Loading...
HomeMy WebLinkAboutB10-0222 � � NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES � � . ; . �wxo�vn� � � ���, t � Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 � p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 =` � � ADD/ALT MF BUILD PERMIT Permit #: B10-0222 � Project #: PRJ09-0529 � Job Address: 520 E LIONSHEAD CIR VAIL Status. . : ISSUED Location......: UNIT 201, LIONSHEAD CENTER Applied . . : 08/05/2010 Parcel No....: 210107103002 Issued. .. : 09/13/2010 Expires. ..: 03/12/2011 : OWNER GOURIEUX, KIMBERLY W.&ERIC 08/05/2010 �' 6200 WOODSBORO RD NEWBURGH " � IN 47630 APPLICANT ONE CALL CONSTRUCTION 08/05/2010 Phone: 303-545-5999 1441 QUINCE AVE BOULDER CO 80304 License: 1053-B CONTRACTOR ONE CALL CONSTRUCTION 08/05/2010 Phone:303-545-5999 1441 QUINCE AVE �' BOULDER CO 80304 License: 1053-B Description: ADDITION:ENCLOSE DECK,81 SQ FT ADDED Occupancy: R2 Valuation: $116,731.00 Type Construction:IlA Total Sq Ft Added: 0 ......................................................,.......«...........«......, FEE SUMMARY .........,.,..,.,,.........,...«.............,.......«..,..,...,.........,,.,.._. ; Building Permit Fee----> $1,088.95 Will Cal Fee------------------> $4.00 Total Calculated Fees-------------> $3,935.39 ' : Plan Check-----------------> $707.82 Use Tax Fee---------------------> $2,134.62 Additional Fees------------------> $1,916.87 �' ; Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES------------> �5,852.26 t` ' Investigation-----------------> $0.00 Recreation Fee---------------> $0.00 � Payments--------- -------> a5,852.26 " Total Calculated Fees--------> $3,935.39 BALANCE DUE--------------------> a0.00 � � ...........................................,.......,,..._....,........,..,.,..«..,.,..,...,,...,...,,,.,,......_......................,.,..,......,,,,......,....,....._,...,,.....,,._= f DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the information ; as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS R INSPECTION E TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4:0 PM. �I �— � �c� �� Si ature of Owne or Contra or Date V ri t Name b Id_a It_con stru ction_perm it_041908 i t � � � ..................................................................................................................................................................................... APPROVALS Permit#: B10-0222 as of 09-13-2010 Status: ISSUED ffrfxfiYk�lYwlff`+l44iRrtYiM'}�Mfr�1f V Y�lrtYr#fHlrtrl'rtYr4#f##f1rRfYMf*d#f}�1rkA'A'Y41(f�tte V ffiYrfiNt#lfRfRRRffrf�ikYf�t#f�f1r1r1rkftf4R41rtrfefr V iRRt�Y4fr4klRR V ftYilf`f'f`lFlrRrtf#t#f4fR1rRR V fiFhtlf#4Rf'RRfrYf�k�k4l�4V V1rlrrtYrt�k'kitf+Mft Item: 05100 BUILDING DEPARTMENT � 08/25/2010 cg Action: AP = Item: 05400 PLANNING DEPARTMENT 08/12/2010 bgibson Action: AP plans routed to D-2 Item: 05600 FIRE DEPARTMENT 08/27/2010 mvaughan Action: AP sprinkler and fire alarm system changes shall be conducted under separate permit. �R1rfhY4Yeffti�l44RitMA�RA'tki1l#*fitf4YtfYf�ffRV VRfA'YftffR#wfxRA'rt4Y(Y(1�1e#ffx�frtA'ik�i%�kti�lfffxxtA'i4Nf#41`R*fA#44#YfiFf44ffff�Li4frYli(f1(IOfffftffYr*RM�A�f�1r��RffYefYfl�t/44441rf�fLYtYt�4�ff44R4frf4A'fi`itk#i See the Conditions section of this Document for any that may apply. v bld alt_construction_permit_041908 � � .................�..........�....:_....�.................:.,........«.........................«................,..�........,.................:............................+....»...... � CONDITIONS OF APPROVAL Permit#: 610-0222 as of 09-13-2010 Status: ISSUED = ...........................................,,...,...........,...,...,,....,..............,..._......,......,.::...,,...,,,.........,.......,,..,.,.....:.................,..,,...�..,.,... � € Cond: 12 s ; (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE � ' COMPLIANCE. Cond: 14 ` � (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. ` Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. � � F bld_alt construction_permit_041908 B10-0222: Entries for Item:90 - BLDG-Final 15:23 11/21/2013 Action Comments By Date Unique_ Ke AP sgremmer 12/17/2010 A000139 998 Total Rows: 1 Page 1 � � � i s; � ****************************************��*********************�************s*************** � TOWN OF VAIL, COLORADO Statement � ***�********�***�****�***********************�************+****************************�**** � Statement Number: R100001285 Amount: $5,144 .44 09/13/201009:45 AM Payment Method:Credit Crd Init: LC � Notation: credit card � from james a fugett " ----------------------------------------------------------------------------- � Permit No: B10-0222 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2101-071-0300-2 Site Address: 520 E LIONSHEAD CIR VAIL k Location: UNIT 201, LIONSHEAD CENTER Total Fees: $5, 852.26 This Payment: $5, 144 .44 Total ALL Pmts: $5, 852.26 Balance: $0.00 ; *�********�**�****�********************************�*******************�**********�********* ACCOUNT ITEM LIST: Account Code Description Current Pmts = ------------ ------------ , 11000003113300, CHPO HOUSING FEE IN LIEU 1, 916.87 BP 00100003111100 BUILDING PERMIT FEES 1, 088.95 UT 11000003106000 USE TAX 4� 2, 134 .62 WC 00100003112800 WILL CALL INSPECTION FEE 4 .00 *************+***********+*+********�**�***********************************+++************** TOWN OF VAIL, COLORADO Statement ***************************************************+**********�****************+****+******* Statement Number: R100000988 Amount: $707.82 08/05/201003 :41 PM Payment Method:Credit Crd Init: SAB Notation: VISA JAMES FUGETT ----------------------------------------------------------------------------- Permit No: B10-0222 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2101-071-0300-2 Site Address: 520 E LIONSHEAD CIR VAIL Location: UNIT 201, LIONSHEAD CENTER Total Fees: $3, 935.39 This Payment: $707.82 Total ALL Pmts: $707.82 Balance: $3,227.57 ******************************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ PF 00100003112300 PLAN CHECK FEES 707 .82 ----------------------------------------------------------------------------- � ��. ` � % = • Department of Community Development� ; «, �� .'. �� � �; � ° � 75 South Frontage Ro�d ; . � , �q . - ,� _�'��� A�=��� � ;�� �. x� A Va�I,;Colorado 8 k65��" .�� 4 �x � � ` � � ,��.a��„ � � � � , �,�� ��� ,� �.,�,`,�" r -' Tel 970=479 2'�2$ 3� f� ,. �� � ������� .. �`:�.�� �� Fax 970=4�79 2'4�2 . � �'� 'M��. � }� � .: '- rlUeb: www.vaifgflv�com � E r�s,�'� , =- � �� �� , t = �� � �=� Developr�ent��riev�r �oo�dinato� � jE jy.yf}�2Jj y{j,� ��� ����.��-� ` �� � � I_ ��.,}3�p�7��.c:J'��.�.'�..,... . ... , . .w��., °� � �':>e.. , l:� ,..+._...u.,�,ce:a+.t�',�"a.a�.�..`"0...u'.� y. BUILDING PERMIT APPLICATION Separate permits are required for electrical, plumbing, mechanical, fireplace, etc. �Project Street Address: � � _ , Office Use: � q � ,irl�� �C��=�������� � ������, c �� � Project#: ��(�Cl'�5 0� / t(Number) (Street) (Suite#) DRB#: 1 Jaa7����J� '�Building/Complex Name: t_������� ��E�� C�E��E��� �'�� guilding Permit#: ��•(�c�� �� "�"'� `"`�"" °""`°� � �� �'°"'" Lot#: Block# Subdivision: i Contractor Information `Company: C��� C�L�... �L�'�J���.` ��1 �� ; ;Company Address: ���� ���`1�� ���, � Detailed Scope and Location of Work: �City: b�.7�.`���.1�L`� State: �� Zip: ���X� — � � ��T��'1���>l� uC�°1•�()�1�� - a�'� \ ����._ ; � �,��rt-- � ;Contact Name: J��L �L='l7��� � Cr�,��i�.l �Ir- �!�'�� ��� 1���� . �`►.���f`'`.�G � E Contact Phone: �����, �iLt�, ..�-S ti� � � �� l:C t �> _�.�� � � 1 � ',1�.7?��`��'�`=-� : ' � r �(use additional sheet if necessary) � E-Mail_ ����1�� '� C�1�.�C.1�1. 1V �-�C t,� �..._.�,,.�u_,.�.x,�».�n,�,,,,�,.,� �....._�,,.,»�.��,,� ��,.�,,�,�.Y..�_._.�,.�,,.�,� ��-� r Work Class: j :Town of Vail C tractor Regist ation No.: � � �� "�� � ? , � New( ) Addition( ) Remodel('`� Repair( ) Other( ) � _ X ;,.,�..�.a.�.��.�w��.,���,.�...�.�,�.,�,. �...�.�.�,.t:,�._ � � �Work Type � ; Contractor Si nature(required) � Interior( ) Exterior( ) Both(�) ; :�.., .,�....�,,,�,.�. �,,�.,.�..__-__A�,�.,. �,r,�.,w� u..�,:»,�, ��w.:.,,,� �..��, .`.r.��..�,�.,.�..�,���,,�ra.,��,,,�.,,d,�. ' � _ ,�, .,,,.m�.,,�,,���v,,�,�,.,_.,�.�.._.b�.z.��,A.�»�,,�,,� ``Property Information s Type of Building: j ;Parcel#: � Single-Family( ) Duplex( ) Multi-Family(� E(For parcel#,contact Eagle County Assessors Office at 970-328-8640 or � Commercial (�.) Other O visit www.eaglecounty.us/patie) _ �.,�,m�,..,���d,�.�,�,«���._.,�,m,�.�r,�.��,.�n.,,,�,=ti,rm , _F� .,�..,,.�_.�.,��,�,; 4 KK, Tenant Name: � Does a Fire Alarm Exist? Yes OC,.) No O ` i `�.Owner Name: �`r.�t5�-�� ��_�'��°� Monitored Alarm? Yes(�) No O ; � Does a Sprinkler System Exist? Yes(''F-) No( ) ,�, �_..,..� _�_....�.,�.,�..� �.�.,��,...�.,...�u� .�,�..��..m ,a�..� . �� ..._��.�.__., ..,�.,.,���.,.,�.�,. ..,�...�..��..�...�.,.��.,��..�,.�. �, ..� �,..�,�,.���; �Valuations(Labor&Materials) �#&Type of Existing Fireplaces: Gas Appliances � ' �Gas Log Wood/Pellet Wood Burning � � �Building: $ ��J: lC� i � , �#&Type of Proposed Fireplaces: Gas Appliances �Plumbing: $ �Li� ��-,� ` Gas Log Wood/Pellet Wood Buming Q_ � * A ___ _...._ _ .._. _ _ . ... _._...__.. .----......_.-- -- :Electrical: $ `� . J`t �� ; � � (� � � � C � �`._� €Date Received: D �� �MechanicaL (including fireplace) $ � 4 � � \� � E Total: $��I[�� � �` QUG �5 2��0 ; �_.._..._._........__..__...._....._._._..._._.._---._....................__...._...._...._...--...._.__...__--------...._..__..__...._..._............__._..__.._......---.....__.... TOWN Or VAIL 15-May-10 COMcheck Software Version 3.8.0 Envelope Compliance Certificate 2009 IECC Section 1: Project Information Project Type:Addition Project Title: Construction Site: Owner/Agent: Designer/Contractor: Section 2: General Information Building Location(for weather data): Vail,Colorado Climate Zone: 6b Vertical Glazing/Wall Area Pct.: 27% Activitv Tvoe(s) Floor Area Multifamily 400 Section 3: Requirements Checklist �- . . �- ..- Climate-Specific Requirements: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R-Value R-Value U-Factor U-Factor�a� Perimeter Exterior Wall 1:Steel-Framed, 16"o.c. 510 13.0 7.5 0.064 0.057 Window 1:Wood Frame:Double Pane with Low-E,Clear,SHGC 139 -- -- 0.350 0.350 0.60 Floor 1:Concrete Floor(over unconditioned space) 68 -- 12.0 0.066 0.057 Roof 1:Insulation Entirely Above Deck 68 -- 20.0 0.048 0.048 (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. Air Leakage, Component Certification,and Vapor Retarder Requirements: � 1. All joints and penetrations are caulked,gasketed or covered with a moisture vapor-pertneable wrapping material installed in accordance with the manufacturer's installation instructions. � 2. Windows,doors,and skylights certified as meeting leakage requirements. � 3. Component R-values 8 U-factors labeled as certified. � 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. � 5. 'Other components have supporting documentation for proposed U-Factors. � 6. Insulation installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the insulation. � 7. Stair,elevator shaft vents,and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. � 8. Cargo doors and loading dock doors are weather sealed. � 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,are sealed with gasket or caulk. � 10.Building entrance doors have a vestibule equipped with closing devices. Exceptions: � Building entrances with revolving doors. � Doors that open directly from a space less than 3000 sq.ft.in area. ,,, Project Title: Report date: 08/03/10 Data filename:P:\CuRent Projects\10023.00-Lionshead Center Unit 201\Calculations\COMcheck\10023-Comcheck.cck Page 1 of 6 Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.0 and to comply with the ma atory requirements in thcRequirements Checklist. c'�-`�- �'`���-��.:�`�'� — r�1� �� �/ ,� �� ��J Name-TiUe Si ature Dat __ _ Project Title: Report date: 08/03/10 Data filename:P:\Current Projects\10023.00-Lionshead Center Unit 201\Calculations\COMcheck\10023-Comcheck.cck Page 2 of 6 COMcheck Software Version 3.8.0 Mechanical Compliance Certificate 2009 IECC Section 1: Project Information Project Type:Addition Project Title: Construction Site: Owner/Agent: DesignedContractor: Section 2: General Information Building Location(for weather data): Vail,Colorado Climate Zone: 6b Section 3: Mechanical Systems List uanti Svstem Type 8 Description 1 HVAC System 1:Heating:Radiant Heater,Hot Water,Capacity 9 kBtu/h/Single Zone w/Perimeter System Section 4: Requirements Checklist Requirements Specific To: HVAC System 1 : � 1. Balancing and pressure test connections on all hydronic terminal devices Generic Requirements: Must be met by all systems to which the requirement is applicable: � 1. Plant equipment and system capacity no greater than needed to meet loads � Exception:Standby equipment automatically off when primary system is operating � Exception:Multiple units controlled to sequence operation as a function of load � 2. Minimum one temperature control device per system � 3. Minimum one humidity control device per installed humidification/dehumidification system � 4. Load calculations per ASHRAE/ACCA Standard 183 � 5. Automatic Controls:Setback to 55°F(heat)and 85°F(cool);7-day clock, 2-hour occupant override, 10-hour backup � Exception:Continuously operating zones � Exception:2 kW demand or less,submit calculations � 6. Outside-air source for ventilation;system capable of reducing OSA to required minimum � 7. Hot water pipe insulation: 1 in.for pipes<=1.5 in.and 2 in.for pipes>1.5 in. Chilled water/refrigeranUbrine pipe insulation: 1 in.for pipes<=1.5 in.and 1.5 in.for pipes>1.5 in. Steam pipe insulation: 1.5 in.for pipes<=1.5 in.and 3 in.for pipes >1.5 in. � Exception:Piping within HVAC equipment. � Exception:Fluid temperatures between 55 and 105°F. � Exception:Fluid not heated or cooled with renewable energy. � Exception:Piping within room fan-coil(with AHRI440 rating)and unit ventilators(with AHRI840 rating). � Exception:Runouts<4 ft in length. � 8. Operation and maintenance manual provided to building owner � 9. Demand control ventilation(DCV)present for high design occupancy areas(>40 person/1000 ft2 in spaces>500 ft2) and served by systems with any one of 1)an air-side economizer,2)automatic modulating control of the outdoor air damper,or 3)a design outdoor airflow greater than 3000 cfm. � Exception:Systems with heat recovery. Project Title: Report date: 08/03/10 Data filename:P:\Current Projects\10023.00-Lionshead Center Unit 201\Calculations\COMcheck\10023-Comcheck.cck Page 3 of 6 � Exception:Multiple-zone systems without DDC of individual zones communicating with a central control panel. � Exception:Systems with a design outdoor airflow less than 1200 cfm. � Exception:Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. � 10.Automatic controls for freeze protection systems present � 11.Three-pipe systems not used � 12.Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70%outside air fraction or specifically exempted � Exception:Hazardous exhaust systems,commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. � Exception:Systems serving spaces that are heated and not cooled to less than 60°F. � Exception:Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. � Exception:Heating systems in climates with less than 3600 HDD. � Exception:Cooling systems in climates with a 1 percent cooling design wet-bulb temperature less than 64°F. � Exception:Systems requiring dehumidification that employ energy recovery in series with the cooling coil. � Exception:Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or,a separate make up air supply meeting the following makeup air requirements:a)at least 75 percent of exhaust flow rate,b)heated to no more than 2°F below room setpoint temperature,c)cooled to no lower than 3°F above room setpoint temperature,d)no humidification added,e)no simultaneous heating and cooling. Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.0 and to comply with the mand,�tory requirements in the Requirements Checklist. � ����c ��S�V���S�� = -,-�, �L� ;d � �� Name-Title Sig tu� Date . . _—_ Project Title: Report date: 08/03/10 Data filename:P:\Current Projects\10023.00-Lionshead Center Unit 201\Calculations\COMcheck\10023-Comcheck.cck Page 4 of 6 VAtI �!F E�� l� �'�_� �.V `'✓�,i I t t. / � � � �, •� 1 / `� �� ��FR�NCY9E?��c�� Vail Fire Department Asbestos Testing &Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu- lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two-Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including multi-family/condominium units,and fractional fee units. Asbestos testing results must be provided with your application for a building permit. � Tests which identify POSITIVE results at more than 1% require abatement by a State-certified and Vail-registered abate- ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: � Will not disturb more than the threshold limits identified above. � Tested negative, or at 1% or below (1 copies of test results included) � Tested positive at more than 1%, requires abatement (1 copies of test results included) Tips&Facts: • Even recent construction projects may include asbestos-containing materials, so buildings of a�age require testing. • The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: State of Colorado Contact: Fire Prevention Bureau Colorado Department of Public Health Vail Fire Department and Environment 75 S Frontage Rd Asbestos Compliance Assistance Group Fire_inspectors@vailgov.com 303-692-3158 970-479-2252 asbestos@state.co.us www.vailgov.com www.cdphe.state.co.us 15-May-10 . Boulder Environmental Management, Inc. 5 Deer Trail Road Boulder,CO 80302 Phone: (303)449-1175 Fax: 1 (866)699-4121 May 26, 2010 One Call Construction Mr. Jim Fugett jfugett@comcast.net RE: Bulk sampling of suspected asbestos-containing materials Lionshead Center, 520 Lionshead Circle, Unit 201,Vail, Colorado Dear Mr. Fugget: Attached is the report for the asbestos survey and bulk sampling of suspected asbestos- containing building materials at Lionshead Center, 520 Lionshead Circle, Unit 201, Vail, Colorado. This investigation was conducted on behalf of and for the exclusive use of One Call Construction (client), solely for use in a limited asbestos survey of the property. This report and the findings herein shall not, in whole or in part, be disseminated or conveyed to any other party, nor used by any other party, in whole or in part, without prior written consent of Boulder Environmental Management. The results of this survey are limited to materials that were assessable and foreseeable. Additional materials may exist behind hard surfaces. Personnel knowledgeable of asbestos containing materials should always oversee demolition activities. Demolition work should be halted and sampling performed by a state of Colorado licensed building inspector if additional materials, which are suspected of containing asbestos, are encountered. If you have any questions regarding the contents of this report, please do not hesitate to contact us. Sincerely, hris ron Project Manager *Asbestos*Lead*Industrial Hygiene*Safety*Final Air Testing* *Health and Safety Training* Boulder Environmental Management, Inc. 2 5 Deer Trail Road Boulder,CO 80302 Phone: (303)449-1175 Fax: 1 (866)699-4121 BULK SAMPLING REPORT Lionshead Center, 520 Lionshead Circle, Unit 201, Vail, Colorado Introduction: On May 24,2010, Boulder Environmental Management, Inc.'s building inspector, Chris Maron, conducted bulk samplin of suspected asbestos-containing materials under the direction of our client. Sampling: During the sampling process, suspect ACM was separated into three EPA categaries. These categories are thermal system insulation(TSI), surfacing ACM, and miscellaneous ACM. TSI includes all materials used to prevent heat loss or gain or water condensation on mechanical systems. Examples of TSI are pipe coverings, boiler insulation, duct wrap, and mud packed fitting cement. Surfacing ACM includes all ACM that is sprayed, trowelled, or otherwise applied to a surface. These applications are most commonly used in fireproofing, decorative and acoustical applications. Miscellaneous materials include all ACM not listed in the thermal system insulation or surfacing categories, such as linoleum, vinyl asbestos flooring, and ceiling tile. Boulder Environmental Management, Inc. followed EPA recommended sampling guidelines for identification of asbestos in bulk matrices. A set of three (3), five (5), or seven (7) samples were collected far each material type and analyzed by Polarized Light Microscopy (PLM). Each sample set was systematically analyzed. Upon determination that a sample in a set contained asbestos, analysis of the remaining samples in the set was discontinued. If no asbestos was detected during the analyses, the suspect material was determined to be negative for asbestos content. *Asbestos*Lead*Industrial Hygiene*Safety*Final Air Testing* *Health and Safety Training* Boulder Environmental Management, Inc. 3 5 Deer Trail Road Boulder,CO 80302 Phone: (303)449-1175 Fax: 1 (866)699-4121 Results: The following materials were analyzed and determined to be trace asbestos-containing utilizing polarized light microscopy(PLM). TRACE ASBESTOS-CONTAINING MATERIALS MATERIAL LOCATION SAMPLE ID Drywall and joint Bedroom closet 5-24-CM-OIA compound Bedroom east wall 5-24-CM-02A** Stora e closet at entry S wall 5-24-CM-03A Drywall and joint Outdoor patio ceiling 5-24-CM-04B** compound Outdoor patio ceiling 5-24-CM-OSB** Outdoor atio ceilin 5-24-CM-06B** **Sample was further analyzed by point count method. The analysis determined that the material contained 1% asbestos or less. The Environmental Protection Agency and the state of Colorado Department of Public Health and Environment do not regulate materials that have an overall asbestos content of 1% or less. However, Occupational Safety and Health Administration regulations apply to workers handling the material. Discussion: Sample analyses results are reported in percentages of asbestos and non-asbestos components. The EPA defines any material that contains greater than one percent (1%) asbestos, utilizing PLM, as being an asbestos containing material. Materials that are identified as "none detected" are specified as not containing asbestos. Conclusion: The following drywall and joint compound systems contained 1% asbestos or less: • Drywall and joint compound throughout the interior of the suite 201 • Drywall and joint compound the outdoor patio ceiling associated with suite 201 The demolition of materials that contain 1% asbestos or less require OSHA handling guidelines be followed. However, a state licensed asbestos abatement contractor is not required to perform such work. It is recommended that a licensed asbestos abatement contractor be retained for this demolition to comply with OSHA requirements regarding the demolition of asbestos containing materials that contain less than 1% asbestos. The OSHA regulation 29 CFR 1926.1101(g)(1)(ii) and (iii), as well as record-keeping requirements under 29 CFR 1926.1101(n)that are associated with the negative exposure assessment, apply so long as neither asbestos permissible exposure limit (PEL) is exceeded or might be exceeded. *Asbestos*Lead*Industrial Hygiene*Safety*Final Air Testing* *Health and Safety Training* Boulder Environmental Management, Inc. 4 5 Deer Trail Road Boulder,CO 80302 Phone: (303)449-1175 Fax: 1 (866)699-4121 29 CFR 1926.1101(g)(1)(ii) requires: "Wet methods, or wetting agents, to control employee exposures during asbestos handling, mixing, removal, cutting, application, and cleanup, except where employers demonstrate that the use of wet methods is infeasible due to for example, the creation of electrical hazards, equipment malfunction, and, in roofing, except as provide in paragraph (g)(8)(ii) of this section;" and 29 CFR 1926.1101(g)(1)(iii)requires: "Prompt clean-up and disposal of wastes and debris contaminated with asbestos in leak- tight containers except in roofing operations, where the procedures specified in paragraph (g)(8)(ii) of this section apply." The results of this survey pertain only to materials tested. The laboratory reports supporting these findings above are attached. Please contact Boulder Environmental Management, Inc. with any questions or concerns regarding this report. Sincerely, Chris Maron Project Manager *Asbestos*Lead*Industrial Hygiene*Safety*Final Air Testing* *Health and Safety Training* �� �' `" �y ����*t t'�" �'� ' �,e�i ��� �` �i°��t ' x�,ryy. t.��,'�M ,,. � ;�� ,� „�� -� _ '�� `� F `��� k'"���'�'�,��� - �����;�`��, �� � �, 4 * � � .. � � � � �° ' � �� - $a� a r '��� �g'4�#t =y �"�'r.+ s t=� �,,. ���°� �Z< ��, .� �7' '�v 3�'�# i �'« � "' . ..r .;�"'ti'h,�t`�-'`:. +,�tx �+,s �:>;,A . t�� ;'�-.;�`t `�+.+'� ����; 5�' � ,�'-�y; �'�a+r. a ?�� . _ ��� ��s . . � > . , . , �,t . . .-. � `.. � � > >..� . , _. E. �' ,. * > : , _ <,� s �. � � �-. . ,. s: crva* , ;' .'�` '"d "�p ...- y - ��. , d � fe . rc, . _ �� . � . . . . . . . .. . �.. �_ # .. ,:. �. . .,, �, .... l._.!����-� ���.� \ 1 ��" �x� �.�� ��,/`� ���� � � �f �� ; �� �� ��31�.`�"������►``� � �'��J�����1��1 ���[ C "a���l����.�:`'���'� k E`,�l��rt�4�t� I)�t�.�:�tt;��:wtt �af l'���li�� 13��z1c�� .. � : �:1.�� C.r,����:�������:��t �°�� � �1�r t'��[4��t:r�z� t..���€�����,� I�}i��i�,�c�� � - _ . 1 :; �� e : � � .; � _�.,r � �..��-�� � � '�11'I� ����t't)tl ('€rxtii�i�:tti«r� '`�t►: C►�� � . ,���' �"� _. , � . � ���5 ;���t tl�c: ���.���s,�;1�?�°x�t�c��i� � �— —`��� , C� _(�_� ft��-�' ��.�.� �?��ii.t� �'c�r��s'�;l Y ('��it����i4;ickr, E��:;�t�l��tit3r� '�c,. >. �'.�t`t �3, i�nc.� ?s ���-s�c:l�� �:��`t�t��:� E�� ti�c ��at� k�t�t ��I�±���c1�? itt tl,c� tf,Pl<�ti�ifit;y c�t��s�.aii��<k. ir����c,ct«i�;�'�1�������������.3��t �'��t�ncYr=� . � � � -� ,�e _ �515k#t'C�: �� 7+af? t� ` ` � .. ����_ ` _ �,� a ' �� �"i E�:���ircxa �stt; �) ��*��?(11l.► ":�' -,pr;.t . 3-:. � sb�¢� . . . .. . ., °`��. � �+^.' ss,..:�4e�N-�.."v`"'t(,.:,L.�,'#f#t��t'� i r��,�.`:. .� � ^�,�k� "w.�;5.�9t �a <t m � .. S _ a - %,r � , � '' ��`� "� t7aic�.�rt�Jerrrt�°i��vrL±d:,ntY:.•xt�i1����„> < <�.<e.,��.>���rcnt tia��e�t�,y-,wf=y�r=,r�itara�u�i,�r�r.����cr = i,�°rtiftt�dlvu in t3F,°s7ast:ij�tn.x xj�ra�rtt Fah�ir ';a� a . w � r` • � , . � r ,,. , s � ,�,� �,r=, . . .� �: ° ..: ° _ � - aeAS . _ -�. .�7 , _ r.� _ ..- � _ .. � . „"� ".�". `,` _ . . _ .. � ,° �, .. ... ` ,Y�. �• ��� . `�. -.� ��� �` a � , �� ,�.Y � �� '� �} ,4 �'s'� ��y;v.,���. .,,,"�!+� r�:� , �a�` "'� �� a;.,. "� #:.,c's r"�� k ""` ``�,�_ t s'�a����$�r�$��� �,g,� ''*� '�.��� �'"� �, .��, , �`° .s *� � �t, ".«�-� �'��� , � �", . �;.�, . .�„,„,a« . a'y' t,, :.� :��. f "��� �t .` '�''..�.{4*�➢ i"R' "k `r �`�+#�.$�' '�.,. . � "s�'���{ ���'y���3 ������'�"��.s�`� "��`���w`�� �` .... iT w �, �s3'�v.4#a � .3 i � � � ��.. �-0� 1�#���? 1 F ',i�i»W e� �w s�.�j��gP n�°ro° ��� d �;� . q e r. � k t i ,. l.B' `� ,9 :° . ,`�, ' p'�a £g, 58 6+ � '��4 '4'`s f tiY y s L ,, » : . � �_ � w. . � � - , . - „,i ,��, . ,� -- .� �. `� . -. .e . _.,�: ,e M. �:, �, _.� . .�-,� �. , a�. a� � ,r � r :^9K _ �� � � � � ������ �� �� �' �� �� ��� ,.,.._.__ �...._... _ __ w�,.,__ ..., .��.. . ,-_. _ ,..,__. � �� � v � � �:� � � � r� �� ?�;�i t ake�ri�:w4 I.atax� E�s��3n�f��ffi �cs#ar��7� 9+'.lCt.".� t�I .sr.�w 5���:�!�4:' ��x �r,.� • � ' ��;£;t", . s � • � i fs , .�� -ti,�,, �.�.�����;�t�s: ��h� EPA-Appraved �HERA Ar�nual Refr�sh�r Course fc�r iN�P��TC��.��AI�AG�M�NT PL_AN.N�R Tt��� c,c���s� �s �PA-ap�rc��,r�d unc��r �ect�an '��6 c�f t�+� , �,x�� =;t�t�;�tare�s �a��rr�i R�i �� �' � � m ;� t{���,��;;�t���� d � � Fx�n�r C��t� � � Gf'�'SI�iCf3ltr? h�lt7 ; "'�� Ex��rat�ar� Q�te ��� ��.�: ����� � ������ �,� � �� > �'a�>� `f�,s`�r�..'s.�:* �.�� �'; (TSCA) and ��r�ee#s th� rec�uir�rr�enis �f Colorad� Reguiat�ar� NU. 8. ��I t r�Ci� ; � � � ��� � � �� � � �. .. _ �.e. � �� a � q A�Ci9 C�3i� Eil'htiP 4�fl2 � � � � ._._.. .. u __.�... , , , ; ,_._ �'° : ; __. �_ _ _.�_ ....�.�__�i�,ii?1�;. _ _ K. J�y Gal�� P�rsid�nt � � � ��; ,�' r;��. �1�e 1 ° � , y; ��."`�� t a�� � �y�' f ' _» +T �,�':�, P �""� � n,� � � �«�B � k. •f �� �� ,�a€.��� ��_ '�a �� ���� 'a � '�+�i1,a.�mt'`t �* �� �:' � ���5 s.�� x i � s r . �� < : 4 a a 4 � }F. a � ° a' ,, y . Ak py�+ � r, ; .fii� .`.� v�� 7�� � s Q '�`# � _ -. �f'� 1 , -=�,� .wy. �- �+tw . .,a ... . .. . s �.. _ � , ..- »rim- .,r =.. ', v -'n w. -,.m��,sz-- • :�"#. �". ��#3 # .., . • � `••` � � � � � �: k _. .,e.��� . w�� ,� m ,n.� _� " �. . ' � . � ; � . , " y� � . .. MAY-25-2010 12:29P FRpM:STRC�1 ENV, iC�3)487-4534 T0:1866699q12? P.2�10 Boulder Environmenta! Management, lnc., 5 Dter Trail Road,Boulder,CO 80302,Phone�(303)449-I 175, Fax: I (866)b49-4121,Emaih Cmaron3000(rr�aoLcom ���� � � BULK SA�I,E LOG b ��n�s� �� LocA-r�orr: �ZO L,��,� C;r _ .C«� VQ;� DATE: 5 �z�Iro � - --- � � -- --- ___---_ ___- CQMPANY BILLING iNFO: Onc +�c11 �hg}r�};a,,� aaa,e�s c, xa : NAME:J i�''� ��se� .� 5�-�5-S5� �7 ��C S L°�c�'Z �„� �aA E�,� '�� � ���t- _.— ____.._�____. �..�_ _ _.�,�-_ _ ___ _ __.� _. __ SCOPE:�Cornplcte buiiding demoiition ❑Renovation/restoration ❑Sample per ciitnt's directioo ❑AHERA Protocol fotlowed-Minimum 3 sAmples,5 samples far se�rfacinb materiais t,000s.f.-S,OOOs.f.,?samples if>S,OOOs.i CONSTRUCTION ERA: — SAMPLE iB MATERIAL SAMPLED BUILDING/LOCATZON QUANTITY � jb3� 5- v-cn�• o �3 C -� �2A � w 1l � f _ � � � � 1 � . OV C ov�� -�to• C ��Y. os _�.r �6� � t � � gBoots ❑Seam tape�Duct cancealed in ceilings or concealed in wails to u per floor ❑Boiler insulatian Pipe insulation on radiant/domestic water ❑ F1ue Q Breeching Fement QpTransite siding�Trsnsiee roof � ACCESSSED:�Ctaw{space❑ Basement Q Aaic[}Roof ❑Checked under carpeting,iayered flooring,and overlsys � ❑Type of heating system(s)[� Steam,0 Forced air,[]Electric bastboard,� Radian:stove PACM AR6A(s) INACCESSiBLE INSTRUCTIONS: STOP ON FIRST SITiV TCRI�AROU':Yll: 2� �'Y SAMPLES COT.LECTED BY: DATE: TIME: SAMPLES RECEiVEU BY��,,_ _ DATE: _S � �i'IME: MAY-25-2010 1�:�9P FR�I:STROM ENV. iC303)�i87-4534 T0:18666994121 P.1'10 . Strom Environmental, Inc. Environmerrtal Testin Services 6925 N. Broadway, Demer,CO. 80221 Phone(303 j48�-4533 Fax(303)487-4534 BULK ASBESTOS SAMPLE ANALYSIS REPORT NIST/IYVLAP LAB#200450-0 CLIENT: BOULDER ENVIRONMENTAL,1NC. SEI PROJECT#: OSl(I-61 S DEER TRAIL ROAD UATE OF RECEIPT: 45-24-10 BUt1LDER,CO 80302 DATE OF ANALYSIS: OS-25-10 CLIENT PROJECT#: SAMPLED BY; CC.IENT PROJECT NAM�: 520 LIONSHEAD CIR.,VAIL,CO PAGE#: 1 OF 1 ABBREVIATIONS: SAMPI.E TYPF ASRESTOS TYPE MATEAIAL'j'1� VT-Yinyl F'toor Tile CHRYS-Chrysotile CELL-Celiulose F'S-Floor Sheatin� A1NOS-Amosite FG-Fibrous Class AC-Acnusticai Sproy.pn CROC-Crocidolite AGC-A�pn;�tle CT-Csiling Tile TREM-Tremoilte lYF-Non Fibroua DJM-Qrywall 3oint Mud AN"i'H-Aalbophyllite BIN-Binder WP-Wall Plaster NAD-No Aebestos Qetected SYN-Syothetic GRA�'-GraAUler Tt2ACE-<i•h Asbestos HH-Horse Hair CL1EfYT N SEt LAB k SAMPGE QF..SCRIPTION N�A$QESTOS OTIiER MATERIAI.S Srcaple bwo�eaeous qaditior� 5-23-CM-(11A 103619 DRYWALUUJM•N1HITE,GRAN NAD 25'.GCFLI.+AGC; GOOD 1Y0 5-24-Ch1-02A 10382Q DRYWALLJi)JM-PIPiK,GRAiV TKACE(UJM) f209GCELL+AGG C,OOD 1U <1°/.7'OTAL ASBEST(3S 5-24-Cbi-03A 103821 DRYWALLJDJM-WNITE,GRAN NAD 25°hCELLrAGG GO(7D VO �2�-C11t-048 103822 DRYWALUDJM-WHITE,CRAN 7'RACE(DJMj +2py.CEL.L+pGG GOOA NO �lyf.T(yTAL ASBEST0.S 5-21-CM-0SB 163823 DRYWALUDJ�t-WHITE�GRAN TRACEIDJM) +38•hCELIrtAGG GOOD NO <r•a�•ornL aseesros 5-24-CM-068 103824 DRYIYALLIAJM-WNITE,GRAN 't RACE(DJM) +ZI1•hCELL�AGG C04D NO <i°/.TOTAL AS$ESTOS 'NETHOD: Pola�iud Light Microscopy,EPA Metbod 60Q/R-93/il6 DETECI'ION LIMIT: i'/.Asbestos AIYALYST: Lars Mslmstrom Aut6orized Sigqature: Lars MalmstromlL �rector -TW npon peryiei�ay q Mo Itas wted. Tbb n�t m�Y wl 6e rtprodueed e=eePt i�full wf1A permWk�of SEI. Twls r►poM caunot�uud by thc cliest to cMim pndud u�p�emaat�NY[.AP w uy�=ency of 1!c U.S.Gmernweet floor 7'ile aarnplu may yidd"Frba ne��rive"(<i h}rsbutw dne b thc stu ot ubam�66en. DeAwUire mule c�n bs ubisiued hy TEN w S£M►wlyas. S£[ncoa.wead�roanaly�N by paiqt couiytor morc�ttunte awatitkaHoa}ar T�M Aa��ytii(�or taf��nced datectbe)fa'a�steriab ro�nlated 6y BPA N$SHAPS ud annlnie'las ibsn ten ptrctet{c10'.L}a�bafos by Polsriied 4iQht(PLM). BotE�ervlca are tvttlabSe for�n�ddttia�at fre. MAY-26-2010 09:33A FR.QM:STROM ENU, 1C3Q3)�8?-4534 T0:18666994121 P.3�4 . Strom Environmental, Inc. EnvironmentalTestin�Services ` 692g N. Broadway,Denver,CO.80221 Phone(3U3)487-4533 Fax(303}487-d534 ' ASBF,STOS POYNT COUNT ANALYSIS REPURT N[ST/IYVLAP LAB q200450 CLIEIVT: BOULAER�NVIRONMENTAL, [NG SEI PROJECT�: OS10-61 S DEGR TRA[L ROAD DATE OF ItECEIPT: OS-24-10 BOULDER.CO 80302 DATE OF ANALYSIS: 85-26-10 CLIENT PR�.IECT#: SAMPLE TAKEN BY: CLIENT PROJECT NAME: S2Q LtONSHEAD CIR.,VA1L,CO PACE# i OF 1 CLIENT# SEI LAB# SAMPLE UESCRIPTION %ASBESTOS 5-24-MC-02A 103820 DRYWALLJOINT MUD O.SO%TOTAL ASBESTOS 5-24-MC-04B 1038Z2 DRY'WALL J01NT t�tUD 0.25%TOTAL A5E3ESTOS _..__� ___ ___ --- _ --- .._----__--- — 5-24-MC-OSB 103823 ARYWALL JOIN'T MUD 0.25°/.TOTAL ASBESTOS 5-24-MGU6B 1U3824 llRYWALL JOIN'I'MUll O.SO%TOTAL AS$ESTOS METNOD: PolAriud Ligbt Microecopy,EPA,'Nethod 600lR-93/l l6(dWpt.) DE7'ECTION LIMtT: 0.25%Asbestos ANALYST: [.ars Malm9trom / Authorized Signature: Lars Malmsirom/La rector •7'big report pvtrim only tn Ihe item�tested. Thi�rtpart m�y not be reprodactd exeept in fufl wiiL pvmis�ion of 3Et. Thb report unaot be uscd by tMe eHent to cirim product endo�scmcnt by NVI.AP or any�Qeney oC tht U.S.Covernment. Fioor Tile aamples�uy yield"FAbe Neeative"(<I°ti)aebeitoi due !o Iht aize otasbestw libers. DetSn[tfve resalb ca�be obuintd by"1'EM or SEM an�lycls. Page 1 of 1 � � , • � � � � � , Boulder Environmental Management, Inc. 5 Deer'Trail Road Boulder,CO 80302 � Phone:(303)449-1175 Fax: I ($b6)699-4121 �: A�a� 26, 2010 One Call Construction Mr. 1im Fugctt jFu��tt�c�comcast.net �� � RE: Bulk sampling nf suspected asbestos-containing materials �� Lionshead Center, S20 Lionshead Circle, Unit 201, Vail,Colorado � Dear Mr. Fuggct: Attached i� the report for the asbesros survey and bulk 5ampling�f suspectet� asbestos- containing building materials at Lionshead Center, 520 Lionshead Circle, Unit 201, Vail, Colorado. This invesCigatic�n was conducted on behalf of and for the exclusive us�of One Call Construction (client}, sc�lel}� for use in a limited asbestas survey of the praperty. This repart and the findings hereiil shall not, in whole or in part, be disseminated c�r conveyed to any ather party, nor used by any other party, in whole c�r in part, wiihout prior written s consent of Boulder Environmental Management. The results of this sunrey are limited to materials that w�re assessable and foreseeable. Additional materials may cxist behind hard surfaces. Personnel knowledgeable of asbestos containi��g materials should always oversee demolition activities. Demolition work should be halted and sampling performed by a state of Calorado licensed building inspeetor ifadditior�al materials, which are susp�:cted ofcontaining asbestos, are encountered. If yau have any questians regardin� the contents of this report, please c�� not hesitate to conta�t us. Sincerely, Chris Marc�n V� Project Manager � � � *Asbestos*Lead*Industrial Hygiene*Safetr�*Final Air Testing* � *Nealth and Safety Training* � I � � Boulder Environmental Management, Inc. 2 5 Dccr Trail Koad Bauldcr,CC180302 Phc�nc: {303)449-117$ Fax: ( (86(i)699-4121 BULK SAMPLING REP�RT Lionshead Center, 520 Lionshead Circle, Unit 201, Vail,Golorado Introduction: On May 24, 2010, Soulder Enviconmental Management, Inc.'s builc�ing inspector,Chris hlaron, conducted bulk samnJin of suti�ecteci asbestos-containin�materialS under the direction of our client. Sampling: During the sampling pracess, suspect AGM was separated into three EPA c�tegories. 1'hese categories are thermal system insulation (TSI), surfacing ACM, and miscellaneous ACM. TSI includes all materials used to prev�nt heat lass or gain or�vater condensation on mechanical systems. Examples af TSI are pi�e coverings, boiler insulation, duct w�rap, and mud packed fitting cement. Surfacing ACM includes all ACM that is sprayed, troweUed, �r otherwise ap�lied to a surface. These applications are mast commonly used in fireproofing, decorative and acc�ustical applications. Misce(laneous materials include all ACM nr�t listed in thc thcrmal system insulation or surfacing categories, such as linoleum, vinyl asbestos fl�oring, and eeiling tile. Boulder Environmental Management, Inc. followed EPA recommended sampling guidelines for identificatior� of asbestos in bulk matrices. A set ofthree (3), five(5), or seven (7) samples were collected f�r each material type and analyzed by Polarized Light Mieroscopy(PLM). Each sample set was systematically analyzed. Upon determination that a sample in a set contained asbestos, analysis of the remaining sarnples in the set was discontinued. If no asbestos was detecteci during the analyses, the sus�ect material was determined to be negati�•e for asbestos contcnt. VI � � *Asbestos*Lead*Iadus#rial H��giene*Safety*Final Air Testing* Z *Health and 5afety Training* Z m 0 Boulder Environmental Management, Inc. ; 5 Dccr Trai► Road Bouldcr,CU 80302 f'honc: (363j�49-!175 Eax: 1 (866)69�3-4121 Results: The following materials werc analyzed and determined ta be trace asbestos-ct�ntaining utiiizing polarizeci light microseo�y (PLM). TRACE ASBESTUS-CONTAINING MATERIALS MATERIAL , L�CATION SAMPLE ID Drywall and joint i Bedroom eloset 5-24-CM-O 1 A campound i Bedroom r:ast wall 5-24-CM-02A** I Stt�ra e closet at entr S wall 5-2�-CM-03A Drywall and joint � Outdoor�atio ceiling 5-24-CM-04B** eompound j Outdoor patio cei(ing 5-24-CM-(��B** ` Outdoor atio ceilin 5-24CM-06B** **Sample was further analyzed by point count methad. The analysis deterniined that the material cantained t% asbestos ar less. The En��ironme�ital Protection Agency and the state of Colorada Department of Public Health and Environment do not regulate materials that have an overall asbestos cantent of i% or less. However, Occupational Safety and Health Administration re�ulati�ns apply to workers handlin� the mater�ial. Discussion: Sample analyses results are reported in percentages of asbestos and non-asbestos eomponents. The �,PA defines any material that contains greater thart one percent (1°10) asbestos, utilizing PLM, as bcing an asbestos containing material. Materials that are identified as "none detected"are specific;d as nat containing asbestos. Conciusion: The following drywall and joint compound systems contained 1% asbestos or less: • Drywall and joint compound throughout the interior of the suite 2Q1 • Drywall and joint compound the outdnor patio ceiling associated with suite 201 The demolition of materials that contain 1% asbestos or less require OSHA handling guidelines be followed. I-iowever, a state ticensed asbestos abatement eontractar is not rcquired to perform such work. It is recommended that a licensed asbestos abatement contractor be retained for this demolition to comply with OSF��A requirements regarding the demolition of asbestos iontaining matcrials that contain less than 1% asbestos. The OSHA regulation 2�)CFR 1926.1 IO1(g)(1)(ii) and (iii), as well as record-keepin� � requirements unc�er 29 CFR 192fi.1 101(n) that are associated with the negative exposure � assessment, apply so long as neither asbestos permissible exposure limit (PEL) is � exceeded or might be exceeded. *Asbestos*Lead*Industrial Hy� iene""Safetv*Finat Air Testin * Z *Health and Safet��Training• g � m 0 Boulder Environmental Management, Inc. � � Deer Trail Road Bc>uldc�,CO 80302 � Phone:(303)449-1 175 Fax: i (8C�6)69�-4121 � 29 CFR 1926.1101(g�(1)(ii) requires: : "Wet mcChods, or wetting agents, to coi�tral employee exposures during asbestos � handling, mixing, removai, eutting, application, and cleanup, except where employers demonstrate that the use of wet methods is infeasible due to for exampie, the creation af etectrical hazards, equipment malfunction, and, in roofing, except as provide in para,�raph ' (g)(S)(ii) of this section;" � and 29 CF�R 1926.1101(�)(l)(iii) requires: "Prompt clean-u�and ciisposal af wastes and debris co��Caminated with asbestos in leak- tight containers except in roofing aperations, where the procedures sp�cifiec� in paragraph (g�($)(ii)of this section ap�ly.'" The resu(ts of this sun�ey�crtain anly to materials tested. The laboratc�ry reports supporting these findings above are attachc;d. Please contact Boulder Environmental Management, lnc. with any questions or concerns regarding this report. � Sincerely, Chris ar Project Manager V/ `♦ � *Asbestos*Lead*Industrial Hy�Iene*Safety*Final Alr Testing* � *Nealth and Safety� Training* . � � v . �� � . � °_I � �. � � � �_ � .� �._:� � l��°� lry��.� '�����'.i`9 � � ��4 �..' �i s��r' � �,.'.i �. ,: . # � � �_�� "a< . � � , . �. ��., .. . . , . ;L � �, . .. . _ ._, i t f }.` . - � It3"1� �����`��zi � t.'!�#i�lC:l!Et�i! �8+. ?ta"� � „� _ ���„ . . ..t; . �� �� °� ' . _ � . � __ , � x.. � � � �� � �i: _. � . �t��,��c����4����'�1����:��;���t�c�r��� �'I������c��•``.� z����<���_ �f��� ��. ��� � f�.���ise�. =��a= ` ..` .���1�; . V� \/ � � � m v �_ _ _ � �, � . � . - � _ . � P B , . t� . . . `? . � . ik � � ��. e . . . � . . 5, . � i ?� * .� G� � 1�� � e � � �r b � y � + �h V� �' 'il � � n ' � �" w� 0 q' 1 . � t, a � 1 ` `i ..R... �t i x . "..:.. x � S:.a. � " y�_ . .� x . a . � . k� .. -_e � .... � .�._�...� . ._. .. . , v ... .e�.a.... _.. �...__ ` �� t�7 � �� �� _� ���z �� �"# � �°� �:� I..FF',Tlf'I�� TM;�T ����� ����� - . i . . ..., .. r _ ' � •� ��'A ����rc;vec! AN��t� Aitrtt��l i�;et�c3:�t�tkr ��c���r��� ';.� ' J � ; $ ' �" ���� � . ,���. � . IN�PECTC�i�?M_Ah1AGENIENT_PL.ANNER w. , �, �: ,, _ _ __. ; � �-' `3 'a ., � � t't�°��C�'t .f . i4€,`�. , �'<���a,l ,'z.`: ;���� �� ',:t!,_ >�k:�,i.i� ���r � �� , ,_ _ s. ` ; �- . ., , � ��.�`l aS'lr� ��>�.�� t�q� t�''a�� L.�`if_ %+.�� €�f . �.tit��1 �. ;� r?l_(��M11;��..i."'. �`.i� � � �[ � �. r � � �.�' c��' s r .t� � �{'� . � � `q=, €K� .T'v; t F j i�} � . .. ' .. , c' � �'. � F { s F t ` ��� �: � ti(� f i`r t �3i 3 �P3�Y �#' ...... . � . . i. £'� . . I � . � � . 1 �� . ' a.... .x...... � �'����'�� 1r �°3'- �:,�°_-� 1_� � K. Jay C�a1� prc�sF�ient � '�. °�,. a ��. �� � ` �„ a+'�,r ������; , , � ��� � � °��� �� ��� � � �k° � �,�� � �. �d[��I�¢' � *��,°� � p�.� �Y.. ..-�. � �.. �" 4�L• � ( :Y'Ei S 4 :'#$Y` +� t^ap "°� ,"Y:q� � �' .: � �'..�.. J ,u Y`..J °� � F"� ] ]� `Y �" . k 2v° ,R, 'p�F �p. `h '� °s.. �. ,.� �� fiA f P�Y 9 , p 'y. ��h P; ,� Y°.'l � P #� +''�' I ^�{,,g, �'..�{t w�`. �,...��"'�` R �,µ`;�(� �}t 'T� •,�::k . � � P� � �`��� �;�..s..N1y.�'"�.+.� .���i "w@F� � ''1��.�'4 °� y,..�'''` `'''..i�aa�i��� �°a��"�� at+a.�Yi��`� .`e.�,a,`y}n �#'X+�iw���.�j�:.w� ,�* '�+ t�d�.1� ��.'y,a�w.�,,* +�`��A�''��"�.,. `r��r"a ��� � �.'�w"�^°� '�,w���'�R�,.r�,.� k �;'�,�.'t ��`"' �r;'�� � r�f�',�b <�i#�.��H���, ��, � # ^,,. Te�. y�' � 5�''�`: ,(j�t�,'yti�_�,a.,+" "�,.^*..t'"�*� ,.��� ��. :>r . ` '�`. x . R� �'. � , n� ,..� .�` _a' � ,�'� �,'�.,,„;� �` . � .� ..� � s � ,,k,� - .�. � .,� �� � ��� � �,�' � "' ° ° r �'� :�.�-�` ,�,�� .� C7�NtV��� s ' � � k � • f MAY-cy5-2010 12:2�' FROM:STROM EI�J. 1t303)487-4534 T0:1�6699q12� P.2�10 � Bouider EnvironmenEal Management, lnc., � S Detr Trail Road,Boulder,CO 80302,Phone�(303)449-1 I�S, Fax: I (866)699-412 I.Email:Cmaron3000(�aol.com � 1 J I BULK S LE LOG �, � J � � G ! �L;ons�.eo� CG,v" 1 i.ocATioN: 2o L � C� � ,�� � __���� _�f --- .c«y UQ�� DATE: � IZ4�10 --- _--__ __. COMPANY BILLING INFO: Onc �c�1 (�hg}r�,�,};a,,� t. � A� �, � . �' � � NA1VIEg 0°1�s� t�oa�k ..� S�'�S-JrS� ? � .� j ,n � ��-.L--.� ._.__ —�,__..__ e" __—_--- Emaii TJ � hR�' _ j SCOPE:�Compleu building demolition ❑ Renovation/restoration ❑Sampte per c{iant's direction ; ❑AHERA Protocol foltowed-Minimum 3 sampies,5 sampies for surfaci�g materiais I,OOOs.f.-5,46as.f.,�samples if>S,OOOs.f � CONSTRUCTION�RA: SAMPLE ID MATERIAL SAMPLED BUILDING/LOCATiON QUANTITY . ` � J63� ` �- u-cn�• o -�C � : _ � o2A � �., I t � � _ � � � y , 1 . � v C- ov�o��r �-ia c `;n , _ ; w ,�_.. � 05 _; 0'6� � . # � � � � � � � � ; ___---_ ; � f � ggoots []Seam tape 0 Duct conceated in ceilings or concealed in walls�o u,pper floor ❑Boiler insulation � Pipe insutation a�radiant/domestic water ❑ FI�Q Breeching pemenc [)Transice aiding�Transite roof= � � ACCE.SSSED:�Craw{space Q Basement�Attie Q Roof ❑C:hecked under carpetiny„layered floosing,and overlays � ❑Typ�of heatin�rystem(s)[)Steam.�Forced air,[]Electric bascboard,�Radiant stove � PACM AREA(s)INACCFSSIBLE � � � f � � INSTRUCTIONS:STOPON FIRST StT1V TL`R1�AROUND: ZK � � � $AMPLES COLLECTED BY: DATE: TIME: � � € SAMpLES RECEIVEU BY: ___ DATE: S � aTiME: � � � �: � � V � 4 � � � � � MAY-c�5-2010 12:29P FROM:STROM ENV. 1C303)487-4534 T0:1�666994121 P.1�10 � Strom Environmental, TIIC. Environntental Testin Services 6 N. roadway, nver, . 221 Phone(303}487-4533 Fax(303)487-4534 E BULK ASBESTOS SAMPLE ANALYSIS REPORT � N15T/IYVLAP LAB�1200450-0 > C1.1EN7': BOULOER�NVIAONMENTAL,INC. SEI PROJECT#: OSt(1-61 S DEER TItAIL ROAD DATE UF RECEIPT: OS-2410 BOULDER,CO 8030Z DATE OF ANALYS(S: OS-2S-10 CLIENT PROJECT#: SAMPLED BY: CLtENT � PRO.lEGT NAME: S20 LIONSHEAD CtR,VAIL,CO PAGE#: 1 OF 1 � ABBREVIATIONS: �AMPLE TYPE ASBESTOS TYPE MATESIA�� � VT-Vlayi Fioor Tite CHRYS-Chrywtile CCI,L-CeUulose f F'S-Floor SqeetinB AMOSAmoslte FGFibroua Giias AC-Acnastie�l Cprqy-On CROC-Croc{dolite ACG-A�re=ats CT-Ceiling Tile TREM-Tremopte NF-Non Fibrou� DJM-Drywali Joint Mad ANTH-A�tbophyllite BIN-Hinder WP-W�11 Plaster NAD-No A:besw9 Dctected SYN-Syethckie GRAN-GraaaMr TRACE-�l•�6 AsbesMs HH-Horse Npi� ' CLIENT M 8E[I.A$M 3AMPLE DE3CRIPTiON '/.ASpES'TOS OTNER MATgRUts 9a�mpk �»os o dltioa S-2i-CM-81A lU3si9 DRYWALWPJM-WHfTE,GRAN NAD 25'hCF.LLtAGG GOOD lr0 5-24-CM-02A 103d20 DRYWALL/DJM•�INK,GRAN TRACE(WM) +20yr.CELL+AGC GdOD NU <i•k TOTAL ASBESTOS 5�14-CM�3A 103821 DRYWALIJDJM-WH?TE,GRAN NAD 25'�4CELLtAGC GOOD NO S2�-CM-OiB 103$�2 DRYWALIJDJM-WNiTE,GRAM TRACE(PJM) +�p•hCL�LGrAGG GOOD NO � <iS4 T(YfAI,ASBRST0.S � 3-24�CM-0SB 103823 DRYWALUDJM-WHITB,GRAN TRACE(DJM) +3M/.CgLL+AGG CdOD NO <{y�TOTAL A56EST03 5-24�C;M-068 1d3824 DRYWALUDJM-WH[TE,CRAN 7`RACE(DJM) +�(i�/.CLLL+ACG GOdD NO <i Y.TOTAL AS$ESTOS METHOD: Poloriud Irgfit Microscapy,EPA MttMod 600tR-43/116 pETECf10N�TMIT: 1•/.Asbestos ANALYST: Lsr�Malmatrom ' i � � a Authorized Si�natnre: } Lacs MAlmatrom rector � � � € �- k j � k � �. 'TY�f'{MN���'M MM(fMY ftlh17. TAi�t'l�IOft C1�y WI b6 KprlOYtfO titlM 111 full Mi1A permtwiw�/SEI. TUIs report u�oot bR med by du eliof to d�im pndret I � � der�h�NVl.A�or Mr��t+ey of 1�e U.S.Govcrnnen� F7ew'1'ik aspla may yfald"Rdsa Neptive"(<I X)uba�s dw ee tks du st uoa�o�tlbsra. De1f�u7re rwwa ue ss � � � aW�lwd Y�7'CM a BEAt wdri�. rC!nessaN*A��+�uai�Y�y pNer mot(tar mon�ecnnra pwatiliatlM)�r TI:M A�Myair(f�r c�aned ds�xtiM)tar m�leri�b ropL4e�M I�A NLSNAps�d poW�M�kp iLu tsr peraal(<IO?L)as0aw by Yol�rhed 4i�t(PLAt). Bot!iervlca are svailabk kr�e�ddflie�sl fte. � . � � � � � � � i � � -i . , . • � MAY-26-2010 09:33A FROM:STROM ENV. fC3033487-4534 T0:18666994121 P.3�4 � . Strom Environmental Inc. Environmentat Testin Services 6925 N.BrOAfIWAy,Denver,CO.80221 Phoae(303)487-4533 Fa�c(303)487-4534 � � ASBESTOS POINT COLTNT ANALYSZS REPORT � NIST/IYVLAP LAB N200ASQ CLIEtVT; BOULDER EIYVIRONMENTAL,INC. SEI FROJECT#s OS10-bl S DEER TRAIL ROAD DATE UF RECEIP'T: OS-24-10 BOULDER.CO 80302 DATE OF ANALYSIS: OS-26-10 ' CLIENT PR�.�ECTi�: SAMPLE TAKEiV BY: CLIENT � PROJECT NAME: S2D L[ONSHEAD C1R.,VA1L,CO PAGE�i 1 OF 1 ' CLiENT# SEI LAH# SAMPLE DESCRIPT(ON °/a ASBEST08 5-24-MC-02A �p3g2p DRYWALLJOINT MUD 4.50%TOTAL ASBESTOS i 5-24-MC-04B 103822 DRYWA4L JOINT MUD O.lS%'fOTAL ASBESTOS r 5•21•MC-0SB 103823�^- --� DRYIVALL JOINT MUD O.IS%'TOTAL ASBC�STOS 5-21-MC-06B 1U3824 DRYWALL JOtiVT MUU U.50°l•TOTAL ASBESTOS METNOD: PolArixed Li�bt Micro�copy,EPA;Nethod 600lR-43/116(400pt.j DL+'TECTION LIMIT: 0.25•/.Asbestos ANALYST: Lars MAtmatrom ; Authorized Si�nAture: Lars Mslmstrnm/Ls rector � 4 } # t � �� •71it repo�t pertaln�oniy to Ipt ltem�ttsted. Thi�report m�y not be reprodaccd excc{N in fup with periab�iuo of SEt. Thb report ueoot be u�M Ay tUe �R,,,� � cNeat to ciafn prodnct eadoreaaent by lYV1.AP or aay Kency of the U.S.Covernmen� Floor 7'fle:smples nay yietd"Faitc Nc@ative"(<I°1.)asbettor due g� � !o tbe she of ubatm Rben. Detinitive resMits esn br oDniatd by"PE�1 ar SEM�nriyais. �� E , !: Page 1 of 1 � � �./