Loading...
HomeMy WebLinkAboutUntitled (190) IPM.Note B07-0275 Solaris Vol 2 Revisions Mike McGee SMTP MMcGee@vailgov.com Mike McGee SMTP MMcGee@vailgov.com dan.feeney@solarisvail.com; Building_Division; Fire_Inspectors tom.ogg@solarisvail.com B07-0275 Solaris Vol 2 Revisions Vail Fire & Emergency Services has reviewed the plans submitted for the above project. Findings and comments are as follows: Life Safety sheet LS – LC plan notes include “options” related to CO2 ventilation and fuel storage. The applicant must select the desired option and submit plans accordingly. VT01 – VT05 do not indicate ventilation elements for pressurization, graphics, control sequencing or alarm and detection. Recommend developing an “elevator package” that includes the foregoing. A5 Vertical Circulation - Plans must be coordinated with smoke control system. The FPE should place a Review Stamp on these sheets. A separate smoke control “package” is required but it is reasonable they review the A5 plans to avoid potential conflict. dan.feeney@solarisvail.com SMTP dan.feeney@solarisvail.com dan.feeney@solarisvail.com dan.feeney@solarisvail.com tom.ogg@solarisvail.com SMTP tom.ogg@solarisvail.com tom.ogg@solarisvail.com tom.ogg@solarisvail.com Building_Division SMTP Building_Division@vailgov.com Building_Division@vailgov.com Building_Division Fire_Inspectors SMTP Fire_Inspectors@vailgov.com Fire_Inspectors@vailgov.com Fire_Inspectors