HomeMy WebLinkAboutM10-0091NOTE: THIS PERMIT MUST BE POSTED ON JOBSI TE AT
mwrrOFV
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970 - 479 -2139 f. 970.479.2452 inspections. 970.479.2149
MECHANICAL PERMIT
ACOM
Job Address: 143 E MEADOW DR VAIL
Location.....: SUITE 207, SOLARIS
Parcel No...: 210108201005
OWNER SOLARIS PROPERTY OWNER LLC 06/07/2010
2211 N FRONTATGE RD STE A
VAI L
CO 81657
APPLICANT DESIGN MECHANICAL, INC. 06/07/2010 Phone: (303) 449 -2092
168 CTC BLVD. STE. D
LOUISVILLE
CO 80027
License: 277 -M
CONTRACTOR DESIGN MECHANICAL, INC. 06/07/2010 Phone: (303) 449 -2092
168 CTC BLVD. STE. D
LOUISVILLE
CO 80027
License: 277 -M
Desciption: TENANT IMPROVEMENT (SEN SUSHI RESTAURANT): INSTALL FAN
COILS, DUCTWORK, HYDRONIC PIPING
Valuation: $49,100.00
ALL TIMES
Permit #: M10 -0091
Project #: PRJ10 -0174
Status ...:
ISSUED
Applied..:
06/07/2010
Issued. ..
07115/2010
Expires. .:
01/11/2011
......,,......, �.. �...... �........,.,., �,., � *.... *,��..,�.,.....,..... >.. >. «........+,.... SUMMARY.........*.., �»»............ �.. ��...* �....... �...... � .. .............. <........... «....
Mechanical Permit Fee --- > $1,000.00 Will Call ------------ > $5.00 Total Calculated Fees --- > $2,365.00
Plan Check ------------------- > $250.00 Use Tax Fee ------ > $0.00 Additional Fees------ - - - - -> $0.00
Investigation------------ - - - - -> $1,000.00 TOTAL PERMIT FEE --- > $2,365.00
Total Calculated Fees - -> $2,365.00 Payments ----- — ---------- > $2,365.00
BALANCE DUE --------- > $0.00
Item: 05100 BUILDING DEPARTMENT
06/07/2010 JLE Action: AP
APPROVALS
03/15/2011 Martin Action: AP Revision #1
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL B
AM - 4 PM. /
G -' Signature of Ow
f¢ Print Name
mechcan ical_permit_041908
TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:01
`
or Contractor Date
f
TOWN OF VAIL, COLORADO Statement
Statement Number: R110000273 Amount: $1,111.00 04/07/201112:45 PM
Payment Method:Credit Crd Init: LC
Notation: CC FROM JED
CROSS DESIGN MECHANICAL
-----------------------------------------------------------------------------
Permit No: M10 -0091 Type: MECHANICAL PERMIT
Parcel No: 2101- 082 - 0100 -5
Site Address: 143 E MEADOW DR VAIL
Location: SUITE 207, SOLARIS
Total Fees: $2,365.00
This Payment: $1,111.00 Total ALL Pmts: $2,365.00
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
PF 00100003112300 PLAN CHECK FEES 110.00
PN 00100003153000 INVESTIGATION FEE (BLDG) 1,000.00
WC 00100003112800 WILL CALL INSPECTION FEE 1.00
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MWW OWF *VIA
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970 - 479 -2139 f. 970.479.2452 inspections. 970.479.2149
MECHANICAL PERMIT
ACOM
Job Address: 143 E MEADOW DR VAIL
Location.....: SUITE 207, SOLARIS
Parcel No...: 210108201005
OWNER SOLARIS PROPERTY OWNER LLC 06/07/2010
2211 N FRONTATGE RD STE A
VAIL
CO 81657
APPLICANT DESIGN MECHANICAL, INC. 06/07/2010 Phone: (303) 449 -2092
168 CTC BLVD. STE. D
LOUISVILLE
CO 80027
License: 277 -M
CONTRACTOR DESIGN MECHANICAL, INC. 06/07/2010 Phone: (303) 449 -2092
168 CTC BLVD. STE. D
LOUISVILLE
CO 80027
License: 277 -M
Desciption: TENANT IMPROVEMENT (SEN SUSHI RESTAURANT): INSTALL FAN
COILS, DUCTWORK, HYDRONIC PIPING
Valuation: $49,100.00
Permit #: M10-0091
Project #: PRJ10 -0174
Status ...:
ISSUED
Applied ..:
06/07/2010
Issued . .:
07/15/2010
Expires. .:
01/11/2011
«««*###+«««++*##*««««**««««««««««««****#*++++##« * # « + + * « « « « « * « * « ««* * * * #*« « « « * « «« « FEE SUMMARY#*##««**«««*«««««««««*««*«#«*«#««##*«*+#***+##*«*«+««« * « «**«« «««* « « « ««« « « « ««« « « # ««« #+
Mechanical Permit Fee --- > $1,000.00 Will Call ------------ > $4.00 Total Calculated Fees ---> $1,254.00
Plan Check ------------------- > $250.00 Use Tax Fee ------ > $0.00 Additional Fees------ - - - - -> $0.00
Investigation------------ - - - - -> $0.00 TOTAL PERMIT FEE --- > $1,254.00
Total Calculated Fees - -> $1,254.00 Payments ------------ — --- > $1,254.00
BALANCE DUE---- ---- -> $0.00
APPROVALS
Item: 05100 BUILDING DEPARTMENT
06/07/2010 JLE Action: AP
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SRAL E MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
4PM.` 7T516
„ Signatu if ne Contra or Date
Print Name
m e ch ca n i ca I_pe rm it_041908
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R100000865 Amount: $1,254.00 07/15/201003:25 PM
Payment Method: Check Init: SAB
Notation: 32717 design
mechanical
Permit No: M10 -0091 Type: MECHANICAL PERMIT
Parcel No: 2101- 082 - 0100 -5
Site Address: 143 E MEADOW DR VAIL
Location: SUITE 207, SOLARIS
Total Fees: $1,254.00
This Payment: $1,254.00 Total ALL Pmts: $1,254.00
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
MP 00100003111100 MECHANICAL PERMIT FEES 1,000.00
PF 00100003112300 PLAN CHECK FEES 250.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
Department, of Community Development
Boiler / Furnace & Fireplace Applications MUST include:
• Complete Mechanical Room Floor Plan with Dimensions
• Combustion Air Duct Size and Location
• Flue detail or Vent size, location & termination
• Gas Piping layout including development length calculations
• Heat Loss Calculations
Project Street Address:
(Number) (Street) (Suite #)
❑ Boiler size & efficiency
❑ Equipment Cut Sheets for Fireplaces /Log Sets
(Manufacturer's info showing make, model & approval listin
Office Use: T�I6 ^ �'
Project #: / L,
Building Permit #: 1 o Q� �; ✓�
Mechanical Permit #: k w — / 1 no( I
Lot #: P Block # �bdivision: ul a*- `
Building/C Name: G.�a l ►S
�N 5LA�1 1W6TXu Define Scope and Location of Work: Jll�rl.l_ll Ct✓ {1.c5,
Contractor Information: 1 ' `
Company: ��K ��1��_��5.—
Company Address: 1(4b dG 15)_ tD - rM Al
City: = WWI L IE State: C (:;> Zip: Z_ 7 (use additional sheet if necessary)
Contact Name
� \\ -- `` Ey Gas Piping Included
Contact Phone: �e�f ld3h• cross. � ❑ Gas Piping by Others
eohnPCSrt.Si-iS crr �m El Wood to Gas Fireplace Conversion
E -Mail ?ten -34 1 23
Town of Vail Contractor Registration No.: Boiler Location:
Interior ( ) Exterior ( ) Other ( )
Con r Signature required) Number of Existing Fireplaces:
Gas Appliances _ Gas Logs _ Wood /Pellet _
Property Information
Parcel #: 9—I O laS 2.01 GUI Number of Proposed Fireplaces:
(For parcel #, contact Eagle County Assessors Office at 970 - 328 - 8640 or Gas Appliances _ Gas Logs Wood /Pellet
visit www.eaglecounty.us /patie)
LI Type of Building:
Tenant Name: S� �ILSN( T le -Famil Duplex (Commercial Properties) Sin g y ( ) Du Multi-Family Commercial ( ) ( )
Owner Name: ta2L."?4S Restaurant4,,,6_Other ( )
Date Received:
Complete Valuation for Mechanical Permit: (including fireplaces)
YO
Mechanical $:
L� t �b��
C lcdevi forms\ perm \tslbuilding�nechanical_j)ermit _0101 10 ('1
� I,
Z5 y 100q U
MECHANICAL PERMIT
r
BC�R
ENGINEERING
La 'f'r k,P Hil -8/i 2bgm ... i.0
,u � _ ors (
Marc E. Espinosa
David B. Robinson, P.E.
Richard D. Matthies, P.E.
Stephen C. Rondine8i, AIA
Robert M. "Mike" Cordaro, P.E.
SUBMITTAL TRANSMITTAL
TO: Tom Ogg DATE: Julie 8, 2011
Solaris Vail REFERENCE: Solaris— MatsuhisaL2
BCER PROJECT #: 47909003.1
e -mail: tom.ogg @solarisvail.com
We are sending via: ® E -MAIL ❑ COURIER
❑ DELIVERED BY HAND
❑ FEDERAL EXPRESS
The following items: ❑ PRINTS ® SUBMITTALS
❑ AS- BUILTS
❑ SPECIFICATIONS
E
E
a
o
l
�
�
�
V
a
Date In Date Out Submittals & Tag #
Section &
a Z Manufacturer
Para. v a oc
a
E Q
06/07/11
06/08/11
Test & Balance Rep
X
Design Mechanical
I
These are ttwtstnitted as indicated below:
1 COPIES TRANSMITTED
® CHECKED AS NOTED (See submittals)
® CHECKED AS NOTED (See comments below)
SUBMITTAL REVIEW COMMENTS:
1. Provide Static Pressure test data on FCUs and KEFs.
2. FCU -5: Airflow is at 114% of design. Re- sheave the fan as required to provide the design airflow at the
grease hood of +/ -5 %. Reference Specs on 15990 G 1.
3. FCU -5: Heating water flow is only at 89% of design flow. Adjust heating water flows in space as
required to have all heating water flow to the FCUs within 5% of design.
4. KEF -2 — Dishwasher: Airflow is at 113% of design. Re- sheave the fan as required to provide design
airflow at the dish hood of + / -10 %. Reference Specs on 15990 G 1.
5. KEF -3 — Grease (small): Airflow is at 112% of design. Re- sheave the fan as required to provide design
airflow at the dish hood of + / -10 %. Reference Specs on 15990 G 1.
6. Provide serial numbers for KEF -2 and KEF -3
F:\ 47AF,h NA\ CA\ C.\\ R•'. 0I\ SI HV_1NC;1 Rli l' 0R' I'-M\ TSUII].;W lls�Zl'& H .11_ \N<;Ii111`1)0R0'- SC)I,1RIS
IIS \ 2h tl ItKARI IX X:
5420 WARD ROAD, SUITE 200, ARvAoA, CALORADo 80002-1838 • TELEPHONE: 303-422 -7400 • F AX: 303. 422
Page 2
Submittal Review Comments (continued)
7. Provide airflow / balance information on the exhaust grille in toilet room.
Provide water flow / balance information on the domestic hot water recirculation balance valve.
Reference P6.1 Water Heater Piping Detail.
Sighed: �
Byron Ballantyne
cr - a ••
FA47''94fXX5V,A \CAME I1 \SIlc 1P[ 1R.\\\ TNUS\' 17ti 1' RBA I..\ NG* RET R2T-N UV INUIIISAVI ItST&- BA I,\ N(]-' RIAX) R'1'- XN..\RISMAIISLIM; \31110MIR.IX)C
5420 WARD R OAD, SUITE 200, ARVADA. COLORADO 80002-1838 • TELEPHONE: 303. 422 -7400 • FAx: 303422 -79W
Design Mechanical, Inc.
168 CTC Blvd., Suite D
Louisville, CO 80027
AIR APPARATUS TEST RE
JOB NAME
Unit Data
M ake
MCQua
Model No.
LAH002ADH
S erial No.
TLNU100900103
T ype/Size
FCU
Discharge
Side
S heave Make
Direct Drive
S heave Diam /Bore
Direct Drive
BeitslMake /Size
Direct Drive
Filtersrr a /Size
1 - 16x25x2
Solaris Matsuhisa L2
[:]REVIEWED REVISE AND R.71JJ "'tY2L
]REJECTED OMAKE CORRECT {I0t OQFDA
corrections or comments made on ttfCSllbdfin "—"
during this review do not relieve contractor from comphan-e
wdh requirements of the drawings and specifications. This
check is only for review of general compliance with the
design concept of the project and general compliance with
the information given in the contract documents. The
contractor is responsible for confirming and correlating aff
quantities and dimensions, selecting fabrication process
and techniques of construction; coordinating his work with
that of all other trades. and performing his work in a safe
and satisfactory manner.
T BCER Engineering, Inc
Dat ®6/08/11 By BEB
System I FCU•1
Motor Data
Make /Frame
Baldor
HP /RPM
2.0-3450
Volts /Phase /Hertz
208-3-60
F.L. Amps /S.F..
5.4
Sheave Make
Direct Drive
Sheave Diameter /Bore
Direct Drive
Sheave Distance
Direct Drive
Sheaver 0 er. Diam.
Direct Drive
5.4
5.0 - 4.8 - 4.8
IF- Test Data
Desiein Actual
T otal CFM Its
750
753
F an RPM
Motor Volts T11T2/T3
208
211 - 210 - 212
nit Amps T11T2/T3
5.4
5.0 - 4.8 - 4.8
A CFM (Us)
763
A CFM (Vs)
Test Data
Desi n Actual
Discharge S.P.
Suction S.P.
Reheat Coil S.P.
Cooling Coil S.P. (Outlet)
Filters S.P.
Fifler Inlet S.P.
V ortex Damper Position
0 A
am per Position
R A Damper Position
REMARKS VFD set at 60 Hz 100% OSA
Readings By: CT Deiley 31 -May -11
Design Mechanical, Inc.
168 CTC Blvd., Suite D
Louisville, CO 80027
AIR APPARATUS TEST REPORT
JOB NAME I Solaris Matsuhisa L2
1� Unit Data
Make
MCQua
Model No,
LAH007AH
Serial No.
TLNU10091004U
Type /Size
FCU
Discharge
Side
Sheave Make
Browning
Sheave Diam/Bore
1BK3.6"
# Belts /Make /Size
18x40
Filters(fypelSize
2 - 24x24x2
Test Data
Design Act
Total CFM I /s)
2000
2011
3.0-3450
V olts/Phase/Hertz
208-3-60
Fan RPM
4.0
Sheave Make
Brownin
Sheave Diameter /Bore
1UP5.0
Motor Volts T11T21T3
208
211 - 208 - 208
Unit Amps T1/T21T3
4.0
2.8 - 2.8 - 2.9
0 A CFM Vs
2157
R A CFM Its
303 -449 -2092
fax 303 - 449 -8739
System I FCU -2
Motor Data
Make /Frame
Baldor
HP /RPM
3.0-3450
V olts/Phase/Hertz
208-3-60
F.L. Ampsi8 f
4.0
Sheave Make
Brownin
Sheave Diameter /Bore
1UP5.0
Sheave Distance
Sheaver 0 er. Diam,
1 Turn Open
Test Data
Design Actual
Dischar a S.P.
Suction S.P.
Reheat Coil S.P.
Cooling Coil S.P. (Outlet
Filters S.P.
Filter Inlet S.P.
V ortex Damper Position
0 A Damper Position
R A Damper Position
REMARKS VFD set at 35 Hz 100% OSA
Readings By: I CT Deiley I 31 May 11
Design Mechanical, Inc.
168 OTC Blvd., Suite D
Louisville, CO 80027
AIR APPARATUS TEST REPORT
JOB NAME I Solaris Matsuhisa L2
Unit Data
Make
McQuay
Model No.
LAH007AH
Serial No.
TLNU100910083
Type /Size
FCU
Discharge
Side
Sheave Make
Brownin
Sheave Diam /Bon;
AK4.4"
BeltsfMake/Size
1 - Ax42
Filters/Type /Size
2 - 24x24x2
Test Data
Desi n A ctual
Total CFM I/s
2300
2388
3.0.3450
V olts/Phase/Hertz
208-3-60
Fan RPM
8.7
Sheave Make
Browning
Sheave Diameter /Bore
1UP5.0L
Motor Volts T11T21T3
208
209 - 212 - 212
Unit Amps T11T21T3
8.7
7.1 - 6.8 - 6.9
0 A CFM (Us)
2436
R A CFM Us
303 - 449 -2092
fax 303 - 449 -8739
System FCiJ 3
Motor Data
Make /Frame
Baldor
HPIRPM
3.0.3450
V olts/Phase/Hertz
208-3-60
F.L. Amps /&E..
8.7
Sheave Make
Browning
Sheave Diameter /Bore
1UP5.0L
Sheave Distance
Sheaver 0 er. Diam.
1 Turn Open
Test Data
Desi n Actual
Discharge S.P. 2,125
S uction S.P.
Reheat Coil S.P.
Cooling Coil S.P. Outlet
Filters S.P.
Filter Inlet S.P.
Vortex Damper Position
0 A Damper Position
R A Damper Position
REMARKS VFD set at 60Hz 100% OSA
Readings By: CT Deiley 31- May -11
Design Mechanical, Inc.
168 CTC Blvd., Suite D
Louisville, CO 80027
AIR APPARATUS TEST REPORT
JOB NAME I Solaris Matsuhisa L2
Unit Data
Make
McQuay
Model No.
LAH007AH
S erial No.
TLNU100910073
Type/Size
FCU
D ischarge
Side
Sheave Make
Browning
Sheave Diam /Bore
AK4.4"
Belts/Make /Size
1 - Ax42
Filters/T e /Size
2 - 24242
Test Data
DesiQn Actual
Total CFM (1 /s)
2300
2210
10 - 3450
V olts/Phase/Hertz
208-3-60
Fan RPM
8.7
Sheave Make
Brownin
Sheave DiameterlBore
1UP5.0L
Motor Volts T11T21T3
208
209 - 210 - 211
Unit Amps TIMID
8.7
7.8 - 8.0 - 8.0
0 A CFM 11s)
2233
R A CFM (Ils)
303.449 -2092
fax 303 - 449 -8739
System FCU•4
Motor Data
Make /Frame
Saldor
HP1RPM
10 - 3450
V olts/Phase/Hertz
208-3-60
F.L. Amps /S.F.,
8.7
Sheave Make
Brownin
Sheave DiameterlBore
1UP5.0L
S heave Distance
heaver Oper. Diam.
1 Turn Open
Test Data
Desi n Actual
Discharge S.P.
Suction S.P.
Reheat Coil S.P.
Cooling Coil S.P. (outlet
Filters S.P.
Filter inlet S.P.
V ortex Damper Position
0 A Damper Position
R A Damper Position
REMARKS VFD set at 60Hz 100% OSA
Readings By: I CT Deiley I 31- May -11
Design Mechanical, Inc.
168 CTC Blvd., Suite D
Louisville, CO 80027
AIR APPARATUS TEST REPORT
JOB NAME Solaris Matsuhisa L2
Unit Data
Make
MCQua
Model No.
LAH007AH
S erial No.
TLNU100910096
TypelSize
FCU
Discharge
Side
Sheave Make
Browning
Sheave Diam /Bore
AK44"
Belts/Make/Size
1 - Ax42
Filters/Type/Size
2 - 24242
Test Data
Desi n Actual
Total CFM Vs
1600
1835
3.0-3450
olts /PhaselHeriz
208-3 - 60
Fan RPM
81
Sheave Make
Brownin
Sheave Diameter /Bore
11JP5.01.
Motor Volts T1/T2/T3
208
209 - 211 - 212
Jnit Amps T11T2/T3
8.7
6.3 - 6.0 - 5.9
0 A CFM I /s)
1711
RA CFM (Vs
303 -449 -2092
fax 303 - 449 -8739
System FCU•5
Motor Data
Make /Frame
Baldor
HPIRPM
3.0-3450
olts /PhaselHeriz
208-3 - 60
F.L. Amps/S.F..
81
Sheave Make
Brownin
Sheave Diameter /Bore
11JP5.01.
Sheave Distance
Sheaver Oper. Diam.
4 Turn Open
Test Data
Desi n Actual
Discharge S.P.
Suction S.P.
Reheat Coil S.P.
Cooling Coil S.P. (Outlet
Filters S.P.
Filter Inlet S.P.
V ortex Damper Position
0 A Damper Position
R A Damper Position
REMARKS Opened motor sheave 4 turns No VFD Installed
Readings By: CT Deiley I 02- Jun -11
Design Mechanical, Inc.
168 CTC Blvd., Suite D
Louisville, CO 80027
DIFFUSER TEST REPORT
303. 449 -2092
fax 303- 449 -8739
JOB NAME: I Solaris Matsuhisa L2 I System: I FCU's
Test and Balance Equipment Used: t DIGITAL FLOW HOOD
R OMi}R
4XFFUSER :::
DESIGN
.A _
NIAL ;:
:'.. COMMENTS
._ . ' e
panen
Free Area
: FPM CFM
CFM 'l�:: ,
. FM, 9& -
•GFII�,
Bar
1
SLT
10"
210
163 77%
211 100%
FCU -1
2
SLT
10"
210
115 54%
212 100%
3
SLT
8"
110
218 198%
111 100%
4
SLT
8"
110
193 175%
109 99%
5
SLT
8"
110
111 100%
110 100%
750
800 106%
753 100%
Kitchen
1
CLG
14"
1000
1534 153%
1011 101%
FCU -2
2
CLG
14"
1000
638 63%
1000 100%
2000
2172 108%
2011 100%
REMARKS. Installed 14" diffuser damper on #1
Readings By: CT Delley Test Date: 31- May -11
DESIGN
MECHANICAL,INC.
PROJECT Solaris Matsuhisa L2
.n; =-,: �.; qtr• • , �; - ..t '.r,- �
BALANCING VALVE
(Fixed or Adjustable Orifice)
Tag
Service
Make
Model
Size
Design
GPM
Valve
Setting !
Position
Initial
AP
Initial
GPM
%
Design
Final
AP
Final
GPM
Design
FCU -1
HW
T &A
DN20
3/4"
3.8
4.0
0.8
3.8
95%
FCU -1
CW
T &A
DN20
314"
4.6
4.0
1.18
4.2
105%
FCU -2
HW
T &A
DN20
1"
10.0
2.0
13'
10.0
100%
FCU -2
CW
T &A
DN20
1"
10.0
2.0
13'
10.0
100%
FCU -3
HW
T &A
DN20
1
7.8
3.0
2.4'
7.8
100
FCU -3
CW
T &A
DN20
1"
20.0
4.0
8.5'
19.0
95%
FCU4
HW
T &A
DN20
1"
7.8
3.0
2'
8.0
102%
FCU4
CW
T &A
DN20
1"
6.9
3.0
1.8'
7.0
101%
FCU -5
HW
T &A
DN20
1"
6.7
3.0
IN
6.0
89%
FCU -5
CW
T &A
DN20
1"
8.3
2.5
4.5'
8.3
100%
REMARKS:
Readings By: 1 CT Delley I Test Date: 2- Jun -11
DESIGN
MECHANICAL,iNC.
JOB NAME
168 CTC Blvd Suite #D
Louisville, CO 80027
303 - 449 -2092 phone
303- 449 -8739 fax
FAN BALANCE TEST REPORT
Solaris Matsuhisa L2
FAN' DATA
FAN #. KEF =1
fAIV # KEF -3'
Location
Grease Hood
Grease Hood
Fan Type
Centrifugal
Centrifugal
Blade Type
Manufacturer
Greenheck
Greenheck
Model #
**
SWB216- 20CCWUB
Serial #
123906371103
Class
MOTOR DATA
: • ..........
.......... . ..:..... ._:
Motor Make /Frame
Marathon
Baldor
Motor HP /RPM
7.5-1760
2-1750
Volts/Phase /Hz
208-3-60
230-3-60
FL Amps /SF
22.5
5.8
Motor Sheave Make
Browning
Browning
Motor Sheave Diameter /Bore
6.0 x 1 -318°
4.2 x V
Fan Sheave Make
Browning
Browning
Fan Sheave Diameter /Bore
6.2 -1 -118"
4.2 x 1 -318"
# Belts /Make /Size
2 - BP - 51
2 - AP - 36
Sheave Distance
: ;TEST DATA ._ :
De
;;Attu :i .:
Design
6680
6593
2000
2236
Fan RPM
Outlet/Inlet SP
Voltage
208
211 - 213 - 210
208
208 - 210 - 211
A mperage
22.5
20 -21 -19.3
5.8
5.9- 5.5 -1.7
REMARKS:
** Cannot read tag - KEF -1 VFD at 60 Hz
Readings By:
CT Deiley Test Date: I 31 -May -11
DESIGN
MECHANICAL,iINC.
fiHatr,nitr7d�'udrsklrx uzJ1 �prrtem:x
JOB NAME
168 CTC Blvd Suite #D
Louisville, CO 80027
303 - 449 -2092 phone
303 - 449 -8739 fax
FAN BALANCE TEST REPORT
Solaris Matsuhisa L2
FAN DATA .::. <::
FANS KEF -2
FAN #
Location
Dishwasher
Fan Type
In Line
Blade Type
Manufacturer
Greenheck
Model #
TCB- 2 -09 -3
Serial #
Class
MOTOR DATA
M otor M ake/Frame
Baldor
Motor HP /RPM
113-1725
Volts /Phase /Hz
115
FL Amps /SF
3.9
Motor Sheave Make
Browning
Motor Sheave Diameter /Bore
3.6 x 518"
Fan Sheave Make
Browning
Fan Sheave Diameter /Bore
4.0 - V
# Belts /Make /Size
1 -A38
Sheave Distance
...BEST DA
Design
Actual
Design
Actual
CFM
450
510
Fan RPM
Outlet/Inlet SP
Voltage
115
118
A mperage
3.9
3.6
(REMARKS:
Readings By: I CT Deiley Test Date: I 31- May -11
a
4�
11
ON
QN Fl R MECHANGAL
END VIFW
KEW
IC �31 PC �4SIAW �AIICE REMOVAL
Tf
4_ SIDE VIEW
T_
nF &F.GHAMrAL P %W DUAL
BARNES COY
jj 'II ARCHITECTS
cm
E;
o � � � aril■
T
0
U)
U)
SECOM - LOOR
MECHANICAL PLAN
M2.2
oK
_2
a t , W
U , .0;5��m 50W
Ell
BARNES COY
jj 'II ARCHITECTS
cm
E;
o � � � aril■
T
0
U)
U)
SECOM - LOOR
MECHANICAL PLAN
M2.2
LED A W V
PLANNING June 8, 2011
ARCHITECTURE
ENGINEERING
Solaris Property Owner, LLC
INTERIORS 141 East Meadow Drive
Suite 211
Vail, CO 81657
Attention: Tom Ogg
EST. 1915
gA
I D '60? (
SAN MARCOS
TAMPA
Project: Solaris Grease Duct Acceptance Test — Suite 207
ABU DHABI
DALY Project No. 211-10015-000
ATLANTA
Testing was planned to be performed in accordance with the HVAC Air Duct Leakage
AUSTIN
Test Manual, 1985 Edition, as published by the Sheet Metal and Air Conditioning
BEIJING
Subject: Acceptance Test Results
BRYAN
performed by utilizing smoke bombs along with the SMACNA test apparatus to identify
CHICAGO
specific locations of leakage within the duct. This is also referred to as the "puff' test.
DALLAS
Dear Tom;
DENVER
FORT WORTH
HONG KONG
This letter report is to document the results of the grease duct acceptance test site visit
HONOLULU
on April 21, 2011, for the grease duct in Suite 207. 1 performed Testing of the Solaris
HOUSTON
grease duct systems other than the grease duct in Suite 207 under a previous company,
ISTANBUL
Thompson LifeSafety Consulting, LLC.
LAS VEGAS
LOS ANGELES
INTRODUCTION
MIAMI
MINNEAPOLIS
Special inspection services of the grease ducts for the Solaris Suite 207 project included
Moscow
performing tests to identify leakage of the grease duct where potential liquid leakage
OMAHA
could occur as a result of cleaning operations of the internal areas of the grease duct. It
PHOENIX
is the desire of the Town of Vail as well as Solaris Property Owner, LLC to avoid liquid
SACRAMENTO
leakage from the grease duct as a result of cleaning the duct.
SAN ANTONIO
SAN MARCOS
TAMPA
BACKGROUND
TIANJIN
Testing for leakage of the grease ducts was planned to be performed in two ways.
WACO
Testing was planned to be performed in accordance with the HVAC Air Duct Leakage
WASHINGTON, DC
Test Manual, 1985 Edition, as published by the Sheet Metal and Air Conditioning
WEST PALM BEACH
Contractors' National Association, Inc. ( SMACNA). Testing was also planned to be
www.leoadaly.com
performed by utilizing smoke bombs along with the SMACNA test apparatus to identify
specific locations of leakage within the duct. This is also referred to as the "puff' test.
RESULTS
Attempts were made during the site visit to perform the SMACNA test, however, it was
determined that due to the small size of the grease duct in Suite 207, the equipment is
not sensitive enough to measure the air leakage losses in the duct. After a call to Town
of Vail, it was determined the SMACNA test would not be performed. This resulted in
limiting the inspection to the puff test and visual inspection.
The puff test for leakage utilizes the same testing apparatus as that of the SMACNA test
however, lit smoke bombs are added to the inside of the grease duct and the flow
producing unit is cycled on and off one or two times very quickly to push the smoke
2000 S. COLORADO BLVD.
ANNEX, SUITE 300
from the smoke bombs out any leakage points in the grease duct. This makes the
DENVER, co 80222
location of leaks very isible and easily Identified for repair. A single smoke bomb can
Y Y P g
TEL 303.756.2100
FAX 303.757.2350
last long enough for several cycles of the flow producing unit. This is especially
www.leoadaly.com
Mr. Tom Ogg
June 8, 2011
Page 2
effective for the horizontal portions of the grease duct where it can be expected that
liquid from the grease duct cleaning operations may lay in the bottom of the grease
duct and leak from the duct through any leakage locations.
During the puff test for the grease ducts in Suite 207, approximately six leaks were
found that required immediate welding repair. The puff test was performed three times
before all leaks were identified and repaired resulting in no leaks at the completion of
the site visit. These puff tests were performed on three separate small sections of grease
duct within Suite 207. The attached drawing (PDF) identifies these grease ducts in grey
line weight.
All three sections of grease duct are considered acceptable from a leakage
perspective. Subject to the puff test results as Special Inspector I find the grease
duct for Suite 207 approved from a leakage perspective.
Very truly yours,
LEO A DALY
ce'VONAL F Zi
Brian O. Thompson, PE Sr. Fire Protection Project Engineer
June 8, 2011
Encl: Suite 207 Grease Duct Drawing
Grease duct report for the Solaris Building connecting to Suite 207
0:
(44
co
SOLARIS
SPECIAL INSPECTION SERVICES
GREASE DUCT
Japanese Restaurant Grease Duct
Future Tenant Grease Duct
PRELIMINARY
INTRODUCTION
Special inspection services of the grease ducts for the Solaris project included performing tests
to identify leakage of the grease duct where potential liquid leakage could occur as a result of
cleaning operations of the internal areas of the grease duct. It is the desire of both the Town of
Vail as well as the Solaris Ownership to avoid liquid leakage from the grease duct as a result of
cleaning the duct. These grease ducts are concealed within construction in most areas and
liquid leakage would be cause for potential water damage to the finish construction materials.
BACKGROUND
Testing for leakage of the grease ducts was performed in two ways. Testing was performed in
accordance with the HVAC Air Duct Leakage Test Manual, 1985 Edition, as published by the
Sheet Metal and Air Conditioning Contractors' National Association, Inc. ( SMACNA). Testing
was also performed by utilizing smoke bombs along with the SMACNA test apparatus to identify
specific locations of leakage within the duct. This is also referred to as the "puff' test.
The SMACNA Leakage Test utilizes testing apparatus consisting of an airflow measuring
device, flow producing unit, pressure indicating devices and accessories necessary to connect
the metering system to the test specimen (grease duct). The testing apparatus used for these
grease duct leakage tests was a United McGill Standard Leak Detective Test Kit consisting of
the following:
• Calibrated orifice tube
• OSHA approved fan with an inlet damper control
• Two U -tube manometers
• Vinyl tubing
• Dye
• Adaptive Flex Duct
The differential pressure flow sensor for this test was a series SSS -1000 manufactured by KMC
Controls (www.kmccontrols.com). The leakage test is performed based on established leakage
limits for ducts. Test results identifying leakage greater than these established limits results in a
failed test for the duct.
Fire Protection Engineering ■ Code Consulting ■ Alternate Means & Methods ■ Performance Based Design
Solaris Special Inspection Services PRELIMINARY
Grease Duct
Japanese Restaurant / Future Tenant
The puff test for leakage utilizes the same testing apparatus as that of the SMACNA test,
however, lit smoke bombs are added to the inside of the grease duct and the flow producing unit
is cycled on and off one or two times very quickly to push the smoke form the smoke bombs out
any leakage points in the grease duct. This makes the location of leaks very visible and easily
identified for repair. A single smoke bomb can last long enough for several cycles of the flow
producing unit. This is especially effective for the horizontal portions of the grease duct where it
can be expected that liquid from the grease duct cleaning operations may lay in the bottom of
the grease duct and leak from the duct through any leakage locations.
It was agreed by the Town of Vail to allow the Solaris project to perform leakage testing of the
grease ducts in phases to allow construction and subsequent concealment of the grease duct
with a final test of each grease duct in its entirety to verify the grease duct is within proper
leakage limits. As of the writing of this report neither the Japanese Restaurant grease duct nor
the Future Tenant grease duct are complete, thus, the identification PRELIMINARY at the top of
this report. Each of the grease ducts have been installed from the tenant area to the building
exit at the roof of the building. However, neither grease duct is complete within the tenant space
as the exact location of each appliance nor appliance hood is not known at this time. The tenant
finish work for the Japanese Restaurant and the Future Tenant spaces will identify exact
locations allowing for the grease duct serving each appliance and appliance hood to be
connected to the appropriate grease duct. A full test of the grease duct will be necessary upon
completion of the grease duct installation within each tenant space. At that time a final report
can be provided with final leakage testing results.
The isometric drawing of these grease ducts is attached. The tested and installed grease ducts
(Japanese and Future Tenant) is complete from the roof to just east of column line 10 on Level
2 of Solaris. The grease duct furthest south in the drawing is the Future Tenant grease duct.
The two grease ducts to the north of this are each for the Japanese Restaurant and make up
the grease duct for this tenant that will be utilizing two appliance hoods. The vertical portion of
the grease duct from the Theater is also shown in this drawing as each of these grease ducts
rise vertically through the building in individual shaft enclosures adjacent to each other. Grease
duct fans are located on the roof.
Numerous tests and associated dates were utilized in performing the leakage testing. Due to an
overlapping of sections tested, only the last leakage test if recorded for the entire (although
preliminary) grease ducts. A final test will need to be performed upon completion of the grease
duct to the appliance hood locations.
The final test grease duct surface area at this preliminary stage is 1,030 ft for the Japanese
Restaurant grease duct and 643 ft for the Future Tenant grease duct. Duct is considered
leakage class (C 12 duct as rectangular metal duct. The duct was tested at 2" w.g. pressure
from the testing apparatus for each test. The allowable leakage factor for the duct is 19
cfm /100ft This equates to 195.7 cfm of allowable leakage for the Japanese Restaurant grease
duct and 122.2 cfm of allowable leakage for the Future Tenant grease duct. Pressure across the
differential flow sensor measured 0.005 for the Japanese Restaurant grease duct and 0.007 for
the Future Tenant grease duct. This correlates to an actual leakage of less than 30 cfm for each
of the grease ducts. Therefore, leakage is acceptable in each grease duct.
Solaris Special Inspection Services
Grease Duct
Japanese Restaurant / Future Tenant
PRELIMINARY
The Japanese Restaurant and Future Tenant grease ducts were tested as indicated below:
Date
Grease Duct
Section Tested (Reference Drawing)
Horizontal Section between column line 8.5 and column
9/29/09
Japanese Restaurant
line 9.25
Horizontal Section between column line 8.5 and column
9/29/09
Future Tenant
line 9.25
Vertical Section from just below Level 4 floor to Level 6
10/15/09
Japanese Restaurant
mid -level
Vertical Section from just below Level 4 floor to 16"
10/30/09
Japanese Restaurant
above Level 8
Vertical Section from just below Level 4 floor to just
10/30/09
Future Tenant
above Level 6
11/6/09
Future Tenant
Vertical Section from just below Level 4 floor to just
above Level 8 floor
12/15/09
Future Tenant
Horizontal Section between column line 8 and column
line 10
Horizontal Section between column line 8 and column
12/15/09
Japanese Restaurant
line 10
Horizontal and Vertical Section between column line 10
12/23/09
Japanese Restaurant
and through the building roof at Level 8
12/23/09
Future Tenant
Horizontal and Vertical Section between column line 10
and through the building roof at Level 8
Each grease duct also was tested utilizing the puff test. Several leaks were discovered as a
result of this testing. Repairs were either made immediately or between tests and retesting of
the duct utilizing the puff test was performed until no leaks were observed. This proved very
valuable in the great performance of the leakage test results.
Both the Japanese Restaurant grease duct and the Future Tenant grease duct are considered
acceptable from a leakage perspective. It is recommended that at the time of each tenant finish
with installation of appliance hoods and extension of each grease duct to respective hoods, that
each grease duct is tested again for final leakage testing and report.
Subject to the above results as Special Inspector I find the Japanese Restaurant grease duct
and the Future Tenant grease duct preliminarily approved from a leakage perspective.
Brian O. Thompson, PE
V� :• .O' . d�
:m 32264 Z.
o •SS�DNA�E.NG\��,
March 17, 2010
is
I T
i
' i-• . i_ ...� ' ice__ - - � _ .i
(1LEVEL -2- SUISHI -GD- 114 " 0 •
F
v
o
W
age
dD m
WJ Oi
FE W
W�
W
IQYlRAN
A
W.
nGREASE- DUCT -150 -VIEW
1 r
06 -06 -2011
Inspection Request Reporting
Page 24
4:39 pm
Vail, CO
- City Of
Requested Inspect Date:
Tuesday, June 07, 2011
Inspection Area:
JLE
Site Address:
143 E MEADOW DR VAIL
SUITE 207, SOLARIS
A/P /D Information
Activity:
M10 -0091 Type: B -MECH
Sub Type: ACOM
Status: ISSUED
Const Type:
Occupancy:
Use:
Insp Area: JLE
Owner:
SOLARIS PROPERTY OWNER LLC
Contractor:
DESIGN MECHANICAL, INC.
Phone: (303) 449 -2092
Description:
TENANT IMPROVEMENT (SEN SUSHI RESTAURANT): INSTALL FAN COILS, DUCTWORK, HYDRONIC
PIPING
Reauested Inspectio
It MECH -Final Requested Time: 01:00 PM
Re stor: ESIGN MECHANICAL, IN Phone: (303) 449 -2092
Co ments: 970 - 708 -7155
Ass' ned To: * * * * * * * * * * ** red By: JMONDRAGON K
ion: Ente Time Exp:
-/-& (I
Inspection Inspection History
Item: 200
Item: 310
Item: 315
Item: 320
Item: 330
Item: 340
Item: 390
MECH -Rough
04/13/11 Inspector: sgremmer Action: DN DENIED
Comment: Have approved plans on site
Pin holes on type 1 hood
04/15/11 Inspector: Martin Action: DN DENIED
Comment: Asked for partial;need to do the whole system
MECH- Heating
PLMB -Gas Piping
MECH - Exhaust Hoods
05/09/11 Inspector: s remmer Action: PI PARTIAL INSPECTION
Comment: type 2 exhaust duct for dishwasher, garage run
MECH - Supply Air
MECH -Misc. ** Approved **
04/22/11 Inspector: JRM Action: AP APPROVED
Comment: GREASE DUCT SMOKE TEST APPROVED
04/27/11 Inspector: JRM Action: PI PARTIAL INSPECTION
Comment: PARTIAL FIREWRAP OF GREASE DUCT 1ST LAYER ONLY
04/27/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: 2nd layer of fire wrap need to see bands
05/12/11 Inspector: JRM Action: AP APPROVED
Comment: FIDE WRAP OF GREASE DUCT COMPLETE
05/16/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: Supports and pipe onlyneed to see air test
05/17/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: Hydronic for air handlers tested at 100 psi
MECH -Final