Warren,
This door will be coiled up all the time. It's purpose is to drop in the event of a fire to create a 2 hr break.
Maggie T. Fitzgerald, AIA
DAVIS PARTNERSHIP ARCHITECTS
225 Main Street, C101
Edwards, CO 81632
970-926-8960
>>> "Warren Campbell" <WCampbell@vailgov.com> 2/7/2008 5:21 PM >>>
I will be interested in the aesthetics of the coiling door. Things such
as color will be of interest. Is there nothing more aesthetically
pleasing that will do the trick?
Warren Campbell
Chief of Planning.
>>> "Dave Leiker" <dleiker@bcer.com> 02/07/2008 4:17 PM >>>
Here is the drawing. It should be fine, but let me know you
interpretation. Dave Leiker (303-817-2299, if you have bad news)
-----Original Message-----
From: Mike McGee [mailto:MMcGee@vailgov.com]
Sent: Thursday, February 07, 2008 12:10 PM
To: Dave Leiker; Christine Rajpal; Maggie Fitzgerald
Cc: Charlie Davis; Chris Gunion; David Rhoades; Greg Denckla; George
Ruther; John Gulick; JR Mondragon; John Plano; JR Rulapaugh; Joseph
Suther; Mike McGee; Mark Miller; Mike Vaughan; Stan Hahn; Warren
Campbell
Subject: Re: Solaris Grage Zamboni entrance detail
I agree if Building Dept agrees and Com Dev does not have any DRB
issues.
>>> "Dave Leiker" <dleiker@bcer.com> 02/07/2008 10:57 AM >>>
Maggie & Christine:
I touched base with Mike McGee this morning to clarify the Level 1
entrance to the Parking Garage where the Zamboni will drive through to
surface the ice on the Plaza skating rink. Since the occupant load
from
the back-of-house corridors from the retail space dumps into this
breezeway/passage with a ceiling above it, the entire breezeway must
be
rated 2 hours with 90-minute fire-rated doors. The back-of-house
corridors dumping into the 2-hour rated breezeway must also have
90-minute rated doors, but these doors must be side-hinged and
swinging
in the direction of egress travel because they are used for egress of
occupants.
The drawing attached shows the condition so everyone is in the same
communication loop and informed the same way. The 2-hour rated
breezeway is the #142 passage shown. The non-egress garage entrance
is
shown and the two side corridor doors are shown. Occupants within the
garage space have two independent means of egress out of the garage
space without having to pass through the Zamboni Garage Door for
egress.
Please call if you have any questions. Thanks.
David Leiker, P.E.
BCER Engineering, Inc.
5420 Ward Road, Suite 200
Arvada, Colorado 80002-1838
Office: 303.422.7400, Extension 285
Fax: 303.422.7900
Cell: 303.817.2299
Email: dleiker@bcer.com
WARREN,THISDOORWILLBECOILEDUPALLTHETIMEITSPURPOSEISTODROPINTHEEVENTOFAFIRETOCREATEA2HRBREAKMAGGIETFI
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=utf-8">
<META content="MSHTML 6.00.6000.16587" name=GENERATOR></HEAD>
<BODY style="MARGIN: 4px 4px 1px">
<DIV>Warren,</DIV>
<DIV>This door will be coiled up all the time. It's purpose is to drop in the event of a fire to create a 2 hr break.</DIV>
<DIV> </DIV>
<DIV>Maggie T. Fitzgerald, AIA</DIV>
<DIV> </DIV>
<DIV>DAVIS PARTNERSHIP ARCHITECTS<BR>225 Main Street, C101<BR>Edwards, CO 81632<BR>970-926-8960<BR><BR><BR>>>> "Warren Campbell" <WCampbell@vailgov.com> 2/7/2008 5:21
PM >>><BR>I will be interested in the aesthetics of the coiling door. Things such<BR>as color will be of interest. Is there nothing more aesthetically<BR>pleasing
that will do the trick? <BR><BR>Warren Campbell<BR>Chief of Planning.<BR><BR>>>> "Dave Leiker" <dleiker@bcer.com> 02/07/2008 4:17 PM >>><BR>Here is the drawing.
It should be fine, but let me know you<BR>interpretation. Dave Leiker (303-817-2299, if you have bad news)<BR><BR>-----Original Message-----<BR>From: Mike McGee [mailto:MMcGee@vailgov.com]
<BR>Sent: Thursday, February 07, 2008 12:10 PM<BR>To: Dave Leiker; Christine Rajpal; Maggie Fitzgerald<BR>Cc: Charlie Davis; Chris Gunion; David Rhoades; Greg Denckla; George<BR>Ruther;
John Gulick; JR Mondragon; John Plano; JR Rulapaugh; Joseph<BR>Suther; Mike McGee; Mark Miller; Mike Vaughan; Stan Hahn; Warren<BR>Campbell<BR>Subject: Re: Solaris Grage Zamboni entrance
detail<BR><BR>I agree if Building Dept agrees and Com Dev does not have any DRB<BR>issues.<BR><BR><BR><BR>>>> "Dave Leiker" <dleiker@bcer.com> 02/07/2008 10:57 AM >>><BR>Maggi
e & Christine:<BR><BR>I touched base with Mike McGee this morning to clarify the Level 1<BR>entrance to the Parking Garage where the Zamboni will drive through to<BR>surface the
ice on the Plaza skating rink. Since the occupant load<BR>from<BR>the back-of-house corridors from the retail space dumps into this<BR>breezeway/passage with a ceiling above it,
the entire breezeway must<BR>be<BR>rated 2 hours with 90-minute fire-rated doors. The back-of-house<BR>corridors dumping into the 2-hour rated breezeway must also have<BR>90-minute
rated doors, but these doors must be side-hinged and<BR>swinging<BR>in the direction of egress travel because they are used for egress of<BR>occupants.<BR><BR>The drawing attached shows
the condition so everyone is in the same<BR>communication loop and informed the same way. The 2-hour rated<BR>breezeway is the #142 passage shown. The non-egress garage entrance<BR>is<BR>
shown and the two side corridor doors are shown. Occupants within the<BR>garage space have two independent means of egress out of the garage<BR>space without having to pass through
the Zamboni Garage Door for<BR>egress.<BR><BR>Please call if you have any questions. Thanks.<BR><BR>David Leiker, P.E.<BR>BCER Engineering, Inc.<BR>5420 Ward Road, Suite 200<BR>Arvada,
Colorado 80002-1838<BR>Office: 303.422.7400, Extension 285<BR>Fax: 303.422.7900<BR>Cell: 303.817.2299<BR>Email: dleiker@bcer.com <BR><BR><BR></DIV></BODY></HTML>
Charlie Davis
SMTP
CDavis@vailgov.com
CDavis@vailgov.com
Charlie Davis
Chris Gunion
SMTP
CGunion@vailgov.com
CGunion@vailgov.com
Chris Gunion
David Rhoades
SMTP
DRhoades@vailgov.com
DRhoades@vailgov.com
David Rhoades
Greg Denckla
SMTP
GDenckla@vailgov.com
GDenckla@vailgov.com
Greg Denckla
George Ruther
SMTP
GRuther@vailgov.com
GRuther@vailgov.com
George Ruther
John Gulick
SMTP
JGulick@vailgov.com
JGulick@vailgov.com
John Gulick
JR Mondragon
SMTP
JMondragon@vailgov.com
JMondragon@vailgov.com
JR Mondragon
John Plano
SMTP
JPlano@vailgov.com
JPlano@vailgov.com
John Plano
JR Rulapaugh
SMTP
JRulapaugh@vailgov.com
JRulapaugh@vailgov.com
JR Rulapaugh
Joseph Suther
SMTP
JSuther@vailgov.com
JSuther@vailgov.com
Joseph Suther
Mike McGee
SMTP
MMcGee@vailgov.com
MMcGee@vailgov.com
Mike McGee
Mark Miller
SMTP
MMiller@vailgov.com
MMiller@vailgov.com
Mark Miller
Mike Vaughan
SMTP
MVaughan@vailgov.com
MVaughan@vailgov.com
Mike Vaughan
Stan Hahn
SMTP
SHahn@vailgov.com
SHahn@vailgov.com
Stan Hahn
Warren Campbell
SMTP
WCampbell@vailgov.com
WCampbell@vailgov.com
Warren Campbell
Dave Leiker
SMTP
dleiker@bcer.com
dleiker@bcer.com
Dave Leiker
Christine Rajpal
SMTP
CRajpal@davispartner.com
CRajpal@davispartner.com
Christine Rajpal