Loading...
HomeMy WebLinkAboutB10-0105 COCommunity Development Department 75 South Frontage Road r Vail, Colorado USA 81657 TOWN V� VE CERTIFICATE OF OCCUPANCY This certificate is issued pursuant to the requirements of Title 10, Section 10 -1 -2, ADOPTED CODES of the Vail Town Code certifying that, at the time of issuance, this structure was found to be substantially in compliance with the various ordinances of the town regulating building construction or use for the following: Name and description of project Vail Fire Station # 3 Address of project: 2399 North Frontage Road Vail, Colorado Owner name and address: Town of Vail 75 South Frontage road IBC Edition: 2009 IBC Occupancy Group(s): R2 B S2 Type(s) of Construction: VB Permit Number(s): B10 -0105 Occupant Load: n/a Sprinkler System Y/N Type: Y 12/07/2011 X e, Chief Building Date � ' �f�^� � �S t . TbWNOFVAi� ' Final Report of Special inspections Project: Fire Emergency Services Sta#3 Permit Number: B10-0105 Project Location: 2399 North Frontage Rd West Owner/Client: Town of Vail Address: 1309 Elkhorn Drive,Vail Special Inspectors: GROUND Engineering Consultants,Inc Address: PO Box 464; lO3A Airpark Dr#9 City: Gypsum State/Zip: CO 81637 Phone: 970-524-0720 Fax: 970-524-0721 E-Mai)Address: EvanK@GroundEng.com; ScottR@GroundEng.com To the best of my information, knowledge, and belief,the special inspections and or testing completed by:GROUND En�ineerin�Consultants, Inc have been completed in accordance with GROUND's Proposal for Materials Testing and Speciol Inspection Services, #1002-03320,dated 3/04/2010. Interim reports submitted prior to this Final Report of Special Inspections form a basis for,and are to be considered an integral part of this final report.Any discrepancies that were noted on the interim reports have been corrected or accepted by the project team. Prepared by: Name: Scott Richards �`c�":���C� �b�,��F�.V�c�R.;S' Signature: ;�� � �;� 45� � fl� Date: �-2�1- ;�D l . c�. �, . : �'�2 9�//:'��'; .. . . t� ��,�A��,��,, A'�w.��waS,'y✓ , March 16, 2011 Subject: Summary of Materials Testing & � Special Inspection Services, Fire � Emergency Services Station #3, Vail, Colorado Job Number: 10-6534 TOV Permit#610-0105 Town of Vail 1309 Elkhorn Drive Vail, Colorado 81657 Attn: Mr. Todd Oppenheimer, This letter summarizes the materials testing GROUND Engineering Consultants, Inc. (GROUND) performed during the construction of the Fire and Emergency Services Station #3 building, located at 2399 North Frontage Road in Vail, Colorado. The special inspections and materials testing services were performed at times scheduled by the Owner, Contractor and/or Subcontractors between June 6 and December 1, 2010. Representatives of our office were present on a part time basis to periodically observe the placement of backfill for the footings and for the floor slab. Nuclear-moisture density testing was periodically performed on the processed soils. Koechlein Consulting Engineers, Inc (KCE) were onsite to observe the foundation subgrade soils between 7/13/2010 and 7/20/2010 and provided additional recommendations regarding the foundation subgrade during these site visits. GROUND was onsite as requested by the Owner and/or Contractor during this time period to observe the foundation soils. Please see GROUND's observation reports and KCE's onsite recommendations and their original soils report #09-033 dated 8/6/2009 regarding preparation of the foundation subgrade soils. During construction, representatives of our office periodically observed reinforcing steel placement and performed periodic testing on the structural concrete placed for the foundation, foundation walls, slabs on deck and other structural elements. Samples of the structural concrete were periodically tested to determine physical properties and compressive strength. Representatives of our office periodically observed reinforcing steel placement and grouting operations, during masonry construction, when scheduled by the Owner, Contractor or Subcontractor. At the time of our visits, representatives of our office observed the placement of reinforcing steel and the general construction of the masonry �R O U H� ____ _____.______ ENGINEEF� IN6 CONSULTRNTS INC 101A Airpark Dr., Unit 9, PO Box 464, Gypsum, CO 81637 Pl�one (970) 524-0720 Fax (970) 524-0721 www.groundeng.co Office Locations: Englewood • Commerce City • Loveland • Granby • Gypsu� � Fire 8 Emergency Services Station#3 Vail,Colorado . walls. Mortar, grout, and masonry prism specimens were cast periodically during construction and tested for compressive strength. Structural steel welded and bolted connections were observed during construction by a certified welding inspector (CWI). These observations were completed at times scheduled by the Owner, Contractor or Subcontractor. Based on the final test results to date, field observations, RFI's received and other project documentation received from the design team, it is our opinion that the materials tested and/or observed for the structural concrete, reinforcing steel, structural masonry, and structural steel were in general accordance with project plans, specifications, and/or applicable RFI's. The observations and materials testing as indicated above were performed periodically to provide data to the Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of the tested materials and/or work with the contract documents at the times of our observation and testing. We did not supervise, direct or have any control over any of the Contractor's or Subcontractor's work. We were not responsible for the Contractor's or Subcontractor's scheduling of our services, means, methods, procedures, techniques, or sequences of construction, nor responsible for ensuring that any Contractor or Subcontractor performed or completed the work in accordance with the contract documents or construction industry standards. If you have any questions concerning this letter, please contact our office. Sincerely, GROUND Engineering..Consultants, Inc. Evan E. Kuhn .�=-.._._��• � ,..r� pG LC ' .; :' pQ.P..�...L�iy,-. p�•° ��oc; � . C� y-, •. •z" • : '} • . ' • • �Q • • ,°9•. 3�I�S �� °.�,� •�• •V+ \ - f �r'rs�'IDNA�-����� �4 ' Reviewed by James B Kowalsky, P.E. Job No.10-6534 GROUND Engineering Consultants,Inc. Page 2 of 2 + � w - , e. . ,� • S chnabel � FOUNDATION COMPANY September I5,20ll Derek Cohen Drahota Vail Fire and Emergency#3 2399 N Frontage Road, Vail,CO 81657 RE: Geo-grid and block facing inspection for Vail Fire and Emergency#3 To Whom It May Concern: The placing of the geo-grid and block facing for the project referenced above was installed in accordance with ouz design. During construction,the work was periodically inspe�ted by a Schnabel Foundation Company engineer to verify adherence to our design. Please contact me at 303-696-7268 if you need additional information regarding this issue: Sincerely, SCHNABEL FOUNDATION C,�ANY ,�;m�...�,� `7� n ^�� fe� ���� �� ��ti odd Duncan,P.E. � u ;� �{..e ���� � Branch Manager ; ; . , r ,ss tl O� S��i At��"'�. 2950 South Jamaica Court,Suite 107,Aurora,CO 80014 303-696-7268 fax 3Q3-745-0887 Atlanta•Boston•Chicago�Denver•Houston�Phiiadelphia�San Francisco•Washington DC t � TbWNOF VAAIL ' Department of Community Developmerit 75 South Frontage Road [/ail, Colorado 81657 970-479-2138 FAX 970-479-2452 www.vailgov.com March 11, 2011 HAND DELIVERED Drahota Attn: Mike Rice, Superintendent 1901 Pine Grove Road, Ste. 202 Steamboat Springs CO 80487 Re: Criteria for a Temporary Certificate of Occupancy (TCO) for Fire Station 3 Dear Mike, In order to identify all items needed for the TCO, per our meeting on Wednesday, March 9, 2011, please see the following: 1. A Framing ILC for roof and eave elevations is still needed and shall be submitted prior to requesting a TCO. Note: review and acceptance by the Town of Vail required prior to a final inspection approval. 2. A TCO phasing plan shall be submitted by March 16, 2011 showing staging for remaining work after TCO issuance to include dates of completion. 3. A final report of special inspections is required to be submitted and approved prior to requesting final inspections 4. Drahota shall submit a copy of the performance bond contract they have with the Town of Vail in place of the standard DIA contract and funding. 5. Drahota shall call for a planning final inspection on March 21 for the exterior fa�ade. 6. Drahota shall submit a letter to the Chief Building Official that will address what will not be completed for the TCO and when it will be completed. This will be included as an attachment to the TCO. 7. As-built's by the engineer of record for the building sewer, water, and gas to be submitted prior to final inspections. 8. Air balancing reports shall be submitted prior to calling for a final inspection. 9. Address numbers shall be installed `SettirtgA New Staudard For Community Development Department Services" •�� RECYCLED PMER v i � Additional items discussed were: 1. Upon completion of partial final inspections, specifically electrical and fire protection systems, it will be ok to move equipment and furnishings into these areas prior to the TCO. � 2. Energy envelope data shall be posted at the electrical panel. � 3. It has been confirmed that the amended final plat was recorded and in our plat files. � 4. Drainage concerns at the street to be resolved between Drahota and Town of Vail Public Works. 5. Staging of construction for the retaining wall needs to be coordinated with Public Works. 6. Planned date of occupancy is April I 1, 2011 per Chief Miller. Mike, if you have any questions, clarifications, or I have missed something please contact me i r Martin A. Haeberle, C.B.O. Chief Building Official Town of Vail 970-479-2142 970-376-2672 mhaeberle@vailgov.com NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES .� �wxo�v�. . Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 NEW COMM BUILDING PERMIT Permit #: B10-0105 Project #: Job Address: 2399 N FRONTAGE RD W VAIL Status. . : ISSUED Location......: FIRE STATION#3 Applied . . : 05/13/2010 Parcel No....: 210311415019 Issued... : 03/03/2011 Expires. ..: 12/27/2010 OWNER TOWN OF VAIL 05/13/2010 75 S FRONTAGE RD VAIL CO 81657 APPLICANT DRAHOTA COMMERCIAL LLC 05/13/2010 Phone: 970-204-0100 4700 INNOVATION DR, BLDG C FORT COLLINS CO 80525 License: 377-A CONTRACTOR DRAHOTA COMMERCIAL LLC 05/13/2010 Phone: 970-204-0100 4700 INNOVATION DR, BLDG C FORT COLLINS CO 80525 License:377-A CONTRACTOR MIKE RICE, PROJECT MANAGER 02/11/2011 Phone: 970-566-2385,cell Description: NEW COMMERCIAL BUILDING: FIRE STATION#3 Occupancy Type Factor Sq Feet Valuation Totals... $3,597,367.00' Number of Dwelling Units: Occupancy: Town of Vail Adjusted Valuation: $3,597,367.00 Type Construction: Total Sq Ft Added: 0 ......................................>....,...,...........«»»..�.,,..>.,....,,,,, FEE SUMMARY ,,..,,,x.,.,,...................«.«.»..............,......,...,.,.............. Building Permit Fee------> $15,091.45 Will Call---------------------------> $5.00 Total Calculated Fees-------------> $96,873.23 Plan Check--------------------> $9,809.44 Use Tax Fee---------------------> $71,747.34 Additional Fees-----------------------> 96,873.23) Add'I Plan Check Hours-> $220.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES-------------> $0.00 Investigation-----------------> $0.00 Recreation Fee----------------> $0.00 Payments------------------------------> $0.00 Total Calculated Fees------> $96,873.23 BALANCE DUE-----------------------> $0.00 ...........................�.........�.....,..............................,«.............,,.,x......,...............xx........................«.....,..,..,,.....,,x.............,.... DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan, and state that all the informatior as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM �;00 Ar�O P . ,✓ � � ° / ( ignature of Owner or Contractor Date {Y`� �it� rint Name new_co n stru ct ion_perm it_041908 ++�+�+���w���w�ww���+++�xa��w+wew�w��xxx��������r+wwwwww��+x�xxx��t��x�+�+��w�w�we+xwwxx+�x��x���+ww«w�wx�++����xx�x��xwx�+wwwaw�wwwwwww��x�xr�+xxxx������x�xxxxx�+xxxw�xx��xxww++��• APPROVALS Permit#: B10-0105 as of 03-03-2011 Status: ISSUED ....x.....................................��,....,,........,,....,..,..................,,.....,...,....,,»......x,....,,,...,.......................,,,,..........,....,............. Item: 05100 BUILDING DEPARTMENT 06/03/2010 martin Action: CR see laserfische project folder 06/30/2010 MH Action: AP item: 05400 PLANNING DEPARTMENT 05/13/2010 bgibson Action: DN Denied pending PEC and DRB approval of Changes to Approved Plans addressing changes in development standards (setbacks, site coverage %, landscape area %, parking space locations, etc.) due to inaccurate land surveying. 06/30/2010 bgibson Action: AP plans routed to JR Mondragon 07/15/2010 bgibson Action: AP revised landscape plan approved by planning 09/02/2010 bgibson Action: AP response to correction N/A. plans routed to Safe Build. 09/17/2010 bgibson Action: AP 9/3/10 revisions approved and plans routed to Martin Haeberle. 03/03/2011 Warren Action: AP Revisions dated recieved on February 25, 2011 are approved by planning Item: 05600 FIRE DEPARTMENT 06/30/2010 McGee Action: AP Fire sprinkler and fire alarm are deferred submittal. 03/02/2011 McGee Action: AP Revision. Item: 05500 PUBLIC WORKS 06/17/2010 tk Action: APCR Approved with the following conditions: 1. Submit final utility approvals as one package to be stapled to final approved BP set. The most recent set does not have any utility approvals on it. Submit prior to start of foundation excavation. 2. The proposed MSE wall at the SW Corner still says designed by others. A design will need to be submitted prior to construction of wall. 3. Comment 17 of the comment letter dated 5/20/10 regarding trees and utilities has not been addressed, please address prior to excavation of Foundation. 4. The shoring plans were to be made a part of the final approved BP, please submit approved shoring plans to be incorporated into BP set. 5. Prior to any Frontage rd access work being done the NTP needs be approved by CDOT. Item: 05101 BUILDING DEPT REVISION 09/22/2010 mhaeberle Action: AP REVISION FIVE TO PLANS DATED 8/27 03/02/2011 Martin Action: AP Revisions to Sheets A-2.0, A2.1, A2.7, A4.6, A4.8, A-6.7 Dated 2/24/2011 .<...<.x..xx<..................�..................��,....,.�......�...............................,.,.,...............,.,..........,.....,>�.,,.,,,,,..�...,....,.....,,..,,.»»...... See the Conditions section of this Document for any that may apply. new_co nstruct io n_perm it_041908 new_con stru ct ion_perm it_041908 ..................>,,.,..,..>......,.,.........,..........,.,.............,..,.........,,..«.,,................,<,...............,.,,,............»..,..,,.,.,.,..,....,.,.......... CONDITIONS OF APPROVAL Permit#: B10-0105 as of 03-03-2011 Status: ISSUED rtrtrtiRf+e'k'kwY'#wY`f f f##*wwx+4wwhNf N�k��l4+lwR+tY(hrt�k##tffrilwfR�k'khYrwrtf+�k44f*f*f whtYrtrY'rtfiVRf f kk4fikf R1rwwRYf w�A'f iF�k�/*ff f f'kYrit it+FMert�,lfi(4�.F4rt*1t*t�rtttRrtiFrt#rtArt4*+Fliwp+t+t tritRhhY`f Ntrk4+4444#!1(41r*A'+tYr YrfiY`#trrtw w w++4 Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 5 (PLAN): PRIOR TO THE TOWN BUILDING DEPARTMENT CONDUCTING A FRAMING INSPECTION, AN IMPROVEMENT LOCATION CERTIFICATE (ILC) SHALL BE SUBMITTED TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT A MINIMUM OF FORTY-EIGHT HOURS IN ADVANCE OF THE REQUESTED INSPECTION. ROOF RIDGES AND BUILDING FOOTPRINT SHALL BE INDICATED ON THE ILC. n ew_co n st ru ct i o n_pe rm it_041908 NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES l� TOWN OF VAIL ' Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 NEW COMM BUILDING PERMIT Permit #: B10-0105 Project #: Job Address: 2399 N FRONTAGE RD W VAIL Status. . : ISSUED Location......: FIRE STATION#3 Applied . . : 05/13/2010 Parcel No....: 210311415019 Issued. .. : 03/03I2011 Expires. ..: 12/27/2010 OWNER TOWN OF VAIL 05/13/2010 75 S FRONTAGE RD VAIL CO 81657 APPLICANT DRAHOTA COMMERCIAL LLC 05/13/2010 Phone: 970-204-0100 4700 INNOVATION DR, BLDG C FORT COLLINS CO 80525 License: 377-A CONTRACTOR DRAHOTA COMMERCIAL LLC 05/13/2010 Phone: 970-204-0100 4700 INNOVATION DR, BLDG C FORT COLLINS CO 80525 License: 377-A CONTRACTOR MIKE RICE, PROJECT MANAGER 02/11/2011 Phone: 970-566-2385, cell Description: NEW COMMERCIAL BUILDING: FIRE STATION#3 Occupancy Type Factor Sq Feet Valuation Totals... $3,597,367.00" Number of Dwelling Units: Occupancy: Town of Vail Adjusted Valuation: $3,597,367.00 Type Construction: Total Sq Ft Added: 0 ,.<...............................,,.....,.............,,..,,,.,..,.,,.......,,... FEE SUMMARY ...........,,......,...,..,.,.,.,...<...........,..,..,,,.....,.........,......+ Building Permit Fee------> $15,091.45 Will Call---------------------------> $5.00 Total Calculated Fees-------------> $96,873.23 Plan Check--------------------> $9,809.44 Use Tax Fee---------------------> $71,747.34 Additional Fees-----------------------> 96,873.23) Add'I Plan Check Hours-> $220.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES-------------> $0.00 Investigation-----------------> $0.00 Recreation Fee----------------> $0.00 Payments------------------------------> $0.00 Total Calculated Fees------> $96,873.23 BALANCE DUE-----------------------> $0.00 .,.>...........................>....,....................,......,,,,,,.............,.....,...,...,............««.......,......,....,..........<.,.,,...,..<...,....,.................. DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the informatior as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4:00 PM. Signature of Owner or Contractor Date Print Name n ew_co n st ru ct i o n_pe rm it_041908 ........................».,..,x..,..,,...,,,,,.,,,,..,...,,,,,,....,...................,..x.x,.,...,....,..,,..,>......,.,.......,,..x.,..,....,..,........,...,.....,.............. APPROVALS Permit#: B10-0105 as of 03-03-2011 Status: ISSUED .......................................................�.........,,..,..x,,...,.,,............,.....,.�,,,...,.....,.....,........,..,.,,,...».................,...,................. Item: 05100 BUILDING DEPARTMENT 06/03/2010 martin Action: CR see laserfische project folder 06/30/2010 MH Action: AP Item: 05400 PLANNING DEPARTMENT 05/13/2010 bgibson Action: DN Denied pending PEC and DRB approval of Changes to Approved Plans addressing changes in development standards (setbacks, site coverage °/o, landscape area %, parking space locations, etc.) due to inaccurate land surveying. 06/30/2010 bgibson Action: AP plans routed to JR Mondragon 07/15/2010 bgibson Action: AP revised landscape plan approved by planning 09/02/2010 bgibson Action: AP response to correction N/A. plans routed to Safe Build. 09/17/2010 bgibson Action: AP 9/3/10 revisions approved and plans routed to Martin Haeberle. 03/03/2011 Warren Action: AP Revisions dated recieved on February 25, 2011 are approved by planning Item: 05600 FIRE DEPARTMENT 06/30/2010 McGee Action: AP Fire sprinkler and fire alarm are deferred submittal. 03/02/2011 McGee Action: AP Revision. Item: 05500 PUBLIC WORKS 06/17/2010 tk Action: APCR Approved with the following conditions: 1. Submit final utility approvals as one package to be stapled to final approved BP set. The most recent set does not have any utility approvals on it. Submit prior to start of foundation excavation. 2. The proposed MSE wall at the SW Corner still says designed by others. A design will need to be submitted prior to construction of wall. 3. Comment 17 of the comment letter dated 5/20/10 regarding trees and utilities has not been addressed, please address prior to excavation of Foundation. 4. The shoring plans were to be made a part of the final approved BP, please submit approved shoring plans to be incorporated into BP set. 5. Prior to any Frontage rd access work being done the NTP needs be approved by CDOT. Item: 05101 BUILDING DEPT REVISION 09/22/2010 mhaeberle Action: AP REVISION FIVE TO PLANS DATED 8/27 03/02/2011 Martin Action: AP Revisions to Sheets A-2.0, A2.1, A2.7, A4.6, A4.8, A-6.7 Dated 2/24/2011 .�................................>............,.......,,.,..�......,................,.,...........,.................,......,..........................�...,..,�....>.......,.,...... See the Conditions section of this Document for any that may apply. new_co nstructio n_pe rm it_041908 n ew_co n st r u ct i o n_pe rm i t_041908 ........................................>...,,,.,...,,..,,.....,,.....�.,..,...�,.....,..,.,........,,......,...,...�.......,.......,.,........,...,........,,,..........,........... CONDITIONS OF APPROVAL Permit#: 610-0105 as of 03-03-2011 Status: ISSUED .�...,.x....,.,..�.........................,,,.,.,.,,......,....,....,.,..,.,..�..................�......�....�........�.,..,....,x...,.....»..x.,,.,.,,....,,,.......,.............. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 5 (PLAN): PRIOR TO THE TOWN BUILDING DEPARTMENT CONDUCTING A FRAMING INSPECTION, AN IMPROVEMENT LOCATION CERTIFICATE (ILC) SHALL BE SUBMITTED TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT A MINIMUM OF FORTY-EIGHT HOURS IN ADVANCE OF THE REQUESTED INSPECTION. ROOF RIDGES AND BUILDING FOOTPRINT SHALL BE INDICATED ON THE ILC. n ew_co nstru ction_perm it_041908 - � � � � �� � � ? �t :( ,? -:� �:'. �" �. `k, l '.. ....-.:. . .. ,' ..:. .::. :� ;.. �'. _ . . . .� .:^ .• '� . :'-... ... .. . .. . ..., ' �,�.. ', ... ..:.. '.',.: - ... . . ... "r'.: �n... .. '.�:r. .��: ... �.�� . . „ :�.... �..-."v ..� . . �.. .. . _ ' .n '.:.'-' : ' .�. . ., . ,�..,.. �..,.. - _ ^' ! P =:: ° = i :� � a `, � ` Department of;Cornmunity Development . v,r x ..,. . . '�? - 3" ` � -ht y �4 � . �..y, �.,� s ` .: ; �, � �t .�,� � 75 South Frontage EZoad �, �� �' ;� K ,, _ _ Vatl, �olora Q 8k$:��,�'� ���`-_ � ,� ' �,,... '� � a - �-� � � `�-� .� � -� � �,� � � � "�-- r �� `�FF'ei '_g�0�-��`�-�'� �'�' 4'� '�'�` '� f ,�r s�. `� ° ,� " �a3c'-��7,�-�'#���.�2'��� � v,} .Y` - d - «s= ' � � `' �... �7 '� /f" .5• J•' �+rT? '�d` .i'` � .�_� � ��;= ,,:��,: � �'IVeb:�,�.�ra�t�o�c� :>> �- �� f��.�..�E�t:. i r�;�a . ` ., .��f�'�r a�. .,,�"�,,,�..�E� /'s�', t. � � ` §� 4 �- - -- Devalo menfi:E��te��v�ti-tr?�i'o�'=� �?������� ;�� � . ,,,�.�� :=�-.� ., - ' y � �,� st�`'^-*•-3"r�,'-_ ..�,« .. ��M�3' "'F �5�''iF'}"114l�1it� F� �-'a3,.a� ~� '� 1��, r '!�,�� -s.`f-:" p`�,-�-':,"'�'y�,'.'�.+�.`?; �� +..��.__._.�c..�'��.�'� -- rf.' r -ct '> f.._���Fr." ��'a���'' TRANSMlTTAL FORM Revision Submittals: 1. "Field SeY' of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55_00 per hour(2 hour minimum),and are due upon issuance. �Permit#(s)information applies to: Attention: ( Revisions ; � ��� ' D 1 O� ��� � ( ) Response to Correction Letter ; � 1_ L A/u N�N G� attached copy of correction tetter � i i ( ) Deferred Submittal , � �1(�� ( }Ofher � � 4 S �Project Street Address: � � I � i Description!List of Changes: ; �(Number) (Street) (Suite#) � �f���-j� �.�, l�_A'��I�_ ; /� t-� � f 3 i BuildinglComplex Name: �_1� �-�. 1 . �'�I .�l' . " �,�, ,�- ,�•- � � i � �..��_.___m___� ' �Contact I rmation: � , � �Company: � s ; !Company Address:�. c7 • �C�C.?� E ; � ; # ;City: -1 State: Zip: F � E % ;Contact Name: ' I � � �Contact Phone: �O • 2'�2. ' (2�� I ? � � i � � E-Mail �����.:���� ,���/` . ; ; � _ . i � � 1 � � .....� .v..�... _ __ ""_ � I j � �Revised ADDITIONAL Valuations (Labor 8�Materials) � � i �(DO NOT include original vatuation) 3 ; � i � � � j i !Building: � ;(use additional sheet if necessary) i � • _._ _.._.-.-----.._..----__._...___.._______._..� ` � � � U �V/ � !Plumbing: $ � �Date Received: D �Electrical: $ � i ' j Mechanical: $ � FEB 2 4 t��' ; � iTotal: � � TOV�IiV OF V�IL i J � � � c� o � � � � _ ° ��� 2 5 2011 ._ .� � � � � . E TOI�liV O� VAI L � � 2/24/11 � o m C,� Architecture JDMondragon Building Dept P�ann ;ng TownofVail 75 South Frontage Road Interio .s Vai1, C0 81657 Re: Permit Application#B 10-0105 Vail Fire Station#3 2399 North Frontage Road Dear Mr Mondragon, Attached are revised, stamped drawings for your review. These sheets document additional changes made to the scope-of-work since issuance of the approved Permit Set and our last update of August 27, 2010. 1. Sheet A2.0, Flag Note#7: Door 118 to Mechanical was relocated into the Exercise Room 119 The door leading from the Copy Room 106 to Office 103 was removed 2. Sheet A2.1, Flag Note#7: Final coordination of refrigerator sizes required relocation of the north wall of Kitchen 259 12" to the north. 3. Sheet A-2.7, Flag Notes #6 and#7: At east entry canopy, roof drainage conducted to a downspout on the south column and connected the to the underground storm drainage system. Provide notch in bent plate edge for overflow. Provide a conductor head and downspout from the gutter above the main entry canopy to the main entry canopy roof. Revise drainage of roof above east stair to be directed to the gutter system ""��`�"���"`�`�" " -� north of the stair. ;�,�.�,-,;.��,-., - At the north entry canopy, roof drainage conducted to a downspout on the east column and discharged at grade. Provide notch in bent plate edge for overflow. At the gable roof on the east side of the building, revise roof pitch from 5.5/12 to 5/12. This revision has been reviewed and approved by DRB and PEC. 4. Sheet A-4.6, Flag Note#7: Access ladder provided at the elevator pit. 5. Sheet A4.8, Flag Note#7: At Training Tower, provide additional guard rail infill at the landings to provide protection between the landings and the adjacent windows. 6. Sheet A-6.7, Flag Note#7 A 4x continuous nailer was added to the edge condition of both the east entry and north entry canopies to allow for flashing anchorage, stiffer edge condition and better roof inembrane edge attachment. Please let me know if you have any concerns as a result of your review of these issues. ectfully, Don Watkins Belford Watkins Group Architects Cc Fire Chief Mark Miller Adam Williams Derek Cohen ,___._�.__e..A_w ___ .� � � � � vi� -�� ��� � � �a�, TOI�I�! OF VAI L F i � i : NO�E: T'HIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES j � : '� � ��ro�vnII, • , �� � ; � t Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 f p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 � �. NEW COMM BUILDING PERMIT Permit #: B10-0105 � ' Project #: �(tT(,j� .-���(� � s Job Address: 2399 N FRONTAGE RD W VAIL Status. . : ISSUED j Location......: FIRE STATION#3 Applied . . : 05/13/2010 � Parcel No....: 210311415019 Issued... : O6/30/2010 � � Expires. ..: 12/27/2010 t OWNER TOWN OF VAIL 05/13/2010 � � i 75 S FRONTAGE RD VAIL CO 81657 APPLICANT DRAHOTA COMMERCIAL LLC 05/13/2010 Phone:970-204-0100 � 4700 INNOVATION DR, BLDG C FORT COLLINS � CO 80525 ' License:377-A z a CONTRACTOR DRAHOTA COMMERCIAL LLC 05/13/2010 Phone: 970-204-0100 � 4700 INNOVATION DR, BLDG C � ; FORT COLLINS CO 80525 License:377-A ! $ Description: � NEW COMMERCIAL BUILDING FIRE STATION#3 � � Occupancy Type Factor Sq Feet Valuation � ; Totals... $3,597,367.00* � Number of Dwelling Units: � � � Occupancy: Town of Vail Adjusted Valuation: $3,597,367.00 Type Construction: Total Sq Ft Added: 0 � � rtiY#t4fii4f41rlrVffL4NM'rtY'Y(f`4flddfr4RlMwRtfikYeYeYef(1(4ft1rRRl�ff�t1M�Y1YriFiFY#4tpJ�k4►R44fftrl' FEE SUMMARY •••••••,•,,••••••••_,,••••••,••••••••••••,•••••,.•••••••,,•••••••_•••,••,•••••,, � �� Building Permit Fee----> $15,091.45 Will Call------------------------> $4.00 Total Calculated Fees---------> $96,652.23 ' Plan Check----------------> $9,809.44 Use Tax Fee------------------> $71,747.34 Additional Fees------------------> 96,652.23) ; Add'I Plan Check Hours-> $0.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES---------> 50.00 'i Investigation------------> $0.00 Recreation Fee-------------> $0.00 Payments------------------------> 50.00 Total Calculated Fees------> $96,652.23 BALANCE DUE-------------------> E0.00 •:»�xxi�.wxxxrxwr,.»�i�tkk:�w�,rxw.xs.wwwwrr,.xt3���x�x:�wxxHwwwxr,.wrv.t����w��:+wxwxxxxxxwwxxrw,r��rr.+�:a+www��,rxwx��,r,e��w������:wxxxwwx�rr�������r��:��+�x+xxxiiexweww:���ttrr,��x+�»xxx � DECLARATIONS � I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information � as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town � applicable thereta � REQUESTS FOR INSPECTION SHALI BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM � 8:00 AM-4:00 PM. � � �� � Signature of Owner or Contractor ate � aa Q ��vG� � Print Name � � �: new_construction_permit 041908 � f t ¢ ff4LR4ri4M+lffrflritYH4l�flrf'4�#O#RfYrfr#ff'RfilrnM4444iRtiH(1e4RRfY'#ii#4fR+4'kf4fONRfrtrt%�4fff'f�1'rtRkf`ffrVfiFRf.f}/#!YY`fifiRlrlrfRY��klefflRV�kFY(4+twfL4iF�IRfrRfffY'MYf(44*YriFiRYttfiltr##'4H#f1w4�rtfi4*4}1fiFiF/pfififrfifVY � • APPROVALS I Permit#: 610-0105 as of 06-30-2010 Status: ISSUED rexr,r�rw�wnxx�wrw��xrww+�xx�n.txw�,ri.���::tr�xwwi.,rxxee���s.:wrx�t��►�+xxw�xw�wxrw,e,e�w�r:��xxwwkx��►wwnr+�rwaxwrw+r�s.wwxww�wrrwvrwwrx+�xwxxw��t�:►:w,.,er.:rrrw:�w�++xwR:xxiwrr�k+i.,'s.x�i,eut�e [ # � Item: 05100 BUILDING DEPARTMENT ; 06/03/2010 martin Action: CR see laserfische = z project folder 06f30/2010 MH Action: AP � Item: 05400 PLANNING DEPARTMENT 05/13/2010 bgibson Action: DN Denied pending PEC � and DRB approval of Changes to Approved Plans addressing t changes in development standards (setbacks, site coverage � %, landscape area %, parking space locations, etc.) due � to inaccurate land surveying. � 06/30/2010 bgibson Action: AP plans routed to JR � Mondragon � Item: 05600 FIRE DEPARTMENT � 06/30/2010 McGee Action: AP Fire sprinkler and fire alarm are deferred submittal. � Item: 05500 PUBLIC WORKS � 06/17/2010 tk Action: APCR Approved with the � following conditions: � � 1. Submit final utility approvals as one package to be � stapled to final approved BP set. The most recent set � does not have any utility approvals on it. Submit prior � to start of foundation excavation. � 2. The proposed MSE wall at the SW Corner still says � designed by others. A design will need to be submitted � prior to construction of wall. � 3:Comment 17 of the comment letter dated 5/20/10 F regarding trees and utilities has not been addressed, � 's please address prior to excavation of Foundation. �: 4. The shoring plans were to be made a part of the final � approved BP, please submit approved shoring plans to be � incorporated into BP set. � 5. Prior to any Frontage rd access work being done the � NTP needs be approved by CDOT. t�fifflfYfYYf�t4RfAf�kf44yf}w�tf'fff'4Y1e\fRRRYY►htf/4ffffr'4�k�kf+t�t`RffYrfr4YefttM}fMfYrk4Yf#�4dA##f4tft4iYR1r##f��k�kf#y#*f#frtYtiFt#Yrt�#Rf'rt�kYrt4Yf�kIrlrlYYiF441rie*iYf4lrf'f'fYiF%MffRtflr4RfY'�k#i4RlRRf}rfriF4f4�t� � � See the Conditions section of this Document for any that may apply. �° � � �: � € � � � ¥ �: � � � � � s �: 4 � € � �' new_construction_permit_041908 � � : � �: � � i � � xxrwrna�w�,ti.t�yr��xxa+aw,r,���:�w,rw�+„wkxxww,r�+w�rxxww�i,r,r:xuxxww����wxexxe+wx��x�wxxwwwww���w�.wrwrv+,r�ww�:ww�it+�xxwwwrxx,r>wRxx,rwxx��rxxie�xx��xxww,rexr,r�:�xw-e��rrk���+x��,r�r��,rwx+n�w� � CONDITIONS OF APPROVAL Permit#: B10-0105 as of 06-30-2010 Status: ISSUED rtw:wrrert�+�.tr�e�ws,�++wx�,e�r����i�wrr:xx��xii�t�,r��,�twxww�++�:xxxiiwi,r�,�xxxi,rw�,e�rx::�xx,re��twx�►:x,rrxtr�xx�++v.���x�x��rrrwt3:++xwxwwwr�:x,ewwwwxw�wrxH,r��+���xzir,eww�a��r+xr,r�:i���:s.x � j �� Cond: 1 � (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY � ' WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE ' COMPLIANCE. Cond: 14 � (BLDG.):ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO � ; BE SEALED WITH AN APPROVED FIRE MATERIAL. � Cond: 5 � � (PLAN): PRIOR TO THE TOWN BUILDING DEPARTMENT CONDUCTING A � FRAMING INSPECTION, AN IMPROVEMENT LOCATION CERTIFICATE � � (ILC) SHALL BE SUBMITTED TO THE DEPARTMENT OF COMMUNITY � � DEVELOPMENT A MINIMUM OF FORTY-EIGHT HOURS IN ADVANCE OF � � THE REQUESTED INSPECTION. ROOF RIDGES AND BUILDING a FOOTPRINT SHALL BE INDICATED ON THE ILC. � � � Y � F' , � � Gy� i � � k � �: K 4 i§'� d. � �: �' �: �. t � �' � � � t �. �: gfi„ # � �" }: � $- � � � t � � [. E. £ � �_ 6 !" � new_construction_permit_041908 , � t 'j � d � ` * �,.��,, Development Review Coordinator � �� ��` �'`' . 75 South Frontage � K ; ` � �. � ;_�;� � , �_� • �[ai� �� ; - � �„F� -� 4 �i�. �.��. __�� ���='� �����,�r��r ,� . �� � ' Transmittal Form Revision Submittals: 1. "Field SeY'of approved plans MUST accompany revisions 2. No further inspections will be performed until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum),and are due upon issuance. � � ( ) Revisions Pertnit#(s)i�formation applies to: Attention: (�) Response to Correction Letter � �attached copy of correction letter � Vail Fire Station#3 Martin Haeberle ( ) Deferred Submittal ( ) Other �� 610-0105 � � Project Address: Description/List of Changes: 2399 N. Frontage Road See attached Letter _ �'��2 k; Contact Infortnation � �Et�=�c.l�a.. � � company: Drahota Construction � Company Ph:970-871-7823 Fax: �� Contact Name:SCOtt Wamer � � Contact Ph: Cell:970-846-5857 �: � E-nna�i: scott.wamer(a�drahota.com � � Town of Vail Contractor Registration No: 377-A � X___lG�i����1`?�'V(��e%/'� �. Signature(required) �� x Revised ADDITIONAL Valuations(Labor&Materials) � (DO NOT include original valuation) � 9: £ s Building$ � I: Plumbing$ (Use additional sheet if necessary) �; � Electrical$ Mechanical$ �� � Fire Sprinkler/Alarm$ Date Received: * i � � Total$ O.00 � � !G � ' 1'!� (� i� f i D� �- � . ,�t � � s� ��N� ����-�� �� v���-� ;� , , � ���� � � zo�� �� ` � �CAlV1�I�D Tt������� ���� �� P €( f E k � � � - � �' Z � � tC` � � � � � � a � � �,� ��;; F � , i ' y� � '4 � ..� �1 -M, ,� _ � : '•'� .� �,a+• +�7. �•) •,�. , f r' Y► � :k` '� � � .'.�M i � � '�... � ' 3 . I�� �+ .•j �.�s� �: �S I ?. " �, 7�j��T I �: „� - -� .���._ � �` . �� � � BUILDING PERMIT APPLICATION � Separate permits are required for electricai, plumbin , mechanical,fireplace,etc. - � � s Project Street Address: Office Use: + /� � 2399 N. Frontage Road West Project#: ���1 �Q — � �"1� �, (Number) (Street) (Suite#) DRB#: �J��IO dG 3� Building/Complex Name: West Vail Fire Station#3 guilding Permit#:��"'� (G� � PArCc,t ,4, (�.e subd�'�'seK -rtaG+ D, Contractor Informatio�: �S � � Company: Drahota Commercial , LLC v� l � ��� � � Company Address: 4700 Innovation Drive, Building C Detailed Scope and Location of Worfc: � City: Fort Collins State: CO Z;p:80525 New Construction of West Vail Fire Station � Contact Name: Scott Warner � Contact Phone: 9�0-871-7823 ` (use additional sheet if necessary) � E-Mail scott.wamer@drahota.com � 377-A Work Class: � Town of Vail Contractor Registration No.: � New(�/) Addition( ) Remodel( ) Repair( ) Other( ) X Work Type Contra tor Signature(required) Interior O Exterior O Both(�/) � Property Information Type of Building: � 210311415019 � Parcel#: Single-Family( ) Duplex( ) Multi-Family( ) (For parcel#,contact Eagle County Assessors Office at 970-328-8640 or visit www.eaglecounty.us/patie) Commercial(✓) Other( ) � Tenant Name: Town of Vail Does a Fire Alarm Exist? Yes(�) No O � Monitored Alarm? Yes No � Owner Name: Town of Vail �� � � � Dces a Sprinkler System Exist? Yes(�} No O � � #&Type of Existing Fireplaces: Gas Appliances � Valuations(Labor&Materials) � Gas Log Wood/Pellet Wood Buming �: Building: $2788088 � #&Type of Proposed Fireplaces: Gas Appliances Plumbing: $246598 Gas Log Wood/Pellet Wood Burning � ,..�... Electrical: g 355308 � � � � � �� � Date Received: D � Mechanical:(including fireplace) $207373 � Total: g 3597367 MAY 12 1010 � ; � :�CANNED Tc�wn� �� V�►��. 4 � � , .....�.� o�-Jar�-�o �. � r DS . �` ai�i2al i � � � Department of Community Development \ Town of Vail Attn: Chief Building Inspector 75 South Frontage Road Vail,CO 81657 • RE: TCO Completion Activities,West Vail Fire Station# 3 The following items have yet to be completed at time of issuance of a Temporary Certificate of Occupancy. Please fi�d the detailed list below with their expected completion dates: . 1. Frontage Road milling and patch June 3,20l 1 2. Landscaping and Irrigarion July 29,2011 � 3.Final site grading July 1,2011 4. Retaining wall MSE block and backfill July 1,201�1 5. Curb& gutter repair,patios,final striping July 29,2011 6. Exterior painting ��r����-or e,�u;p►n�, �l�s; ��f�G��� June 3,2011 7. Snowmelt system and VFD pumps July 1,2011 8. Exterior building signage May 6,2011 9.Generator exhaust May 6,2011 10. Sheet metal backing @ architectural louvers May 6,2011 11. Site signage April 15,2011 12. Mechanical labeling insulation May 1, 2011 13. Install roof walk pads April 15,2011 14. Threshold at Exercise Room April 15,2011 15.Remove temporary water hose bib , April 15,2011 16. Brass tags for condensing units, sea.l penetrations April 15,2011 17. Install proper pipe support for refrigerant lines April 15, 2011 We request that the Temporary Certi�cate of Occupancy be valid until September 1, 2011. Please contact us with any questions. Sincerely, ' 1 J`� Derek Cohen,Proj ect Manager Drahota Commercial, LLC �� � �� � z �s � (� 04-08-2011 Inspection Request Re orting Page 16 10�28 am Vail, C� - Citv O� Requested Inspect Date: Friday April 08, 2011 Assigned To: JMONDRAGON Inspection Type: BLDG Inspection Area: MH Site Address: 2399 N FRONTAGE RD W VAIL FIRE STATION#3 A/P/D Information Activity: 610-0105 Type: COMBLD Sub Type: NCOM Status: ISSUED Const Type: Occupancy: Use: Insp Area: MH Owner: TOWN OF VAIL Contractor: DRAHOTA COMMERCIAL LLC Phone: 970-204-0100 Contractor: MIKE RICE, PROJECT MANAGER Phone: 970-566-2385, cell ' Description: NEW COMMERCIAL BUILDING: FIRE STATION#3 Requested Inspection(s) Item: 530 BLDG-Temp� C/O Requested Time: 11:00 AM Requestor: DRAHOTA COMMERCIAL LLC Phone: 970-204-0100 Assigned To: JMOND ON Entered By: JMONDRAGON K Action: Time Exp: . 1�' �` � � f �� b � `� S Inspection History Item: 501 PW-Access/Stagin�/Erosiori Item: 10 BLDG-FOOTING * Approved*" 08/04/10 Inspector: mdenney Action: NR NOT READY FOR INSPECTION Comment: rebar placement has just been started, not ready for insp ection at this time. 08/05/10 Inspector: mdenney Action: CR CORRECTION REQUIRED Comment: footing jumps shall have continuous bar per plan. 2 areas within mentioned grid lines. G.8 north to corner and line 12 to line 9 along K, K9 to J9. Provide soils report, and report addressing clean gravel fill. 08/06/10 Inspector: mdenney Action: PI PARTIAL INSPECTION Comment: 13 to J9 4 pilasters @ east side line 14 btwn G& H. Footin jumps are corrected from 8/4/2010. 08/10/10 Inspec�or: mdenney Action: PI PARTIAL INSPECTION Comment: footing at grid lines H and 12(stair tower) clockwise to E and 10-ap roved. 08/11/10 Inspector: mdenney Action: PI PARTIAL INSPECTI�N Comment: grid B &6 clockwise to G.5&2. 08/12/10 fnspector: mdenneY Action: PA PARTIAL APPROVAL Comment: E at 10 clockwise to C to 8 elevator pad interior pads along 4 line 08/19/10 Inspector: mdenney Action: PI PARTIAL INSPECTION Comment: interior 6 line from I to B, pad footing a� E and 8.5 08/20/10 Inspector: . Martin Action: PI PARTIAL INSPECTION Comment: Footing Gridline 3/D to I 09/16/10 Inspector: mdenney . Action: PA PARTIAL APPROVAL Comment: trash enclosure; retaining wall @ sw corner. Item: 504 PW-Retainin Wall Layout Item: 502 PW-Rough �riveway Grade Item: 20 BLDG-Foundation/Steel "`Approved"` 08/10/10 Inspector: mdenney Action: PI PARTIAL INSPECTION Comment: grid lines J.1 and 9 clockwise to stair tower at H and 12. 08/19/10 fnspector: mdenney Action: PI PARTIA� INSPECTION Comment: I and 3 clockwise to f and 6, B and 6 to B and 3, short walls at stair shaft. REPT131 Run Id: 12944 I March 16, 2011 Subje�t: Sumrnary of Ma4erials Testing & Special Inspection Services, Fire & Emergency Services Station #3, Va?i, Calorado Job IVumber: 10-6534 T�V Permit#B10-0105 Tawn of Vaii 1309 Efknorn Drive �Jail, Co(arado $1657 Attra� Mr. Todd Oppenhein7er This ':.etter sumrnarizes the r�a;erials testing GROUND Engineering Consu�tants, Inc. {GRt}UNDj perfarm�d during the constr:.�ction of the Fire and �mergency Se�v�c�s Station #3 bui(ding, located at 2399 No��fh FranCage Road in Vail, Coiorado. The spec:a( inspections an� materials iesting services were pe�formed at times scheduled by the O..�ref, Cort�a:.t�� a��dl�r Subcor7ti°�ctors Qetween June E� and Decerrsber ', 2�J1 G. Representatives af our office were present on a part time �asis fo periodically observe tn� placement of c�ackfifi for the �ootings ana far the rloor slab. Nuclear-moist�re dens;ty testi�g was periodieafly perforrned an the processed soils. Kaechlein Cansufting Engineers, (nc (KC�) w�re on�ite �o observe the �oundaiion subc�rade sails between 7/'i 3I201 p ar�d 7/20/2a1� and prnvided additicna! recommendafians regarding the f�undation subgrade during tt�ese site visits. GROUfvD was c�nsite as requeste� by the Owner andtor Cont�actor dur�ng this time perf�cf ta observe the foundation soiis. Please see GROUND's oose�vation reports and KCE s onsite recommendations anci their ariginal soils report #09-�33 �a`e� 8/612�09 regard+ng preparation af the fa�ar�datian subgrade soils. During construction. representatives of our office periadically observed reinforcing steel placemen; and performed per�adic testing on the structural concrete p�aced fiar the founda#iort. foundat�on walls, s(abs an dec� and ather structura: elements. Samples of the structural concrete dvere periodica':.'y tested ;o determire physical properies and campressive strength Representa:ives of o�r affiee periodically observed reinfareing steel placement ar.d groufing operations, durir:g masonry cor�struction, when scneduled by the Oavrer, Contractar or S�Ebcontractor. At the time af our visi±s, rep�esertat�ves of aur office observed the placement of re�nfarc�ng stee( and the general constructior� of the ;nasonry __�_.___�ROU�1['Z! _ _ __.�___________. __�__ _ _ ___ ___. ENGIfVE � RING C I� N '.aUL�T � NT� INC 101A Airpark Dr., Unit 9, PO 8ox 464, Gy�ssurre, CO 81637 Phoi7e (97Q) 524_Q720 Fax (970} 524-0721 WWW.gfOUtldCtlt�.COi/1 Qffice Locatians: Englewaad • Cornmerce City • Loveland • Granb . Y Gypsum Fire 8 Emergency Services Station#3 Vail,Colorado waRs. Mo�tar, graut, and masonry pr:sm specimens we�e cast periodically during construetion and tested for compressive strength Structural steef welaed and aolted connections were observed dur n� constructian by a cErtif=ed welding inspector (CW{j. These observations we�e cor~ipieted a: t�mes scheduled by the Owner, Contractor ar Subcontractor. Based on t�e final test results to date, field observatians RFI's recei�re� and other �ro�ect d�cumen:ation received from the design team. it is our cpin=on tha, the mat�rials ;�sted anc�for abserved far tne structura! concrete. reinforcing steei, structural masonry. and structurai steel were in g�neral accordance with praject pians, specifications andicr app�icable RF1's. The observations and ma�erials testing as inciicated abnv� were performecf periodicali;� to pravide data `a the Owner, Contractor and Su�ca�trac�ars tn assist them in evaxuatEng th� generai campiiance o�the tested materiais and/or wo�k with the contract dactaments at the times of aur observation and test�ng. We cic not supervise, direct or have any control over any of the Contractor s or Subcontractor"s work. We were no* responsible for t€�e Contractor's or Subcontractor's schedul�ng of our services, rneans. I'T1�th0(�S. �fOCi�dUfE?5. t�C(1�1(�l��S; (�I' gPC�i.�@�1rPS �f GQT?g{n�r.tin�, n�r rpern,���ihl�; f�r ensuring that any Contractar or Subcontractor performed er completed the work in accordance w�th the cantract documenis or constructian industry standards. If you have ary questions concerning this letter, please �ontact our office. Sincerely,. GROUND Engineering-Consuitants, Inc. ` j � j� �° r � . ,�'��,�/';,-- ����_ . ,. ��1 Ev�n E Kuhn ">�,A,,o Z ��,, �,,�:0. , ,• ; r. ��:• �w��;���- <'- y � � '�� �r �"e <<,:,,Gt i : J2 .tra '�'. � 1� i{ ,•°�4+f . � �,s�r„�,�r .aR���C�,�~,. � ,�Fv11 Revi�wed by James B Kowalsky. P.E. Job No.10-6534 GROUND Engineering Consultants.Inc. Page 2 of 2 � APR/27/2011/WED 03, 49 PM N�CCOG FAX No, 970-468-1208 P, 001 i ;, ,<-;.° : ����. i _ ,��, , , :.,��` :,.`��. . .;::, ,,;�: :�:�;.,. �,""• „t ti. j; .�' �.i• •�'.,�• R - � �OUIJCIL,OP GOVFRNMEIJTS•''4�'� ,� 1 � .��;�,:•:` r .:< — r'4Ci:�:?iv.y s � J�� `';r . :;� . .��r..'.`.,�,•�: I To: Martin Haeber�e Town of Vail,Co. Building Ofiicial �rom: Gene Morse, Elevator rnspector ' . 970-468-0295 ext. 108 ot'elevator(a�nwc.coa.co.us Date: 4/20/2011 Project Name: Town of Vail West F�re Statan B10-105 � ❑ Cot�veyance P(an Review . . , � Conveyance Test and Inspectilon ' l:oca�on: 2399 N. Frontage Road Vail, Co. ! Permit Num6er: NWCCOG 10-077 ' Conveyance Type: Commercial Hydraulic Passenger Elevator ❑ The pians; have been reviewed and found to conform to all applicable ASME 17.1 and � IBC Codes � The rated speed of the conveyance meefs ASME A17.1 requirements, speed in up direction 100 FPM, speed in down direction �.00 FPM t� The Conveyance at the above locat�on was inspected and tested on 4/18/2011 and a: ❑ TEMPORARY Certificate; has been issued. � � FINAL Inspec4on Certificate; has been issued. M ❑ NO certlficate; is being issued. � ��� ❑ FOR CONSTRUCTlON USE ONLY � . Comments; Si natu �� g re , Northwest Colorado Councii of Govemments • PO Box 2308 ♦ Silverthome • CO • 80498 970-468-0295 ♦ Fax 970-468-1205 ♦ www.nwc.cog_co.us ;� � . � N � 1• 10-03-2011 Inspection Request Reporting Page 1 4:22 Dm Vail, C� - Citv Of Requested Inspect Date: Tuesday,October 04, 2011 Inspection Area: MH Site Address: 2399 N FRONTAGE RD W VAII FIRE STATION#3 A/P/D Information Activiry: B10-0105 Type: COMBLD Sub Type: NCOM Status: ISSUED Const Type: Occupancy: Use: Insp Area: MH Owner: TOWN OF VAIL Contractor: DRAHOTA COMMERCIAL LLC Phone: 970-204-0100 Contractor: MIKE RICE, PROJECT MANAGER Phone: 970-566-2385, cell Description: NEW COMMERCIAL BUILDING: FIRE STATION#3 Requested Insaection(s1 Item: 537 PLAN-FINAL C/O Requested Time: 08:15 AM Requestor: DRAHOTA COMMERCIAL LLC Phone: 970-204-0100 Com ments: 970-846-1950 Assigned To: BGIBSON Entered By: JMONDRAGON K Action: Time Exp: Comment: e erior improvements must be comp e e pnor to final Go inspection approval. Comment: the raw concrete retaining walls must be addressed Item: 539 PW-FINAL C/O Requested Time: 04:00 PM Requestor: DRAHOTA COMMERCIAL LLC Phone: 970-204-0100 C o m m e nts: 970-846-1950 Assigned To: JMONDRAGON Entered By: JMONDRAGON K Action: Time Exp: Comment: ,�v Cay��1�^ . �- � C 0 I Inspection Historv Item: 501 PW-Access/Stagin�/Erosion Item: 10 BLDG-FOOTING * Approved*" 08/04/10 Inspector: mdenney Action: NR NOT READY FOR INSPECTION Comment: rebar placement has just been started, not ready for insp ection at this time. 08/05/10 Inspector: mdenney Action: CR CORRECTION REQUIRED Comment: footing jumps shall have continuous bar per plan. 2 areas within mentioned grid lines. G.8 north to corner and line 12 to line 9 along K, K9 to J9. Provide soils report, and report addressing clean ravel fill. 08/06/10 Inspector: mdenney Action: PI P�TIAL INSPECTION Comment: 13 to J9 4 pilasters @ east side line 14 btwn G& H. Footin jumps are corrected from 8/4/2010. 08/10/10 Inspec�or: mdenney Action: PI PARTIAL INSPECTION Comment: footing at grid lines H and 12(stair tower)clockwise to E and 10-ap roved. 08/11/10 Inspector: mdenney Action: PI PARTIAL INSPECTf�N Comment: grid B&6 clockwise to G.5&2. 08/12/10 fnspector: mdenneY Action: PA PARTIAL APPROVAL Comment: E at 10 clockwise to C to 8 elevator pad interior pads along 4 line 08/19/10 Inspector:. mdenney Action: PI PARTIAL INSPECTION Comment: interior 6 line from I to B, pad footing @ E and 8.5 08/20/10 Inspector: Martin ACtion: PI PARTIAL INSPECTION REPT131 Run Id: 13561 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ,, TOWNOFYAII. ' Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.4792139, f. 970.479.2452, inpsections 970.479.2149 NEW COMM BUILDING PERMIT Permit #: B10-0105 Project #: Job Address: 2399 N FRONTAGE RD W VAIL Status. . : FINAL Location......: FIRE STATION#3 Applied . . : 05/13/2010 Parcel No....: 210311415019 Issued... : 03/03/2011 Expires. ..: 01/04/2012 OWNER TOWN OF VAIL 05/13/2010 75 S FRONTAGE RD VAIL CO 81657 APPLICANT DRAHOTA COMMERCIAL LLC 05/13/2010 Phone: 970-204-0100 4700 INNOVATION DR, BLDG C FORT COLLINS CO 80525 License:377-A CONTRACTOR DRAHOTA COMMERCIAL LLC 05/13/2010 Phone: 970-204-0100 4700 INNOVATION DR, BLDG C FORT COLLINS CO 80525 License: 377-A CONTRACTOR MIKE RICE, PROJECT MANAGER 02/11/2011 Phone: 970-566-2385,cell Description: NEW COMMERCIAL BUILDING: FIRE STATION#3 Occupancy Type Factor Sq Feet Valuation Totals... $3,597,367.00" Number of Dwelling Units: Occupancy: Town of Vail Adjusted Valuation: $3,597,367.00 Type Construction: Total Sq Ft Added: � ....,.......,..��..................................................,,.,............ FEE SUMMARY ...«..,..,�,..,,,:.....,,,,,�,.....,.....x,,..._..,,..........,�..».,.,x..,............, Building Permit Fee------> $15,091.45 Will Call---------------------------> $5.00 Total Calculated Fees-------------> $96,873.23 Plan Check--------------------> $9,809.44 Use Tax Fee---------------------> $71,747.34 Additional Fees-----------------------> 96,873.23) Add'I Plan Check Hours-> $220.00 Restuarant Plan Review---> $0.00 TOTAL PERMIT FEES--------------> $0.00 Investigation-----------------> $0.00 Recreation Fee----------------> $0.00 Payments-------------------------------> 50.00 Total Calculated Fees------> $96,873.23 BALANCE DUE------------------------> $0.00 .......................,,x.....................,..._..............................................».>.......,................x.....__......_......_.......,................._,,......... DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4:00 PM. Signature of Owner or Contractor Date Print Name new_construction_perm it_041908 •w��wR�wwww��kwwwxff��ww�w��Rkf�t��t#�+iw���Awwfl���www���f�wwff�k+fwf��#w�i��4ff�x*14fwwf*!kw##wRl�www*fRlMwwk*Rfkww�Rf�f/wfx��rt+w�R�rtw*}��kw+Rf*4wwwf�kwwR���wrtwf�kwk�t�kwk**f�fwxM APPROVALS Permit#: 610-0105 as of 05-07-2013 Status: FINAL ............................��,,,,............,......,..,.�...........,........�...........,,....,,...........,..,.�..........,.,....,.x....,,....,.....,.............,.............. Item: 05100 BUILDING DEPARTMENT 06/03/2010 martin Action: CR see laserfische project folder 06/30/2010 MH Action: AP Item: 05400 PLANNING DEPARTMENT 05/13/2010 bgibson Action: DN Denied pending PEC and DRB approval of Changes to Approved Plans addressing changes in development standards (setbacks, site coverage %, landscape area %, parking space locations, etc.) due to inaccurate land surveying. 06/30/2010 bgibson Action: AP plans routed to JR Mondragon 07/15/2010 bgibson Action: AP revised landscape plan approved by planning 09/02/2010 bgibson Action: AP response to correction N/A. plans routed to Safe Build. 09/17l2010 bgibson Action: AP 9/3/10 revisions approved and plans routed to Martin Haeberle. 03/03/2011 Warren Action: AP Revisions dated recieved on February 25, 2011 are approved by planning Item: 05600 FIRE DEPARTMENT 06/30/2010 McGee Action: AP Fire sprinkler and fire alarm are deferred submittal. 03/02/2011 McGee Action: AP Revision. Item: 05500 PUBLIC WORKS 06/17/2010 tk Action: APCR Approved with the following conditions: 1. Submit final utility approvals as one package to be stapled to final approved BP set. The most recent set does not have any utility approvals on it. Submit prior to start of foundation excavation. 2. The proposed MSE wall at the SW Corner still says designed by others. A design will need to be submitted prior to construction of wall. 3. Comment 17 of the comment letter dated 5/20/10 regarding trees and utilities has not been addressed, please address prior to excavation of Foundation. 4. The shoring plans were to be made a part of the final approved BP, please submit approved shoring plans to be incorporated into BP set. 5. Prior to any Frontage rd access work being done the NTP needs be approved by CDOT. 01/03/2012 Is Action: AP Item: 05101 BUILDING DEPT REVISION 09/22/2010 mhaeberle Action: AP REVISION FIVE TO PLANS DATED 8/27 03/02/2011 Martin Action: AP Revisions to Sheets A-2.0, A2.1, A2.7, A4.6, A4.8, A-6.7 Dated 2/24/2011 ...................................<x.,...,..,�.,,..�,.�,..........,,.....,..,..,............,..,,..,.....,.......,...............,...,........,......,.....................x........ See the Conditions section of this Document for any that may apply. new_construction_perm it_041908 wxw���w.+�w��w+•�+����+x::x��*xw�������x�a��wwxx�x+www�xx�wrwxwx�s�w.xw���+.�•x��+�x�x�wwwx���w�.xxxxxee��•xwxx�+..x��x.wwxw:r.wxx��x++xx���w�+x��x.�xx�rww•wx��+xw��w.•x�w�.+���+ww� CONDITIONS OF APPROVAL Permit#: 610-0105 as of 05-07-2013 Status: FINAL ......................................................................,,.............,�.,.......,.......�...,,,.........,.....,............,..�......,.....,�.,.�.......,............. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 5 (PLAN): PRIOR TO THE TOWN BUILDING DEPARTMENT CONDUCTING A FRAMING INSPECTION, AN IMPROVEMENT LOCATION CERTIFICATE (ILC) SHALL BE SUBMITTED TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT A MINIMUM OF FORTY-EIGHT HOURS IN ADVANCE OF THE REQUESTED INSPECTION. ROOF RIDGES AND BUILDING FOOTPRINT SHALL BE INDICATED ON THE ILC. n ew_co n st ru ct i o n_pe rm it_041908 B10-0105: Entries for Item:90 - BLDG-Final 15:48 05/07/2013 Action Comments By Date Unique_ Ke PI Items completed as 4/15/2011 sgremmer 04/15/2011 A000142 HC sign installed 038 Excercise threshold installed Walkway on roof installed for mech. equipment Penitrations sealed for MEch equipment on roof Line sets supported Brass tags installed Items are still outstandin on the list AP Martin 10/10/2011 A000145 622 Total Rows:2 Page 1