Loading...
HomeMy WebLinkAboutM10-0091NOTE: THIS PERMIT MUST BE POSTED ON JOBSI TE AT mwrrOFV Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970 - 479 -2139 f. 970.479.2452 inspections. 970.479.2149 MECHANICAL PERMIT ACOM Job Address: 143 E MEADOW DR VAIL Location.....: SUITE 207, SOLARIS Parcel No...: 210108201005 OWNER SOLARIS PROPERTY OWNER LLC 06/07/2010 2211 N FRONTATGE RD STE A VAI L CO 81657 APPLICANT DESIGN MECHANICAL, INC. 06/07/2010 Phone: (303) 449 -2092 168 CTC BLVD. STE. D LOUISVILLE CO 80027 License: 277 -M CONTRACTOR DESIGN MECHANICAL, INC. 06/07/2010 Phone: (303) 449 -2092 168 CTC BLVD. STE. D LOUISVILLE CO 80027 License: 277 -M Desciption: TENANT IMPROVEMENT (SEN SUSHI RESTAURANT): INSTALL FAN COILS, DUCTWORK, HYDRONIC PIPING Valuation: $49,100.00 ALL TIMES Permit #: M10 -0091 Project #: PRJ10 -0174 Status ...: ISSUED Applied..: 06/07/2010 Issued. .. 07115/2010 Expires. .: 01/11/2011 ......,,......, �.. �...... �........,.,., �,., � *.... *,��..,�.,.....,..... >.. >. «........+,.... SUMMARY.........*.., �»»............ �.. ��...* �....... �...... � .. .............. <........... «.... Mechanical Permit Fee --- > $1,000.00 Will Call ------------ > $5.00 Total Calculated Fees --- > $2,365.00 Plan Check ------------------- > $250.00 Use Tax Fee ------ > $0.00 Additional Fees------ - - - - -> $0.00 Investigation------------ - - - - -> $1,000.00 TOTAL PERMIT FEE --- > $2,365.00 Total Calculated Fees - -> $2,365.00 Payments ----- — ---------- > $2,365.00 BALANCE DUE --------- > $0.00 Item: 05100 BUILDING DEPARTMENT 06/07/2010 JLE Action: AP APPROVALS 03/15/2011 Martin Action: AP Revision #1 CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL B AM - 4 PM. / G -' Signature of Ow f¢ Print Name mechcan ical_permit_041908 TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:01 ` or Contractor Date f TOWN OF VAIL, COLORADO Statement Statement Number: R110000273 Amount: $1,111.00 04/07/201112:45 PM Payment Method:Credit Crd Init: LC Notation: CC FROM JED CROSS DESIGN MECHANICAL ----------------------------------------------------------------------------- Permit No: M10 -0091 Type: MECHANICAL PERMIT Parcel No: 2101- 082 - 0100 -5 Site Address: 143 E MEADOW DR VAIL Location: SUITE 207, SOLARIS Total Fees: $2,365.00 This Payment: $1,111.00 Total ALL Pmts: $2,365.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- PF 00100003112300 PLAN CHECK FEES 110.00 PN 00100003153000 INVESTIGATION FEE (BLDG) 1,000.00 WC 00100003112800 WILL CALL INSPECTION FEE 1.00 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MWW OWF *VIA Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970 - 479 -2139 f. 970.479.2452 inspections. 970.479.2149 MECHANICAL PERMIT ACOM Job Address: 143 E MEADOW DR VAIL Location.....: SUITE 207, SOLARIS Parcel No...: 210108201005 OWNER SOLARIS PROPERTY OWNER LLC 06/07/2010 2211 N FRONTATGE RD STE A VAIL CO 81657 APPLICANT DESIGN MECHANICAL, INC. 06/07/2010 Phone: (303) 449 -2092 168 CTC BLVD. STE. D LOUISVILLE CO 80027 License: 277 -M CONTRACTOR DESIGN MECHANICAL, INC. 06/07/2010 Phone: (303) 449 -2092 168 CTC BLVD. STE. D LOUISVILLE CO 80027 License: 277 -M Desciption: TENANT IMPROVEMENT (SEN SUSHI RESTAURANT): INSTALL FAN COILS, DUCTWORK, HYDRONIC PIPING Valuation: $49,100.00 Permit #: M10-0091 Project #: PRJ10 -0174 Status ...: ISSUED Applied ..: 06/07/2010 Issued . .: 07/15/2010 Expires. .: 01/11/2011 «««*###+«««++*##*««««**««««««««««««****#*++++##« * # « + + * « « « « « * « * « ««* * * * #*« « « « * « «« « FEE SUMMARY#*##««**«««*«««««««««*««*«#«*«#««##*«*+#***+##*«*«+««« * « «**«« «««* « « « ««« « « « ««« « « # ««« #+ Mechanical Permit Fee --- > $1,000.00 Will Call ------------ > $4.00 Total Calculated Fees ---> $1,254.00 Plan Check ------------------- > $250.00 Use Tax Fee ------ > $0.00 Additional Fees------ - - - - -> $0.00 Investigation------------ - - - - -> $0.00 TOTAL PERMIT FEE --- > $1,254.00 Total Calculated Fees - -> $1,254.00 Payments ------------ — --- > $1,254.00 BALANCE DUE---- ---- -> $0.00 APPROVALS Item: 05100 BUILDING DEPARTMENT 06/07/2010 JLE Action: AP CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SRAL E MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0( 4PM.` 7T516 „ Signatu if ne Contra or Date Print Name m e ch ca n i ca I_pe rm it_041908 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R100000865 Amount: $1,254.00 07/15/201003:25 PM Payment Method: Check Init: SAB Notation: 32717 design mechanical Permit No: M10 -0091 Type: MECHANICAL PERMIT Parcel No: 2101- 082 - 0100 -5 Site Address: 143 E MEADOW DR VAIL Location: SUITE 207, SOLARIS Total Fees: $1,254.00 This Payment: $1,254.00 Total ALL Pmts: $1,254.00 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- MP 00100003111100 MECHANICAL PERMIT FEES 1,000.00 PF 00100003112300 PLAN CHECK FEES 250.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 Department, of Community Development Boiler / Furnace & Fireplace Applications MUST include: • Complete Mechanical Room Floor Plan with Dimensions • Combustion Air Duct Size and Location • Flue detail or Vent size, location & termination • Gas Piping layout including development length calculations • Heat Loss Calculations Project Street Address: (Number) (Street) (Suite #) ❑ Boiler size & efficiency ❑ Equipment Cut Sheets for Fireplaces /Log Sets (Manufacturer's info showing make, model & approval listin Office Use: T�I6 ^ �' Project #: / L, Building Permit #: 1 o Q� �; ✓� Mechanical Permit #: k w — / 1 no( I Lot #: P Block # �bdivision: ul a*- ` Building/C Name: G.�a l ►S �N 5LA�1 1W6TXu Define Scope and Location of Work: Jll�rl.l_ll Ct✓ {1.c5, Contractor Information: 1 ' ` Company: ��K ��1��_��5.— Company Address: 1(4b dG 15)_ tD - rM Al City: = WWI L IE State: C (:;> Zip: Z_ 7 (use additional sheet if necessary) Contact Name � \\ -- `` Ey Gas Piping Included Contact Phone: �e�f ld3h• cross. � ❑ Gas Piping by Others eohnPCSrt.Si-iS crr �m El Wood to Gas Fireplace Conversion E -Mail ?ten -34 1 23 Town of Vail Contractor Registration No.: Boiler Location: Interior ( ) Exterior ( ) Other ( ) Con r Signature required) Number of Existing Fireplaces: Gas Appliances _ Gas Logs _ Wood /Pellet _ Property Information Parcel #: 9—I O laS 2.01 GUI Number of Proposed Fireplaces: (For parcel #, contact Eagle County Assessors Office at 970 - 328 - 8640 or Gas Appliances _ Gas Logs Wood /Pellet visit www.eaglecounty.us /patie) LI Type of Building: Tenant Name: S� �ILSN( T le -Famil Duplex (Commercial Properties) Sin g y ( ) Du Multi-Family Commercial ( ) ( ) Owner Name: ta2L."?4S Restaurant4,,,6_Other ( ) Date Received: Complete Valuation for Mechanical Permit: (including fireplaces) YO Mechanical $: L� t �b�� C lcdevi forms\ perm \tslbuilding�nechanical_j)ermit _0101 10 ('1 � I, Z5 y 100q U MECHANICAL PERMIT r BC�R ENGINEERING La 'f'r k,P Hil -8/i 2bgm ... i.0 ,u � _ ors ( Marc E. Espinosa David B. Robinson, P.E. Richard D. Matthies, P.E. Stephen C. Rondine8i, AIA Robert M. "Mike" Cordaro, P.E. SUBMITTAL TRANSMITTAL TO: Tom Ogg DATE: Julie 8, 2011 Solaris Vail REFERENCE: Solaris— MatsuhisaL2 BCER PROJECT #: 47909003.1 e -mail: tom.ogg @solarisvail.com We are sending via: ® E -MAIL ❑ COURIER ❑ DELIVERED BY HAND ❑ FEDERAL EXPRESS The following items: ❑ PRINTS ® SUBMITTALS ❑ AS- BUILTS ❑ SPECIFICATIONS E E a o l � � � V a Date In Date Out Submittals & Tag # Section & a Z Manufacturer Para. v a oc a E Q 06/07/11 06/08/11 Test & Balance Rep X Design Mechanical I These are ttwtstnitted as indicated below: 1 COPIES TRANSMITTED ® CHECKED AS NOTED (See submittals) ® CHECKED AS NOTED (See comments below) SUBMITTAL REVIEW COMMENTS: 1. Provide Static Pressure test data on FCUs and KEFs. 2. FCU -5: Airflow is at 114% of design. Re- sheave the fan as required to provide the design airflow at the grease hood of +/ -5 %. Reference Specs on 15990 G 1. 3. FCU -5: Heating water flow is only at 89% of design flow. Adjust heating water flows in space as required to have all heating water flow to the FCUs within 5% of design. 4. KEF -2 — Dishwasher: Airflow is at 113% of design. Re- sheave the fan as required to provide design airflow at the dish hood of + / -10 %. Reference Specs on 15990 G 1. 5. KEF -3 — Grease (small): Airflow is at 112% of design. Re- sheave the fan as required to provide design airflow at the dish hood of + / -10 %. Reference Specs on 15990 G 1. 6. Provide serial numbers for KEF -2 and KEF -3 F:\ 47AF,h NA\ CA\ C.\\ R•'. 0I\ SI HV_1NC;1 Rli l' 0R' I'-M\ TSUII].;W lls�Zl'& H .11_ \N<;Ii111`1)0R0'- SC)I,1RIS IIS \ 2h tl ItKARI IX X: 5420 WARD ROAD, SUITE 200, ARvAoA, CALORADo 80002-1838 • TELEPHONE: 303-422 -7400 • F AX: 303. 422 Page 2 Submittal Review Comments (continued) 7. Provide airflow / balance information on the exhaust grille in toilet room. Provide water flow / balance information on the domestic hot water recirculation balance valve. Reference P6.1 Water Heater Piping Detail. Sighed: � Byron Ballantyne cr - a •• FA47''94fXX5V,A \CAME I1 \SIlc 1P[ 1R.\\\ TNUS\' 17ti 1' RBA I..\ NG* RET R2T-N UV INUIIISAVI ItST&- BA I,\ N(]-' RIAX) R'1'- XN..\RISMAIISLIM; \31110MIR.IX)C 5420 WARD R OAD, SUITE 200, ARVADA. COLORADO 80002-1838 • TELEPHONE: 303. 422 -7400 • FAx: 303422 -79W Design Mechanical, Inc. 168 CTC Blvd., Suite D Louisville, CO 80027 AIR APPARATUS TEST RE JOB NAME Unit Data M ake MCQua Model No. LAH002ADH S erial No. TLNU100900103 T ype/Size FCU Discharge Side S heave Make Direct Drive S heave Diam /Bore Direct Drive BeitslMake /Size Direct Drive Filtersrr a /Size 1 - 16x25x2 Solaris Matsuhisa L2 [:]REVIEWED REVISE AND R.71JJ "'tY2L ]REJECTED OMAKE CORRECT {I0t OQFDA corrections or comments made on ttfCSllbdfin "—" during this review do not relieve contractor from comphan-e wdh requirements of the drawings and specifications. This check is only for review of general compliance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating aff quantities and dimensions, selecting fabrication process and techniques of construction; coordinating his work with that of all other trades. and performing his work in a safe and satisfactory manner. T BCER Engineering, Inc Dat ®6/08/11 By BEB System I FCU•1 Motor Data Make /Frame Baldor HP /RPM 2.0-3450 Volts /Phase /Hertz 208-3-60 F.L. Amps /S.F.. 5.4 Sheave Make Direct Drive Sheave Diameter /Bore Direct Drive Sheave Distance Direct Drive Sheaver 0 er. Diam. Direct Drive 5.4 5.0 - 4.8 - 4.8 IF- Test Data Desiein Actual T otal CFM Its 750 753 F an RPM Motor Volts T11T2/T3 208 211 - 210 - 212 nit Amps T11T2/T3 5.4 5.0 - 4.8 - 4.8 A CFM (Us) 763 A CFM (Vs) Test Data Desi n Actual Discharge S.P. Suction S.P. Reheat Coil S.P. Cooling Coil S.P. (Outlet) Filters S.P. Fifler Inlet S.P. V ortex Damper Position 0 A am per Position R A Damper Position REMARKS VFD set at 60 Hz 100% OSA Readings By: CT Deiley 31 -May -11 Design Mechanical, Inc. 168 CTC Blvd., Suite D Louisville, CO 80027 AIR APPARATUS TEST REPORT JOB NAME I Solaris Matsuhisa L2 1� Unit Data Make MCQua Model No, LAH007AH Serial No. TLNU10091004U Type /Size FCU Discharge Side Sheave Make Browning Sheave Diam/Bore 1BK3.6" # Belts /Make /Size 18x40 Filters(fypelSize 2 - 24x24x2 Test Data Design Act Total CFM I /s) 2000 2011 3.0-3450 V olts/Phase/Hertz 208-3-60 Fan RPM 4.0 Sheave Make Brownin Sheave Diameter /Bore 1UP5.0 Motor Volts T11T21T3 208 211 - 208 - 208 Unit Amps T1/T21T3 4.0 2.8 - 2.8 - 2.9 0 A CFM Vs 2157 R A CFM Its 303 -449 -2092 fax 303 - 449 -8739 System I FCU -2 Motor Data Make /Frame Baldor HP /RPM 3.0-3450 V olts/Phase/Hertz 208-3-60 F.L. Ampsi8 f 4.0 Sheave Make Brownin Sheave Diameter /Bore 1UP5.0 Sheave Distance Sheaver 0 er. Diam, 1 Turn Open Test Data Design Actual Dischar a S.P. Suction S.P. Reheat Coil S.P. Cooling Coil S.P. (Outlet Filters S.P. Filter Inlet S.P. V ortex Damper Position 0 A Damper Position R A Damper Position REMARKS VFD set at 35 Hz 100% OSA Readings By: I CT Deiley I 31 May 11 Design Mechanical, Inc. 168 OTC Blvd., Suite D Louisville, CO 80027 AIR APPARATUS TEST REPORT JOB NAME I Solaris Matsuhisa L2 Unit Data Make McQuay Model No. LAH007AH Serial No. TLNU100910083 Type /Size FCU Discharge Side Sheave Make Brownin Sheave Diam /Bon; AK4.4" BeltsfMake/Size 1 - Ax42 Filters/Type /Size 2 - 24x24x2 Test Data Desi n A ctual Total CFM I/s 2300 2388 3.0.3450 V olts/Phase/Hertz 208-3-60 Fan RPM 8.7 Sheave Make Browning Sheave Diameter /Bore 1UP5.0L Motor Volts T11T21T3 208 209 - 212 - 212 Unit Amps T11T21T3 8.7 7.1 - 6.8 - 6.9 0 A CFM (Us) 2436 R A CFM Us 303 - 449 -2092 fax 303 - 449 -8739 System FCiJ 3 Motor Data Make /Frame Baldor HPIRPM 3.0.3450 V olts/Phase/Hertz 208-3-60 F.L. Amps /&E.. 8.7 Sheave Make Browning Sheave Diameter /Bore 1UP5.0L Sheave Distance Sheaver 0 er. Diam. 1 Turn Open Test Data Desi n Actual Discharge S.P. 2,125 S uction S.P. Reheat Coil S.P. Cooling Coil S.P. Outlet Filters S.P. Filter Inlet S.P. Vortex Damper Position 0 A Damper Position R A Damper Position REMARKS VFD set at 60Hz 100% OSA Readings By: CT Deiley 31- May -11 Design Mechanical, Inc. 168 CTC Blvd., Suite D Louisville, CO 80027 AIR APPARATUS TEST REPORT JOB NAME I Solaris Matsuhisa L2 Unit Data Make McQuay Model No. LAH007AH S erial No. TLNU100910073 Type/Size FCU D ischarge Side Sheave Make Browning Sheave Diam /Bore AK4.4" Belts/Make /Size 1 - Ax42 Filters/T e /Size 2 - 24242 Test Data DesiQn Actual Total CFM (1 /s) 2300 2210 10 - 3450 V olts/Phase/Hertz 208-3-60 Fan RPM 8.7 Sheave Make Brownin Sheave DiameterlBore 1UP5.0L Motor Volts T11T21T3 208 209 - 210 - 211 Unit Amps TIMID 8.7 7.8 - 8.0 - 8.0 0 A CFM 11s) 2233 R A CFM (Ils) 303.449 -2092 fax 303 - 449 -8739 System FCU•4 Motor Data Make /Frame Saldor HP1RPM 10 - 3450 V olts/Phase/Hertz 208-3-60 F.L. Amps /S.F., 8.7 Sheave Make Brownin Sheave DiameterlBore 1UP5.0L S heave Distance heaver Oper. Diam. 1 Turn Open Test Data Desi n Actual Discharge S.P. Suction S.P. Reheat Coil S.P. Cooling Coil S.P. (outlet Filters S.P. Filter inlet S.P. V ortex Damper Position 0 A Damper Position R A Damper Position REMARKS VFD set at 60Hz 100% OSA Readings By: I CT Deiley I 31- May -11 Design Mechanical, Inc. 168 CTC Blvd., Suite D Louisville, CO 80027 AIR APPARATUS TEST REPORT JOB NAME Solaris Matsuhisa L2 Unit Data Make MCQua Model No. LAH007AH S erial No. TLNU100910096 TypelSize FCU Discharge Side Sheave Make Browning Sheave Diam /Bore AK44" Belts/Make/Size 1 - Ax42 Filters/Type/Size 2 - 24242 Test Data Desi n Actual Total CFM Vs 1600 1835 3.0-3450 olts /PhaselHeriz 208-3 - 60 Fan RPM 81 Sheave Make Brownin Sheave Diameter /Bore 11JP5.01. Motor Volts T1/T2/T3 208 209 - 211 - 212 Jnit Amps T11T2/T3 8.7 6.3 - 6.0 - 5.9 0 A CFM I /s) 1711 RA CFM (Vs 303 -449 -2092 fax 303 - 449 -8739 System FCU•5 Motor Data Make /Frame Baldor HPIRPM 3.0-3450 olts /PhaselHeriz 208-3 - 60 F.L. Amps/S.F.. 81 Sheave Make Brownin Sheave Diameter /Bore 11JP5.01. Sheave Distance Sheaver Oper. Diam. 4 Turn Open Test Data Desi n Actual Discharge S.P. Suction S.P. Reheat Coil S.P. Cooling Coil S.P. (Outlet Filters S.P. Filter Inlet S.P. V ortex Damper Position 0 A Damper Position R A Damper Position REMARKS Opened motor sheave 4 turns No VFD Installed Readings By: CT Deiley I 02- Jun -11 Design Mechanical, Inc. 168 CTC Blvd., Suite D Louisville, CO 80027 DIFFUSER TEST REPORT 303. 449 -2092 fax 303- 449 -8739 JOB NAME: I Solaris Matsuhisa L2 I System: I FCU's Test and Balance Equipment Used: t DIGITAL FLOW HOOD R OMi}R 4XFFUSER ::: DESIGN .A _ NIAL ;: :'.. COMMENTS ._ . ' e panen Free Area : FPM CFM CFM 'l�:: , . FM, 9& - •GFII�, Bar 1 SLT 10" 210 163 77% 211 100% FCU -1 2 SLT 10" 210 115 54% 212 100% 3 SLT 8" 110 218 198% 111 100% 4 SLT 8" 110 193 175% 109 99% 5 SLT 8" 110 111 100% 110 100% 750 800 106% 753 100% Kitchen 1 CLG 14" 1000 1534 153% 1011 101% FCU -2 2 CLG 14" 1000 638 63% 1000 100% 2000 2172 108% 2011 100% REMARKS. Installed 14" diffuser damper on #1 Readings By: CT Delley Test Date: 31- May -11 DESIGN MECHANICAL,INC. PROJECT Solaris Matsuhisa L2 .n; =-,: �.; qtr• • , �; - ..t '.r,- � BALANCING VALVE (Fixed or Adjustable Orifice) Tag Service Make Model Size Design GPM Valve Setting ! Position Initial AP Initial GPM % Design Final AP Final GPM Design FCU -1 HW T &A DN20 3/4" 3.8 4.0 0.8 3.8 95% FCU -1 CW T &A DN20 314" 4.6 4.0 1.18 4.2 105% FCU -2 HW T &A DN20 1" 10.0 2.0 13' 10.0 100% FCU -2 CW T &A DN20 1" 10.0 2.0 13' 10.0 100% FCU -3 HW T &A DN20 1 7.8 3.0 2.4' 7.8 100 FCU -3 CW T &A DN20 1" 20.0 4.0 8.5' 19.0 95% FCU4 HW T &A DN20 1" 7.8 3.0 2' 8.0 102% FCU4 CW T &A DN20 1" 6.9 3.0 1.8' 7.0 101% FCU -5 HW T &A DN20 1" 6.7 3.0 IN 6.0 89% FCU -5 CW T &A DN20 1" 8.3 2.5 4.5' 8.3 100% REMARKS: Readings By: 1 CT Delley I Test Date: 2- Jun -11 DESIGN MECHANICAL,iNC. JOB NAME 168 CTC Blvd Suite #D Louisville, CO 80027 303 - 449 -2092 phone 303- 449 -8739 fax FAN BALANCE TEST REPORT Solaris Matsuhisa L2 FAN' DATA FAN #. KEF =1 fAIV # KEF -3' Location Grease Hood Grease Hood Fan Type Centrifugal Centrifugal Blade Type Manufacturer Greenheck Greenheck Model # ** SWB216- 20CCWUB Serial # 123906371103 Class MOTOR DATA : • .......... .......... . ..:..... ._: Motor Make /Frame Marathon Baldor Motor HP /RPM 7.5-1760 2-1750 Volts/Phase /Hz 208-3-60 230-3-60 FL Amps /SF 22.5 5.8 Motor Sheave Make Browning Browning Motor Sheave Diameter /Bore 6.0 x 1 -318° 4.2 x V Fan Sheave Make Browning Browning Fan Sheave Diameter /Bore 6.2 -1 -118" 4.2 x 1 -318" # Belts /Make /Size 2 - BP - 51 2 - AP - 36 Sheave Distance : ;TEST DATA ._ : De ;;Attu :i .: Design 6680 6593 2000 2236 Fan RPM Outlet/Inlet SP Voltage 208 211 - 213 - 210 208 208 - 210 - 211 A mperage 22.5 20 -21 -19.3 5.8 5.9- 5.5 -1.7 REMARKS: ** Cannot read tag - KEF -1 VFD at 60 Hz Readings By: CT Deiley Test Date: I 31 -May -11 DESIGN MECHANICAL,iINC. fiHatr,nitr7d�'udrsklrx uzJ1 �prrtem:x JOB NAME 168 CTC Blvd Suite #D Louisville, CO 80027 303 - 449 -2092 phone 303 - 449 -8739 fax FAN BALANCE TEST REPORT Solaris Matsuhisa L2 FAN DATA .::. <:: FANS KEF -2 FAN # Location Dishwasher Fan Type In Line Blade Type Manufacturer Greenheck Model # TCB- 2 -09 -3 Serial # Class MOTOR DATA M otor M ake/Frame Baldor Motor HP /RPM 113-1725 Volts /Phase /Hz 115 FL Amps /SF 3.9 Motor Sheave Make Browning Motor Sheave Diameter /Bore 3.6 x 518" Fan Sheave Make Browning Fan Sheave Diameter /Bore 4.0 - V # Belts /Make /Size 1 -A38 Sheave Distance ...BEST DA Design Actual Design Actual CFM 450 510 Fan RPM Outlet/Inlet SP Voltage 115 118 A mperage 3.9 3.6 (REMARKS: Readings By: I CT Deiley Test Date: I 31- May -11 a 4� 11 ON QN Fl R MECHANGAL END VIFW KEW IC �31 PC �4SIAW �AIICE REMOVAL Tf 4_ SIDE VIEW T_ nF &F.GHAMrAL P %W DUAL BARNES COY jj 'II ARCHITECTS cm E; o � � � aril■ T 0 U) U) SECOM - LOOR MECHANICAL PLAN M2.2 oK _2 a t , W U , .0;5��m 50W Ell BARNES COY jj 'II ARCHITECTS cm E; o � � � aril■ T 0 U) U) SECOM - LOOR MECHANICAL PLAN M2.2 LED A W V PLANNING June 8, 2011 ARCHITECTURE ENGINEERING Solaris Property Owner, LLC INTERIORS 141 East Meadow Drive Suite 211 Vail, CO 81657 Attention: Tom Ogg EST. 1915 gA I D '60? ( SAN MARCOS TAMPA Project: Solaris Grease Duct Acceptance Test — Suite 207 ABU DHABI DALY Project No. 211-10015-000 ATLANTA Testing was planned to be performed in accordance with the HVAC Air Duct Leakage AUSTIN Test Manual, 1985 Edition, as published by the Sheet Metal and Air Conditioning BEIJING Subject: Acceptance Test Results BRYAN performed by utilizing smoke bombs along with the SMACNA test apparatus to identify CHICAGO specific locations of leakage within the duct. This is also referred to as the "puff' test. DALLAS Dear Tom; DENVER FORT WORTH HONG KONG This letter report is to document the results of the grease duct acceptance test site visit HONOLULU on April 21, 2011, for the grease duct in Suite 207. 1 performed Testing of the Solaris HOUSTON grease duct systems other than the grease duct in Suite 207 under a previous company, ISTANBUL Thompson LifeSafety Consulting, LLC. LAS VEGAS LOS ANGELES INTRODUCTION MIAMI MINNEAPOLIS Special inspection services of the grease ducts for the Solaris Suite 207 project included Moscow performing tests to identify leakage of the grease duct where potential liquid leakage OMAHA could occur as a result of cleaning operations of the internal areas of the grease duct. It PHOENIX is the desire of the Town of Vail as well as Solaris Property Owner, LLC to avoid liquid SACRAMENTO leakage from the grease duct as a result of cleaning the duct. SAN ANTONIO SAN MARCOS TAMPA BACKGROUND TIANJIN Testing for leakage of the grease ducts was planned to be performed in two ways. WACO Testing was planned to be performed in accordance with the HVAC Air Duct Leakage WASHINGTON, DC Test Manual, 1985 Edition, as published by the Sheet Metal and Air Conditioning WEST PALM BEACH Contractors' National Association, Inc. ( SMACNA). Testing was also planned to be www.leoadaly.com performed by utilizing smoke bombs along with the SMACNA test apparatus to identify specific locations of leakage within the duct. This is also referred to as the "puff' test. RESULTS Attempts were made during the site visit to perform the SMACNA test, however, it was determined that due to the small size of the grease duct in Suite 207, the equipment is not sensitive enough to measure the air leakage losses in the duct. After a call to Town of Vail, it was determined the SMACNA test would not be performed. This resulted in limiting the inspection to the puff test and visual inspection. The puff test for leakage utilizes the same testing apparatus as that of the SMACNA test however, lit smoke bombs are added to the inside of the grease duct and the flow producing unit is cycled on and off one or two times very quickly to push the smoke 2000 S. COLORADO BLVD. ANNEX, SUITE 300 from the smoke bombs out any leakage points in the grease duct. This makes the DENVER, co 80222 location of leaks very isible and easily Identified for repair. A single smoke bomb can Y Y P g TEL 303.756.2100 FAX 303.757.2350 last long enough for several cycles of the flow producing unit. This is especially www.leoadaly.com Mr. Tom Ogg June 8, 2011 Page 2 effective for the horizontal portions of the grease duct where it can be expected that liquid from the grease duct cleaning operations may lay in the bottom of the grease duct and leak from the duct through any leakage locations. During the puff test for the grease ducts in Suite 207, approximately six leaks were found that required immediate welding repair. The puff test was performed three times before all leaks were identified and repaired resulting in no leaks at the completion of the site visit. These puff tests were performed on three separate small sections of grease duct within Suite 207. The attached drawing (PDF) identifies these grease ducts in grey line weight. All three sections of grease duct are considered acceptable from a leakage perspective. Subject to the puff test results as Special Inspector I find the grease duct for Suite 207 approved from a leakage perspective. Very truly yours, LEO A DALY ce'VONAL F Zi Brian O. Thompson, PE Sr. Fire Protection Project Engineer June 8, 2011 Encl: Suite 207 Grease Duct Drawing Grease duct report for the Solaris Building connecting to Suite 207 0: (44 co SOLARIS SPECIAL INSPECTION SERVICES GREASE DUCT Japanese Restaurant Grease Duct Future Tenant Grease Duct PRELIMINARY INTRODUCTION Special inspection services of the grease ducts for the Solaris project included performing tests to identify leakage of the grease duct where potential liquid leakage could occur as a result of cleaning operations of the internal areas of the grease duct. It is the desire of both the Town of Vail as well as the Solaris Ownership to avoid liquid leakage from the grease duct as a result of cleaning the duct. These grease ducts are concealed within construction in most areas and liquid leakage would be cause for potential water damage to the finish construction materials. BACKGROUND Testing for leakage of the grease ducts was performed in two ways. Testing was performed in accordance with the HVAC Air Duct Leakage Test Manual, 1985 Edition, as published by the Sheet Metal and Air Conditioning Contractors' National Association, Inc. ( SMACNA). Testing was also performed by utilizing smoke bombs along with the SMACNA test apparatus to identify specific locations of leakage within the duct. This is also referred to as the "puff' test. The SMACNA Leakage Test utilizes testing apparatus consisting of an airflow measuring device, flow producing unit, pressure indicating devices and accessories necessary to connect the metering system to the test specimen (grease duct). The testing apparatus used for these grease duct leakage tests was a United McGill Standard Leak Detective Test Kit consisting of the following: • Calibrated orifice tube • OSHA approved fan with an inlet damper control • Two U -tube manometers • Vinyl tubing • Dye • Adaptive Flex Duct The differential pressure flow sensor for this test was a series SSS -1000 manufactured by KMC Controls (www.kmccontrols.com). The leakage test is performed based on established leakage limits for ducts. Test results identifying leakage greater than these established limits results in a failed test for the duct. Fire Protection Engineering ■ Code Consulting ■ Alternate Means & Methods ■ Performance Based Design Solaris Special Inspection Services PRELIMINARY Grease Duct Japanese Restaurant / Future Tenant The puff test for leakage utilizes the same testing apparatus as that of the SMACNA test, however, lit smoke bombs are added to the inside of the grease duct and the flow producing unit is cycled on and off one or two times very quickly to push the smoke form the smoke bombs out any leakage points in the grease duct. This makes the location of leaks very visible and easily identified for repair. A single smoke bomb can last long enough for several cycles of the flow producing unit. This is especially effective for the horizontal portions of the grease duct where it can be expected that liquid from the grease duct cleaning operations may lay in the bottom of the grease duct and leak from the duct through any leakage locations. It was agreed by the Town of Vail to allow the Solaris project to perform leakage testing of the grease ducts in phases to allow construction and subsequent concealment of the grease duct with a final test of each grease duct in its entirety to verify the grease duct is within proper leakage limits. As of the writing of this report neither the Japanese Restaurant grease duct nor the Future Tenant grease duct are complete, thus, the identification PRELIMINARY at the top of this report. Each of the grease ducts have been installed from the tenant area to the building exit at the roof of the building. However, neither grease duct is complete within the tenant space as the exact location of each appliance nor appliance hood is not known at this time. The tenant finish work for the Japanese Restaurant and the Future Tenant spaces will identify exact locations allowing for the grease duct serving each appliance and appliance hood to be connected to the appropriate grease duct. A full test of the grease duct will be necessary upon completion of the grease duct installation within each tenant space. At that time a final report can be provided with final leakage testing results. The isometric drawing of these grease ducts is attached. The tested and installed grease ducts (Japanese and Future Tenant) is complete from the roof to just east of column line 10 on Level 2 of Solaris. The grease duct furthest south in the drawing is the Future Tenant grease duct. The two grease ducts to the north of this are each for the Japanese Restaurant and make up the grease duct for this tenant that will be utilizing two appliance hoods. The vertical portion of the grease duct from the Theater is also shown in this drawing as each of these grease ducts rise vertically through the building in individual shaft enclosures adjacent to each other. Grease duct fans are located on the roof. Numerous tests and associated dates were utilized in performing the leakage testing. Due to an overlapping of sections tested, only the last leakage test if recorded for the entire (although preliminary) grease ducts. A final test will need to be performed upon completion of the grease duct to the appliance hood locations. The final test grease duct surface area at this preliminary stage is 1,030 ft for the Japanese Restaurant grease duct and 643 ft for the Future Tenant grease duct. Duct is considered leakage class (C 12 duct as rectangular metal duct. The duct was tested at 2" w.g. pressure from the testing apparatus for each test. The allowable leakage factor for the duct is 19 cfm /100ft This equates to 195.7 cfm of allowable leakage for the Japanese Restaurant grease duct and 122.2 cfm of allowable leakage for the Future Tenant grease duct. Pressure across the differential flow sensor measured 0.005 for the Japanese Restaurant grease duct and 0.007 for the Future Tenant grease duct. This correlates to an actual leakage of less than 30 cfm for each of the grease ducts. Therefore, leakage is acceptable in each grease duct. Solaris Special Inspection Services Grease Duct Japanese Restaurant / Future Tenant PRELIMINARY The Japanese Restaurant and Future Tenant grease ducts were tested as indicated below: Date Grease Duct Section Tested (Reference Drawing) Horizontal Section between column line 8.5 and column 9/29/09 Japanese Restaurant line 9.25 Horizontal Section between column line 8.5 and column 9/29/09 Future Tenant line 9.25 Vertical Section from just below Level 4 floor to Level 6 10/15/09 Japanese Restaurant mid -level Vertical Section from just below Level 4 floor to 16" 10/30/09 Japanese Restaurant above Level 8 Vertical Section from just below Level 4 floor to just 10/30/09 Future Tenant above Level 6 11/6/09 Future Tenant Vertical Section from just below Level 4 floor to just above Level 8 floor 12/15/09 Future Tenant Horizontal Section between column line 8 and column line 10 Horizontal Section between column line 8 and column 12/15/09 Japanese Restaurant line 10 Horizontal and Vertical Section between column line 10 12/23/09 Japanese Restaurant and through the building roof at Level 8 12/23/09 Future Tenant Horizontal and Vertical Section between column line 10 and through the building roof at Level 8 Each grease duct also was tested utilizing the puff test. Several leaks were discovered as a result of this testing. Repairs were either made immediately or between tests and retesting of the duct utilizing the puff test was performed until no leaks were observed. This proved very valuable in the great performance of the leakage test results. Both the Japanese Restaurant grease duct and the Future Tenant grease duct are considered acceptable from a leakage perspective. It is recommended that at the time of each tenant finish with installation of appliance hoods and extension of each grease duct to respective hoods, that each grease duct is tested again for final leakage testing and report. Subject to the above results as Special Inspector I find the Japanese Restaurant grease duct and the Future Tenant grease duct preliminarily approved from a leakage perspective. Brian O. Thompson, PE V� :• .O' . d� :m 32264 Z. o •SS�DNA�E.NG\��, March 17, 2010 is I T i ' i-• . i_ ...� ' ice__ - - � _ .i (1LEVEL -2- SUISHI -GD- 114 " 0 • F v o W age dD m WJ Oi FE W W� W IQYlRAN A W. nGREASE- DUCT -150 -VIEW 1 r 06 -06 -2011 Inspection Request Reporting Page 24 4:39 pm Vail, CO - City Of Requested Inspect Date: Tuesday, June 07, 2011 Inspection Area: JLE Site Address: 143 E MEADOW DR VAIL SUITE 207, SOLARIS A/P /D Information Activity: M10 -0091 Type: B -MECH Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: Insp Area: JLE Owner: SOLARIS PROPERTY OWNER LLC Contractor: DESIGN MECHANICAL, INC. Phone: (303) 449 -2092 Description: TENANT IMPROVEMENT (SEN SUSHI RESTAURANT): INSTALL FAN COILS, DUCTWORK, HYDRONIC PIPING Reauested Inspectio It MECH -Final Requested Time: 01:00 PM Re stor: ESIGN MECHANICAL, IN Phone: (303) 449 -2092 Co ments: 970 - 708 -7155 Ass' ned To: * * * * * * * * * * ** red By: JMONDRAGON K ion: Ente Time Exp: -/-& (I Inspection Inspection History Item: 200 Item: 310 Item: 315 Item: 320 Item: 330 Item: 340 Item: 390 MECH -Rough 04/13/11 Inspector: sgremmer Action: DN DENIED Comment: Have approved plans on site Pin holes on type 1 hood 04/15/11 Inspector: Martin Action: DN DENIED Comment: Asked for partial;need to do the whole system MECH- Heating PLMB -Gas Piping MECH - Exhaust Hoods 05/09/11 Inspector: s remmer Action: PI PARTIAL INSPECTION Comment: type 2 exhaust duct for dishwasher, garage run MECH - Supply Air MECH -Misc. ** Approved ** 04/22/11 Inspector: JRM Action: AP APPROVED Comment: GREASE DUCT SMOKE TEST APPROVED 04/27/11 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: PARTIAL FIREWRAP OF GREASE DUCT 1ST LAYER ONLY 04/27/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: 2nd layer of fire wrap need to see bands 05/12/11 Inspector: JRM Action: AP APPROVED Comment: FIDE WRAP OF GREASE DUCT COMPLETE 05/16/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Supports and pipe onlyneed to see air test 05/17/11 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Hydronic for air handlers tested at 100 psi MECH -Final REPT131 Run Id: 13180