Loading...
HomeMy WebLinkAboutUntitled (66) IPM.Note B09-0016 Solaris Theater Mike McGee SMTP MMcGee@vailgov.com Mike McGee SMTP MMcGee@vailgov.com Dave Leiker; kenneth.d.ball@jci.com; dan.feeney@solarisvail.com; tom.ogg@solarisvail.com Building_Division; Fire_Inspectors B09-0016 Solaris Theater Approved as Noted: Sheet E10.2 - All fire alarm related details are superceded by FAFP0.00 and FA1.02 and 1.02 Sheet A2.7 and A7.3.2 ref FEC - No electrical, data or switched are allowed on the face or inside the fire extinguisher cabinet. Only plans stamped by BCER and JCI are recognized as applicable fire alarm drawings. Plan review for Re-submittal fee assessed. Building_Division SMTP Building_Division@vailgov.com Building_Division@vailgov.com Building_Division Fire_Inspectors SMTP Fire_Inspectors@vailgov.com Fire_Inspectors@vailgov.com Fire_Inspectors Dave Leiker SMTP dleiker@bcer.com dleiker@bcer.com Dave Leiker kenneth.d.ball@jci.com SMTP kenneth.d.ball@jci.com kenneth.d.ball@jci.com kenneth.d.ball@jci.com dan.feeney@solarisvail.com SMTP dan.feeney@solarisvail.com dan.feeney@solarisvail.com dan.feeney@solarisvail.com tom.ogg@solarisvail.com SMTP tom.ogg@solarisvail.com tom.ogg@solarisvail.com tom.ogg@solarisvail.com