B07-0275 Solaris Vol 2 Revisions
Vail Fire & Emergency Services has reviewed the plans submitted for the above project. Findings and comments are as follows:
Life Safety sheet LS – LC plan notes include “options” related to CO2 ventilation and fuel storage. The applicant must select the desired option and submit plans accordingly.
VT01 – VT05 do not indicate ventilation elements for pressurization, graphics, control sequencing or alarm and detection. Recommend developing an “elevator package” that includes the
foregoing.
A5 Vertical Circulation - Plans must be coordinated with smoke control system. The FPE should place a Review Stamp on these sheets. A separate smoke control “package” is required but
it is reasonable they review the A5 plans to avoid potential conflict.
dan.feeney@solarisvail.com
SMTP
dan.feeney@solarisvail.com
dan.feeney@solarisvail.com
dan.feeney@solarisvail.com
tom.ogg@solarisvail.com
SMTP
tom.ogg@solarisvail.com
tom.ogg@solarisvail.com
tom.ogg@solarisvail.com
Building_Division
SMTP
Building_Division@vailgov.com
Building_Division@vailgov.com
Building_Division
Fire_Inspectors
SMTP
Fire_Inspectors@vailgov.com
Fire_Inspectors@vailgov.com
Fire_Inspectors