Re: B08-0287 Solaris Bowling Ally
Re:
Mike McGee
SMTP
MMcGee@vailgov.com
Mike McGee
SMTP
MMcGee@vailgov.com
Chris Gunion
B08-0287 Solaris Bowling Ally
Chris,
Was there anything significant in the plans from 12 19 08?
I have looked and do not see them here.
The only real concerns I have include:
1. The raised stage/platform. Is the foam combustible?
2. The sound system must have a shunt for sound amplification per the fire alarm code amendments.
3. Note 20 on your 01/06/09 review is of concern re: panic hardware on Sheet A0.4. The panic hardware should be installed.
4. Note 37 of 01/06/09 re the grease ducts must also be addressed in the fire suppression system and clean outs for the grease duct.
5. Being an Assembly occupancy, they must also supply an Emergency Plan per Chapter 4 of the IFC.
6. Sheet FS1.0 - Fryers must have a minimum 18 inches clearance to open flame. We have accepted 18 in. vertical splash guards in the past.
>>> Chris Gunion 01/07/2009 12:30 PM >>>
Looks like the most current plan set has "BUILDING DEPT. REVIEW 12.19.08" on the title block. It was routed to your office on 1/2/09. This set is addressing the 2nd round of plan review
comments. I just finish review and have a few outstanding issues still on the entry door hardware and grease duct termination. Attached is the 3rd check letter I sent them the other
day. I did not see any Fire Dept comments on the original permit submittal so if they do need to make any other changes please forward comments to MAH Architects.
Also let me know if you need anything on B08-0399 for that Arrabelle interior remodel, the contractor has been asking about that permit.
Jen will be out until next week, so for the time being just go ahead and email me when permits are signed-off and I'll get them issued.
thanks
Chris Gunion
I.C.C Plans Examiner
Town of Vail Building Safety and Inspection Services
970.479.2369
cgunion@vailgov.com
>>> Mike McGee 01/07/2009 11:47 AM >>>
Which set of plans is Chris reviewing for his 3rd round?
I have a set dated Nov 25, 08 but John Plano tells me a new set was delivered this past weekend.
I want to make sure we're working off the same set of plans.
Thanks,
Mike
Chris Gunion
SMTP
CGunion@vailgov.com
CGunion@vailgov.com
Chris Gunion