Loading...
HomeMy WebLinkAboutB10-0158 CorrectionsDepartment of Community Development 5 South Frontage Road Vail, Colorado 81657 970-479-2138 FAX 970-479-2452 www.vailgov.com ______________________________________________________________________ PROJECT REVIEW COMMENTS DATE: 7/22/2010 TO: Burke Harrington Construction PERMIT APPLICATION #: B10-0158 PROJECT ADDRESS: 2602 Davos Trail OCCUPANCY GROUP: R-3 TYPE OF CONSTRUCTION: VB NUMBER OF STORIES:2 BUILDING AREA: 3313 ● Submit four complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. ● Please respond in writing to each comment with a response letter addressing each comment. BUILDING DEPARTMENT COMMENTS Architectural Comments: Sheet A2.0 Clarify location of drainage for the trench drain in front of garage. Sheets A3.1/ A3.2/ A3.3 Please clarify proposed work within the existing construction. Is only walls being changed? Same uses as existing? Sheet A4.0 Show compliance with R806.2 IRC. for ventilation Sheet A6.0/ A8.0 A8.2 Provide u values for windows as required per the energy code utilizing a Rescheck program or by prescriptive method. Include all the R values for each wall/ ceiling assembly utilizing Rescheck or the prescriptive methods of the energy code. Details reflect thermal breaks at header locations. Please revise plans. Provide details of flashing for the proposed stucco and include stucco system to be used. Plans reflect an opening exceeding the allowed amount for guards on the deck. Reference section R312.3 IRC Structural Comments: Sheet S1.1 Revise plans to reflect the current ground snow load of Vail per the Colorado Ground Snow Loads 2007 Include in resubmittal the completed special inspection form available on the Town of Vail web page. Plumbing Comments: Provide plans for the proposed plumbing showing compliance with the plumbing code. Mechanical Comments: Provide plans reflecting the proposed mechanical system to be designed Provide developed length calculations for the proposed gas fireplace. Provide the btus of the proposed fireplace. Electrical Comments: Sheet A10.0 Provide load calculations for the existing and proposed electrical system. Show how compliance with the energy code is to be achieved for lighting Show required smoke detectors as required by the IRC. Provide plans for the proposed work in the existing building.