Loading...
HomeMy WebLinkAboutDRB100367TOM r• =CW- 1,1N1ry DEVELOPMENT Design Review Board ACTION FORM Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel': 970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: GOLF COURSE TEE BOX #7 Project Description: REPLACE RETAINING WALLS Participants: OWNER TOWN OF VAIL 08/09/2010 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 APPLICANT VAIL RECREATION DISTRICT C/O SCOTT OCONNELL 700 S FRONTAGE RD E VAIL CO 81657 License: C000001431 Project Address: 1778 SUNBURST DR VAIL VAIL GOLF COURSE #7 TEE BOX DRB Number: DRB100367 08/09/2010 Phone: 970 - 477 -5264 Location: Legal Description: Lot: 3 Block: Subdivision: SUNBURST FILING 3 Parcel Number: 2101 - 091 - 0101 -2 Comments: Motion By: DUBOIS Second By: PLANTE Vote: 5 -0 -0 Conditions: BOARD /STAFF ACTION Action: APPROVED Date of Approval: 09/01/2010 Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and /or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS. Cond:202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Bill Gibson DRB Fee Paid: $0.00 Department,of.Community Development JL .75 South Frontage Road Vail, Colorado 81657 Tel: 970 - 479 -2128 Fax: 970-479-2452 . Web: www.vailgov.conl Application for Design Review Changes to Approved Plans General Information: This application is for all changes to approved plans prior to Cert ap- plication for Design Review cannot be accepted until all required information is received by the Community Development Department. Design review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Submittal Requirements: 1. Three (3) Copies of all pertinent approved plans with illustrated, labeled changes 2. Joint Property Owner Written Approval Letter, if applicable Fee: $20 Single Family Duplex Multi - Family V Commercial Description of the Request: to review changes to the proposal for the replacement of the retaining walls located at the # 7 tee complex on the Vail Golf Course Physical Address: The Vail Golf Club house is located at 1778 Vail Valley Drive ( #7 tee complex is on golf property) Parcel Number: Unplatted Property Owner: Mailing Address: Town of Vail 75 South Frontage Rd Vail CO 81657 Owner's Signature: Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.) Phone: (970) 479 -2138 Primary Contact/ Owner Representative: Scott F. O'Connell Mailing Address: 700 South Frontage Rd East Vail CO 81657 E -Mail: soconnell @vailrec.cm Phone: (970) 477 -5264 Fax: (970) 479 -2197 For Office Use Only: Cash CC: Visa / MC Last 4 CC # Auth # Check # Fee Paid: IJ ,w� Received From: Meeting Date: DRB No.: 0ijlC-) C)-;L Planner: ; C Project No: �L U191 Zoning: Land Use: Location of the Proposal: Lot: Block: Subdivision: 01- Jan -10 N" VAIL RECREATION D I S T R I C T To: Design Review Board From: Vail Recreation District Date: 08 /05/10 RE: Vail Golf Course #7 retaining wall construction project The Vail Recreation District (VRD), in conjunction with the Town of Vail (TOV) is currently working on plans to replace the existing retaining walls located on the # 7 Tee Box on the Vail Golf Course. Background: This project is a result of an engineering study conducted by Bourne Engineering firm from Westminster CO. This study was conducted at the request for the TOV to evaluate the Property conditions and provide and analysis for physical needs for the assets owned by the TOV and operated by the VRD. As a result of this study there were several areas with the District that were identified as "life safety" issues. The retaining walls on the 37 tee complex were specifically included in this "life safety" assessment. TOV then contracted Loris and Associates Inc. of Lafayette CO to draft conceptual plans for the #7 tee box retaining wall including options and pricing. The TOV and VRD agreed on a course of action and the VRD then contracted Loris to provide final design plans and engineering specifications. The VRD has also been working with other consultants to minimize the impact this project will have on surrounding area. Purpose: The purpose of this project is to replace the retaining walls identified as "life safety" issues located at the #7 tee box on the Vail Golf Course. Details: This project will involve excavating and removing the existing retaining walls and grading the tee box. We will be moving several utilizes. We will then install new walls, cart path and fencing. It is our goal to commence work on this project in the fall of 2010 with a 6 to 8 week construction period. Thank you for your time. Sincerely, .-- Scott F. O'Connell Building, Facility & Maintenance Manager Vail Recreation District (970) 477 -5264 soconnell @vailrec.com r, -roil WORK JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER This form is applicable to all Planning and Environmental Commission applicants that share ownership of the sub- ject property. For example, the subject property where construction is occurring is a duplex, condominium or multi- tenant building. This form shall be completed by the applicant's neighbor/ joint property owner. In the case of a multiple - family dwelling or multi- tenant building, the authority of the association shall complete this form and mail to: Community Development Department, 75 South Frontage Road, Vail, CO 81657 or fax to 970.479.2452. I, (print name erty located at as written approval of the plans dated a joint owner, or authority of the association, of prop- provide this letter which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the ad- dress noted above. I understand that the proposed improvements include: (Signature) (Date) Additionally, please check the statement below which is most applicable to you: E7 I understand that minor modifications may be made to the plans over the course of the review process to en- sure compliance with the Town's applicable codes and regulations. (Initial here) o I request that all modifications, minor or otherwise, which are made to the plans over the course of the re- view process, be brought to my attention by the applicant for additional approval before undergoing further re- view by the Town. (initial here) F: \cdev\ Forms\ Permits \Planning \PEC \PEC_CUP_010110 UTILITY APPROVAL & VERIFICATION TW This fare serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be subrrdtted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Developer to Provide Lot Address Information, �1 rz-' t L— 6 - Lot Address: t om" IS c—K Subdivision: CYO LOCr -rer} b Lot #: NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the utility's re pt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Unity locations must be obtained before digging in any public right -of -way or easement within the Town of Vail. A building Permit is not a Public Way Permit and must be obtained separately. 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). Developer's Signature F: lcdevlFORMS \PermitslPlanninglDRB \Utility Approval_08-28-07.doo Date Authorized Signature Comments Date QWEST 970.468.6860(tel) t L N. 7 970.468.0672(fax) CCli &1Ca Contacts: Sam Tooley 2'ty �v ivPrt 12 L (%Z,+�d✓S' �CY samud,togLel@qwest.com t XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros rj�hard.si5nerosftcelenergy.com HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) Contact: Diana Golis dcj9li52b2jycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kath n. XCELEN y EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee leeralerwsd.or COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: David Evans michael iohnson@pble.comcast.can NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the utility's re pt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Unity locations must be obtained before digging in any public right -of -way or easement within the Town of Vail. A building Permit is not a Public Way Permit and must be obtained separately. 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). Developer's Signature F: lcdevlFORMS \PermitslPlanninglDRB \Utility Approval_08-28-07.doo Date TWO UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements VAN not impact any existing or proposed Utility services, and ialso to verify service availability and location for new construction and dwUld be Used in conjunction with preparing Your utility p nand scheduling Installations. A site plan, Including grading plan, floor plan, and elevatlons, shall be with petted n the following t and for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS o the THE COMPANIES. If you are unable to obtain comments within Shat timefrarrre LM please contact The Town of Vag. Deve%Per tie Provfde tot AddressTrifivrmhWn: 1 Lot Address:_ Subdivision• contacts: Sam Tooley Mel ,too levcmaw cr.rnm XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros righard.slsncUa&ceIe2ff.qy,% HOLY CROSS ENERGY 970,947.5471(tel) 970.945.4081 (fax) Contact: Diana Golis 11aohs(&h!&ci-o5k, XCEL Energy- 970.262.4038 (fax) 970.262.4024 (� Contacts: Kit Bogert N EAGLE RIVER WATER A SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee 2asleg2erwsd.o COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: David Evans F05ftiLe [:9NQF-[td4-;5 4T tawr�oA 7 3. `&5hjc 6%0 -1,46 Tb NOTES- 4 L If the utility approval & verification form has signatures from each of the utility companies, and no comments are made dlr on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will preSL Me that there are no problems and the development can proceed. 2. If a utility Company has Concerns with the proposed construction, the utility representative shall note directly on the ul ility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to he Town of Vail. However, please keep in mind that It is the responsibility of the utility comparry and the applicant to res Ive identified problems. 3. These venlicatlons do not relieve the contractor of the responsibiNty to obtain a Public Way Permit from the Departmerill of Public Works at the Town of Vail. Utiliity UNRIVA ns must be obtained before ftialno in any public right -of- =way or easem t within the Town of vaii. A building permit is not a Public Wav Perntlt and must be obtained epFra . 4. The Developer Is required and agrees to submit any revised drawings to the utilities for re submitted plans are altered in any way after the authorized signature date (unless otherwise re-approval & re- ith'ritihe co if e area of this form), specificaQy noted within the comet nt Developer's Signature Date F: td evl FORMS1PermbXPranr ;ingloRBtUtitity Approves o6- 28- Q7 -doc UTILITY APPROVAL & VERIFICATION 1i)14N�'i!B1I, ' This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Developer to Provide Lot Address Information: Lot Address: Subdivision: Lot #: IRWIN NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed constriction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the Public Works at the Town of Vail. Utility locations must within the Town of Vail. A building permit is not a Publi to obtain a Public Way Permit from the Department of before digging in any public right -of -way or easement 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). Developer's Signature F: \cdev\FORMS\Pennits \Planning \DRB \Utility Approval _ 08- 28- 07.doc Date Authorized Signature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley amud&Qolevaqw m XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros ri h r. ro I n c m HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) \ Contact: Diana Golis li (ahol ro .M XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert K th .BO EN R Y-_ m EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact Fred Haslee fha fee .or COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: David Evans michael_johnson@cable.comcast.com IRWIN NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed constriction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the Public Works at the Town of Vail. Utility locations must within the Town of Vail. A building permit is not a Publi to obtain a Public Way Permit from the Department of before digging in any public right -of -way or easement 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). Developer's Signature F: \cdev\FORMS\Pennits \Planning \DRB \Utility Approval _ 08- 28- 07.doc Date Oct. 9. 2008 2:04PM NO. bl 12 r L O UTILITY APPROVAL & VERIFICATION iON This form serves to verify that the proposed improvements wig not impact any existing or proposed utility services, and also to verify service availability and location for new construcdon and should be used in conjunction with preparing your utillty plan and schedul" Installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. if you are unable to obtain comments w0in that timeframe please contact The Town of Vail. Developer to Provide tot Address JhMrm2t10n -' Lot Address- "Irl --Q /boy, Subdivision: YFl t L C o -i; 0-9.9 : Lot #: NOTES, 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Willy`s receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall tote directly on the utility veriflcatlon form that there is a problem which needs to be resolved. The Issue should then be detailed in an attached letter to the Town of Vall. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of VaA. Utility locations must be obtained before�llgglllg let any public right -of waY or easement within the Town of Vad. A buildinsr penin1t Is not a Public Way permit and must be obtained sgggratt:lY• 4, The Developer Is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification If the submitted plans are altered In any way after the authorized signature date (unless otherwise specifically noted within the Comment area of this form). Developer's Signature F: lcdevlFORMSttarmdrtptaArMODR81UtOKyAppioval 00- 28 -07 -4oc Date Aufhurized Signatrre Comments Pate QWM 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tootey XCEL HIGH PRESSURE GAS 970.262.4076 (tell) 970.468,1401 (fax) Contact: Rich Slsneros richard.sisneros ten HOLY CROSS ENERGY 970.947.5471 (Eel) 970.945.4081 (fax) Contact: Diana Gofis XCEL Energy 970.262.4038 (fax) ts�a /1m4�x� f iD�t 970.262.4024 (Eel) (► �� Contacts: Kit Bogert ,a � gam, f EAGLE RIVER WATER & SANITATION DISTRICi 970.476.7480 (let) 970.476.4089 (fax) Contact. Fred Haslee COMCAST GABLE 970.416.8248 (let) 970.949.9138 (fax) Contact: David Evans michael iohnson@Cable.comcast.com NOTES, 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Willy`s receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall tote directly on the utility veriflcatlon form that there is a problem which needs to be resolved. The Issue should then be detailed in an attached letter to the Town of Vall. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of VaA. Utility locations must be obtained before�llgglllg let any public right -of waY or easement within the Town of Vad. A buildinsr penin1t Is not a Public Way permit and must be obtained sgggratt:lY• 4, The Developer Is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification If the submitted plans are altered In any way after the authorized signature date (unless otherwise specifically noted within the Comment area of this form). Developer's Signature F: lcdevlFORMSttarmdrtptaArMODR81UtOKyAppioval 00- 28 -07 -4oc Date 0 UTILITY APPROVAL & VERIFICATION TOWN (I'VAR ) This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Developer to Provide Lot Address Information: ` / k� Lot Address: V L�%A G'A� C 0�,-r xc Subdivision: ,� U NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right -of -way or easement within the Town of Vail. A building permit is not a Public Way permit and must be obtained separately. 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). Developer's Signature F: \cdev\ FORMS \Permits \Planning \DRB \Utility Approval_08- 28- 07.doc Date Authorized Signature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley samuel.tooley@gwest.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisneros xcelenergy.co m HOLY CROSS ENERGY 970.947.5471 (tel) 970.945.4081 (fax) Contact: Diana Golis d olis hol cross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kathryn. Bo ert XCELENERGY.com EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 () 970.476.4089 (fax) Contact: Fred Haslee fhaslee @erwsd.org COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: David Evans michae[johnson@cable.comcast.com ,� U NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right -of -way or easement within the Town of Vail. A building permit is not a Public Way permit and must be obtained separately. 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). Developer's Signature F: \cdev\ FORMS \Permits \Planning \DRB \Utility Approval_08- 28- 07.doc Date 10107/2008 TUE 16:47 FAX 9709254106 CONCAST CABLE 16wvv.., yr I UTILITY APPROVAL & VERIFICATION ONNtE� 1�'iV This form serves to verify that the proposed improvements will not impact any e)6sbng or proposed utility services, and also to verify service availability and location for new catsbuction and strauld be used in conjunction with preparing your utility plan and scheduling instaNations. A site plan, including grading plan, floor Ilan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. if you are unable to obtain comments within that timeframe please contact The Town of Vail. Detrefoper to Provide tot Address Lrformatian: Lot Address..-4 7 T-nE 4>e14 Subdivision: = 7 y Aa NOTES: 1. If the unity approval & verification form has signatures from each of the utility compardess, and no comments are made directly on the form, or no action Is taken within 2 weeks of the Utilitys receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2 If a utility company has concerns with the proposed cons ructim, the utility representative shall note directly on the utility verification form that there Is a problem which needs to be resolved. The issue should then be detailed it an attached letter to the Torn of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public works at the Town of Val. Utility iocatloru must be obtained before diaaina In any public right- of-way or easement within the Town of Vail. A building permit is not a Public way permit and must be obtained seaarateIV, 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). Developer's Signature Date F: kdev lFORMSTermits'PlammngNDRBUUIdity Appmva1_o8- 28- 07.doc Authorized Signature Comments Date QWEST 97&468.6860(tel) 970.468.0672(faz) Contacts: Sam Tooley sa uel corn XCEL NIGH PRESSM GAS 970.262.4076 (td) 970.468.1403 (fax) Contact: Rich Slsneros 6chard.si;sj ostf.>}xcelener HOLY CROSS ENERGY 970.947.5471(tel) 970.945.4081 (fax) Contact: Diana Golis dwrlsoldymuffimm XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Ka.ttnTLRD-qey.t@XCELENERGY.com EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (lei) 970.476.4089 (fax) Contact: Fred Haslee -- CONCASI CABLE _.. .. 970.�105--- S Y!2 970.4S0-- W046- Contact; David Evans michael-johnson@cabl ecornc.astcam NOTES: 1. If the unity approval & verification form has signatures from each of the utility compardess, and no comments are made directly on the form, or no action Is taken within 2 weeks of the Utilitys receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2 If a utility company has concerns with the proposed cons ructim, the utility representative shall note directly on the utility verification form that there Is a problem which needs to be resolved. The issue should then be detailed it an attached letter to the Torn of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public works at the Town of Val. Utility iocatloru must be obtained before diaaina In any public right- of-way or easement within the Town of Vail. A building permit is not a Public way permit and must be obtained seaarateIV, 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). Developer's Signature Date F: kdev lFORMSTermits'PlammngNDRBUUIdity Appmva1_o8- 28- 07.doc (N LLI 0.4 U- C) Oco < LLJ O O by b0 L LLI ) 61 by z T U) LL C oor5 LIJ w > LLJ co 0 ui rX C) 0-4 OL Z 44 (D LL 0.) 7. = — od co CL kty fi lit O rj oj oj z C) Lli U U0 LLJ U- m im uj LU cc