HomeMy WebLinkAboutEM Gen Cert �������� :
12 Feb-201 D �
��� � 7 �A7� i
E-Light Electrical � �;I�F�T ��,�CTi�IC
361 Inverness Drive South Surte B
Englewood, Colorado 80112
Project and Equipment Reference;Solaris
Onan Generator Set Model 1000 DQFAD s/n E080177870
Onan Automatic Transfer Switch Model OTPCC 300 S/n I080206879
Onan Automatic Transfer Switch Model OTPCC 300 s/n I080206880
Onan Automatic Transfer Switch Model OTPCC 300 s/n I080206882
Onan Automatic Transfer Switch Model OTPCC 600 s/n I080206883
Onan Automatic Transfer Switch Model OTPCC 400 s/n I080206885
To Whom It May Concern:
Start up and systems check out of the above referenced project and equipment has been
completed on 07-Jan-201 D
The 1 year commercial base standby warranty on the generator and the 2 tear power
electronres warranty on the transfer switches has commenced as of the startup and
systems check out date. Cummins Rocky Mountain LLC considers this testing to be final
acceptance of the equipment.
Please note that maintenance and scheduled service are not included with warranty and
that maintenance in accordance with the manufacturer's instructions and
recommendations will help protect warranty coverage, For information on maintenance
and scheduled service contracts please cantact us at 303-927-2282.
It has been our pleasure to supply you with this equipment and we appreciate the
opportunity to do business with you. If we may be of any further assistance,please call.
Cummins Rocky Mountain LLC
Power Generalion Division
Richard C. Connon
Cummins Power Generatron
303-927-2225
richard.connon@cummins.com
�� 8213 E. 96th Avenue
. Henderson, CO 80640
� ����t�'�
�
303-28�-0201
Initial Start Up&lnstallati�n Review
Project#: �yQ y/
Date: 01I05/10 WO#:--� 34583
End User/Owner: SOLARIS
/y.5' �, 9Pa.,�c�y�(',
,/�.;� �'a. �165"�
Contact: Phone:
Contractor/Sold To: ELIGHT ELECTRIC
3�/�,�vzf,v rss �,= Sd,..rt,
� 4/e6+-.o0� �G, �a/I2
Contact: � Phone:
Generator Set Manufacturer ONAN
Model Number: 1000 DQFAD-7090833/A Spec No: A Serial No: E080177870
Engine Manufac�urer Cummins
Model Number; QST30-G5 CPL No: 1704 Serial No: 37235057
Transfer Switch Manufacturer ONAN 7 total ats's onsite
#1. Model/Spec.#: OTPCC-7251541 / Serial#: 1080206882 ATS Ip : ATS-CAM-OPT
#2. Model/Spec.#: OTPCC-7251544/ Seriai#: 1080206885 A7S ID : ATS-CAM-LS
#3. Model/Spec.#: OTPGC-7251540/ Serial#: 1080206883 ATS ID: ATS-HOA-LS
#�. Model/Spec.#: OTPCC-7251541 Serial#: 1080206880 ATS ID: ATS-CAM-LR
#5. Model/Spec.#: OTPCC-7251541 / Serial#: 1080206879 ATS ID: ATS-HOA-LR
Initial Start-up Date: 1/7/2010
Type of Fuel: DIESEL simplex fuel system and daytank.
(Natural Gas,LPG Vapor,LPG Liquld,Gasoline,Diesei)
Type of installation: INDOOR BASEMENT THIRD LEVEL DOWN IN PARKING GARAGE
(indoor/Outdoor)
Type of Cooling: UNIT MOUNT�D RADIFiTOR
(Radiator,City Water Heat Exchanger,City Water Standpipe,Remote Radiator)
Cummins Power Generation Warranty Initiation
Engine/Generator Date: 1/7/2010 Automatic Load 7ransfer Date: 1/7/2010
Checkout and Start-up performed by: KELLY BONNER
(Signature)
Checkout and Start-up performed by:
(Signature)
Company: Cummins ROCKY MOUNTAIN
Witnessed by:
(Signature)
Company:
� 8213 E. 96t" Avenue
,� � Henderson, CO 80640
n 303-287-0201
Initial Start Up&Installation Review
Project#:
Date: WO#:
End User/Owner: Solaris Page 2 ATS
Contact; Phone:
Contractor/Sold Ta
Contact: Phone:
Generator Set Manufacturer
Model Number: Spec No: Seriai No:
Engine Manufacturer ;
I
Model Number: CPL No: Serial No;
Transfer Switch ManufacEurer Onan
#1. Model/Spec.#: OTPC 400 Serial#: 1080206884 ATS ID :
#2. Model/Spec.#: OTPC 300 Serial#: 108020688�r ATS ID :
#3, Model/Spec.#: Serial#: ATS ID :
#4. Model/Spec,#: Serial#: A7S ID :
#5. Model/Spec.#; Serial#: ATS ID :
Initial Start-up Date:
Type of Fuel:
(Naturai Gas,LPG Vapor,LPG Liquid,Gasaline,Diesel)
Type of Installafion:
(Indoor/Outdoor)
Type of Cooling:
(Radiator,City Water Heat Exchanger,Clty Water Standpipe,Remote Radiator)
Cummins Power Generation Warranty Initiation
Engine/Generator Date: Automatic Load Transfer Date:
Checkout and Start-up performed by:
(5ignature)
Checkout and Start-up performed by:
' (Signature)
Company,
Witnessed by:
(Signature)
Company:
Initiai Installation and Prestart Checks
, FUEL SYSTEM Page 1
�]`���PS��������x��
s_ �--'� `�,�-�n�,�:Y-�ti�:
C� Flexible Fuel Connections (supply & return)
� To Engine I� Supply Tank � Day Tank
❑ Base Tank
❑ High Level Alarm
❑ Low Level Alarm
❑ Rupture Basin Alarm
❑ Other
❑ Day Tank
❑ Low Level Alarm
❑ High Level Alarm
❑ Screen/Filter Assembly ahead of Fuel Inlet
❑ Fuel Transfer Pump andlor Solenoid Valve
❑ Day Tank AC Power from Emergency Panel
❑ Site Installed Fuel Piping Proper Material (black pipe only)
[� Check Valves on Engine
❑ Service Isolation valve in Supply Line to Engine/No valve in Return
❑ Fuel Return/Overflow Line to Main Tank One Size Larger than Supply
� Fuel Level below Injectors
p Diesel Fuel Available
p Bleed Diesel
--�y�s�. �� ���-� ��-�—�:���-�° �,��- ����s.,�
C7�����u����s���-�77�1����/��i�r�--��;C1 ��L�P,����i�t��d�����
❑ Manual Shut Off Valve
❑ Primary Gas Pressure Regulator
❑ Gas Volume Surge Tank
CI Dry Fuel Strainer
❑ Gas Solenoid Valve
❑ Flexible Fuel Connection
❑ Gas Pressure at secondary Regulator No Load
Full Load
EXHAUST SYSTEM
0 Rain CaplBeveled End with Screen
0 Flexible Exhaust Tubing
O Exhaust Condensation Trap
� Muffler
� Correct Exhaust Piping Size
� Long-Radius Exhaust Elbows
� Exhaust Thimble
Inifiial Instailation and Prestarfi Checks
' COOLING SYSTEM Page 2
� � ��� � ���� �,
�s���ia��s��`���������
O Unit Mounted ❑ Remote
p Add Coo�ant, Antifreeze, Check LevQi
� Proper Exhaust Ventilation Duct& Opening
� Prope�Inlet Ventilation Opening
� Proper Air Circulation ;
� Check freeze protection level -35 Degrees F i
❑ Proper Plumbing to rempte Raditor �
C1 Proper clearance in front of Radiator? DUCTED WITH REMOT� FAN ASSISTANCE
❑ Surge Tank
'�,? ��-
'���� � w£fr - �'������������ �J
,�•.���'::�_ +�'f=.. #'�e� .�=�`z�_ .
❑ Standpipe ❑Heat Exchanger O Direct
❑ Flexible Water Lines
❑ Water Solenoid Valve
O Water Strainer
❑ Water Available
❑ Proper Air Exhaust & Inlet Ventilation
❑ Proper Air Circulation
GENSET MOUNTING
L�l Secured to Level SurFace
� Oil Drainage Clearance
� Vibration Isolators Installed Correctly &Adjusted
BATTERY
� Type & Size 2 EACH 8D BATTERIES
p Electrolyte
� Correc# Polarity
CI Isolated From Floor
p System Voltage 24 VDC
� Battery Charger Float Voltage 26.4 VDC
❑ Batter Charger Equalize Voltage VDC
GENERAL INSPECTION
0 Mountings
� Clearances
Cl Supports
Initial Installation and Prestart Checks
ELECTRICAL Page 3
� Engine Water Jacket Heater Wired to Normal Source, Voltage 480 VAC
� Battery Charger wired to Normal Source.
� Flexible Generator Load conductors/Conduits
O DC Interconnect wiring complete?
C] Generator Load Conductors Connected Correctly? (Phases & Neutral)
C] Is Plant Grounded? �Yes ❑No ,Where C��7Z����, ��( v,-,z_
C7 Is Generator Neutral Grounded (Four Pole ATS/s)? C7Yes ❑No
� � Line, Load, & Emergency. Conductors Connected to proper location in ATS?
p Alarm Network.installed? 0 Yes ❑No Operational? C�r�s ❑rvo
RECOMMENDATION OR MODIFICATIONS BEFORE PLANT IS STARTED FIRST TIME
unit needs to be secured to pad. Fresh air intake almost directly over radiator on the left side. Fresh air
and hot air are ducted. Louuers installed backwards, customer will reverse after testing is complete.
❑ Modifications Completed E-�'"�OK for Start Up
OK for Start Up By : kelly bonner -
(Name) (Signature)
START UP& CHECK OUT
� Hoses
p Check Oil Level
O Fuel Solenoid valve Wired to Ignition System
� Operatio Selectar Switch to Off
C� Inspect Belt, Fan, Altenator, & Governar
Cl Wiring
START AND WARM UP PERIOD (NO 40AD)
� ATS Locked out of Emergnecy- Linear Motor Control - Off
p Circuifi Breaker�pen
Cl Start Engine (Selectar Switch in "Run" Position)
f� Oi! Pressure 64 psi. L9-L2 VAC 480
� Water Temperature 170 deg. L2-L3 VAC 480
O Battery Voltage 26.9 VDC L1-L3 VAC 480
� Frequency 60 Hz.
C1 Any oil or coolant leaks detected?
� Unusual NoisesNibrations ❑ves CI►vo
� Check co ntrol voltage calibration
� Check Low Coolant Level Safety Switch �
Initial Installation and Prestart Checks
� ELECTRICAL CHECK OUT Page 4
� Generator Main Circuit Breaker Closed
� � Automatic Transfer Switch Set Points
ATS-CAM- ATS-CAM- ATS-H�A- ATS-CAM- ATS-HOA-
ATS ID OPT LS LS LR LR
Remote Start Wiring Correct � 0 � CJ 0
Under Valtage Pickup % of Normal 90 90 90 90 90
Under Volfiage Drop Out % of Pickup 85 85 85 85 85
Over Voltage Drop Out% of Normal
Over Voltage Delay in Seconds
Freq. Sensing Pickup % of Normal 10 10 10 10 10
Freq. Sensing Delay in Seconds 1 1 1 1 1
Utility Voltage L,ine to Line (VAC)
Generator Voltage Line to Line (VAC) 480 480 480 480 480
Utility Frequency (HZ) 60 60 60 60 60
Generator Frequency(HZ) 60 60 60 60 60
Phase Rotation Utility ❑ccw ❑cw ❑ccw ❑cw ❑ccw ❑cw ❑ccw ❑cw ❑ccw ❑cw
Phase Rotaion Generator ❑ccw ❑cw ❑ccw ❑cw ❑ccw ❑cw �ccw ❑cw ❑ccw ❑cw
START UP PERIOD (ADD LOAD)
� Selsctor Switch in "Run" Position
� Add Load by Load Bank- if required
AUTOMATIC START
� Check �il & Water Levels
C� ySelector Switch in "Auto" .
D�Simulate Power Failure (Utility,Main Breaker, or Test Switch @ ATS)
0 Set ATS Time Delays
� ATS Linear Motor Switch - ON
ENGINE/GENERATOR
0 Engine Start OK?
0 Engine & Generator Under Load OK?
C7 AMPS: Line 1 p Line 2 0 Line 3 0
0 Voltage: L.'!-L2 480 L1-L3 480 L2-L3 480
� Hertz 60 Hz.
� Oil Pressure 55 psi.
� Wa#er Temperature 170 deg.
Cl Unusual NoisesNibrations
Initial Installation and Prestart Checks
�UTOMATIC LOAD TRANSFER pa���
(�Transfer to Emergency OK
C�.�eturn Load to Normal (Utility,Main Breaker, or Test Switch @ ATS)
� Retransfer to Normal OK
�Time Delays Times Out Properly
C�l'�enset Shut- Down OK
ATS-CAM- ATS-CAM- ATS-HOA- ATS-CAM- ATS-HOA-
ATS ID OPT LS LS LR LR
Start Time Delay in (sec.) '3���-�- '3 ��<..- ' � � �`�� � �c �
Transfer Time Delay in (sec.) N ��� � `���. ��` 3�.;.<.�:.._ 3 � �
Program Transiton Time Delay (sec.) 3��� ( �� 1�. ` s{ �-- �-
Re-TransferTime Delay (min.) IorN�n p�;� ��,�; � �.�.,.� /o,�-,, `.-�
Cool Down Period (min.) 3,.,�;r �,-•.;.� �•��� � M� �--- 3�-� ��---
FINAL INSTALLATION RECOMMENDATIONS
exhaust leak in generator raom, customer advised and will make the repairs after all testing is
completed. Customer advised of intake louver location, customer advised of exhaust louvers operating
in the wrong direction.
A%� G"o .'�Ts ��
•'�r S .3 3��c._ �'17�5 3 S t.�.
7'D yt('� �s r �— %�i U� y 5--�..�
�rp�.�f �v,.,,,,�._ f',7� �r" � s� �—
���� /S,t�.� nJ �� r v n,.. �.�
1"a�C.... 3,�: ,... 7'�j�, � 3,�: .`--
CUMMINS POWER GENERATION WARRANTY INITIATION
Engine/Generator Date: 1/7/2010
Automatic Load Transfer Switch Date: 1/7/2010
CHECKOUT& INITIAL START�UP
Pertormed BY: KE�.LY BONNER
Performed BY: 0
Witnessed By: 0
Company: 0
PRODUCT TRAINING
Performed BY: Date :