Loading...
HomeMy WebLinkAboutB10-0167NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES 1 V In1 Ul V111L , Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 NEW COMM BUILDING PERMIT Permit #: B10 -0167 Project #: PRJ10 -0346 Job Address: 395 S FRONTAGE RD W VAIL Location......: BUS STOP Parcel No....: 210106407012 OWNER TOWN OF VAIL 07/08/2010 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 APPLICANT 4240 ARCHITECTURE, INC. TRACY HART DENVER CO 80202 License: C000001868 ARCHITECT 4240 ARCHITECTURE, INC. 1621 18TH STREET SUITE 200 DENVER CO 80202 License: C000001868 CONTRACTOR FCI CONSTRUCTORS, INC P.O. BOX 1767 GRAND JUNCTION CO 81502 License: 191 -A 07/08/2010 Phone: 303 - 785 -7260 07/08/2010 Phone: 303-292-3388 08/06/2010 Phone: 970-434-9093 Description: NEW COMMERCIAL BUILDING (BUS STOP) Occupancy Type Totals... Number of Dwelling Units: Occupancy: Type Construction: Status .. : ISSUED Applied ..: 07/08/2010 Issued...: 06/28/2011 Expires ...: 02/21/2011 Town of Vail Adjusted Valuation: $1,053,000.00 Total Sq Ft Added: 0 FEE SUMMARY ...*......**....*..........*..*.***......*.* *.... * *.. * *. * * *..... *... *. *. * *. Building Permit Fee ------ > $5,802.20 Will Call --------------------------- > $5.00 Total Calculated Fees ------------- > $31,428.63 Plan Check--------------- - - - - -> $3,771.43 Use Tax Fee --------------------- > $20,860.00 Additional Fees------------------ - - - - -> 31,428.63) Add'I Plan Check Hours -> $990.00 Restuarant Plan Review --- > $0.00 TOTAL PERMIT FEES --- ---------- > $0.00 Investigation------------ - - - - -> $0.00 Recreation Fee ---------------- > $0.00 Payments -- ---------------------------- > $0.00 Total Calculated Fees ------ > $31,428.63 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the informatior as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM -4 :OOP ture of wner or C tractor Da Factor Sq Feet Valuation $1,053,000.00* n ew_con stru ction_perm it_041908 APPROVALS Permit #: B10 -0167 as of 06 -28 -2011 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 07/29/2010 Martin Action: DN Architectural Comments: Sheet L100 1. Annotate on plans that the sprinklers system shall be 10 feet from the building per the Geotech report. 2. Indicate the use of Geotextile fabric as per Geotech report. Sheet A110 1. Provide cross - sectional details of the proposed accessible elements showing compliance with the 2003 A117.1 ANSI. Sheet A100 1. Please clarify the 1 hour enclosure required for the mechanical room. Sheet A151 1. Provide comcheck and relate the required R and U values on the plans. Sheet A164 1. How is stone veneer to be attached? Structural Comments: General Comment: 1. Complete the special inspection agreement for the proposed special inspections. 2. Structural engineer to provide design for the snow guards and snow retention. See amendments to sections 1503.7 and 1510.7 of the Town of Vail building code. Plumbing Comments: Reviewed and accepted Mechanical Comments: Reviewed and accepted 08/23/2010 Martin Action: AP Item: 05110 ELECTRICAL REVIEW 07/28/2010 mdenney Action: AP Item: 05400 PLANNING DEPARTMENT 08/03/2010 Warren Action: AP 06/06/2011 Warren Action: AP Mechanical venting change approved. 06/06/2011 Warren Action: AP The plans for the additional three boiler flues is approved by planning. Item: 05600 FIRE DEPARTMENT 08/05/2010 drhoades Action: AP 1. Provide fire detection per NFPA 72 and TOV Standards for new terminal. 2. Verify FDC's and standpipes are not adversely affected during or after construction. new st ru ct i o n_pe rm it_041908 3. Connect lighting in new terminal to EM generator. 4. Add em lighting to restrooms. 5. Provide details ref battery back up E 100L 6. Fire alarm matrix needs revision. All signals shall be transmitted to central station. 7. Relocate horn /strobe at FACP. 8. Delete exterior horn strobe. Exterior horn strobes are restricted to flow indicators only. 9. Provide Knox Box at north entry. 10. Access to boiler room requires excesssive travel time. 06/06/2011 MVAUGHAN Action: AP REVISION DATED JUNE 1 2011 Item: 05500 PUBLIC WORKS 08/02/2010 TK Action: AP 04/18/2011 TK Action: AP Approved changes to roof snow fencing. Item: 05550 ENGINEERING CIVILS Item: 05101 BUILDING DEPT REVISION 10/29/2010 MARTIN Action: AP REVISON TO SHEET S100 11/18/2010 jrm Action: AP Revisionto S117 and code anaylis sheet for parking 01/28/2011 Martin Action: AP Sheet S1 Revisons Sheets of Gyp board assebly revisons micropile shop drawings 01/28/2011 Martin Action: DN Glass curtain wall design Plans to reflect comcheck for building 03/02/2011 Martin Action: AP Glass curtain wall design 06/09/2011 JRM Action: AP APPROVED REVISONS (SOIL NAIL) APPROVED MECH REVISONS. See the Conditions section of this Document for any that may apply. new-con st ru ct i o n_pe rm it_041908 CONDITIONS OF APPROVAL Permit #: B10 -0167 as of 06 -28 -2011 Status: ISSUED Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 5 (PLAN): PRIOR TO THE TOWN BUILDING DEPARTMENT CONDUCTING A FRAMING INSPECTION, AN IMPROVEMENT LOCATION CERTIFICATE (ILC) SHALL BE SUBMITTED TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT A MINIMUM OF FORTY -EIGHT HOURS IN ADVANCE OF THE REQUESTED INSPECTION. ROOF RIDGES AND BUILDING FOOTPRINT SHALL BE INDICATED ON THE ILC. new_constructio n_pe rm it_041908 Revision Submittals: 1. "Field Set' of approved plans MUST accompany revisions_ 2_ No further inspections will be performed until the revisions are approved & the pen is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: i 314- Project Street Address: (Number) (Street) 11 (Suite #) Building /Complex Name: 1 �l Ff__1 k1I;e Contact Information: Company: /UV Company Address: City: State: Zip: Contact Name: /o stin�/ Contact Phone: E -Mail Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: Plumbing: Electrical: Mechanical: Total: Attention: Revisions O Response to Correction Letter _attached copy of correction letter O Deferred Submittal O Other Description I List of Changes_ i iooi4 a.,n m m (use additional sheet if necessary) Date Received: Fn nJ C UN. 01 2011 2011 V TRANSMITTAL FORM Frontage Road Transit Building 01 June 2011 Page 1 Rio -oib7 4 2 4 0 01 June 2011 Mr. Martin Haeberle Chief Building Official Department of Community Development 5 South Frontage Road Vail, Colorado 81657 Mr. Tom Kassmel Town Engineer Town of Vail Public Works 1309 Elkhorn Drive Vail, CO 81657 Chief Mike McGee, Deputy Chief & Chief Mike Vaughan, Fire Marshall Town of Vail Fire Department 42 W. Meadow Drive Vail, CO 81657 Lionshead Transit Welcome Center Permit Application # B11 -0017 Dear Sirs Mr. Warren Campbell Chief of Planning Department of Community Development 5 South Frontage Road Vail, Colorado 81657 Attached are the revised sheets for the Frontage Road Transit Building that incorporate changes made to the contract documents. The changes include the combination of two individual exhaust ducts into one that then penetrates the roof via the architectural chimney. Attached. M100H, M101 Please contact me with any additional comments or questions. Best Regards, Tracy Hart LEED AP Senior Associate <cc: Tom Kassmel /Town of Vail E. Randal Johnson /4240 21064.20/3.2 Attachment 31D -0)(07 COMcheck Software Version 3.8.0 Envelope Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title : Lionshead Welcome Center Construction Site: Owner /Agent: Town of Vail Fl oor Are 10998 Designer /Contractor: 4240 Section 2: General Information Building Location (for weather data): Vail, Colorado Climate Zone: 6b Vertical Glazing / Wall Area Pct.: 12% Actly! TYQe_(-4) Transportation MAR U 4 2011 TOWN OF VAIL Section 3: Requirements Checklist code. Envelope PASSES: Design 13% better than Climate- Specific Requirements: Component Name /Description Gross Cavity Cont. Proposed Budget Area or R -Value R -Value U- Factor U- Factorial Perimeter Main Roof: Insulation Entirely Above Deck 2200 _ — 60.0 0.016 0.048 Caterer's Roof: Other Roof (b) 539 – - -- 0.016 0.027 Deck Roof: Other Roof (b) 800 – — 0.033 0.027 Stairs Roof: Other Roof (b) 1213 – — 0.033 0.027 Exterior Wall 1: Solid Concrete 8" Thickness,Light Density , Furring: 15049 17.6 10.0 0.055 0.080 Metal Window 1: Metal Frame Curtain Wall /Storefront: Double Pane with 1492 - -- - -- 0.290 0.450 Low -E, Clear, SHGC 0.30 Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, SHGC 332 – - -- 0.290 0.800 0.30 Door 2: Insulated Metal, Swinging 210 - -- – 0.200 0.700 Floor 1: Slab -On- Grade: Unheated, Vertical 4 ft. 520 – 10.0 – (a) Budget U- factors are used for software baseline calculations ONLY, and are not code requirements. (b)'Other components require supporting documentation for proposed U- factors. Air Leakage, Component Certification, and Vapor Retarder Requirements: 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor - permeable wrapping material installed in accordance with the manufacturer's installation instructions. 2. Windows, doors, and skylights certified as meeting leakage requirements. Cj 3. Component R- values & U- factors labeled as certified. ❑ 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. Ej 5. 'Other components have supporting documentation for proposed U- Factors. 6. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. Project Title: Lionshead Welcome Center Report date: 02/04/11 Data filename: \ \bece- projects \data \BGProjects\8828.00 Lionshead Transit Center Study \8828.04 Auxiliary ❑ 8. Cargo doors and loading dock doors are weather sealed. 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. 10.Building entrance doors have a vestibule equipped with closing devices. Exceptions: ❑ Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system 1, been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.0 and to comply with the mandatory Requirements Checklist. Project Title: Lionshead Welcome Center Data filename: 1lbece- projectsldatalBGProjects 18828.00 Lionshead Transit Center Study18828.04 Auxiliary 3.4. r� Date Report date: 02/04111 424o Architecture Inc chicago denver 4 2 4 0 15 February 2011 Mr. Martin Haebere Chief Building Official Department of Community Development 5 South Frontage Road Vail, Colorado 81657 Re: Lionshead Transit Center ECO Building and Associated Pedestrian Pathway Mr. Haeberle In response to you questions about the compliance of the submitted glazing to the COMCheck submitted with the permit set of drawings V su mit the following. The COMCheck was calculated with Double pane low -e glazing with a SHGC of .30. The gl zing ubmitted by the general contractor complies with these performance characteristics. Best regar , E. Randal Johl Principal /7" ` 3oo3 Larimer Street Denver, Colorado 8o2o5 T 303 292 3388 F 3 2 9 2 3 W 4240architecture.com Transmittal Cover Sheet 0 FC1 Detailed, Grouped by Each Transmittal Number Constructors, Inc. _80- DiL2`7 Lionshead Transit Center Phase 1 Improvements 350 South Frontage Road, Vail, CO 81657 Project # 10 -0 -025 TeL 970 - 476 -0666 Fax: 970 - 476 -7240 FCI Constructors, Inc. - GJ Date: 1/20/2011 Reference Number: 0141 Transmitted To Transmitted By Tom Kassmel Town Of Vail 1309 Elkhorn Drive Vail, CO 81632 Tel: 970 - 479 -2235 Fax: 970 - 479 -2166 ❑ Acknowledgement Required Kurt Barnett FCI Constructors, Inc. - GJ P. O. Box 1767 Grand Junction, CO 81502 Tel: 970 - 434 -9093 Fax: 970 - 434 -7583 Package Transmitted For Delivered Via Tracking Number Information, As Requested, Your Use Hand Deliver Deffered Submittal Item # Qty Item Reference Description Notes Status Cc: Company Name Contact Name Copies Notes Remarks Included under this cover are the Following deffered Submittals 04 200 Masonry 07 8123 Intumescent Fireproofing 08 4313 Aluminum Framed Storefronts / Curtainwalls 09 2116 Gyp Board Assemblies 10 1400 Signage 31 -6333 Drilled Micropiles Also included with this package is a CD with all of the digital files listed above for your use. Thank you, Kurt Barnett Project Engineer FCI Constructors, Inc. EC IF- HI1ff. JAN 2 '1 2011 rr - 1 0 A TOWN OF VAIL Signature Signed Date Prolog Manager Printed on: 1/20/2011 fci pm data Page 1 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES znwxoM Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 NEW COMM BUILDING PERMIT Permit #: B10 -0167 Project #: Job Address: 395 S FRONTAGE RD W VAIL Location......: BUS STOP Parcel No....: 210106407012 OWNER TOWN OF VAIL 07/08/2010 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 APPLICANT 4240 ARCHITECTURE, INC. TRACY HART DENVER CO 80202 License: C000001868 ARCHITECT 4240 ARCHITECTURE, INC. 1621 18TH STREET SUITE 200 DENVER CO 80202 License: C000001868 CONTRACTOR FCI CONSTRUCTORS, INC P.O. BOX 1767 GRAND JUNCTION CO 81502 License: 191 -A Description: NEW COMMERCIAL BUILDING (BUS STOP) 07/08/2010 Phone: 303 - 785 -7260 07/08/2010 Phone: 303 - 292 -3388 08/06/2010 Phone: 970 -434 -9093 Status .. : ISSUED Applied ..: 07/08/2010 Issued...: 08/25/2010 Expires ...: 02/21/2011 Occupancy Type Factor Sq Feet Valuation Totals... $1,053,000.00* Number of Dwelling Units: Occupancy: Town of Vail Adjusted Valuation: $1,053,000.00 Type Construction: Total Sq Ft Added: 0 FEE SUMMARY Building Permit Fee - -- $5,802.20 Will Call ------ — ---- — ------ — ----- > $4.00 Total Calculated Fees--- - - - - -- > $30,437.63 Plan Check----------- - - - - -> $3,771.43 Use Tax Fee--------------- - - - - -> $20,860.00 Additional Fees -- -------- — ----- > 30,437.63) Add'I Plan Check Hours- $0.00 Restuarant Plan Review ---> $0.00 TOTAL PERMIT FEES----- ---- -> $0.00 Investigation ----- — ---------- > $0.00 Recreation Fee ---------------- > $0.00 Payments ---- ------------ — ----- > $0.00 Total Calculated Fees ------ > $30,437.63 BALANCE DUE--------- - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUEST FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 a.s -a d�� Si na ur_e of wnQ��ractor Date new_const n_perm it_041908 APPROVALS Permit #: B10 -0167 as of 08 -25 -2010 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 07/29/2010 Martin Action: DN Architectural Comments: Sheet L100 1. Annotate on plans that the sprinklers system shall be 10 feet from the building per the Geotech report. 2. Indicate the use of Geotextile fabric as per Geotech report. Sheet A110 1. Provide cross - sectional details of the proposed accessible elements showing compliance with the 2003 A117.1 ANSI. Sheet A100 1. Please clarify the 1 hour enclosure required for the mechanical room. Sheet A151 1. Provide comcheck and relate the required R and U values on the plans. Sheet A164 1. How is stone veneer to be attached? Structural Comments: General Comment: 1. Complete the special inspection agreement for the proposed special inspections. 2. Structural engineer to provide design for the snow guards and snow retention. See amendments to sections 1503.7 and 1510.7 of the Town of Vail building code. Plumbing Comments: Reviewed and accepted Mechanical Comments: Reviewed and accepted 08/23/2010 Martin Action: AP Item: 05110 ELECTRICAL REVIEW APPROVAL 07/28/2010 mdenney Action: AP Item: 05400 PLANNING DEPARTMENT 08/03/2010 Warren Action: AP Item: 05600 FIRE DEPARTMENT 08/05/2010 drhoades Action: AP 1. Provide fire detection per NFPA 72 and TOV Standards for new terminal. 2. Verify FDC's and standpipes are not adversely affected during or after construction. 3. Connect lighting in new terminal to EM generator. 4. Add em lighting to restrooms. new_construction_perm it_041908 5. Provide details ref battery back up E 100L 6. Fire alarm matrix needs revision. All signals shall be transmitted to central station. 7. Relocate horn /strobe at FACP. 8. Delete exterior horn strobe. Exterior horn strobes are restricted to flow indicators only. 9. Provide Knox Box at north entry. 10. Access to boiler room requires excesssive travel time. Item: 05500 PUBLIC WORKS 08/02/2010 TK Action: AP Item: 05550 ENGINEERING CIVILS See the Conditions section of this Document for any that may apply. new_con struction_pe rm it_041908 CONDITIONS OF APPROVAL Permit #: B10 -0167 as of 08 -25 -2010 Status: ISSUED kkkkkkkkkkkk kkk kkkk# kkkkY kkkkkkkkkkkkYYYYYYk** kkkkkkkkkkkkkkkk* Y* 4 kk# k# kkkkkkkkkk## Ykk**#* kk*** kkkkkkk** Y# Y# Y4# 4* kkk* kkkk4frkkk* kkkY* k4# k *k * #kkkkkkkkkkkkkkYkkY #kk4444 *k Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 5 (PLAN): PRIOR TO THE TOWN BUILDING DEPARTMENT CONDUCTING A FRAMING INSPECTION, AN IMPROVEMENT LOCATION CERTIFICATE (ILC) SHALL BE SUBMITTED TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT A MINIMUM OF FORTY -EIGHT HOURS IN ADVANCE OF THE REQUESTED INSPECTION. ROOF RIDGES AND BUILDING FOOTPRINT SHALL BE INDICATED ON THE ILC. new_constru ction_perm it_041908 Separate permits are required for electrical, plumbing mechanical, fireplace, etc. T� m _n (irl 1 Project Street Address: Office Use: 350 Sow fivon±Lt� R A- Project #: 0 (Number) (Street) (Suite #) DRB #: Building/Complex Name: L i ov%skev-A Vk'wl." Gts+ -✓or q� Building Permit #: ` 010 Contractor Information: Lot #: Block # Subdivision: Company: 4 - 6ok Company Address: City: State: Contact Name: Contact Phone: Detailed Scope and Location of Work: Zip: Ste a 1 —1 w 1 I " Valuations (Labor & Materials) Building: Plumbing: _ Electrical: $ Mechanical: (including fireplace) Total: Qa� Coh�of � Traci (-� -av� 4e)4-0 Inc 3o3 •165 •72.&0 t k a vt(q 42-4D , c oY'% # & Type of Existing Fireplaces: Gas Appliances O Gas Log Q Wood /Pellet o Wood Burning O # & Type of Proposed Fireplaces: Gas Appliances O Gas Log Q_ Wood /Pellet O Wood Burning __CL Date Receive FE C IE U IN (E JUL 0 7 2010 TOWN OF VAIL 15- May -10 BUILDING PERMIT APPLICATION (use additional sheet if necessary) E -Mail Work Class: Town of Vail Contractor Registration No.: New X Addition (X Remodel ( )Repair ( )Other ( ) X Work Type Contractor Signature (required) Interior ( ) Exterior( ) Both (M Property Information Type of Building: Parcel #: 2I0F - oro4 - O 012 1 o f - p 4 - b7 - oo Single - Family ( ) Duplex ( ) Multi - Family ( ) (For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or Commercial) Other ( ) visit www.eaglecounty.us/patie) Tenant Name: Tow✓t o•C Vag I Does a Fire Alarm Exist? Yes (x) No( ) Owner Name: Sow h of Va.• Monitored Alarm? Yes c74 No( ) Does a Sprinkler System Exist? Yes ( ) No Valuations (Labor & Materials) Building: Plumbing: _ Electrical: $ Mechanical: (including fireplace) Total: Qa� Coh�of � Traci (-� -av� 4e)4-0 Inc 3o3 •165 •72.&0 t k a vt(q 42-4D , c oY'% # & Type of Existing Fireplaces: Gas Appliances O Gas Log Q Wood /Pellet o Wood Burning O # & Type of Proposed Fireplaces: Gas Appliances O Gas Log Q_ Wood /Pellet O Wood Burning __CL Date Receive FE C IE U IN (E JUL 0 7 2010 TOWN OF VAIL 15- May -10 BUILDING PERMIT APPLICATION Date: 06 July 2010 To. Town of Vail Department of Community Development 75 South Frontage Road Vail, Colorado 81657 CC: From: Tracy Hart File: 21064.00/3.2 Subject: Description of Work Project: Lionshead Transit Center Page: 1 of 1 Memorandum 4 2 4 0 Message: Detailed Scope of Work: 1. Transit station with site improvements including bus stop, hardscape including snowmelt, landscape, and pedestrian bridge to existing Lionshead parking structure. 2. Transit station building including basement, restrooms, indoor and outdoor waiting area. Utility relocation will be required. 3. Road improvements along South Frontage Road, including improvements to the intersection at East Lionshead Circle. 4. Snow- melted pedestrian walkway including bridge and ramps connecting to northwest corner of Lionshead parking garage, and running along west side of parking garage. Includes modifications to existing parking garage for access. 5. Extension of existing exit stairs located in the Lionshead parking garage. Stairs will be extended from level 2 to level 3, and include a roof canopy. 6. Snow plow path and snow storage to west of existing Lionshead parking garage, including new snow removal access gates. 7. New vehicular access to lowest level of parking garage on the west side, including excavation, new retaining walls, opening in existing structural wall of parking garage, and new stair connection with snow melt from level three to level two of existing parking structure. 424o Architecture chicago denver 3003 Larimer Street Denver, Colorado 80202 T 303 292 3388 F 3 2 9 2 3 W 424oarchitecture.com COMcheck Software Version 3.7.1 Envelope Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title : Construction Site: Owner /Agent: Section 2: General Information Building Location (for weather data): Vail, Colorado Climate Zone: 6b Vertical Glazing / Wall Area Pct.: 40% Activity Type(s) Transportation Floor Area 1600 Section 3: Requirements Checklist Designer /Contractor: Envelope PASSES: Design 14 better than code. Climate-Specific Requirements: Component Name/Description Gross Area Cavity Cont. Proposed Budget or Perimeter R -Value R -Value U- Factor U- Factorial Roof 1: Insulation Entirely Above Deck 1150 - -- 60.0 0.016 0.048 Exterior Wall 1: Concrete Block:8 ", Partially Grouted, Cells 2000 10.0 0.0 0.171 0.080 Empty,Ught Density, Furring: Metal Window 1: Metal Frame:Double Pane with Low -E, Clear, SHGC 225 - -- -- 0.290 0.550 0.30, PF 0.25 Window 3: Curtain Wall:Double Pane with Low -E, Clear, SHGC 130 - -- - -- 0.290 0.450 0.30, PF 0.25 Window 4: Curtain Wall:Double Pane with Low -E, Clear, SHGC 495 - -- -- 0.290 0.450 0.30, PF 0.25 Door 4: Glass (> 50% glazing):Metal Frame, Entrance Door, SHGC 42 - -- -- 0.290 0.800 0.30, PF 0.25 Door 5: Glass (> 50% glazing):Metal Frame, Entrance Door, SHGC 21 - -- -- 0.290 0.800 0.30, PF 0.25 Basement Wall 3: Solid Concrete:12" Thickness, Light Density, 640 10.0 0.0 0.151 0.108 Furring: Metal, Wall Ht 10.0, Depth B.G. 10.0 Door 3: Insulated Metal, Swinging 24 - -- -- 0.250 0.700 Basement Wall 4: Solid Concrete:12" Thickness, light Density, 460 10.0 0.0 0.151 0.108 Furring: Metal, Wall Ht 10.0, Depth B.G. 4.0 Floor 1: Slab-On- Grade:Heated, Vertical 4 ft. 78 - -- 10.0 - -- - -- Floor 2: Slab-On- Grade:Unheated, Vertical 2 ft. 20 - -- 10.0 - -- - -- (a) Budget U- factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: 0 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor - permeable wrapping material installed in accordance with the manufacturer's installation instructions. I] 2. Windows, doors, and skylights certified as meeting leakage requirements. 0 3. Component R- values & U- factors labeled as certified. Project Title: Report date: 07/06/10 Data filename: S: \BGProjects\8828.00 Lionshead Transit Center Study\8828.01 Frontage Road_ECO \Engineering\882801 envelope.cck Page 1 of 2 4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. 5. No roof insulation is installed on a suspended ceiling with removable ceiling panels. 6. 'Other' components have supporting documentation for proposed U- Factors. 0 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. ❑ 8. Cargo doors and loading dock doors are weather sealed. 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. 10. Building entrance doors have a vestibule equipped with dosing devices. Exceptions. Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area. 11. Vapor retarder installed. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.7.1 and to comply with the mandatory requirements in the Requirements Checklist. TRAo%( T� - T, 4!. 7 7. 7 • U l o Name - Title Signature I Date Project Title: Report date: 07/06110 Data filename: SABGProjects\8828.00 Uonshead Transit Center Study\8828.01 Frontage Road_ECO \Engineering\882801 envelope.cck Page 2 of 2 12 -26 -2012 Inspection Request Reporting Page 3 4 :05 pm Vail, CO - City Of Pin Q'i� Requested Inspect Date: Thursday, December 27, 2012 Inspection Area: CG Site Address: 390 S FRONTAGE RD W VAIL BUS STOP A/P /D Information Activity: B10 -0167 Type: COMBLD Sub Type: NCOM Status: ISSUED Const Type: Occupancy: Use: Insp Area: CG Owner: TOWN OF VAIL Architect: 4240 ARCHITECTURE, INC. Phone: 303 - 292 -3388 Contractor: FCI CONSTRUCTORS, INC Phone: 970 - 434 -9093 Description: LIONSHEAD TRANSIT CENTER: PHASE I: FRONTAGE ROAD TRANSIT BUILDING; NEW COMMERCIAL BUILDING (BUS STOP) Reauested InSpection(s Rem: 540 BLDG -Final C/O Requested Time: 09:00 AM Requestor: FCI CONSTRUCTORS, INC Phone: 970 - 434 -9093 Comments: close out ?? Assigned To: J N l4GON Entered By: JMONDRAGON K Action: Time Exp: Inspection History Item: 10 BLDG - FOOTING 07/13/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Column at East stair of parking structure Ok per Si report Rem: 30 BLDG - Framing 05/27/11 Inspector: Martin Action: NR NOT READY FOR INSPECTION Comment: 06/03/11 Inspector: Martin Action: NR NOT READY FOR INSPECTION Comment: 06/08/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Sheer wall reinspection 12/05/11 Inspector: Martin Action: PI PARTIAL INSPECTION Comment: Framing of chimney cap only Rem: 50 BLDG - Insulation 06/08/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: pipe insulation on Rem: 60 BLDG - Sheetrock Nail ** pproved " 06/16/11 Inspector: JRM Action: AP APPROVED Comment: Rem: 70 BLDG -Misc. 11/18/10 Inspector: cg Action: NR NOT READY FOR INSPECTION Comment: 11/20/10 Inspector: Martin Action: PI PARTIAL INSPECTION Comment: 2nd level lathe only Rem: 532 PW -TEMP. C/O *' Approved " 08/16/11 Inspector: tk Action: AP APPROVED Comment: Rem: 533 PLAN -TEMP. C/O ** Approved *' 08/16/11 Inspector: Warren Action: AP APPROVED Comment: Prior to requesting a CO the chimney shroud needs to be installed the port-o -lets need to be removed, the louver on the east elevation and the capped electrical box on the north elevation shall The be painted to blend in with the stone facade. applicant shall also explore the possibility of in heat in for R to blend in to a black heat tape place of the gray tape on the roof order a grater Rem: 530 BL008/17�11 C/O ARM Approved " Action: PI PARTIAL INSPECTION Comment: APPROVED FOR TCO... ITEMS THAT NEED TO BE COMPLETED. REPT131 Run Id: 14654 `. ', , � . Department of Community Development ° t�. '_'��`� , � � ;�� � � 75 South Frontage Road � ., . �� a . ` :e � �.y ` �.. � . � . '"� �> � .'�. �, y Vail,.Colorado 81657 ; , �, _ � � � � y . ,. , � ,, Y;� �^� �� i Tel: 970-479-2128 �� �`: � � w�-�� 1. `�"�".��- Fax: 970-479-2452 ° ` .a �� =a� �' �� Web: www.vail ov.com , , i` �`�� . . 9 � - � Development Review Coordinator : {. .:. , - � .. , .;...��::�.� �� � , p. , . _:� .��.'_0�_�r� . ��- - -�- �.�,. � :� ., ��.� TRANSMITTAL FORM Revision Submittals: 1. "Field SeY' of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re-issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: () Revisions B10-0166 & B10-0167 () Response to Correction Letter attached copy of correction letter ( �) Deferred Submittal ( ) Other Project Street Address: 390 S. Frontage Road (Number) (Street) (Suite #) BuildinglComplex Name: Lionshead Transit Center Contact Information: Company: Town of Vail Company Address: 1309 Elkhorn Drive, Vail CO 81657 City: Vail State: CO Zip:81657 Contact Name: Tom Kassmel, Town Engineer Contact Phone: 479-2235 E-Mail tkassmel@vailgov.com Revised ADDITIONAL Valuations (Labor 8� Materials) (DO NOT include original valuation) Building: Plumbing: Electrical: Mechanical: Total: $ $ $ Description / List of Changes: Deferred submittal of Cap and Shroud for Chimney Work to be performed by TRC. • G. + � • (use additional sheet if necessary) Date Received: [�CG� � ��IC �y� OCT � 1011 � � TOWN OF VAIL 01-Jan-l0 Revision Submittals: 1. "Field Set' of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: 610 - 616 7 M ri 4 ( ) Response to Correction Letter _attached copy of correction letter () Deferred Submittal () Other Project Street Address: ,,35U 5 • 6iwrk, W Description / List of Changes: (Number) (Street) J (Suite #) Sb�- Leew,_4 Building /Complex Name: i Contact Information: � 5 1 DC FG / Company Address: 5ab5 City: State: Zip: Sala Contact Name: S a i f.� 1 Contact Phone: S a 15 E -Mail SGOI a Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: Plumbing: Electrical: Mechanical: Total: $ N (use additional sheet if necessary) Date Received: OCT 18 2010 TOWN OF VAIL 01- Jan -10 TRANSMITTAL FORM Lionshead Transit Center> 04 October 2010 Page 1 4 2 4 0 15 November 2010 Mr. Martin Haeberle Chief Building Official Department of Community Development 5 South Frontage Road Vail, Colorado 81657 Mr. Tom Kassmel Town Engineer Town of Vail Public Works 1309 Elkhorn Drive Vail, CO 81657 Chief Mike McGee, Deputy Chief & Chief Mike Vaughan, Fire Marshall Town of Vail Fire Department 42 W. Meadow Drive Vail, CO 81657 Lionshead Transit Center Permit Application # B10- 0166/167 Dear Sirs Mr. Warren Campbell Chief of Planning Department of Community Development 5 South Frontage Road Vail, Colorado 81657 Attached are revised structural sheets. Included changes are as follows. 1. Revisions to the west pedestrian wall to include pad footings. (CCD 07) 2. Revised truss / purlin layouts based on shop drawing review and coordination. (RFI 79) 3. Added detail to provide connection for concrete wall at the southwest stair landing. (RFI 87) 4. Revised column transition detail at new stairs from 2nd to 3rd level at garage corners to account for field conditions. (RFI 86) Attached: S102, S205, S212, S214, S215, S601, Please contact me with any additional comments or questions. Best Regards, Tracy Hart LEED AP Senior Associate <cc: Tom Kassmel /Town of Vail E. Randal Johnson /4240 21064.00/3.2 Department,of Community Development Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: X310 --0 1 67,� Project Street Address: Fx� S. r 6 AE'cD (Number) (Street) (Suite #) Building /Complex Name: //7 � 15' <L ( ) Response to Correction Letter _attached copy of correction letter () Deferred Submittal () Other Description / List of Changes: SIQQ — 2'YytZtiC_'XI 12RL___ Contact Information: Company: , Company Address: City: State: Zip: Contact Name: ­ 70 1 r. Zl f.% Contact Phone: E -Mail Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: $ Plumbing: $ Electrical: $ Mechanical: $ Total: $ ty (use additional sheet if necessary) Date Received: D C OCT 2 5 2010 TOWN OF VAIL 01 -Jan -10 TRANSMITTAL FORM Lionshead Transit Center> 04 October 2010 Page 1 4 22 October 2010 Mr. Martin Haeberle Chief Building Official Department of Community Development 5 South Frontage Road Vail, Colorado 81657 Mr. Tom Kassmel Town Engineer Town of Vail Public Works 1309 Elkhorn Drive Vail, CO 81657 Chief Mike McGee, Deputy Chief & Chief Mike Vaughan, Fire Marshall Town of Vail Fire Department 42 W. Meadow Drive Vail, CO 81657 Lionshead Transit Center Permit Application # B10- 0166/167 Dear Sirs Mr. Warren Campbell Chief of Planning Department of Community Development 5 South Frontage Road Vail, Colorado 81657 1. Attached is a revised structural sheet S100 that adjust the location of the east retaining wall footer at the basement level entry slab . Attached: S100 Please contact me with any additional comments or questions. Best Regards, Tracy Hart LEED AP Senior Associate <cc: Tom Kassmel/Town of Vail E. Randal Johnson /4240 21064.00/3.2 �CEC[EUWIEn �( OCT 25 2010 IUI TOWN OF VAIL