HomeMy WebLinkAboutUntitled (205)
IPM.Note
Fwd: Solaris B07-0275 Temp Offices Level 1
Fwd:
Mike McGee
SMTP
MMcGee@vailgov.com
Mike McGee
SMTP
MMcGee@vailgov.com
John Plano; Leonard Sandoval
Solaris B07-0275 Temp Offices Level 1
>>> Mike McGee 03/25/2009 3:07 PM >>>
Temp Office Space - Plaza Level
1. Distance from an operable standpipe shall not be greater than 200 ft "as the hose lays". Closed stair towers do ot receive credit for standpipe coverage.
Demonstrate minimum 500 gpm is avaialble and within range of combustible storage room.
2. Revise Level 1 plan to show exit path from offices. Indicate travel distances. Travel distance up ramps may exceed maximum allowable.
3. Provide updated information on emergency evauation plan to reflect new office spaces.
4. Show location(s) of electrical disconnects for new office areas.
5. Show access route to new office space.
Please do not use red markers for plan notes.
John Plano
SMTP
JPlano@safebuilt.com
JPlano@safebuilt.com
John Plano
Leonard Sandoval
SMTP
LSandoval@vailgov.com
LSandoval@vailgov.com
Leonard Sandoval