Solaris Miscellaneous areas—Fire Protection System Commissioning
Gentlemen:
BCER Engineering has performed and witnessed the inspections of the fire alarm system and sprinkler
system for the BOL,Lounge,level 1 rest rooms(parking garage),house keeping suite and bike storage.This
letter serves as the documentation of that testing and provides an overview of the inspection procedures and
findings.
In general there were random sprinkler escutcheons missing specifically noted were,the house keeping suite
and the lounge. Some ceiling tiles were missing in these areas as well.
The fire alarm system tested adequately and there are no deficiencies regarding the fire alarm system to
report in these areas.
Upon completion of these items the fire alarm and fire sprinkler system will be complete.
o�Ppo LicF�
Prepared by: vo�'.o p,.�GAR�.,`S'FO
BCER Engineering,Inc. ;o0 2�:
�G�� �`� 36145 p i
: :
-� : :�-
�o•. ::�,�
�F S�ONAL E��\�
Todd Gardner,P.E. s
Fire Protection Engineer
cc: Dan Feene�Sol�•i s
5420 WARD ROAD,SUITE 200,ARVADA,COLORADO 80002-1838•TELEPHpNE: 303-422-7400•FAx: 303-422-7900