Loading...
HomeMy WebLinkAboutUntitled (195) IPM.Note Fwd: RE: Solaris B07-0275 Temp Offices Level 1 Fwd: Mike McGee SMTP MMcGee@vailgov.com Mike McGee SMTP MMcGee@vailgov.com tom.ogg@solarisvail.com RE: Solaris B07-0275 Temp Offices Level 1 >>> John Plano <JPlano@safebuilt.com> 03/25/2009 4:00 PM >>> Mike, I forwarded your comments to Rick Pusch at the Solaris Project. I didn't know that there were corrections for this submittal. There is an approval by the fire department in Permits Plus on the 18th of March. John Plano Plans Examiner / Senior Building Inspector SAFEbuilt, Colorado P.O. Box 1618 Eagle, CO 81631-1618 (970)328-1790 (877)428-6412 john.plano@safebuilt.com -----Original Message----- From: Mike McGee [mailto:MMcGee@vailgov.com] Sent: Wednesday, March 25, 2009 3:13 PM To: John Plano; Leonard Sandoval Subject: Fwd: Solaris B07-0275 Temp Offices Level 1 >>> Mike McGee 03/25/2009 3:07 PM >>> Temp Office Space - Plaza Level 1. Distance from an operable standpipe shall not be greater than 200 ft "as the hose lays". Closed stair towers do ot receive credit for standpipe coverage. Demonstrate minimum 500 gpm is avaialble and within range of combustible storage room. 2. Revise Level 1 plan to show exit path from offices. Indicate travel distances. Travel distance up ramps may exceed maximum allowable. 3. Provide updated information on emergency evauation plan to reflect new office spaces. 4. Show location(s) of electrical disconnects for new office areas. 5. Show access route to new office space. Please do not use red markers for plan notes. tom.ogg@solarisvail.com SMTP tom.ogg@solarisvail.com tom.ogg@solarisvail.com tom.ogg@solarisvail.com