLJM
R�allIR£� R��UIRE❑ MlNiMUM H�4GHT RFAI]IRED REDl1lFiE�
WIqTH C]�PTH �EPTN WITH LOGS BTIJ GAS PIPIN�
y 8724 34" ' a4" 24' 18" �p,��p 112" I,D,
8T3� 44: �Q" �B" 18" 9�,�D0 �1�" I.�.
8T3B 4.8�� 22" �B` 20" i20,40Q tI2" I,p.
8T42 b2° �2" 28" 24" � t40.�Q0 314" LD.
BT48 58' 22" 2$" 24" 19�,�� 314" l.0.
BifiO l�" 22' �8" 24' 18d,4Q0 i" i3O.
BT72 8�" 22' �8" 24" 2�O,�fl4 1" l.D,
Cvmpon�nte Pmt� R��� c��,
o� �� .
R�
�. �-Stage Bumer Asserr��y
�. Sit��a 5�tnd �IJsed in rais�d rear b�mer- Nai, GasJ
3. G�awing EmberB
� �. ai�� v�:��„i� c�na�
5. Vemiiaulite �Ussd ln ral�ed rear a�rr�sr -�P Gas �nd usec�
vr� tup af lawe� adf Ustahle bumer - N�. & LP Gas]
B. �as Cvnnea#or
T. D�m�er qarmp
e. Contro� Taal (Ad�ustab�� Iowe� �umer�
N4TEt "Big Trx" cer�mic p$ lo�s �re
p�ka�ea m ��n�r�te c�rtQna.
Indivia,nei log,s and log arrana�wr
ment ias�iructions are supplied
in ing r.artoas.
#The ga� btting� �upplied a�e f�Or what t�e�
Y�bQry canaider� a nnr�l in�tal�adaa.
5ame ;nstalladana may �e[#uire a Ian,ger
cormectar tube ar othec 6tting� a►�ailable
in m�st hardwar� stvree.
C
Lmrar
�d�wta�le
Burn�
❑2
r. 5 ,�
L� J
�iala9d Raar
9um�r
�war
8umar
AdJu�tmer�
YAl+►o
���
.�- ..
6
��
� ��
� S
. L.R SETS MUST INCLUDE GB FACTQRY INSTALLEO SAFETY PILDT I�IT
a
�..
Ilr� fE: TN1S PERMIT �VlUS T 6E P�S TED Q11r J06S1TF a f
,
�R�f 4F YAd, '
Town of Vaii, Community ae�elopment, 75�South Frontage Road, Vail, Colorado 81657
p. 97�-479-2139 f.974.479.2452 inspections. 97Q.479.2149
MECHANICAL PERMIT
NSFR
Job Address: 1fi$7 BUFFEHR CREEK RD VAIL
Lacatian.....: 1687 6UFFEHR CREE�{ RD
Parcef No...: 210312215Q02
flWNER BUFFEHR CREEK PARTNERS 0212312fl69
PQ BQ}C 365
MINTURN
CO 81645
APPUCANT K.W.'S PIPE FIXATIpN, IfVC. 02123120Q9 Phone: 870-4p1-3688
P4 Bflx 877
C,YPSUM
CfliORADQ 81637
License: 348-M
CDNTRACTOR IC.W,'S PIPE FI}CATIqN, 7NC,
PQ BO}C S77
GYPSUM
C�L�RADa 8i637
License: 348-M
Q212312069 Phone•97p-4p1-3688
�esciptlon: NEW 5FR- iMSTALLAFIQN QF INFLOOR RA�iANT HE4T AfJD BQItER
I �15TALLATf ON
Valuatlon: $36,50q.�a
A L L f1�VlES
Perm it #: MU9-0�27
Praject #: PRJ�l-�529
Status . . . : ISSLIEE3
Applied . . : 0?J2312069
I5sued . . : U2123l2U09
Expires . .: 0 812 212 0 0 9
..,'.,�.....,.,...�,....,,...+....+,M«.,...,.,+._.......*.�.......,.,t..,....,....,.......F�E SUhIIMARY� ..............,.a.........,.�.,'...�...x.....�,,,.....,,.,,.,.�.,..........,.........,,x...
Mechanical Permit Fee---� $740.Q4 Will Call--------� $4,00 Total Calculated Faes—� $929.00
Plan Chack-----_---� 5185,OD Use 7ax Fee--� $�.60 Add�tional Fees--------� $Q.00
In�est�gation--------� 56.00 TOTAL PERMf7 F�E--� 5929.40
Total Calculated Fees–� $928.QD Payments-------� Ss2�.00
BALAI�CE f]UE----a $0.00
tr+�w��wr� a-�H�rwrrf+i Ma-����fi-a � �� �-e� �� f �x � x nt ��tw �x�twwx�hw t� x�y � F*� Nrw*� N#r#FHaa� �i+at�aas � �er�wxy a�a ty nrw t w�exwwKxwrRww�rw-wwxr rn�wxrN+�rw�r�x���a�x�f�� R n �ewwrwxw�r �•
APPRqVALS
Item: Q51Q0 BL11LdIM� CYEPARTMEfJT
p7J2312pQ9 RLF A�tton: AP
Item: p5SOD FIRE �EPARTM�NT
.,..,.....,.t,�,.,„.,. ............,�..,,.,...,'.,'.�,,.,.,�.,.,...,.....�,.........�,.....,�.,�....,�..�.w„..,.,x...,,'k,..,,,,"'+.,...,..........-.,.....,�...�..,...�,,,..,M,,.,.,w..,:�.....
C�NDITI�N QF APPROVAL
Cond' i 2
(8LaG.}: FI�LD IN5PEC71QAlS ARE RE[�L11R�Q TQ CHECK FOR CaaE CaMPLIANCE.
Cond: 22
{8t�G.j: CdMBUSTIQN AfR 15 RERUIRE� PER CHAP7ER T dF THE 2D43 !MC AND SECTION
3U4 OF THf 2QQ3 IFGC AS MOOIFIEO 6Y 70WN �F VAIL.
Cand: 23
[BL�G.j. BnIILER INSTALLATIQN ML1ST CQNFaRM 7Q MANUFRCTURER'S INSTRUCTIONS AfV❑
CHAPTER 94 OF TFiE 2pQ3 IMC.
Cond: 25
(BLDG.}: GAS APPLIANCES SFiALL BE VENTED ACC�RLYING 7p CHAPTER 5 OF THE 2003 I�GC.
Cvnd: �9
[BLDG.}: ACCE55 70 MECHANICAL EQUIPMENT MLJS7 COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND CHAP7ER 3�F 7FiE 2fl03 IFGC..
Cond' 3i
tBLDG.]: 801E.ER5 SMALL BE MOUNTEL] ON FL�aRS flF NpNC�MBLJSTIBLE C�NST, UNLESS
LIS"fED FDR MpUNTING DA1 CaM6U5TIBLE FLOORING.
Cond: 32
[BLDG.}: PERMI7',PLANS ANO C�i}E AN/ILY515 MUST 6E PaS7EQ IN MECHANICIaL RO�M PRIpR
T� AN INSPECTI�N R�QUES7.
Cand' 3�
[6L�G.}: BDILER ROdMS SHALL 8E EQUIPPPED WITH A FLQ�R DRAIN OR �THER APPRflVED
mechcaniC8l�ermit p819Q8
MEANS FOR �ISP�SING �F LIf�U{� WASTE PER SECTIpN i004.6.
HR�IRAA�k�Rlffr�Rl�Vw�kRlrwlMtlrRlrrtRw/1rRT�R�fiR'R�YfnFk'k4.�wkxkw#YF#wm'�#st�MlR�YwRinY�ATY�rtR*f� TR�FTYFYk�fliHR�fHiYl.FFYlTfRfwR�-k�F#R*fiMfik/*/ kF#/T#rkik�l�tVRTRRwlrwirw-ww�w.-.-r..-rn-F���nfwwlww-R�r� � •
oEC�awarior�s
! hereby acknowledge that I ha�e read this applicatfon, filled out in full the information required, completed an accurate pfot plan, and state that all the infonnation
as required is correct. I agree to camply with tha informatian and pfot p1an, to camply with all Town o�dinan�es and state laws, and to build this structure
aceording to the towns xoning and su6division codes, design review appro�ed, Intemation$I Buflding and Residential Codes and other ordinances of the Town
applicahle thereto.
REOL1E57S FaR
AM ��✓ �
PECTION SHALL BEMADE TWENiY-FOUR HQURS IN ADVANCE BY FELEPHONE AT 9i0.479.2149 OR AT aUR OFFICE FROM 8:0[
Signature of �wner or Contractor
�i e.7►7c 1��, ,,,� . r..�� ,��i u �
Print Name
mec hea ni ca I�e rm it_Q419 a8
� �� a�
aate
**��#*�**#i****4*#*t#���i��i�i*�����k#�***�*****�x�*t�*#&*��*�*#*#**�*�#***t�*�***��*�*��*#�
TOWN OF VA1L, co�.o�no 5tatement
««****�r.*.�r+r.�x�s�*�k*�k*.. *�**� ��*� *�� ��+*�*����k�k�� r�b * * � * *�***���. * � * *+���*.. **�k��*� ��k�*��** �*
Statemerlt Number: R090000185 Amount: 5929.04 02/23/2a�901:23 PM
Payment Methvd: Check Init: RLF
Notation: 4575 K.W,'S
PIPE F'I}�TIOiV, INC
-----------------------------------------------------------------------------
Permit No: M�9-0427 T�e: i7ECHADiICAL PERMIT
PdrCeJ. Nv: 21Q3-122-15�0-2
Site Address: 1687 BUFFEHR CitEEK RD VAIL
Location: 1587 BUFFEHR CREEK RD
Total Fees: $929.4a
This Payment: $9Z9.00 Total ALL Pmts: $929.4a
Balance: go.00
��*a�**�*�*���***�*�*****�*#����*.*�.*��:�*�����*�*******.*.**�**��.�..����*���*��*a��+******.
ACCQLIN"[' iTEM LIST:
Account Code f]escrzption Current Pmts
-------------------- ---------------------_____---- ------------
MP O�l00Qd3].J.l.ldp M$CHANICAC� P�RiyflT FEES 740.04
PF 4fl100Qa317.230� PLAN CHECK FEES 185.04
WC 44144063112800 WILL CALL IiVSPECTIOI� FEE 4.04
-----------------------------------------------------------------------------
�
�
.� ,� _
�: �� �
�� . .'�
!r.: S
,� ^�AIE
��
^� ;: - �.� y • ,_ � []epartmen� af Cvmmunity O���laprrrer�t; �
Y= � � ' �`� ��; �' `' " . . �„, � �5 S�vuth Fr n�tage �{aat!
.��� 'r Y 4 . - , Y - ' � . �; ` . ' ' �' ' �' A '
� �. `Y" � � k �.� -. � . F�y�,� � i.�i�;;Gaiora�c�..8�tG5'7�`j
. , ti.4s5 �. :r; V'
.�:- � ' l
_ � , . �: , . " �w r �.t� ... ' - . . -�? . .!"y' . . : �. � F-,� �'� 9. �' ��.r�
� � .. i•. :�1:..5 � . . � ' . . ','�"�i:� � �}1" • �+�LS1.�,���:e.:
� . .. . �:•.. � . ..3•: ..��' . .. ?'..� � _ _x.P•`'�. p r� �y
:,,a: �'.� S , . � ���,:`�! ;'��'�rG�i,,�iF •� �
4 _ �.. ! s : � � r F:.' � '
: • ' ``��� � . . �:;:r's .: . '.,� �i►Ve�:� vvww ai�gvv�i� 'ti�
�e -°`§'..i�,'.3_• ;' _ , � y• 1 ' . .. � �; •-. : .. ... . : i.+ ,�,� , v
?��a�'�E-����;',�'''��� . , Qp��e7d��truen�f: Rev�e1i�i�0�i�L����t�•'•'.
� i � _i� . � . - ._ ' ' �T„d . - y•4 r . _ .' :.¢ � -.��?` � 7�
f.
. i � �.. , i '�,• p'rr. i �r
,y. � � •5
...s. .. ..,..----._... ... .. � ... . !c _ ... ........�,..��{�i',i :�._1►�iY�IDkxn�
MECHANICAL PERMIT
Boiler �urnace Annli�atinns MU indude:
❑ Mechanical Room Layout/Plan w�th Dimensians
❑ Camt�ustion Air DUCt Size and Location
a Flue or Vent Size
o Gas Pipir�g Plan {if applicable}
a Heat toss Calculations*
o Equipment Cut 5heets for Boiler�Fumace
*Nat mquired far same s�ze (BTrJ} 6oiler replacemerrf x�+th no system
chanqes, or sno�v melt
Profect Street Address:
1�� ����� �'� 1'�e�' �
' tNumber} [Streetj {Suite #j
SuildinglComplex Name:
Contractor Inf rmatlon:
Company: f{ . J,�.�� .� P.`�� �� TvO� �� G•
Company Address: �1�. _� ]�" ,
Cisy: �� �-�1�% 5tate: �_ Zip: B/�3 �
Contact Name: ��� ���1� �
Contact Phone: � "" �b'"� ����
E-Mail
Tvwn o i ont ctor Registratis�n No.: �i� ��
� ��� � ��^�l
�C �L � � ,G. �4,UJ
Contractvr Signature �requiredJ
Properly Information
Parcel #; o�IL� I o�o� I��a�
(For parcel #, contact Eagle County Assessors dffice at 97p-328•8840 or
visit wwrw.eagleoouty. uslpatie}
Tenant Name:
{Commercial Properties}
Owner Name: �-7U �1��1�� ��P.e� ��x��JC� .
Comple[e Valuativn for Mechanical Permit' ��� ~
Mechanical $:
Fireplace Ap�licakions MLlST -nclude:
a Equipment Cut 5heets far �ireplaces�Log 5ets
(Manufacturer's info showing maice, model & approvai listing}
Office Use: �� � � L � - � � ��
Praject #: � �
Suilding Permit #: [ � � " � 1 � I
MechaniCal Permit #: � � U �
Lot #: Block # Suhdi�isian:
Qetailed Des�r�ption of Work: �(1-�7�Itai`��►�-- B T"
z� �IQa� ,����� fk�,f � !3� � J�r ,��s�.��.�'�,.�,
{use additianal sheet if necessary}
a Gas Piping Included
❑ Gas Piping by flthers
❑ Woad to Gas Fireplaca Canversion
Bvfler Location:
Interior [ ) Exserior { � �ther ( }
iVumber of Existing Fireplaces:
Gas Appliances Gas Logs
Number of Pro�vsed Fireplaces:
Gas Appiiances Gas Lags _
Type vf Building:
Single-Family �} Dupl , �
�.
Restaurant { } �ther ( --'
Date Recei�ed:
WoodlPellet
WoodlPeliet
� __. �f��l� ! )
U i—_. i i v �:-�: `
I
FEe � � 2a�g
TQ1NN C3F VAIL
��B-19-2009 14:05 �VAC SUPPLY
,
�,_ � t t����
�� p��5Y5TEMS Heat Lass Detail
Pro�ec� Summary
Prajec[ #: Buffehr Craek Rd.
Project Name: Buffehr Creak rd
7atsl FIoDr Ares: 4,735 ft�
Total Fieat Loss: 130.821 Btulhr
7otaf Radfant fnto Ropm: 107,418 Btulhr
Totai �ther Heat Supplied: 21,880 Btulhr
Downward ta Ground: 1,542 Btulhr
Total Inflltration Loss: 76,a23 Btulhr
Detai led Heat Loss ❑ata
GREATR�qM {Upper Le�el}
1'otal Area:
A�erage Helght:
Voluma:
Expvsed Wall Length:
Aar Changes:
Room Tamperature:
Ffvor
Total ArBB:
�ieated Area:
Canstructlon:
Cover Ft�:
SWcture Rv:
Space 8alaw Heated
SurFace Temperature:
Ceiling
Tata1 Area:
HeateG Area;
Construotlon:
Ca�ering Rv:
Insulativn R�:
Space Abo�a Heatecf:
Project I�umber. Buffehr Creek Rd.
Project Nasne: 8uffehr Greek rd
Date: February 19, 2009
Design Fluid Ternp. Drop:
Flu[d Type:
Total Flowrate:
Maximum Head Loss:
Total Loops:
Total Manlfvlds:
Total Zanes:
a56 ft� rotai Heat Lass:
15 ft Total Radian! Into Ftoom
�,84D ft' Tota4 flther Heat
42 fE 5upplled;
0.94 li�r Totak Oownward Loss:
7Q °F Total Irr�ltration Loss:
Fioar Llnit Load To
Raom:
45fi ft'
45B ft'
Jaist 1 G"
9.0$ °F•ft�•hrlBtu
20 °�•ft'•hrlBtu
From Sarrse Sauroe
�F
83.2
Uther Components
45� ft'
o nZ
Gypsum 6oard
0,7i °F•R=•hrl8tu
49 °F•R2 hrlBtu
Na
Downward Lass:
Floor Unit Load To Room:
Heat Lvss:
2Q °F
a °�e grycof
9.1 USGPM
8 ft(Ft20}
31
5
10
19,056 8kulhr
11,1B7 8[ulhr
7,039 BlulF�r
884 Btulhr
9,859 8lulhr
24.5 Btulhrlft'
860 B[ulhr
24.5 Blulhrlfix
754 Btumr
Componerrt Length WlttthlFieight Area R� Heat Loss
Wall-1 d2 15 B3� 24 5,51p
Door-1 2.8 S 22.4 2.15 875
Units: Hest tass = BWIhr, Lengtl� = ft. Area = i�'. R� _°F fl'•hrlBtu
Cr-eatacf using Ms PEJC Radlant - 1.8.0 Pags � of 46
FE8-19-2049 14:Q5 HVAC SUFPLY
Mr P�X` � +
SY5TEM5
I?etailed Heat Lass Data
Ooor-2 2.8
Wlndow-1 -
Window-2 -
Windvw-3 -
wrndaw-a -
r•.
�
�
�
�
�
❑INING �llpper Le�el)
Total Area: 26fi fi'
A�ersge Height: 42 f!
Volume: 3, ti 92 ft'
Expvsed Wa�l Le�gth: 32 ft
Air Changes: 0.94 Ihr
Rpdm Tempsrature: Tfl °F
Floar
Tota! Area: 266 ft'
Heateci Area: 266 ft'
Canstru�tlon: Joist 15"
�o�er F�+: i,Q$ °�•fN•hrlBtu
Stn�cture R�: 20 °�•ft�•hrl8tu
5paoe Below Fieated: From Same Saurr.s
�F
5r�rtace iemperalure; 85,1
Ce�lfng
Total Area: 266 ft
Heatecf Area: 0 ft�
Construdion: Gypsum Board
Covering Rv: 4.77 °F•fl2•hriBtu
Insuiatian Rv: 49 °F•fN•hrlBtu
5pa�e Ahove Heated� IYo
�ther Gomp�nents
22.4
sa
25
�z
19
P.Q2
�eat Loss Defat�
Project Numher: Buffehr Creek Rd.
Project Marne: 8uffehr Creek rd
Date: Fehruary 19, 2�09
z.�a
z�s�
2.85
2.85
2.85
Tot�! Heak Lass:
Total Raciiant Into Room
Tvtal aownward Loss:
Tfltal Infiltratlon Lass:
FIQOr llnit Load To
Roflm;
Dawnward Loss:
Flaor Unit Load To Roam:
Fieat Lvas:
a��
i,132
72fi
a.� z2
552
8,9i$ 6tulhr
7,539 Btufhr
579 Btulhr
A,548 Btumr
28.3 BtulhrlRz
579 Btulhr
28.3 Bkulhrfft'
44D Btullir
Component Length WldthlHelght Area Rr► Heat Loss
Wall-1 32 72 384 24 i,97fi
Window-9 - - 48 2.85 1,415
11nRs: FMat �ass n B[u1Fir, Ler�gth = h, Area = Rz. Rv =°F•R'�hrlstu
Created using Mr PEX Radlant - 1.SA Pags 2 of 16
FEB-19-2DDg 14:05 HVAG SUPFLY
Mr PE���STEMS
�
De�ailed Heat Lvss Data
1{ITCHEN [LJpper Le►►el]
Total Area;
A�srage Fieighk:
Valume:
Exposed Wall Length:
Air Changes:
F2aom Temperature:
F�OGC
Total Area:
Heatad Area:
ConStruCtivn:
�o�er Rv:
5hvclure R�:
Spa�e Belvw Heated
Surface Temperature
Ceiling
Tatal ArB2:
Neated Area:
Constructian:
Covering R��
Insulation R�:
5pace Aba�e Heated:
Heat Lass Detail
Project Number: Buffehr Creek Rd.
288 ft' 7otal Heat Loss:
13 ft Tvtal RaOiant Into Rvom:
3,744 ft' Total flther Heat
4p ft Suppfled:
�.94 Ihr 7ota1 Downward Loss:
7p °F Tot2l Inflftrdtfpn Loss:
Flvor Unit LaBd iv
RoUm:
2$8 ft=
zsa n�
Jolst 16"
9,48 °F•R2•hrlBtu
20 °F•ft'•hrlBiu
FrDm Same 5ource
�F
83.2
�ther Companents
288 ft'
fl ft'
Gypsum Saard
0.77 °F•R�•hrlBtu
49 °F•ft�•hdBtu
Na
�awnward Loss:
Ffaar Unii Load Ta Raom:
Heat Loss:
Project iVame: Buffehr Creek rd
❑ate: Fek�ruary 1 S, 20a9
9,928 Btulhr
7,Q53 Btulhr
2,332 Biulhr
543 Btulhr
5,287 Btumr
24.5 Stulhrlft'
543 Btulhr
2�.5 BtuThrlft2
A77 Btulh►
Cvmpvnent Length WidthlHelght Area R� Heat Loss
Wall-1 40 13 524 24 i,577
Wlndow-1 - - 80 2.85 1,788
W�ndow-2 • - 8 2.85 278
STLIDY {Upper Le�el}
Total Area:
A�arage Height:
Volume:
Expvsed Wall Length'
Air Chang�s:
s
Roam Tem�erature:
169 ft' Total Heat Loss:
14 ft Tatal Ra[ilant into Room:
2,366 R' 7otal Dther Fie�t
72 ft Supplied:
4.84 Ihr Total Downward Loss:
7� °F Tofal Infiltratfon Lpss:
Floor Unit Laad To
Raam:
11,227 Btul�r
4,i39 B�ulhr
6,769 6tulhr
3i9 B�ulhr
3,341 Btulhr
24.5 B[ulhrlftT
UnfCs: Heat Loss = BtWhr, Length = tt, Area = ft', R� _°F FtxhrlBtu
Created using Mr PEX Radkant - 1.8,0 Page 3 of �fi
FEB-15-2D09 14:05 HVAC �UPPLY
rP
P.a4
SYSTEMS Heat Loss D�tatl
� Pro�sct Numt�er: BufFehr Creek Rd.
Project Name: 8uffehr Creek rd
Date: F��ruary 7 9, 20�9
Detailed Heat Lass Data
Flvor
Tbtal Area: 1S9 ft;
Heated Araa: 1E9 ft'
�onstrudion: Joisi 16"
�over Rv; 1,Q8 °F•£t=•hrlBtu
Stnic�ure Rv: 24 °F•ft�•hrBtu
5pace Belaw Heated: From Same Saurce
'F
5urfaca 1'emperatws; 83.2
Ceiling
Ta[al Area: 169 ft
Fieated Area: � ft�
ConstrucE�vn; Gypsc�m Baard
Covering Rv: 0.77 °F-ff'•hrlBiv
InsulatiQn R�; 48 °F•ft�•hrlBtu
Space Abo�e Heated� No
ather Cornponents
�ownward Loss:
Floar Unit Laad To Room
Heat Loss:
3'#9 Btulhr
24.5 Btulhrlft�
26D Btul4�r
Compvnent !_ength WidthlFlalght Area R� Heat Loss
Wal!-1 72 14 1,408 24 3,021
Window-1 - - 128 2.85 3,71a
VV�ndow-2 - - �9 2.85 552
PownER �up�r ���e�}
Total Area;
A�Brage Heig�rt:
Vvlume:
Exposed Wall Length:
Alr Changes:
Room iemperature:
54 ft=
9ft
aas tt�
a �.
�.94 Ihr
70 °F
Floor
Total Are�: 54 fi�
Heatad Area: 54 ft=
Construction: Jnis1 7 6"
Co�er Rv; 0.99 °F•R2•hrlBtu
Sfructure Fi�: 20 °F•ft�•FrrBtu
Space Below Heated: From 5ame 5ource
o�
SurFace Temperature: 77.9
Total Heat Loss:
Tptal Ra�flant lnto Rovm
Tatal Dawnward Loss:
Total In5ltraiion Loss:
Flaor IJnit Load To
Rvam;
�ownward Lass:
Floor Unit Load 7o Room
83'i Blulhr
776 Blulhr
55 6tulhr
886 BtuJhr
14.4 BtulhrlFkZ
55 Btulhr
'��•� BtulhrlFi�
Units: Fteat �ass = Btulhr, Length = 4l, Area = Tt', Rv ="F•ft;hriB[u
Creatsd using Mr REx Rad�ant - 1.8.0 pa9g 4 of 9 6
FEB-19-2003 14:05 HVAC SUPPLY
�� p��SYSTEMS
Detailed Heat Lass Qata
Ceiling
Tvt&I Area:
Hasted Ares'
Canstr�ctlan:
Cwen[ng Rrr
Insulation R�:
5pace Abo�e H$ated:
�ther Componen#s
54 R�
fl ft�
Gypsum Board
�.71 "F�ftx•hrlBtu
49 °F•ft�•hrlBtu
A10
Heat Loss:
F,05
Heat Lvss Deta��
Praject Number: BufFehr Creelc Rd.
Project Name: Buffehr Creek rc!
Date: February '! 9, 2�Q9
89 $tulhr
Component Length Widthlfielght Area Rv Neat Lass
Wall-1 1 9 9 24 D
LAN�ING �lJpper Le►rel�
Total Area:
A�erage Height:
Volum�:
Exposed Wall Length:
Alr Changes:
Roorrt Temper2iture�
zso r�
�2 ft
3,00o r�
25 ff
O.S4 Ihr
7� °�
Floo r
Total Area: 250 R=
HBafed Area: 250 ft�
Cvnstf�.ictipn: Joist 16"
Cv�er Rv: 'f.QB °F•ft�•hrlBtu
5truetura R�: 24 °F•ft'�hrlBtu
5pace Below Fieatecl: From Same Svurce
o�
5urfaoe Temperature: 84
Ceiling
Tatal ArBa:
Fieated Area:
Constructlon:
Ca�ering R�:
Insulatfon Rv:
5pace Ado�e hteated:
�ther Campanents
250 ftz
Oft
GypsuEn Baard
4.77 °F•Ftz•hrl�tu
49 °F•flt'•hrl8tu
Na
Total Heat �oss:
"�otal Ra[flant fnto Raom:
Total Downward Loss:
7ota1 Infiltrafion Loss:
Floor L3nit l.aad Ta
Raom:
Downwarci ZaSS:
Floor Unit Load 7o Rovm:
N eat Lass:
7,�58 Btvlhr
6,554 Btulhr
5D4 Btulhr
A.237 Btulhr
26.2 SfulFirlft2
5�4 Btulhr
28,2 8tufhrlft�
414 Btulhr
Component Length YVtdtf�fHal�f�t Anea R� Heat �oss
Wall-1 25 i2 3D0 24 986
�oor-1 3 8 24 2.7 S 938
Un��s: Maat Lass = BWlitr, Lersgth = T!, Area = h'. Rv =°� ft'�hrl8tu
Creatad using Mr PF.)C Rac��ant - 1.8.Q
PBgB 5 uf 7G
FEB-19-20Q9 14:D6 HVAC SUPPLY ��0�
M� PE�5�5TEfVlS Heat Loss Detai�
Detailed Hea# LQSS Data
IIAASTER SUITEICLST �Upper Le�elj
Total Area: 468 ff�
Averac�e Fieight: 10.8 ft
Volume: 4,860.8 ft'
�xposed Wall L9ngth: 53 R
Afr Changas: 0.94 Ihr
Raom TempBracure: 70 °F
FMoUI"
7otaf Area:
H9aiBd ArsB:
Cpnstr�ction:
Cn�er R�:
Structure Rv;
Space eeiow Weated:
5urfaoe TBrrlperature:
Celling
7otai Area:
Heated Area:
Constructlon:
Covering Rv�
Insulation Rv:
Space Abo�e HeSted;
a5s ft�
A88 ft'
Jvlst 16"
1.91 °F•ff' hrlStu
20 °F•ft' hslBtu
From 5ame Source
�F
S�
�ther Cvmponents
468 ft'
� ft=
Gypsum Board
O.TT °F�ft'•hrlBtu
49 °F•it�•hr�Bku
IVD
Proje�t I�umber: BuTfehr Creek Rd.
Proje�t Name: Buffehr Creek rd
7vtal Heat Loss:
Tatal Radlan[ Into Room:
Total Other Heat
5upplied:
Tatal avwnward Loss:
TOt81 Infiltrati0n Loss:
Floor Unit Lvad 70
Room:
❑vwnward Lass:
Floar Unit Laad To Rvom:
Heat Lass:
Date: Fehruary 19, 2009
13,554 Btulnr
9,473 Blulhr
2,974 S€ulhr
1,�47 Btulhr
7,OQ6 Ssulhr
20.2 �tulhrlftz
i , 9 67 BtulFir
20.F Btulfirlft2
774 Btulhr
Companent Lengtfi W�dthlFielgfit Area R� Heat Loss
Wall-1 53 1Q.6 5Bi.8 24 1,fi02
Windaw-1 - - 144 2.85 3,a85
MASTER BATH [Upper Leyel}
Total Area: 208 ftz
Awerage Fielght: 10 ft
Valums: 2,fl80 ft'
Exposed Wall Length� 42 ft
Air Changes; 0.94 Ihr
RUam 3empErature: 70 °F
Units: Neas ioss = Btulhr, Lengih = f4 Araa = R', R� ='� FI'-hrlBw
Created using Mr PF>f Radiant - 1.8.a
Total Heat Loss:
Total Radiant In10 Rvvm:
Total pownward Loss:
7otal Infiitration Loss:
Floor Unit Load To
Room:
fi,171 Btulhr
5,164 Btumr
a07 6tulhr
2,937 Btulhc
27,7 8tultsslft'
Page 6 of 48
FEB-I9-2009 14:4E HVAG SUFPLY
r
�
l��YI
`
S�'STEMS Hsat Loss Detail
� �roject Number: Buffehr Greek Rd.
Praject I�ame: Buffehr Creek rd
Date: February 19, 2DQ9
Deta�led Heat Lass Data
��aor
7"ot2i� AreB:
Heated Area:
Conslruction:
CD�er Rv:
5tructure Rv:
Spane Below Heated;
SurFdce 1'emperalure:
Ce'rling
Tatal Area:
H�ted Area:
Cons[ru�tion:
Cv�ering R�:
lnsulatlon R�:
Space Ahove NeBied:
208 ftx
208 ft'
.loist �8"
0,95 °F•ft •hrlBiu
24 °F•ftY•hrlBlu
From Same 5aurce
o�
84.8
Other Cvmponents
2Q8 ftz
v rt=
Gypsum Board
0.77 °F•it�•hrl8tu
49 °F•f{'•hrBtu
No
Dawnward Loss:
Floor Unit Laad To Room
Heat Loss:
4�7 Btulhr
27.7 Btulhrlft'
344 6tul�sr
Componant Length 1MdthlHefght Area R� Heat Lvss
Wall-1 42 10 42a 24 1,334
Window-1 - - 39 2.85 1,949
�AMILY RO�M �Main Le�el}
Total Area: 483 ftz
A�erage Fleight: 1D R
Vvlume: 4,834 R'
FxpDS�d Wall Lengtfi: A6 ft
Alr Changes: 0.94 Ihr
Roosn Temperature: 7� °�
��001`
Total Area:
Heated Area:
Construd�on:
Cover Rv:
Structure R�:
Spaoe Belvw I-�eated:
Surfacs Temperatura:
483 ft'
483 ft'
Jolst 16"
1.08 °F•ft'•hrlBtu
2� °F•ft�•hrlBtu
From 5ame 5aurce
v�
81.2
Llnits: i-ieat LDSS = BtuRir, L.e�g1h = P!, Area = ft', i3v =°F•ft'•hrlBSu
�reatsd using Mr PE}C Racffant - 1.8.0
7ota1 Heat Lass:
Tatal Radiant Into Rvom
Total DOwriwBrd �oss:
Total Infl�tra�on Loss:
Floor Unit Lo�d T❑
Roam:
❑ownward Loss:
Floor Unit Load Fo Roam
10,7Ad 8tulhr
9,973 6tulfir
771 Btulhr
8,821 Btulhr
2fl.6 BtulhrlftY
771 Btulhr
20.6 BtulhrlfN
Page 7 of � fi
r PE�S`Y5TEM5
�etai�ed Heat Lass Data
Ceiling
Total Area:
Heated Area:
Constructiar�:
Cavering Rw:
Insulatian R�:
SpaCe A�vve Heated:
483 ft� Haat Loss:
� ft'
Gypsum Board
Q.17 °F•ft�•hrlBtu
49 "F•ft�•hrJBtu
Fmm Same Source
4ther Gvniponents
P.08
Heat Lass D�taif
Proje�t Number: BufFehr CreEk Rd.
Project Name: Buffehr Creek rd
bate: Fehruary 19, 2009
o B�m�
Component Lengtt� WldihlFleight Area R►► Heat Loss
W811-1 48 1 D 46a 24 1,442
Window-1 - - SQ 2.85 �,47a
Window-2 - - 9 2.$5 278
P�]WDERILN (AAain Ler►el}
Tat,�4 Area: 84 ft�
A�eragg 1-kefght: 9 ft
Vvlume: 756 fl�
F
Expased Wall Length: 1� R
Air Charrges: �.9a !hr
Ftaam Temperature: 7a °F
Flavr
7otal Area:
Heated Area:
Construr.tion;
Cover ftv:
5tru�ture Rv:
5pace 6elow Heaied:
SurFace Temperature
C$I�li1g
Total Area:
Fieated Area'
Constructian.
Ca�ering R�v:
insulakion R�:
5pace Rbo�e Naated:
84 ft�
84 ft
Joist 16"
Q.95 °F�ft��hrBtu
23 °F•ft�•hrl8tu
Frvm 5ame Sourre
�F
79.3
84 ftz
4 ft�
Gypsusn Board
Q °F•ftz•hrlBtu
�9 °F•R2•hrlBtu
From Same Source
Tatal Heat Loss:
Total Radiar�t Inta Room:
Total Downward Loss:
Total Infiltration Lass:
Floar Unit Lvad To
Room:
❑ownward Lass:
Floar Unit Load To Fiovm�
Heat Loss;
1,517 etullsr
1,428 etulhr
89 Btu1F+r
1,a68 etulhr
17 etulhrlft�
89 BiWhr
17 Bfulhrlft�
� Btt�ll-ir
Ilnita: Heaf Loss = BtuRU. Length = ft, Araa = R', fN =°F h'•hflBtu
Craated using iNr PE?C Radiant - 1,8.0 p�ye g o( �g
�EB-19-ZQ09 14:06 HVAC SUFPLY
P.03
�m
SYSTEMS H�at Loss Deta� I
� Project Number: B�ffehr Creek Rd.
� Projeet �Jame: BufFahr Creek rd
Oate: Fe�ruary 18, 2fl09
Detailed Heat Lvss Da�a
Dther Cornpvnents
Camponent Langth WldthlHeight Area R� Heat Losa
Wall-1 7� 9 90 21 36a
BEDRDDM 4 (Main Le►ret}
7otai Area:
A�erage Height:
Volusne:
Exposed Wall Length:
Air Changes:
Room Temperature:
Floor
Total Area:
Heated Area:
Constru�tion:
Cp�er R�;
S1ru�ture Rw:
5paoe Belaw Neated:
SurFace Temperalure
G91�111f�
Total Area:
fieatsd Area:
Constru�tian:
COV9fIRg RV:
Insu�ativn F2v:
5pace Aba�e Heated:
2�s n�
9.B ft
z,s2o.s n�
'1 {5 R
0.94 Ihr
�a °�
273 ft'
273 ft'
JvisE 18"
i.91 °F•ft'•hrlBtu
2Q °F•4t'•hrlBtu
From 5ame Sflurce
'F
78.2
2l3 ft�
b �
Gypsum Board
0 °F•ftz•hrlBtu
48 °F•ftz•hrlBtu
From 5ame 5ource
Qther Components
Total Meat Loss:
Total Radi2nt Into Roam'
Total pvwnward Loss:
7otal Inflltratlan Loss:
Flvar Unit Load Ta
Rvom:
❑ownward Lo55:
Flvar Unit Load To Rvvm:
Heat Loss:
4,583 Btuihr
4,d85 Btumr
47$ 6tufir
3,701 Btulhr
15 8tulhd#t'
478 Btulhr
15 Btulhrlft�
Q Bt�lhr
Campvnent Length WldthlHafght Area F[� Heat Loss
Wa11- 7 1 Q 9.6 96 21 384
BATH 4 �Main Le►►elj
7flta� Area:
A�e►age Hefght:
volume:
Exposed Wall Lengti�•
Air Ghanges:
Raom �emperalure:
84 R�
S fc
75E ft'
,o n
a.9a mr
70 °F
`fatai Fteat Lvss:
ioial Ra�iant lnto Rvom:
Total Dvwnwarci Lc�ss:
Total lnfiltratfon Lvss:
Floor Unit Laad Tp
Room:
1,53a Sttyhr
1,A28 6tulhr
��z B�,m�
1 A68 6tulhr
17 Btultirfit'
UnitS; Haat Lasa = 8lufl�r, LengSh = ft, Ares = it', Rv =°F�ft'�hdBtu
Created uslrry Mr PEX Radlanl • 1.8.Q Page 9 af 1 fi
FEB-19-2Q09 14:Ofi HVAC SUPP�Y
r
P.1Q
.
5Y5TEMS Heat Loss Detail
� Project Numher: Buffehr Cree�C Rd.
Project Name: Buffehr Gresk rd
Qate: Fehruary 19, 2409
Detailed Heat Lass Data
�lovr
Tvtal Area� 84 ftz
Hested Area: 84 ft�
ConstruCtion: Jofsk 16"
Ca�er R�: Q.95 °F ft�•hrl6tu
5tructure Rv: 24 °f�ft'•hrlBtu
Spar.a 8alow Heated: From 5ame Saurce
�F
5urhdce Temperature: 79.3
Ceilir�g
Total A�ea: $4 ft'
Heated Asea: � ft�
Gonsfru�lion: Gypsum 8o�rd
CaVering Rv'. a °Ffl'•hrlBtu
Insulatfon Rv: 49 °F•ft2•hrlBtu
5pa�e Abo�e Heated; From Same 5ource
�ther Components
Downward LQSS:
Floar tJnit LQad To Room
Ffeat Loss:
1 �2 Btulhr
17 BtulhrlfE�
� Btulhr
Compon�nt Length WicithlHslghk Area R� Heat Loss
Wall•1 96 9 94 21 350
FDYER �M�in Ler►el}
rota� Area:
A��rage HeIgM:
Volume:
Exposed Wall Lengkh:
Air Changes;
Room TampQrature:
348 it' Total Heat Loss:
17 ft Tot2Fl Radlant Into Room
5,23fi fN Total Dther Heat
17 ft 5upplied:
�.94 /hr Total aowr�ward L.oss:
70 °F Tolal In5ltration Lass:
Flaor Unit Load To
Room;
Floor
Total Area: 348 ft�
Heated Area: 308 ft�
Canstruct6oa: Joist 16"
Co�er Rv: 0.94 °F•fk�•hrlBfu
Structure Ft�: 2d °F•ft'•hr16[u
Space 8alvw Heatetf: From Sama Sour�e
�F
5urface Ternperaturs: 85
oawnward Loss:
Flvvr Unit Load To Rvom
90,582 Btulhr
8,659 BkuRir
�,304 8tulhr
607 Btulhr
7,394 Stufir
28, T atumrrn'
6fl7 gtuli�r
28.1 Btuli�rlft=
Unhs: Neat Lass = 6tuli�r. l.Bngth = fL Araa = R', R� _"F it�hrl6lu
Created using Mr PF.]( Radlant-1.8.0 Page 10 of 1fi
F�B-19-2009 14:06 HVAC SUPPLY
Mr PEXS�STEMS
Detai�ed Heat Loss Data
Ceiling
Total Area 308 R�
Heated Area: a Ft'
Constrtictlon: Gypsum Board
Co�eCing Rv: �.7T °F•fk'•hrlBtu
Insulati�n Rv: 49 °F•ft�•hrlBEu
5pace Ahove Heated: Frvm Same Souree
❑�her Gomponents
Heat Lass:
P.11
Heat Loss aetail
Proje�t Number: BufFehr Creek Rd.
Project Name: Suffehr Cre�ek rd
Date: Fet�ruary 19> 2009
� Btulhr
Component Length WidthlHeight Area R� Heat Loss
Wal1-1 17 17 288 24 840
poor-1 3.6 8 28.8 2.15 1, 9 25
Wsndrnvti - • 7 2.85 212
1Mndow-2 - - 13 2.85 383
BEDR4flM 3 (Maln Ls�el�
Total Acea:
Averaga Helgnt:
Volume:
Exposed Wall Length:
Air Changes:
Room Temperature:
Flaor
Tofaf Area:
Heated Area:
Constru�tion:
Ga�er R�;
Structure Rv,
Space Belaw Meated
Surfaoe 7emperature
�91�IIlg
Total Area:
Heated Araa:
Cansir�ctlon;
co�ering Rv:
Insulation R�:
Space Aha�e Heated
zz� ��
9.6 ft
2,121.6 ft'
23 f9
o.�a mr
74 °F
221 ft�
221 ft'
JoEst 16"
� .91 °F•ft�•hrlBtu
20 °F•ft=•hrl6tu
From Same 5aurce
e�
81.8
221 ft'
a n2
Gypsum Board
D,77 °F•ft�•hrlBlu
49 'F•ft�•hrlBtu
From Same Souroe
Total Heat Loss �
Tvtal Radiant Ir�to Room:
Total powrsward Loss:
7otal Infiitrat�on Loss:
Flvar Unit Laad To
Room;
Downward Loss:
Flovr Unit Lvad To Ftoom:
Heat Loss:
5,3E9 Btulhr
a.sa8 er�um�
Sfi1 Btulhr
�,9�6 Btulhr
21,8 Btulhrlit'
5S 1 Btum r
21.8 6tulhrlftx
o atumr
Units: Heat �ass = B[ulhr, tenglh = ft, Area = fi�, R� _°F (i'•hrl6tu
Created using Mr PEX Radiant - 1.S.a Page 91 of 16
FEB-19-2Q09 i4:Ofi HVAC SUPPLY
P.12
m
SYSTEMS Hsat Lvss Deta�l
� Project Nurnber: Bu#fehr Creek Rd.
ProJect Name: Buffehr Creek rd
Date: February 'E 8, 2Q09
aetailed Hea� Loss Data
�her Cvmponents
Camponent Length WidthlHelght Area R� Heat Loss
W811-1 23 S.$ 220.$ 24 633
Window-1 • - 40 2.$5 1,178
BATH 3 [Main LeWel�
Total Area:
A�erage H9ight:
Valume:
Expvsed Waii Length:
Alr �Change5:
Room Temperature:
78 ft;
9 R
7D2 ft'
5 ft
D.94 Ihr
7D °F
�i�df
Tatal Area: 78 R'
I-leatad Area: 7$ ft�
Construdion: Jalst 1 G"
Gvver Rv: fl.95 °F•ft�•hrlBtu
5tructure i�: 2d °F�ft •hrlBtu
Space Bebw Neated: From 5ame 5ource
°F
Sur£ace Temperature: 78.T
7otal iieat Loss:
7o[al F2adiant Info Rvom:
Tatal pownward Loss:
Tvtal Inffitration Loss:
Flvar Unit Load 70
Room:
Dawnward l.ass:
Floar Unit Load 7o Room;
Ceiling
Total Area: 78 R2 Heat toss:
Heated Area' 0 ftz
Constructivn: Gypsum Baard
Covering R�: O.17 °F�Rz•hrlBtu
Insu#aUon Rv: 49 °F-ft=•hrl8tu
5pace Abave Heated: From 5ame 5ource
flther Components
1,23i 6tulhr
1,149 6tulhr
82 Btult�r
991 Btulhr
14.7 etulhrlft2
82 BtulYir
14.7 Bfu/hrlft'
0 Biulhr
Companent Length 1NidthiHelght Area R� Neat Lass
Wall-1 5 9 45 24 158
Units: Hea[ Loss = Btulhr, Lgnglh = ft. Area = ft', R� _°F•ft'-hrf6[u
Croated using Mr PEx Radfa�t - 1.8,0 Pa�r. e 12 af 'f fi
FEB-I9-ZD09 14:07 K�AC SUPPLY
P.13
PE�SY5TEM5 Heat Lass Detail
� Project Numk�er: 8uffehr Creek Rd.
� Project Name: 8uffehr Creek rd
aetaiied F�eat Lvss Data
BE�RDOM 2 �Main Le►rel}
�otal Area:
Averege Height:
Vofume:
Ex{>osed Wall Lengih:
Air Changes:
Room 7amperature;
Flavr
Total Area:
Heats�4 Area:
Cvnstructlon:
COVBf RV:
SLTLICtUf9 �V:
Spare 6elow Heated:
Sur#ape Temperature:
Ceili�g
Total Arsa:
Heated Area:
Consiruction:
Ga�ering Rv:
Insulatfon Rv:
Space Above Heated:
315 ft� iotal Heat Lass:
9.6 ft Total Radlant Into Room:
3,024 ft Total Dther Heak
36 ft Suppliec4:
0.84 Ihr iotal Qoumward LO55:
70 °F Total Infiftratfon Loss�
Floor Unit Load To
Room:
315 ft'
315 ft=
Joist 1 �i"
9.81 °F•ft'•hr18lu
20 °F•ft'•hrlBtu
From Same Source
°F
81
315 ft'
a n2
Gypsum 8oar�
0.77 °F•fl�•hrlBtu
49 °F•fl'•hrlStu
From Same 5ource
�ther Cvmpanents
Downward Lass:
Ffoor Unit Load TD Rpbm
Heat Loss:
Date: �ebruary T 9, 2[]Q9
8,$63 Btt+lhr
fi,376 Btulhr
1.442 Btulhr
745 Btulhr
4,2T0 Btulhr
24.2 BtuThrJft�
745 Blulhr
20.2 Btulhrlft�
0 Btumr
Component Length WiafthlHelght Area R� Haat Loss
Wall-1 3E 8.8 345.B 24 895
Window-1 - - 86 2.85 2,853
BATH 2 (Main Le�elj
Total Araa:
A�eraga Heighk:
Vvlume:
Exposed Wall L,ength:
Air Changes:
Rvom Temperature;
�s ��
9 ft
Tfl2 ft'
28 ft
0.94 Ihr
7a °F
To4al Heat Loss�
Tatal Radiant lnto Roam:
Tvtal Qownward Loss:
�otal Infillration Loss:
Flaor Unit Load To
Rvom;
2,405 Btulhr
'1,873 Btulhr
132 BtuJhr
991 Bfulhr
24 BSUlllrlftx
Unrts: hieal lASS = Btulhr. Lengtt� = ft. Area = it', Rn =°F ft'•hrl6tu
Creatad using Mr PE7{ Radiant -1.8.4 Page 13 of 16
SYSTEMS
Detailed Heat Loss Data
Floor
Toial Araa:
Heated Area:
Constn.rction:
Cvver R�:
5tructure R�:
5pac�e Below Fieated;
Suriace Temperature
Ceiling
"Total Ares:
HeSted Area:
Construation:
Ca�ering R�:
Insulation R�;
Space At�a�e Heated
78 ft'
78 ft�
Jotst 19"
�.94 °F•ft2•hrl8tu
24 °F•ft�•hrl8tu
From 5ame Souroe
a�
82.9
78 ft'
0 ft2
Gypsum Board
0.77 °F•ft'•hrlBtu
49 °F•ft'•hN6tu
From 5ame Saurr,e
Qther Cvmpvnents
P.14
Heat Loss D�tai1
Profect Nurni�er: $uflehr �reek Rd.
Projecf Name: BufFe�r Creek rd
Date: FBbn,ary i 9, 2009
Downward Loss:
FIoDr llnit L.oad To Room:
Heat Loss:
l32 Btulhr
24 BiulhrJft�
0 BtUlnr
Component LengH1 VYfdtiuHsight Area R� Neat Lasa
Wall-i 28 9 252 24 882
hed 1 �Basernent}
Total Aree:
Average Hsight:
VOiume:
Exposed Wall Lenglh:
Air Ch2ngBS:
RDOm Temperature:
Floor
Total Area:
Haated Area:
Constructivn:
Slah papih;
Cvver R�:
5tructure R�;
�dge R�:
Surface 7emperature:
192 ft�
'i U ft
1.92fl fN
30 it
0.94 1?ir
70 °F
192 ft�
192 ft�
Concrete
4 in
D.$$ °F•ft�•F1r1BtU
5 °F•fi2•hrlBtu
S °F•R'•hrlBtu
�F
83.4
Total Heat Loss:
Total Radlant Irto Raam:
Total Downward Lvss:
Total Infiltratlqn 4oss:
Floor Unit Load Tv
Raom:
Downward Loss:
Floar lJnit Load Ta Room:
5,309 8tulhr
4, 781 Stulhr
528 8tulhr
2,711 Btulhs
24.g Stumrlfl'
528 BtuThr
24.9 $tllJhflftx
Llnits; Heat Loss = SSu�hr, Langth = ft, Area = ft'. R� _°F•ftxhrlBtu
Created using Mr P�C Radian� -1.8.0 Page 14 of 1fi
FE8-19-2009 14:0� HUAC SUPFLY P.15
�f PE�S��TEMS Fieat Loss Detai�
Deta�led Heat Lass Data
ce�i��9
Totaf Area:
Haatad Area:
Construction:
Ca�ering Rv:
Insulation Rw:
Spaoe Aha�e Neated;
192 flt� Heat �.ass:
0 Ftx
Gypsum Bvard
�.Tl °F•R2•hrJ61�
49 °F•ft�•hrl�iu
From Same Sour�e
i]ther Camponents
Praject �Jumber: Bufiehr Creek Rd.
Pro;ect Name: Buffehv Craek rd
❑ats: February 19, 2��9
0 $tulhr
Componen! l.ength 11�tithlHeight Area R� Heat Lass
Wall-1 30 14 3W 2Z 880
Windaw-1 - - 4U 2,85 1,179
bath 1 (Basement)
iatal Area:
Average Helght:
Vfllume:
Exposed Wall Lengt�:
Alr Changes:
Raom Tem�reratura:
Flovr
Total Araa:
Heakeci Area:
Constructifl�:
Slab aepth:
Cv�er Rv:
StruCturB R�:
Edge R�:
Surface Temperature
Celiing
Tatal Area�
Heaied Area;
Cvnstructian:
Cavering R�:
Insulak"son Fiv:
Space Abo�a Neatecf:
84 fta
9 ft
54D PN
1S ft
D.34 Ihr
70 °F
so ��
&Q ft'
Concrale
4 in
fl.42 °F•f#'•hrlBtu
5 °F•ftz•hrlBtu
5 °F•ft'•hNBtu
o�
81.9
60 RZ
� �a
Gypsum Baard
❑.77 °F•ft2•hrlBtu
49 °F•ft�•hrl8tu
Fram Same Souroe
Total Neat Less:
Total Radiant 4nfv Room:
Tolal Qowrrward L.oss:
Ta�al Inflltratlon Loss:
Floar Unit Load To
Room:
❑ownward Lvss:
Floar Linit i.oad To 3�oom
Heat Loss:
7,45� StWhr
'1,322 8tulhr
T32 Btt�lhr
7S3 Btulhr
2Z Btultirll'�
i 32 $tulhr
22 Btumrift�
0 Btumr
Un1IS: FieaS Loss = BtuThr, tength = ft, Area = ft', R� =°F•ft'•hrlBtu
Created using Mr PE7( Radlant - 1.8.0 Page 15 of i6
FE8-I9-2009 14�0� HVAC SUPPLY P.15
�� �E�SYSTEMS Heat Loss Detail
� Project Number: Buffohr Creek Rd.
Project Name: euffehr Creak rd
❑ate: February 19, 2D�9
Detailed Heat Lvss Data
Qther Carr�panents
Companent Lengih Widti�IHefght Area R� Heat Loss
Wa[I-1 18 g 171 24 5fi�
MLJ❑ ! Sltl CHANGE �Basement}
Tvtal Area� 440 f['
A�erage Height: iff.8 ft
Valume; A.2a4 fi'
ExpDSed Wall Length: 42 ft
Air Changes: fl.84 Ihr
Room Tamperature: 70 °F
FIvOr
7vfal Area;
Heafed Rrea:
Cvnstruction:
Sleb l7epth:
Co�er R�:
5tructure Rv:
Edge R��
5urface Temperature:
C@I�Iflg
Toial Area:
Heated Area:
Constnuction:
Co�ering Rv:
Insulativn Rv:
SpaCe Ahv�e Neated:
4DQ ft'
404 tt'
Conorete
4 in
fl,�2 °F•ft�•hrlB�u
5 °F•ft=•hrlBtu
5 °F�ft�•�rfBtu
�F
82.3
40� ft�
o n�
Gypsum Board
0.77 °F•ft2•hrlBtu
49 °F•ftz•hrlBtu
From 5ama Souroe
Other Campvnents
Tvral Heai Loss:
Tvtal Radlant Into Room:
Total pownward Lass:
Total tnfifaation Loss:
�loar Unit Load To
Room:
6awnward Lass:
Flovr Uriit Lva� To Raom:
Heat Loss:
9,964 6tuThr
9,a82 Btulhr
882 Btulhr
5.988 Btulhr
22.7 8tulhdR'
asa si�m�
22.7 Btulhrlft'
o Btull�r
Component Length N1IdthlHelght Area R� Heat Lass
Wsll-7 42 '10.6 445.2 24 1.299
Daor-1 6 $ 48 ?.15 7,875
Unlis: Heat Loss = 8tulhr, Length = R Area = R', R� _•F•h'•hrl8lu
Greated using Mr PE?C Radlant -?.$.0
Page 18 vf 1 fi
TOTAL P.16
' •l���i•1�R6 �b dr*A�� rs e r; :� � _ -• -
s�•*������a�•a�#�a � � � a �:� � •:
�
,�;�=�f- �:�..:
a��
��, r,__ —
��l
e
� �'/� . ..
- b��� - ��r
m�� ��n �r �rm� n��
�
ar�d p . .
up�'° G � � � � �
o'o
, ���
.
�
NICI-1
kEATING BDILER
�
�- �
Now with Floor and
Wall Maunt Models
r, ass��s��
�. 'rt i ^I IJ
� �=�i ��.i: ii:..ic:� �-
�:' ���.�,���. oE51GH
� �
� s
�� ��
''J H4Fh f:ffirkn:7 �Y:jior nca�rrz. Hnilrn and }Yinl llrelrrx
www.kn i gh th eati n gh o i ler.cam
Knight Fieatin� Boiler Dimensinns & 5pecificatinns— Fiaor 5#�nding N�odels
Mode15:
KBN$o-zso
���,��.
ECF:OYS
8
�Mnfie�:
IlCBI�x85
BACFC
� I{HIGHT Heating Boiler �I Dimensivn5 and SpeClFltation5
M1LL�
1M1
N�T
=NSATE
aodusrna''�
1'4' -'-„�'
Wal! Mount Madels
7�
FRON7 A I
I
SIQE , �
A G/IS �
Ol1iLET
F
K F
G
R03u5TA8L � lNLEi 3"
i:a• - i-ve• A_i �s
S�TTDM �s �
�NLET �
Nfodels:
WBNoSo-zia
E�ECiRICA'�
_ CONryECTIONS
DO
' O6
C�7
VJBf�@059 1� 5L� 95.3 45 39 291j4" 153,'4' N;v 1�3,!4" IO3,'h" 2" (r314" PW 3•1J4" 4•1�4' 2•3,''4' I,+2" 1' 2" � 130 �
WBi�ED�6 16 80 953 72 b3 29-1j4" 153;4" NA 1a3�4" 1Q�3�4" 2" o-314" NA 3-1�4" G-114" 231k" Ej?" 7" 2" 2" 130
-- - -- -
W8N105 �l 165 95.4 97 82 t9-1�4" 15�3f4" AW la3�k" fa3,�4" 31�2" 5•lj2" NA 3�J�4" k•1J4" 2-3j4" ij2.' 1" 2" 134
W8H15Q 30 150 95.5 135 119 29-lfq'. 2a3/4" Hll 15-3�4" 8•1!2" 3•1�2" 5�112" NA &3�G" 9-3J4" 1-7/2" 1�2. 3" 3" 3'. 182
WBH219 42 21D 95.7 190 1b5 24•lj4" 25" hA 20" 12" 3•1�2" ylj2" NA 13" 34" 1•i12" 3?2" 7" 3" 3" 177
If6h10�0 id SO 953 T2 53 3'r114.' 14" 1" 5-3f4'. 5" 3" 2a1�2" 2�" 3-3�4" frlf2" WI lj�.' 7" 3" 3" 125
-- -
KBH1D5 27 305 95A 9l 82 33-1f4" i4" 6�1�2" 5-314" 4•1��" 1-1�2" h}1�2" 12" 3•3�4" G1/2" NA 1�2" 7" 3" 3" 129
— ---
KBHI56 3fl 15C1 95.5 ]35 139 33-t14" 18" 1�-1�4" 11•7(2" 10" 1•1�2" 21•1�4" 23" 7-3�4" 12'. NA lj�" 1" 3" 3" J57
r•KBH214 42 21Q 95.7 19D 165 33�k14" 22•ijG" ]bljx" 15-3f4" 14-1�4" �1�q" 21-llri' 23" t•3,�4" 9(r1f4" i�W 1(2" I" 3" 3" 172
Y$H285 57 285 96.0 250 226 42•Ir2" 1g3�4" 12-3I�+" 13 7j2" 6" 2.' 34" 31'. 11-3j4" 4-3�4„ i�W 31L'� i-llk" 4" G" 224
Notes: Performance data based on manuiacturers cest resuirs. Indoor installa�ion on�y. A1l informa�ion suEjec� �o �hange. Change "N" �o "L" for I?gas mvdels.
St�ndard Features
> ENERGYSTAR@' QualiFed
> INodulating8umerwith 5:17umdown
> PSME 5tainless Steel Heat Ex�hanger
> Gasketless Heat Exchanger Design
r 3D psi RelieiVah+e
f�iNART SY�EM'" Operating Cor�hol, with:
h'
- OigitalOperatingCorttrol
- 2-Line,16-Charader LCO �isplay
- Passward 5ecurity
• Dutdoor Reser
- Suilt-i� Sequenrangfor2-8 Boile�s
- 0 —10 VdC input Confrpl
- Produet Sen+ke Indicator
- Time Clocic
- PC Canne��an Port
y Inlet & Outlet Temperature Sensors
} Easy-Ac[ess Terminal 5trip
5randard fearures rn S�LO [exf indica[e equrpr+�ent you would ,vay extm for oR compe[iRg madels.
> Low-Water Flow Indi[ation
� Auiamati[ ReSet Nigh Limit
� Contaas on Any Failure
� 3-Pump Control (Bailer, Sys[em and DHWP]
� Pump Relaywith Freeze Protectio�
� eoilerCircula�ngPumpp[er+osaxss){waHasa2io)
� �irect-5park Ignition
> Low-N�x aperation
> Natural to LPGas Can�ersion Kit
� �irect-Vent 5eaied Comhustion
> PVC Venting up [01 �� Feet
> Sidewall Vent Terminals
5 2ero Clearan�e to Com6ustihles
> Adjustable Leveling Legs (i[aN �nodels onty}
� Wall Mount 8ra�ket �We� n�odelsoniy]
> 12-YearLimit2dWarrdnry [SeewarranryTnrOetails)
� . _.. . � oer
, .� H � � R���,
�f1a
30o Maddax Simpsan Parkway, Lebanon, TiV 37ogo
i��-04 [Repiaces Kl3\-[1± ti'e17]
Dptinnal Equi�ment
> Adjustahle High Limit with Manual Reset
> Flow 5witch
> Low-Water CutoFf with Manual Reset and 7est
� A1arrn 6ell an Any Failure
� SMARTSY5TF1u1'"" PC 5oftware
� Cpn[entric Vent Kit
> Condensate Neutralization Kit
� Multi-StaCk Ffdm@ (K6P! Modelsonly]
��,� i
�` ,� T1 a .�tJ�
'' �{�Rh F,flieirinr� IYacrr 11.•aFrrx� Yf�iilrn arid Prierl ]icatrrs
6�5-88g-Sgoa � fax: d�5•547-i000 � www.lochinvar.com
1�K-201+�1-�68-Pnnted �n U.S.A.
i�
,
Generated by REScheck-Web 5�ftware
�ompliance �ertificate
Projecf Titie: Custom Vail Residence-V1leltner
Report Date: �5102168
Energy Cade: 2003 IECC
Location: Vaii, Colorado
Construction Type� $ingle Famify
Glazing Area PerCentage: 15°1a
HeSti�g �egree pays: 9248
�I�'�[��i�l�^1'
D �- -� �
T���n= � �:. v� � �.
Constructran Site: OwnerlAgent: DesignerlContraotor:
1887 8uffei�r Creek Rvad KC BuFfehr Creek, LLC Scott 5. Tumipsee, AIA, Inc.
VaEI, Colorado 81B57 4520 Main Street, Suite iDD PQ 6ox 3388
Kansas City, Missouri Sd111 Eagle, Colorado 81631
(s7QJ328-38aa
Compliance: 15.9% 6etter Than Code Maximurn Ula: iQ63 Your UA: 894
��
Ceiling 1: Flat or 5cissar Truss
Cellfng 2: Cafhedral
Wood Frame, 1Bin. o.o.-Front Efe�atian: Wood Frame, 16in. o.�.
Wood Frame, 2 Pane wl Low-E-Front Ele�advn� Wood Frame, 2
Pane wl Low-E
Glass-Front Ele�ation: Glass
5olid-Front Ele�ation: Solid
Solid Concrete-Front Ele�atlon: Solir} Concrete or Masonry
Wall height: 10.�'
Depth below grade: 10.D'
Insulation depth: 10.0'
Wood Frame, 18in. a.c.-Right EIe�aUon: Wood Frame, 16in. o.�.
Wood Frame, 2 Pffne wl Low-E-Right Ele�ation: Waad Frame, 2
Pane wl Low-E
5olid-Rlght Ele�ation: Sofid
5o3id Conorete-Right Ele�ativn� Solid Cancrete ar Masonry
Wall hefght: ip.0'
�epth tielow grade: 10.0'
InsulaGian depth: 1Q.0'
Wood Frame, 16in. o.c.-Back Ele�atipn� Wood Frame, iBin. o•e.
5alid-8aek Ele�ation: 5alfd
SoHd Cpncrete-Back Ele�adan (LL�I.): 5olid Concrete or Masonry
Wall height: 12.�'
Depth below grade: 12.0'
Insulation dep[h: y2.0'
5alid Concrate-Sack Ele�ation [MLvl.j: Solid ConCrete or Masonry
Wall heighi 12.a'
�epih 691pw grade: 12.Q'
Insulation depth: 12.0'
Waod Frame, 78in, o.c: LaR Elevation: Wppd Frame, 1fiin. o.c.
Wood Frame, 2 Pane w! Low-E-LeFt EIe�aUon: Wood Frame, 2
Pane wl Low-E
5olid Cancrete-Lek Ele�atipn (LL�I.}: SolEd Concrete or Masonry
Wall height 1 Q.6'
Depth below grade: 10.0'
Project 7iGe: Custom Vail Resldenoe-Weltner
pata filename:
1332 43.0 �.0 35
998 49.4 4.0 22
1fi41 23.� 0.0 60
384 0.356 134
13$ 0.350 4$
28 Q.5B0 'f fi
250 19.a D.0 10
1444 23.0
145
165
2QD 18.D
808 23.D
2,
1080 19.d
�asa �s.a
583 23.0
i2
52p 1 S.0
0.0
4.D
O.D
0.0
a.a
ao
0.0
60
0.35a 57
6.560 92
8
43
a.�so � 2
40
ao
0.350
31
4
za
Report date: 051021D8
Page 1 of 6
Insulatipn depth: 10.6'
Solid Concrete-Left Ele�a6ion �ML�I.}: 5alid Concrete or Masanry
Wall helghl: 10A'
dBpth below grade: 'f 0.�'
Insulallon depth� 1p.0'
Floorl � Heafed Siab��n-Grade
Insulation depth: 6.0'
Crawl1: Solid Concrete or Masonry
Wall heEght 7.p'
�epth below grade: 7.D'
InsulBtion depth: 5.�'
inside helaw-grade dep[h: 5.0'
Boiler 1: Qther (Except Gas-Fired 5team}90 AFUE
aao is.D
38
1812 11.0
o.a
6.0
D.Q
ir1
2$
123
Compliaxa S[afemen[: 7he proposed bu4lding design descrit�ed here is consistent with the building plans, specifications, and other
calr,ulations submitted with the permif applEcation. Tha proposed 6uilding has Geen designed [o meet the 2D03 IECC requfrements in
REScheck-Web and to oomply wiffi the mandatory requlrements listed in the EScheck Insp cNan Checklist.
f' �V '� ° �iC'4 e ��1�
lVame - Ti gnatur �ate
Projecf TiUe: Custom Vail Residence-Weliner
Dala Filename:
Report date: �51021Q8
Page 2 vf fi
o�tB: o5�az�os
Generated by REScheck-Weh S�ftware
Inspection Checklist
Ceilings:
❑ Ceiling 1: Flat pr 5cissor Truss, R-48.Q pvity insulation
Camments:
❑ Ceiling 2: Cathedral, R�9.D ca�ity insulation
Cammants:
Aba��-Grade Walls:
❑ Wood Frame, fBin. o.�.-Front Ele�ation: Wood Frame, 16in. o.c., R-23.0 r,a�ity insulation
Camments:
❑ Waad Frame, 16in, o.c.-Rlght Ele�ation: Wood Frame, 1Sin. o.c., R-23.D ca�ity insulation
Comments:
❑ Waod Frame, lfiin, o.c: 8a�k Ele�ation: Wood Frame, 1fiin. o.�., R-23-0 ca�ity insulatipn
Comments:
0 Wood Frame, 'f8in. o.c.-Left E�e�aGon: Wvod Frame, i 6in. p.c., R-23.0 ca�ity insufabon
Camments:
6asement Walls:
❑ 5olid Concrete-Front Ele�ation; 5olid Concrete or Masonry, 1D.0' h! 1 1D.0' bg 1 iD.O' {rasul, R-19.0 qvfty insulation
Cpmmenis:
❑ 5olfd Concrete-Right Ele�ation: SalEd Concrete or Masonry, 1 a.d' ht 1 10.D' t�g 1'1 O.D' insul, R-19.D ca�iry insulation
CAmmBnts:
❑ Solid Concrete-6ar,lc Ele�afion [LL�I.J: 5alid Concrete or Masonry, 12.0' ht 1 12.D' bg 1 i 2.0' insui, R-i 9.0 �a�ity insulation
Commenis:
❑ Solfd Concrete-8ack Ele�ation [ML�I.J: Solid Cancrete or Masonry, i 2.0' ht I 12.6' bg 112.D' insul, R-'f 9.0 cavity insulation
Comments:
0 5olid Concreta-LeR Ele�afion [LL�I.]: Salid Concrete or Masnnry, 10.6' ht f 1Q.p' bg 1 10.6' insul, R-19.� ca�ity fnsulation
Cpmmenis:
❑ Solld Concrete-LeR Ele�ation {ML�I.}: 5olid Concreie or Masonry, 10.0' ht ! 1Q.0' tlg I 10.0' insul, R-19.Q ca�ity insulati0n
Comments:
Windows:
❑ Wood Frame, 2 Pane w! Low-E-Front Elewation: Wood Frame, 2 Pane wl LovwE, U-fa�tor. D.35Q
For windvws wifhout la6eled Ll-factors, descripe features:
qPanes Frame Type 'fhermai 6reak? Yes No
Comments:
❑ Wood Frame, 2 Pane wl Low-E-Right Elewation: Wood Frame, 2 Pane wl Low-E, U-Fa�tor: D.35fl
For windows withvut fabeled U-factors, describe features�
#Panes Frame Type Thermal Break7 Yes IVo
Comments:
❑ Wood Frame, 2 Pane wl Low-�-LeR Ele�atian: Wood Frame, 2 Pane wl Low-E, U-factor: �.356
For windows without la6eled U-factors, descril�e features:
#Panes Frame Type 7hermai Break? Yes No
Comments:
ProjOCt Tnle: Custom VBfI RBSidance-Welfi9r
Oata filename:
Repar► daie: 05102Ip$
Page 3 of 6
Oovrs:
❑ Glass-Front Elevalfon: Glass, U-Factor. 6.350
CpmmenLs:
❑ 5olid-Front �le�atfon; Solid, LI-factor: 0.56Q
Comments�
❑ 5ofid-Rlght Elevalion: 5olid, U-factor: p.56�
Comments:
❑ 5olid-8aelc Ele�atian: Soiid, Ll-fa�tor: a.56Q
Comments:
Ffaors:
❑ Floorl: Heated Slab-On-Grade, fi.0' insulatian dapth, R-8.4 cantinuous insulation
Comments:
Slab insulation extends down from the top of the slab to at least 6.0 ft. dR down to at least the hottom of the slah then horizontaliy for a
zotal distance of 8.Q ft.
�xkenor insulation has a rigid, opaque, weather-resistant protecti�e po�ering [ha1 co�ers ihe exposed �above-grade} insulafion and extends
af least 6 In. pe#ow grade.
Crawl 5pace Walls:
❑ Crawl1: Solid Con[xete or Masanry, 7.Q' ht 17.0' bg 15.D' ext, insul 15.6' inside bg depth, R-1'I.0 ca�ity insulation
Camments:
Applies tp walls of unventilated crawl spaoes.
Heating artd Gvoling Equlpment:
❑ Boiler 1: Qther (Fxcept Gas-Fired 5team}: 90 AFUE or higher
Ma{ce and Model IVumber:
Air Leakage:
� Jofnts, penetrations, and all ather such openings in the building en�+elope th8t ara souroes of air leakage are sealed.
� Re�essed Ilghts are 1} Type IC rated, or 2} installed inside an appropriate air-tight assem6ly with a Q.5" clearan�e from comk�ustible
materiais If non-IC rated, fixtures are inslailed with a 3" dearanoe Trom insulation.
5kylights:
� Minimvm insuladan requfrement for skylfght shaRs equal to or greater ihan 12 inches is R-19.
Vapor Retarder:
� Installed on the warm-in-wintsr side of al! non-�ented framed oefiings, walls, and floors.
Materials Ideniification:
� Materials and equipment are ir�.stalled in acaordance with ihe manufacturers installa6ion instrucNons.
� Materlals and equipment are idenlified so that complfance can he determined.
� Man�rfacturer manuals Tor all insfalled heating and 000ling equipment and service water heating equipment ha�e been provided.
� Insulation R-�alues, glazing U-factors, and hea6ing equipment efficiency are clearly m8rked on ilie 6uilding plans ar specifications.
� Insulaiion is installed according tp manufacturers instruc6ions, in substantfal oontact with [he surtace being insula[ed, and in a manner
tiiat achfe�es the rated R-�aEue without oompressing tha insulafion.
Duct Insulatlon:
� 5upply duets in uncandifioned attics or outside the building are insulated to at least R-11.
� �ietum ducts in unCOnditioned attics or outside [he building are insulated to at least R-6.
� Supply ducts in unCOnditioned spaces are insula[ed to at least R-11.
� Return ducts in uncanditfoned spaces �except basements] ara insulated to R-2. InsulaGian is no! requfred on retum ducis in basements.
� Where extgrior walls are used as plenums, ihe wall is insulated to af laast R-11.
Duct Constructi�n:
� Ouct connectians to flanges of air distributivn system equipment are sealed and mechanically fastened.
� All joints, seams, and connections are securely fastened with welds, gasfcets, mastics {adhesi�es}, mastiGplus-embedded-fabric, or
tapes. 7apes and mastfcs are rated UL 181A or UL 181 B,
Exoep[ions�
Continuously welded and io�kEng-type Iongitudinal jofnts and seams on ducis operating at less than 2 in. w.g. (500 Pa}.
Projeet 7ille� Custom Vail Residenoe-Weliner Repart date: 051Q21Q8
Data filename: Paga 4 of fi
� The FiVAC system pro�fdes a means for balancing afr and w
7emperature Controls:
0 Thetmoslats exist fpr each separate HVAC system. R manual pr automatic means [o partially resir{cf or shut aff tha heating andlor
cooling inpu� tp each zone ar floor is pro�ided.
Servlce Water Heating:
� Water heaters with �erGical pipe risers have a heat lrap on both the inlet and outlet unless the water heater has an in[egral heat trap or
is part of a circulaHng system.
� Circulating hot weter pipes are insu{ated to the le�els in Table 1.
Girculating Hot Water Systems:
� CfrCUlating hot water pipes are insulated ta the levels in Tabte 1.
Swimming Poals:
� All heated swimming poofs ha�e an onloff heater switch and a cover unless o�er 2D°Io of ihe heating energy is from non-depletat�le
sourpes. Pool pumps have a dme clo�k,
Heating and Cooling Piping Insulatlon:
0 HVAC piping conveying Ruids abo�e 105 degrees F or chflle[i Ruids belpw 55 degrees F are insulatad to the levals in Table 2.
Project 7it1e: Custam Vail Residence-Welfner Report date: {15l42�48
Data �ilename: Page 5 of 6
l • ' �
iable 9: Minimum Insufation Thickness for Clrculating Hot Water Pfpes
Insulatlon Thickness In Inches 6y Pipe Slzes
Non-Clrculating Runouts Clrculating Malns and Runauts
Heated Water Up W 1" !Jp to 'f.25" 1.5` io 2-0" th�er 2"
TemperaturB {°F}
17D-180 Q.5 1.a 1.5 2.0
940-189 0.5 0.5 1A 1.5
'i00-439 d.5 0.5 �.5 1.0
Table �: Mlrrirnum Insulatron Thickness far HYAC Plpes
Insulation Thickness tn Inches hy Pipe Slzes
Piping System Types � Ed 7e� p. 2» Runouts 1" and Less 1.25" Yo 2.0" 2.5" ta 4"
nge{ J
Heating s�rstems
Low PressurelTemperature 2Q1-250 1.0
Low 7emperature 1pfi-20Q p.5
Steam Condensate {Tor feed waterJ Any 1.4
Conling Systems
Chflled Water, Refrigerant and 40-55 D.5
8rine 8elpw 40 1.0
NOTES Ta FIELO: {Building Department lJse aniyJ
Project Tiile: Custom Vail Residence-Wel[ner
Data Filename:
1.5
'i .D
i.0
0.5
1.0
1.5 2.6
1.fl 1.5
1.5 2.0
0.75 1.a
1.5 9.5
Report date: a5102108